Loading...
HomeMy WebLinkAbouttecp_061306TRAFFIC ENGINEERING COMMITTEE AGENDA UKIAH CIVIC CENTER Conference Room No. 3 300 Seminary Avenue Ukiah, California 95482 TUESDAY, JUNE 13, 2006 3:00 P.M. 1. CALL TO ORDER: Kageyama, Lohse, Baxter, Seanor, Turner, Taylor, and Whitaker 2. APPROVAL OF MINUTES: April 11, 2006 3. AUDIENCE COMMENTS ON NON -AGENDA ITEMS: The Traffic Engineering Committee welcomes input from the audience. In order for everyone to be heard, please limit your comments to three (3) minutes per person and not more than 10 minutes per subject. The Brown Act regulations do not allow action to be taken on non -agenda items. 4. OLD BUSINESS: a. Discussion and possible action regarding request for a crosswalk on Leslie Street at River Oak Charter School. (verbal report) b. Discussion and possible action regarding speeding traffic on Leslie Street. (verbal report) 5. NEW BUSINESS: a. Discussion and comment on City Traffic Circulation Study (copy of Power Point presentation attached). 6. COMMITTEE MEMBER REPORTS: a. Update on City Traffic Circulation Study (City Council meeting June 21, 2006) b. Update on City Parking Study (verbal report) c. Update on crosswalks (verbal report) 7. MISCELLANEOUS ITEMS: 8. ADJOURNMENT Please call JoAnne Campbell at 463-6755 if you are unable to attend the meeting. The City of Ukiah complies with ADA requirements and will attempt to reasonably accommodate individuals with disabilities upon request. TRAFFIC ENGINEERING COMMITTEE MINUTES TUESDAY, APRIL 11, 2006 UKIAH CIVIC CENTER Conference Room No. 3 300 Seminary Avenue Ukiah, California 95482 Members Present Others Present Steve Turner, Chair David Taxis, River Oak Charter School Ben Kageyama, Staff Bart Kaplan, River Oak Charter School Dan Baxter, MTA Robin Sunbeam, Parent, River Oak Charter School Rick Seanor, Staff Brenda Christian, Senior Center Jerry Whitaker, Staff Trent Taylor, UPD Chris White (sitting in for Dave Lohse) Members Absent Staff Present Dave Lohse, Staff JoAnne Campbell, Recording Secretary 1. 3:00:57 Pm CALL TO ORDER: Chairman Turner called the meeting to order at 3:00 pm. 2. 3:04:00 Pm APPROVAL OF MINUTES: January10,2006 ON A MOTION by Member Seanor, seconded by Member Whitaker, it was carried by an all AYE voice vote of the members present to approve the January 10, 2006, minutes as submitted. 3. AUDIENCE COMMENTS ON NON -AGENDA ITEMS: The Traffic Engineering Committee welcomes input from the audience. In order for everyone to be heard, please limit your comments to three (3) minutes per person and not more than 10 minutes per subject. The Brown Act regulations do not allow action to be taken on non -agenda items. No one from the audience came forward. 4. OLD BUSINESS: None. 5. NEW BUSINESS: a. 4:10: 19 Pm Discussion and possible action regarding request for STOP sign at West Perkins Street and Oak Street. Member Seanor submitted and presented report, which consisted of a letter from Fred and Joann Schneiter, the collision history at this intersection, and staff recommendations. Member Seanor recommends not taking action at this time. Upon completion of the Citywide Traffic Circulation Study Staff will reevaluate stop sign request at that time. ON A MOTION by Member Seanor, seconded by Member Whitaker, it was carried by an all AYE vote to not take action at this time and upon completion of the Citywide Traffic Circulation Study to reevaluate the request for STOP sign at West Perkins Street and Oak Street. Traffic Engineering Committee April 11, 2006 \\fs3\SHARED FILES\Public Works\Meetings\TEC\minutes 041106.doc Page 1 3 : 05: 05 PM Discussion and possible action regarding request for a crosswalk on Leslie Street at River Oak Charter School. Member Seanor submitted and presented report, which consisted of an email from David Taxis, Administrator of River Oak Charter School; excerpts from the Manual of Uniform Traffic Control Devices (MUTCD); the MUTCD 2003 California Supplement; the California Vehicle Code; and staff options/recommendations. Member Seanor reported on April 10, 2006, he witnessed the traffic flow when school was released; the congestion slowed traffic. The Senior Center parking lot is being used by parents for picking up students as well as the street. Member Whitaker submitted photos of the existing crosswalk. Audience Comments: 3 :11:20 Pm David Taxis, River Oak Charter School, is looking for creative solutions to make crossing safe. 3 :16: 18 PM Bart Kaplan, River Oak Charter School, stated a child was struck by a vehicle at the school. 3:16:26 PM Robin Sunbeam, mother of the boy who was struck by the vehicle, feels a bike lane and safe crossing are needed. 3: 19: 56 PM Brenda Christian, Senior Center, concerned about the safety of the elderly and wants to find solutions for making this area safer for everyone. 3 : 22 : 38 PM Member Turner asked David Taxis where the pedestrians are crossing. David Taxis replied crossing happens in the crosswalk and the street in front of the school -shortest route. 3 :32: 55 PM Member Turner asked if the school is willing to appoint a crossing guard to monitor a mid -block cross walk; David Taxis replied they are very willing to do that. Discussion ensued on moving the crosswalk, painting the curb red across from the school, various traffic controls, speed table, history, and traffic flows and patterns. Research to see if this will qualify for grant moneys. Member Turner suggests two cross walks but will only support it if a guardis supplied. 3:48:25 PM David Taxis stated the school is willing to help with the cost of traffic controls. 3: 52 : 28 PM More research needs to be done; this topic will be carried to the May 9, 2006, meeting. b. 3 :55:39 Pm Discussion and possible action regarding speeding traffic on Leslie Street. Member Seanor submitted and presented report, which consisted of a letter from Brenda Christian, Ukiah Senior Center; excerpt from the 2003 MUTCD and the MUTCD 2003 California Supplement regarding beacons; and staff recommendations. 3:57:28 PM Discussion ensued on the effectiveness of flashing beacons, rezoning the street so it will qualify for grant moneys, the layout of street and area, and the traffic flow the school has set up. 4 :10:15 PM More research needs to be done; this topic will be carried to the May 9, 2006, meeting. 6. COMMITTEE MEMBER REPORTS: a. 4:16:27 PM Update on City Traffic Circulation Study Member Seanor verbally reported the consultants will make a presentation and status report at the April 19, 2006, City Council meeting. Traffic Engineering Committee April 11, 2006 \\fs3\SHARED FILES\Public Works\Meetings\TEC\minutes 041106.doc Page 2 b. 4:16:56 Pm Update on City Parking Study Member Seanor verbally reported the Circulation Study needs to be completed before the consultants can proceed. C. 4:17:30 Pm Update on crosswalks Member Whitaker verbally reported the weather is too wet to install crosswalks. 7. MISCELLANEOUS ITEMS: 3:04:55 Pm Tim Eriksen, City Engineer and Director of Public Works, announced Candace Horsley, City Manager, has appointed Ben Kageyama, Civil Engineer, as her representative. Sue Goodrick is now removed from the Committee. 4:20:15 Pm Member Seanor reported two projects have been awarded to consultants at the April 51 2006, City Council meeting. One is speed zone study starting Thursday, April 13, 2006. The other study is an ADA access plan to review sidewalks and City parking facilities. The money is coming from MCOG. 8. 4:22:34 Pm ADJOURNMENT There being no further business, the meeting was adjourned at 4:22 p.m. Steve Turner, Chair JoAnne Campbell, Recording Secretary Traffic Engineering Committee April 11, 2006 \\fs3\SHARED FILES\Public Works\Meetings\TEC\minutes 041106.doc Page 3 CITYWIDE CIRCULATION STUDY Presented by: SJ1!IIjIt11,@r!N� _A OIA-zzu r!.uuuas Ukiah Citywide Circulation Study S�rfili3�rru��r�-� rr�: tAllAtt Jl Ill AAt1J a Ukiah onrn. \'^,III qq 1 s I _ F ww� � boa INTERSECTIONS CURRENTLY OPERATING AT UNACCEPTABLE Level Of Service (LOS) CONDITIONS (BASED ON YEAR 2004 VOLUMES) Intersection Control AM Peak Hour PM Peak Hour Delay 1 LOS Warrant Met? Delay Warrant LOS Met? State St / Brush St / Low Gap Rd Signal 29.9 C - 44.6 D - Perkins St / Orchard Ave Signal 34.8 C - 35.2 D - PerkinsSt/ U.S. 101 SB Ramps TWSC 1 38.3 E YES 482.1 F YES Perkins St / U.S. 101 NB Ramps 1 TWSC 281.8 F 1 YES 110.6 F YES Gobbi St/Main St AWSC 19 C no 46.7 E YES Gobbi St/ Waugh Ln TWSC i 18.2 C no 26.3 D 1 no Talmage Rd/Waugh Ln TWSC 16.1 C no 25 D no Talmage Rd/ Hastings Frontage Rd TWSC 1. 22.3 C,, 27.5 D no INTERSECTIONS """""' CURRENTLY OPERATING AT UNACCEPTABLE - -' Level Of Service Ukiah 1?_ •A l 2 Z o Am u o e w rc J �x r z dam e x w= s• �y., � r, x � a g d L y o Y � i TRIP GENERATION SUMMARY WITHIN CITY OF UKIAH = qm.h m ule mw.e rea, vom ma cu.rem reel 21 e n. =0fl l inp untie " KSF=1.000 s,-, leel 1, TRIP GENERATION SUMMARY WITHIN THE COUNTY (Outside the CITY OF UKIAH and within the Area Plan) Fvl[11n xozs tiny Atnv a Po ulvllon FAO KSF J.u. Telpv Ac—le Po olvllon FAR KSF du KSF/E.u. Ovll Trips Talvl Tolvl A Tolvl A A Tolvl 13,477 21,182 BIDS BeJEenOvl 1]66' 5339 41,950 14,266 603 9,954 4,615 72972 '1.", Camme[[ivl 464 025 S,OSE 96 88,729 544 80 025 5924.16 871.2 141,948 53,219 In6m1[I[1 880 0.25 9,58'.20 23,369 942 fit 025 10,25838 615.18 20859 3,510 OIBeI '1$'8 16,819 3Mp 3 -70 15,]05 -1.114 Tvtvly 46,245 170,921 44245 0 9,9s4 x51A84 80551 Cr—t. 41.13, timev // A-8raxth in the/ulurc Xar/rem IM1e cunenl3ver 25 KSf - I MIO rgmre feel i/ SM/ollowinl([nunlypry/'ecu ere nolim{uJeQIn IM1e above lvdle. .51n1On1[ShoppinBCemer ri.el l.nae+cone 1-1- RyAer Honx't PROPOSED COUNTY LAND USE CHANGES • Lovers Lane Property (1,800 SF Dwelling Units) north of Lovers Lane and south of Orr Springs Road • Masonite Shopping Center (750,000 square feet commercial east of North State Street in the northeast corner of US 101/North State Street Interchange • Ryder Homes (469 SF and 265 MF) east of the proposed Masonite Shopping Center PROPOSED COUNTY ROADWAY IMPROVEMENTS • Extension of Despina Lane further north up to Orr Springs Road • Extension of Bush Street further north of Lovers Lane to provide access to Lovers Lane property • Extension of Orr Springs Road further east of North State Street • Extension of Orchard Avenue further north up to Orr Springs Road • Extension of River Street that currently provides access to the hook-up ramps further north up to Orr Springs Road • Extension of Masonite Road further north up to Orr Springs Road 9 PROPOSED COUNTY ROADS CHANGES IN DAILY VOLUMES WITH COUNTY LAND USE CHANGES Yresinus Ilxlated '% increase 5 E s, , Z CHANGES IN DAILY VOLUMES WITH COUNTY LAND USE CHANGES Yresinus Ilxlated '% increase 5 ' � S LU Ln D Z 00� Q� U a 4 4 0Is,Is ,v 11 10. Is ss 1 r a Is $ o o w i 1 z � LU Ln D Z 00� Q� U a YEAR 2025 Inlnr,[(linn (mlmnl I,elu, 1[IS e1"?tl'. I,clpv I(Il ,Jul/ Sbl1a11/lnreIII/ lir glial 41; 1, INTERSECTIONS slam Xl/nan.n 9l n.�o GaP xe It j I... rulll,l 59.1 F', J1.Y a1.2 � OPERATING AT Cbu.A.....rna.er,a. T11( aoE JPa.9 Pcrkim Al/11—Fl,'CS(. ']9 I) \'I:\ '_2.1 UNACCEPTABLE^I°„1/6°^°X1 g°al 64.9 Perklna Xl/MxIn 51 ANJ (' iI,X ! Y4:9 5e 4 VI'A LOS CON DITIONSI k .XI,O llnnl°,� glml 43J 11.4 Petkins\I, 1(4. III1 SO Itimin I'll( 01 It 1' 1'N:1 PRIOR TO ANY PlIki its 51, 11.X. i 01, Biala 116(- 834.I J 1'Ir, { It, (I F1'umvIl I'll 261 11 YRC r 1 "111 " 2"1 < MITIGATIONS ;,;°�";,NJ,H t "u 21 ; Gubbl Xl lllun! It AN'S('. 571 P 1'F5 lo' G'obbl S, 11 I'll S I Signel 119 11 j 61A V Ca Wi 5U 11nin 51 10[(' X85 N AFl9 IJTil I' 111 I:aMi 51/1\NnI;M1 In l\\S(' I23 1 11S 2110.4 F .... O'Ift 511(),a—” In AlV1 164 1' \'F:1 Ill" (:ubbl It lk\. 101 Xtl lipinle 19"'9 124.1 V 111 5552 V ll':\ (:n Mei 51! U.I. 101111 ltamlw J1111' Il 14 4M1.2 1. YI':1 l'vl mn{i lie l f late 51 \if.nul 41,2 Il ffiX Il I'nbnage Ne/11'nnFM1 InE2JV I' 14ti 1X1,1 f 111 Ilemage Ne/ Alrlartl Park 111Wfihnel 65X f: _ 10[.] 1 [it le Jill, l'.tl. 111 YLL Mm@ TNS(( 23192 1 1'F;9 1919 I' V!ti Tnlnlvgc MJ, I LS. 1111 V Il Rngn J -1C 6099 V yYV 5],N p A'fS pilmapa AJ/ lh'titi lrmntaAe lie TNS(I 49.5 1 YFS 401 E YFS U'erM1iii,-Ne/Ilore Sl AIS](' 5L Y \'N;S Wral.nkx Am, Slmo Xl ,g"M 5X.5 N] t9.1 p ('mine rt, it, I Ai. Park 111WINII( 101' ! 1T5 151' 1 YYl YEAR 2025 INTERSECTIONS OPERATING AT UNACCEPTABLE -� LOS CONDITIONS Ukiah r E. O 0 ti NOUF DUZR � +d, X11 e4 O /P 1 pK�U w Zo— b. /Y,w hob a., 1 I • ��" 7 � �Gl �" 4 I g � .mn w. W -/- ... • M ?adn �jTx.:' • wnWo ss • • • v1^ I yq � w.aw %r ` = a � f � 3 � • s � d 5 ;♦ o� � J u r �a d z I z~J Q UO) u) O co z o z O f- N W �-- W O �~-+ Q U -J � � U Z � �.a.Q O U z0= I YEAR 2025 CONDITIONS ROADWAY LEVELS OF SERVICE I GP Hi M lhresllold 11.... hold for [, r Calncity N.. plAcaepable Acc,A. a S No Rovd(my Segment Configuration Lanev I,OS LOS k,Iv. c Daily 'I . i, prU'l) Vulomes HCM te�el oI Service I I'S 101-Stat,St10-1 Rd. I'r"4:�v 4 2.OW 74,()(M)2`,(") B US 101-'1 ahlnec Rd. oE. G+bi StP""'1, 4 27(W 740W 41000 B l [IS I01-CGobbiSt- to Whv Springs Rd. freeway 4 27,11tt1 74.1)W 4>00) C 4 IIS Illi - Vehv Springs Rd. w N. Smtc Sr krcc.mv 4 2706,1 74.0W 4?,000 C Lown, Uid- Dcspine Dr. to Bush St. Mniar('p k,,or 2 11,1rr9 135W 6,200 n 6 North State Street P. Perkins St. to Bmsb St Maipr(blleaor 4 27,0(F) 1_7.1)W 21,200 C Soutb Stmc Surct - L Perkins St. to (k)hbi St. M,I, ('ollccmr 4 2710) 27,0W 20.400 B 8 Perkins Strcct-N. Stare SttoIIS 101 SB Renes Major Collector 4 27,00) 22p(Xt 16,000 A 9 1pbbi Stmcl- S. Stam St.. IiS 101 SR Rantps M.I,,.('ollccmr 2 121W 1VD) 11100 C 10 "ralpmgc Road Alrpoet Rd. to US 101 SBRamps Mellor Collector 4 17,0K) 27.0(X) 19,800 B I I Bush Strcct -Perkins St. to I,, CIDP ltd- .Minor('ollettor 2 I21W 13,5W 6,100 A 12 DomSL PcrAins St. to US1,1 St. Minor('ollecmr 11, 1W 1J.SW 7,100 A Note that all of the roadway segments are projected to operate at acceptable LOS based on Highway Capacity Manual (HCM) LOS thresholds. YEAR 2025 CIRCULATION IMPROVEMENTS RECOMMENDED BY OMNI MEANS LTD. — L>A e UkiahfUl" .. e •� e I i J �/� �__ .. � •i Ili ��',• 7 d 4 M wAa W e ti VZ W Z�'' O y O UO 05, w O> QQ "gwo ,°' ��1 ego z0 a u� T.ITT, ITs0 IT 11 ED, i u�ry F ung xM'i s ■ 3 ai s 1 � ■ Ll F is81,•� � ' a tl J u s 1 A 1 s w g Y 2 a i x ol `s Z I— Ew V) Ln N � w �Q O I- w w ■ N�w�m�H Q�O� ~J wce CY0 37 U oC US 101 CORRIDOR INTERCHANGE STUDY IMPROVEMENTS • Intersections - E. Perkins St./SB Ramps Signal - E. Perkins St./NBB Ramps Signal - Restripe/add lane on Route 101 NB at N. State St. Merge - N. State St./NB Ramps Signal - N. State St./SB Ramps Signal Gobbi St./Orchard Ave. Signal - Gobbi St./SB Ramps Signal US 101 CORRIDOR INTERCHANGE STUDY IMPROVEMENTS - CONTD.. • Roadway Improvements — Lake Mendocino Drive — North State Street — East Perkins Street — East Gobbi Street —Talmage Road 0 ROUTE 101 & N. STATE STREET IMPROVEMENTS CONTD.. a ROUTE 101 & E. PERKINS STREET IMPROVEMENTS _ _ ' J < ,r r k ' r M1E l iI 12�Y WII} ., I r11 10 ROUTE 101 & E. PERKINS STREET S CONTD.._ IMPROVEMENT ^® ' ' • ' • 1 •Mai : ' t E � c 4L . q1 I l.�t [ �1 � a.• i YrP M.� �j�tf ' ' • t E � c 12 YEAR 2025 TRANSPORTATION IMPROVEMENTS 13 QUESTION AND ANSWER SESSION eaoiaru+.ruaae++ 14 City Of Ukiah NAME & COMPANY — please print Sign In Sheet Traffic Engineering Meeting June 13, 2006 3:00 p.m. 300 Seminary Avenue, Con. 3 ADDRESS JGL(� a L ce a� /C rte,-��-