HomeMy WebLinkAboutVero Fiber Networks, LLC 2025-09-23; Subcontractor Substitution 2026-09-30(AlCity of Ukiah MEMORANDUM To: File CC: Darcy Vaughn, City Attorney Myles Fisette, Purchasing Manager From: Tim Eriksen, Public Works Director Date: September 30, 2026 Re: UKIAH GIGABIT FIBER PROJECT DETERMINATION AND APPROVAL OF SUBCONTRACTOR SUBSTITUTION Prime Contractor: Vero Fiber Networks Listed Subcontractor: Martin Paving Scope of Work: Asphalt, concrete, fiber pull box installation, and related surface restoration The City of Ukiah makes the following determination regarding Vero Fiber Networks' request to substitute another subcontractor for Martin Paving for restoration work associated with the Ukiah Gigabit Fiber Project. Background and Findings 1. Martin Paving was identified as a subcontractor for the Ukiah Gigabit Fiber Project for work that includes asphalt and related surface restoration. 2. Vero Fiber Networks, the prime contractor, notified the City that Martin Paving is not available to perform the required restoration work and requested authorization to utilize an alternate subcontractor so that the work can be completed without further delay. 3. Pursuant to California Public Contract Code Section 4107, the City provided Martin Paving written notice of Vero Fiber Networks' request to substitute an alternate subcontractor and the basis for the requested substitution. The notice was transmitted by certified mail on September 17, 2026, with delivery documented on September 22, 2026. 4. Martin Paving was provided with the statutory five -working -day period to submit written objections to the proposed substitution. 5. The five -working -day objection period expired on September 29, 2026. As of the expiration of that period, the City received no written objection from Martin Paving. Pursuant to Public Contract Code Section 4107, failure to submit a written objection within the prescribed period constitutes the listed subcontractor's consent to the substitution. 6. Based upon Vero Fiber Networks' representation that Martin Paving will not be available to perform the required restoration work, confirmation via email, dated 9/19/2026 from Phil Palmquist of Martin Paving confirming that they are not available, the absence of any objection from Martin Paving within the statutory period, and the need to complete the required restoration work, the City finds that substitution of the listed subcontractor is appropriate under Public Contract Code Section 4107. Determination and Approval Based on the foregoing, the City of Ukiah determines that the requirements applicable to the requested subcontractor substitution have been satisfied and consents to Vero Fiber Networks' substitution of Martin Paving for the subject restoration work. Vero Fiber Networks is authorized to retain an alternate subcontractor to perform this work, subject to the replacement subcontractor meeting all applicable requirements of the Contract Documents and federal, state, and local law, including applicable contractor licensing, Department of Industrial Relations registration, prevailingwage, insurance, bonding, and other public works requirements. This determination authorizes the substitution of Martin Pavingforthe identified scope of work. It does not relieve Vero Fib r N orks, as prime contractor, of responsibility for performance of the work or complipnce Vero Fib t rms and requirements of its contract with the City. A— V,�_V PPROV Tim riksen Public Works Director City of Ukiah Saa Sangi omo City Manager City of Ukiah Date: /� 06 Date: .; 3,C-). - aC _ 2