HomeMy WebLinkAboutLarry Walker Associates 2025-10-144905-3284-5672.2 014737.001 1
UVBGSA AGREEMENT NO. 2 6-05
UKIAH VALLEY BASIN GROUNDWATER SUSTAINABILITY AGENCY
PROFESSIONAL SERVICES AGREEMENT WITH LARRY WALKER ASSOCIATES, IN
THE AMOUNT OF $1,215,105 FOR INTERCONNECTED SURFACE WATER
MONITORING SERVICES
This Agreement is by and between the UKIAH VALLEY BASIN GROUNDWATER
SUSTAINABILITY AGENCY, hereinafter referred to as “UVBGSA”, and Larry Walker
Associates, hereinafter referred to as the “CONSULTANT”.
WITNESSETH
WHEREAS, pursuant to Article 5 Section 5.2.7 of the Joint Powers Agreement Forming
the Ukiah Valley Basin Groundwater Sustainability Agency, UVBGSA shall have the
power to make and enter into contracts necessary to the full exercise of the Agency’s
power; and
WHEREAS, in order to meet the various requirements of a groundwater sustainability
agency under the Sustainable Groundwater Management Act (Part 2.74 of the
California Water Code), UVBGSA is in need of interconnected surface water monitoring
services related to the implementation of the Ukiah Valley Basin Groundwater
Sustainability Plan; and
WHEREAS, pursuant to Revenue and Taxation Code Section 34019(f)(2) and Fish and
Game Code Section 1501.5(b), the California Department of Fish and Wildlife (“CDFW”) is
authorized to make a grant award to UVBGSA for projects that characterize surface and
groundwater interconnection and groundwater-dependent ecosystems that support
Chinook salmon and steelhead in the Upper Russian River and adjacent watersheds; and
WHEREAS, on January 30, 2025, UVBGSA executed a grant agreement with CDFW in
the amount of $1,359,500 to support the UVBGSA’s Upper Russian River Groundwater
Dependent Ecosystem and Interconnected Surface Water Study (Grant Agreement No.
Q2496105) (“Grant Award Project”), of which UVBGSA designated $1,215,105 for
CONSULTANT’s implementation of the Grant Award Project, and the remainder for
UVBGSA’s administration costs for implementing the Grant Award Project; and
WHEREAS, this agreement is being awarded to CONSULTANT as the result of
UVBGSA’s competitive bidding process, wherein UVBGSA reviewed CONSULTANT’s
Statement of Qualifications and Bid Proposal and identified CONSULTANT as the lowest
responsible bidder; and
WHEREAS, CONSULTANT is uniquely and effectively qualified to evaluate groundwater-
dependent ecosystems and interconnected surface water dynamics in the Upper Russian
River watershed and the Ukiah Valley Basin; and
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
4905-3284-5672.2 014737.001 2
WHEREAS, CONSULTANT is willing to provide such services on the terms and
conditions set forth in this AGREEMENT and is willing to provide same to UVBGSA.
NOW, THEREFORE it is agreed that UVBGSA does hereby retain CONSULTANT to
provide the services described in Exhibit “A”, and CONSULTANT accepts such
engagement, on the General Terms and Conditions hereinafter specified in this
Agreement, the Additional Provisions attached hereto, and the following described
exhibits, all of which are incorporated into this Agreement by this reference:
Exhibit A Definition of Services
Exhibit B Payment Terms
Exhibit C Insurance Requirements
Exhibit D ePayables Information
The term of this Agreement shall be from the date this Agreement becomes fully
executed by all parties (the “Effective Date”) and shall continue through March 1, 2028.
The compensation payable to CONSULTANT hereunder shall not exceed one million,
two hundred fifteen thousand, one hundred five dollars ($1,215,105) for the term of this
Agreement.
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
4905-3284-5672.2 014737.001 3
GENERAL TERMS AND CONDITIONS
1.INDEPENDENT CONTRACTOR: No relationship of employer and employee is
created by this Agreement; it being understood and agreed that CONSULTANT is
an Independent Contractor. CONSULTANT is not the agent or employee of the
UVBGSA in any capacity whatsoever, and UVBGSA shall not be liable for any acts
or omissions by CONSULTANT nor for any obligations or liabilities incurred by
CONSULTANT.
CONSULTANT shall have no claim under this Agreement or otherwise, for
seniority, vacation time, vacation pay, sick leave, personal time off, overtime, health
insurance medical care, hospital care, retirement benefits, social security, disability,
Workers’ Compensation, or unemployment insurance benefits, civil service
protection, or employee benefits of any kind.
CONSULTANT shall be solely liable for and obligated to pay directly all applicable
payroll taxes (including federal and state income taxes) or contributions for
unemployment insurance or old age pensions or annuities which are imposed by
any governmental entity in connection with the labor used or which are measured
by wages, salaries or other remuneration paid to its officers, agents or employees
and agrees to indemnify and hold UVBGSA harmless from any and all liability
which UVBGSA may incur because of CONSULTANT’s failure to pay such
amounts.
In carrying out the work contemplated herein, CONSULTANT shall comply with all
applicable federal and state workers’ compensation and liability laws and
regulations with respect to the officers, agents and/or employees conducting and
participating in the work; and agrees that such officers, agents, and/or employees
will be considered as Independent Contractors and shall not be treated or
considered in any way as officers, agents and/or employees of UVBGSA.
CONSULTANT does, by this Agreement, agree to perform their said work and
functions at all times in strict accordance with all applicable federal, state and
County laws, including but not limited to prevailing wage laws, ordinances,
regulations, titles, departmental procedures and currently approved methods and
practices in their field and that the sole interest of UVBGSA is to ensure that said
service shall be performed and rendered in a competent, efficient, timely and
satisfactory manner and in accordance with the standards required by the
UVBGSA.
Notwithstanding the foregoing, if the UVBGSA determines that pursuant to state
and federal law CONSULTANT is an employee for purposes of income tax
withholding, UVBGSA may upon two (2) week’s written notice to CONSULTANT,
withhold from payments to CONSULTANT hereunder federal and state income
taxes and pay said sums to the federal and state governments.
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
4905-3284-5672.2 014737.001 4
2. INDEMNIFICATION: To the furthest extent permitted by law (including without
limitation California Civil Code sections 2782 and 2782.8, if applicable), Consultant
shall assume the defense of, indemnify, and hold harmless the UVBGSA, its
officers, agents, and employees, from and against any and all claims, demands,
damages, costs, liabilities, and losses whatsoever alleged to the extent occurring or
resulting in connection with the CONSULTANT’S performance or its obligations
under this AGREEMENT, unless arising out of the sole negligence or willful
misconduct of UVBGSA. “CONSULTANT’S performance” includes
CONSULTANT’S action or inaction and the action or inaction of CONSULTANT’S
officers, employees, agents and subcontractors.
3. INSURANCE AND BOND: CONSULTANT shall at all times during the term of the
Agreement with the UVBGSA maintain in force those insurance policies and bonds
as designated in the attached Exhibit C, and will comply with all those requirements
as stated therein.
4. WORKERS’ COMPENSATION: CONSULTANT shall provide Workers'
Compensation insurance, as applicable, at CONSULTANT's own cost and expense
and further, neither the CONSULTANT nor its carrier shall be entitled to recover
from UVBGSA any costs, settlements, or expenses of Workers' Compensation
claims arising out of this Agreement.
5. CONSULTANT affirms that they are aware of the provisions of Section 3700 of the
California Labor Code which requires every employer to be insured against liability
for the Workers’ Compensation or to undertake self-insurance in accordance with
the provisions of the Code and CONSULTANT further assures that s/he will comply
with such provisions before commencing the performance of work under this
Agreement. CONSULTANT shall furnish to UVBGSA certificate(s) of insurance
evidencing Worker’s Compensation Insurance coverage to cover its employees,
and CONSULTANT shall require all subcontractors similarly to provide Workers’
Compensation Insurance as required by the Labor Code of the State of California
for all of subcontractors’ employees.
6. CONFORMITY WITH LAW AND SAFETY:
6.1 In performing services under this Agreement, CONSULTANT shall observe
and comply with all applicable laws, ordinances, codes and regulations of
governmental agencies, including federal, state, municipal, and local
governing bodies, having jurisdiction over the scope of services, including all
applicable provisions of the California Occupational Safety and Health Act.
CONSULTANT shall indemnify and hold UVBGSA harmless from any and all
liability, fines, penalties and consequences from any of CONSULTANT’s
failures to comply with such laws, ordinances, codes and regulations.
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
4905-3284-5672.2 014737.001 5
6.2 Accidents: If a death, serious personal injury or substantial property damage
occurs in connection with CONSULTANT’s performance of this Agreement,
CONSULTANT shall immediately notify UVBGSA by telephone.
CONSULTANT shall promptly submit to UVBGSA a written report, in such
form as may be required by UVBGSA of all accidents which occur in
connection with this Agreement. This report must include the following
information: (1) name and address of the injured or deceased person(s); (2)
name and address of CONSULTANT's sub-contractor, if any; (3) name and
address of CONSULTANT's liability insurance carrier; and (4) a detailed
description of the accident and whether any of UVBGSA's equipment, tools,
material, or staff were involved.
6.3 CONSULTANT further agrees to take all reasonable steps to preserve all
physical evidence and information which may be relevant to the
circumstances surrounding a potential claim, while maintaining public safety,
and to grant to the UVBGSA the opportunity to review and inspect such
evidence, including the scene of the accident.
7.PAYMENT: For services performed in accordance with this Agreement, payment
shall be made to CONSULTANT as provided in Exhibit “B” hereto as funding
permits.
If UVBGSA over pays CONSULTANT for any reason, CONSULTANT agrees to
return the amount of such overpayment to UVBGSA within 30 calendar days, or at
UVBGSA’s option, permit UVBGSA to offset the amount of such overpayment
against future payments owed to CONSULTANT under this Agreement or any
other agreement.
In the event CONSULTANT claims or receives payment from UVBGSA for a
service, reimbursement for which is later disallowed by UVBGSA, State of
California or the United States Government, which disallowance is due to the
actions or omissions of CONSULTANT, the CONSULTANT shall promptly refund
the disallowance amount to UVBGSA upon request, or at its option UVBGSA may
offset the amount disallowed from any payment due or that becomes due to
CONSULTANT under this Agreement or any other agreement.
All invoices, receipts, or other requests for payment under this contract must be
submitted by CONSULTANT to UVBGSA in a timely manner and consistent with
the terms specified in Exhibit B. In no event shall UVBGSA be obligated to pay any
request for payment for which a written request for payment and all required
documentation was first received more than six (6) months after this Agreement
has terminated, or beyond such other time limit as may be set forth in Exhibit B.
8.TAXES: Payment of all applicable federal, state, and local taxes shall be the sole
responsibility of the CONSULTANT.
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
4905-3284-5672.2 014737.001 6
9. OWNERSHIP OF DOCUMENTS: CONSULTANT hereby assigns the UVBGSA
and its assignees all copyright and other use rights in any and all proposals, plans,
specification, designs, drawings, sketches, renderings, models, reports and related
documents (including computerized or electronic copies) respecting in any way the
subject matter of this Agreement, whether prepared by UVBGSA, the
CONSULTANT, the CONSULTANT’s subcontractors or third parties at the request
of the CONSULTANT (collectively, “Documents and Materials”). This explicitly
includes the electronic copies of all above stated documentation.
CONSULTANT shall be permitted to retain copies, including reproducible copies
and computerized copies, of said Documents and Materials. CONSULTANT
agrees to take such further steps as may be reasonably requested by UVBGSA to
implement the aforesaid assignment. If for any reason said assignment is not
effective, CONSULTANT hereby grants UVBGSA and any assignee of UVBGSA an
express royalty – free license to retain and use said Documents and Materials.
UVBGSA’s rights under this paragraph shall apply regardless of the degree of
completion of the Documents and Materials and whether or not CONSULTANT’s
services as set forth in Exhibit “A” of this Agreement have been fully performed or
paid for.
UVBGSA’s rights under this Paragraph 8 shall not extend to any computer software
used to create such Documents and Materials.
10. CONFLICT OF INTEREST: The CONSULTANT covenants that it presently has no
interest, and shall not have any interest, direct or indirect, which would conflict in
any manner with the performance of services required under this Agreement.
11. NOTICES: All notices, requests, demands, or other communications under this
Agreement shall be in writing. Notices shall be given for all purposes as follows:
Personal delivery: When personally delivered to the recipient, notices are effective
on delivery.
First Class Mail: When mailed first class to the last address of the recipient known
to the party giving notice, notice is effective three (3) mail delivery days after
deposit in a United States Postal Service office or mailbox. Certified Mail: When
mailed certified mail, return receipt requested, notice is effective on receipt, if
delivery is confirmed by a return receipt.
Overnight Delivery: When delivered by overnight delivery (Federal
Express/Airborne/United Parcel Service/DHL WorldWide Express) with charges
prepaid or charged to the sender’s account, notice is effective on delivery, if
delivery is confirmed by the delivery service.
Email transmission: When sent by email to the email address of the designated
recipient of the party giving notice, notice is effective at the time the email is sent.
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
4905-3284-5672.2 014737.001 7
Any notice given by email shall be deemed received on the next business day if it
is received after 5:00 p.m. (recipient’s time) or on a non-business day.
Addresses for purpose of giving notice are as follows:
To UVBGSA: UVBGSA
340 Lake Mendocino Dr.
Ukiah, CA 95482
Email: badams@cityofukiah.com
Attn: Blake Adams
To CONSULTANT: Larry Walker Associates
1480 Drew Avenue, Suite 100
Davis, CA 95618
Emails:
lauraf@lwa.com;
audrab@lwa.com
ATTN: Laura Foglia
Any correctly addressed notice that is refused, unclaimed, or undeliverable
because of an act or omission of the party to be notified shall be deemed
effective as of the first date that said notice was refused, unclaimed, or deemed
undeliverable by the postal authorities, messenger, or overnight delivery service.
Any party may change its address or facsimile number by giving the other party
notice of the change in any manner permitted by this Agreement.
12. USE OF UVBGSA PROPERTY: CONSULTANT shall not use UVBGSA property
(including equipment, instruments and supplies) or personnel for any purpose other
than in the performance of their obligations under this Agreement.
13. EQUAL EMPLOYMENT OPPORTUNITY PRACTICES PROVISIONS:
CONSULTANT certifies that it will comply with all Federal, State, and local laws,
rules, and regulations pertaining to nondiscrimination in employment.
13.1 CONSULTANT shall, in all solicitations or advertisements for applicants for
employment placed as a result of this Agreement, state that it is an “Equal
Opportunity Employer” or that all qualified applicants will receive
consideration for employment without regard to their race, creed, color,
pregnancy, disability, sex, sexual orientation, gender identity, ancestry,
national origin, age, religion, Veteran’s status, political affiliation, or any
other factor prohibited by law.
13.2 CONSULTANT shall, if requested to so do by UVBGSA, certify that it has
not, in the performance of this Agreement, engaged in any unlawful
discrimination.
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
4905-3284-5672.2 014737.001 8
13.3 If requested to do so by UVBGSA, CONSULTANT shall provide UVBGSA
with access to copies of all of its records pertaining or relating to its
employment practices, except to the extent such records or portions of such
records are confidential or privileged under State or Federal law.
13.4 Nothing contained in this Agreement shall be construed in any manner so as
to require or permit any act which is prohibited by law.
13.5 The CONSULTANT shall include the provisions set forth in this paragraph in
each of its subcontracts.
14.NO DISCRIMINATION: In CONSULTANT’s implementation of the Grant Award
Project and the scope of work set forth in this agreement, CONSULTANT shall not
unlawfully discriminate against, harass, or allow harassment against any employee
or applicant for employment because of race, religion, color, national origin,
ancestry, physical disability (including HIV and AIDS), mental disability, medical
condition, marital status, age (over 40), sex, sexual orientation, or use of family-
care leave, medical-care leave, or pregnancy-disability leave. CONSULTANT shall
take affirmative action to ensure that the evaluation and treatment of its employees
and applicants for employment are free of such discrimination and harassment.
Such action shall include, but not be limited to, the following: employment,
upgrading, demotion or transfer; recruitment or recruitment advertising; layoff or
termination; rates of pay or other forms of compensation; and selection for training,
including apprenticeship. CONSULTANT shall comply with the provision of the Fair
Employment and Housing Act (Government Code, Section 12900 (a-f) et seq.) and
applicable regulations (California Code of Regulations, Title 2, Section 7285 et
seq.). The regulations of the Fair Employment and Housing Commission regarding
Contractor Nondiscrimination and Compliance (Chapter 5 of Division 4 of Title 2 of
the California Code of Regulations) are incorporated by reference into this
agreement. CONSULTANT shall give written notice of its obligations under this
non-discrimination clause to labor organizations with which CONSULTANT has a
collective bargaining or other agreement and shall post in conspicuous places
available to employees and applicants for employment notice setting forth the
provisions of this section. CONSULTANT agrees to put a substantially similar terms
in any subcontract it executes with another entity related to the performance of this
agreement.
15.DRUG-FREE WORKPLACE: CONSULTANT and CONSULTANT's employees
shall comply with County of Mendocino’s policy of maintaining a drug-free
workplace. Neither CONSULTANT nor CONSULTANT's employees shall
unlawfully manufacture, distribute, dispense, possess or use controlled substances,
as defined in 21 U.S. Code § 812, including, but not limited to, marijuana, heroin,
cocaine, and amphetamines, at any County facility or work site. If CONSULTANT
or any employee of CONSULTANT is convicted or pleads nolo contendere to a
criminal drug statute violation occurring at a County facility or work site, the
CONSULTANT, within five days thereafter, shall notify the head of UVBGSA.
Violation of this provision shall constitute a material breach of this Agreement.
16.ENERGY CONSERVATION: CONSULTANT agrees to comply with the mandatory
standards and policies relating to energy efficiency in the State of California Energy
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
4905-3284-5672.2 014737.001 9
Conservation Plan, (Title 24, California Administrative Code).
17. COMPLIANCE WITH LICENSING REQUIREMENTS: CONSULTANT shall comply
with all necessary licensing requirements and shall obtain appropriate licenses. To
the extent required by law, CONSULTANT shall display licenses in a location that is
reasonably conspicuous. Upon UVBGSA’s request, CONSULTANT shall file
copies of same with UVBGSA.
CONSULTANT represents and warrants to UVBGSA that CONSULTANT and its
employees, agents, and any subcontractors have all licenses, permits,
qualifications, and approvals of whatsoever nature that are legally required to
practice their respective professions.
18. AUDITS; ACCESS TO RECORDS: The CONSULTANT shall make available to
UVBGSA, its authorized agents, officers, or employees, for examination any and all
ledgers, books of accounts, invoices, vouchers, cancelled checks, and other
records or documents evidencing or relating to the expenditures and
disbursements charged to UVBGSA, and shall furnish to UVBGSA, within sixty (60)
days after examination, its authorized agents, officers or employees such other
evidence or information as UVBGSA may require with regard to any such
expenditure or disbursement charged by the CONSULTANT.
The CONSULTANT shall maintain full and adequate records in accordance with
UVBGSA requirements to show the actual costs incurred by the CONSULTANT in
the performance of this Agreement. If such books and records are not kept and
maintained by CONSULTANT within the County of Mendocino, California,
CONSULTANT shall, upon request of UVBGSA, make such books and records
available to UVBGSA for inspection at a location within UVBGSA or CONSULTANT
shall pay to UVBGSA the reasonable, and necessary costs incurred by UVBGSA in
inspecting CONSULTANT’s books and records, including, but not limited to, travel,
lodging and subsistence costs. CONSULTANT shall provide such assistance as
may be reasonably required in the course of such inspection. UVBGSA further
reserves the right to examine and reexamine said books, records and data during
the four (4) year period following termination of this Agreement or completion of all
work hereunder, as evidenced in writing by UVBGSA, and the CONSULTANT shall
in no event dispose of, destroy, alter, or mutilate said books, records, accounts, and
data in any manner whatsoever for four (4) years after UVBGSA makes the final or
last payment or within four (4) years after any pending issues between UVBGSA
and CONSULTANT with respect to this Agreement are closed, whichever is later.
19. AUDITS BY CDFW, DOF, DGS, AND CSA – In CONSULTANT’s implementation of
the Grant Award Project and the scope of work set forth in this agreement,
CONSULTANT agrees that CDFW, the Department of Finance, Department of
General Services, California State Auditor’s Office, or their designated
representatives (“Auditors”) shall have the right to review and to copy any records
and supporting documentation related to the performance of this Agreement.
CONSULTANT agrees to maintain such records for possible audit for a minimum of
three years after final payment, unless a longer period of records retention is
stipulated. CONSULTANT agrees to allow the Auditors access to such records
during normal business hours and to allow interviews of any employees who might
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
4905-3284-5672.2 014737.001 10
reasonably have information related to such records. CONSULTANT agrees to put
a substantially similar term in any subcontract it executes with another entity
related to the performance of this agreement.
20. DOCUMENTS AND MATERIALS: CONSULTANT shall maintain and make
available to UVBGSA for its inspection and use during the term of this Agreement, all
Documents and Materials, as defined in Paragraph 8 of this Agreement.
CONSULTANT’s obligations under the preceding sentence shall continue for four (4)
years following termination or expiration of this Agreement or the completion of all
work hereunder (as evidenced in writing by UVBGSA), and CONSULTANT shall in no
event dispose of, destroy, alter or mutilate said Documents and Materials, for four (4)
years following UVBGSA’s last payment to CONSULTANT under this Agreement.
21. TIME OF ESSENCE: Time is of the essence in respect to all provisions of this
Agreement that specify a time for performance; provided, however, that the
foregoing shall not be construed to limit or deprive a party of the benefits of any
grace or use period allowed in this Agreement.
22. TERMINATION: UVBGSA has and reserves the right to suspend, terminate or
abandon the execution of any work by the CONSULTANT without cause at any
time upon giving to the CONSULTANT notice. Such notice shall be in writing and
may be issued by any UVBGSA officer authorized to execute or amend the
contract, UVBGSA Chair of the Board of Directors, or any other person designated
by UVBGSA. In the event that UVBGSA should abandon, terminate or suspend the
CONSULTANT’s work, the CONSULTANT shall be entitled to payment for services
provided hereunder prior to the effective date of said suspension, termination or
abandonment. Said payment shall be computed in accordance with Exhibit B
hereto, provided that the maximum amount payable to CONSULTANT for its
interconnected surface water monitoring services shall not exceed $1,215,105 for
services provided hereunder prior to the effective date of said suspension,
termination or abandonment or lack of funding.
23. NON APPROPRIATION: If UVBGSA should not appropriate or otherwise make
available funds sufficient to purchase, lease, operate or maintain the products set
forth in this Agreement, or other means of performing the same functions of such
products, UVBGSA may unilaterally terminate this Agreement only upon thirty (30)
calendar days written notice to CONSULTANT. Upon termination, UVBGSA shall
remit payment for all products and services delivered to UVBGSA and all expenses
incurred by CONSULTANT prior to CONSULTANT’S receipt of the termination
notice.
24. CHOICE OF LAW: This Agreement, and any dispute arising from the relationship
between the parties to this Agreement, shall be governed by the laws of the State of
California, excluding any laws that direct the application of another jurisdiction’s
laws.
25. VENUE: All lawsuits relating to this contract must be filed in Mendocino County
Superior Court, Mendocino County, California.
26. WAIVER: No waiver of a breach, failure of any condition, or any right or remedy
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
4905-3284-5672.2 014737.001 11
contained in or granted by the provisions of this Agreement shall be effective
unless it is in writing and signed by the party waiving the breach, failure, right or
remedy. No waiver of any breach, failure, right or remedy shall be deemed a
waiver of any other breach, failure, right or remedy, whether or not similar, nor shall
any waiver constitute a continuing waiver unless the writing so specifies.
27. ADVERTISING OR PUBLICITY: CONSULTANT shall not use the name of
UVBGSA, its officers, directors, employees or agents, in advertising or publicity
releases or otherwise without securing the prior written consent of UVBGSA in
each instance.
28. ENTIRE AGREEMENT: This Agreement, including all attachments, exhibits, and
any other documents specifically incorporated into this Agreement, shall constitute
the entire agreement between UVBGSA and CONSULTANT relating to the subject
matter of this Agreement. As used herein, Agreement refers to and includes any
documents incorporated herein by reference and any exhibits or attachments. This
Agreement supersedes and merges all previous understandings, and all other
agreements, written or oral, between the parties and sets forth the entire
understanding of the parties regarding the subject matter thereof. This Agreement
may not be modified except by a written document signed by both parties. In the
event of a conflict between the body of this Agreement and any of the Exhibits, the
provisions in the body of this Agreement shall control.
29. HEADINGS: Herein are for convenience of reference only and shall in no way
affect interpretation of this Agreement.
30. MODIFICATION OF AGREEMENT: This Agreement may be supplemented,
amended or modified only by the mutual written agreement of the parties. No
supplement, amendment or modification of this Agreement shall be binding unless
it is in writing and signed by authorized representatives of both parties.
31. ASSURANCE OF PERFORMANCE: If at any time UVBGSA has good objective
cause to believe CONSULTANT may not be adequately performing its obligations
under this Agreement or that CONSULTANT may fail to complete the Services as
required by this Agreement, UVBGSA may request from CONSULTANT prompt
written assurances of performance and a written plan acceptable to UVBGSA, to
correct the observed deficiencies in CONSULTANT’s performance. CONSULTANT
shall provide such written assurances and written plan within thirty (30) calendar
days of its receipt of UVBGSA’s request and shall thereafter diligently commence
and fully perform such written plan. CONSULTANT acknowledges and agrees that
any failure to provide such written assurances and written plan within the required
time is a material breach under this Agreement.
32. HEADINGS: Herein are for convenience of reference only and shall in no way
affect the interpretation of this Agreement.
33. MODIFICATION OF AGREEMENT: This Agreement may be supplemented,
amended or modified only by the mutual written agreement of the parties. No
supplement, amendment or modification of this Agreement shall be binding unless
it is in writing and signed by authorized representatives of both parties.
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
4905-3284-5672.2 014737.001 12
34. ASSURANCE OF PERFORMANCE: If at any time UVBGSA has good objective
cause to believe CONSULTANT may not be adequately performing its obligations
under this Agreement or that CONSULTANT may fail to complete the Services as
required by this Agreement, UVBGSA may request from CONSULTANT prompt
written assurances of performance and a written plan acceptable to UVBGSA, to
correct the observed deficiencies in CONSULTANT’s performance. CONSULTANT
shall provide such written assurances and written plan within thirty (30) calendar
days of its receipt of UVBGSA’s request and shall thereafter diligently commence
and fully perform such written plan. CONSULTANT acknowledges and agrees that
any failure to provide such written assurances and written plan within the required
time is a material breach under this Agreement.
35. SUBCONTRACTING/ASSIGNMENT: CONSULTANT shall not subcontract, assign
or delegate any portion of this Agreement or any duties or obligations hereunder
without UVBGSA’s prior written approval.
35.1 Neither party shall, on the basis of this Agreement, contract on behalf of or in
the name of the other party. Any agreement that violates this Section shall
confer no rights on any party and shall be null and void.
35.2 Only the UVBGSA General Manager or his or her written designee shall
have the authority to approve subcontractor(s).
35.3 CONSULTANT shall remain fully responsible for compliance by its
subcontractors with all the terms of this Agreement, including the quality of
the work of the subcontractors, regardless of the terms of any agreement
between CONSULTANT and its subcontractors.
The UVBGSA recognizes that Will Lewis Consulting, LLC, which is owned and
operated by Will Lewis, is a subconsultant to the CONSULTANT and is considered
for the purposes of this agreement an employee of the CONSULTANT and
therefore, the CONSULTANT may delegate work assigned by the UVBGSA to
CONSULTANT to Will Lewis Consulting, LLC as the CONSULTANT deems
appropriate. This contract modification constitutes prior written approval from the
UVBGSA for Will Lewis only.
36. SURVIVAL: The obligations of this Agreement, which by their nature would
continue beyond the termination on expiration of the Agreement, including without
limitation, the obligations regarding Indemnification (Paragraph 2), ownership of
Documents (Paragraph 8), and Conflict of Interest (Paragraph 9), shall survive
termination or expiration for two (2) years.
37. SEVERABILITY: If a court of competent jurisdiction holds any provision of this
Agreement to be illegal, unenforceable, or invalid in whole or in part for any reason,
the validity and enforceability of the remaining provisions, or portions of them, will
not be affected, unless an essential purpose of this Agreement would be defeated by
the loss of the illegal, unenforceable, or invalid provision.
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
4905-3284-5672.2 014737.001 13
38. INTELLECTUAL PROPERTY WARRANTY: CONSULTANT warrants and
represents that it has secured all rights and licenses necessary for any and all
materials, services, processes, software, or hardware (“CONSULTANT
PRODUCTS”) to be provided by CONSULTANT in the performance of this
AGREEMENT, including but not limited to any copyright, trademark, patent, trade
secret, or right of publicity rights. CONSULTANT hereby grants to UVBGSA, or
represents that it has secured from third parties, an irrevocable license (or
sublicense) to reproduce, distribute, perform, display, prepare derivative works,
make, use, sell, import, use in commerce, or otherwise utilize CONSULTANT
PRODUCTS to the extent reasonably necessary to use the CONSULTANT
PRODUCTS in the manner contemplated by this agreement.
CONSULTANT further warrants and represents that it knows of no allegations,
claims, or threatened claims that the CONSULTANT PRODUCTS provided to
UVBGSA under this Agreement infringe any patent, copyright, trademark or other
proprietary right. In the event that any third party asserts a claim of infringement
against UVBGSA relating to a CONSULTANT PRODUCT, CONSULTANT shall
indemnify and defend UVBGSA pursuant to Paragraph 2 of this AGREEMENT.
In the case of any such claim of infringement, CONSULTANT shall either, at its
option, (1) procure for UVBGSA the right to continue using the CONSULTANT
Products; or (2) replace or modify the CONSULTANT Products so that that they
become non-infringing, but equivalent in functionality and performance.
39. ELECTRONIC COPIES: The parties agree that an electronic copy, including
facsimile copy, email, or scanned copy of the executed Agreement, shall be
deemed, and shall have the same legal force and effect as, an original document.
Electronic signatures with docusign, signature equivalent included with PDF
editor/reader software, or scanned wet signature copy is acceptable.
40. COOPERATION WITH UVBGSA: Contractor shall cooperate with UVBGSA and
UVBGSA staff in the performance of all work hereunder.
41. PERFORMANCE STANDARD: Consultant shall perform all work hereunder in a
manner consistent with the level of competency and standard of care normally
observed by a person practicing in Consultant's profession. UVBGSA has relied
upon the professional ability and training of Consultant as a material inducement to
enter into this Agreement. Consultant hereby agrees to provide all services under
this Agreement in accordance with generally accepted professional practices and
standards of care, as well as the requirements of applicable Federal, State, and
local laws, it being understood that acceptance of Consultant's work by UVBGSA
shall not operate as a waiver or release. If UVBGSA determines that any of
Consultant's work is not in accordance with such level of competency and standard
of care, UVBGSA, in its sole discretion, shall have the right to do any or all of the
following: (a) require Consultant to meet with UVBGSA to review the quality of the
work and resolve matters of concern; (b) require Consultant to repeat the work at
no additional charge until it is satisfactory; (c) terminate this Agreement pursuant to
the provisions of paragraph 19 (Termination) or (d) pursue any and all other
remedies at law or in equity.
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
4905-3284-5672.2 014737.001 14
42. ATTORNEYS’ FEES: In any action to enforce or interpret the terms of this
agreement, including but not limited to any action for declaratory relief, each party
shall be solely responsible for and bear its own attorneys’ fees, regardless of which
party prevails.
[END OF GENERAL TERMS AND CONDITIONS]
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
/.-/2-03
4905-3284-5672.2 014737.001 16
EXHIBIT A
DEFINITION OF SERVICES
CONSULTANT shall provide the following services:
The scope of work to be performed by CONSULTANT includes the scope of work
contained in CONSULTANT’s Statement of Qualifications, attached hereto and
incorporated herein as Attachment 1 to Exhibit A, and includes, but is not limited to, the
following tasks:
•Task 1: Monitoring Plan Development
•Task 2: Water Resource Management Recommendations
•Task 3: Program Management and Grant Compliance.
CONSULTANT shall implement the Grant Award Project in accordance with the terms
and conditions set forth in the Cannabis Restoration Grant Program Upper Russian
River Groundwater Dependent Ecosystem and Interconnected Surface Water Study
(Grant Agreement No. Q2496105), attached hereto and incorporated herein as
Attachment 2 to Exhibit A, including, but not limited to:
[END OF DEFINITION OF SERVICES]
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
4905-3284-5672.2 014737.001 17
Attachment 1 to Exhibit A:
Statement of Qualifications Prepared for:
Ukiah Valley Groundwater Sustainability Agency
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
Statement of Qualifications Prepared for:
Ukiah Valley Groundwater Sustainability Agency
Proposal for ISW Study 1
Larry Walker Associates
TABLE OF CONTENTS
1.0 COVER LETTER……………………………………………………………………………………………….I
2.0 DESCRIPTION OF QUALIFICATIONS ................................................................................................. 2
2.1 Larry Walker Associates ................................................................................................................ 2
2.2 Stillwater Sciences ......................................................................................................................... 3
2.3 DBS&A ........................................................................................................................................... 4
2.4 University of California Cooperative Extension ............................................................................. 4
2.5 Similar Project Experience ............................................................................................................. 6
3.0 PROPOSED RESPONDENT TEAM ................................................................................................... 11
3.1 Organizational Chart .................................................................................................................... 17
3.2 Project understanding .................................................................................................................. 18
4.0 PROPOSED SCOPE OF WORK ......................................................................................................... 21
Task 1: Monitoring Plan Development ..................................................................................................... 21
Task 2: Water Resource Management Recommendations ..................................................................... 27
Task 3: Program Management and Grant Compliance ........................................................................... 28
5.0 SCHEDULE.......................................................................................................................................... 30
6.0 COST PROPOSAL .............................................................................................................................. 31
7.0 CONFLICTS ......................................................................................................................................... 33
8.0 REFERENCES..................................................................................................................................... 33
9.0 ADDITIONAL REQUIREMENTS ......................................................................................................... 34
9.1 Insurance ..................................................................................................................................... 34
9.2 Use of UVBGSA Logo .................................................................................................................. 34
Appendix 1. Resumes
Appendix 2. Required Forms
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
Statement of Qualifications Prepared for:
Ukiah Valley Groundwater Sustainability Agency
Proposal for ISW Study 2
Larry Walker Associates
2.0 DESCRIPTION OF QUALIFICATIONS
As demonstrated by the qualifications and supporting information listed below, the Larry Walker
Associates Team (LWA Team) is uniquely and effectively positioned to assist the Ukiah Valley Basin
Groundwater Sustainability Agency (UVBGSA or GSA) with evaluating groundwater-dependent
ecosystem (GDE) and interconnected surface water (ISW) dynamics in the Upper Russian River (URR)
watershed. LWA has been a trusted technical leader in the groundwater-surface water management area
for over a decade and has been at the forefront of water resource management efforts in California for
more than 45 years.
Experience with Groundwater-Surface Water Interconnection Studies: Our Team brings
extensive experience characterizing groundwater-dependent ecosystems and surface water
interconnection, particularly in systems supporting salmonids like Chinook salmon and steelhead
in California watersheds.
Expertise in Monitoring and Modeling: The LWA Team has demonstrated excellence in all key
aspects of the project, including biological surveys, telemetered sensor networks, specialized
geochemical analyses, and integrated hydrological modeling, as outlined in the Scope of Work.
California Department of Fish and Wildlife (CDFW) Grant Experience: Our Team has
successfully managed more than a dozen projects funded through CDFW grants, ensuring
compliance with rigorous data management requirements and scientific integrity policies.
Successful Collaboration with Stakeholders and Tribes: We have proven experience
incorporating stakeholder and Tribal input into monitoring networks and water resource
management planning efforts.
Technical Capabilities: The LWA Team possesses the technical expertise required for all
project components, including updating the Ukiah Valley Integrated Hydrological Model (UVIHM)
to assess various management scenarios under different climate conditions, installation operation
and maintenance of telemetered sensor networks, and development of an interactive data
management system.
Record of Meeting Schedules and Budgets: Our Team has consistently delivered similar
technical studies on time and within budget, with the capacity to complete this project by the
March 2028 deadline.
Strong References: The LWA Team has supportive client references from similar GSP-related
projects, as provided in 6.0. References.
Efficient Access to the Ukiah Valley Basin (UVB or Basin): Key LWA Team members
including the proposed project manager live within a two-hour drive of Ukiah and are prepared to
quickly mobilize for UVBGSA and community meetings, field work, and instrument installation.
2.1 Larry Walker Associates
Larry Walker Associates, Inc. (LWA) is a privately owned S corporation and Women-Owned Business
Enterprise providing environmental engineering and management services throughout California.
Headquartered in Davis, California (1480 Drew Ave, 100, Davis, CA), LWA has regional offices in Yreka,
Berkeley, San Diego, Santa Monica, and Ventura and an office in Seattle, Washington. For more than 45
years, LWA has been a partner, innovator, and industry leader, assisting public agencies in navigating
and solving complex environmental and public policy challenges.
Since the adoption of the Sustainable Groundwater Management Act (SGMA) in 2014, LWA has
developed six Groundwater Sustainability Plans (GSPs), all completed on time and approved by
DWR. We currently provide GSP implementation support in more than 10 basins, focusing on the critical
data collection and monitoring networks that form the foundation for sustainable groundwater
management.
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
Statement of Qualifications Prepared for:
Ukiah Valley Groundwater Sustainability Agency
Proposal for ISW Study 3
Larry Walker Associates
LWA's technical expertise directly aligns with the URR GDE/ISW Study requirements, with a staff of over
75 staff, with a team of over 15 specializing in groundwater-surface water integrated modeling,
geochemical analysis, water quality monitoring, and comprehensive data management that meets
CDFW's scientific integrity standards. Our Team has extensive experience implementing all aspects of
SGMA, particularly in characterizing groundwater-dependent ecosystems and analyzing surface water
interconnections critical for supporting sensitive fish species like the Chinook salmon and steelhead found
in the Upper Russian River watershed.
LWA has over 20 years of experience designing, installing, and operating real-time telemetered water
monitoring networks across California—expertise directly applicable to Task 1 of this request for
proposals (RFP). Our experience includes installing over 200 continuous sensor systems, including 20
streamflow stations, uniquely positioning our Team to effectively and efficiently install continuous sensors
to measure temperature and water levels in the specified wells and to develop the expanded monitoring
network required for this study.
Of particular relevance to this project, LWA has worked with the UVBGSA in the URR watershed since
2018, developing and implementing the GSP that this study will enhance. We have established
productive relationships with key Basin stakeholders through ongoing stakeholder engagement and
coordination, including agricultural representatives, municipalities (City of Ukiah), and tribal
representatives. This existing network and familiarity with the Basin will enable efficient implementation of
the stakeholder and Tribal input requirements specified in the project.
Our experience building, updating and running integrated hydrological models, including the UVIHM
specified in Task 2, will allow our Team to immediately begin the project with no lag time and without
duplicating the efforts of existing projects.
2.2 Stillwater Sciences
Stillwater Sciences is a 100-person scientific consulting firm with
specialists in aquatic and terrestrial biology, wetland and restoration
ecology, water quality, geomorphology, hydrology, engineering, and
spatial analysis. Stillwater uses science-based technical approaches
to water resource management and has been conducting hydrologic,
geomorphic, riparian, and ecological studies for nearly 30 years. Our scientists and engineers have been
actively engaged in evaluating ecological and geomorphic characteristics of groundwater basins
throughout California river systems and provide keen insight into habitat linkages to the overall aquatic
ecosystem, including sensitive species and habitats. Stillwater staff use a combination of field data
collection, field- and GIS-based modeling, and analytical methods to support project orientation and
conceptual model development, determination of current site conditions, interpretation of past and
predictions of future site conditions, interdisciplinary problem-solving and project planning.
Stillwater is leveraging its scientific expertise to understand the impacts of groundwater management on
GDEs throughout California. Our Team has assessed GDEs and evaluated their hydrologic needs in eight
GSPs and the five-year update for one alternative GSP. Stillwater developed and is currently
implementing a post-GSP monitoring plan for ISW and GDEs in the Napa Valley Subbasin. The Stillwater
Team is developing projects to use pumped groundwater to supplement important GDEs in the Fillmore
and Piru groundwater basins during droughts. The Stillwater Team is also evaluating the presence of
steelhead (O. Mykiss) using environmental DNA. Stillwater scientists have also published on GDEs in the
journal Fremontia and Stillwater staff have monitored anadromous fish throughout the western U.S.
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
Statement of Qualifications Prepared for:
Ukiah Valley Groundwater Sustainability Agency
Proposal for ISW Study 4
Larry Walker Associates
2.3 DBS&A
DBS&A is a water resources, environmental, and engineering
consulting firm. Our firm’s scientists and engineers provide a broad
range of services to assist water managers, water purveyors, and
natural resource entities with optimal development, use, and management of groundwater and surface
water resources, including water resources planning, water supply development, managed aquifer
recharge, water recycling and reuse, water infrastructure engineering, water rights, hydrologic analyses
and modeling, water quality investigations and treatment, and watershed and stormwater management.
DBS&A developed a comprehensive, web-accessible environmental database management system
(DMS/DBMS) called GLA-Data to store, visualize, map, manage, and report environmental data. Since
2007, we have been a leader in the development of environmental DMS/DBMS. Our developers have
continuously enhanced our systems, incorporating new technology to meet clients’ evolving needs. GLA -
Data now serves more than 20 clients across the western U.S., helping clients make vast amounts of
technical data readily accessible and easy to analyze. New applications based on our existing platform
can be rolled out quickly at a reasonable cost.
Key features include:
• Dashboard-style user interfaces through
a web browser.
• Map-based geographic information
system integration.
• Interactive data visualization tools.
• Automated reporting capabilities.
• Multiple data export options.
• Tiered login credentials for enhanced
security.
• 24/7 downtime monitoring.
• Routine security updates and backups.
DBS&A has in-house expertise in developing customized information management solutions to assist
clients with managing data-related environmental, natural resource, and infrastructure projects and
programs. We have developed data management systems that en able remote users to access,
manipulate, map, and interpret vast amounts of data with a user-friendly, web-based interface. We use
standard industry software and integrate data with project-related documents for simplified analysis and
interpretation. With a web-based platform, every team member can access the same information
simultaneously or individually from their desktop.
2.4 University of California Cooperative Extension
UCCE Mendocino County is part of the UC Agriculture and Natural
Resources (UC ANR) network, dedicated to delivering science-based
solutions to local challenges. As a key link between UC research and
the Mendocino community, UCCE Mendocino has provided research,
education, and outreach for over a century and it serves as a hub for
agriculture, natural resources, community development, and youth programs, helping to sustain and
enhance the County’s socioeconomic resilience. Within UCCE Mendocino, the Water and Climate
Change Program tackles critical environmental challenges through research and education. Our program
studies extreme climate events such as droughts and floods, integrated water resources management,
environmental flows, surface-groundwater interactions, water quality assessments, and social-ecological
resilience in watersheds. Additionally, the program actively engages with the community by providing
science-based education and resources to support informed decision -making. Through workshops,
technical assistance, and collaborative projects, it helps Tribes, landowners, farmers, and local
governments implement water policies, advance water management strategies, conservation measures,
and climate adaptation strategies.
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
Statement of Qualifications Prepared for:
Ukiah Valley Groundwater Sustainability Agency
Proposal for ISW Study 5
Larry Walker Associates
Table 1. LWA Team Relevant Project Experience
Services Identified in the Scope of Work
Project Experience
Reference Provided1
Project Description Provided2
Mo
n
i
t
o
r
i
n
g
P
l
a
n
D
e
v
e
l
o
p
m
e
n
t
Ae
r
i
a
l
/
F
i
e
l
d
Bi
o
l
o
g
i
c
a
l
S
u
r
v
e
y
s
De
s
i
g
n
E
x
p
a
n
d
e
d
I
n
t
e
g
r
a
t
e
d
Su
r
f
a
c
e
Wa
t
e
r
M
o
n
i
t
o
r
i
n
g
Ne
t
w
o
r
k
Tr
i
b
a
l
C
o
o
r
d
i
n
a
t
i
o
n
Co
n
t
i
n
u
o
u
s
S
e
n
s
o
r
I
n
s
t
a
l
l
a
t
i
o
n
Hy
d
r
o
l
o
g
i
c
a
l
M
o
d
e
l
S
c
e
n
a
r
i
o
s
a
n
d
Up
d
a
t
e
s
Wa
t
e
r
R
e
s
o
u
r
c
e
M
a
n
a
g
e
m
e
n
t
Re
p
o
r
t
i
n
g
Da
t
a
M
a
n
a
g
e
m
e
n
t
P
l
a
n
De
v
e
l
o
p
m
e
n
t
Bo
a
r
d
/
T
A
C
M
e
m
b
e
r
P
a
r
t
i
c
i
p
a
t
i
o
n
Gr
a
n
t
R
e
p
o
r
t
i
n
g
/
I
n
v
o
i
c
i
n
g
Firm
Scott Valley Irrigation District (SVID) Recharge Project, CA1,2 • • • • • • LWA
Creating Long-Term Water Supply Resiliency for Ukiah Valley and Upper
Russian River, CA1,2 • • • • • • • • LWA
Napa Valley Subbasin ISW and GDE Workplan and Implementation,
Napa, CA1,2 • • • • • Stillwater
Ukiah Groundwater Sustainability Plan and On-Call Technical Services,
Ukiah, CA2 • • • • • • • • • LWA & WLC
Fillmore and Piru Groundwater Subbasins Interconnected Surface Water
Analysis, CA 2 • • • • • • DBS&A
Groundwater Quality Monitoring and Reporting, St. Helena, CA • • • • • • • LWA
Sierra Valley Groundwater Sustainability Plan Development, Plumas and
Sierra Counties, CA • • • • • • LWA & WLC
County of Siskiyou Developing and Implementing Groundwater
Sustainability Plans for the Shasta, Scott, and Butte Valley Groundwater
Basins, Siskiyou, CA
• • • • • • LWA & WLC
South American Subbasin Groundwater Sustainability Plan
Development, Sacramento, CA • • • • • • LWA & WLC
The Nature Conservancy, Framework for Coho Salmon Habitat
Restoration in Lower Ten Mile River, CA • • • • • Stillwater
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
Proposal Prepared for:
Ukiah Valley Groundwater Sustainability Agency
Proposal for ISW Study 6
Larry Walker Associates
2.5 Similar Project Experience
The following project descriptions feature select efforts demonstrating our expertise in monitoring plan
development, sensor updates and installation, water resource management reporting and data
management plan development. These examples highlight our collaborative approach, technical
excellence, and consistent delivery of exceptional results.
Project 1. Creating Long-Term Water Supply Resiliency for Ukiah Valley and Upper
Russian River
Completed By LWA
Client Name California Land Stewardship Institute
Years of Service 2024-Present
This US Bureau of Reclamation WaterSMART grant -funded project aims to create a
comprehensive water management solution for Upper Russian River communities through the
enhancement of the existing UVIHM and development of an innovative Decision Support Tool
(DST). The project addresses critical water management challenges by combining advanced
modeling capabilities with practical, user-friendly tools for stakeholders.
The UVIHM integrates three sophisticated models: the USGS Precipitation-Runoff Modeling
System (PRMS), USGS Modular Groundwater Flow Model (MODFLOW), and DWR Integrated
Water Flow Model Demand Calculator (IDC). This integrated approach enables precise simu lation
of surface and groundwater interactions across the Upper Russian River watershed. The project
will enhance this existing framework through:
Automated data integration from public sources (NOAA, USGS, DWR) for annual model
updates.
Incorporation of high frequency sensor data for groundwater level and streamflow from Ukiah
Valley Basin Groundwater Sustainability Agency monitoring network.
Implementation of climate scenario modeling capabilities.
Incorporation of multi-faceted management scenarios informed by climate conditions and
surface water availability.
Development of groundwater pumping zones to visualize potential impacts of pumping on
surface water resources.
The project includes a range of climate scenario modeling, combined with projected changes to
release volumes and timing from Lake Mendocino and inter-basin water transfers from the Eel
River. These scenarios will help stakeholders understand potential impacts and effectiveness of
various management strategies, from water rights curtailment and conservation measures to
construction of off-stream storage ponds. A key project outcome is the development of a DST with
online user interface that will provide critical water resource information to water system managers,
farmers, and stakeholders. The DST will offer:
An accessible web-based interface suitable for a diverse set of users.
Interactive visualization of water management scenarios under a variety of climate
conditions.
Guidance on pumping rates and locations to minimize streamflow impacts.
Community engagement is integrated throughout the project through a Technical Steering
Committee, ensuring that local knowledge and stakeholder needs are incorporated into the
tool's development. The final product will be a sustainable, maintainable system that can be
updated annually.
This project provides a data-driven, scientifically rigorous approach to water resource management
in the Upper Russian River Watershed while maintaining accessibility for all stakeholders.
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
Proposal Prepared for:
Ukiah Valley Groundwater Sustainability Agency
Proposal for ISW Study 7
Larry Walker Associates
Project 2. Scott Valley Irrigation District (SVID) Recharge Project
Completed By LWA
Client Name Scott Valley Irrigation District
Years of Service 2021-Present
The CDFW-funded Scott Valley Irrigation District
(SVID) pilot recharge project aims to apply 5,400 acre-
feet of water to agricultural fields for recharge from
January through March and assess the resulting
instream flow benefits to key salmonid habitat in the
Scott River. This is accomplished through a threefold
approach that combines physical measurements,
geochemical monitoring, and integrated hydrologic
modeling. LWA has developed applications for and has
received 180-day temporary permits for underground
storage from the State Water Board for 2022-2025.
Water is diverted from the Scott River under qualifying flow conditions through the existing earthen
SVID irrigation ditch and distributed to agricultural fields for recharge to the aquifer.
The project has three core monitoring components that are conducted in tandem to gage the
potential benefits of managed SVID recharge:
• Physical monitoring through a network of telemetered high-frequency groundwater level,
temperature, and streamflow sensors that help to track the movement of water and quantify
recharge benefits. Instrumentation includes two stream gages in Scott River, located upstream and
downstream of the point of diversion, and five stream gages in the SVID ditch. In addition, the study
leverages existing observation wells and has installed two additional shallow well transects near
Scott River to understand groundwater gradient fluctuations in response to recharge.
• Geochemical monitoring helps characterize the timing and locations of interconnection in the
Scott River adjacent to and downstream of the recharge sites. Time series Radon-222 and stable
isotope of water samples are collected along a transect comprised of six Scott River monitoring
locations. These naturally occurring environmental tracers shed light on shifting water source
contributions to river discharge through time and the relative importance of localized groundwater
inputs to streamflow. Targeted subsurface streambed sampling helps to confirm periods when
monitoring sites gaining conditions.
• Biological monitoring carried out on the daily basis in coordination with Siskiyou County RCD to
ensure fish are not harmed by high flow diversions for on-field recharge.
Monitoring results are being used to calibrate and validate integrated hydrological modeling that
simulates the impacts of managed recharge on basin water budgets and ultimately key salmonid
habitat.
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
Proposal Prepared for:
Ukiah Valley Groundwater Sustainability Agency
Proposal for ISW Study 8
Larry Walker Associates
Project 3. Napa Valley Subbasin ISW and GDE Workplan and Implementation
Completed By Stillwater Sciences
Client Name Napa County Groundwater Sustainability Agency, as a subconsultant to
Luhdorff & Scalmanini Consulting Engineers
Years of Service 2022-Present
SMGA requires that impacts on ISW and GDEs be considered part of GSPs. This is particularly
important in the Napa River, where ISW maintains dry season flows that are crucial for aquatic
species living there. However, developing sustainable management criteria for ISW requires
understanding the spatial and temporal patterns of ecosystem usage in the basin and the linkage
between groundwater levels, surface flow, and habitat. The impact of groundwater levels on ISW on
GDEs was identified as a data gap in the Napa Subbasin GSP. Stillwater Sciences and our project
partners developed the ISW and GDEs workplan for the Napa Valley Groundwater Subbasin to
address this data gap. The Workplan addressed data gaps to better understand and quantify
existing and historical streamflow characteristics and how they relate to GDE health in the Napa
Valley Subbasin. The Workplan identified GDEs within the subbasin based on statewide datab ases
and past biological studies in the watershed. The work plan includes hydrologic and biological
surveys and incorporates the scientific components of the California Environmental Flows
Framework (CEFF). A prioritization metric was developed to identify six intensive survey sites for
implementation of the Workplan based on hydrologic record, ecologic importance (a function of the
number of special-status species life stages that use the site), and other considerations (i.e., stream
restoration, uniqueness of the site). The Napa Valley Subbasin Groundwater Sustainability Agency
adopted the Workplan in March 2024 and outlines studies through 2031.
Workplan implementation began in May 2024. Stillwater Sciences conducted field surveys with
access permission for northwestern pond turtles, foothill yellow -legged frog, California freshwater
shrimp, and vegetation health at the four intensive survey sites. The presence of northwestern pond
turtles and foothill yellow-legged frog were also assessed using environmental DNA sampling.
Stillwater scientists also coordinated with the Napa RCD on steelhead habitat assessment, including
snorkel surveys, continuous stream temperature and dissolved oxygen measurements, and monthly
wet-dry mapping of the survey reaches. Hydrological data collected at each intensive site includes
groundwater elevation, vertical groundwater gradients, stream stage, and thalweg elevation profiles.
Subsequent surveys will assess special-status plants and birds at intensive sites. The 2024
biological and hydrological data and groundwater model results are being integrated into a CEFF
analysis, which will help determine ecosystem water needs at the six intensive sites and support the
development of sustainable management criteria for the depletion of ISW.
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
Proposal Prepared for:
Ukiah Valley Groundwater Sustainability Agency
Proposal for ISW Study 9
Larry Walker Associates
Project 4. Fillmore and Piru Groundwater Subbasins Interconnected Surface Water
Analysis
Completed By DBS&A
Client Name Ventura County
Years of Service 2019-Present
During GSP development, DBS&A performed an
evaluation of possible ISWs within the Fillmore and
Piru subbasins. Our approach was multi-faceted and
included a review and comparison of critical habitat
designations by the National Oceanic and
Atmospheric Administration’s (NOAA) National Marine
Fisheries Service (NMFS or NOAA Fisheries) and
beneficial uses identified by the Los Angeles Regional
Water Quality Control Board (LARWQCB). Biological reports for the endangered Southern
California Steelhead, the primary driver of aquatic conservation efforts in the area, were reviewed
to determine their presence or absence in specific reaches. Surface water information and
relationships to groundwater data collected by the United Water Conservation District (UWCD or
United) was also evaluated as the Santa Clara River that flows through both basins is naturally
ephemeral, which adds additional challenges to quantifying the location, timing, and a quantity of
streamflow depletion required by SGMA. A plan to address ISW data gaps in the subbasins was
developed and is currently being implemented, with data made publicly available through the
Fillmore and Piru Basins DMS.
Project 5. Ukiah Groundwater Sustainability Plan and On-Call Technical Services
Completed By LWA
Client Name Ukiah Valley Basin GSA
Years of Service 2022-Present
Between 2018-2022 LWA successfully led development of the Ukiah Valley Basin GSP, which was
submitted to DWR in January 2022 and received DWR approval in July 2023. The cornerstone of
this effort was the creation and calibration of an Integrated Hydrological Model for the Upper
Russian River watershed, which enabled simulation of various climate and management scenarios.
The team conducted comprehensive stakeholder engagement throughout the process to ensure
local control of groundwater management while meeting SGMA requirements.
Beginning in 2022, LWA transitioned to an On-Call Technical Support role and has provided
comprehensive technical and regulatory support for GSP implementation in the Ukiah Valley Basin,
working in close partnership with the GSA staff, general manager, Board of Directors, and
Technical Advisory Committee.
Key tasks include, but are not limited to:
GSP Annual Report preparation integrating data from a broad cross -section of partner
agencies and monitoring networks to assess progress towards achieving SMCs.
Telemetered monitoring network management, maintenance and expansion, including
groundwater level and streamflow sensors with data visible on a custom dashboard and
integrated into an automated QAQC process.
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
Proposal Prepared for:
Ukiah Valley Groundwater Sustainability Agency
Proposal for ISW Study 10
Larry Walker Associates
Grant proposal development, including a successful submission to California Department of
Fish and Wildlife for an Interconnected Surface Water Study ($1.36 M awarded in October
2024).
Interpretation and prioritization of DWR’s recommended corrective actions ahead of the 2027
Periodic GSP Evaluation.
Data aggregation to support Rate and Fee Study development.
Development and implementation a Phase I Well Inventory focused on collection,
aggregation, and informed revision of well location and construction information followed by
identification of data gaps and recommendations for addressing those data gaps in
subsequent phases.
The LWA team provides regular technical presentations to the UVBGSA Board of Directors,
Technical Advisory Committee, and stakeholders to ensure transparent communication of GSP
implementation progress and challenges.
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
Proposal Prepared for:
Ukiah Valley Groundwater Sustainability Agency
Proposal for ISW Study 11
Larry Walker Associates
3.0 PROPOSED RESPONDENT TEAM
The LWA Team brings together highly qualified professionals with extensive experience in CDFW grant
funded project implementation, GDE and ISW analyses, integrated hydrological modeling, telemetered
sensor network installation, and database management. Each team member has been strategically
selected based on their specialized expertise, regional knowledge, and proven track records with similar
projects throughout California. The following biographies highlight our key staff's qualifications,
demonstrating the depth and breadth of experience they bring to UVBGSA. Detailed resumes are
provided in Appendix 1. Resumes.
As Project Manager, Dr. Bardsley will coordinate staff and subcontractors to ensure seamless delivery of
all project components. The two Technical Advisors will support Dr. Bardsley in developing
comprehensive monitoring plans, guiding hydrological modeling updates, and ensuring scientific rigor in
all technical analyses and management recommendations.
We have confirmed the Team's full availability and commitment through project completion. LWA will
notify UVBGSA staff in writing to receive approval for any change to the project team.
Staff Biographies
Dr. Bardsley is an aqueous geochemist with over ten
years of experience assisting public agencies with
water resource management challenges. As a Senior
Scientist at LWA, she provides technical, regulatory,
and project management support to groundwater and
stormwater clients across California. Dr. Bardsley has
developed particular expertise in SGMA compliance
and supports GSP implementation in five basins, where
she provides unique insights with her isotopic and
geochemical knowledge. She manages
multidisciplinary teams that tackle complex projects by
combining advanced technical tools like integrated
hydrologic modeling with an appreciation of local conditions to inform water management strategies. As
a former county government employee and faculty member with the USC Environmental Studies
Program, she’s able to effectively bridge the gap between scientific insights and practical, policy-
relevant solutions.
Dr. Foglia is a Vice President assisting with projects in
hydrological modeling, groundwater management
assistance, and managed aquifer recharge. At LWA,
she leads the groundwater services for the UVBGSA,
the implementation of Groundwater Sustainability Plans
for Siskiyou County, Sierra Valley and the South
American Subbasin Sacramento Central Groundwater
Authority. She is designing and implementing groundwater recharge projects for the Omochumne-
Hartnell Water District, the Scott Valley Irrigation District, the Dunnigan Water District, and other small
districts throughout Northern California. Since January 2016, Dr. Foglia has also been an adjunct
faculty member in the Land, Air, and Water Resources (LAWR) Department at the University of
California, Davis, where she teaches a graduate class on groundwater models and model calibration.
Laura Foglia, Ph.D.
Vice President, LWA
Role: Technical Advisor
Education: Ph.D. in Environmental
Engineering, ETH Zurich
Audra Bardsley, Ph.D.
Senior Scientist, LWA
Role: Project Manager
Responsibilities:
• Primary POC for UVBGSA staff
• Oversee quality control and final
document preparation
Education: Ph.D., Geochemistry, University
of Southern California
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
Proposal Prepared for:
Ukiah Valley Groundwater Sustainability Agency
Proposal for ISW Study 12
Larry Walker Associates
Mr. Lewis is a hydrologist affiliated with LWA. Mr.
Lewis has over 21 years of experience working with
government agencies in the field of integrated water
resource management with a focus on the application
of computational tools to evaluate groundwater -surface
water interactions and complex watershed processes
across California. Most recently, he has been involved
in efforts to enhance PRMS platforms under GSP
revision efforts across the State of California to ensure that models can be used to support management
and climate change scenario evaluation moving forward.
Dr. Walker focuses on environmental real-time
continuous remote sensing technology and
applications. He has developed a versatile sensor
platform based on data loggers, cellular modem
telemetry, and various sensors including both
discrete sensor elements, and multi -parameter data
sondes. The systems are designed for rapid
deployment at surface or groundwater sites or
paired with a GPS receiver for mixing zone studies or other mapping applications. Real time data is
typically posted to an internal web site for use by the project team. The platform enables effective
deployment of sophisticated web-enabled, real-time remote sensor equipment even for many small or
short-term projects. This sensor technology has proven valuable in complementing traditional monitoring
methods, enabling efficient and rapid understanding of parameters of interest within a watersh ed.
Mr. O’Neill has over 30 years of experience as an
environmental and water resources consultant. He
specializes in groundwater hydrology and modeling
and has contributed significantly to numerous
projects involving hydrogeologic characterization,
evaluation of the effectiveness of artificial recharge
in agricultural, desert and urban settings,
remediation of contaminated groundwater, and
water resources management.
Dr. Calderwood serves as a Project Engineer with
specialized expertise in groundwater modeling,
recharge project implementation, and GSP
development. Drawing on five years of experience in
groundwater condition assessment and monitoring,
Dr. Calderwood leads the development and
continuous refinement of integrated hydrologic models to support regional groundwater planning and
sustainability initiatives. His technical leadership spans multiple groundwater basins, including serving
as task lead for loosely coupled MODFLOW-PRMS models in Shasta Valley and Butte Valley, where he
successfully navigated GSP submissions that received state approval. Dr. Calderwood's project portfolio
includes managing groundwater recharge initiatives for the Omochumne -Hartnell Water District, where
he oversees monitoring equipment, prepares measured data for board review, and handles temporary
diversion permit reporting and renewals with state agencies. His innovative work integrating California
statewide Airborne electromagnetic survey data with existing groundwater models has enhanced the
Jeffrey Walker, Ph.D., PE
Engineer, LWA
Role: Tasks 1 & 2 Support
Education: Ph.D., Electrical Engineering &
Computer Sciences, University of California,
Berkeley
Gerald O’Neill, CHG, PG
Project Scientist, LWA
Role: Tasks 1 & 2 Support
Certifications: Certified Hydrogeologist,
California, No. 886; Professional Geologist,
California, No. 8186
Education: B.S., Geosciences, Pennsylvania
State University
Andrew Calderwood, Ph.D.
Project Engineer, LWA
Role: Tasks 1 & 2 Support
Education: Ph.D., Physical Hydrology
Will Lewis
Senior Hydrologist, LWA
Role: Technical Advisor & Task Lead
Education: M.S., Environmental Science
and Management, University of California,
Santa Barbara
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
Proposal Prepared for:
Ukiah Valley Groundwater Sustainability Agency
Proposal for ISW Study 13
Larry Walker Associates
representation of stream-aquifer interactions for the Cosumnes River Levee Setback project, directly
contributing to improved flood risk reduction and managed aquifer recharge opportunities. Dr.
Calderwood regularly presents complex groundwater modeling concepts to diverse stakeholders,
effectively communicating the benefits of managed recharge and sustainable groundwater management
practices throughout California.
Ms. Woicekowska is a Project Scientist with a
wealth of experience in environmental analysis,
computer science, and data visualization. As a
research assistant at the Lawrence Berkeley
National Laboratory, Ms. Woicekowska utilized high
performance computing systems to perform
simulations that provided valuable insights into fluid
systems and their dynamics. She worked with large
datasets from simulations and field studies, developing scripts in Python to effectively process, analyze,
and visualize the information. At LWA, Ms. Woicekowska supports groundwater projects, with a
particular focus on MODFLOW models for GSPs. In addition, she contributes compliance support for
stormwater reporting and field monitoring for stormwater and groundwater.
Mr. Melechin is a Project Scientist with specialized
expertise in ISW studies and groundwater
sustainability. Drawing on his geochemical
background, Mr. Melechin leads field teams in
conducting specialized sampling of radioisotopes
and water chemistry to identify groundwater-surface
water interactions across multiple watersheds. Mr.
Melechin's technical proficiency extends to analyzing stable water isotopes and major ions to identify
different water source contributions, constructing comprehensive data visualizations through GIS
mapping, and supporting GSP implementation in multiple basins across California.
Mr. Dory serves as a Project Scientist specializing
in environmental data analysis, advanced
instrumentation, and water resource management.
With an M.S. in Hydrology from UC Davis, he
applies Python and R programming to develop
custom data analysis solutions for environmental
monitoring. His relevant experience includes leading
continuous surface water monitoring systems, spearheading data collection and analysis for streamflow
improvement in Scott and Shasta River Valleys and supporting interconnected surface water
identification for sustainable management c riteria. Mr. Dory's field experience covers groundwater
sampling, installation of acoustic groundwater level sensors with telemetry, and implementing quality
control procedures for environmental mapping. His ability to communicate technical concepts has
facilitated effective stakeholder engagement with local residents and tribal members regarding
groundwater use curtailments on livelihoods and cultural traditions.
Stillwater Sciences
Camille Woicekowska
Project Scientist, LWA
Role: Tasks 1 & 2 Support
Education: B.A., Environmental Earth Science,
2022, University of California, Berkeley
Ben Melechin
Project Scientist, LWA
Role: Tasks 1 & 2 Support
Education: B.A., Earth Sciences, 2022,
University of Southern California
Chris Dory
Project Scientist, LWA
Role: Tasks 1 & 2 Support
Education: M.S., Hydrology, University of
California, Davis
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
Proposal Prepared for:
Ukiah Valley Groundwater Sustainability Agency
Proposal for ISW Study 14
Larry Walker Associates
Dr. Braudrick is a geomorphologist with over 26 years
of extensive experience in river and floodplain systems
as both an environmental consultant and researcher.
Throughout his career at Stillwater Sciences, where he
has served for 13 years, Dr. Braudrick has established
himself as a leading expert in the interconnection
between hydrological processes and ecological systems.
His comprehensive knowledge spans fluvial geomorphology, GDEs, hillslope processes, and sediment
transport dynamics. Dr. Braudrick has pioneered methodologies for assessing the complex relationships
between groundwater systems and surface ecology, becoming instrumental in developing GSPs across
numerous California watersheds. As project manager for multiple groundwater sustainability initiatives,
Dr. Braudrick has successfully implemented the California Environmental Flows Framework to evaluate
impacts on aquatic species, developed drought mitigation strategies for riparian ecosystems, and
utilized remote sensing technologies to monitor vegetation health in groundwater-dependent systems.
Dr. Orr is a Principal/Senior Ecologist with over 40
years of experience leading complex natural resource
projects throughout the western United States. During
his 29-year tenure at Stillwater Sciences, Dr. Orr has
established himself as a preeminent authority in riparian
and wetland ecology, restoration planning, and GDEs.
Dr. Orr has been instrumental in pioneering Stillwater
Sciences' approach to assessing GDEs under the SGMA
serving as project director for multiple groundwater sustainability plans across Cali fornia, including the
Fillmore and Piru Basins, Owens Valley, and Madera and Chowchilla watersheds. Dr. Orr holds multiple
permits for working with sensitive species, including a USFWS recovery permit for California freshwater
shrimp and CDFW collecting permits for various aquatic species.
Ms. Adelstein is a seasoned hydrologist with 6 years of
professional experience and comprehensive expertise in
numerical modeling, data analysis, geospatial analysis,
water quality field methods, and technical writing. As a
key team member at Stillwater Sciences for the past 5
years, Ms. Adelstein has established herself as a
specialist in groundwater flow modeling using various
platforms including MODFLOW, GSFLOW, and FEHM.
Her technical proficiency extends to complex data analysis using Python and MATLAB, advanced GIS
applications, Google Earth Engine for environmental monitoring, and time-series data management
through AQUARIUS. Ms. Adelstein has made significant contributions to numerous groundwater
sustainability planning projects across California, where she applied her expertise in hydrogeology to
assess groundwater-dependent ecosystems, develop sustainable management criteria, and implement
monitoring networks for interconnected surface water systems.
Mr. Keith is a Senior Aquatic Ecologist with 34 years
dedicated to fisheries ecology and aquatic resource
management throughout California. During his 29-year
tenure at Stillwater Sciences, he has established himself
as a specialist in analyzing water and land management
impacts while developing effective restoration and
recovery strategies for native aquatic species. He excels
Christian Braudrick, Ph.D.
Senior Geomorphologist, Stillwater
Role: Tasks 1 & 3 Support
Education: Ph.D., Earth and Planetary
Science, University of California, Berkeley
Bruce Orr, Ph.D.
Principal Ecologist, Stillwater
Role: Tasks 1 & 3 Support
Education: Ph.D., Aquatic
Entomology/Aquatic and Wetland
Ecology, University of California, Berkeley
Esther Adelstein
Hydrologist, Stillwater
Role: Tasks 1 & 3 Support
Education: M.S., Earth and Planetary
Science, University of California, Santa
Cruz
AJ Keith
Senior Aquatic Ecologist, Stillwater
Role: Tasks 1 & 3 Support
Education: M.A., Ecology and Systematic
Biology, San Francisco State University
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
Proposal Prepared for:
Ukiah Valley Groundwater Sustainability Agency
Proposal for ISW Study 15
Larry Walker Associates
in managing multidisciplinary conservation projects for sensitive aquatic resources, with particular
emphasis on collaborative approaches involving diverse stakeholders. His recent work has focused on
evaluating GDEs for GSPs, conducting comprehensive fisheries monitoring in watershed systems like
the Napa River, and developing habitat improvement designs for endangered Southern California
steelhead in the Los Angeles River watershed.
Ms. Burger is a Senior Wildlife Biologist at Stillwater
Sciences with 23 years of experience in aquatic and
terrestrial biology with focused experience in special-
status species surveys, biological resource evaluations,
impact analyses, and mitigation and monitoring planning.
Ms. Burger holds the following permits:
USFWS 10(a)1(A) recovery Permit #148552-4 for giant garter snake, Alameda whipsnake, San
Francisco garter snake, and California red-legged frog;
USFWS 10(a)1(A) recovery Permit #98536C-1 for Sierra Nevada yellow-legged frog and
California tiger salamander (aquatic surveys);
CDFW Scientific Collecting Permits (SCP), Project -specific, for: SMUD (#20023-002), Balch &
Helms (#20023-002), and Kern [#21084-001) for northwestern pond turtle, foothill yellow -legged
frog, Sierra Nevada yellow-legged frog, and/or western spadefoot; and
CDFW Memorandum of Understanding for Sierra Nevada yellow-legged frog, foothill yellow-
legged frog, California tiger salamander, giant garter snake, and Alameda whipsnake.
Mr. Brumo is a fisheries biologist with Stillwater
Sciences with 23 years of experience working on
projects aimed at managing and restoring anadromous
fish populations in diverse watersheds across the West.
Mr. Brumo holds the following permits:
• USFWS Section 10(a)(1)(A) Permit #ES98536C for
California freshwater shrimp; and
• CDFW Incidental Take Permit (2081(a))/Memorandum of Understanding for California freshwater
shrimp.
DBS&A
Dr. Tolley is a hydrogeologist with 15 years of
professional experience. He specializes in groundwater
hydrology, groundwater resources, numerical modeling,
contaminant transport in groundwater, environmental
database management systems, workflow automation,
and GIS analysis and mapping.
Ms. Nicholls is a hydrogeologist and field technician at
DBS&A with 7 years of experience and a background in
hydrology and earth sciences. She holds a Master of
Science in Hydrology from the New Mexico Institute of
Mining and Technology which allowed her to gain
experience in water quality and hydrological data. She is
Holly Burger
Senior Wildlife Specialist, Stillwater
Role: Tasks 1 & 3 Support
Education: B.S., Biology, Baldwin Wallace
University
Abel Brumo
Fisheries Biologist, Stillwater
Role: Tasks 1 & 3 Support
Education: M.S., Fisheries Science,
Oregon State University
Douglas Tolley, Ph.D., PG
Hydrogeologist, DBS&A
Role: Task 3 Lead
Education: Ph.D., Hydrology, University of
California, Davis
Phoebe Nicholls
Hydrogeologist, DBS&A
Role: Task 3 Support
Education: MS, Hydrology, New Mexico
Institute of Mining and Technology
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
Proposal Prepared for:
Ukiah Valley Groundwater Sustainability Agency
Proposal for ISW Study 16
Larry Walker Associates
skilled in ArcGIS Pro, Python, Applied Environmental Statistics, R Statistical Software, Aquarius, and
Ambient Water Quality Monitoring Systems.
Mr. Buczek is an accomplished software developer and
Information Technology (IT) professional with more than
24 years of varied accomplishments, participation in
numerous technologies and involvement across all
aspects of software development, including numerous
geo-centric web applications. Mr. Buczek developed a
database management system called GLA-Data for our
parent company, Geo-Logic Associates, Inc. (GLA). He has customized GLA -Data for 17 clients (7
water resources specific) and continues to maintain and add features to the system. He provides
database support for the Sierra Valley Groundwater Management District GSP and is the Senior
Software Developer responsible for all front-end and back -end aspects related to the web applications
associated with development of the DMS for the Owens Valley GSP and Fillmore and Piru Basins GSP.
UCCE
Dr. Garza Diaz is the UC Cooperative Extension
(UCCE) Advisor for Water Quality, Quantity, and
Climate Change in Mendocino and Lake Counties.
She holds a Ph.D. in Hydrologic Sciences from the
University of California, Davis, specializing in water
policy and management under climate change. As a
UCCE advisor, Dr. Garza has launched the water
and climate change program in Mendocino and
Lake Counties, supporting projects that integrate water management under climate change, sustainable
groundwater practices, well monitoring, instream and environmental flows, extreme climate events like
drought and floods, and the resilience of social-ecological systems. She has built strong relationships
with Tribal Nations, including the Sherwood Band of Pomo Indians and Middletown Rancheria, as well
as local governments such as the Mendocino County Boards of Supervisors, the Mendocino County
Department of Transportation, and the Ukiah Valley Groundwater Sustainability Agency. She also
collaborates with water suppliers and districts, including Russian River Flood Control, Potter Valley
Irrigation District, and the Mendocino County Resource Conservation District, along with grassroots
organizations.
Gregory Buczek
Database Architect, DBS&A
Role: Task 3 Support
Education: BA, Psychology and Sociology,
Purdue University
Laura E. Garza Diaz, Ph.D.
Area Water Quality, Quantity, and Climate
Change Advisor, UCCE
Role: Tasks 1 & 2 Support
Education: Ph.D., Hydrologic Sciences,
University of California, Davis
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
Proposal Prepared for:
Ukiah Valley Groundwater Sustainability Agency
Proposal for ISW Study 17
Larry Walker Associates
Bold: Task Lead
1: LWA
2: Stillwater Sciences
3: DBSA
4: UCCE
3.1 Organizational Chart
Our proposed approach brings together a multidisciplinary team of hydrologists, ecologists, and modeling
specialists who combine the technical expertise required for GDE and ISW assessment with extensive
experience in Russian River watershed. The organizational chart presented in Figure 1 below provides
an overview of our team structure, emphasizing our capabilities in the three core areas identified in the
RFP. Team members have successfully implemented similar studies for GSAs throughout California and
have specific experience with salmonid habitat assessment in the watershed. Our Team qualifications are
further described in Section 3.0 and Appendix 1. Resumes.
Figure 1. Organizational Structure of the LWA Team
AUDRA BARDLSEY, PH.D. 1
PROJECT MANAGER
LAURA FOGLIA, PH.D. 1
WILL LEWIS 1
TECHNICAL ADVISORS
Will Lewis1,
Gerald O’Neill1, PG, CHG
Jeffrey Walker1, PE
Andrew Calderwood1, Ph.D.
Camille Woicekowska1
Ben Melechin1
Chris Dory1
Laura Garza Diaz4, Ph.D.
Christian Braudrick2, Ph.D.
Bruce Orr2, Ph.D.
Esther Adelstein2
AJ Keith2
Holly Burger2
Abel Brumo2
Laura Garza Diaz4, Ph.D.
1. Monitoring Plan Development 2. Water Resource Management
Recommendations
Will Lewis1,
Gerald O’Neill1, PG, CHG
Jeffrey Walker1, PE
Andrew Calderwood1, Ph.D.
Camille Woicekowska1
Ben Melechin1
Chris Dory1
Laura Garza Diaz4, Ph.D.
3. Program Management & Grant
Compliance
Douglas Tolley3, Ph.D., PG
Phoebe Nicholls3
Greg Buczek3
Christian Braudrick2, Ph.D.
Bruce Orr2, Ph.D.
Esther Adelstein2
AJ Keith2
Holly Burger2
Abel Brumo2
Ukiah Valley GSA
TASKS
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
Proposal Prepared for:
Ukiah Valley Groundwater Sustainability Agency
Proposal for ISW Study 18
Larry Walker Associates
3.2 Project understanding
UVBGSA has initiated this project to advance the understanding of ISWs and GDEs in the URR
watershed. Funded by the CDFW Watershed Grant Program, this study directly addresses the UVBGSA’s
obligations under SGMA and enhances the implementation of its GSP, which was approved by DWR in
July 2023 with recommended corrective actions.
This project presents a timely opportunity to improve scientific understanding of groundwater-surface
water interactions, particularly as they relate to sensitive fish species, instream flows, and long-term water
management decisions. By integrating geochemical, biological, and physical monitoring with hydrological
modeling, this study will characterize the spatial extent, seasonal timing, and ecological impacts of ISW
under varied climate and management scenarios. The resulting insights will support adaptive water
management strategies, helping UVBGSA fulfill its regulatory obligations under SGMA while safeguarding
groundwater resources for both human and ecological needs.
Advancing UVBGSA’s GSP and DWR Recommended Corrective Actions
This study builds upon and refines the original ISW and GDE analysis conducted for the 2021 GSP,
which was based on limited data and relied on groundwater elevation as a proxy for surface water
connectivity. While this approach provided an initial characterization, both the GSP and DWR’s 2023 Staff
Report1 identified the need for field-based validation and expanded monitoring to improve the accuracy of
ISW and GDE assessments.
Since 2021, UVBGSA and its partners have made significant strides in addressing these data gaps. The
monitoring network has been expanded, increasing spatial coverage and frequency of groundwater level
measurements, and a newly completed thalweg survey of the mainstem Russian River has enhanced
understanding of groundwater-surface water interactions. These improvements provide a strong
foundation for a more refined, field-validated assessment of ISW and GDEs in the Basin. The April 25,
2024 Board of Directors meeting further reinforced the urgency of these efforts, with the Technical
Advisory Committee (TAC) prioritizing enhancing the monitoring network, conducting a Well Inventory
Study, and initiating an ISW Study as key actions to be completed ahead of the 2027 Periodic Evaluation .
Since that meeting, UVBGSA has instrumented three additional Representative Monitoring Point wells,
initiated Phase I of the Well Inventory Study, and successfully secured CDFW grant funding to support
this ISW/GDE Study. These proactive measures offset the need for additional ratepayer funding while
ensuring that SGMA compliance remains on track .
Leveraging the UVIHM & WaterSMART Project for Hydrological Modeling and Scenario Analysis
This project will directly benefit from and build upon the UVIHM, which the LWA Team is currently refining
through the WaterSMART-funded project, “Creating Long-Term Water Supply Resiliency for Ukiah Valley
and Upper Russian River”, led by the California Land Stewardship Institute (CLSI). The ongoing UVIHM
improvements provide a critical opportunity to integrate new ISW/GDE data from this study into predictive
modeling efforts, ensuring that groundwater-surface water interactions are more accurately represented
in future scenario analyses. An overview of UVBGSA’s and CLSI’s groundwater level monitoring and
stream gage networks is presented in Figure 2.
Through the WaterSMART project, CLSI has installed water level sensors in three wells outside the
formal GSA network, collected extensive thalweg data for the Upper Russian River, and made
1 California Department of Water Resources: Sustainable Groundwater Management Office , Ukiah Valley Basin GSP Determination,
July 27, 2023, https://ukiahvalleygroundwater.org/wp-content/uploads/2023/11/2023-07-27-Ukiah-Valley-Basin-GSP-
Determination-v2.pdf.
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
Proposal Prepared for:
Ukiah Valley Groundwater Sustainability Agency
Proposal for ISW Study 19
Larry Walker Associates
Figure 2. UVBGSA and CLSI Groundwater Level and Streamflow Monitoring Networks
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
Proposal Prepared for:
Ukiah Valley Groundwater Sustainability Agency
Proposal for ISW Study 20
Larry Walker Associates
enhancements to stream routing within
the UVIHM. These advancements have
significantly improved the model’s ability
to simulate surface water-aquifer
interactions, but data gaps remain,
particularly regarding mainstem cross-
section details and Western Hills
streamflow characteristics. This ISW/GDE
Study provides a unique opportunity to
close these gaps through expanded field
data collection, including the installation
of two new stream gages, up to ten
groundwater level sensors with telemetry,
and shallow piezometers funded through
an $80,000 allocation.
The synergy between this study and the
ongoing UVIHM refinements will enable
UVBGSA to run management and climate scenarios that assess ISW/GDE response to changing water
availability, reduced surface water inputs, and future groundwater management strategies . These
analyses will directly inform the development of new SMC for ISW depletion, addressing a major
corrective action identified by DWR in their 2023 Staff Report.
Strengthening Salmonid Habitat and Instream Flow Protection
Beyond advancing groundwater management objectives, this study will provide critical insights to support
salmonid conservation efforts in the Upper Russian River and its fish -bearing tributaries. ISWs and GDEs
play an essential role in maintaining instream flows, which are vital for Chinook salmon and steelhead
migration, spawning, and juvenile rearing. However, data gaps remain in identifying when and where
surface water-groundwater disconnections occur, especially during dry-season low-flow periods when
salmonids are most vulnerable.
This project will use high-resolution geochemical, biological, and hydrological monitoring to map seasonal
patterns of groundwater discharge and aquifer-surface water exchanges, allowing for more targeted
conservation efforts. The expanded monitoring network will provide essential data to support long-term
ecological planning, conservation land acquisitions, and instream flow protection measures. These
outcomes will directly inform regional water management decisions, ensuring that groundwater
sustainability measures align with broader ecosystem protection efforts.
The Opportunity
By integrating field data collection, hydrological modeling, and ecosystem assessments, this project will
establish a strong scientific foundation for improving ISW and GDE understanding and management in
the Ukiah Valley Basin. The study responds directly to SGMA requirements, DWR recommended
corrective actions, and stakeholder priorities, while leveraging ongoing UVIHM enhancements and the
WaterSMART project’s scenario modeling capabilities. This effort will transition the ISW/GDE analysis
from a proxy-based approach to a data-driven, field-validated understanding, allowing UVBGSA to make
more informed, adaptive water management decisions. Additionally, by supporting instream flow
improvements, identifying priority conservation areas, and strengthening the scientific foundation for
SMC, this study will contribute to long-term water resource resilience and salmonid habitat protection in
the URR watershed.
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
Statement of Qualifications Prepared for:
Ukiah Valley Groundwater Sustainability Agency
Proposal for ISW Study 21
Larry Walker Associates
4.0 PROPOSED SCOPE OF WORK
This project will follow a phased methodology grounded in both robust desktop analyses and targeted
field investigations, with a strong emphasis on stakeholder collaboration and scientific rigor. The objective
is to improve understanding of ISWs, GDEs, and associated fish habitats within the URR watershed,
while also enhancing the UVIHM and addressing critical data gaps and agency recommendations.
Task 1: Monitoring Plan Development
To effectively assess and monitor surface water and groundwater interactions in the Ukiah Valley Basin,
this study will employ a multi-faceted, transdisciplinary approach that integrates biological surveys,
hydrological assessments, and advanced geochemical monitoring techniques. By combining field-based
research with geochemical tracers, continuous data collection, and stakeholder engagement, this plan will
establish a comprehensive monitoring network that enhances our understanding of hydrologic
connectivity and informs sustainable water management decisions for the Upper Russian River and its
key fish-bearing tributaries. This task will be carried out in close collaboration with the Ukiah Valley
Groundwater Sustainability Agency (GSA), the City of Ukiah, Tribal representatives, CDFW, and other
stakeholders to ensure that the resulting expanded surface water monitoring network effectively fills
existing data gaps and provides critical information for managing ISWs and GDEs.
Phase 1: Desktop Investigations and Community Input
The first phase will focus on desktop analyses aimed at refining our understanding of ISW and GDE
distribution using updated datasets, including the extended UVIHM, newly mapped groundwater elevation
contours, recent stream network improvements, and mainstem thalweg survey data. These analyses will
generate updated ISW and GDE maps, summarize key geospatial data (e.g., stream slope, drainage
area, confluences), and identify priority stream reaches that likely support both ISW and GDEs with
adequate subwatershed representation.
Additional datasets will be compiled to further refine stream reach selection, including:
• Fish-bearing stream data from NMFS, CDFW, and DWR, cross-checked against existing
literature and reports on fish passage barriers and viability in the Upper Russian River.
• Existing surface water and groundwater monitoring networks operated by the GSA, partner
agencies, and researchers in the Upper Russian River watershed to ensure that new monitoring
locations complement and enhance ongoing efforts.
A potential deliverable for Phase 1 is presented in Figure 3. This site prioritization for the Napa River was
determined by ranking each potential site by the amount of hydrologic data (0 -3 points), the ecological
importance of the site (a function of the number of species and life stages that are likely to use the site)
(0-6 pts), and site uniqueness and proximity to a stream restoration site (0-1 pts) yielding a clear visual
representation of how candidate locations compare.
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
Statement of Qualifications Prepared for:
Ukiah Valley Groundwater Sustainability Agency
Proposal for ISW Study 22
Larry Walker Associates
Figure 3. Site Prioritization for the Napa River Subbasin
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
Statement of Qualifications Prepared for:
Ukiah Valley Groundwater Sustainability Agency
Proposal for ISW Study 23
Larry Walker Associates
Findings from Stillwater Sciences, including previously identified GDE locations and other relevant
ecological resources will be integrated into the analysis to ensure that the monitoring plan builds on and
complements existing scientific efforts. Each potential stream reach will be evaluated for feasibility,
considering factors such as landowner access, logistical constraints, and health and safety
considerations. In coordination with the GSA Board of Directors, the TAC, and the Mendocino County
Resource Conservation District, LWA will incorporate local knowledge to refine the list of candidate
stream reaches. This preliminary list will be presented at a public meeting to solicit feedback from
community members, Tribal representatives, and other stakeholders. UCCE will facilitate this
engagement process, leveraging their existing outreach programs and experience in organizing public
meetings related to water resource management in the Basin.
Phase 2: Site Selection, Monitoring Plan Development, and Instrumentation
Following stakeholder engagement and feasibility assessments, a final set of stream reaches will be
selected for detailed investigation. This selection process will ensure that the monitoring network
effectively captures ISW and GDE dynamics, provides adequate spatial coverage, and integrates with
existing surface and groundwater monitoring efforts. The refined list of sites will balance scientific
priorities with practical considerations such as landowner access, logistical constraints, and the need for
data continuity within the Upper Russian River Basin.
A key component of this phase will involve conducting comprehensive biological surveys, including fish
counts, across the selected tributaries in the UVB. These surveys will be designed to capture seasonal
variations in aquatic habitat, assess fish populations, and provide essential ecological data to evaluate
how groundwater-surface water interactions impact sensitive species. Using a combination of aerial
imagery, drone-based imaging, and field-based fish count methods, including electrofishing, visual
surveys, and eDNA sampling, the study will generate a detailed picture of fish distribution, habitat
connectivity, and potential passage barriers. This information will complement hydrological and
geochemical data, strengthening the ability to assess ISW and GDE responses to environmental
changes.
To enhance the monitoring network, continuous water level and temperature sensors will be installed in
up to ten wells, ensuring data collection in areas that are critical for understanding groundwater -surface
water interactions. These wells will be strategically selected based on their proximity to ISW locations,
their ability to fill gaps in the existing network, and their relevance to GDE sustainability assessments. The
placement of these sensors will allow for real-time data collection that captures fluctuations in
groundwater levels and temperature over time, providing a high-resolution dataset that can inform water
management decisions. The installation of these sensors will be coordinated with the City of Ukiah and
the GSA, ensuring that the necessary landowner access agreements are secured before deployment.
In addition to hydrological monitoring, a geochemical assessment will be conducted to refine the
understanding of groundwater influx to surface waters. This effort will utilize Radon-222 time-series
sampling along selected stream reaches to detect seasonal changes in groundwater discharge. The
study will also incorporate stable isotope analyses and major ion chemistry to differentiate groundwater
sources and quantify their contributions to streamflow. Targeted push point sampling of subsurface
sediments will further help identify groundwater upwelling in gaining stream reaches. These geochemical
techniques will provide an independent validation of model predictions and offer insight into the variability
of groundwater-surface water interactions across different hydrologic conditions.
Upon completing the field investigations and data collection, LWA will develop a comprehensive
Monitoring Plan and Baseline Monitoring Report. This document will outline the methodologies used in
the study, summarize key findings from biological and geochemical assessments, and provide
recommendations for long-term monitoring strategies. The report will also serve as a foundation for
adaptive water management, ensuring that monitoring efforts remain relevant and effective in the face of
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
Statement of Qualifications Prepared for:
Ukiah Valley Groundwater Sustainability Agency
Proposal for ISW Study 24
Larry Walker Associates
evolving climate conditions and water resource challenges. To facilitate ongoing integration with regional
water management efforts, LWA will ensure that all analytical tools, field data, and documentation are
made available to the GSA and technical staff responsible for groundwater sustainability planning. The
monitoring network and datasets developed through this study will directly support UVIHM calibration, the
refinement of the Groundwater Sustainability Plan, and future decision-making processes regarding ISW
and GDE protections. Following a public presentation of the draft recommendations, stakeholder
feedback will be incorporated into the final monitoring strategy, ensuring that the project remains
responsive to local priorities and management objectives.
Examples of four potential deliverables for Phase 2 from the LWA Team’s previous work are presented in
Figures 4 through 6. Figure 4 presents the results of GDE mapping for Fillmore-Piru developed using a
recent vegetation map from CDFW coupled with a review of the plant associations in the literature to
determine which associations were likely associated with groundwater. The connected and disconnected
stream reaches were identified by Balance Hydrologics during GSP development. Figure 5 presents an
aquatic species distribution for the Eel River, which was assessed using USFWS, NOAA, and CDFW
databases. Critical riffles were identified in the field by Stillwater Sciences on a previous study. Figure 6
presents a visual representation of radon activity by reach in the Scott River watershed where a higher
radon activity suggests a higher contribution of groundwater to surface waters. Figure 7 presents a visual
representation of evidence suggesting a reach of interest is gaining a reach in the Scott River Watershed
based on PushPoint samples and radon activities.B
y combining biological assessments, geochemical monitoring, and stakeholder collaboration, this phase
of the project will establish a robust scientific foundation for understanding and protecting groundwater -
dependent ecosystems and fish habitats in the Ukiah Valley Basin. The insights gained will inform long -
term strategies for sustainable water resource management, ensuring that ISW and GDEs remain
resilient in the face of changing environmental conditions.
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
Statement of Qualifications Prepared for:
Ukiah Valley Groundwater Sustainability Agency
Proposal for ISW Study 25
Larry Walker Associates
Figure 4. Groundwater Dependent Ecosystem Units in the Fillmore and Piru Basins
Figure 5. Aquatic Species distribution for the Eel River Groundwater Basin
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
Statement of Qualifications Prepared for:
Ukiah Valley Groundwater Sustainability Agency
Proposal for ISW Study 26
Larry Walker Associates
Figure 6. Visual Representation of Radon Activity by Reach in the Scott River Watershed
Figure 7. Visual Representation of Evidence Suggesting a Gaining Reach in the Scott River
Watershed
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
Statement of Qualifications Prepared for:
Ukiah Valley Groundwater Sustainability Agency
Proposal for ISW Study 27
Larry Walker Associates
Task 2: Water Resource Management Recommendations
This project will employ a phased approach to refine the UVIHM, evaluate groundwater-surface water
interactions under various management and climate scenarios, and develop actionable recommendations
for sustainable water resource management. By leveraging recent modeling efforts, targeted field data
collection, and stakeholder engagement, the project will ensure that water management decisions
affecting ISWs and GDEs are based on the best available scientific analyses.
Phase 1: Enhancing UVIHM and Running Management and Climate Scenarios
LWA originally developed the UVIHM during the Groundwater Sustainability Plan (GSP) process and has
an in-depth understanding of its capabilities and limitations. Since early 2024, LWA has been working
closely with CLSI under the URR WaterSMARTs project to enhance the model, particularly in assessing
the effects of reduced surface water availability due to the Potter Valley Project decommissioning and
long-term climate change. These efforts have already resulted in key updates, and this project will build
upon that progress by refining UVIHM’s ability to characterize stream-aquifer interactions, particularly in
tributary reaches that serve as critical fish habitats.
Data collected as part of Task 1 will significantly improve model calibration by refining key hydrological
parameters such as streambed conductivity, aquifer conductivity, and tributary inflows, which remain
poorly constrained. In addition, field-based geomorphological surveys will improve representation of
tributary stream channels, including their width, slope, and physical characteristics, allowing for more
precise predictions of groundwater-surface water connectivity and the spatial distribution of GDEs.
Geochemical data including Radon -222, stable isotopes of water, and major ion concentrations will
further validate model predictions by identifying the timing and locations of surface water-groundwater
interactions. The LWA Team will also incorporate insights from ongoing GSA efforts to enhance the
accuracy of UVIHM ahead of running scenario simulations. Addressing a key data gap identified in the
GSP, the Team will conduct cross-sectional surveys at critical locations such as tributary confluences and
stream gages, complementing recent mainstem thalweg mapping carried out under the WaterSMARTs
project. Additional refinements will be made using well location and construction data obtained through
the GSA’s ongoing Well Inventory Study, which has already improved model representation of municipal
wells and, to a lesser extent, agricultural wells. By integrating these datasets, LWA will further enhance
UVIHM’s ability to assess groundwater use impacts on surface water resources.
In addition to model improvements, the LWA Team will conduct targeted scenario simulations to evaluate
the response of tributary ISW and GDEs to different climate and management conditions. As part of this
effort, the Team has already engaged with DWR to obtain updated climate projections for the Upper
Russian River Watershed, ensuring that model simulations reflect the most current hydrological
expectations. Having met with key Basin stakeholders – including the State Water Board, City of Ukiah,
Willow County Water District, and Russian River Flood Control – LWA is well-positioned to refine its
representation of historical and future surface water availability and integrate new information regarding
the Potter Valley Project decommissioning as it becomes available.
These modeling efforts will also examine the effects of potential water management strategies, such as
the construction of off-stream storage ponds to capture high winter flows, surface water curtailments, and
shifts in groundwater pumping across different areas of the Basin. Given the similarities between the
CDFW ISW/GDE project objectives and those of the WaterSMARTs project, LWA will be able to efficiently
build upon existing scenario work to develop tailored simulations that provide detailed insights into future
ISW and GDE conditions under changing hydrological regimes.
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
Statement of Qualifications Prepared for:
Ukiah Valley Groundwater Sustainability Agency
Proposal for ISW Study 28
Larry Walker Associates
Phase 2: Development of Recommendations and Public Engagement
Following the completion of model refinements and scenario simulations, LWA will synthesize key
findings into a comprehensive set of water resource management recommendations designed to
minimize impacts on sensitive fish habitats while ensuring sustainable groundwater use. This process will
be carried out in close collaboration with CDFW, the GSA, Tribes, and other stakeholders to ensure that
the recommendations align with ongoing regional water management efforts.
As part of this effort, LWA will present preliminary findings at a UCCE-facilitated public meeting, where
stakeholders will have the opportunity to provide feedback on draft recommendations. Following this
engagement, the Team will document public input and refine its recommendations to ensure they are
both scientifically robust and adaptable to future water management needs. To support long -term
implementation, LWA will also take proactive steps to ensure seamless integration of analytical tools and
datasets with ongoing GSA efforts. This will include sharing all modeling refinements, field data, and
calibration methodologies with technical staff involved in GSA-led groundwater sustainability initiatives,
ensuring that potential challenges related to version control, documentation, and data consistency are
addressed. Additionally, the Team will provide technical support for GSA staff to facilitate the continued
refinement of UVIHM and GSP, ensuring that water resource management strategies remain adaptive as
new information becomes available.
By combining state of the science hydrological modeling, high-resolution field data collection, and an
inclusive stakeholder-driven process, this project will establish a strong scientific foundation for informed
decision-making in the Ukiah Valley Basin. The outcomes will directly support regional water resource
planning efforts and enhance the resilience of ISW, GDEs, and fisheries under evolving climate and water
management conditions.
Task 3: Program Management and Grant Compliance
Effective execution of the Upper Russian River GDE/ISW Study requires strong project management,
transparent communication, and full compliance with grant requirements in addition to sound technical
work. Task 3 is designed to ensure that the study is cond ucted efficiently, meets the standards of the
CDFW Watershed Grant Program, and remains responsive to stakeholder priorities throughout its
duration. A robust project management framework will be implemented to maintain clear scheduling,
milestone tracking, and internal coordination across multiple technical tasks. The consultant team will
establish regular check-ins, document reviews, and quality assurance/quality control (QA/QC) protocols to
ensure that all deliverables adhere to CDFW requirements and project objectives. These quality control
measures will minimize risks, ensure technical accuracy, and provide early identification of potential
challenges to maintain project momentum. Coordination with the UVBGSA, its consultants, and partners
will be a key aspect of this effort, allowing for real -time adjustments and collaborative decision-making as
new findings emerge.
As part of this task, the LWA Team will also develop a comprehensive Data Management Plan (DMP)
using CDFW’s standardized form. This plan will define metadata standards, establish data validation
protocols, and outline strategies for long-term data storage and accessibility. The DMP will cover a range
of datasets, including groundwater level readings, isotope analyses, streamflow measurements, and
biological survey results, ensuring that data integrity is maintained across all project activities. The plan
will be submitted to CDFW early in the project and will serve as a foundational reference for data
collection, processing, and reporting. A critical consideration for data management is the lack of a
centralized Data Management System (DMS) within the GSA to house datasets collected under GSP
implementation efforts and annual reporting. While data are currently organized, they are not centrally
accessible in a streamlined system. This project presents an opportunity to lay the foundation for a more
comprehensive DMS that integrates not only the new datasets collected under this study but also
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
Statement of Qualifications Prepared for:
Ukiah Valley Groundwater Sustainability Agency
Proposal for ISW Study 29
Larry Walker Associates
historical and ongoing monitoring efforts across the Basin. The consultant team will work with the GSA to
explore scalable solutions that enhance data accessibility, visualization, and long-term usability. Figure 8
presents an online interactive mapping interface for a DMS that members of the LWA Team developed
for the Fillmore and Piru Groundwater Subbasins as part of an Interconnected Surface Water Analysis.
Figure 8. Interactive Map Interface from a DMS showing well data compiled as part of an
Interconnected Surface Water Analysis for the Santa Clara River and its Tributaries in the Fillmore
and Piru Groundwater Basins
Stakeholder and UVBGSA engagement are another key element of this task, ensuring that the project
remains collaborative, transparent, and aligned with community priorities. In addition to the two UCCE-
facilitated stakeholder and community engagement meetings described in Tasks 1 and 2, the LWA Team
will provide regular updates to the UVBGSA Board and TAC. The LWA Team will coordinate with the
UVBGSA General Manager to ensure that progress reports and draft materials for review are delivered at
regularly scheduled Board and TAC meetings to reduce the meeting burden on UVBGSA members, and
to streamline coordination with ongoing management efforts. The proposed project manager and other
key team members live within a two-hour drive of Ukiah. They are prepared and committed to attending
UVBGSA meetings in person if required. Presentation materials for community and UVBGSA meetings
will be tailored to both technical and non-technical audiences, ensuring that complex findings are
communicated in an accessible and engaging manner. In addition to sharing information, the LWA Team
will actively incorporate stakeholder and UVBGSA feedback into project refinements, ensuring that the
study remains responsive to local concerns and management needs, strengthening its relevance and
applicability. By integrating this feedback with scientific analyses, the study will remain responsive to local
concerns and management needs, strengthening its relevance and applicability.
Finally, the LWA Team will support the UVBGSA with all aspects of grant reporting and invoicing,
ensuring that the project remains fully compliant with CDFW requirements. This will include the
preparation of quarterly or milestone-based progress reports, tracking of deliverables, and compilation of
financial documentation in accordance with CDFW’s grant compliance guidelines. The consultant team
will maintain clear records of expenditures, task completion, and project challenges, allowing for
transparent project administration. Coordination with UVBGSA staff will ensure that all financial and
technical reports align with CDFW expectations, minimizing administrative burdens and ensuring
continued grant eligibility. By implementing a structured project management approach, refining data
management strategies, engaging stakeholders, and ensuring full grant compliance, this task will provide
the foundation for the successful execution of the Upper Russian River GDE/ISW Study.
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
Statement of Qualifications Prepared for:
Ukiah Valley Groundwater Sustainability Agency
Proposal for ISW Study 30
Larry Walker Associates
5.0 SCHEDULE
The LWA Team has developed a project schedule that aligns with the UVBGSA's timeline requirements, with work commencing in Ma y 2025 and concluding by March 1, 2028. Our schedule
reflects a phased approach that accounts for seasonal considerations essential for field surveys, appropriate sequencing of monitoring activities, and adequate time for stakeholder engagement
and review processes.
The proposed schedule ensures timely completion of all deliverables while building in sufficient flexibility to accommodate p otential adjustments in response to field conditions, stakeholder input, or
other project developments. Our timeline emphasizes efficient coordination among team members and with UVBGSA staff to maintain continuous progress. Critical path elements have bee n
carefully mapped to ensure that the project maintains momentum while allowing for thorough quality assurance at each stage of work.
Figure 9. Project Schedule
Contract Start/End
2028 Deliverable/Task Development
Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Deliverable Submitted
Contract Dates UVBGSA Deliverable Review Period
Stakeholder/Tribal Meeting
Task 1 Monitoring Plan Development
Phase 1. Desktop Investigations and Community Input
Phase 2: Site Selection, Monitoring Plan Development, Instrumentation, Baseline
Monitoring and Reporting
Task 2: Water Resource Management Recommendations
Phase 1: Enhancing UVIHM and Running Management and Climate Scenarios
Phase 2: Development of Recommendations and Public Engagement
Task 3: Program Management and Grant Compliance
Note: The LWA Team will coordinate with the UVBGSA General Manager to provide updates and submit materials for review at regularly scheduled Board and TAC Meetings
Dates of Service
Deliverables include: 1) Monitoring Plan in 2026-Q2 2) Baseline Monitoring Report in 2027-Q4 3) Data Management Plan in 2028-Q1 4) UVIHM Model Updates and Scenario Evaluation
Summary Technical Memo in 2028-Q1
Tasks 2025 2026 2027
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
Statement of Qualifications Prepared for:
Ukiah Valley Groundwater Sustainability Agency
Proposal for ISW Study 31
Larry Walker Associates
6.0 COST PROPOSAL
The LWA Team’s approach emphasizes cost efficiency while delivering comprehensive, high-quality services that meet all requirements outlined in the RFP. We have carefully structured our budget to align with the project objectives and
deliverables, with appropriate allocation of resources for each task. Our cost proposal reflects our extensive experience with similar SGMA-related studies and includes all necessary personnel, equipment, field work, monitoring, modeling, and
reporting tasks. We have factored in optimal resource allocation to maximize value while ensuring thorough coverage of all project elements. The LWA Team is committed to delivering exceptional results within the proposed budget framework
while maintaining flexibility to address evolving project needs. The quote provided is valid for 120 days following submission on April 7, 2025.
Table 2. Cost Proposal
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
Statement of Qualifications Prepared for:
Ukiah Valley Groundwater Sustainability Agency
Proposal for ISW Study 32
Larry Walker Associates
6.1 LWA TEAM RATES
The following table presents the fixed rates for all staff on the LWA Team, as presented in Table 2 above.
The LWA Team acknowledges that the rates shall remain fixed for the duration of the contract.
Table 3. LWA Team Rate Schedule
Firm Classification Rate
LWA Vice President $332
Senior Hydrologist $200
Senior Scientist I $261
Project Engineer/ Scientist II-B $215
Project Engineer/ Scientist I-B $171
Project Scientist I-C $146
Stillwater Sciences Senior Geomorphologist $208
Principal/ Senior Ecologist $266
Hydrologist $156
Senior Aquatic Ecologist $218
Senior Wildlife Biologist $234
Fisheries Biologist $176
DBS&A Project Professional II $211
Staff Professional III $175
Principal Professional I $288
UCCE UCCE Advisor $97
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
Statement of Qualifications Prepared for:
Ukiah Valley Groundwater Sustainability Agency
Proposal for ISW Study 33
Larry Walker Associates
7.0 CONFLICTS
The LWA Team confirms that no conflict of interest would prevent our participation in this solicitation or
contract.
8.0 REFERENCES
LWA's extensive portfolio demonstrates our commitment to excellence across diverse watersheds,
regulatory frameworks, and stakeholder environments. The following references highlight our proven
expertise in monitoring plan development and water resource management recommendations.
Reference 1. Creating Long-Term Water Supply Resiliency for Ukiah Valley and Upper
Russian River
LWA
Client Name California Land Stewardship Institute
Years of Service 2024-Present
References Laurel Marcus, Science Director
550 Gateway Dr #104, Napa, CA 94558
(707) 253-1226; laurelm@fishfriendlyfarming.org
Chelsea Jimenez Ph.D., Director of Specialty Projects and Research,
(707) 253-1226; chelseaj@fishfriendlyfarming.org
Description of Services See Project 1 above.
Reference 2. Scott Valley Irrigation District (SVID) Recharge Project
LWA
Client Name Scott Valley Irrigation District
Years of Service 2021-Present
Reference Matt Parker, Program Manager
1312 Fairlane Road, Yreka, CA 96097
(530) 842-8005; mparker@co.siskiyou.ca.us
Description of Services See Project 2 above.
Reference 3. Napa Valley Subbasin ISW and GDE Workplan and Implementation
Stillwater Sciences
Client Name Napa County Groundwater Sustainability Agency
Years of Service 2024-Present
Reference Jamison Crosby, Natural Resources Conservation Manager
1195 Third Street, Napa, CA 94559
(707) 253-4823; Jamison.Crosby@countyofnapa.org
Description of Services See Project 3 above.
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
Statement of Qualifications Prepared for:
Ukiah Valley Groundwater Sustainability Agency
Proposal for ISW Study 34
Larry Walker Associates
9.0 ADDITIONAL REQUIREMENTS
9.1 Insurance
LWA verifies that the minimum coverage of $1,000,000 in commercial general liability, workers'
compensation, and automobiles is met and will be maintained for the duration of the contract.
9.2 Use of UVBGSA Logo
The LWA Team recognizes that the unauthorized use of the UVBGSA’s official logo is strictly prohibited.
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
4905-3284-5672.2 014737.001 18
Attachment 2 to Exhibit A:
Cannabis Restoration Grant Program
Upper Russian River Groundwater Dependent Ecosystem and
Interconnected Surface Water Study
(Grant Agreement No. Q2496105)
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
4905-3284-5672.2 014737.001 19
EXHIBIT B
PAYMENT TERMS
1. CONSULTANT shall be compensated on a time-and-expense basis, not to
exceed one million, two hundred fifteen thousand, one hundred five dollars
($1,215,105), and CONSULTANT will charge UVBGSA in accordance with the
allocated budget to each task and rate schedule in the Cost Proposal, attached
hereto and incorporated herein as Attachment 1 to Exhibit A. This fee shall not
be exceeded without the prior written authorization from the UVBGSA General
Manager and approval by the Board.
2. CONSULTANT shall submit invoices no less than quarterly, detailing the specific
services provided and clearly explaining any incidental charges.
3. UVBGSA shall pay CONSULTANT for all work requested upon the satisfactory
completion of said work.
4. Payments for work completed by CONSULTANT will be made by UVBGSA
within 30 days of receipt of CONSULTANT's invoice.
[END OF PAYMENT TERMS]
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
4905-3284-5672.2 014737.001 20
EXHIBIT C
INSURANCE REQUIREMENTS
Insurance coverage in a minimum amount set forth herein shall not be construed
to relieve CONSULTANT for liability in excess of such coverage, nor shall it
preclude UVBGSA from taking such other action as is available to it under any
other provisions of this Agreement or otherwise in law. Insurance requirements
shall be in addition to, and not in lieu of, Consultant’s indemnity obligations under
Paragraph 2 of this Agreement.
CONSULTANT shall obtain and maintain insurance coverage as follows:
a. Combined single limit bodily injury liability and property damage liability -
$1,000,000 each occurrence.
b. Vehicle / Bodily Injury combined single limit vehicle bodily injury and
property damage liability - $500,000 each occurrence.
CONSULTANT shall furnish to UVBGSA certificates of insurance evidencing the
minimum levels described above.
[END OF INSURANCE REQUIREMENTS]
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
4905-3284-5672.2 014737.001 21
EXHIBIT D
EPAYABLES INFORMATION
UVBGSA is currently making credit card payments to all of our vendors and suppliers
who qualify. To qualify, vendors need to currently accept credit card payments. To
achieve this more efficient form of payment, the County of Mendocino has partnered
with Bank of America and their ePayables credit card program. This electronic initiative
will yield many benefits to its participants:
• Expedited receipt of cash – electronic credit card payments provide cash flow benefits
by eliminating mail and paper check float
• Elimination of check processing costs
• Remittance data transmitted with payment for more efficient back-end reconciliation
• No collection costs associated with lost or misplaced checks
• Reduced exposure to check fraud
• More efficient handling of exception items
• Fits with existing accounting software – requires no purchase of software, no
modifications to existing accounts receivable system and no change to bank accounts.
• Going green with paperless electronic credit card payments help conserve the
environment by eliminating printing and mailing of paper checks.
Doc ID: fa664dab1ceb68be38a78e3c195aff76867b0945
2025-09-30 DRAFT UVBGSA Agreement with Larry Walker......
2025-09-30 DRAFT ...urface Water .pdf
fa664dab1ceb68be38a78e3c195aff76867b0945
MM / DD / YYYY
Signed
10 / 14 / 2025
10:12:01 UTC-7
Sent for signature to Ashli Desai (ashlid@lwa.com) from
brianl@lwa.com
IP: 168.150.196.18
10 / 14 / 2025
10:31:34 UTC-7
Viewed by Ashli Desai (ashlid@lwa.com)
IP: 104.173.243.97
10 / 14 / 2025
10:32:21 UTC-7
Signed by Ashli Desai (ashlid@lwa.com)
IP: 104.173.243.97
The document has been completed.10 / 14 / 2025
10:32:21 UTC-7