HomeMy WebLinkAboutImage Tree Pros 2026-09-08COU No. 2627-097
SHORT FORM CONSTRUCTION CONTRACT
This Agreement is made and entered on September 8, 2026, in Ukiah,
California, by and between Image Tree Pros, a partnership
("Contractor") and the City of Ukiah ("City"), a general law municipal
corporation.
RECITALS:
1. The plans and specifications for this work ("the Work") are
contained in Exhibit A - Bid Specification, which is attached hereto
and incorporated herein by this reference.
2. Contractor is properly licensed and qualified to perform the
work.
3. Whenever this Agreement calls for City approval or
notification, the approval or notification must be signed by the City
Manager or his or her designee.
4. The Work is funded in whole or in part through financial
assistance provided by the Federal Emergency Management Agency (FEMA)
under the Hazard Mitigation Grant Program.
AGREEMENT:
Wherefore, in consideration of the foregoing facts and the terms
and conditions as further stated herein, the parties hereby agree as
follows.
1. PERFORMANCE OF THE WORK
Contractor will perform the Work as further provided herein.
1.1 Time of Performance. Contractor shall commence the Work when
receiving a formal Notice to Proceed, and shall complete the Work by
no later than October 4, 2026.
1. 1. 1. ❑ [check if applicable] It is agreed by the parties to the
contract that time is of the essence and that, in case all the work
is not completed before or upon the expiration of the time limit as
set forth, damage, other than those cost items identified in section
1.1.2, will be sustained by the City and that it is and will be
impracticable to determine the actual amount of damage by reason of
such delay; and it is therefore agreed that, subject to Sections
1.13-1.14, below, the Contractor will pay to the City the sum of five
1
COU No. 2627-097
hundred dollars ($500.00) per day for each and every calendar day's
delay beyond the time prescribed.
1. 1.2 ❑ [check if applicable] In case the work called for under
this contract is not completed within the time limit stipulated
herein, the City shall have the right as provided hereinabove, to
extend the time of completion thereof. If the time limit be so
extended, the City shall have the right to charge to the Contractor
and to deduct from the final payment for the work the actual cost
to the City of engineering, inspection, superintendence and other
overhead expenses which are directly chargeable to the contract and
which accrue during the period of such extension, except that the
cost of final unavoidable delays shall not be included in such charges.
1.2 Construction of Contract Documents. Contractor will perform
the Work in compliance with the plans and specifications set forth in
the attached Exhibit A. If there is any inconsistency or conflict
between the plans and the specifications, the specifications will
prevail. If there is any inconsistency between the plans and the
specifications and this agreement, the terms of this Agreement shall
prevail, unless expressly stated otherwise in a particular
specification.
1.3 Contractor furnished items. Contractor will furnish all
necessary labor, materials, tools, equipment, and transportation
necessary to perform the Work.
1.4 SB 854 requirements
1.4. 1 No contractor or subcontractor may be listed on a bid
proposal for a public works project unless registered with the
Department of Industrial Relations pursuant to Labor Code section
1725.5 [with limited exceptions from this requirement for bid
purposes only under Labor Code section 1771.1(a)].
1.4.2 No contractor or subcontractor may be awarded a
contract for public work on a public works project unless registered
with the Department of Industrial Relations pursuant to Labor Code
section 1725.5.
1.4.3 This project is subject to compliance monitoring and
enforcement by the Department of Industrial Relations.
1.4.4 The Labor Commissioner through the Division of Labor
Standards Enforcement (DLSE) may at any time require contractors and
subcontractors to furnish electronic certified payroll records
directly to DLSE. All contractors and subcontractors must furnish
electronic certified payroll records directly to the DLSE.
PA
COU No. 2627-097
1.4.5 The Prime Contractor is required to post job notices
at the job site as prescribed by regulations (currently, 8 CCR
§16451 (d) . )
1.5 Use of Employees.
1.5.1. Contractor and any subcontractors shall pay all
mechanics and laborers employed by them to work upon the site of the
work unconditionally and without subsequent deductions or rebate on
any account the full amounts due at the time of payment at wage rates
not less than those contained in the applicable prevailing wage
determination, regardless of any contractual relationship which may
be alleged to exist between the Contractor and subcontractors and
such laborers and mechanics.
1.5.2. Contractor shall comply with the California
Labor Code Section 1775. In accordance with said Section 1775,
Contractor shall forfeit as a penalty to the City, $50.00 for each
calendar day or portion thereof, for each workman paid less than the
stipulated prevailing rates for such work or craft in which such
workman is employed for any work done under the Contract by him or
her or by any subcontractor under him or her in violation of the
provisions of the Labor Code and in particular, Labor Code Sections
1770 to 1780, inclusive. In addition to said penalty and pursuant
to Section 1775, the difference between such stipulated prevailing
wage rates and the amount paid to each workman for each calendar day
or portion thereof for which each workman was paid less than the
stipulated prevailing wage rate shall be paid to each workman by the
Contractor.
1.5.3. Pursuant to the provision of Section 1770 of the
Labor Code of the State of California, City has ascertained the
general prevailing rate of wages (which rate includes employer
payments for health and welfare, vacation, pension and similar
purposes) applicable to the work to be done, for straight time work.
The holiday wage rate listed shall be applicable to all holidays
recognized in the collective bargaining agreement of the particular
craft, classification, or type of workers concerned. Copies of the
General Prevailing Wage Determination are on file in the office of
the City Engineer and are available to the Contractor on request.
The Contractor shall post the wage determination at the site of work
in a prominent place where the workers can easily see it.
1.5.4. City will not recognize any claim for additional
compensation because the Contractor has paid any rate in excess of the
3
COU No. 2627-097
prevailing wage rate obtained from the City Engineer. The possibility
of wage increases is one of the elements to be considered by the
Contractor in determining his or her bid and will not in any
circumstances be considered as the basis for a claim against the City.
1.5.5. Travel and Subsistence Payments.
Contractor shall make travel and subsistence payments to
each worker needed to execute the work in accordance with the
requirements in Section 1773.8 of the Labor Code (Chapter 880, Statutes
of 1968) .
1.5.6. Apprentices.
Attention is directed to the provisions in Sections 1777.5
(Chapter 1411, Statutes of 1968) and 1777.6 of the California Labor
Code concerning the employment of apprentices by the Contractor or
any subcontractor under him. Contractor and any subcontractor under
him or her shall comply with the requirements of said sections in
the employment of apprentices.
Information relative to apprenticeship standards, wage
schedules and other requirements may be obtained from the Director
of Industrial Relations, ex officio the Administrator of
Apprenticeship, San Francisco, California, or from the Division of
Apprenticeship Standards and its branch offices.
Copies of Labor Code Sections 1771 (requiring prevailing wages), 1775
(imposing penalties, including a $50 per day, per worker forfeiture,
for failure to pay prevailing wages), 1776 (requiring contractor to
maintain available for inspection certified payroll records), 1777.5
(requiring certain apprenticeship programs), 1813 (imposing
penalties for failure to make records available for inspection) and
1815 (requiring time and 1� for overtime) are available at the
Department of Industrial Relations website at
http://www.dir.ca.gov/
1.6 CITY Inspector. CITY may designate an architect, engineer,
other design professional or other inspector ("Inspector") to
supervise and/or inspect Contractor's performance of the Work. The
Inspector shall have no authority to change the Work, the compensation
for performing the Work or the time for completing the Work without
City's prior written approval. City shall notify the Contractor in
writing, if it designates an Inspector.
M
COU No. 2627-097
1.7 Site Conditions. Contractor acknowledges that it has
inspected the work site and any improvements involving the Work and
satisfied itself as to the conditions which can affect the Work or its
cost. Contractor has not relied on any representation by CITY or its
officers or employees as to the condition of the site or the houses
or any condition that might affect the cost of performing this
Agreement.
1.8 New Products Required. All equipment, materials or fixtures
furnished by Contractor under this Agreement shall be new and of the
most suitable grade for the intended purpose, unless otherwise
specifically provided.
1.9 Compliance with Laws. The Contractor shall give all notices
and comply with all applicable laws, ordinances, codes, rules and
regulations. The Contractor shall secure and pay for all permits, fees,
and licenses necessary for the proper execution and completion of the
work.
1.10 Protection of Site and Improvements. The Contractor shall
preserve and protect the site, grounds and any involved improvements
and shall not alter or damage any portion thereof, except as is
absolutely necessary in order to perform the Work. The Contractor
shall repair or replace, as directed by CITY, any property that it
damages, looses or destroys in violation of this paragraph. Contractor
shall assume full responsibility for maintaining the safety of the
worksite in compliance with all applicable state and federal worker
safety and protection laws and shall maintain the worksite in
compliance with all such laws.
1.11 Inspection of Work. The Contractor shall ensure that the
Work is available for inspection by CITY or its Inspector at all
reasonable times and that no work is covered up or rendered incapable
of inspection without prior notice to CITY or its Inspector and a
reasonable opportunity for inspection. The presence or absence of an
CITY inspector or the conduct of an inspection by CITY or its Inspector
shall not relieve the Contractor from any contract requirement or
compliance with Exhibit A.
1.12 Title. The Contractor warrants that it conveys full and
complete title, free of all liens and encumbrances, to all materials,
supplies, fixtures and equipment furnished to CITY under this
Agreement and agrees to fully defend and indemnify CITY, its officers
and employees, and the houses and homebuyers included in the Work from
5
COU No. 2627-097
and against any claim, lien, charge, debt, cost, expense or liability
arising from a breach of said warranty.
1.13 Warranties. In addition to any other warranties in this
contract, the Contractor warrants that the Work conforms to the
contract requirements and is free of any defect in equipment, material
or workmanship for a period of one year from the date of final
acceptance of the Work by CITY. If CITY accepts any part of the Work
before final acceptance of the entire Work, the warranty shall continue
for the period of one year from the date of such partial acceptance.
The Contractor shall remedy, at the Contractor's expense, any failure
to conform, or any defect. [Initial if following sentence applies / /
/_/] CITY shall retain of the Contract Amount to secure the
Contractor's warranty and shall remit the unused portion of that amount
at the end of the warranty period. The time limit of this warranty
shall not apply to any latent defects, or gross negligence or fraud
on the part of the Contractor.
1.14. Extension of Time.
Should any delays occur which the City may consider unavoidable, as
herein defined, the Contractor shall, pursuant to his or her
application, be allowed an extension of time proportional to said delay
or delays, beyond the time herein set forth, in which to complete this
contract; and liquidated damages for delay shall not be charged against
the Contractor by the City during an extension of time granted because
of unavoidable delay or delays.
Any claim by Contractor for a time extension based on unavoidable
delays shall be based on written notice delivered to the City within
15 days of the occurrence of the event giving rise to the claim. Failure
to file said written notice within the time specified shall constitute
a waiver of said claim. Notice of the full extent of the claim and all
supporting data must be delivered to the City within 45 days of the
occurrence unless the City specifies in writing a longer period. All
claims for a time extension must be approved by the City and
incorporated into a written change order.
1.15. Unfavorable Weather and Other Conditions.
During unfavorable weather and other conditions, the Contractor shall
pursue only such portions of the work as shall not be damaged thereby.
No portions of the work whose satisfactory quality or efficiency will
be affected by any unfavorable conditions shall be constructed while
these conditions remain, unless, by special means or precautions
approved by the City, the Contractor shall be able to overcome them.
1.1
COU No. 2627-097
The Contractor shall be granted a time extension of one day for each
unfavorable weather day that prevents him or her from placing concrete
forms or placing and finishing concrete or asphalt concrete. Such
unfavorable weather day is defined as a rain day where precipitation
prevents the contractor from performing the work more than four (4)
continuous hours within the authorized work period or a temperature
day where the ambient temperature is below that specified for the
placement of materials associated with the controlling work item for
more than four (4) continuous work hours of the authorized work period.
1.16. Saturday, Sunday, Holiday and Night Work.
No work shall be done between the hours of 5 p.m. and 8 a.m., nor on
Saturdays, Sundays or legal holidays except such work as is necessary
for the proper care and protection of work already performed, or except
in cases of absolute necessity and in any case only with the permission
of the City.
It is understood, however, that night work may be established as a
regular procedure by the Contractor if he or she first obtains the
written permission of the City and that such permission may be revoked
at any time by the City if the Contractor fails to maintain at night
adequate force and equipment for reasonable prosecution and to justify
inspection of the work.
1.17. Hours of Labor.
Eight (8) hours of labor shall constitute a legal day's work and the
Contractor or any subcontractor shall not require or permit more than
eight hours of labor in a day from any person employed by him or her
in the performance of the work under this contract, unless paying
compensation for all hours worked in excess of eight ( 8 ) hours per day
at not less than 1 � times the basic rate of pay. The Contractor shall
forfeit to the City, as a penalty, the sum of twenty-five dollars
($25.00) for each workman employed in the execution of the contract
by him or her or by any subcontractor, for each calendar day during
which such laborer, workman, or mechanic is required or permitted to
labor more than eight hours in violation of the provisions of Section
1810 to 1816, inclusive, (Article 3, Chapter 1, Part 7, Division 2)
of the Labor Code of the State of California and any acts amendatory
thereof.
2. CONTRACT PRICE
CITY shall pay the Contractor for performance of this Agreement
a lump sum total not to exceed amount of $2,750.
7
COU No. 2627-097
3. PAYMENT OF CONTRACT PRICE
3.1 City shall pay any invoice for completed work, and approved
by the City, within thirty (30) days of its receipt by City. All
payments under this contract shall be made upon the presentation of
certificates in writing from the City and shall show that the work
covered by the payments has been done and the payments thereof are due
in accordance with this contract. As a condition of final payment,
Contractor shall provide all documentation required by Exhibit A and
reasonably requested by CITY for grant reimbursement and reporting
purposes, including required before -and -after photographs of the
Work.
4. INDEMNIFICATION AND INSURANCE.
4.1 Indemnification. The Contractor shall do all of the work
and furnish all labor, materials, tools and appliances, except as
otherwise herein expressly stipulated, necessary or proper for
performing and completing the work herein required in the manner and
within the time herein specified. The mention of any specific duty or
liability imposed upon the Contractor shall not be construed as a
limitation or restriction of any general liability or duty imposed upon
the Contractor by this contract, said reference to any specific duty
or liability being made herein merely for the purpose of explanation.
The right of general supervision by the City shall not make the
Contractor an agent of the City and the liability of the Contractor
for all damages to persons or to public or private property, arising
from the Contractor's execution of the work, shall not be lessened
because of such general supervision.
Until the completion and final acceptance by the City of all the work
under and implied by this contract, the work shall be under the
Contractor's responsible care and charge. The Contractor shall rebuild,
repair, restore and make good all injuries, damages, re -erections and
repairs, occasioned or rendered necessary by causes of any nature
whatsoever, excepting only acts of God and none other, to all or any
portions of the work, except as otherwise stipulated.
To the fullest extent permitted by law, Contractor shall indemnify and
hold harmless the City and its officers, directors, agents, and
employees from and against all claims, damages, losses and expenses
including but not limited to attorneys' fees, costs of suit, expert
witness fees and expenses and fees and costs of any necessary private
investigators arising out of or resulting from the performance of the
13
COU No. 2627-097
work, provided that any such claim, damage, loss or expense (1) is
attributable to bodily injury, sickness, disease or death, or to injury
to or destruction of tangible property, other than the work itself,
including the loss of use resulting therefrom and (2) is caused in whole
or in part by any act or omission of the Contractor, any subcontractor,
or anyone directly or indirectly employed by any of them, or anyone
for whose acts any of them may be liable, regardless of whether or not
it is caused in part by a party indemnified hereunder, or by the
negligence or omission of a party indemnified herein.
In any and all claims against the City or any of its agents or employees
by any employee of the Contractor, any subcontractor, anyone directly
or indirectly employed by any of them, or anyone for whose acts any
of them may be liable, the indemnification obligation shall not be
limited in any way by any limitation on the amount or type of damages,
compensation or benefits payable by or for the Contractor or any
subcontractor under workers' or workmen's compensation acts,
disability benefit acts, or other employee benefit acts. The
obligation to indemnify shall extend to and include acts of the
indemnified party which may be negligent or omissions which may cause
negligence.
The City shall have the right to estimate the amount of such damage
and to cause the City to pay the same and the amount so paid for such
damage shall be deducted from the money due the Contractor under this
contract; or the whole or so much of the money due or to become due
the Contractor under this contract as may be considered necessary by
the City, shall be retained by the City until such suits or claims for
damages shall have been settled or otherwise disposed of and
satisfactory evidence to that effect furnished to the City.
4.2 Insurance. Contractor shall procure and maintain for the
duration of the contract insurance against claims for injuries to
persons or damages to property which may arise from or in connection
with the performance of the work hereunder by the Contractor, his
agents, representatives, employees or subcontractors.
4.2.1. Minimum Scope of Insurance
Coverage shall be at least as broad as:
A. Insurance Services Office Commercial General
Liability coverage (Form No. CG 20 10 10 01 and
Commercial General Liability - Completed Operations
Form No. CG 20 37 10 01).
4
COU No. 2627-097
B. Insurance Services Office form number CA 0001 (Ed.
1/87) covering Automobile Liability, code 1 (any
auto) .
C. Worker's Compensation insurance as required by the
State of California and Employer's Liability
Insurance.
4.2.2. Minimum Limits of Insurance
Contractor shall maintain limits no less than:
A. General Liability: $2,000,000 per occurrence for bodily
injury, personal injury and property damage
including operations, products and completed
operations. If Commercial General Liability
Insurance or other form with a general aggregate
limit is used, either the general aggregate limit shall
apply separately to this project/location or the
general aggregate limit shall be twice the required
occurrence limit. Insurance must be written on an
occurrence basis.
B. Automobile Liability: $2,000,000 per accident for
bodily injury and property damage. Insurance must be
written on an occurrence basis.
C. Worker's Compensation Employer's Liability: $1,000,000
per accident for bodily injury or disease.
4.2.3. Deductibles and Self -insured Retentions
Any deductibles or self -insured retentions must be declared to and
approved by the City. The City may require the insurer to reduce or
eliminate such deductibles or self -insured retentions with respect
to the City, its officers, officials, employees and volunteers; or
the Contractor to provide a financial guarantee satisfactory to the
City guaranteeing payment of losses and related investigations,
claim administration and defense expenses; or to approve the
deductible without a guarantee.
4.2.4. REQUIRED Insurance Provisions
Proof of general liability and automobile liability policies
are to contain, or be endorsed to contain, the following
provisions:
10
COU No. 2627-097
A. The City, its officers, officials, employees, and volunteers
are to be covered as ADDITIONAL INSURED with respect to
liability arising out of automobiles owned, leased, hired or
borrowed by or on behalf of the contractor; and with respect
to liability arising out of work or operations performed by or
on behalf of the Contractor including materials, parts or
equipment, furnished in connection with such work or operations.
General liability coverage can be provided in the form of an
endorsement to the Contractor's insurance, or as a separate
owner's policy.
B. The workers' compensation policy is to be endorsed with a
waiver of subrogation. The insurance company, in its
endorsement, agrees to waive all rights of subrogation against
the City, its officers, officials, employees and volunteers for
losses paid under the terms of this policy which arises from
the work performed by the named insured for the City. NOTE: You
cannot be added as an additional insured on a workers'
compensation policy.
C. For any claims related to this project, the Contractor's
insurance coverage shall be primary insurance with respect to
the City, its officers, officials, employees, and volunteers.
Any insurance or self-insurance maintained by the City, its
officers, officials, employees, or volunteers shall be in
excess of the Contractor's insurance and shall not contribute
with it.
D. Each insurance policy required by this clause shall be
endorsed to state that coverage shall not be canceled by either
party, except after thirty (30) days' prior written notice by
certified mail, return receipt requested, has been given to the
City.
E. Note: (This protects the Contractor) -Coverage shall not
extend to any indemnity coverage for the active negligence of
the additional insured in any case where an agreement to
indemnify the additional insured would be invalid under
Subdivision (b) of Section 2782 of Civil Code.
5. TERMINATION.
This Agreement may only be terminated by City: 1) for breach of
the agreement; 2) because funds are no longer available to pay
11
COU No. 2627-097
Contractor for services provided under this Agreement; or 3) for the
convenience of City, including if City has abandoned and does not wish
to complete the project for which Contractor was retained. City shall
notify Contractor of any alleged breach of the agreement and of the
action required to cure the breach. If Contractor fails to cure the
breach within the time specified in the notice, the contract shall be
terminated as of that time. If terminated for lack of funds or for
the convenience of City, the contract shall terminate on the date
notice of termination is given to Contractor. City shall pay the
Contractor only for services performed and expenses incurred as of the
effective termination date, unless terminated because the Contractor
has failed to satisfactorily cure a breach after notice in which event
City shall:
a. retain any amounts earned under the Contract but not yet paid
by City;
b. take possession of all material and fixtures on the job site;
c. have the right to complete the Work and recover from Contractor
any increased cost to complete the Work above the amounts that would
have been paid to Contractor hereunder, together with any other damages
suffered by City as a result of said breach.
6. MODIFICATION OF AGREEMENT.
City may, from time to time, request changes in the Work, the time
to complete the work or the compensation to be paid for the Work. Such
changes must be incorporated in written amendments to this Agreement.
To be effective, all such changes as referred to in this section must
be agreed upon in writing by both parties to this agreement.
7. ASSIGNMENT.
The Contractor shall not assign any interest in this Agreement,
and shall not transfer any interest in the same (whether by assignment
or novation), without the prior written consent of City.
8. FEDERAL GRANT REQUIREMENTS.
The Work under this Agreement is funded in whole or in part through
financial assistance provided by the Federal Emergency Management
Agency (FEMA) under the Hazard Mitigation Grant Program. Contractor
12
COU No. 2627-097
shall comply with all applicable requirements of the federal award,
including applicable provisions of 2 C.F.R. Part 200 and Appendix II
to Part 200, federal laws and regulations, and applicable FEMA policies,
procedures, and directives. Contractor represents that neither
Contractor nor its principals are suspended, debarred, excluded, or
otherwise ineligible to participate in federally funded transactions
and shall not enter into any covered subcontract or other lower -tier
transaction with a party that is suspended, debarred, excluded, or
otherwise ineligible; Contractor shall immediately notify City of any
change in such status. Contractor shall maintain all books, documents,
papers, photographs, invoices, payroll information, and other records
directly pertinent to this Agreement and necessary to establish the
eligibility, performance, and cost of the Work, and shall provide the
City, FEMA, the U.S. Department of Homeland Security, the Comptroller
General of the United States, and their authorized representatives
access to such records and to the project site for audit, examination,
monitoring, or other authorized purposes. Contractor shall retain such
records until notified by City that retention is no longer required
and shall provide all documentation reasonably requested by City for
grant reimbursement, monitoring, audit, or closeout, including
required before -and -after photographs of the Work. Contractor shall
comply, to the extent applicable to the Work, with federal requirements
regarding covered telecommunications and video surveillance equipment
or services under 2 C.F.R. § 200.216, domestic preferences for
procurements under 2 C.F.R. § 200.322, including applicable Build
America, Buy America requirements, and procurement of recovered
materials under 2 C.F.R. § 200.323. In procuring any subcontractors,
Contractor shall comply with applicable federal requirements
concerning consideration of small businesses, minority businesses,
women's business enterprises, veteran -owned businesses, and labor
surplus area firms. Contractor shall not use the DHS or FEMA seals,
logos, or other protected marks without prior authorization.
Contractor acknowledges that the Federal Government is not a party to
this Agreement and is not subject to any obligations or liabilities
to Contractor arising from this Agreement, and that federal laws
concerning false or fraudulent statements and claims apply to
Contractor's activities under this Agreement. Contractor shall
include all applicable federal requirements in its subcontracts and
shall be responsible for compliance with such requirements by its
subcontractors.
9. APPLICATION OF LAWS.
The parties hereby agree that all applicable Federal, State and
local rules, regulations and guidelines not written into this
13
COU No. 2627-097
Agreement shall hereby prevail during the period of this Agreement.
10. INDEPENDENT CONTRACTOR.
It is the express intention of the parties hereto that Contractor
is an independent contractor and not an employee, joint venturer, or
partner of City for any purpose whatsoever. City shall have no right
to, and shall not control the manner or prescribe the method of
accomplishing those services contracted to and performed by Contractor
under this Agreement, and the general public and all governmental
agencies regulating such activity shall be so informed.
Those provisions of this Agreement that reserve ultimate
authority in City have been inserted solely to achieve compliance with
federal and state laws, rules, regulations, and interpretations
thereof. No such provisions and no other provisions of this Agreement
shall be interpreted or construed as creating or establishing the
relationship of employer and employee between Contractor and City.
Contractor shall pay all estimated and actual federal and state
income and self-employment taxes that are due the state and federal
government and shall furnish and pay worker's compensation insurance,
unemployment insurance and any other benefits required by law for
himself and his employees, if any. Contractor agrees to indemnify and
hold City and its officers, agents and employees harmless from and
against any claims or demands by federal, state or local government
agencies for any such taxes or benefits due but not paid by Contractor,
including the legal costs associated with defending against any audit,
claim, demand or law suit.
Contractor warrants and represents that it is a properly licensed
for the work performed under this Agreement with a substantial
investment in its business and that it maintains its own offices and
staff which it will use in performing under this Agreement.
11. GOVERNING LAW.
This Agreement shall be governed by and construed in accordance
with the laws of the State of California and any legal action concerning
the agreement must be filed and litigated in the proper court in
Mendocino County, each party consenting to jurisdiction and venue of
California state courts in Mendocino County.
12. SEVERABILITY.
14
COU No. 2627-097
If any provision of the Agreement is held by a court of competent
jurisdiction to be invalid, void, or unenforceable, the remaining
provisions shall nevertheless continue in full force and effect
without being impaired or invalidated in any way.
13. INTEGRATION.
This Agreement, including the exhibits attached hereto, contains
the entire agreement among the parties and supersedes all prior and
contemporaneous oral and written agreements, understandings, and
representations among the parties. No amendments to this Agreement
shall be binding unless executed in writing by all of the parties.
14. WAIVER.
No waiver of any of the provisions of this Agreement shall be
deemed, or shall constitute a waiver of any other provision, nor shall
any waiver constitute a continuing waiver. No waiver shall be binding
unless executed in writing by the party making the waiver.
15. NOTICES.
Whenever notice, payment or other communication is required or
permitted under this Agreement, it shall be deemed to have been given
when personally delivered, emailed, or deposited in the United States
mail with proper first-class postage affixed thereto and addressed as
follows:
CONTRACTOR
Image Tree Pros
564 Caletti Ave.
Windsor, CA. 95482
CITY
City of Ukiah
300 Seminary Ave.
Ukiah, CA. 95482
Either party may change the address to which notices must be sent by
providing notice of that change as provided in this paragraph.
16. PARAGRAPH HEADINGS.
The paragraph headings contained herein are for convenience and
15
COU No. 2627-097
reference only and are not intended to define or limit the scope of
this agreement.
17. EXECUTION OF AGREEMENT.
This Agreement may be executed in duplicate originals, each
bearing the original signature of the parties. Alternatively, this
Agreement may be executed and delivered by facsimile or other
electronic transmission, and in more than one counterpart, each of
which shall be deemed an original, and all of which together shall
constitute one and the same instrument. When executed using either
alternative, the executed agreement shall be deemed an original
admissible as evidence in any administrative or judicial proceeding
to prove the terms and content of this Agreement.
WHEREFORE, the parties have entered this Agreement on the date
first written above.
CONTR,aCTOR I CITY OF UKIAH
By: yV l'C By: s�`s
Sage Sangiacomo
City Manager
California Contractor's License Number jT,)(Q��[Number or N/A]
16
Exhibit A
(11 City of Ukiah
Bids mm• be emailed fared or hand delivered to the contact information listed
herein, and by the specified deadline, or the bid will be rejected.
Submitted by: Mao, %~�,e, �ros
(Company Name
S Address) 56 y Csle% Ave.A) i Kdsar, CA -
BIDS ARE REQUESTED FOR THE FOLLOWING ITEMS:
PAGE 1 OF 1
REQUEST FOR BID
300 SEMINARY AVENUE
UKIAH, CALIFORNIA 95482
P: (707) 463-6225
DATE: 8/20/2026
RE) NO E41604
BIDS WILL BE RECEIVED UNTIL
2:00 p.m., September 4th, 2026
AT THE OFFICE OF THE PURCHASING MANAGER
411 W CLAY ST. CITY of UKIAH
BY: Myles Fisette
Email: mfisette@cityofukiah.com
ALL BIDS SHALL BE F.O.B. UKIAH, CA.
QUANTITY
DESCRIPTION
UNIT PRICE
EXTENDED PRICE
1 Lump Sum
All necessary labor, materials, and equipment to perform vegetation management adjacent to
SS0.'
1,2�S�i. od
the City's 12kV electric distribution lines along Jones Street in Ukiah, CA 95482. The work
generally consists of trimming approximately five (5) trees to provide an eight -foot (8')
clearance from the electric lines. As per attached City of Ukiah Specification E41604.
TOTAL:
Payment
Terms:
SIGNATURE;
DATE: - 2b
PRINT NAME: r
PHONE: - b y - I &S
EMAIL: S},w.r-I
c
TERMS:
1. LOCAL PREFERENCE: Local Vendors shall be given an allowance of five percent (5%), up to a maximum allowance of $2,500, on any bid for
supplies, equipment and/or materials per Ukiah City Code Section 1522.D.4. A Local Vendor is defined as one which, 1) conducts business in an
office or other business premises with a physical location in Mendocino County, 2) holds a valid business license issued by Mendocino County
or one of the cities in Mendocino County for that business location, and 3) has conducted business in compliance with 1) and 2) for not less than
six (6) months prior to requesting the preference. The City shall receive satisfactory proof that a business qualifies as a local vendor before it
may receive the local preference. In the event that there is a he bid, where one bidder is local, the other is not, and the bid is equal in price and
quality, the award shall go to the Local Vendor.
2. Right is reserved to reject any and all bids.
3. Right is reserved to accept separate items unless specifically denied by bidder.
4. Right is reserved to reject a bid from any bidder who has previously failed to perform adequately for the City of Ukiah.
5. In CASE OF DEFAULT, the City of Ukiah may procure the items quoted on from other sources and hold the original bidder liable for any increased
costs.
6. The price, terms, delivery point, and delivery date may Individually or collectively be the basis of the awarding of the bid.
7. In submitting the bid, bidder agrees that the bid shall remain open and may not be revoked or withdrawn for 6U days from the bid due date, unless
a different time period is specified in RFB.
8. Bidder agrees to perform according to its bid, if the City's acceptance Is communicated to the bidder within the time specified in number 7 above.
REQUEST FOR BID
City of Ukiah
SPECIFICATION E41604
UKIAH ELECTRIC UTILITY HAZARD MITIGATION
FUEL REDUCTION PROJECT
AUGUST 20, 2026
Bid Due Date
2:00 PM SEPTEMBER 4, 2026
City of Ukiah SPEC # E41604 UKIAH ELECTRIC UTILITY HAZARD
MITIGATION FUEL REDUCTION PROJECT - RFB
I. Introduction
The City of Ukiah is seeking bids from qualified Contractors to provide all necessary labor, materials,
and equipment to perform vegetation management adjacent to the City's 12kV electric distribution lines along
Jones Street in Ukiah, CA 95482. The work generally consists of trimming approximately five (5) trees to
provide an eight -foot (8') clearance from the electric lines.
II. Bid Procedure
PLEASE TAKE NOTICE: This Request for Bid (RFB) is issued as an open market purchase under
Section 1522 of the Ukiah City Code. This is not a formal or informal bid under the provisions of state law
governing RFB's for Public Projects. The procedures governing open market purchases are at the discretion
of the Purchasing Officer and may vary from bid to bid, depending on the City's needs. The City Code
encourages the Purchasing Officer to use modern communications, including the telephone, e-mail and the
internet, to obtain the lowest possible price, consistent with the City's needs. The Purchasing Officer does
use City bidder's lists when soliciting bids. You may contact the Purchasing Officer if you would like to be
placed on the City's bidder's list.
III. Contact Person
The City has designated Myles Fisette, Purchasing Manager, as the contact person for questions
related to the work requested. Questions are to be submitted in writing and can be done so by e-mail at
mfisettegcityofukiah. com.
IV. Examination of the Site
The Contractor should familiarize himself with the local conditions of the project sites, and shall be
responsible for having acquired full knowledge of the job and all problems affecting it. Failure to do so will
in no way relieve him/her of the responsibility for performing any of the work or operations required as part
of this contract.
V. Bid Submittal Instructions
Bids can be submitted in hardcopy, fax, or by email. Bids are due on or before 2:00 PM
SEPTEMBER 4, 2026 to:
City of Ukiah Purchasing Department
Attn: Myles Fisette
411 West Clay Street
Phone: (707) 463-6225
Email: mfisette&cityofukiah.com
It will be the sole responsibility of the bidders to have their bids delivered to the City before the
closing hour and date. Late bids will not be considered and will be returned unopened to the sender. The City
will not be responsible for any cost incurred by the Contractor in preparation of their bid response.
VI. Scope of Work
The City of Ukiah requests bids that include all labor, materials, equipment, traffic control, disposal,
and other incidental work necessary to perform vegetation management adjacent to the City's 12kV electric
distribution lines along Jones Street in Ukiah, CA 95482.
N
City of - Ukiah SPEC # E41604 UKIAH ELECTRIC UTILITY HAZARD
MITIGATION FUEL REDUCTION PROJECT - RFB
The work consists of trimming approximately five (5) trees and associated vegetation to provide a
minimum clearance of eight feet (8') from the 12kV electric lines. The trees requiring work are generally
depicted in Attachment A.
The Contractor shall mobilize all personnel and equipment necessary to complete the work and shall
perform all trimming in accordance with the City of Ukiah Tree Management Guidelines, included as
Attachment B. All work shall be performed in a manner that protects existing electric facilities, adjacent
property, structures, landscaping, and the public.
The Contractor shall conduct operations so as to cause the least possible obstruction and inconvenience to
vehicular and pedestrian traffic and nearby residents. The Contractor shall furnish and maintain, at its
expense, all flaggers, signs, barriers, warning devices, pedestrian walkways, driveway access measures, and
other traffic -control measures necessary to safely perform the work and provide adequate warning to the
public. No road closure shall be permitted without prior written approval from the City. Public vehicular and
pedestrian traffic shall be permitted to pass through or around the work area with as little interruption or delay
as reasonably possible, and the Contractor shall provide for the safe passage of pedestrians around the work
area at all times.
Access to adjacent residences and properties shall be maintained to the maximum extent reasonably
possible throughout the work. The Contractor shall minimize any interruption to driveways or property
access, and no driveway or property access shall be closed for more than four (4) hours during a workday
without prior approval from the City. All driveways shall be accessible at the end of each workday. Gutters
and drainage facilities shall remain clear and unobstructed, and Contractor equipment and operations shall be
conducted in a manner that protects City streets, sidewalks, and other public facilities from damage.
The Contractor shall provide adjacent and affected homeowners with a minimum of twenty-four (24)
hours advance notice before scheduled vegetation management activities begin in the vicinity of their
property. If the Contractor anticipates a temporary closure or material restriction of a driveway or property
access, affected property owners shall receive at least forty-eight (48) hours advance written notice. Any
proposed street closure, extended traffic obstruction, or other condition materially affecting public access
shall be coordinated in advance with the City.
Unless otherwise approved in writing by the City, all work shall be performed Monday through Friday
between the hours of 8:00 a.m. and 5:00 p.m. Work shall not be performed on Saturdays, Sundays, City -
observed holidays, or outside these hours without prior written approval from the City, except in an
emergency. The Contractor shall conduct its operations in a manner that minimizes noise and disturbance to
adjacent residents and shall comply with all applicable City noise regulations.
The Contractor shall remove and properly dispose of all limbs, brush, wood chips, and other debris
generated by the work. Upon completion, the work area shall be cleaned and restored to a condition at least
equal to that existing prior to commencement of the work.
The Contractor shall provide clear photographs documenting each work location before and after
vegetation management activities. Photographs shall be submitted to the City upon completion of the work for
project and grant documentation purposes.
City of - Ukiah SPEC # E41604 UKIAH ELECTRIC UTILITY HAZARD
MITIGATION FUEL REDUCTION PROJECT - RFB
Due to the requirements of the FEMA Hazard Mitigation Grant Program funding this project, all Work,
including vegetation management, cleanup, and required photographic documentation, shall be fully
completed no later than October 4, 2026. The Contractor shall promptly notify the City of any circumstance
that may affect its ability to meet this deadline.
Contractor shall be solely responsible for damage resulting from its operations and shall restore damaged
property to its original condition at its own expense. Contractor shall comply with all applicable safety
requirements, including the Construction Safety Orders of the California Division of Occupational Safety and
Health, and shall provide appropriate traffic and pedestrian control as necessary to protect workers and the
public.
Work will not be considered complete until the required photographic documentation has been submitted
and the work has been inspected and accepted by the City.
VII. Federal Grant Requirements
This project is funded in whole or in part through financial assistance provided by the Federal
Emergency Management Agency (FEMA) for hazard mitigation activities intended to reduce the impact of
wildland fires on critical electric power infrastructure. By submitting a bid and entering into a contract with
the City, the Contractor agrees to comply with all applicable requirements of the federal award, including
applicable provisions of 2 C.F.R. Part 200 and Appendix II to Part 200, and all applicable federal laws,
regulations, FEMA policies, procedures, and directives. The Contractor shall maintain all books, documents,
papers, photographs, records, and other documentation directly pertinent to the work and shall provide the
City, FEMA, the U.S. Department of Homeland Security, the Comptroller General of the United States, and
their authorized representatives access to such records and to the project site for audit, examination,
monitoring, or other authorized purposes. The Contractor shall provide all documentation reasonably
requested by the City to establish the eligibility, performance, and cost of the work, including required before -
and -after photographs. The Contractor and its principals shall not be suspended, debarred, or otherwise
excluded from participation in federally funded transactions and shall comply with applicable suspension and
debarment requirements, including applicable requirements for lower -tier covered transactions. The
Contractor shall comply with applicable federal requirements concerning the consideration of small
businesses, minority businesses, women's business enterprises, veteran -owned businesses, and labor surplus
area firms in subcontracting; the prohibition on the use of covered telecommunications and video surveillance
equipment or services under 2 C.F.R. § 200.216; domestic preferences for procurements under 2 C.F.R. §
200.322, including any applicable Buy America requirements; and procurement of recovered materials under
2 C.F.R. § 200.323, to the extent applicable to materials or products acquired in connection with the work.
The Contractor shall not use DHS or FEMA seals, logos, or other protected marks without prior authorization.
The Contractor acknowledges that the Federal Government is not a party to the Contract and assumes no
obligations or liabilities to the Contractor arising from the Contract, and that federal laws concerning false or
fraudulent statements and claims apply to activities performed under the Contract. The Contractor shall
include applicable federal requirements in its subcontracts and shall be responsible for compliance by its
subcontractors. Because the Contract is expected to exceed $10,000, the Contract shall be subject to
termination by the City for cause and for convenience in accordance with the terms of the Contract, including
the manner of termination and basis for settlement.
il
City of - Ukiah SPEC # E41604 UKIAH ELECTRIC UTILITY HAZARD
MITIGATION FUEL REDUCTION PROJECT - RFB
As a condition of the grant funding, all Work under this RFB must be fully completed no later than October 4,
2026.
VIII. Measurement and Payment
The bid price for this work shall be lump sum, and consist of all labor, materials, equipment,
applicable fees, including tax (8.875%) and freight necessary to perform the work as described in this bid
specification.
IX. Terms
The City asks that vendors specify their desired payment preferences in their bid response. The actual
payment terms of the contract will be open for negotiation during the contract phase. If no special payments
are requested prior to issuing the work, the City will assume net 30 terms.
The City reserves the right to award to the lowest, responsible bidder. The City also reserves the right
to waive any irregularities and technicalities and request rebids should it be deemed in its best interests to do
so. The price, terms, delivery point, and delivery date may individually or collectively be the basis of the
awarding of the bid. In addition, the City reserves the right to make the selection of specific parts of a bid, or
multiple proposals that will best meet the needs of the City as defined in this RFB. In addition, the City
reserves the right to reject any or all bids. The awarded contractor will enter a "Short Form Construction
Contract", Attachment C.
X. Addenda
If it becomes necessary to revise any part of this Request for Bid (RFB) after it has been issued, the
City will issue an addendum to the RFB containing the revision. All addenda will be posted on the City's
website at www.cityofukiah.com/purchasing with the rest of the RFB documents. Anyone who intends to
submit a bid in response to the RFB must check the website frequently for any posted addenda. Anyone
submitting a bid will be deemed to have seen and agreed to be bound by the posted addenda.
XI. Warranty
Unless otherwise indicated, the Contractor must provide a 1 year workmanship warranty from the
date of final acceptance. The Contractor shall replace promptly and at his own expense any materials and/or
workmanship which fail during this warranty period.
XII. Bidder Oualifications
The City will satisfy itself that the potential contractors are reputable firms with a proven track record
and a proven product. Contractors are asked to provide the information requested under Work Performance
History Capability. References are to be those who you have performed similar scope of work as asked for in
this RFB. References are to include the contact name and phone number. A minimum of three references are
requested.
XIII. Insurance Requirements
Bidder's attention is directed to the insurance requirements — see Attachment E. Contractors shall
furnish to the City, upon award of contract, certificates of insurance covering full liability under Worker's
Compensation laws of the State of California, Comprehensive General Liability and Business Auto Insurance
5
City of Ukiah SPEC # E41604 UKIAH ELECTRIC UTILITY HAZARD
MITIGATION FUEL REDUCTION PROJECT - RFB
with policy limits of not less than $2,000,000 naming the City as an additional insured party.
It is highly recommended that contractors confer with their respective insurance carriers or brokers to
determine in advance of bid submission the availability of insurance certificates and endorsements as
prescribed and provided herein. If an apparent awarded contractor fails to comply with the insurance
requirements, that contractor may be disqualified from award of the contract. If you have questions regarding
the City's requirements, please contact the City's Risk Manager at 707-463-6287.
XIV. License and Additional Requirements
1) Compliance with Laws and Regulations: All materials, parts and equipment furnished pursuant to
these specifications shall be in compliance with the laws and regulations of the State of California and OSHA.
The contractor shall, if requested by the City, supply certification and evidence of such compliance.
2) Payment Bond: As per California Civil Code Section 9550, a direct contractor that is awarded a
public works contract involving an expenditure in excess of twenty-five thousand dollars ($25,000) shall,
before commencement of work, give a payment (material and labor) bond to and approved by the officer or
public entity by whom the contract was awarded. Please refer to Attachment D for a copy of the sample
forms.
3) Legal Requirements and Permits: The contractor agrees to fully comply with all local, City, State and
Federal laws, regulations and ordinances governing performance of contractual services required, and it will
be the responsibility of the contractor to obtain any and all necessary licenses, permits or clearances,
including the actual cost of licenses.
4) License Requirements: Bidder/Contractor must possess a current State of California contractor's
license and a City of Ukiah business license. (For information business license, please contact Kathy
Norris, City of Ukiah Finance Department at 707-463-6202.)
a) The Contractor shall possess a valid State of California Class D-49 license. Bidder shall provide proof
of possession of the proper licenses and certificates of registration necessary to perform the work.
Employees actually performing the tasks shall provide proof of proper certificates of registration for
same.
b) The bidder shall keep in force a City of Ukiah business license for the extent of the project.
c) Where subcontractors/jobbers are used, bidder shall provide the City with proof of proper
licenses, certificates and proof of insurance for work performed.
5) Notice to Bidders — Contractor Registration and Prevailing Wages —No contractor or
subcontractor may be listed on a bid proposal for a public works project unless registered with
the Department oflndustrial Relations pursuant to Labor Code section 1725.5 [with limited
exceptions from this requirement for bid purposes only under Labor Code section 1771. ](a)]. No
contractor or subcontractor may be awarded a contract for public work on a public works
project unless registered with the Department of Industrial Relations pursuant to Labor Code
section 1725.5. The prime contractor shall be responsible for posting job site notices as
prescribed by regulation. This project is subject to compliance monitoring and enforcement by
the Department of Industrial Relations.
Public Works Small Project Exemption: Small project exemption means that contractors who
work exclusively on small projects are not required to register as public works contractors or file
electronic certified payroll reports for those projects. However, prevailing wages must still be
paid on projects with small project exemption. Contractors are still required to maintain certified
payroll records on a continuous basis, and provide those records to the Labor Commissioner's
Office upon request. Small project exemption is applied based on the amount of the entire
project, not a contractors subcontracted amount of the project. Small project exemption applies
Con
City of Ukiah SPEC # E41604 UKIAH ELECTRIC UTILITY HAZARD
MITIGATION FUEL REDUCTION PROJECT - RFB
for all public works projects that do not exceed: $25,000 for new construction, alteration,
installation, demolition or repair; and $15,000 for maintenance.
Each laborer or mechanic of Contractor or any subcontractor engaged in work on the project
under this contract shall be paid, pursuant to provisions of Section 1770, including amendments
thereof, of the Labor Code of the State of California, the Director of the Department of Industrial
Relations, State of California, has ascertained the general prevailing rate of wages for straight
time, overtime Saturdays, Sundays and Holidays including employer payment for health and
welfare, vacation, pension and similar purposes, copies of the General Prevailing Wage
Determination (applicable to the work), for the locality in which the work is to be done can be
reviewed at Website: www.dir.ca.gov/dlsL/pwd/northem.html.
The Labor Commissioner through the Division of Labor Standards Enforcement (DLSE) may at
any time require contractor and subcontractors to furnish electronic certified payroll records
directly to DLSE. For projects that do not meet the "Public Works Small Project Exemption ",
contractors and subcontractors must furnish electronic certified payroll records directly to the
DLSE.
7