HomeMy WebLinkAboutImage Tree Pros 2026-09-08COU No. 2627-097 SHORT FORM CONSTRUCTION CONTRACT This Agreement is made and entered on September 8, 2026, in Ukiah, California, by and between Image Tree Pros, a partnership ("Contractor") and the City of Ukiah ("City"), a general law municipal corporation. RECITALS: 1. The plans and specifications for this work ("the Work") are contained in Exhibit A - Bid Specification, which is attached hereto and incorporated herein by this reference. 2. Contractor is properly licensed and qualified to perform the work. 3. Whenever this Agreement calls for City approval or notification, the approval or notification must be signed by the City Manager or his or her designee. 4. The Work is funded in whole or in part through financial assistance provided by the Federal Emergency Management Agency (FEMA) under the Hazard Mitigation Grant Program. AGREEMENT: Wherefore, in consideration of the foregoing facts and the terms and conditions as further stated herein, the parties hereby agree as follows. 1. PERFORMANCE OF THE WORK Contractor will perform the Work as further provided herein. 1.1 Time of Performance. Contractor shall commence the Work when receiving a formal Notice to Proceed, and shall complete the Work by no later than October 4, 2026. 1. 1. 1. ❑ [check if applicable] It is agreed by the parties to the contract that time is of the essence and that, in case all the work is not completed before or upon the expiration of the time limit as set forth, damage, other than those cost items identified in section 1.1.2, will be sustained by the City and that it is and will be impracticable to determine the actual amount of damage by reason of such delay; and it is therefore agreed that, subject to Sections 1.13-1.14, below, the Contractor will pay to the City the sum of five 1 COU No. 2627-097 hundred dollars ($500.00) per day for each and every calendar day's delay beyond the time prescribed. 1. 1.2 ❑ [check if applicable] In case the work called for under this contract is not completed within the time limit stipulated herein, the City shall have the right as provided hereinabove, to extend the time of completion thereof. If the time limit be so extended, the City shall have the right to charge to the Contractor and to deduct from the final payment for the work the actual cost to the City of engineering, inspection, superintendence and other overhead expenses which are directly chargeable to the contract and which accrue during the period of such extension, except that the cost of final unavoidable delays shall not be included in such charges. 1.2 Construction of Contract Documents. Contractor will perform the Work in compliance with the plans and specifications set forth in the attached Exhibit A. If there is any inconsistency or conflict between the plans and the specifications, the specifications will prevail. If there is any inconsistency between the plans and the specifications and this agreement, the terms of this Agreement shall prevail, unless expressly stated otherwise in a particular specification. 1.3 Contractor furnished items. Contractor will furnish all necessary labor, materials, tools, equipment, and transportation necessary to perform the Work. 1.4 SB 854 requirements 1.4. 1 No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. 1.4.2 No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. 1.4.3 This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. 1.4.4 The Labor Commissioner through the Division of Labor Standards Enforcement (DLSE) may at any time require contractors and subcontractors to furnish electronic certified payroll records directly to DLSE. All contractors and subcontractors must furnish electronic certified payroll records directly to the DLSE. PA COU No. 2627-097 1.4.5 The Prime Contractor is required to post job notices at the job site as prescribed by regulations (currently, 8 CCR §16451 (d) . ) 1.5 Use of Employees. 1.5.1. Contractor and any subcontractors shall pay all mechanics and laborers employed by them to work upon the site of the work unconditionally and without subsequent deductions or rebate on any account the full amounts due at the time of payment at wage rates not less than those contained in the applicable prevailing wage determination, regardless of any contractual relationship which may be alleged to exist between the Contractor and subcontractors and such laborers and mechanics. 1.5.2. Contractor shall comply with the California Labor Code Section 1775. In accordance with said Section 1775, Contractor shall forfeit as a penalty to the City, $50.00 for each calendar day or portion thereof, for each workman paid less than the stipulated prevailing rates for such work or craft in which such workman is employed for any work done under the Contract by him or her or by any subcontractor under him or her in violation of the provisions of the Labor Code and in particular, Labor Code Sections 1770 to 1780, inclusive. In addition to said penalty and pursuant to Section 1775, the difference between such stipulated prevailing wage rates and the amount paid to each workman for each calendar day or portion thereof for which each workman was paid less than the stipulated prevailing wage rate shall be paid to each workman by the Contractor. 1.5.3. Pursuant to the provision of Section 1770 of the Labor Code of the State of California, City has ascertained the general prevailing rate of wages (which rate includes employer payments for health and welfare, vacation, pension and similar purposes) applicable to the work to be done, for straight time work. The holiday wage rate listed shall be applicable to all holidays recognized in the collective bargaining agreement of the particular craft, classification, or type of workers concerned. Copies of the General Prevailing Wage Determination are on file in the office of the City Engineer and are available to the Contractor on request. The Contractor shall post the wage determination at the site of work in a prominent place where the workers can easily see it. 1.5.4. City will not recognize any claim for additional compensation because the Contractor has paid any rate in excess of the 3 COU No. 2627-097 prevailing wage rate obtained from the City Engineer. The possibility of wage increases is one of the elements to be considered by the Contractor in determining his or her bid and will not in any circumstances be considered as the basis for a claim against the City. 1.5.5. Travel and Subsistence Payments. Contractor shall make travel and subsistence payments to each worker needed to execute the work in accordance with the requirements in Section 1773.8 of the Labor Code (Chapter 880, Statutes of 1968) . 1.5.6. Apprentices. Attention is directed to the provisions in Sections 1777.5 (Chapter 1411, Statutes of 1968) and 1777.6 of the California Labor Code concerning the employment of apprentices by the Contractor or any subcontractor under him. Contractor and any subcontractor under him or her shall comply with the requirements of said sections in the employment of apprentices. Information relative to apprenticeship standards, wage schedules and other requirements may be obtained from the Director of Industrial Relations, ex officio the Administrator of Apprenticeship, San Francisco, California, or from the Division of Apprenticeship Standards and its branch offices. Copies of Labor Code Sections 1771 (requiring prevailing wages), 1775 (imposing penalties, including a $50 per day, per worker forfeiture, for failure to pay prevailing wages), 1776 (requiring contractor to maintain available for inspection certified payroll records), 1777.5 (requiring certain apprenticeship programs), 1813 (imposing penalties for failure to make records available for inspection) and 1815 (requiring time and 1� for overtime) are available at the Department of Industrial Relations website at http://www.dir.ca.gov/ 1.6 CITY Inspector. CITY may designate an architect, engineer, other design professional or other inspector ("Inspector") to supervise and/or inspect Contractor's performance of the Work. The Inspector shall have no authority to change the Work, the compensation for performing the Work or the time for completing the Work without City's prior written approval. City shall notify the Contractor in writing, if it designates an Inspector. M COU No. 2627-097 1.7 Site Conditions. Contractor acknowledges that it has inspected the work site and any improvements involving the Work and satisfied itself as to the conditions which can affect the Work or its cost. Contractor has not relied on any representation by CITY or its officers or employees as to the condition of the site or the houses or any condition that might affect the cost of performing this Agreement. 1.8 New Products Required. All equipment, materials or fixtures furnished by Contractor under this Agreement shall be new and of the most suitable grade for the intended purpose, unless otherwise specifically provided. 1.9 Compliance with Laws. The Contractor shall give all notices and comply with all applicable laws, ordinances, codes, rules and regulations. The Contractor shall secure and pay for all permits, fees, and licenses necessary for the proper execution and completion of the work. 1.10 Protection of Site and Improvements. The Contractor shall preserve and protect the site, grounds and any involved improvements and shall not alter or damage any portion thereof, except as is absolutely necessary in order to perform the Work. The Contractor shall repair or replace, as directed by CITY, any property that it damages, looses or destroys in violation of this paragraph. Contractor shall assume full responsibility for maintaining the safety of the worksite in compliance with all applicable state and federal worker safety and protection laws and shall maintain the worksite in compliance with all such laws. 1.11 Inspection of Work. The Contractor shall ensure that the Work is available for inspection by CITY or its Inspector at all reasonable times and that no work is covered up or rendered incapable of inspection without prior notice to CITY or its Inspector and a reasonable opportunity for inspection. The presence or absence of an CITY inspector or the conduct of an inspection by CITY or its Inspector shall not relieve the Contractor from any contract requirement or compliance with Exhibit A. 1.12 Title. The Contractor warrants that it conveys full and complete title, free of all liens and encumbrances, to all materials, supplies, fixtures and equipment furnished to CITY under this Agreement and agrees to fully defend and indemnify CITY, its officers and employees, and the houses and homebuyers included in the Work from 5 COU No. 2627-097 and against any claim, lien, charge, debt, cost, expense or liability arising from a breach of said warranty. 1.13 Warranties. In addition to any other warranties in this contract, the Contractor warrants that the Work conforms to the contract requirements and is free of any defect in equipment, material or workmanship for a period of one year from the date of final acceptance of the Work by CITY. If CITY accepts any part of the Work before final acceptance of the entire Work, the warranty shall continue for the period of one year from the date of such partial acceptance. The Contractor shall remedy, at the Contractor's expense, any failure to conform, or any defect. [Initial if following sentence applies / / /_/] CITY shall retain of the Contract Amount to secure the Contractor's warranty and shall remit the unused portion of that amount at the end of the warranty period. The time limit of this warranty shall not apply to any latent defects, or gross negligence or fraud on the part of the Contractor. 1.14. Extension of Time. Should any delays occur which the City may consider unavoidable, as herein defined, the Contractor shall, pursuant to his or her application, be allowed an extension of time proportional to said delay or delays, beyond the time herein set forth, in which to complete this contract; and liquidated damages for delay shall not be charged against the Contractor by the City during an extension of time granted because of unavoidable delay or delays. Any claim by Contractor for a time extension based on unavoidable delays shall be based on written notice delivered to the City within 15 days of the occurrence of the event giving rise to the claim. Failure to file said written notice within the time specified shall constitute a waiver of said claim. Notice of the full extent of the claim and all supporting data must be delivered to the City within 45 days of the occurrence unless the City specifies in writing a longer period. All claims for a time extension must be approved by the City and incorporated into a written change order. 1.15. Unfavorable Weather and Other Conditions. During unfavorable weather and other conditions, the Contractor shall pursue only such portions of the work as shall not be damaged thereby. No portions of the work whose satisfactory quality or efficiency will be affected by any unfavorable conditions shall be constructed while these conditions remain, unless, by special means or precautions approved by the City, the Contractor shall be able to overcome them. 1.1 COU No. 2627-097 The Contractor shall be granted a time extension of one day for each unfavorable weather day that prevents him or her from placing concrete forms or placing and finishing concrete or asphalt concrete. Such unfavorable weather day is defined as a rain day where precipitation prevents the contractor from performing the work more than four (4) continuous hours within the authorized work period or a temperature day where the ambient temperature is below that specified for the placement of materials associated with the controlling work item for more than four (4) continuous work hours of the authorized work period. 1.16. Saturday, Sunday, Holiday and Night Work. No work shall be done between the hours of 5 p.m. and 8 a.m., nor on Saturdays, Sundays or legal holidays except such work as is necessary for the proper care and protection of work already performed, or except in cases of absolute necessity and in any case only with the permission of the City. It is understood, however, that night work may be established as a regular procedure by the Contractor if he or she first obtains the written permission of the City and that such permission may be revoked at any time by the City if the Contractor fails to maintain at night adequate force and equipment for reasonable prosecution and to justify inspection of the work. 1.17. Hours of Labor. Eight (8) hours of labor shall constitute a legal day's work and the Contractor or any subcontractor shall not require or permit more than eight hours of labor in a day from any person employed by him or her in the performance of the work under this contract, unless paying compensation for all hours worked in excess of eight ( 8 ) hours per day at not less than 1 � times the basic rate of pay. The Contractor shall forfeit to the City, as a penalty, the sum of twenty-five dollars ($25.00) for each workman employed in the execution of the contract by him or her or by any subcontractor, for each calendar day during which such laborer, workman, or mechanic is required or permitted to labor more than eight hours in violation of the provisions of Section 1810 to 1816, inclusive, (Article 3, Chapter 1, Part 7, Division 2) of the Labor Code of the State of California and any acts amendatory thereof. 2. CONTRACT PRICE CITY shall pay the Contractor for performance of this Agreement a lump sum total not to exceed amount of $2,750. 7 COU No. 2627-097 3. PAYMENT OF CONTRACT PRICE 3.1 City shall pay any invoice for completed work, and approved by the City, within thirty (30) days of its receipt by City. All payments under this contract shall be made upon the presentation of certificates in writing from the City and shall show that the work covered by the payments has been done and the payments thereof are due in accordance with this contract. As a condition of final payment, Contractor shall provide all documentation required by Exhibit A and reasonably requested by CITY for grant reimbursement and reporting purposes, including required before -and -after photographs of the Work. 4. INDEMNIFICATION AND INSURANCE. 4.1 Indemnification. The Contractor shall do all of the work and furnish all labor, materials, tools and appliances, except as otherwise herein expressly stipulated, necessary or proper for performing and completing the work herein required in the manner and within the time herein specified. The mention of any specific duty or liability imposed upon the Contractor shall not be construed as a limitation or restriction of any general liability or duty imposed upon the Contractor by this contract, said reference to any specific duty or liability being made herein merely for the purpose of explanation. The right of general supervision by the City shall not make the Contractor an agent of the City and the liability of the Contractor for all damages to persons or to public or private property, arising from the Contractor's execution of the work, shall not be lessened because of such general supervision. Until the completion and final acceptance by the City of all the work under and implied by this contract, the work shall be under the Contractor's responsible care and charge. The Contractor shall rebuild, repair, restore and make good all injuries, damages, re -erections and repairs, occasioned or rendered necessary by causes of any nature whatsoever, excepting only acts of God and none other, to all or any portions of the work, except as otherwise stipulated. To the fullest extent permitted by law, Contractor shall indemnify and hold harmless the City and its officers, directors, agents, and employees from and against all claims, damages, losses and expenses including but not limited to attorneys' fees, costs of suit, expert witness fees and expenses and fees and costs of any necessary private investigators arising out of or resulting from the performance of the 13 COU No. 2627-097 work, provided that any such claim, damage, loss or expense (1) is attributable to bodily injury, sickness, disease or death, or to injury to or destruction of tangible property, other than the work itself, including the loss of use resulting therefrom and (2) is caused in whole or in part by any act or omission of the Contractor, any subcontractor, or anyone directly or indirectly employed by any of them, or anyone for whose acts any of them may be liable, regardless of whether or not it is caused in part by a party indemnified hereunder, or by the negligence or omission of a party indemnified herein. In any and all claims against the City or any of its agents or employees by any employee of the Contractor, any subcontractor, anyone directly or indirectly employed by any of them, or anyone for whose acts any of them may be liable, the indemnification obligation shall not be limited in any way by any limitation on the amount or type of damages, compensation or benefits payable by or for the Contractor or any subcontractor under workers' or workmen's compensation acts, disability benefit acts, or other employee benefit acts. The obligation to indemnify shall extend to and include acts of the indemnified party which may be negligent or omissions which may cause negligence. The City shall have the right to estimate the amount of such damage and to cause the City to pay the same and the amount so paid for such damage shall be deducted from the money due the Contractor under this contract; or the whole or so much of the money due or to become due the Contractor under this contract as may be considered necessary by the City, shall be retained by the City until such suits or claims for damages shall have been settled or otherwise disposed of and satisfactory evidence to that effect furnished to the City. 4.2 Insurance. Contractor shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder by the Contractor, his agents, representatives, employees or subcontractors. 4.2.1. Minimum Scope of Insurance Coverage shall be at least as broad as: A. Insurance Services Office Commercial General Liability coverage (Form No. CG 20 10 10 01 and Commercial General Liability - Completed Operations Form No. CG 20 37 10 01). 4 COU No. 2627-097 B. Insurance Services Office form number CA 0001 (Ed. 1/87) covering Automobile Liability, code 1 (any auto) . C. Worker's Compensation insurance as required by the State of California and Employer's Liability Insurance. 4.2.2. Minimum Limits of Insurance Contractor shall maintain limits no less than: A. General Liability: $2,000,000 per occurrence for bodily injury, personal injury and property damage including operations, products and completed operations. If Commercial General Liability Insurance or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit. Insurance must be written on an occurrence basis. B. Automobile Liability: $2,000,000 per accident for bodily injury and property damage. Insurance must be written on an occurrence basis. C. Worker's Compensation Employer's Liability: $1,000,000 per accident for bodily injury or disease. 4.2.3. Deductibles and Self -insured Retentions Any deductibles or self -insured retentions must be declared to and approved by the City. The City may require the insurer to reduce or eliminate such deductibles or self -insured retentions with respect to the City, its officers, officials, employees and volunteers; or the Contractor to provide a financial guarantee satisfactory to the City guaranteeing payment of losses and related investigations, claim administration and defense expenses; or to approve the deductible without a guarantee. 4.2.4. REQUIRED Insurance Provisions Proof of general liability and automobile liability policies are to contain, or be endorsed to contain, the following provisions: 10 COU No. 2627-097 A. The City, its officers, officials, employees, and volunteers are to be covered as ADDITIONAL INSURED with respect to liability arising out of automobiles owned, leased, hired or borrowed by or on behalf of the contractor; and with respect to liability arising out of work or operations performed by or on behalf of the Contractor including materials, parts or equipment, furnished in connection with such work or operations. General liability coverage can be provided in the form of an endorsement to the Contractor's insurance, or as a separate owner's policy. B. The workers' compensation policy is to be endorsed with a waiver of subrogation. The insurance company, in its endorsement, agrees to waive all rights of subrogation against the City, its officers, officials, employees and volunteers for losses paid under the terms of this policy which arises from the work performed by the named insured for the City. NOTE: You cannot be added as an additional insured on a workers' compensation policy. C. For any claims related to this project, the Contractor's insurance coverage shall be primary insurance with respect to the City, its officers, officials, employees, and volunteers. Any insurance or self-insurance maintained by the City, its officers, officials, employees, or volunteers shall be in excess of the Contractor's insurance and shall not contribute with it. D. Each insurance policy required by this clause shall be endorsed to state that coverage shall not be canceled by either party, except after thirty (30) days' prior written notice by certified mail, return receipt requested, has been given to the City. E. Note: (This protects the Contractor) -Coverage shall not extend to any indemnity coverage for the active negligence of the additional insured in any case where an agreement to indemnify the additional insured would be invalid under Subdivision (b) of Section 2782 of Civil Code. 5. TERMINATION. This Agreement may only be terminated by City: 1) for breach of the agreement; 2) because funds are no longer available to pay 11 COU No. 2627-097 Contractor for services provided under this Agreement; or 3) for the convenience of City, including if City has abandoned and does not wish to complete the project for which Contractor was retained. City shall notify Contractor of any alleged breach of the agreement and of the action required to cure the breach. If Contractor fails to cure the breach within the time specified in the notice, the contract shall be terminated as of that time. If terminated for lack of funds or for the convenience of City, the contract shall terminate on the date notice of termination is given to Contractor. City shall pay the Contractor only for services performed and expenses incurred as of the effective termination date, unless terminated because the Contractor has failed to satisfactorily cure a breach after notice in which event City shall: a. retain any amounts earned under the Contract but not yet paid by City; b. take possession of all material and fixtures on the job site; c. have the right to complete the Work and recover from Contractor any increased cost to complete the Work above the amounts that would have been paid to Contractor hereunder, together with any other damages suffered by City as a result of said breach. 6. MODIFICATION OF AGREEMENT. City may, from time to time, request changes in the Work, the time to complete the work or the compensation to be paid for the Work. Such changes must be incorporated in written amendments to this Agreement. To be effective, all such changes as referred to in this section must be agreed upon in writing by both parties to this agreement. 7. ASSIGNMENT. The Contractor shall not assign any interest in this Agreement, and shall not transfer any interest in the same (whether by assignment or novation), without the prior written consent of City. 8. FEDERAL GRANT REQUIREMENTS. The Work under this Agreement is funded in whole or in part through financial assistance provided by the Federal Emergency Management Agency (FEMA) under the Hazard Mitigation Grant Program. Contractor 12 COU No. 2627-097 shall comply with all applicable requirements of the federal award, including applicable provisions of 2 C.F.R. Part 200 and Appendix II to Part 200, federal laws and regulations, and applicable FEMA policies, procedures, and directives. Contractor represents that neither Contractor nor its principals are suspended, debarred, excluded, or otherwise ineligible to participate in federally funded transactions and shall not enter into any covered subcontract or other lower -tier transaction with a party that is suspended, debarred, excluded, or otherwise ineligible; Contractor shall immediately notify City of any change in such status. Contractor shall maintain all books, documents, papers, photographs, invoices, payroll information, and other records directly pertinent to this Agreement and necessary to establish the eligibility, performance, and cost of the Work, and shall provide the City, FEMA, the U.S. Department of Homeland Security, the Comptroller General of the United States, and their authorized representatives access to such records and to the project site for audit, examination, monitoring, or other authorized purposes. Contractor shall retain such records until notified by City that retention is no longer required and shall provide all documentation reasonably requested by City for grant reimbursement, monitoring, audit, or closeout, including required before -and -after photographs of the Work. Contractor shall comply, to the extent applicable to the Work, with federal requirements regarding covered telecommunications and video surveillance equipment or services under 2 C.F.R. § 200.216, domestic preferences for procurements under 2 C.F.R. § 200.322, including applicable Build America, Buy America requirements, and procurement of recovered materials under 2 C.F.R. § 200.323. In procuring any subcontractors, Contractor shall comply with applicable federal requirements concerning consideration of small businesses, minority businesses, women's business enterprises, veteran -owned businesses, and labor surplus area firms. Contractor shall not use the DHS or FEMA seals, logos, or other protected marks without prior authorization. Contractor acknowledges that the Federal Government is not a party to this Agreement and is not subject to any obligations or liabilities to Contractor arising from this Agreement, and that federal laws concerning false or fraudulent statements and claims apply to Contractor's activities under this Agreement. Contractor shall include all applicable federal requirements in its subcontracts and shall be responsible for compliance with such requirements by its subcontractors. 9. APPLICATION OF LAWS. The parties hereby agree that all applicable Federal, State and local rules, regulations and guidelines not written into this 13 COU No. 2627-097 Agreement shall hereby prevail during the period of this Agreement. 10. INDEPENDENT CONTRACTOR. It is the express intention of the parties hereto that Contractor is an independent contractor and not an employee, joint venturer, or partner of City for any purpose whatsoever. City shall have no right to, and shall not control the manner or prescribe the method of accomplishing those services contracted to and performed by Contractor under this Agreement, and the general public and all governmental agencies regulating such activity shall be so informed. Those provisions of this Agreement that reserve ultimate authority in City have been inserted solely to achieve compliance with federal and state laws, rules, regulations, and interpretations thereof. No such provisions and no other provisions of this Agreement shall be interpreted or construed as creating or establishing the relationship of employer and employee between Contractor and City. Contractor shall pay all estimated and actual federal and state income and self-employment taxes that are due the state and federal government and shall furnish and pay worker's compensation insurance, unemployment insurance and any other benefits required by law for himself and his employees, if any. Contractor agrees to indemnify and hold City and its officers, agents and employees harmless from and against any claims or demands by federal, state or local government agencies for any such taxes or benefits due but not paid by Contractor, including the legal costs associated with defending against any audit, claim, demand or law suit. Contractor warrants and represents that it is a properly licensed for the work performed under this Agreement with a substantial investment in its business and that it maintains its own offices and staff which it will use in performing under this Agreement. 11. GOVERNING LAW. This Agreement shall be governed by and construed in accordance with the laws of the State of California and any legal action concerning the agreement must be filed and litigated in the proper court in Mendocino County, each party consenting to jurisdiction and venue of California state courts in Mendocino County. 12. SEVERABILITY. 14 COU No. 2627-097 If any provision of the Agreement is held by a court of competent jurisdiction to be invalid, void, or unenforceable, the remaining provisions shall nevertheless continue in full force and effect without being impaired or invalidated in any way. 13. INTEGRATION. This Agreement, including the exhibits attached hereto, contains the entire agreement among the parties and supersedes all prior and contemporaneous oral and written agreements, understandings, and representations among the parties. No amendments to this Agreement shall be binding unless executed in writing by all of the parties. 14. WAIVER. No waiver of any of the provisions of this Agreement shall be deemed, or shall constitute a waiver of any other provision, nor shall any waiver constitute a continuing waiver. No waiver shall be binding unless executed in writing by the party making the waiver. 15. NOTICES. Whenever notice, payment or other communication is required or permitted under this Agreement, it shall be deemed to have been given when personally delivered, emailed, or deposited in the United States mail with proper first-class postage affixed thereto and addressed as follows: CONTRACTOR Image Tree Pros 564 Caletti Ave. Windsor, CA. 95482 CITY City of Ukiah 300 Seminary Ave. Ukiah, CA. 95482 Either party may change the address to which notices must be sent by providing notice of that change as provided in this paragraph. 16. PARAGRAPH HEADINGS. The paragraph headings contained herein are for convenience and 15 COU No. 2627-097 reference only and are not intended to define or limit the scope of this agreement. 17. EXECUTION OF AGREEMENT. This Agreement may be executed in duplicate originals, each bearing the original signature of the parties. Alternatively, this Agreement may be executed and delivered by facsimile or other electronic transmission, and in more than one counterpart, each of which shall be deemed an original, and all of which together shall constitute one and the same instrument. When executed using either alternative, the executed agreement shall be deemed an original admissible as evidence in any administrative or judicial proceeding to prove the terms and content of this Agreement. WHEREFORE, the parties have entered this Agreement on the date first written above. CONTR,aCTOR I CITY OF UKIAH By: yV l'C By: s�`s Sage Sangiacomo City Manager California Contractor's License Number jT,)(Q��[Number or N/A] 16 Exhibit A (11 City of Ukiah Bids mm• be emailed fared or hand delivered to the contact information listed herein, and by the specified deadline, or the bid will be rejected. Submitted by: Mao, %~�,e, �ros (Company Name S Address) 56 y Csle% Ave.A) i Kdsar, CA - BIDS ARE REQUESTED FOR THE FOLLOWING ITEMS: PAGE 1 OF 1 REQUEST FOR BID 300 SEMINARY AVENUE UKIAH, CALIFORNIA 95482 P: (707) 463-6225 DATE: 8/20/2026 RE) NO E41604 BIDS WILL BE RECEIVED UNTIL 2:00 p.m., September 4th, 2026 AT THE OFFICE OF THE PURCHASING MANAGER 411 W CLAY ST. CITY of UKIAH BY: Myles Fisette Email: mfisette@cityofukiah.com ALL BIDS SHALL BE F.O.B. UKIAH, CA. QUANTITY DESCRIPTION UNIT PRICE EXTENDED PRICE 1 Lump Sum All necessary labor, materials, and equipment to perform vegetation management adjacent to SS0.' 1,2�S�i. od the City's 12kV electric distribution lines along Jones Street in Ukiah, CA 95482. The work generally consists of trimming approximately five (5) trees to provide an eight -foot (8') clearance from the electric lines. As per attached City of Ukiah Specification E41604. TOTAL: Payment Terms: SIGNATURE; DATE: - 2b PRINT NAME: r PHONE: - b y - I &S EMAIL: S},w.r-I c TERMS: 1. LOCAL PREFERENCE: Local Vendors shall be given an allowance of five percent (5%), up to a maximum allowance of $2,500, on any bid for supplies, equipment and/or materials per Ukiah City Code Section 1522.D.4. A Local Vendor is defined as one which, 1) conducts business in an office or other business premises with a physical location in Mendocino County, 2) holds a valid business license issued by Mendocino County or one of the cities in Mendocino County for that business location, and 3) has conducted business in compliance with 1) and 2) for not less than six (6) months prior to requesting the preference. The City shall receive satisfactory proof that a business qualifies as a local vendor before it may receive the local preference. In the event that there is a he bid, where one bidder is local, the other is not, and the bid is equal in price and quality, the award shall go to the Local Vendor. 2. Right is reserved to reject any and all bids. 3. Right is reserved to accept separate items unless specifically denied by bidder. 4. Right is reserved to reject a bid from any bidder who has previously failed to perform adequately for the City of Ukiah. 5. In CASE OF DEFAULT, the City of Ukiah may procure the items quoted on from other sources and hold the original bidder liable for any increased costs. 6. The price, terms, delivery point, and delivery date may Individually or collectively be the basis of the awarding of the bid. 7. In submitting the bid, bidder agrees that the bid shall remain open and may not be revoked or withdrawn for 6U days from the bid due date, unless a different time period is specified in RFB. 8. Bidder agrees to perform according to its bid, if the City's acceptance Is communicated to the bidder within the time specified in number 7 above. REQUEST FOR BID City of Ukiah SPECIFICATION E41604 UKIAH ELECTRIC UTILITY HAZARD MITIGATION FUEL REDUCTION PROJECT AUGUST 20, 2026 Bid Due Date 2:00 PM SEPTEMBER 4, 2026 City of Ukiah SPEC # E41604 UKIAH ELECTRIC UTILITY HAZARD MITIGATION FUEL REDUCTION PROJECT - RFB I. Introduction The City of Ukiah is seeking bids from qualified Contractors to provide all necessary labor, materials, and equipment to perform vegetation management adjacent to the City's 12kV electric distribution lines along Jones Street in Ukiah, CA 95482. The work generally consists of trimming approximately five (5) trees to provide an eight -foot (8') clearance from the electric lines. II. Bid Procedure PLEASE TAKE NOTICE: This Request for Bid (RFB) is issued as an open market purchase under Section 1522 of the Ukiah City Code. This is not a formal or informal bid under the provisions of state law governing RFB's for Public Projects. The procedures governing open market purchases are at the discretion of the Purchasing Officer and may vary from bid to bid, depending on the City's needs. The City Code encourages the Purchasing Officer to use modern communications, including the telephone, e-mail and the internet, to obtain the lowest possible price, consistent with the City's needs. The Purchasing Officer does use City bidder's lists when soliciting bids. You may contact the Purchasing Officer if you would like to be placed on the City's bidder's list. III. Contact Person The City has designated Myles Fisette, Purchasing Manager, as the contact person for questions related to the work requested. Questions are to be submitted in writing and can be done so by e-mail at mfisettegcityofukiah. com. IV. Examination of the Site The Contractor should familiarize himself with the local conditions of the project sites, and shall be responsible for having acquired full knowledge of the job and all problems affecting it. Failure to do so will in no way relieve him/her of the responsibility for performing any of the work or operations required as part of this contract. V. Bid Submittal Instructions Bids can be submitted in hardcopy, fax, or by email. Bids are due on or before 2:00 PM SEPTEMBER 4, 2026 to: City of Ukiah Purchasing Department Attn: Myles Fisette 411 West Clay Street Phone: (707) 463-6225 Email: mfisette&cityofukiah.com It will be the sole responsibility of the bidders to have their bids delivered to the City before the closing hour and date. Late bids will not be considered and will be returned unopened to the sender. The City will not be responsible for any cost incurred by the Contractor in preparation of their bid response. VI. Scope of Work The City of Ukiah requests bids that include all labor, materials, equipment, traffic control, disposal, and other incidental work necessary to perform vegetation management adjacent to the City's 12kV electric distribution lines along Jones Street in Ukiah, CA 95482. N City of - Ukiah SPEC # E41604 UKIAH ELECTRIC UTILITY HAZARD MITIGATION FUEL REDUCTION PROJECT - RFB The work consists of trimming approximately five (5) trees and associated vegetation to provide a minimum clearance of eight feet (8') from the 12kV electric lines. The trees requiring work are generally depicted in Attachment A. The Contractor shall mobilize all personnel and equipment necessary to complete the work and shall perform all trimming in accordance with the City of Ukiah Tree Management Guidelines, included as Attachment B. All work shall be performed in a manner that protects existing electric facilities, adjacent property, structures, landscaping, and the public. The Contractor shall conduct operations so as to cause the least possible obstruction and inconvenience to vehicular and pedestrian traffic and nearby residents. The Contractor shall furnish and maintain, at its expense, all flaggers, signs, barriers, warning devices, pedestrian walkways, driveway access measures, and other traffic -control measures necessary to safely perform the work and provide adequate warning to the public. No road closure shall be permitted without prior written approval from the City. Public vehicular and pedestrian traffic shall be permitted to pass through or around the work area with as little interruption or delay as reasonably possible, and the Contractor shall provide for the safe passage of pedestrians around the work area at all times. Access to adjacent residences and properties shall be maintained to the maximum extent reasonably possible throughout the work. The Contractor shall minimize any interruption to driveways or property access, and no driveway or property access shall be closed for more than four (4) hours during a workday without prior approval from the City. All driveways shall be accessible at the end of each workday. Gutters and drainage facilities shall remain clear and unobstructed, and Contractor equipment and operations shall be conducted in a manner that protects City streets, sidewalks, and other public facilities from damage. The Contractor shall provide adjacent and affected homeowners with a minimum of twenty-four (24) hours advance notice before scheduled vegetation management activities begin in the vicinity of their property. If the Contractor anticipates a temporary closure or material restriction of a driveway or property access, affected property owners shall receive at least forty-eight (48) hours advance written notice. Any proposed street closure, extended traffic obstruction, or other condition materially affecting public access shall be coordinated in advance with the City. Unless otherwise approved in writing by the City, all work shall be performed Monday through Friday between the hours of 8:00 a.m. and 5:00 p.m. Work shall not be performed on Saturdays, Sundays, City - observed holidays, or outside these hours without prior written approval from the City, except in an emergency. The Contractor shall conduct its operations in a manner that minimizes noise and disturbance to adjacent residents and shall comply with all applicable City noise regulations. The Contractor shall remove and properly dispose of all limbs, brush, wood chips, and other debris generated by the work. Upon completion, the work area shall be cleaned and restored to a condition at least equal to that existing prior to commencement of the work. The Contractor shall provide clear photographs documenting each work location before and after vegetation management activities. Photographs shall be submitted to the City upon completion of the work for project and grant documentation purposes. City of - Ukiah SPEC # E41604 UKIAH ELECTRIC UTILITY HAZARD MITIGATION FUEL REDUCTION PROJECT - RFB Due to the requirements of the FEMA Hazard Mitigation Grant Program funding this project, all Work, including vegetation management, cleanup, and required photographic documentation, shall be fully completed no later than October 4, 2026. The Contractor shall promptly notify the City of any circumstance that may affect its ability to meet this deadline. Contractor shall be solely responsible for damage resulting from its operations and shall restore damaged property to its original condition at its own expense. Contractor shall comply with all applicable safety requirements, including the Construction Safety Orders of the California Division of Occupational Safety and Health, and shall provide appropriate traffic and pedestrian control as necessary to protect workers and the public. Work will not be considered complete until the required photographic documentation has been submitted and the work has been inspected and accepted by the City. VII. Federal Grant Requirements This project is funded in whole or in part through financial assistance provided by the Federal Emergency Management Agency (FEMA) for hazard mitigation activities intended to reduce the impact of wildland fires on critical electric power infrastructure. By submitting a bid and entering into a contract with the City, the Contractor agrees to comply with all applicable requirements of the federal award, including applicable provisions of 2 C.F.R. Part 200 and Appendix II to Part 200, and all applicable federal laws, regulations, FEMA policies, procedures, and directives. The Contractor shall maintain all books, documents, papers, photographs, records, and other documentation directly pertinent to the work and shall provide the City, FEMA, the U.S. Department of Homeland Security, the Comptroller General of the United States, and their authorized representatives access to such records and to the project site for audit, examination, monitoring, or other authorized purposes. The Contractor shall provide all documentation reasonably requested by the City to establish the eligibility, performance, and cost of the work, including required before - and -after photographs. The Contractor and its principals shall not be suspended, debarred, or otherwise excluded from participation in federally funded transactions and shall comply with applicable suspension and debarment requirements, including applicable requirements for lower -tier covered transactions. The Contractor shall comply with applicable federal requirements concerning the consideration of small businesses, minority businesses, women's business enterprises, veteran -owned businesses, and labor surplus area firms in subcontracting; the prohibition on the use of covered telecommunications and video surveillance equipment or services under 2 C.F.R. § 200.216; domestic preferences for procurements under 2 C.F.R. § 200.322, including any applicable Buy America requirements; and procurement of recovered materials under 2 C.F.R. § 200.323, to the extent applicable to materials or products acquired in connection with the work. The Contractor shall not use DHS or FEMA seals, logos, or other protected marks without prior authorization. The Contractor acknowledges that the Federal Government is not a party to the Contract and assumes no obligations or liabilities to the Contractor arising from the Contract, and that federal laws concerning false or fraudulent statements and claims apply to activities performed under the Contract. The Contractor shall include applicable federal requirements in its subcontracts and shall be responsible for compliance by its subcontractors. Because the Contract is expected to exceed $10,000, the Contract shall be subject to termination by the City for cause and for convenience in accordance with the terms of the Contract, including the manner of termination and basis for settlement. il City of - Ukiah SPEC # E41604 UKIAH ELECTRIC UTILITY HAZARD MITIGATION FUEL REDUCTION PROJECT - RFB As a condition of the grant funding, all Work under this RFB must be fully completed no later than October 4, 2026. VIII. Measurement and Payment The bid price for this work shall be lump sum, and consist of all labor, materials, equipment, applicable fees, including tax (8.875%) and freight necessary to perform the work as described in this bid specification. IX. Terms The City asks that vendors specify their desired payment preferences in their bid response. The actual payment terms of the contract will be open for negotiation during the contract phase. If no special payments are requested prior to issuing the work, the City will assume net 30 terms. The City reserves the right to award to the lowest, responsible bidder. The City also reserves the right to waive any irregularities and technicalities and request rebids should it be deemed in its best interests to do so. The price, terms, delivery point, and delivery date may individually or collectively be the basis of the awarding of the bid. In addition, the City reserves the right to make the selection of specific parts of a bid, or multiple proposals that will best meet the needs of the City as defined in this RFB. In addition, the City reserves the right to reject any or all bids. The awarded contractor will enter a "Short Form Construction Contract", Attachment C. X. Addenda If it becomes necessary to revise any part of this Request for Bid (RFB) after it has been issued, the City will issue an addendum to the RFB containing the revision. All addenda will be posted on the City's website at www.cityofukiah.com/purchasing with the rest of the RFB documents. Anyone who intends to submit a bid in response to the RFB must check the website frequently for any posted addenda. Anyone submitting a bid will be deemed to have seen and agreed to be bound by the posted addenda. XI. Warranty Unless otherwise indicated, the Contractor must provide a 1 year workmanship warranty from the date of final acceptance. The Contractor shall replace promptly and at his own expense any materials and/or workmanship which fail during this warranty period. XII. Bidder Oualifications The City will satisfy itself that the potential contractors are reputable firms with a proven track record and a proven product. Contractors are asked to provide the information requested under Work Performance History Capability. References are to be those who you have performed similar scope of work as asked for in this RFB. References are to include the contact name and phone number. A minimum of three references are requested. XIII. Insurance Requirements Bidder's attention is directed to the insurance requirements — see Attachment E. Contractors shall furnish to the City, upon award of contract, certificates of insurance covering full liability under Worker's Compensation laws of the State of California, Comprehensive General Liability and Business Auto Insurance 5 City of Ukiah SPEC # E41604 UKIAH ELECTRIC UTILITY HAZARD MITIGATION FUEL REDUCTION PROJECT - RFB with policy limits of not less than $2,000,000 naming the City as an additional insured party. It is highly recommended that contractors confer with their respective insurance carriers or brokers to determine in advance of bid submission the availability of insurance certificates and endorsements as prescribed and provided herein. If an apparent awarded contractor fails to comply with the insurance requirements, that contractor may be disqualified from award of the contract. If you have questions regarding the City's requirements, please contact the City's Risk Manager at 707-463-6287. XIV. License and Additional Requirements 1) Compliance with Laws and Regulations: All materials, parts and equipment furnished pursuant to these specifications shall be in compliance with the laws and regulations of the State of California and OSHA. The contractor shall, if requested by the City, supply certification and evidence of such compliance. 2) Payment Bond: As per California Civil Code Section 9550, a direct contractor that is awarded a public works contract involving an expenditure in excess of twenty-five thousand dollars ($25,000) shall, before commencement of work, give a payment (material and labor) bond to and approved by the officer or public entity by whom the contract was awarded. Please refer to Attachment D for a copy of the sample forms. 3) Legal Requirements and Permits: The contractor agrees to fully comply with all local, City, State and Federal laws, regulations and ordinances governing performance of contractual services required, and it will be the responsibility of the contractor to obtain any and all necessary licenses, permits or clearances, including the actual cost of licenses. 4) License Requirements: Bidder/Contractor must possess a current State of California contractor's license and a City of Ukiah business license. (For information business license, please contact Kathy Norris, City of Ukiah Finance Department at 707-463-6202.) a) The Contractor shall possess a valid State of California Class D-49 license. Bidder shall provide proof of possession of the proper licenses and certificates of registration necessary to perform the work. Employees actually performing the tasks shall provide proof of proper certificates of registration for same. b) The bidder shall keep in force a City of Ukiah business license for the extent of the project. c) Where subcontractors/jobbers are used, bidder shall provide the City with proof of proper licenses, certificates and proof of insurance for work performed. 5) Notice to Bidders — Contractor Registration and Prevailing Wages —No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department oflndustrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771. ](a)]. No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. The prime contractor shall be responsible for posting job site notices as prescribed by regulation. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. Public Works Small Project Exemption: Small project exemption means that contractors who work exclusively on small projects are not required to register as public works contractors or file electronic certified payroll reports for those projects. However, prevailing wages must still be paid on projects with small project exemption. Contractors are still required to maintain certified payroll records on a continuous basis, and provide those records to the Labor Commissioner's Office upon request. Small project exemption is applied based on the amount of the entire project, not a contractors subcontracted amount of the project. Small project exemption applies Con City of Ukiah SPEC # E41604 UKIAH ELECTRIC UTILITY HAZARD MITIGATION FUEL REDUCTION PROJECT - RFB for all public works projects that do not exceed: $25,000 for new construction, alteration, installation, demolition or repair; and $15,000 for maintenance. Each laborer or mechanic of Contractor or any subcontractor engaged in work on the project under this contract shall be paid, pursuant to provisions of Section 1770, including amendments thereof, of the Labor Code of the State of California, the Director of the Department of Industrial Relations, State of California, has ascertained the general prevailing rate of wages for straight time, overtime Saturdays, Sundays and Holidays including employer payment for health and welfare, vacation, pension and similar purposes, copies of the General Prevailing Wage Determination (applicable to the work), for the locality in which the work is to be done can be reviewed at Website: www.dir.ca.gov/dlsL/pwd/northem.html. The Labor Commissioner through the Division of Labor Standards Enforcement (DLSE) may at any time require contractor and subcontractors to furnish electronic certified payroll records directly to DLSE. For projects that do not meet the "Public Works Small Project Exemption ", contractors and subcontractors must furnish electronic certified payroll records directly to the DLSE. 7