HomeMy WebLinkAbout2012-05-23 RVCWD MinutesREDWOOD VALLEY C01117TTYATER DISTRIUT
2370 Webb Ranch Road
Redwood Valley CA 95470
(707) 485-0679
MINUTES
Regular Meeting
Wednesday, May 23, 2012
Directors Present: Donald E. Butow, Jeanette Hallman, Granville Pool, Pamela Ricetti, Jack Spilman
Directors Absent: None
Staff Present: General Manager Bill Koehler
Recording Secretary: Linda Groth
Others Present: John Locey-Brelje & Race Engineers, Will Carson-Millview CWD,
Steven Gardner, Paula Berezay, Liz Markowski,
Unnamed member of public from Mohawk Trail,
Unnamed member of public -acting representative for S. Benrazavi
Dp—on-a-ff i5utow,-50ara Teice-Fresiaen
Jeanette Hallman, Director
Jack Spilman, Director
Granville Pool, Board President
Unnamed member of public brought a letter to the District from S. Benrazavi, property owner at Lakeridge
Road.
GM Koehler stated the letter is loosely tied to an agenda item although it is not directly related to the
discussion that is unfortunately titled, Surge Tank Mitigation/Fund Expenditure.
President Pool stated the Board will then wait until the Meeting progresses to that Agenda Item.
Minutes, Regular Meeting
Board of Directors, R.V.C,W.D.
May 23, 2012
1 11i F WE R4 Z00 N 1 a 91
I w III a! 111 11
Nothing submitted.
MOTION: Accept the Agenda as presented.
Hallman/Spilman Discussion CARRIED
AYES: Hallman, Spilman, Butow, Ricetti, Pool
NOES: None
,9,BSE'LIT: None
GM Koehler asked, as a courtesy to John 'Jack' Locey from Brelje & Race Engineers in Santa Rosa, that
the Board hear his presentation early in the Meeting as he has some traveling to do after his presentation.
President Pool stated his willingness to hear this matter before anything else on the Agenda.
MOTION: Hear the Brelje & Race Engineers presentation at this time.
Spilman/Ricetti Discussion CARRIED
AYES: Spilman, Ricetti, Butow, Hallman, Pool
NOES: None
ABSENT: None
Jack Locey, Senior Principal at Brelje & Race Engineers introduced himself and referred to the phone call
he received from GM Koehler outlining the needs of the District at this time. Brelje & Race is extremely
pleased to be provided with the opportunity to reestablish an ongoing relationship with the RVCWD. A
binder presentation titled, Statement of Qualifications for District Engineering Services was provided in the
Board Packets previous to the Meeting. The attributes that place Brelje & Race above other professional
engineering firms in serving the District include their prior experience working with the District and a better
understanding of the various physical and financial challenges the District faces. Additionally, B & R has a
long history of assisting rural communities with their planning and engineering needs including executing
water system renovation and expansion projects. Their ability to evaluate and devise solutions to problems
associated with difficult terrain, limited access and sensitive environments is unmatched.
Director Butow: In the past while I served as Chairman of the Board of Directors there were many years of
working with Brelje & Race. I recall that the District always received prompt, thorough responses from B &
R. They were available for any questions, any time that they were called and he felt it was a very cordial
and professional relationship.
Jack Locey: Thank you for that. And, as a result of the retirement of Tom Yokoi some four years ago, it is
proposed that I would be the Senior Principal/Lead Contact with the District. I have been with Brelje &
Race for 35 years and have extensive experience working with rural water supply systems.
Minutes, Regular Meeting
Board of Directors, R.V.C.W.D.
May 23, 2012
Director Spilman: Are you familiar with this type of system?
Jack: I am already somewhat familiar with the general nature of Redwood Valley's system.
President Pool: One of the high priority issues for the District is that the 'as -built' data is considerably
lacking for the original construction of the infrastructure of this District. As a result, one of the things that
we don't know very well is the exact manner in which the joints were put together in our main transmission
line.
GM Koehler: It's steel, coated with cement lining, and 4-1/2 miles long with no access points except at
either end.
President Pool: Because of age of the system and our uncertainty about the quality of the joints in
particular, in terms of what was done to make sure they were lined and had a continuous lining after
everything was put together, we're thinking strongly about doing an inspection of the inside of the pipe. He
asked for Jack Locey's comments on what he thinks would be involved in making the necessary access
points and what approach we should take with that and what B & R's part in that would likely be.
Jack: Brelje & Race's part would involve defining an inspection protocol for an outside firm that specializes
in pipeline inspections to come to the District to make the necessary improvements or additions to that
pipeline. We would provide the level of access point that they would need based upon the ability of current
camera inspection equipment and so forth, to ready that pipeline so that they could actually complete an
inspection and do the report preparation. Our primary goal would be to investigate how that inspection
might come about, develop that program, ready the pipeline, and also then manage that actual inspection
activity and assist them in a review of the report that would be generated as a result of that inspection.
B&R would provide the District with recommendations as to what they perceive the lifetime of that would be
or what remediation efforts need to occur to date or for something that's going to be coming down the line
or can be phased over time, etc.
President Pool: At this point the Board of Directors is trying to take a really comprehensive and intelligent
look at our capital improvement needs and our depreciation and this seems like a fairly important thing to
get more knowledge about so that we can program in what sort of expenses we need to look at.
GM Koehler: The pipeline did break at one point and had to be repaired. It was expensive and time
consuming and timing became critical, as it is our lifeline to the lake.
Director Hallman: The first paragraph in your presentation, please expand your comments on your
experience with identifying and securing long-term financing for your clients.
Jack Locey: For myself, for better than 20 years I have put together a lot of projects that have been
submitted to USDA for their water and waste loan/grant money to that program. I've done about
$15,000,000-$20,000,000 worth of infrastructure work, over 10 projects or better, utilizing that financing. At
the present time I just finished a large project and identified some other applications pending throughout
Sonoma and nearby counties. My long-term relationship with the USDA District and State staff is
unmatched in the local engineering community.
Director Hallman: I just wanted to make sure you know that this District doesn't qualify for federal loans.
Minutes, Regular Meeting
Board of Directors, RN.C.W.D.
May 23, 2012
GM Koehler- Perhaps sometime in the future, the District's status might change. I have previous
employment experience interacting with the USDA staff, and, the USDA has a very short list of engineering
firms they deal with because only those firms are familiar with the USDA protocols.
President Pool: It may be years before the District is able to qualify for federal funding. I encourage Jack
to think about any other good avenues for financing that the Board might consider.
GM Koehler: Was Brelje & Race involved with the Sweetwater Springs buy-out?
Jack: My firm was peripherally involved.
Jack then offered detailed information on the conditions of those pipelines and of water quality issues.
GM Koehler: This was the re-formation of some small water districts on the Russian River near the Monte
Rio area who were converting into a small County Water District.
Director Hallman: Did Brelje & Race looked at this District's bid request.
GM Koehler: This was the RFP (request for proposal) that was sent during the recent months
Mr. Locey: Brelje & Race did not respond. Frankly the structure of the RFP and the nature of the request
was generally not in line with what we would normally see in a request for proposal. That was enough of a
concern by the various parties involved to decide to not respond.
Director Hallman: I looked it over and thought it was ok, was it the structure of it?
Jack: Well, forgive me for bringing this up, you used the word bid in the request for professional services.
It's something that causes firms to shy away Professional services in general should be retained on the
matter of their qualifications, that doesn't mean the price is no object, but professional firms and
professional services should be retained on the basis of what they can do for the group that's engaging
them from a technical standpoint and so forth, and a best fit for their need based upon their experience. I
suspect that may be a factor on the number of responses the District may have received.
Director Hallman: I appreciate that answer. One of my concerns while I've been on the Board is that it
seems the District generally doesn't get a lot of responses back, not just for engineering firms but for a
couple other things and one of them was a major construction job. Do you do things like that?
Jack: One of the services B & R often provides for its clients is the preparation of bid documents for a
construction project; we do that on a routine basis. Even though the Water District is a little bit out of the
way, I'm surprised that the District would have a significant opportunity for contractors to do some work and
yet not receive responses, unless the Noticing is not adequate or there is concern that the manner in which
the project is described or not specified clearly enough for the contractor to feel comfortable; they are not
going to get themselves into a situation that could become complicated. It's all about putting very clear
information out there so that everybody has a good understanding going into it. Under those
circumstances, you should be able to attract contractors to do the work. I certainly see contractors in my
general area going at least this far for work opportunities.
4
Minutes, Regular Meeting
Board of Directors, RY.C.W.D.
May 23, 2012
GM Koehler asked Director Hallman: Are you referring to the pipeline repair project?
Director Hallman, In my opinion there has been a general lack of putting bids out there, but, yes, I am
talking about the FEMA project.
GM Koehler: The FEMA project was a very formal bid process; it was put out by Rau & Associates
Engineers. A lot of people came out and looked at it and said it wasn't their cup of tea.
Jack Locey: There is always a chance for that happening with very specialized projects.
GM Koehler: The majority of the project was extremely specialized.
Director Hallman: There are also cases where we just haven't had time to put it out there because of time
and circumstances; but it has been a concern of mine. Thank you for your response.
Director Spilman: Is there a standard rate that you have?
Jack Locey: I did bring a rate schedule that covers the ranges of employee classifications within the firm.
(it was distributed at this time.) Obviously I'm a senior principal, but on average a senior principal project
engineer would earn $100-$120 per hour depending upon how senior they are and how experienced.
Obviously we expect that somebody who is receiving a higher rate has more experience and a much
quicker thought process and is able to get the project done much quicker than someone who charges less
dollars per hour. At the end of the day it's all about the efficiency and quality of the total product taking into
account the budget agreed upon.
Director Spilman: Just quickly looking at this rate sheet, if we wanted a two -man survey party, we would be
paying a rate of $210 from the time they leave the office, plus mileage?
Jack: Yes. I do have to say that if the travel up here is for a client with whom we have a regular
engagement, the mileage charge is nominal. That's not to say that on some circumstances like surveying,
the District may choose to have surveying done by a local surveyor. It would make more sense financially
to have certain portions of the work, like surveying, topography work, etc. accomplished by others and then
forwarded on to a firm like ourselves to actually utilize. That occurs when the client is further away from
our office.
GM Koehler: Has Brelje & Race ever worked with Rau & Associates?
Jack: At some point Brelje & Race probably had some background material provided by their office. We
know the office but we don't have an ongoing relationship with them.
Director Hallman: I think that's all the questions I have. Thank you again for your answers.
Jack Locey: I appreciated the opportunity to meet with the Board and General Manager and respond to the
questions. I look forward to hearing from Bill (GM Koehler) regarding potentially moving forward with this.
Thanked you for moving this agenda item to the beginning of the Meeting.
The Directors thanked him for coming and for his presentation.
Jack Locey left the Meeting at 7:28 P.M.
5
Minutes, Regular Meeting
Board of Directors, RN.C.W.D.
May 23, 2012
GM Koehler: I did have direct professional dealings with Jack Locey at Brelje & Race back when he
worked at a district that was next to Sweetwater Springs. My District arranged to abandon their water
source and do a tie-in with Monte Rio and become a consecutive system. We spent several months in
negotiations with people that were representing Sweetwater Springs; it was a very successful project.
Director Butow: Do you want the Board to take action tonight?
GM Koehler: That would be up to the Board but I can say that I cannot imagine anybody better for that
scope of work, and especially since Jack is so comfortable about things like the School Way Bridge
Project, or minor surveying, etc., where we would presumably go to Rau & Associates or somebody like
that in the immediate area.
Director Butow: So you would like the Board to agree to a relationship?
GIVI Koehler: I don't think the Board needs to do anything other than agree. Well basically, if we put
money in the budget for say, the pipeline inspection, then we have a need to engage. If we don't have
money in the budget, we don't have a need to engage.
Director Ricetti asked GM Koehler: In your experience, if we hire Brelje & Race would we have any clue as
to what parameters they would be billing?
GM Koehler: Generally what you might get from them is a "not to exceed" number. Each project really
does need to be considered individually. As a point of interest, all the maps on the office walls here were
made by Brelje & Race. The 'as-builts' of the original construction of the District were not the responsibility
of B & R, but they did have them to work with and they did provide them to us on electronic form. When
B & R was transferring all of their records out of paper, Jack called me and offered me the opportunity for a
small fee, to receive all our engineering records on electronic form.
MOTION: Hire and accept Brelje & Race Engineers to do all the engineering or, as
appropriate for the situation, with a $5,000 cap without Board approval.
Ricetti/Pool Discussion CARRIED
AYES: Ricetti, Pool, Butow, Hallman, Spilman
NOES: None
ABSENT: None
GM Koehler: I have no problem with there being a cap, but the only reason I'm saying it is redundant is
because if the Board doesn't put it in the budget, it's not going to happen. The only thing that I might need
to hire somebody for would be on an emergency basis and that would be for repair work, not something
requiring an engineer. Anything I would hire Brelje & Race to do would be something in the budget and it
would certainly be a capital item.
Director Ricetti: Every project involving B & R would be different. How do you know what the cap would
be?
Director Spilman: With the $5,000 cap, if the District receives a bill for $15,000 the Board of Directors
would have to approve it to get the month to month bills done.
Minutes, Regular Meeting
Board of Directors, RN.C.W.D.
May 23, 2012
GM Koehler: Yes, that's fine. What you would hope to do with a firm like this is to get them to at least try
to give you a reasonably accurate "not to exceed" figure.
President Pool: Yes, and my experience is that they will do that.
GM Koehler: I don't expect to be spending money with B & R that isn't in the budget or that isn't
a clearly acknowledged priority emergency disaster.
a. Financial Statement.
b.-1. Bills Paid since those approved at last Meeting.
b.-2. Bills Paid as approved at previous Meeting.
c. Bills Payable.
d. District Activity.
The Consent Calendar was reviewed.
Director Hallman: I see a check for D-2 qualification for Scott Norcross. When did he became a D-2?
GM Koehler: The new way things are required to be done are, you pay one fee to have them look at your
application; then you pay another fee to take the test; if you pass the test you pay a third fee to actually get
the Certificate. When Scott Norcross recently showed me the notification of passing, I approved the
expenditure. For the record, another employee recently took his T-1 test and when he submits the
documentation required, we will be cutting another check.
MOTION: Approve the Consent Calendar as presented.
Butow/Ricetti Discussion CARRIED
AYES: Butow, Ricetti, Hallman, Spilman, Pool
NOES: None
ABSENT: None
Steven Gardner: The District employees wish to attend the portion of the Meeting discussing Agenda Item
8.6.: Immediate Raises. Those employees will need to be notified by phone when we know what time the
topic will be discussed.
The Directors agreed to hear the topic as a soon as they arrive. Steven Gardner then stepped outside and
phoned the employees.
The Draft Minutes of April 19, 2012 were reviewed.
Director Spilman: On page 8 of the draft where Steven Gardner was talking about the low morale of field
staff when a new hire, without proper experience, was hired at a starting wage higher than that of the
7
Minutes, Regular Meeting
Board of Directors, RN.C.W.D.
May 23, 2012
established employee. I am concerned that the response of the General Manager was not included in the
Minutes and I would appreciate the GM comments be included in the Minutes before they are approved.
GM Koehler to the Recording Secretary: Let me know if I can be of assistance in case that part of the
meeting tape is garbled.
Director Ricetti: Is it on a different page of the Draft?
Director Spilman: No, that isn't what I was talking about. It was where Bill explained his logic for
overpaying this one gentleman a rate higher, over and above the rest of the employees, and the logic
associated with that.
GM Koehler : My recollection is, 'in hindsight that wasn't the best choice in the world', or something along
those lines. Like I said, I had an ulterior motive in trying to get the wage scale up, in general.
Director Spilman: Basically, what I got out of it is that you had directions from this Board and you were not
liking it, basically, and trying to go around it.
GM Koehler: We'll have to listen to the tape.
Director Hallman: lbelieve the word used, was 'maneuvering'.
Director Spilman: Yes.
President Pool: On the capitalization process, in regards to the company that offers contracts on tank
maintenance, what process are they using to wash out the tanks?
GM Koehler: They have a food -grade chemical that they use in conjunction with a pressure washer. It's
essentially to wash off the iron and manganese.
President Pool: A sentence seems wrong on Page 11: "We have replaced or retrofitted all we can of the 2"
domestic meters."
GM Koehler: Although we do have 2" domestic meters, and I may have said 'domestic' meters, I was
actually talking about ag meters.
Director Ricetti: We can just make a Notation in the Minutes clarifying that although the word domestic was
used, we were actually discussing ag meters. The Board was in agreement.
President Pool: The April 19, 2012 Minutes will remain as a Draft until the next Board Meeting.
Paula Berezay and Liz Markowski arrived at 7:52 P.M.
MOTION: At this time Hear Agenda Item 8.6. Immediate raises.
Butow/Ricetti Discussion CARRIED
AYES: Butow, Ricetti, Hallman, Spilman, Pool
NOES: None
ABSENT: None
Minutes, Regular Meeting
Board of Directors, RN.C.W.D.
May 23, 2012
GM Koehler: I contacted Brooktrails, Millview and City of Ukiah. As Steven Gardner mentioned at the last
Board Meeting, there are many similarities among the water agencies, but there are no two that are the
same. i had a nice meeting with the manager at Brooktrails and corrected Steven's incorrect statement
that Brooktrails employees make $40 per hour. They do not make $40 per hour. They are in Group 40 pay
scale. This is a 5-Step pay scale. So you take the monthly figure and apply the mathematical conversion.
You multiply it x 12 months and divide by 2080 annual hours. The Sheet in your Board Packet shows the
results. The City of Ukiah also pays both employee and employer contribution to PERS.
In an effort to make the figures as true to the formula for RVCWD, I pulled out the 7% employee portion.
For Redwood Valley, my chart shows the start date of employment. For many other agencies it's not the
start date longevity, but the certification level.
Director Hallman: Can you again provide the current pay for each employee.
GM Koehler: To get that figure, remove $4.50 off each listing on my Sheet, except for Operator 1.
Director Hallman: OK, I just wanted to make sure.
Director Ricetti: Can you clarify this information please.
GM Koehler: Let's use the Brooktrails info as an example. If you are an Operator 1 at Brooktrails you will
need to obtain a T-1, D-1 before they will even allow the employee to earn time at the treatment plant. In
order to move into the Operator 3 Range, the employee has to obtain a T-3, D-3; and so there is some
horizontal movement in terms of pricing. Brooktrails is a little bit unique in that they give the employee 46
months to obtain T-3, D-3 or they are released from employment. So, you can be a Step 5 after 5 years,
and if you don't want to move on to a T-3, D-3 and you don't have a contract, you would peak at Step 5,
you would not go to Step 6. You would be an operator T-2 at Step 5. You're all done with any raises.
President Pool: If you hire people that have the experience and qualifications that you are looking for, you
may hire them at a higher Step.
GM Koehler: Yes. The RVCWD is a T-3, D-2 system, so you are not required to have a D-3 and we do not
have that language in our Handbook that says you will do this or you are gone. For instance we have an
operator that passed his T-2 in January 2010; so at that point it becomes, where do we put that guy? Do
we put him in a different level so that in future years he has an opportunity for higher earnings, or leave him
in that level where he is maxed out? Another example is in the office we have Liz; she has been doing the
job that she does for eight years. So again, is that maxed out or do you want to leave some wiggle room
for some more advancement over and above the COLA opportunities? Paula has also been doing a
primary job of 'Financials'. That's another place where the comparisons aren't completely accurate
because there are some District's that don't do nearly as much of the financial work as Paula does.
Millview is a good example: their people to A/P and A/R and Payroll. They don't do the in-depth Financial
that you receive from Paula.
Director Butow: So, then further down the list (sentence interrupted)
Minutes, Regular Meeting
Board of Directors, RN.C.W.D.
May 23, 2012
Director Hallman: I'd actually like to interrupt you right there, Don. I do have something to say, especially
about this wording.
Director Butow: About what wording?
Director Hallman: On the Agenda Item wording: Immediate Raise. (Agenda Item 8, Action No. 6)
It says raises based on the savings from recent staff reduction.
This was not just a reduction, this was a correction. When we spoke a couple years ago at a Budget
Meeting, we said the budget must be low, we've got to cut the budget. And Bill (GM Koehler) said There is
nothing to cut, and we said, Well then we've got to have furlough days, we've got to get overtime under
control, what about office hours? And Bill said 'Office hours are actually at a higher rate here than at other
Districts this size.' So this was not a savings. This was not a gee -golly we're going to save some money.
This was an actual correction to too many office hours for the size of our District; I would like that reflected
because there's a big difference between a correction and a reduction. For the size of our District, Bill said
we have too many hours, and that happened at a Budget Meeting. We probably didn't do anything about it
for probably two years.
Director Butow: Possible. Are you then saying we shouldn't pass on this $4.50 per hour savings to these
employees?
Director Hallman: No. Well that's another thing I'd like to discuss: $4.50 per hour at 4 people, that's
$9,360 for each person, which comes to $37,440. That's just the hourly wage. That doesn't include
overtime or workers' comp. When you add in your payroll benefits, the workers' comp taxes, just say
you're doing it at a 50% wage even though it's surely higher than that, you're talking $56,160 per year
without touching overtime.
What is our workers' comp?
GM Koehler: I'm sorry, I don't have that number off the top of my head.
Director Hallman: I'd really like to have the number because I know for a lot of construction crews it is right
around 75%. So the number would be good because I don't know how much we're 'saving', I don't know
what other word to use by not having Linda employed, but $57,160? And that's before overtime. If that's
the case we need to have a conversation with our Manager because we've had this going on for a couple
years before. So on just the numbers thrown out there, and I actually called on an accountant for this one
because I thought I was doing the math wrong. And then I double-checked it with my husband who was
the accountant for MGM Brakes for a few years before he decided he didn't like laying people off. And so I
ran the numbers by him and asked if I was doing it right. And he said that the benefits are really low. At
the last meeting I got a little confused so I actually broke down some of the things that were bothering me.
Again, the first one, the word 'reduction'. It was a correction in our hours, not some magical thing; and I
feel the Manager should have taken care of this if he were aware of the problem. The second thing that
got me is that I kept hearing that we weren't competitive; and Paula, I've known you for a long time and I
really respect you and I want you to know that. So I went to the website, because you said that if you
worked for the County you would be paid more. So I went to the County website and they have all their
wages shown there. An Office Assistant 1 starts at $11.65 and max's out at $14.11. Office Assistant 2
max's out at $15.56, Office Assistant 3 max's out at $17.13. 1 don't quite know what category Paula falls
under, so I went to the Office Assistant/Supervisor 2 which max's out at $20.85. Then there is an Office
Service Supervisor and that's $22.98. Feel free to pass these papers around and look at them. Again, the
Office Assistant I starts at $11.65, the Office Assistant 2 is $12.80, the Office Assistant 3 is $14.09. So I
kept hearing, We're not competitive; but, we can't compare.
10
Minutes, Regular Meeting
Board of Directors, RN.C.W.D.
May 23, 2012
�l�l���l�l� ill,
ir Z]; � ll � ril I 111
Director Hallman- These papers are Mendocino County and what they offer. I also noticed that the County
employees don't even get benefits if they work less than 30 hours per week. So there is that. And so then,
I went out and spoke to a few people because I was confused. I said, I feel for these guys who haven't had
a raise in four years. I was directed to the COLA website. Four years ago if the Manager had come to us
and said we need to do a cost of living adjustment, it would have been 5.8%. January 2010, None.
January 2011, None. January 2012, 3.6% - that's the cost of living adjustment.
Also, I don't remember the last time we had an employee review or the last time our Manager came to us
saying we need a cost of living adjustment.
GM Koehler: The Handbook specifically states that this District does not give COLA's.
Director Hallman: Darin (GM McCosker) came to us, and the last thing definitely was a COLA. And then,
this gets to the harder part: How do you compare our Operators to other Operators? So I started asking
around and I finally got a name, it was Jim Gambini at SCWA. I was told that if I wanted some decent rate
studies that he might be able to help me, so I emailed him. He responded that his guys are wastewater so
it's not going to translate quite right, but he started giving me other websites. The part that I found
interesting is that treatment plant and system operators, on average for the United States make $40,707
per year. Of course we're in California so that's really low; but the lowest 10% earn less than $24,000 and
the high 10% earn more than $63, 000. So, we're not on the low end of the spectrum and we're not on the
high end, we're somewhere in the middle. Then he sent me to another couple of other places and the only
thing I could pull out was people who are looking for a Water Operator, and this happens to be San Luis
Obispo. I checked their cost of living there. It's at 100% and we are at 95%, so essentially it is 5%
cheaper to live here than there. They are starting their T-3 at $23.55 and maxing out at $35.50. But I want
to point this out, they've got several pages that I've printed here describing the responsibilities of the T-3.
Also, they ask on their questionnaire, whether the applicant has a college degree in a related field such as
chemistry, biology, similar environmental engineering; and of course these are things that we don't ask for.
Their website details what a W.T.P. Operator T-3 is, and of course they are a lot larger than we are. But
what it all comes down to is that there is a lot of information out there; but I keep hearing that we're not
competitive, we're not competitive, we're not competitive, and looking at Bill's numbers here, sure we're not
where we should be but I definitely don't think $4.50 per hour is the way to go. There is definitely
something that needs to be done, I'm not saying that there isn't. But when you start talking $56,000, and
Don sits over there and says, water rate increase, water rate increase, I'm going to pause and say, What's
going on people. So that's just some of the information I brought; if you'd like the rest of it I can get it to
you. Again, I feel for you guys; you haven't gotten a raise in four years, it really, really does suck, I know
that. But this magically taking a number that wasn't a savings, it was a correction, and then dividing it, isn't
the way we do it.
Director Spilman: But also, it's not within the realm of what we suggested to be provided.
Director Hallman: No, it was definitely above the number we were given. And then, I kind of don't know on
this one, but this is for Bill (GM Koehler): We need reviews. When I hear phrases like 'they don't play well
in the sandbox together', and the name calling, and lawsuits, I really need to have an employee review
where we sit down and say This person is going somewhere. And, this person has hit a brick wall, etc.
And now, this statement is for the Board Members: I don't think we're giving Bill clear directions and for
that I apologize because I'm as much at fault as the other Board Members, but I definitely think we should
11
Minutes, Regular Meeting
Board of Directors, RN.C.W.D.
May 23, 2012
give him some clear direction. And, this one is for Pam (Director Ricetti): Be careful offering suggestions
about rate increases for your nephew, because it is a conflict of interest.
Director Ricetti: I haven't.
Director Hallman: He's not even on this sheet Bill gave us, I'm just saying it is a conflict of interest so be
careful.
So. I think that is my soapbox rant.
Paula Berezay: I just want to say something Jeanette. I started here at $4.50 per hour and received hardly
anything for years. Our 5% merit increase, on $4.50, is nothing. I think I worked here 15 years before I got
$9.00 per hour. The Board did make an adjustment with a reorganization some years ago and I'm thankful
for that. But for being here for 29 years, I don't think that $20 per hour for everything I'm doing, is a lot.
Director Hallman: You know, I'm not even disagreeing with that. I just kept hearing, we're not competitive.
Paula Berezay: People that I know that work at the County earn more than I do.
Director Hallman: This list that I printed off the County website was done before they decided to give
everybody a 10% pay cut, which is what the County is doing now.
President Pool: I think it may be, that without looking at the job descriptions for each of these at the
County, it's kind of hard to say, but (sentence interrupted)
Director Hallman: I did look at some of the job descriptions because I was concerned about that as well,
and it's not as different as you think.
President Pool: Well what I was wondering is, for Paula for example, if we should be looking at one of the
Office Assistant levels or if it should be one of those Staff Analyst levels or whatever. Without seeing these
descriptions, it's hard to say.
Director Hallman: I absolutely did look at the descriptions, and not just at Mendocino County. I looked at
several Counties. Again, I absolutely want to be fair and I want to be responsible to our customers, as well,
and that's all I'm saying. I am not saying these people do not deserve an increase, that's not what I'm
saying. But again, $9,360 without touching overtime and we average 15 hours of overtime, give or take?
GM Koehler: You've got weekend coverage, every weekend.
President Pool: When our employee does get whatever increase we give to the staff and we do give
overtime, and the budget impacts (sentence interrupted)
Director Hallman: In theory, even if an employee is not taking part in the retirement, it's still a potential
liability and it needs to be factored in.
President Pool: If you were calculating a fully loaded raise, which is how we need to look at the budget
impact, I think you would normally include that.
12
Minutes, Regular Meeting
Board of Directors, RN.C.W.D.
May 23, 2012
GM Koehler: The dollar amount that I was playing with was based on fully loaded for Linda, minus the
`savings' or `correction', minus what would be projected for the Recording Secretary costs. And if I did bad
math, I'm real sorry, but it wasn't coming out with that particular number. I can't dispute what you just said,
but that's where I was taking that from.
Director Hallman: Well $56,000 as a low ballpark number; I mean, that is low.
President Pool: So you're dividing up a fully loaded rate and turning it into wages?
GIVI Koehler: Well again, some of the taxes would increase, but I'm not sure that Workers' Comp would
increase.
Director Butow: Workers' Comp premiums are based on payroll.
Paula Berezay: Jeanette, did you take into consideration that Liz's hours are 24-per-week, and not 40?
Director Hallman: No, I didn't, I was looking at 40.
Director Spilman: Liz, do you receive benefits on that 24-hour week?
Liz Markowski: I don't take them. I do have the retirement plan, but I don't have medical or dental.
Director Hallman: So you have retirement at 24-hours? Because the County does start at 30-hours.
Liz Markowski: I have retirement but I don't have medical or dental.
Director Spillman: Well I think we need some corrected figures. What the Board asked for before was, as a
temporary stopgap, and did not exceed what amount that was left. Even with the 16-hours difference, I
think that the $4.50 will far exceed that. I think we need to refigure this.
MIGEMSEKSM
Director Spillman: And for the employee's benefits when it is decided, I think it should be retroactive back
to this date, because the employees came to this meeting thinking they would get a decision.
Director Hallman: In Bill's (GIVI Koehler's) paper he indicated the raise should be effective as of January 1,
2012. He wrote: This is the date on which the staff reduction occurred and the date on which funds for the
raises became available.
Director Hallman: But again, we did reduce the office hours because we were told that they were too high.
Director Butow: Well that was not from a budget savings standpoint, that was from an efficiency
standpoint.
Director Hallman: I think it was more than two, it was almost three years ago when we were discussing
budgets, that was the first time this topic came up.
Director Butow: That's correct but I don't agree with saying it was a correction and therefore this savings,
or funds, that became available that we've already budgeted for salaries, should not be considered. What
13
Minutes, Regular Meeting
Board of Directors, RN.C.W.D.
May 23, 2012
I'm saying is, and What Bill Was Working on Was, ok, we had the salary portion budgeted at this amount of
money, and during that budget year we reduced by one employee, so the budgeted money for that
employee was no longer in play, it was sitting there. Using the same budget parameters, but, could we use
that money that was left on the table in that budget, to help out the employees while we were in the
process of working up a new budget and determining if we're able to give the employee's a raise after the
four-year freeze.
Director Hallman: It could be argued that that money should have never been spent.
Director Butow: It could be, but the budget was set for the employees we had at that time.
Director Hallman: On this paper submitted to the Board, Bill exceeded that number.
Director Butow: Now, as far as the $4.50 was concerned, and if the math was wrong and it should be
$4.25 or $4.00 or $3.75 or whatever it is, then we should consider it. But the theory is that taking this
money that was already budgeted and is sitting out there, we could use it for giving these folks an increase.
Now if you don't want to do that, because your argument is that the employee left and we don't have that
money to give (sentence interrupted)
Director Hallman: I'm saying we should give them a competitive wage. That's all I'm saying. I believe they
do need raises.
GM Koehler: I can do the math. I don't believe your core premise. Generally I have found that the office
manager/auditor-secretary:
A) the point that I made five years ago when this discussion first started, does not work for me. That
person serves at the Will of the Board. It is not a General Manager decision. This is a point that I have
made for five years.
B) in a small office like this, the buck stops here. I didn't like some of the comparisons to the City of Ukiah
and I didn't go to the County of Mendocino. But ultimately, the person at the County reports to Carmel
Angelo, so there is an entire chain of support that we don't have. We are stand-alone. So I'm not as
comfortable with looking at some of those comparisons because there is this chain of support that exists
above the employee.
President Pool: That's a very good point, because I am retired from a bottom -rung management position at
the County and your point is very well taken. It's very different to work in an organization like that; and
whatever your responsibilities are, they are complemented both horizontally and vertically, both up and
down with the whole structure that makes it really quite different. So to compare what Paula does to what
anyone at the County does is probably troublesome. You can look at the job descriptions and kind of
compare but I think you have to take that to some extent, with a grain of salt. I agree with Bill on that point.
Director Hallman: Fair enough, and like I said, the reason I went to the County is because I kept hearing,
well if I worked for the County I'd make more income.
14
Minutes, Regular Meeting
Board of Directors, RN.C.W.D.
May 23, 2012
Director Hallman: Well this is potentially dangerous to us. If you wanted to add in everything, if Steven
and Scott decided to take up their retirement, and you add that in, and we're still paying for dependants
and we're doing overtime and everything else, this number is a lot larger.
President Pool, And the comparison becomes difficult. For example, the County, the loading is different in
several respects because the County doesn't pay for dependants which is a very big difference.
Director Hallman: Nobody else that I spoke to paid for dependants.
Director Spilman: The other thing is that we have only so much money that is allotted to increase this at
this point, and if we go outside of that (sentence not finished)
President Pool: Then we've busted the budget.
Director Spilman: We have to stay within that scope.
GM Koehler: I will go back to my worksheet and review my figures where I came up with these numbers
and try to identify the error.
President Pool: If there is not an error, or either way, make sure that we are working with a full deck here
when we are making a decision. And again, Bill's proposal that we are in the process of considering, would
be retroactive to the first of this year.
Director Spilman: Did we agree on that?
President Pool: I'm not saying that we did; I said that's what Bill had proposed.
Well, we thank the staff, and we will continue this item to the next Meeting. I apologize that we're not more
together on that, but thank you all for coming and thank you Jeanette for the extraordinary amount of
homework.
GM Koehler: I would, however as you pointed out, I don't always get as much direction as I need and it
would have been handy for me to have that information going into this study. It would have probably
created a more useful document that might have moved ahead farther.
Director Hallman: I do think we as a Board need to give you more direction and I do have to say that my
husband made a comment and I defended you, but when he was looking at the numbers he said, "You
have an operating manager who doesn't operate or manage." He said, "Bill should be able to pull these
numbers off the top of his head." As far as the Workers' Comp and everything, and of course that was a
part of his job when he was working for MGM Brakes, he had those numbers at the top of his head.
President Pool: Well if you're a financial guy, then maybe. But otherwise, I don't see it.
Director Hallman: The point that he was trying to say, was that (interrupted)
GM Koehler: I'm never going to be able to pull those numbers off the top of my head, other than maybe
being comfortable with 40%. But no, that isn't my job.
Our payroll is outsourced, but the job title in California Water Code is Auditor -Secretary. It's not technically
Office Manager; it is the person that does the day-to-day financials. That is Paula, not me.
15
Minutes, Regular Meeting
Board of Directors, RN.C.W.D.
May 23, 2012
Director Hallman: Oh, one other thing. I was talking to another person while gathering information and
mentioning our budget. And they asked which District this was about. When I said Redwood Valley Water
they said, Oh a couple of months ago I was at the Forks Caf6 around 8 A.M. or 9 A.M. having break -fast
and for the hour and five minutes that I was there, the Redwood Valley Water District truck was parked
there.
So, this is part of why we need the annual Employee Review.
GM Koehler: I'm not that far behind you.
Member of the Public: May I say something about your employees?
President Pool: Yes.
Member of the Public: I wish they would come down Mohawk Trail slowly. It is a real dusty, really bumpy
road and when they come down there like UPS drivers, the wind and dust is just horrible. There are kids
playing, there are pets outside. Please just drive safely and slowly.
Member of the Public left the Meeting after making her request.
Director Spilman: While we're on this, I came past the treatment plant on Sunday. In the Budget, Bill
wants some new trucks. So I saw one of the pickups sitting out in the yard, completely, unsafely
overloaded to the point that the front wheels were off the ground. Not only do people see the District trucks
where they shouldn't be, like the Forks' Cafe, but they see the guys take their trucks too fast down Mohawk
Lane for example, and they also see that truck unsafely loaded and sitting out there for the whole weekend.
And then they are asking for new trucks.
Steven Gardner: That might be a little easier to explain than you might think. That truck was actually fairly
safely loaded when we loaded it. But we were on an emergency water leak which we hand -dug on Friday
because it blew out on the bottom of Road E. It was about a 40'-50' tall geyser and it drenched that truck
with about 1,000 gallons or more, in all that dirt. When that truck was originally loaded, it was perfectly fine
to drive. Once all that water was added to that soil, we couldn't figure out what to do with it. 1, myself,
drove it back to the treatment plant because I didn't trust anybody else driving it. Neither one of us had the
energy to unload it, and we didn't have anything to do with the materials that were in it. We got pretty torn
up with that job, I still have some cuts on my face and hands from it. It was just Scott and me, so we opted
that he would follow behind me and I drove it back to get it back here safely. It steered just fine. But that
was all we did with that one. We don't normally load those trucks like that. Actually when you saw it, the
airbags had deflated; it's got airbags on that truck for that purpose. It weighed way over what it should
have weighed.
GM Koehler: It is designated as the official 'dirt hauler truck' and that is why it has airbags installed on it.
And it was unloaded the first thing Monday morning. When I came in on Monday I immediately saw that
we had done a leak repair. We don't normally do leak repairs on Friday, but I saw photographs and I fully
support their reasoning for repairing that leak on Friday. It looked kind of like one of the Calistoga geysers.
Stephen Gardner: It took out a section of the road
W.
Minutes, Regular Meeting
Board of Directors, RN.C.W.D.
May 23, 2012
Director Spilman: I would suggest that you possibly look into either a dump -trailer that can be pulled with a
heavier truck and see how that works, instead of doing that to that poor little truck. If that works maybe we
can afford to purchase one.
GIVI Koehler: We already know it works. I have rented them in the past and it's on the 'wish list' of
equipment to buy. It is the most practical piece of equipment for us to own. It's something to load road
base in, and spoil out. That's what we are lacking. I appreciate the support and yes, I would love to buy
one.
Director Spilman: I think the Board should consider that because I think it is a real safety issue. I've seen
this little 2-wheel trailer out here being used to go pick up gravel, I'm sure the handy little thing probably
doesn't have any brakes on it and if they were to get in an accident without the proper trailer, it would be
worse than a water tank situation.
GM Koehler: That's been on the list for probably 5-years. As I've said before, each year I come to you
with a budget and I get told to cut. And I cut. That is one of the few places that I can cut. I can't cut
PG&E, I can't cut chemicals, it's not there. So what gets cut year after year is equipment. It's first on the
hit list. By all means, put it in the budget and then we can get it.
Liz Markowski left the Meeting at 8:40 P.M.
9. DIRECTORS AND STAFF REPORTS AND DISCUSSION OF NON -ACTION TOPICS. (Agenda Item
No. 7).
GM Koehler referred the Directors to the Board Meeting last month at which he was directed to create a
Resolution regarding a semi -abandoned service. The Resolution is done, but it wasn't included on the
Agenda. It will be placed on the Agenda for the Board at the June Meeting.
Director Hallman requested that the June Agenda also include a discussion about clams in the fire
hydrants.
GM Koehler confirmed the topic will be on the June Agenda.
Director Spilman requested we now go to the Agenda item this Member of the Public is waiting for.
GM Koehler stated that this lady is here for 8.d., somewhat mistakenly, but he will go to 8.d. as requested.
President Pool agreed, saying, Please do.
10. GENERAL MANAGER'S REPORT, Surge Tank Mitigation/Fund Exenditure. (Agenda Item No. 8.d.)
GM Koehler: I have been in ongoing discussions with the owner of the property where the surge tank used
to be. I suspect that's why she saw this item listed on the Agenda and assumed it was going to be a
further discussion of finalizing the deal between the two of us, and which is what the letter she sent is
attempting to do. But that's not what this Agenda Item is about. This is about the Fund Expenditure. So:
Sonoma has finally waffled around long enough and indicated that no, they do not want the $64,000 to go
toward the stream mitigations. However, the good news is they loved the idea of paying for ag meters. So
it's basically a wash.
Director Hallman: When did Sonoma informed you that they weren't going to pay this?
17
Minutes, Regular Meeting
Board of Directors, RY.C.W.D.
May 23, 2012
GM Koehler: It was about two weeks ago.
Director Spilman: Where will the money come from to pay for the mitigation?
GM Koehler: General Funds. However, we basically have $120,000 in mitigation funds. What they are
telling us, is OK we really like you spending that on meters. When I sat down with Sonoma and finally had
the, OK, yes, we're working on actually making this project proceed with the water acquisition, and, they
are finally sitting down to do clean up of all their accounting including the surplus water agreement, all that
stuff is at this point being rolled into one. So at our most recent meeting, they said they need to run it by
Counsel, finally, even though on a number of occasions I had communicated with them that this is what we
wanted to do. They said No. Counsel will not let us do that; however we think it's wonderful that you
spend this money on replacing your ag meters under the heading of conservation.
Director Hallman: Is that Approved?
GM Koehler: It won't be spent until I have it in my hands. But I have repeatedly said that I have zero
leverage with SCWA. I can go down there and ask politely. I'm not working with Pam, I'm working with
Todd and Don. SCWA is not going to commit to anything until the extension of the Surplus Agreement is
signed. That is the first step. Short of that, they are not going to do anything.
Director Butow: What about this letter here tonight about ingress and egress at the Lake Ridge property
distributed by this lady.? She has been so patient here at the meeting. All we have is a very nice letter
saying we've got ingress and egress to her property and to please give her a call prior to arriving. I think
it's nice.
President Pool: So what do we need to do?
GIVI Koehler: What I was under the impression, and I'd really like to resolve this letter issue first rather than
jumping into the ingress/egress. For right now I am happy with that letter, but there is an extremely
important piece missing that I don't have. It is an actual copy of the easement document. What I see is all
kinds of references to the fact that the Bureau of Reclamation would not have issued the loan without the
easement being in place, but I cannot find the easement.
Director Spilman: Are we going two different places here?
GM Koehler: This is the surge tank. So, being rid of that, I just want to set this aside and say right now,
I'm a happy camper with this letter; we are making progress. This is Not part of the money we're
discussing on the Agenda.
Director Butow: Why, exactly? What you asked for coming up first, was the surge tank issue but not all the
damage money that we owe — that's a whole separate thing.
GM Koehler: Yes, that's the Surge Tank Mitigation/Fund Expenditure. That's the title of the Agenda Item,
it was not the Surge Tank, alone.
Director Butow: I understand that. We just want to get to her letter so she can go home
18
Minutes, Regular Meeting
Board of Directors, R.V.C.W.D.
May 23, 2012
GM Koehler: I gave her a copy of the Agenda and explained that the Agenda Item is not about that. I think
she phoned Dr. Benrazavi.
Director Spilman: So you're satisfied with the letter that you got, and that's the end of it?
GM Koehler: No.
Director Hallman: No.
Director Spilman: What's your position?
Director Hallman: We need the easement agreement.
GM Koehler: This is not really the topic on the Agenda. My position is that the next step that I need to do
is somehow find a copy of the original easement because, as I said, I am absolutely convinced that that
document exists out there. The only people who've done any kind of search for it was Adobe Engineering
when they were doing the design work on the project, and I don't believe they spent a whole lot of time
looking for it because it was not a part of their job.
Director Butow: OK, so we have two questions here:
One is in regards to whatever our arrangements are with Dr. Benrazavi, and the other is the Fish and
Game issue, which was sort of related to SCWA but now that's drifting off into some other situation.
GM Koehler: But the easement is not part of this item on the Agenda.
Director Butow: Right, exactly. So what we're trying to do instead of a round peg in a square hole, and
what we want to do is say, Are you're happy with this, as far as it goes?
GM Koehler: Again, it's not part of the Agenda. I'm happy with it as far as it goes. All this letter does, is
repeat what has been said back and forth in emails. So now it's in writing; hunky-dory. Am I happy, do I
consider it done? No. I want a document that can be put into the legal description of the property. And be
done with it forever.
President Pool: So the title report does not mention anything?
Member of the public representing Dr. Benrazavi: Dr. Benrazavi had a civil engineer do a search and there
was no easement found.
GM Koehler: As I said, I talked to Adobe which is a Civil Engineer, and they did not dig deeply on that
particular issue. It is true that they reported that they did not find it.
Director Spilman: The title company, when she bought the property would have come up with it, too.
Director Ricetti : Yes, it would have been on the Title.
GM Koehler: There's got to be something in it. If there isn't something out there, then it will be resolved in
a different manner; it will be resolved with something like this.
19
Minutes, Regular Meeting
Board of Directors, R.V,C.W.D.
May 23, 2012
Director Spilman: So how much are we going to spend trying to find something that the title company
didn't find and the engineering company didn't find?
Director Ricetti: If it's a matter of record, then it would have been on the Title of the property; but if it never
got recorded, it could be in somebody's drawer.
GM Koehler: In any case, I don't want to go off onto this, that's not who I'm dealing with.
Director Spilman: Well the lady came and she waited, and I'd like to get it resolved.
GM Koehler: It's not going to get resolved here tonight.
Director Butow: Are we accepting this as one little step in the process?
GM Koehler: Yes, it's a great letter.
Director Hallman: As a District we definitely need the original document with the easement on there
because, as Sill has said, it is an important issue to resolve with the property.
GM Koehler: If it exists. If it doesn't exist, then — I really don't even want to go there. It's very complicated,
convoluted and it's not the Agenda item. The Agenda Item, is that I'm saying I want to pull the $64,000 out
of general funds, give it to Mendocino County RCD, get that done with. I do have a letter from the Regional
Board and with the approval of Fish and Game that says, Upon the receipt of a receipt, it's over.
Member of the public: Excuse me. So for all intents and purposes you are accepting the letter for now and
you are going to take the responsibility of finding the easement if there is one.
President Pool: Yes, if there is one.
GM Koehler: That is correct.
Director Butow to Member of the public: Thank you for your patience. And she thanked the Board.
Member of the public left the Meeting at 8:50 P.M.
Director Butow: Now, you need our authorization for the $64,000?
GM Koehler: Yes. I think that would be the appropriate thing to do. And also in relation to this same topic,
the Fisheries and Conservation Committee has been reformulated to consist of Carmel Angelo and Carre
Brown. We have already met and discussed what the next steps are. I have found the documentation I
need in order to proceed with the next steps, which is that a lot of the items were pulled. The items that
were initially approved, such as retrofitting the school which is closed and no longer in use, I certainly don't
think we need to retrofit a closed school with water -saving devices.
Director Butow: This is all to do with the Surplus Water Agreement with Sonoma County. What's
happening is that they have decided that they are not going to approve spending any money out of that
`pot' to pay the $64,000 Mitigation Fee. We are going to have to pay the $64,000 out of our own funds.
GM Koehler: In addition, the size of the `pot' is now $47,000 which was put in to the account to pay for the
water that we got from SCWA while the Surplus Water Agreement was current. Since the expiration of the
20
Minutes, Regular Meeting
Board of Directors, RN.C.W.D.
May 23, 2012
Agreement, an additional $75,-$80,000 was allocated to money for water from SCWA. That money was
never moved into the account because the Agreement had expired. However, we have tracked it from Day
One; this money is there, this is the money that will go into that account. The SCWA will not let us credit
the $64,000 into the Fisheries and Conservation Fund.
President Pool: Because it is Mitigation.
GM Koehler: Because it is Mitigation.
Director Spilman: This whole $64,000, has it been taken in front of an Arbitration Board?
GM Koehler: It hasn't been taken to a formal arbitration board, but I did have a long meeting with Fish and
Game and the Regional Board and the engineering firms and basically we were shown the statutes that
say this is how we calculated that number and this is what you're going to pay.
Director Spilman: I can't see paying that kind of money without it going to arbitration in front of an
Arbitration Board. It's just somebody picking that number out of thin air and saying 'this is what we're going
to charge you'. It's just one State agency gouging another public agency, that's all it is.
GM Koehler: Whatever you want to do. But it isn't just picking a number out of the air, it's a multi page
formula that says, this is how many feet of streambed was damaged, how many organisms were impacted,
and there was impact to the river and unfortunately we got stuck with the blame for the entire damage
because Granite just basically stonewalled. We basically moved in and started doing repairs. We were
given very little time to complete the remediation. Fortunately everybody is thrilled with the repairs, but
there is a $64,000 debt.
Director Spilman: I wouldn't pay the $64,000 from general funds before it went to arbitration.
Director Butow: How much is arbitration going to cost?
Director Spilman: I don't know but I think we should find that out before we spend $64,000 out of general
funds; that would buy a lot of dump -trailers.
GM Koehler: Again, I consider it a win -win situation because they are allowing us to, instead of taking
$64,000 out of the general funds to pay for water meters, they are allowing us to take $64,000 out of the
general funds to pay off the stream mitigation and then take the money out of the Contract Fund, and then
go buy water meters.
President Pool: It's a win -win with SCWA, but Jack's point isn't about that. It's about being jerked around
by the State and he thinks it's not Just. My own feeling about that is that Yes, it's hideous, but I don't think
it's a very prudent way for us to deal with them, to try to rake that through a legal process, because I think
we're almost certainly going to lose, and then we'll have a relationship with those agencies that probably
won't make our lives any easier in the future.
Director Spilman: What kind of relationship have you got, if they're going to gouge you like they did?
GM Koehler: I think we have, actually, an excellent relationship and part of that is based on looking at the
numbers and realizing that, according to the formula that they used, which again, is based on square feet
21
Minutes, Regular Meeting
Board of Directors, RN.C.W.D.
May 23, 2012
of river impacted, the time of year, what was going on, what animals were living in there, what animals
likely lost their spawning and rearing habitat especially under the Endangered Species Act. So when I did
sit down with them and discuss that, of course we paid for them to come over and discuss it, I was shown
some alternative calculations that were considerably higher. If you do want to go to arbitration, I don't like
what it will do to the relationship, but if that's what the Board agrees to do, then that's what we will do.
President Pool: I will agree to hear a Motion, to see if someone wants to make such a motion and second
it, we can see where that will go.
MOTION: We find the cost of arbitration before we proceed any further.
Spilman/Hallman
AYES: Spilman, Hallman, Ricetti
NOES: Butow, Pool
ABSENT: None
President Pool: So now we will see what it costs us to go to arbitration.
Director Hallman: Now, we've got $47,000 in the Conservation Fund. This $78-$85,000, when we sign an
Agreement with Sonoma, does that go in the Fund?
Ximf6=1
Director Hallman: OK, but right now it's just sitting there instead.
GM Koehler: It's part of our bank account, that is correct. And SCWA doesn't want it to go into the Fund
until the Surplus Purchase Agreement is renewed, and they do not want to authorize any expenditures out
of the existing $47,000 until the Surplus agreement is renewed.
Director Butow: Do you think that they are actually going to form a Surplus Agreement?
GIVI Koehler: Yes.
Director Butow: It's really going to happen then?
GM Koehler: Yes.
Director Butow: I attended a couple of meetings down in Sonoma before GM Koehler came aboard, and all
they did was some shuffling their feet in the ground.
GM Koehler: The last discussion I had with them was that we agreed that the only hang-up in the entire
process was the insistence upon compliance with the, especially the Ag Water Management Council
mandatory adherence to the Best Management Practices that don't apply to this District. I had asked them
to eliminate those two clauses, the CUWCC mandatory and the Ag Water Management Council mandatory
BMP's which are going to cost us a lot of money to comply with, for no gain. So our final discussion at the
last time was, we are already at 45% reduction. If the easiest way to proceed with this is to stop objecting
to the inclusion of the mandatory BMP's, because during the interim, the California Urban Water
Conservation Council and the Ag Water Management Council have also both modified their positions on
mandatory adherence to the BMP's to the extent that you can demonstrate the reductions, you don't have
22
Minutes, Regular Meeting
Board of Directors, RN.C.W.D.
May 23, 2012
to comply with all the BMP's. As in, I would have to do a write-up to prove that it would not be
economically feasible for this District to have a front -load washing machine rebate program. That's one of
their BMP's. The Ag BMP's that are particularly onerous in my opinion, is that you have to prove that we
don't need to line our ditches. We don't have any ditches. We have to prove that it doesn't really make a
whole lot of sense to divide 3,000-acre vineyards into microclimates with individual valves and weather
stations, because we don't have any 3,000-acre vineyards. As to the mandatory water surveys, we tried;
we actually hired somebody to contact folks and get the water surveys done. There was basically no
cooperation on that front. That's the kind of stuff that I objected to initially, saying that this stuff makes no
sense to this District. There are 14 BMP's for the domestic side. But as I said, in the interim, both of those
Councils are backing off and trying to adhere more closely to Gov. Schwarzenegger's guideline. But they
have not even grown up and stated what their base year is. Nobody knows what it's based on; but what
we do know is that if they base it on anything before 2004, we're there. Our per capita water usage in
Redwood Valley is lower than what it needs to be, the per acre ag use has gone from 10-12" per acre, to 6.
8". We're there. My position to SCWA is, if you guys make me adhere to these policies, I will do it. If
that's the only stumbling block remaining, let's move ahead. We've demonstrated the 15-25%
unaccounted for water loss which is what they are saying, is wow, if you put in new meters, and since we
have meters that don't register 40 gpm and we replace them with meters that register 6 gpm, we're going
to see a difference. So that's where we are right now and yes, it has taken several meetings with them.
We are such a fly -speck to those folks.
Director Hallman: My ongoing request is that we don't spend any of this money until it's actually released,
because there have been some projects, we've done a few things where we've said Well, the money is
going to come out of this Fund. And then something like this happens.
GM Koehler: We haven't spent any more money. But if we don't spend the $64,000 for mitigation and get
that work done during this construction season, things are going to get ugly.
Director Hallman: Well in the past, and as recently as last month, the Board was expecting this $64,000 to
come out of the Fund but, now it is not. I am asking that we not spend any more money out of this
Conservation Fund until we actually have it in hand.
GM Koehler: We have not.
President Pool: The $64,000 is coming out of our general fund.
Director Hallman: The thing is, I don't know how Russian River Flood Control knew, but they knew after
our last Meeting that this $64,000 was not going to be paid by the SCWA money.
GM Koehler: Sean was there; Sean and I were both there.
Director Hallman: So that was the day after our last Meeting, that Lee told me. So, I'm just saying, I didn't
know how they knew.
GM Koehler: Because Sean tells Lee, and Lee tells you.
Director Spilman: Well, did it happen before the last Meeting?
23
Minutes, Regular Meeting
Board of Directors, RN.C.W.D.
May 23, 2012
GM Koehler: It happened at the Meeting and it was confirmed with a private conversation that I had, that
Sean was not present for, two weeks later on the phone with Todd and Don who confirmed a point that,
Yes Indeed, even though at the Meeting that we went to, it appeared that it wasn't going to happen. But
they went to their Counsel and since this was not a meeting that Sean needed to be privy to, he had
nothing to do with it. I had that phone conversation with Todd and Don where they confirmed that I could
go buy meters. But Sean and I were the only two people present at the meeting where we discussed the
fact that, I showed them the paperwork of 10 years of non -revenue water stream, why I thought it was
coming out of the ag side, etc., etc. And that little light bulb went off in their heads and said, We support
meters. But I did not get confirmation at that meeting. My confirmation was with Todd and Don that they
had spoken with counsel and it was firm, that no, we cannot spend that money.
Director Hallman: Again, I was telling Lee that I'm not comfortable with spending that Conservation money.
They've never released any of it, and we've got this bill debt that's supposed to be coming out of it. And I
was listing things, and I said this. And he said, They're not paying that. And I said, Well I thought they
were. And he said, Oh, maybe I have it wrong. And that was literally the end of the conversation.
GM Koehler: That meeting was the first time with that topic because that is none of Flood Control's
business. So that topic has generally not been discussed at those meetings. It only came up peripherally
because of the issue of the unaccounted for water loss.
Director Hallman: It must have been reported to the Board. Anyway (sentence trailed off)
GM Koehler: Some of the suppositions that come out of meetings and then get telephoned through two or
three different people, come back differently.
Director Hallman, Ok, well, very good. Thank you.
GM Koehler: Basically, if you tell me that you won't spend that $64,000 without going to arbitration, fine.
However, it will get ugly.
Director Spilman: All we asked for is that we find out what the cost of arbitration was.
GM Koehler: Ok, that alone, slows the process down a month.
Director Spilman: How long has it been going on already? A year?
GM Koehler: It is now ready to move. RCD has a project that is $64,000 that is ready to go, that needs to
be done, now.
Director Butow: I voted No mainly because, it isn't going to get any better with arbitration, other than a
delay and so why complicate everything? But it's up to you guys.
President Pool: And it's going to cost more money.
Director Butow: It's going to cost us more money and it might cost us more grief. I certainly don't like to be
bullied by these various Agencies. Particularly Fish and Game, they get under my skin real quick. But, you
cut a deal and you did the best deal and everybody said yes and now we're going to change our mind and
run to arbitration, and say, well maybe we don't want to do it any more.
24
Minutes, Regular Meeting
Board of Directors, R.V.C.W.D.
May 23, 2012
Director Butow: No they didn't
GM Koehler: Not really.
Director Spilman: Well that's the way it was explained, that Bill said everybody was in agreement and you
come down the path later on, and they want $64,000 a year later.
GM Koehler: Unfortunately it was in writing, and it was a part of the Agreement. It was my
misunderstanding, it was also JR's misunderstanding from Rau, that by moving diligently ahead without
waiting for them to fight over whose fault it was that, this mitigation could be accounted for by all the work
that we were doing on the unnamed tributary. So that did change; however, the $64,000 Determination
was in the first Clean Up & Abatement Order, which is what we are now finally closing out.
So, I don't feel jerked around by those folks, at all. I feel that we got the best deal that we could get, in light
of the fact that there was silt deposit in the river from the entrance of the unnamed tributary all the way
down to the Forks, on the day of the river clean-up. So, obviously, if you Directors say, Do it this way, I will
do it however you say it, but it is going to cost us money and good will.
Director Butow: Well I think we ought to reconsider, but it's up to you.
Director Spilman: The whole Board voted on it and it was Passed.
Director Butow: Yes, at 3-2.
GM Koehler: You passed a Motion to find out the cost of arbitration so if that's what you want me to do, I
will find out the cost of arbitration.
A. District Operations
Things are relatively normal although we have experienced a couple of problems that are being resolved.
GM Koehler is especially concerned about the electrical controls at the Lake Pump Station. We're
continuing to order parts and also doing as much as we can, in house.
B. State Water Board.
We think the Change of Place of Use is, largely, resolved. It is exempt from CEQA. Darren at the State
Water Board has all the maps and everything he could possibly need, including the letter from Resource
stating that there is no potential growth associated with this. So now in order for us to apply for an
additional 1 0-year time extension, we should have a proposed project. We do not have a proposed project
for storage.
President Pool: So, it seems like we're basically back at square one.
25
Minutes, Regular Meeting
Board of Directors, RN.C.W.D.
May 23, 2012
M
GM Koehler- Not if we can split them apart. We are looking at both options. When I spoke to Darren at
the SWB I said, We are done with the annexation, let's move ahead and get it done. His first response
was, No, we can't split them apart. So I did a lot more research and I went back to Darren and said, We
never did put the two together. You guys are the ones that put them together and you guys ought to be
able to split them back apart. The Change of Place of Use Petition is separate from the Application for a
1 0-year time extension. They were actually filed about a year apart, but it took them almost 2-years to
respond and agree to receive them.
President Pool: I'm completely bewildered then, because you said you were trying to split them apart bul
then you were back to trying to put them back together.
GM Koehler: And the reason being when Darren Tran pointed out to me, that if the State splits the two
apart and grants our Change of Place of Use, then the State is going to deny the time extension.
GM Koehler: It essentially puts us into a Licensing Mode that drops storage completely and forces us to
account for what water we have diverted under 17593 during the winter and we're going to drop from a
maximum of 4900 acre-feet to all we can really account for at this time is about 500 acre-feet. That's the
most we have ever diverted during the winter.
President Pool: OK that all makes sense, but what does the Time Extension buy us?
GM Koehler: Time to resolve whether or not there is some way we can take advantage of that 2800 acre-
feet of the 4900 that goes to storage. That's the piece that's out there, but probably not within Redwood
Valley. So that is contingent upon something else happening.
President Pool: All right, it makes sense to me now, thank you.
GM Koehler: Right now I do not have a project in my pocket to take to them and say this is the reason I
need it. If I push it, and say the reason that we need the time extension is so that we can do the
documentation to prove how much water we have diverted historically during the winter when we are above
the conservation pool and there is 150 cfs going down the river, then we will be locked into about 500 acre-
feet, maximum.
C. SCWA.
GM Koehler: I feel that there has been a real change in attitude from SCWA. What they are requesting
now is the information that I have been trying to give them all along. There are some discrepancies in the
reporting numbers but they appear to be coming out of the Army COE because we have documentation
that says we reported 'x' number of acre-feet to the ACOE, but that is not what they put on their website. It
came to light that SCWA gets it's numbers from the ACOE website and GM Koehler suggested to them
that they probably ought to be looking at Redwood Valley's numbers instead of ACOE numbers because
he is guessing that the data -entry person is not proofing his entries, because the numbers are goofy. 1
26
Minutes, Regular Meeting
Board of Directors, RN.C.W.D.
May 23, 2012
offered that SCWA could come up here to see where my documentation numbers are coming from. Before
I started doing the reporting, some of those numbers were sloppy while that reporting system was being
developed, but while I've been here, the same copy goes out to the ASCOE, the SCWA, our attorney, and
Russian River Flood Control. They all get the same copy of Daily Diversions, Usage in the Annexed Areas,
Breakdown Between Ag and Domestic, River Flows, Level in the Lake, all that stuff is in one Master
Document that goes off to all those people. If there is a mistake in the reporting, it's not coming from our
*4'ice.
GM Koehler: We did already finish the touch-up paint repair on B; it's done. We're doing some minor
touch-up on the Clearwell because it's got structural damage and I'm not sure that is something our staff
should take on as we do not have the skills or equipment to do this ourselves. We will inspect the inside
coating tomorrow to see if there is any minor touchup we should be doing there. We really need to get that
tank back into service because we are heading into summer usage and we can't operate efficiently without
that tank. I don't have time to do the quotes and bids and, depending how involved we get with Brelje &
Race, this is also the kind of thing where B & R would write the bid specs on the tank repair, because the
rafters are gone.
President Pool: What would the condition would be in a year from now?
Steven Gardner: We've got a crew of water treatment operators here who are hired to operate and
maintain this District and all its facilities. You know, gluing a few pieces of steel together is well within the
skills of two of the operators here. The proper tools to use to do the job are readily accessible by the
District. We've got everything it takes and doing jobs like that is actually, fairly simply and a lot more
simple than running this treatment plant, I'll say that. And that's definitely something we should be doing
in-house.
GM Koehler: That decision will be made in consultation with all the folks. I have some concerns about it
primarily because we have a backlog of projects. I'm concerned that I don't want that backlog to get
bigger, but ultimately that's a discussion we have already had in-house about the capacities to do it, with
proper equipment, primarily scaffolding and a little bit of welding on top.
Director Ricetti: You need to have the tank for the summer period, but that's just roughly 4-months, so it
actually wouldn't be a whole year away.
GIVI Koehler: I don't think that it's going to get a whole lot worse in the next 9-10 months.
Director Hallman asked Steven Gardner: Have you done something like that before?
Steven Gardner: It's just welding; I do that all the time. It's welding steel plates at the I-beam rafters.
E. RRID Water Payment. (GM Report, Item No. G).
GM Koehler: The RRID has finally sent its bill for water for 2011. The actual cost of water was a bit lower
than estimated and also there was a small overpayment credit riding with them from our payment the
previous year.
27
Minutes, Regular Meeting
Board of Directors, R.V.C.W.D.
May 23, 2012
Director Hallman: I do have a question. That $15K, is that reflected in the budget? Because we estimated
$45K and it's actually $30K, is that reflected in the budget as income, or has that not been moved yet?
GM Koehler: I will review that. Because we pay Flood Control at one price and SCWA at another price, I
can't say right now whether or not there is a true savings. We got into this new Calendar Year
arrangement with Flood Control and we just got billed in May for water that we used in 2011.
BREAK: 9:25 P.M.
RECONVENE: 9:40 P.M.
GM Koehler: Attorney Chris Neary has developed a merger proposal and presented it to the four Districts
initially included in the proposal. The Districts are Redwood Valley, Millview, Calpella and Flood Control.
This proposal was developed by Mr. Neary working on his own, not as the attorney for Millview and
although Redwood Valley is included in the proposal, Redwood was not consulted during the development
phase. At this time there is no formal process to discuss the proposal although it is being discussed
informally. Directors Pool and Butow are already serving on the ad hoc committee to discuss a merger
with Flood Control. The Board should discuss if it is appropriate to extend the ad hoc committee's
responsibilities to include further discussions with other Districts regarding the Neary proposal.
Will Carson, Millview CWD: A bit of background regarding that topic: I guess during a break in some of the
proceedings before a court hearing, Sean and Neary and another person had lunch together and they were
brainstorming, and Neary became intrigued with this idea. This concept was to have Neary request a
meeting with Millview's Board President and the General Manager, and also I was asked to attend the
meeting, to see if Miliview had any objections to Neary pursuing this exercise since he serves as Millview's
attorney.
Director Butow: Is Neary doing this pro-bono?
Will Carson: Neary wouldn't be charging Millview because it isn't Millview's thing, it was his idea. Neary
asked us (Millview) if we have any objections about him pursuing this intellectual exercise, which we will
call it right now, and as long as it's not costing Millview any money and we are not the authors of it, we
would actually be interested in seeing what he came up with. You asked if it was pro-bono. He's doing this
himself, so it's for the water community within the Valley.
GM Koehler: The document Neary put together is in the Board Packet, and, another piece of background
is that Neary has titled it Chapter 141 of the Water Code Appendix. Now, within the California Water Code
there are a series of appendices and at this moment, the Appendix has 140 Chapters. For instance I
believe it is Chapter 59 which is the Chapter that enables the Sonoma County Water Agency. Also some
other Agencies exist that are not County Water Agencies, and they are not California Water Agencies, they
are something other than that. They tend to be formed under some form of legislation and placed into the
Appendix.
President Pool: I imagine the Flood Control enabling legislation would be in here someplace
28
Minutes, Regular Meeting
Board of Directors, RN.C.W.D.
May 23, 2012
GM Koehler: It actually isn't. I went and looked at that very question. It is another piece of legal code that
has a much longer number on it than 141. So for whatever reason, they formed it differently and much
less, the 'Improvement District'that was tacked on behind it. I haven't been able to find a copy of the full
Appendix. There are only a half dozen Chapters of the Appendix that can be 'Google-able" and I happen
to have a copy of SCWA's. It doesn't appear that Mr. Neary spent a whole lot of time creating this
document on his own. The majority of it is boiler -plate.
President Pool: I can recognize that. A huge part of it came from the Community Services District code.
GM Koehler: Yes, and that's another little interesting twist in this particular document where he formed the
Upper Russian Water Agency Act and then it kind of slipped in at the end, oh by the way, it's called the
Russian Powers of the CSD.
GIVI Koehler: But it's not one. Most of these are Community Service Districts. CSD's are Independent
Special Districts, that's a slightly different critter than what's being described here. So the real question
becomes, what do you want to do with it?
Director Butow: Does anybody want to talk about it more? (No response).
We are already talking with Russian River on their ideas, and the question is, do you want Granville and I
continue on down that road? Or talk to other Districts on this matter? Or do something different? Or do
you want to do anything? What they are proposing is, this whole idea of merging of all the Districts into a
valley -wide project. It's got some interesting ideas.
Will Carson: We feel that it's worthy of a discussion. I personally feel that there is some benefit to this and
I think that many Districts within this region have issues and problems. I think a lot of those problems can
be lessened by grouping these entities together. The first requirement would be the realization that
everybody that would be part of this would be on an equal level; everybody is eyeball to eyeball. There is
no superior agency, there is no inferior agency, we are all the same. Every District has assets and skills
and brings something to the table that benefits the whole. RR Flood Control has a file cabinet with
contracts for water. The individual Districts have an infrastructure, they treat water, they store water, they
provide something that people put into their bodies, so there is no superior agency, there is no inferior
agency. You have to look at it from this as a starting point and then the discussions can begin. If you take
a look at the whole region there is enough water in this area to be able to supply all of the Districts within
the area. The problems are that some Districts have restrictions on the time that they are able to use a
water right, some Districts have supply or quantity or treatment; everybody's got some problems. If you
look at all of the water that's available for this valley and if you took a look at each one of the Districts at
what would be theoretical build -out if you could ever get there, there's enough water to supply every District
within this region with enough water for theoretical build -out. When theoretical build -out would occur, that's
the responsibility of the Planning Department or the Building Department, the Board of Supervisors and
everybody else that either wants growth or doesn't want growth. So if you take a look at all of the Water
Rights that are available and if you had an agency like this, and you were able to say that all of these
Water Rights now belong to the global agency and are able to be used everywhere within the agency's
footprint, you'd have a situation where, for instance Redwood has access to water in the Lake when its full,
when it's at a certain level, and has it for certain months, and all that other stuff. In the past you may have
been able to draw 500 feet, your Right is actually greater than that. If that Right is part of the agency
everybody could draw from that Right during the time it is available, and that could provide relief for some
29
Minutes, Regular Meeting
Board of Directors, RN.C.W.D.
May 23, 2012
of the other Rights that have some specific timelines. So I think that Mr. Neary's plan of Board Member
representation and Service Districts solves some problems and provides representation. Basically there
would be a Board Member from each of the Service Districts which would provide the residents of the
original footprint of the Founding Districts to be on th-Bo d and the fifth member, which he was calling an
at -large Member, and I don't remember if this Draft has it.
President Pool: On the eventual Elected Board.
Will Carson: Okay, but my suggestion to him was that the fifth Member not be an at -large member but be a
representative from the areas that are not from a Service District. So each of the four Districts have a
representative plus the fifth Member representative. The Flood Control has a file cabinet with contracts
that basically go to ag users throughout the rest of the area. That fifth Board Member would be
representing people that are using the Agency's water, that are not already being represented by a Service
District.
President Pool: if I may, the problem with that as I see it, is that we were talking about the four Districts
that would be combining; well, one of those four is Russian River Flood Control District and its footprint is
all that area. And so what you would be saying was then that there would be two from Flood Control.
Will Carson: And, so I may back up on that, because I really hadn't put that together yet.
President Pool: And if it's representation by any of the areas that are really not covered by any of them,
the way it's written now, that wouldn't be part of the Agency, and that bothers me a little bit. It seems it
should sweep in the area in the boundaries, so that would be a chink in it.
GM Koehler: I don't think there aren't any, because Flood Control's area actually overlaps ours and it
already takes in Calpella. I guess you could make an argument. One of the decisions that Neary made is
to not include Calpella or Hopland, primarily because they are dual -Districts with wastewater in them.
Right now that complicates things.
Will Carson: I had a discussion with him regarding that also. Calpella has special issues because we're
basically wheeling Flood Control water to Calpella, and Millview can only send 100 gpm or something like
that, to Calpella. Their problems would be eliminated also. Calpella is also a vital link that you're actually
going to have that will tie everything together. But he was reluctant to include Calpella initially in his
thinking because of the wastewater treatment that they do, and that's the same thing with Hupland.
President Pool: And it indicates that both of those are also quite a bit smaller Rights.
Will Carson: Yes. My opinion is that they're looking at a geographical area to become one Agency. Does
it really matter that this one is smaller?
Will Carson: If they are an important piece. You could argue against Russian River Estates.
GM Koehler: They are a Mutual.
Will Carson: Well, Dave (Redding) has mentioned Russian River.
Minutes, Regular Meeting
Board of Directors, RN.C.W.D.
May 23, 2012
IN
GM Koehler: Russian River Estates and Rogina need to be at least involved in the discussions; possibly
not as a voting member but logically they would be involved. Also the City in all of its wisdom, at some
point needs to be included in the discussion even if it ends up as, in theory, which is kind of the reason why
I was asking Jack Locey (B & R) earlier in the meeting about his involvement with the buyout of
Sweetwater, in case he is available if Dan Rogina ever chooses to dissolve Rogina Water. Dan has been
involved in discussions with a couple of investors of Mutual water utilities. But he does not want to sell to
an investor of the utility because he does not want to see his customers rates 'triple' in cost. So the logical
next entity that might possibly take over Rogina Water would be a special district of some kind.
Will Carson: And, Rogina's pipelines are right there.
Director Butow: And the other thing, too, is that Dave Redding and likely some others are capable of
operating a system like Hopland. It's not like we don't have personnel.
What was intriguing in 2009 and those issuues, we were sitting down at the table to talk about this, too.
The Districts had their scratchpads out and we had things put together so that we could deliver water one -
to -the -other. Within a month we were ready to go, and we had already identified spots where we would
increase delivery flow between Miliview and through Calpella and Redwood and all. What was nice about
it was that there was no animosity, there was no in -fighting; everybody was just interested in solving the
problem, and jumping in and doing it. But that didn't work out, however later it did open up a nice
communication between the Districts. And here we are talking now about something very similar. I think
this is certainly a very productive proposal to talk about; it think there is some good stuff here.
Will Carson: I feel that it is worth the discussion and that it is time for the discussion. My sense is that
most of the Districts are half a guy shy of what they would like to have and I think that the cross-
pollenization of crews and training etc., would be beneficial. I know that those are issues that are a long
ways away when it comes to looking at this in here as a starting point.
Being a blue collar guy, I'm concerned about job security and families.
Director Butow: I think we would have a bigger base in which to support the families, and to get things
done. It's true there is a lot of positive.
President Pool: This sounds lovely but I think it's fair that you should all know that the antagonism toward
this proposal, at least as written, as far as Willow Water District, is palpable. I attended their meeting,
which was shortly after the Flood Control meeting and I noted with some interest that they don't record their
meetings. But, my ears really burned.
Will Carson: I did have a conversation with Dave Redding. Ken was the gentleman that was there, and he
may have been their Board President last year. I talked to Dave and got a feeling for some of the
stumbling blocks. I did ask Ken at our meeting, if you remember, if there some sort of configuration that
would be agreeable for them to continue the conversation and he said it would be possible. Millview and
Willow have a pretty good working relationship right now and the ultimate goal was to continue that
relationship and broaden it. Right now we are sharing facilities, we're supporting each other with clerical
and administrative duties and it is working well. I feel that there is a possibility with maybe some continued
conversation, that they might want to continue this exercise, continue discussing it. There may be some
way to structure things so that at least a discussion can take place. That's all I'm advocating, is just having
the discussion. Like you were saying, e
natugthbrought us all closer. The Grand Jury ports have suggested an arrangement like this. I understand that
31
Minutes, Regular Meeting
Board of Directors, R.V.C.W.D.
May 23, 2012
Sonoma County would prefer to speak to one entity up here rather having to deal with a lot of individual
groups. A regional agency would allow us to speak with more authority about things that concern us when
it • to •, with State legislators and asking for help or expressing opinion, because then it would
not just be a small individual District.
GM Koehler: There have been discussions regarding this document where the consensus was that, yes, it
gives people one voice. We could tackle • evil •. r• there at Sonoma. I think that's an attitude
that • to be removed.
President Pool: That basically came up with Neary and Johnson.
GM Koehler: Yes, and that needs to go away.
Will Carson: There is some baggage there. The first draft that I saw contained some language that really
didn't need to be there.
President Pool: Some of that had been removed by the time Bill (GM Koehler) and I saw it. But one thing
that reminds me to mention that I wanted to mention earlier, that was in the first draft that we saw and what
we had going into that meeting where a few of us from each of the Districts sat down, absent however was
Flood Control. In this document there is a mention of an option for the County to appoint an ex officio
member who, while not a voting member, would be able to attend all meetings including Closed Sessions.
That person would be there as an overall advisory capacity. Well in the first draft that I saw, there was also
an option for the City to appoint an ex officio member, and I don't remember now who it was that jumped
out and someone said, Get them out of there. And it was immediately removed.
Will Carson: I suggested to Mr. Neary that one can understand the BOS having a representative there
because this area is an economic engine for the County. They have ties to the State, and are able to
speak to the State. It makes sense for them to be aware of what's going on. This is the closest to a
County Water Agency as they will have in this geographic area.
The reason that I said that Flood Control doesn't need to be at these meetings, is that District's that are
considering this have a much greater scope of things to try to deal with and understand and think about,
than does Flood Control. Flood Control has got a lot of water and it should be put to use, but they don't
have infrastructure, they don't have crew, they don't have a lot of the things that these Districts have.
Flood Control has a file cabinet with the contracts, they have a specified amount of acreage that they can
provide water to. Flood Control's file cabinet means as much to these municipalities as much as the
municipalities need Flood Controls water. Ag needs the water, too. They can't give all 8,000 ac-ft of their
water to ag. This region is set up with a status -quo with crops; we're not going through a radical
changeover from crops, like grapes, to row crops. The amount of water that's going to be purchased by ag
growers for their crops is known. You could probably make a pretty good guess of what's going to be
required for the next 20 years. There is a shift between pears and the vineyards. Thomas ranches
underwent a big loss of pears, and those ranches are going from pears to grapes.
Director Butow: That was a lot of water loss; as far as water sales by Flood Control the pears used a lot
more water than grapes.
Will Carson: And you can make a pretty good guess as to how much water is going to be going to ag from
the Flood Control file cabinet for the next 20 years. You'll be off a little bit, but you're going to be pretty
darn close. To be able to sell that full 8,000 ac-ft, and to make good use of it, it's going to have to go to 32
Minutes, Regular Meeting
Board of Directors, R.V.C.W.D.
May 23, 2012
industry and residential; and so Flood Control's file cabinet needs us as much as we need them. In that
respect, everybody's equal.
President Pool: In addition to the kinds of things that you mentioned, the broadening of the Place of Use
for all the District's, I think that all the District's have to do something, that came up earlier in this meeting.
Our 2800 ac-ft Right to storage is something that presently we can't use at all; and if this legislation could
change how that 2800 ac-ft Right could be used and stored, such as of course ideally saying that it could
be stored in the Lake, then of course that would be a huge benefit for us and would be something that
could then be used anywhere within the new broader agency, it could become a Water Right that could
actually be used. So that's what made the Time Extension something that we're trying for.
Will Carson: This shows the advantage of having conversations between the District's, so that these things
can be talked out and addressed. We know there is baggage from the last 30 years, and it would be nice
to eliminate all of the baggage and just move forward and do something good. A discussion is going to be
helpful even if we decide this is not what's going to happen.
President Pool: I agree. I think just having a discussion of ways that we can work together, even if it
doesn't result in this, could result in some levels and types of cooperation that we might never have
attained before.
Director Hallman: I'd be interested in seeing what comes down the line.
Director Ricetti: So, is it Russian River that has the excess water to feed the other entities?
Will Carson: Well we all have water. Millview has water. Some of our water is specified, we can draw it at
certain times and we cannot draw it at other times. Sometimes water on a Right doesn't get consumed
because you ran out of time before you were able to draw it. In that situation you have water you can draw
at a specific time of the year when conditions are just right and you have available to you more water than
you can consume or use. What I envision, and I'm not alone, is that you would end up with a detailed
analysis of all of the Rights when they are available. And you have to do an analysis of needs of specific
Districts or service areas and you would maximize the Rights so that the ones that sunset at a certain time
during year, you've used up everything that they have available to be used, and there would be other ones
that would be available to step in right after that one sunsetted, and continue on.
Director Ricetti: Would this keep Redwood Valley from their moratoriums and from buying water from
Sonoma?
GM Koehler: Well we don't want to rule Sonoma out of the mix either. Even though the concept is accurate
that if each of the Water Rights were being put to full beneficial use, having another several thousand
shouldn't be ruled out. We've got to look at the cost/benefit ratio and what they want for it but I think we
need to keep running parallel streas because if we're not able to do something like this, then we're not
going to be able to put all that watermto beneficial use and we're going to need something different if people
want us to lift the moratorium for Redwood.
33
Minutes, Regular Meeting
Board of Directors, RN.C.W.D.
May 23, 2012
Will Carson: Something like this would eliminate three problems. it would eliminate Millview's problem for
capacity. That may not be the right word. We're on a moratorium because there's not enough water
available guaranteed in the event that we have to supply water for so many hours and all this other stuff.
Calpella has needs for more water, Redwood has needs for more water. You have to have excess
capacity. If this larger entity has all of this water, then the capacity would be there. Millview's moratorium
would be lifted, Redwood's moratorium would be lifted, the chokepoint for Calpella would be gone. Willow
doesn't have a problem; they have water. They're in the best shape of all the District's.
President Pool: At Willow's meeting, one of the Director's made the point that their customers were happy,
the water came out of the tap, their water quality is good and they have no problems and they have no
debt. He saw nothing in this for Willow. He said that any proposal that would be sold to him, was going to
have to be something, well it comes down to: We all work for our customers. And just as he says, we have
to be concerned for our customers. He is concerned that something like this would end up making water
cost more and the customers rates would go up and that definitely would not make his customers happy.
So no matter how interesting we think this is, we have to keep looking at it from all the different angles
including and especially from the point of view of our customers. I see potentially a lot of value in this for
Redwood Valley but if it doesn't benefit all of the Districts and all of the parts of the agency that would be
coming together, it's not likely to come together. And if it did, and didn't benefit everyone it would likely get
to be an ugly situation. So I think there is going to be a lot to deal with to try to study this and continue
discussion and see where it goes. I think that it is a good thing that we're talking about it.
Will Carson: I agree with you, it has to benefit everybody. It may be that Willow will decide that they do not
want to do this, but I don't know that necessarily should put a stop to the exercise.
President Pool: Well I don't think so, and by the same token, it may be that someone who should and
would want to be a part of this could turn out to be the Sanitation District. There were some good
arguments made for the idea of including the Sanitation District. One of the big problems the Sanitation
District has is that, because it doesn't control water, if people don't pay their sewer bills there is no way to
shut them off. But if you have one agency that's controlling both the water and sewer, there is leverage.
Director Butow: There is that. But at this point, I guess the question would be, do you want that ad hoc
committee to do this or do you want to appoint someone else?
Director Hallman: I would just wait to see the next revision. If he wants to come in here and talk to us
about it, that's fine but I don't think we need to chase it down with an ad hoc. That's just my opinion; and
the thing is, we have an ad hoc working with Russian River right now and according to Sonoma, they are
behind what we are doing. I mean that's what I took out of the last meeting that Sean and Bill had with
them, is that they were behind giving us water if we could get our agreement together. So I think that we
need to keep looking at both of them obviously, but when they send us another revision we can take a look
at it and I just don't think we need an ad hoc committee to chase it down.
GM Koehler: Well it is nice to be able to engage in conversations. And the couple of conversations that
we have had so far have consisted of typically the Manager and the President. I think that is extremely
useful and I think the process will move ahead faster if that conversation continues. The logic of keeping it
the same as the ad hoc and not creating a committee, but allowing that ad hoc committee to carry the
responsibility of continuing the discussions over the Neary proposal, which are very interrelated, is that you
34
Minutes, Regular Meeting
Board of Directors, RN.C.W.D.
May 23, 2012
don't run afoul of the Brown Act. Whereas if you bring a new member on board of that ad hoc, at the very
minimum you are supporting the appearance of violation of the Brown Act. It would be my
recommendation that you allow Granville and Don to participate in conversations as requested by the other
District's.
Director Hallman: Can I throw one more thing out there. This is my concern, that this is Don's last year on
the Board.
Director Butow: I have next year, also.
Director Hallman: Oh, okay. Well I don't know how long the process will take, but at the same time
(unfinished sentence)
GM Koehler: Well if he leaves the Board, then it is not a Brown Act issue. As long as he is on the Board,
then you are skirting big time with Brown Act violation with three members on the ad hoc.
I guess the very reason that Don was not informed of the initial meeting was to keep it to the President, so
that we were not dealing with a committee of any kind; it was just a couple of guys being invited to sit
around and talk. I think it needs to go harder, faster. If at any time there is an invitation to sit down, as Will
is pointing out, there is an awful lot of stuff in here that needs to be hashed out by potable water purveyors.
Director Hallman: Yes, I did notice that you pointed out earlier that Redwood Valley was not consulted
during the development phase.
GM Koehler: Correct. This all came out of the blue.
President Pool: And it was already the 2nd draft by the time Bill saw it.
GM Koehler: As we pointed out, Neary is Millview's attorney and Tom Johnson is Willow's attorney and
both these gentlemen were there. They started in on this County of Origin stuff, and this needs to go away:
The animosity towards Sonoma needs to go away.
President Pool: That reminds me to mention something else that I heard at the Willow meeting, was that
Tom Johnson had provided the Willow Board with a 2-page response, or answer, to this proposal
document, and I asked if that was something that they would like to share, and, it was not. So I wanted to
make sure that you knew that.
GM Koehler: It was an Open Session. They don't have the ability to say No.
President Pool: It was not in Open Session. I think they must have discussed it in Closed Session, but I
don't know.
Will Carson: I think that part of what they are struggling with is that they are not viewing the new agency as
a global agency. When you read the document, when you get down to the point where the new agency
has been created, the individual agencies disappear; for example Millview would disappear, there would be
no contracts with the Flood Control District for water because it would all be one agency with one water.
It's not us and them, it's all one.
That's part of their stumbling block, but it's not us and them, it's all one.
35
Minutes, Regular Meeting
Board of Directors, RN.C.W.D.
May 23, 2012
Director Ricetti: So the question is, our committee wants to be empowered to just go ahead and caucus
with the other Districts with regard to this.
Director Butow: And to come back and report to our Board.
Will Carson- We have County Water Districts which have been created by the residents within the District.
It's their money that has paid for the infrastructure and they have certain rights also.
President Pool: That reminds me of a point one of your esteemed Members brought up, and it's a point we
need to be very sensitive about: This legislative process ostensibly bypassing the voters, and he didn't like
that and he makes a point because this is not a process. While there are dates in here about when this is
all going to happen, no one believes that, including Neary. it's just something that he put in there to give it
the kind of structure so that there is a beginning time and there's an ending time, and these things happen
in between, and then it moves on, and then this happens. It's just a talking point. But along the way we
start to flush this out and if it looks like it's going to go somewhere, then there's got to be Press about it;
the public has got to be involved, to the extent that you can get the public involved. He says, bypass the
voters; well, if you put something out to a vote and the voter's don't understand it, where does it go? And
the same thing, whether they vote on it or not, you try to educate the constituents about it and give them an
opportunity to get involved, and a few will, but not many.
GM Koehler: If indeed this Article 141-44 Capital Financing, if indeed that does comply with CSD law, that
requires a 2/3's majority vote.
President Pool: This document goes around that.
GM Koehler: I think he is trying to go around that, whether he's going to be able to succeed is another
issue.
Director Butow: Again, this is a proposal; it's probably going to go through several editions before it goes
through, depending if we all want to do so.
Director Hallman: I'm just curious how much it's going to cost. For example, we paid (legislative
consultant) Nick Tibbetts $385,000 or something like that.
President Pool: This is something that would go to the State Legislative vote.
Director Butow: Before we talk about something like that, there are numerous issues that each District has
to resolve before we get to that point.
Several people were speaking at the same time, unable to decipher.
Will Carson felt he needed to go home. The Board thanked him for participating.
Will Carson left the Meeting at 10:35 P. M.
Director Ricetti: Do we need a Motion to extend the responsibility on that or is it just o.k.?
In
Minutes, Regular Meeting
Board of Directors, RN.C.W.D.
May 23, 2012
MOTION: The ad hoc committee duties of Granville Pool and Don Butow be extended ts
include discussions of the Neary proposal.
Ricetti/Butow Discussion CARRIED
AYES: Ricetti, Butow, Hallman, Pool
NOES: Spilman
ABSENT: None
G. IWPC Expenditures. (GM Report, Action Item No. 21
GM Koehler: There were some Commissioners at the IW&PC Meeting that seemed to understand that as
a Commissioner, they were appointed to disperse the dues. The dues have now been dispersed but the
greater question still has not been discussed. Director Butow directed me to attempt to get it on the
Agenda for the All Board Meeting but it was kind of sidelined. So that issue has not been resolved.
The IWPC has agreed unanimously to pay Paige Poulos $7,500 to combat the disinformation coming out of
the Friends of the Eel group.
H. IWPC Dues. (GM Report, Action Item No. 3).
The IW&PC invoice in the amount of $2,000 for annual dues has been received.
MOTION: Pay the invoice.
Hallman/Spilman Discussion CARRIED
AYES: Hallman, Spilman, Butow, Ricetti, Pool
NOES: None
i,BSENT: None
I. All Boards Meeting. (GM Report, Action Item No. 4).
GM Koehler: I and three Board Members attended the All Boards Meeting for an hour. I guess it boils
down to, does anybody want to rush to get back into the Feasibility Study, based on that Meeting?
Director Butow: I would still like to sit on the sidelines for the time being. This is for the same reasons that
we got out of the Study in the first place — where are they going with the budget and the dam raising issue?
President Pool: Mike Dillabough (COE) seems to like to express the opinion that he thinks this dam raising
is a real project that will actually happen, but nothing that he says in the details ever seems to support that,
from what I can see.
J. Vendor Review. (GM Report, Action Item No. 7).
Our internet service continues to be unreliable and unsatisfactory. GM Koehler reported on his efforts to
contact internet service providers and also some property owners with lands at higher elevations.
37
Minutes, Regular Meeting
Board of Directors, RN.C.W.D.
May 23, 2012
Another vendor that probably should be reviewed on a regular basis would be the back -flow prevention
device tester. We have no complaints about the service or prices of our current vendor, but it's a good idea
to review.
Director Ricetti: What is the status of our review on auditor services?
GM Koehler: There are some firms with experience in Auditing the Special Districts. The California
legislation is looking more closely at Special District's largely in response to the problems in the cities of
Bell and Vernon. So, I will be sending out RFP's soon. Again, doing this is certainly no negative reflection
on our current accountant.
K. Budget. (GM Report, Action Item No. 5).
GM Koehler: The Budget Committee wasn't able to meet last month, but will be meeting soon.
Director Spilman: All I heard at the last Meeting about the Budget was, we've got to raise the rates, we've
got to raise the rates, and we've got to spend more money. I've been in a private practice and, you don't
raise more money by charging more for something. The customers will go away. There's too many other
resources in this valley for people to get water, and you want them to use your water, and you keep talking
about raising the rates. They are not going to use your water; they are going to go to their wells.
Director Ricetti: It's already happened.
Director Spilman: Well it's already happened and it's going to get worse. I think we need to look into some
ways that we can produce more income, and not raise the rates. Nobody seems to want to do that.
(multiple speakers/cannot decipher)
Director Spilman: Well okay, for one item, we've got a whole district that we could wheel water down to the
south, down where Don lives and that's all Russian River. We could take that and move those meters up
into Redwood Valley (sentenced not finished)
GM Koehler: No. We can't.
Director Spilman: You can't?
GM Koehler: We cannot. We've had this discussion multiple times. If it's not in the Surplus Agreement
Appendix (SAA) it cannot be served water. The SAA is the contractual agreement that we have with
SCWA (sentenced not finished)
Director Spilman: Wait wait wait. You don't have a contractual agreement with Sonoma County.
GM Koehler: We want one real bad.
Director Spilman: Okay. You don't have one. You're letting Sonoma County control you by telling you that
you can't sell here, you can't sell water there if that address isn't on the list. You can't service all the
customers that your tax base is paying and you need to get rid of that out of the Contract before you sign
another contract with them. 38
Minutes, Regular Meeting
Board of Directors, RN.C.W.D.
May 23, 2012
Director Butow: Wait a minute, I'm missing something here. How can we sell to more people when we're
under this moratorium? We've got a bunch of people out there that would buy more water from us.
Director Spilman: You've got domestic meters, and if you've removed that SAA or whatever Bill said it is,
the people that don't want to mess with this new issue that's coming up with a lawsuit right now, and would
just as soon buy their District water, they can't because you won't sell it to them.
Director Butow: We can't sell it to them.
Director Spilman: You can sell it to them.
Director Hallman: Are you talking about ag water?
Director Spilman: Yes. It was your choice to put the ag moratorium in place.
GM Koehler: That was on the recommendation of Brelje & Race based on the inability of the ag water
distribution system to move additional water. And considering that four years ago, we ran out of water.
Director Spilman: You had one issue in the life of this system. You're taking tax money from people and
you are not servicing them. That's not right.
GM Koehler: Well, put together a proposal. I have failed to understand that logic, we are wheeling to one
customer now, but I understand that you are saying that, to Don's house for instance, we sell Russian
River water to Don and we take Don's meter off our list of those folks we serve, and then sell that to
somebody else.
Director Spilman: Exactly. Not sell it, but say, service somebody else.
GM Koehler: Sell them the meter.
Director Ricetti: Now when you say Russian River water, how (sentence not finished)
GM Koehler: There is an overlap. It's at the south side of Road B coming down to East Road and then
over to the northern border of Don's property and thence across the river to the freeway. It's within the
Russian River Flood Control District in addition to being within RVCWD; our maps overlap at that point.
Director Butow: This came up years ago. At that time there were supposedly 21 domestic users, and the
map got revised later saying it went up to Road B, so they all were to be charged to Russian River and be
taken off our RVCWD map. That was back in the day that Russian River Flood was going to start billing
people. Well, if you want to start playing that game maybe we could do that I guess.
GIVI Koehler: On the flip side of that, let's say we bought 20 additional acre-feet from Russian River Flood
Control to serve that portion of our District boundary, that's 20 acre-feet less that might be available to us
during hardship times resulting in customers on the south quarter of our District who do have access to
Flood Control water, and our customers have been cut off, the rest of the customers would be cut off if they
do, indeed, approach the 8,000 acre-feet limit. Then that's what we've effectively done, is we've said You
guys get water; and You guys don't. it's messy. 39
Minutes, Regular Meeting
Board of Directors, R.V.C.W.D.
May 23, 2012
Director Butow: It also gets complicated in bookkeeping in the sense that we'd have to start charging a
service fee for delivering Russian River water through our system. We'd have to set the cost, the
depreciation of all of our infrastructure to deal with that water. And including the meter reading, etc., etc., it
gets very complicated and whether it's cost effective or not, I don't know.
On this other thing Jack brought up, I'm sure there are people out there that would sign up for District water
if they could.
Director Ricetti: There is a nearby property owner that is going bankrupt; he's been hauling water in there
for 5 years and it looks like he is just going to walk away from the property.
GM Koehler: The District can accept Hardship Water Service Applications if the property is within District
boundaries.
11 �-Wzmvl
The financial report was reviewed.
GM Koehler: We are paying $2,000 to Inland Water & Power Commission; we are not paying $70,000 to
get back in the Feasibility Study. Also, I will look into the cost of arbitration.
Director Ricetti: Can we talk a little bit about the $64,000 and the arbitration? I've been thinking about
this, and one of the fears I have is that we go to arbitration and they come in and say, Look this should
have cost you $200, 000 for what was done to the river. it's only $64, 000. You know, arbitration is binding.
Director Spilman: We are just asking about the cost of arbitration.
Director Ricetti: I understand. I'm just wondering about the time element. I don't know what the time
element is in this scenario, but I see that there is a letter here. Do they have something to work on, that
they need the $64,000?
GM Koehler: They have the CCC lined up, they have the con crew lined up, they have their supplies and
materials for planting willows lined up, and they want to get it done and get the willow stakes in the ground
now, so that the willows have some root structure before the winter rains come.
Director Ricetti: I really feel like I've come into this late and I may not have the best understanding of it and
I'd like to make a motion that we do not look into the cost of arbitration.
President Pool: Well what you'd have to do now is make a Motion for consideration of the Board-
ie vote Tnat WW-_
Ricetti/Butow Discussion CARRIED
AYES: Ricetti, Butow, Pool
NOES: Hallman, Spilman
ABSENT: None 40
Minutes, Regular Meeting
Board of Directors, RN.C.W.D.
May 23, 2012
President Pool: We have three Ayes, to two Nays. So the first Motion earlier in the meeting was that,
rather than paying the $64,000 and going ahead with that project, that we postpone it until we review the
cost of going to arbitration. So that Motion is back on the Table.
Director Spilman: I'd say that if we had to hold a Special Meeting it would be worth $64,000 or $67,000 if
we could find this out before the Special Meeting, and move this along. If it isn't advisable by somebody
that knows a lot more about this than we do, (sentence not finished)
Director Ricetti: Yes, I just feel like the Board has worked on this for a long time and they understand
(sentence not finished)
Director Spilman: Well they have worked on it a long time, but they've got this dumped on them
backwards, too. And all the time they were working on it, they dumped it on Bill and said, OK if you do this,
this and this, and this is going to be taken care of. And after Bill went through and did all the restoration
work and cleaned up the dump site up there; and he got no credit for it. So they just gave him this bill of
$64,000 to pay for it. And then, Bill represented that we would be able to pay for it out of the money set
aside in the SCWA account. And now, it's going to come directly out of the budget? I'd say that if we're
going to have to pay it out of the budget that we should at least find out, is it feasible to take it to
arbitration? And if it's feasible, let's find out what the cost would be.
Director Ricetti: I'm just worried that there are so many unknowns about it. if you go to arbitration, it's
really, rolling the dice.
Director Hallman: I have another problem. We've quite often have Special Meetings for budgets and
everything else. The thing is, I have to agree with Jack. They sent us this letter on the 14 th
Director Ricetti: Well we're kind of confused about it, and I kind of have to bend to experience, on this.
Director Spilman: Well the way it's been handled, it's been really confusing because they left Bill with the
impression that, this is before I got on the Board but I sat in at the Meetings and I listened to this, and they
left Bill with the impression that Redwood would get it all cleaned up and Redwood would get credit for all
this. And then after it was all cleaned up, and a year later, they came back with this $64,000 billing.
President Pool: And it was not just a year later, it was also after we had settled with Granite.
Director Spilman: It really stinks and I think we should at least find out how much it's going to cost to look
at it, and get a good look at it, instead of (sentence not finished)
Director Butow: Well you two have just come in as Directors. It's too late, but if you want to do that and
take a chance on screwing things up, go for it.
virector Spilman: It's already screwed up, Don.
Director Butow: it's screwed up already, you're absolutely right. And it's not been right from the beginning.
GM Koehler: And now we have a firm commitment to closure. This is a commitment to closure. This is it.
This letter says, this is it, this is closure. 41
Minutes, Regular Meeting
Board of Directors, RN.C.W.D.
May 23, 2012
Director Hallman, In the letter, do they say they would like the money by 10 days? 30 days? I mean, those
people (sentence not finished)
GM Koehler: No, but the letter is written contingent upon the description of the project that Mendocino
County RCD put together, which does have time elements in it. In other words, as I said, they need to
have well -rooted willow before the rainy season starts. And, if they don't get started on the work soon, they
won't beat the deadline.
President Pool: Okay, I guess the question is, how soon is soon?
GM Koehler: Well, Jan at RCD would love to have me show up tomorrow with the check. They are ready
to go. A lot of the reason that it took this long to get their letter together because Jan and Shelly, both from
RCD, proposed the project consist of cleaning up the area that was immediately contiguous to the Outdoor
Education Project; but when they finalized all of their paperwork, they hadn't spent enough money.
#irector Hallman: Yeah, you know, we are the only dog jumping through the hoop right now.
Director Ricetti: Yes, I can see that.
Director Hallman: We get to jump, and we get to pay immediately after it takes them an 'x' amount of ti
to get it to us and after they tack on more to the project. I mean, we get to roll over and I
Director Ricetti: They have a great big stick.
GIVI Koehler: It isn't quite that clear. The mitigation project, actually, the clock didn't really start running
until after the expiration of all the monitoring along the river from the point below the confluence with the
unnamed tributary, to determine whether or not the river had recovered. And that actually happened at the
end of this last rainy season. So that's when the clock stopped. The Regional Board said, OK, the river
has recovered, now we can move into the last phase. And that's why it came back a year later, and
actually, they cut a year off the monitoring because the work was well done. So they already cleared it;
Rau & Associates no longer has to do the monitoring of the river.
".•1 off 11
GM Koehler: Yes.
Director Hallman: And the thing is with arbitration, you're absolutely right, it could come back and bite us.
The thing is, I'd like to know. We were the party that was named at fault. We always said No it wasn't us,
but (sentence not finished)
GM Koehler: That topic is closed. A discussion of Fault is not on the table
6
EN
Minutes, Regular Meeting
Board of Directors, RN.C.W.D.
May 23, 2012
GM Koehler: No. They will not. And what you would get in that particular instance is that you would incur
additional legal costs with Granite's attorneys. Fault is closed. It's not a topic that will be discussed ever
again.
Director Ricetti: By the time you get lawyers, and go to arbitration, it's not cheap.
Director Spilman: Well, $64,000 is not cheap. The question is, Can you just find out the cost?
President Pool: Well we have reopened the vote. I'm going to call for the vote. We are reconsidering the
Motion that we already voted on at 3-2 that we would delay the payment. Are we going to delay this
payment until we decide we are going to arbitration?
President Pool: Those in favor of delaying the payment until we find out the cost of arbitration:
AYES: Hallman, Spilman
m1resident Pool: Those not in favor of delaying:
AYES: Ricetti, Butow, Pool
President Pool: I'm sorry, I know it's ugly. If I thought that that avenue had any prospects for us, I would
go along with it but I think it would be making a huge mistake.
*-irector Ricetti: I think we should just pay it and get it over with.
The next Regular Meeting is scheduled for Thursday, June 21, 2012 at 7:00 P.M. at the Water District
Office, 2370 Webb Ranch Road, Redwood Valley, California.
Respectfully submitted,
Linda Groth, Recording Secretary
APPROVED: Board of Directors
DATE APPROVED: June 21, 2012
SIGNED: Paula Berezay
Secretary, Board of Directors
Minutes, Regular Meeting
Board of Directors, RN.C.W.D.
May 23, 2012
M