HomeMy WebLinkAbout2016-06-16 RVCWD MinutesMINUTES
Redwood Valley County Water District
2370 Webb Ranch Road
Redwood Valley, CA 95470
(707)485-0679
Board of Directors - Regular Meeting Minutes
Thursday, June 16, 2016
Directors: Granville Pool, Pamela Ricetti, Ken Todd, Jeff Basili, Mary Talso
Staff: General Manager Bill Koehler
Call To Order: 6:05 P.M.
1. Roll Call
Present:
Mary Talso, Director
Ken Todd, Director
Jeff Basili, Director
Pamela Ricetti, Director
Absent:
Granville Pool, President
2. Hearing of Comments or Questions from the Attending Public for Items Not on the
Agenda
Will Carson introduces himself as a member of the Russian River Flood Control Board
who has been assigned to attend Redwood Valley Water Board meetings. He can only be
here for an hour tonight.
Cesar Toxqui from Cesar Toxqui Cellars has just purchased a property over on North
State Street. He is in the first steps to build a small winery and tasting room. He is here to
request an upgrade in his meter size from a residential to a minimum 2-inch line. He lays
out some plans for saving water including steam cleaning equipment instead of washing
and using a recirculating pump with ice to cool things off. Also, being an organic grower
reduces his water needs.
Dir Todd asks when the Board is allowed to upgrade his meter. GM Koehler says that
there is already one meter on the property. It's a 3-acre parcel with an active meter that is
not being used. So there's no question that he can use that meter or relocating it on the
same property, but it's too small for his needs. GM Koehler is working with Cesar and
Rau and Crane who are assisting with design and construction. If they let the small meter
run at full all day, he could store 20,000 gallons per day in a tank and that may be
enough. Also, a well might be feasible in that particular area, though it may be Forsythe
Creek underflow. Dir Todd brings up that a lot of the water use at a winery has to do with
cleaning and using steam is a big saver as is recycling the water. His request will be
formally addressed at the next Board Meeting.
3. Consider Hearing of Urgent Items Received Since the Agenda Was Posted
None.
4. Acceptance of Agenda
Motion: Accept the agenda
Motion by Dir Todd, second by Dir Basili
In favor: Unanimous
5. Approval of Consent Calendar
Dir Ricetti asks about paying the recording secretary on behalf of the JPA. GM Koehler
says that we should not be doing that for the JPA and that he will look into it.
Motion: Approve the May consent calendar
Motion by Dir Basili, second by Dir Talso
In favor: Unanimous
6. Approval of Minutes as Presented
Motion: Accept the May Regular Meeting
Motion by Dir Talso, second by Dir Basili
In favor: Unanimous
7. Action Items
1. Discussion and possible approval of Engagement Letter with Robert Johnson
CPA for 2015 Audit.
It looks the same as years prior. There are two copies that will be signed once the
item is approved. We can expect his report within about 60 days.
Motion: Approve the Engagement Letter with Robert Johnson
Motion by Dir Talso, second by Dir Basili
In favor: Unanimous
8. General Manager's Report and Action Items
a. District Operations
We have hired a new employee for Willow and he has put in notice with his
current employer. So we're unsure when he'll begin, but it'll be soon. He has also
discovered how expensive it has become to advertise in the Ukiah Daily Journal.
Also, it's hard finding people to hire since most qualified people already have a
job and our lack of high wages aren't going to bring people from far and wide.
Dir Ricetti says that we should start getting word out in high schools and even for
people who are looking for a career that don't want to get a formal higher -
education. We also have to compete with Sonoma County poaching our guys
because the Bay Area is poaching their people. The informal consensus is that
we're going to have to start paying more or we'll never keep good people working
here.
b. District Mapping
GM Koehler has been working with Shane Feirer and have pretty much figured
out what they want. We're still under -budget, too.
c. Backflow Prevention Device Testing
GM Koehler has called in a friend for some years who is a backflow fanatic.
Between all the systems, there are about 900 backflow devices, which is a nice
prize for someone. Redwood has a good system where they just go and perform
the test and bill people, instead of trying to force people to get them done
themselves. We'll have this guy do the devices for now until we can commit to a
single tester. This area is tough because of the gophers and that about 25% of the
devices are buried or very difficult to access.
d. Office Mergers
The field staff has already been consolidated. Once the audit is done in August,
we'll be working toward closing this office. One person down there is retiring, so
we'll see how that goes. We should keep having the board meetings here for a
while so that people will know where to come to complain about the office being
closed. GM Koehler doesn't see very much foot traffic coming through, so he
doesn't see much impact. Dir Ricetti asks about moving the meeting down to
Ukiah and he says that they can have the meetings where they conduct business.
Dir Ricetti mentions that even if the plant starts running, they don't need office
staff for that. On that topic, GM Koehler says that they have started running the
plant again (not into the system) to get things ready if they need it for water.
There are two reasons to get it going now. One is that the County is doing some
work on the Moore Street Bridge which means they need to main shut down
across the bridge. This will cut off about 100 gallons per minute (GPM). The
second is in case of a fire or another source of high demand on the system.
Someone in the audience asks about how this affects the solar array system. GM
Koehler says that they sized the array before a previous drought and they have
never used all of that generated electricity in the first place. So they've been
working with PG&E so far and using that toward a credit for the pumps at Lake
Mendocino. GM Koehler is looking for ways to use that electricity. In any case,
the panels are on a lease, so when the lease runs out, they take their old panels,
leave the infrastructure, and we can install new panels, putting us ahead in the
end.
e. SGMA
The general consensus according to the facilitator is that people want a single
Sustainable Groundwater Agency. It has not been voted on yet, but most people
are thinking about the County. But we're waiting to see how the City of Ukiah
wants to work with this. It could also be one of the JPAs in this area, as there are a
few. The nice thing about a JPA would be that no one agency can dominate the
others. The thing about having multiple agencies is that each would have their
own plan but those plans must match. The fear is that the State will come in and
take over once the hard work has been done. Tamara says that their next meeting
will be in about a month and expresses distress at how long this is taking.
Supervisor Brown wanted another meeting right away, but it's not looking like
that will happen.
f. GM Evaluation Discussion
Last month the Board directed GM Koehler to have him discuss things with
Millview. Because of the way things work, that meeting is next week, so there's
nothing to say on this right now.
g. Budget
It is almost done. There have been changes because the treatment plant will be
used soon and because the labor force has been consolidated.
Talk turns to drought and water conservation. GM Koehler says that usage has creeped
up a little bit, about 5 gallons per person per day. It usually drops during the conservation
time with a little creep afterward. In the State, we are very low usage and in a low risk
area, but the State treats us the same. All the small, home wells also help us show that we
are using less water.
9. Financial Report
Dir Ricetti mentions the changes to the labor costs. GM Koehler says that we are not
having the field crews keeping track of where they are and when. The idea is that it
would take about an hour per person per day to keep those reports added up. He thinks
that things can be fine-tuned and are being fine-tuned better. Lately, Redwood has been
seeing a lot of attention with the work on the treatment plant. Dir Basili asks about the
jump in the amount for office supplies. GM Koehler says that they buy their cardstock for
the year all at once. Dir Todd asks about the fuel charge that is higher. GM Koehler says
that it's most likely for use of the mini -excavator and tractor here at Redwood.
Motion: Approve the May Financial Report
Motion by Dir Talso, second by Dir Basili
In favor: Unanimous
10. JPA — Upper Russian River Water Agency
It was a very short meeting because we didn't have a quorum. There will be a regular
meeting next time. The issue that was talked about was how nothing can be voted on if
anyone is absent.
*Dir Poole arrives at 7:00pm.*
11. Local Agency Formation Commission of Mendocino County (LAFCo)
GM Koehler did not attend the latest LAFCo meeting. What's going on with LAFCo
between the City and Willow is not pretty. There was a housing subdivision separated
from Ukiah and Willow put in the pipes and has been serving them for years. Now the
City has grown up to that area and someone is telling LAFCo they need to force Willow
to give up those services to the City. The thought of the lawyers is that it's appropriate for
LAFCo to be involved, but there is no requirement for LAFCo to force it to happen.
There's a lot of back -and -forth and differing opinions on what should happen. This area
represents a 10% of Willow's customer base and there's no plan for how they will be
compensated. The other thing is, what if the city waits until the Ford Road area is
developed and then decide to take that area over as well? GM Koehler wants to see a
long-term plan from the City as to what they want to do.
12. Mendocino County Inland Water & Power Commission (IWPC)
Nothing to report. They did not have a quorum.
13. Mendocino County Russian River Flood Control & Water Conservation Improvement
District (RRFC)
Last meeting, Tamara thought she had the Junior College on board with finding people to
install the toilets. Now, that idea has fallen through. They're trying other options, but GM
Koehler is not optimistic. We haven't spent any money on this program and will only
need to once the program will come through.
In late 2014, Millview was bringing Well 6 online and they arranged with the railroad to
run pipe along the railroad. The RR Commission approved it with the cost to be
determined. The cost they decided on is $65 per linear foot. This is not a market value
price. So GM Koehler will be meeting (as Millview) with the North Coast Railroad
Authority to talk about the railroad easements in this area.
Back to RRFC, these meetings have been much smoother since Tamara has been the GM.
There was some talk about restarting talks about consolidation with Redwood.
Talk moves to the groundwater monitoring and how a lot of well owners are starting to be
required to report water usage. It's a draconian system and has a lot of potential to get
worse.
14. Sonoma County Water Agency
GM Koehler has talked with Grant about getting together to talk about finding a way to
keep from making lawyers rich off of us.
15. Report of Attendance at Agency Meetings
Nothing to report.
16. State Water Resources Control Board (SWRCB)
Nothing to report.
17. Status Report of Place of Use Issues
Nothing to report.
18. Status Report of 2800 acre-feet Storage Right.
Nothing to report.
19. Consider Attendance at Other
Nothing to report.
GM Koehler and Dir Ricetti give Dir Poole a summary of Cesar's discussion.
Motion to adjourn.
Motion by Todd, second by Dir Talso
In favor: Unanimous
Meeting adjourned at 7:40 pm.
Minutes submitted by Jeanette Wise
Approved:
Date Approved:
Signed:
6
Exhibit B
INITIAL STATEMENT OF FEES AND CHARGES
Amendment 1 8 / 2016
The charge to MILLVIEW for the services of a GENERAL MANAGER provided by
REDWOOD shall be $91,333 (ninety one thousand, three hundred thirty three dollars)
per YEAR as calculated by REDWOOD.
This AMENDMENT 1 reflects an increase from the GENERAL MANAGER SERVICE
AGREEMENT originally signed by Millview October 28, 2015 and by Redwood
November 19, 2015.
All other conditions stated in the GENERAL MANAGER SERVICE AGREEMENT,
EXHIBIT A, THE DELIVERABLES; AND EXHIBIT B, INITIAL STATEMENT OF
FEES AND CHARGES remain un changed and in full effect.
DATE: 1 q C 6
DATE:
lithe Board of Directors
Valley Count/ Water District
of the Board of Directors
Millview County Water District