HomeMy WebLinkAbout2016-02-18 RVCWD MinutesRedwood Valley County Water District
2370 Webb Ranch Road
Redwood Valley, CA 95470
(707) 485-0679
Board of Directors - Regular Meeting Minutes
Thursday, February 18, 2016
Directors: Granville Pool, Pamela Ricetti, Ken Todd, Jeff Basili, Mary Talso
Staff: General Manager Bill Koehler
Call To Order: 6:00 P.M.
1. Roll Call
Present:
Granville Pool, President
Pamela Ricetti, Director
Jeff Basili, Director
Ken Todd, Director
Mary Talso, Director
2. Hearing of Comments or Questions from the Attending Public for Items Not on the
Agenda
GM Koehler speaks up as a member of the public. After the Millview meeting he got a
call from a lawyer for a group called Californians Aware asking about documentation of
actions taken on the agenda. The complaint is that the Millview agenda does not
completely comply with the Brown Act because there is not enough information about
what the action is. This lawyer was responding to a complaint made by Lee Howard. So
technically, we need to add a little bit more information to the agenda at Millview and
also here at Redwood Valley.
Dir Pool was looking at the Sacramento Bee about how the local water managers in that
area are complaining about how the Army Corps of Engineers is managing Folsom Lake.
It's the exact same situation as over here in this valley. The ACoE is afraid that if they
show any preferential treatment in California, they'll have the same problems all over the
country and they don't want to lose their authority.
3. Consider Hearing of Urgent Items Received Since the Agenda Was Posted
None.
4. Acceptance of Agenda
Motion: Accept the agenda
Motion by Dir Ricetti, second by Dir Todd
In favor: Unanimous
5. Approval of Consent Calendar
Dir Talso has a question about a charge involving food and GM Koehler says it's for
Christmas hams. Willow Water has traditionally bought hams for his guys and since the
Redwood employees had only been there about a week, he didn't feel right about it, so
GM Koehler said to go for it.
Motion: Approve the January consent calendar
Motion by Dir Ricetti, second by Dir Basili
In favor: Unanimous
6. Approval of Minutes as Presented
Dir Pool points out that someone from this Board usually attends the Willow meetings
since they're after the RRFC meeting, so it's inaccurate to say that nobody's attending. In
Item 15, Willow does not yet have a license but has been offered a license that they have
not accepted yet. GM Koehler says he is very interested to see what happens since RRFC
is also going for license and he wants to see if the State puts unreasonable stipulations on
them as well as Willow. If they don't, than Willow will want equality and if they do, it'll
really hit the fan. Also, if they don't give this license to Willow, Willow will have to buy
their water from RRFC and RRFC is going for a license on the basis that they have no
extra water to give. So the State may be backing itself into a corner on this one.
There are a few other minor changes.
Motion: Accept the January Regular Meeting minutes as corrected.
Motion by Dir Basili, second by Dir Ricetti
In favor: Unanimous
*Note* Dir Basili says "agenda" when he meant to say "minutes".
7. Directors and Staff Reports and Discussion of Non -Action Topics
Nothing at this time that will not be covered later.
General Manager's Report and Action Items
Within the last couple of days, the Redwood has received two subpoenas for
information. The first iofrom the plaintiff attorney in a lawsuit against Fedrick,
Inc. related to asbestos from when the plant was being built back in the 1970s.
They are looking for anything and everything related to construction of the plants.
There was way too much information to go through so he drafted a letter back to
them saying that this is crazy. It seems that during the construction of the
treatment plant, someone was exposed to asbestos, probably by cutting certain
types of pipe, and now they're suing everyone related to the construction. GM
Koehler realizes that Redwood may be part of this lawsuit, so he shouldn't do
anything without a lawyer. In cases like this, the Mendocino County Counsel is
available. So after he got a letter from the defendant in this lawsuit asking for the
2
same information, he forwarded it all along to Katherine Elliot who is acting
County Counsel for Mendocino County.
Dir Pool says to keep him appraised as the situation changes because he's still in
contact with people who were lawyers during the asbestos wars.
a. District Operations
Things are going well and the crew is getting along together very well. It's a
pleasure to watch with no bickering or fussing. GM Redding is looking in to
getting another employee.
b. R.V. Septic System
The old pipe right outside the building was basically flat when it was installed.
Over the years it has developed dips and bumps which have been causing back-
ups for years now. So they replaced the pipe it's much better than it was before.
c.SCADA
We need a new SCADA system. GM Koehler has a quote for a new system the
same as the system Millview has, it is for $200,000. His concern right now is that
the treatment plant has been off for a year and who knows how long that will last.
So now is not the time to be spending a bunch of money. He's looking into getting
the plant up and going again and troubleshooting problems as they go. The
amount is a reasonable proposal and is needed if the treatment plant is going to be
operated again.
d. Intertie
The intertie is doing great. We've been ordering spare parts to have on hand; most
things are pretty standard.
e. Valve Exercising Machine
GM Redding wants to get another model up to look at. After going back and forth
and firture projections, they're looking at a trailer -mounted unit that can be put on
a flat-bed truck if needed. After review of the minutes, there wasn't a formal
consensus from the board to proceed with this item and he's assuming he has that.
The Board agrees that the consensus was to proceed with the shared purchase.
f. Transmission Main Inspection
This has been talked about before. This is a four and a half mile pipeline with an
entrance at one end and exit on the other. It's a tough one to inspect. There are a
lot of risers with air relief valves, but nothing that you can get a camera into. He
got a flyer from a company that says they can inspect pipelines like this and after
some back and forth he got from them that they can attach equipment to one of
these risers and give the condition of the pipe 20-feet in either direction and tell
you if something is wrong, though not what. It'd be $10,000 to do this at 15
locations along the pipeline and that's with the crew coming from Southern
California. Sonoma Water Agency is having the same trouble with wanting to
know what kind of shape their viaduct is in, so GM Koehler is in contact with
them about their potential methods and both are rather skeptical of the usefulness
of this acoustic method that's been proposed. So we'll wait and see what they
come up with. The only reliable method for this distance would cost about
$400,000 and for that method you're just as well looking for water bubbling out of
the ground.
9. Financial Report
Dir Ricetti asks about a $4,500 revenue and it's an ad valorem revenue, from taxes. Dir
Todd asks about the PG&E charge even with the pumps not running. GM Koehler says
that we're still playing catch-up. The pumps have only been run a few times and that was
to test them. The ponds are full and the pumps work fine.
Water sales were up during December. GM Koehler says that was based on cash received
and doesn't necessarily equal more water sold. There's also money coming in for GM
Koehler's time over at Millview and he says there's a lot to be done over there.
Dir Talso asks if the bridge project is over and GM Koehler says that the construction is
over but they can still expect a charge with the release of the retention.
Motion: Approve the January Financial Report
Motion by Dir Ricetti, second by Dir Talso
In favor: Unanimous
10. JPA — Upper Russian River Water Agency
The latest meeting was relatively uneventful. There was some talk of having a website
that would compile all of the districts' minutes and agendas. There wasn't a lot of
enthusiasm about it except from Dir Silver and it looks like if she wants one, she'll have
to do it. She's also pushing for a timeline about the merger and that's a very tough thing to
get a handle on. She didn't get very far with that, either, since the other members know
how hard this process is.
There is also talk about the insurance and if being under ACWA/ JPIA is the way to go.
It's tough because there's no equipment or employees, and no cash flow, which is usually
how they decide how much your payments are. So he talked to someone else who was in
a similar situation and they got a flat rate for "membership" to get the insurance. He also
told ACWA that the JPA is working toward being a member agency.
11. Local Agency Formation Commission of Mendocino County (LAFCo)
GM Koehler wasn't at the latest meeting but he heard a lot about it. Lee Howard has been
causing a stink about how Millview passing water through Calpella is illegal and nobody
paid attention to him.
12. Mendocino County Inland Water & Power Commission (IWPC)
The prediction is a wetter than usual March, but that's what they said about February and
that hasn't happened. Sean White is still doing some reporting for RRFC and says the
City of Ukiah is still working toward the Purple Pipe Project. It's still a lot of money for a
little bit of water. $55 million dollars for 4,000 acre-feet which comes to about $12,000
per acre foot. They have farmers who have come together to contract for 1,600 acre-feet
of water so far.
Some concerns are that treated wastewater can't be used on overhead sprinklers, only on
drip which greatly reduces the amount needed. Technically, when someone works on a
charged line, they need to wear a full hazmat suit. Also, there's a lot of pharmaceuticals
that don't get removed during the wastewater treatment process.
Lake Pillsbury is overflowing and the tunnel is done and open!! A month early. 175 cfs is
coming through for a brief period for testing and then it will drop to 40 cfs until frost.
They've been talking about the process of licensing and the Friends of the Eel River
cannot initiate the process of de -licensing, which is a good thing. There's a lot of
discussion about public outreach and letting people know how important that tunnel is
and the dam to people in this county, Sonoma County, and even Marin.
If there is actual progress on raising the dam, one logical method is for Redwood to pay
their $50,000 in back -debt and then turn it over to the JPA to let them take Redwoods
seat at the table and represent the water districts in this valley.
13. Mendocino County Russian River Flood Control & Water Conservation Improvement
District (RRFC)
They met the new GM, Tamara. She's very nice and enthusiastic about her job. They
once again selected who would go to which district meetings. Paul Zellman volunteered
to come to Redwood meetings and is doing just as well as Shoemaker did, which is a
perfect zero so far. Zellman also brought up an idea for their website where they add a
calendar that would include all water meetings. There's also a good possibility that
Richard and Judi will be resigning. That may be a good thing depending on who comes in
to take their place.
There is some talk about another goal -setting workshop. Most of the dates that they're
proposing would be tough for GM Koehler to attend, though he wants to. Dir Pool and
Dir Ricetti express their desire to not go.
They did get their letter signed expressing interest in the GSA. It was sharply written with
a lot of demands. The other Board members have been more conservative about it.
The economic impact study for the scenario of loss of Ag has been finished and is eagerly
anticipated. It outlines the losses for all the vineyards and such if RRFC tries to cut off
the Ag water to Redwood Valley.
14. Sonoma County Water Agency
Nothing to report.
15. Report of Attendance at Agency Meetings
There's a meeting on March 23rd sponsored by the California Special Districts
Association to discuss Special District Law. There is also a meeting of the Eel Russian
River Commission on April 1.
16. State Water Resources Control Board (SWRCB)
If tll St to Board comes out with some stuff about Willow, that'll be interesting.
loms nally moving ahead with purchase of part of the Masonite property. So that
area is being built up for industrial use. They put in a large water line down Ford Road
and that'll really open things up. There's also talk of In N Out moving in to the Fjord
building. Millview building up these areas is a huge step forward and will help facilitate
the consolidation in this valley. So GM Koehler talking with Paul Minasian is costing
Redwood Water some money but it's toward a common goal. The Board agrees.
17. Status Report of Place of Use Issues
Nothing to report.
18. Status Report of 2800 acre-feet Storage Right.
Nothing to report.
19. Consider Attendance at Other
Nothing to report.
Motion to adjourn.
Motion by Ricetti, second by Dir Basili
In favor: Unanimous
Meeting adjourned at 7:30 pm.
Minutes submitted by Jeanette Wise
Approved: Board of Directors
Date Approved: (hr (t
Signed: