Loading...
HomeMy WebLinkAbout2020-08-20 RVCWD Minutes MINUTES REDWOOD VALLEY COUNTY WATER DISTRICT REGULAR BOARD MEETING TELECONFERENCE VIA ZOOM THURSDAY, AUGUST 20, 2020 1. Roll Call President, Granville Pool, called the meeting to order at 5:00 p.m., with the following roll call: Directors Present: Director, Granville Pool Director, Ken Todd Director, Tom Schoeneman Director, Jeff Basili Absent: None Others Present: Dave Redding, GM, Jared Walker, Operations, Kate Barrett, Board Secretary, Beth Salomone & John Reardon & Christopher Watt, Russian River Flood Control, Janet Pauli, Mendocino County Inland Water and Power Commission & a Director of the Potter Valley Project Board, Carre Brown, Board of Supervisors 2. Public Expression None 3. Consider hearing of urgent items since the Agenda was posted: Board agreed to move agenda item #13 up to after financials. 4. Approval of Agenda Director Todd made a motion, seconded by Director Basili, to accept the agenda. This motion was passed with a unanimous aye vote. 5. Approval of July 16, 2020 Meeting Minutes Director Schoeneman made a motion, seconded by Director Todd, to approve the minutes of the July 16, 2020 regular board meeting. This motion was passed with a unanimous aye vote. 6. Approval of Financials Director Basili made a motion, seconded by Director Schoeneman, to approve the financials for June 2020. This motion was passed with a unanimous aye vote. 7. General Managers Report • GM, Dave Redding reported that there was a 24” main irrigation line break Wednesday night. • Operations, Jared Walker, reported that a PG&E pole was set up on top/next to the main line; the concrete lining around the pipe had been scraped off on the side where the pole was located. This may have led to and caused the failure in the water main. • The line has been isolated and everything has been cleaned up. If everything goes well, the repairs should be completed and the line should be turned on Monday or Tuesday. 8. Treatment Plant/Radio Communication • Operations, Jared Walker, reported that staff has been working with Telstar for the past couple of months, and the work being done is exceptional. • Telstar sent in a quote for $28,250.00 to solidify the project. The board directed staff to proceed with the quote from Telstar. 9. Redwood Valley Rancheria Grant Funding Operations, Jared Walker noted that he has been in contact with Mary Camp, but there is no new news about funding. This agenda item will be brought back to the September 17, 2020 board meeting. 10. Redwood Valley County Water District Rate Increase Staff contacted legal counsel and got the go-ahead to hold a meeting via Zoom for the Redwood Valley County Water District Rate Increase. The board directed staff to give customers notice about a special meeting regarding the rate increase. 11. Russian River Flood Control District Surplus Water Supply Agreement • GM, Dave Redding reported that legal counsel had responded regarding the Russian River Flood Control District Surplus Water Supply Agreement and said to not sign the agreement. • John Reardon from Russian River Flood Control commented that the agreement was meant for Redwood Valley and the Flood Control District to move together and give Redwood Valley a contract like the other clients the Flood Control District has. • The board directed staff to put together an ad hoc committee to work together and discuss the terms of the agreement. 12. Upper Russian River Water Agency Goals and Objectives: Staff reported that the Ukiah Valley Sanitation District wants to join the Upper Russian River Water Agency; the JPA thinks it is a good idea for them to join. 13. Potter Valley Project • Director of the Potter Valley Project Board and Chair of the Mendocino County Inland Water and Power Commission, Janet Pauli discussed in depth the details of the Potter Valley Project. • One of the main points discussed was the proposed plan to remove the Scott Dam. They are doing extensive studies on the impact of the removal of Scott Dam such as restoring habitat, sediment impact, cost risk and liability of Scott Dam. They are also accepting requests for other studies to be done. 14. Redwood Valley Infrastructure Retrofit Project No report. 15. Board Vacancy Staff reported that that no one has signed up to be on the board; there is going to be one vacancy on the board. 16. LAFCo Nomination Special District Member LAFCo is taking nominations for Special District Member. The nomination must be a board member of a special district. 17. 2020/2021 Budget Approval Director Todd made a motion, seconded by Director Basili, to approve the 2020/2021 budget. This motion was passed with a unanimous aye vote. 18. Resolution 2020-01: A Resolution Ratifying Acceptance of UVSD as a JPA Member Director Todd made a motion, seconded by Director Basili to amend Resolution 2020-01: A Resolution Ratifying Acceptance of UVSD as a JPA Member. This motion was passed with the following vote: AYES: Pool, Todd, Basili, Schoeneman NOES: -0- ABSENT: -0- ABSTAIN: -0- 19. Report of Attendance at Other Meetings Director Schoeneman reported that he attended the Russian River Flood Control District’s meeting and the Mendocino County Inland Water and Power Committee’s meeting. 20. Directors Comments No Report. 21. Closed Session The board did not adjourn to closed session • Potential Litigation Per Government Code §54956.9(b)(3) Adjourn meeting Director Todd made a motion, seconded by Director Basili to adjourn the meeting. This motion was passed with a unanimous aye vote. The meeting was adjourned at 7:20 p.m. _____________________________________ Date________________________ Granville Pool- Board President _____________________________________ Date__________________________ Attest: Kate Barrett, Secretary