Loading...
HomeMy WebLinkAboutCC Reso 2026-59 - Updated Fees for Community DevelopmentRESOLUTION NO. 2026-59 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF UKIAH ESTABLISHING UPDATED FEES FOR COMMUNITY DEVELOPMENT DEPARTMENT, BUILDING DIVISION PERMITS AND SERVICES AND AUTHORIZING ANNUAL CPI-U ADJUSTMENTS PURSUANT TO DIVISION 3, CHAPTER 1, ARTICLE 3 OF THE UKIAH CITY CODE WHEREAS: 1.Community Development Department, Building Division permit and service fees have not been updated since 2020; and 2.City staff reviewed the Building Division's revenues and expenditures and determined that existing fee revenues have not consistently kept pace with the cost of providing Building Division services; and 3.Since the Building Division's fees were last adjusted, personnel, operational, administrative, and other costs associated with providing Building Division services have increased; and 4.The City Council has reviewed the proposed amendments to the Building Division fee schedule and finds that a 5% adjustment to the existing fees is reasonable and appropriate to partially address increased costs while avoiding a larger one-time adjustment to permit applicants; and 5.The proposed modifications to Building Permit and Mechanical, Electrical, and Plumbing (MEP) permit fees are set forth in Exhibit A, attached hereto and incorporated herein by this reference; and 6.The City Council further finds that providing for annual inflationary adjustments to Building Division fees will help maintain the purchasing power of the adopted fee schedule, improve the relationship between fee revenues and the cost of providing Building Division services, and reduce the need for larger periodic adjustments resulting from accumulated inflation; and 7.The City Council desires to authorize annual adjustments based on the Consumer Price Index for All Urban Consumers (CPI-U), San Francisco-Oakland-Hayward, All Items, while retaining City Council review when the annual CPI-U increase exceeds 5%; and 8.Division 3, Chapter 1, Article 3 of the Ukiah City Code authorizes the City Council to establish these fees from time to time by resolution; and 9.The City Council conducted a duly noticed public hearing to consider the proposed fees and receive public comments. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ukiah as follows: Section 1. Adoption of Fees. The City Council hereby adopts the updated Building Division permit and service fees set forth in Exhibit A. Section 2. Effective Date. The fees established by this Resolution shall be effective 30 days after adoption. Section 3. Annual CPI-U Adjustment. Beginning July 1, 2027, and each July 1 thereafter, the Building Division permit and service fees established by this Resolution shall be adjusted by the annual percentage change in the Consumer Price Index for All Urban Consumers (CPI-U), San Francisco-Oakland-Hayward, All Items, as published by the United States Bureau of Labor Statistics, measured by comparing the index published for April of the immediately preceding calendar year with the index published for April of the current calendar year. Page 1 of 6 Page 2 of 6 Section 4. Adjustments of 5% or Less. If the annual percentage increase calculated pursuant to Section 3 is 5% or less, the adjustment shall become effective administratively on July 1 without further action of the City Council. Section 5. Adjustments Greater Than 5%. If the annual percentage increase calculated pursuant to Section 3 exceeds 5%, no automatic adjustment shall take effect for that fiscal year. Staff shall return the Building Division fee schedule to the City Council for review and consideration. The City Council may thereafter approve such adjustment as it determines appropriate. Section 6. Annual Monitoring. Staff shall continue to monitor Building Division revenues, expenditures, development activity, and cost-recovery performance. The annual CPI-U adjustment authorized by this Resolution is intended to maintain the purchasing power of the adopted fee schedule and does not preclude the City Council from conducting or directing a comprehensive review of the Building Division fee schedule or modifying the fees at any time as otherwise authorized by law. Section 7. Administrative Implementation. The City Manager, Finance Director, Community Development Director, or their designees are authorized to calculate and implement the annual adjustments authorized by this Resolution and to make corresponding updates to the published Building Division fee schedule. PASSED AND ADOPTED this 19th day of August, 2026, by the following roll call vote: AYES: Councilmembers Crane, Rodin, Criss, Orozco, and Mayor Sher. NOES: None. ABSTAIN: None. ABSENT: None. ___________________________ Susan Sher, Mayor ATTEST: _____________________________ Araceli Sandoval, Deputy City Clerk SUSAN SHER (Aug 25, 2026 10:18:46 PDT) SUSAN SHER Building Fees Sept 21, 2026 1.00 -500.00 110.25 $ 501.00 - 2,000.00 110.25 $ for the first 500.00 plus 4.99 $ for each additional 100.00 or fraction thereof, to and including 2,000.00 2,001.00 - 25,000.00 181.00 $ for the first 2,000.00 plus 22.85 $ for each additional 1,000.00 or fraction thereof, to and including 25,000.00 25,001.00 - 50,000.00 639.22 $ for the first 25,000.00 plus 16.47 $ for each additional 1,000.00 or fraction thereof, to and including 50,000.00 50,001.00 - 100,000.00 1,050.40 $ for the first 50,000.00 plus 11.42 $ for each additional 1,000.00 or fraction thereof, to and including 100,000.00 100,001.00 - 500,000.00 1,622.29 $ for the first 100,000.00 plus 8.98 $ for each additional 1,000.00 or fraction thereof, to and including 500,000.00 5000,000.00 - 1,000,000.00 5,276.50 $ for the first 500,000.00 plus 7.75 $ for each additional 1,000.00 or fraction thereof, to and including 1,000,000.00 1,000,000.00 - And Up 9,151.79 $ for the first 1,000,000.00 plus 5.95 $ for each additional 1,000.00 or fraction thereof Red Taged work w/o permit Permit fee plus 3 times permit fee. Inspections outside of normal business hours 110.25 $ * (mininum charge - Two hours) 110.25 $ * Inspections for which no fee is specifically indicated 110.25 $ * Additional plan review requred by changes, additions or revisions to plans 110.25 $ * For use of outside consulatants for plan checking and inspections, or both. Cost ** Actual Cost * Or the fully burdened hourly rate, inclusive of salary and benefits for each position and overhead costs. Overhead includes the at-cost charge for direct costs and a percentage of City costs according to the most recently adopted Cost Allocation Plan ** Actual cost includes administrative and overhead costs. Reinspection fee Other inspection fees Exhibit A Page 2 of 6 Page 2 of 6 Page 3 of 6 Mechanical Permit Fees Sept 21,2026 For the issuance of each mechanical permit.110.25 $ For issuing each supplemental permit for which the original permit has not expired, been canceled or finaled. 13.52 $ Unit Fee Schedule Furnaces For the installation or relocation of each forced-air or gravity-type furnace or burner, including ducts and vents attached to such appliance, up to and including 100,000 Btu/h (29.3 KW)27.60 $ For the installation or relocation of each forced-air or gravity-type furnace or burner, including ducts and vents attached to such appliance, over 100,000 Btu/h (29.3 KW)33.94 $ For the installation or relocation of each floor furnace, including vent.27.60 $ For the installation or relocation of each suspended heater, recessed wall heater or floor-mounted unit heater.27.60 $ Appliance Vents For the installation, relocation or replacement of each appliance vent installed and not included in an appliance permit.13.52 $ Repairs or Additions For the repair of, alteration of, or additions to each heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption or evaporative cooling system, including installation of controls regulated by the Mechanical Code.25.56 $ Broilers, Compressors and Absorption Systems For the installation or relocation of each boiler or compressor to and including 3 horsepower (10.6kw), or each absorption system to and including 100,00 Btu/h (29.3kw)27.42 $ For the installation or relocation of each boiler or compressor over 3 horsepower (10.6kw), to and including 15 horsepower (52.7kw) or each absorption system over 100,00 Btu/h (29.3kw) to and including 500,000 Btu/h (146.6kw)50.63 $ For the installation or relocation of each boiler or compressor over 15 horsepower (52.7kw), to and including 30 horsepower (105.5kw) or each absorption system over 500,000 Btu/h (146.6kw) to and including 1,000,000 Btu/h (293.1kw)69.47 $ For the installation or relocation of each boiler or compressor over 30 horsepower (105.5kw), to and including 50 horsepower (176kw) or each absorption system over 1,000,000 Btu/h (293.1kw) to and including 1,750,000 Btu/h (512.9kw)103.40 $ For the installation or relocation of each boiler or compressor over 50 horsepower (176kw), or each absorption system over 1,750,000 Btu/h (512.9kw)172.77 $ Air Handlers For each air-handling unit to and including 10,000 cubic feet per mininute (cfm) ( 4719 L/s), including ducts attached thereto. Note: This fee does not apply to an air-handling unit which 19.86 $ is a portion of a factory-assembled appliance, cooling unit, evaporative cooler or absorption unit for which a permit is required elsewhere in the Mechanical Code. For each air-handling unit over 10,000 (cfm) ( 4719 L/s)33.75 $ Evapoorative Coolers For each evaporative cooler other than portable type.19.86 $ Ventilation and Exhaust For each ventilation fan connected to a single duct.13.52 $ For each ventilation system which is not a portion of any heating or air-conditioning system authorized by a permit.19.86 $ For the installation of each hood which is served by mechanicial exhaust, including the ducts for such hood. 19.86 $ Incinerators For the installation or relocation of each domestic-type incinerator.33.94 $ For the installation or relocation of each commercial or industrial-type incinerator.27.05 $ Miscellaneous (Mechanical) For each appliance or pice of equipment regulated by the Mechanical Code but not classed in other appliance categories, or for which no other fee is listed in this code.19.86 $ Other Inspections and Fees (Mechanical) *Inspection outside of normal business hours, per hour (Minimum charge two hours) 110.25 $ *Reinspection fee per inspection.110.25 $ *Inspection for which no fee is specifically indicated, per hour (Minimum charge one half hour) 110.25 $ *Additional plan review required by changes, additions or revisions to plans or to plans which an initial review has been completed. (Minimum charge one half hour) 110.25 $ *Or the total hourly cost to the jurisdiction, whichever is greatest. This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved. Electrical Permit Fees Proposed For the issuance of each electrical permit.110.25 $ For the issuance of each supplemental permit for witch the original permit has not expired, been cancelled, or finaled.13.52 $ System Fee Schedule (note: the following do not include permit issuing fee) New Residential Buildings The following fees shall include all wiring and electrical equipment in or on each building, or other electrical equipment on the same premises constructed at the same time. Multifamily - For new multifamily buildings (apartments and condominiums) having three or more dwelling units constructed at the same time, not incluing area of garages, carports, and accessory buildings, per square ft (0.09m2) 1.01 $ Single and two family - For new Single and two family residential buildings constructed at the same time, not incluing area of garages, carports, and accessory buildings, per square ft (0.09m2)1.01 $ For other types of residential occupancies and for alteration, addations, and modifications to existing residential buildings, use the unit fee schedule. Private Swimming Pools For new private, in-ground swimming pools for single-family and multifamily occupancies, including a complete system of nevessary branch circuit wiring, bonding, grounding, under- water lighting, water pumping and othersimilar electrical equipment directly related to the operation of a swimming pool, each pool.92.32 $ Carnivals and Circuses Carnivals, circuses, or other traveling shows or exhibitions utilizing transportable-type rides, booths, displays and attractions. For electric generators and electrically driven rides, each 43.83 $ For mechanically driven rides and walk-though attractions or displays having electric lighting, each.13.52 $ For a system of area and booth lighting, each 13.52 $ For permanently installed rides, booths, displays and attractions, use the Unit Fee Schedule. For a temporary service power pole or pedestal-mounted receptacle outlets and appurtenances, each 43.83 $ For a temporary distribution system and temporary lighting and receptacle outlets for construction sites, decorative lights, Christmas tree sales lots, fireworks stands, etc. each 22.93 $ Community Development Department -Building Division Existing and Proposed Fees -Mechanical, Electrical, and Plumbing (MEP) Page 4 of 6 UNIT FEE SCHEDULE (Note: The following does not include permit-issuing fee.) Receptacle, Switch and Lighting Outlets For receptacle, switch, light or other outlets at which current is used or controlled, except services, feeders and meters: First 20, each 2.05 $ Additional fixtures, each 1.37 $ Note: For multi-outlet assemblies, each 5 feet (1524 mm) or fraction thereof may be considered as one outlet. Lighting Fixtures For lighting fixtures, sockets or other lamp-holding devices: First 20 fixtures, each 2.05 $ Additional fixtures, each 1.37 $ For pole or platform-mounted lighting fixtures, each 2.05 $ For theatrical-type lighting fixtures or assemblies, each 2.05 $ Residential Appliances For fixed residential appliances or receptacle outlets for same, including wall-mounted electric ovens; counter-mounted cooking tops; electric ranges, self-contained room, console or through-wall air conditioners; space heaters; food waste grinders; dishwashers; washing machines; water heaters; clothes dryers; or other motor-operated appliances not exceeding one horsepower (HP) (746 W) in rating, each 8.85 $ Note: For other types of air conditioners and other motor-driven appliances having larger electrical ratings, see Power Apparatus. Nonresidential Appliances For nonresidential appliances and self-contained factory-wired, nonresidential appliances not sxceeding 1 horsepower (HP), kilowatt (kW) or kilovolt-ampere (kVA), in rating, including medical and dental devices, food, beverage and ice cream cabinets; illuminated show cases, drinking fountains, vending machines, laundry machines, or similar types of equipment, each. Note: For other types of air conditioners and motor-driven appliances having larger electrical ratings, see Power Apparatus.8.85 $ Power Apparatus For motors, generators, transformers, rectifiers, synchronous converters, capacitors, industrial heating, air conditioners and heat pumps, cooking or baking equipment and other apparatus, as follows: Rating in horsepower (HP), kilowatts (kW), kilovolt-amperes (kVA), or kilovolt-amperes-reactive (kVAR): Up to and including 1, each 8.85 $ Over 1 and not over 10, each 22.93 $ Over 10 and not over 50, each 45.89 $ Over 50 and not over 100, each 92.32 $ Over 100, each 138.94 $ Note: For equipment or appliances having more than one motor, transformer, heater, etc., the sum of the combined ratings may be used. Note: These fees include all switches, circuit breakers, contractors, thermostats, relays and other directly related control equipment. Busways For trolley and plug-in-type busways, each 100 feet (30 480 mm) or fraction thereof 13.52 $ Note: An additional fee will be required for lighting fixtures, motors and other appliances that are connected to trolley and plug-in-type busways. Fee not required for portable tools. Signs, Outline Lighting and Marquees For signs, outline lighting systems or marquees supplied from one branch circuit, each 45.89 $ For additional branch circuits within the same sign, outline lighting system or marquee, each 8.85 $ Services For services of 600 volts or less and not over 200 amperes in rating, each 56.89 $ For services of 600 volts or less and over 200 amperes to 1,000 amperes in rating, each 115.90 $ For services over 600 volts or over 1,000 amperes in rating, each 231.79 $ Miscellaneous Apparatus, Conduits, and Conductors For electrical apparatus, conduits, and conductors for which a permit is required but for which no fee is herein set forth 33.94 $ Note: This fee is not applicable when a fee is paid for one or more services, outlets, fixtures, appliances, power apparatus, busways, signs or other equipment OTHER INSPECTIONS AND FEES (Electrical) *Inspection outside of normal business hours, per hour (Minimum charge two hours) 110.25 $ *Reinspection fee per inspection.110.25 $ *Inspection for which no fee is specifically indicated, per hour (Minimum charge one half hour) 110.25 $ *Additional plan review required by changes, additions or revisions to plans or to plans which an initial review has been completed. (Minimum charge one half hour) 110.25 $ *Or the total hourly cost to the jurisdiction, whichever is greatest. This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved. Plumbing Fees Proposed For the issuance of each plumbing permit.110.25 $ For issuing each supplemental permit for which the original permit has not expired, been canceled or finaled. 13.52 $ Unit Fee Schedule Fixtures and vents. For each plumbing fixture or trap set of fixtures on one trap. (Including water, drainage piping and backflow protection thereof)18.28 $ For repair or alteration of drainage or vent piping each fixture.8.85 $ Sewers, Disposal Systems and Interceptors For each building sewer and each trailer park sewer.45.97 $ For each cesspool.69.47 $ For each private sewage disposal system. 138.94 $ For each industrial waste pretreatment interceptor, Including its trap and vent (exception kitchen-type grease interceptors functioning as fixture traps).37.11 $ Rainwater systems per drain (inside building).18.28 $ Water Piping and Water Heaters For installation, alteration, or repair of water piping or water treating equipment, or both, each.8.85 $ For each water heater including vent. (For vents only see Table 3-C).22.93 $ Gas Piping Systems For each gas piping system of one to five outlets. 11.48 $ For each additional outlet over five, each.2.05 $ Lawn Sprinklers, Vacuum Breakers and Backflow Protection Devices Page 5 of 6 For each lawn sprinkler system on any one meter, including, backflow protection devices thereof.27.60 $ For atmospheric-type vacuum breakers or backflow protection devices not included in Item 1: 1 to 5 devices.22.93 $ For over 5 devices, each 4.20 $ For each backflow-protection device other than atmospheric-type vacuum breakers: 2 inches (50.8mm) and smaller.22.93 $ Over 2 inches (50.8mm)45.97 $ Swimming Pools For Each Swimmimg Pool Or Spa. Public Pool 170.16 $ Public Spa 113.28 $ Private pool 113.28 $ Private Spa 56.42 $ Miscellaneous (Plumbing) For each appliance or price of equipment regulated by the plumbing code but not classed in other appliance categories, or for which no other fee is listed in this code.18.28 $ Other Inspections and Fees (Plumbing) *Inspection outside of normal business hours, per hour (Minimum charge two hours) 110.25 $ *Reinspection fee per inspection.110.25 $ *Inspection for which no fee is specifically indicated, per hour (Minimum charge one half hour) 110.25 $ *Additional plan review required by changes, additions or revisions to plans or to plans which an initial review has been completed. (Minimum charge one half hour) 110.25 $ *Or the total hourly cost to the jurisdiction, whichever is greatest. This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved. City Of Ukiah Fees Mandatory Training and Certification surcharge. (based on a % of building permits, plan review, and utility permit fees) 4% Technology and records management surcharge. (based on a % of building permits, plan review, and utility permit fees) 3% General plan update fund. (based on a % of building permits, plan review, and utility permit fees) 15% Temporary certificate of occupancy. (Based on the project size and timeframe. ) (60 Days) > $100,000.00 525.00 $ <$100,000.00 1,050.00 $ Request for alternate materials and methods review. (100% cost recovery fully burdened rate per hour)** Actual Cost Cost Appeal to building regulations appeal board. (Two Hours of Building Official time minimum)** Actual Cost Cost Postage - 3rd party plan check. (100% cost recovery) ** Actual Cost Red Tagged work without permits violation fee ( Permit fee plus violation fee) ** Actual Cost 3 Times New deck/decking. (per square foot) Value Re-roofing shingles only. (per square foot)2.84 $ Re-roof sheathing/ plywood. (per square foot)2.84 $ Temporary structure ( Max 60 days) 236.25 $ Residential Solar permit. Max permit Fee 450.00 to come in to compliance with AB 1414 368.50 $ ** Actual cost includes administrative and overhead costs. Page 6 of 6