Loading...
HomeMy WebLinkAboutCC Reso 2026-56 - Adopting Conflict of Interest Code for Design-Build Construction ProjectsRESOLUTION NO. 2026-56 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF UKIAH ADOPTING AN ORGANIZATIONAL CONFLICT OF INTEREST CODE FOR DESIGN -BUILD CONSTRUCTION PROJECTS WHEREAS: 1. Procuring design -build contracts for construction of projects in the City is a valuable option; and 2. Public Contract Code section 22162(c) requires the City to develop guidelines for a standard organizational conflict -of -interest policy that can be incorporated into and applied in soliciting proposals for design -build projects; NOW, THEREFORE, BE IT RESOLVED as follows: Organizational Conflict of Interest Policy Applicable to Design -Build Projects 1. Purpose The purpose of this Organizational Conflict of Interest Policy ("Policy") is to establish the City of Ukiah's organizational conflict of interest guidelines applicable to design -build projects procured pursuant to Public Contract Code section 22160, et seq. and Federal Procurement Standards 2 CFR 200.319. 2. Authority By this Policy, the City Manager, or his/her designee, of the City (Ukiah) is delegated the authority to make the City's final determination on whether any Proposers have an Organizational Conflict of Interest in a manner consistent with the City Council's general and specific intent set forth herein, consistent with all applicable laws, and in consultation with the City Attorney. The legal basis for this policy is Public Contract Code Sections, 22160-22169, as may be amended from time to time, and such other statutory and regulatory provisions as may be applicable. 3. Policy Contractors and Consultants participating as proposers on a design -build project or joining a design -build team ("Proposers") may not have organizational conflicts of interest. 3.1 Organizational Conflict of Interest Defined Page 1 of 4 Organizational conflicts of interest are circumstances arising out of a Consultant's or Contractor's existing or past activities, business or financial interests, familial relationships, contractual relationships, and/or organizational structure (e.g., parent, entities, subsidiaries, affiliates) that results in: (i) impairment or potential impairment of a Consultant's or Contractor's ability to render impartial assistance or advice to the City or of its objectivity in performing work for the City; (ii) an unfair competitive advantage for any bidder or proposer with respect to a City procurement; or (iii) a perception or appearance of impropriety with respect to any of the City's procurements or contracts or a perception or appearance of unfair competitive advantage with respect to a procurement by the City (regardless of whether any such Exhibit A 2 perception is accurate). While this Policy cannot and does not purport to describe every problematical situation that may arise, the following are examples of circumstances that will constitute an organizational conflict of interest: 3.1.1 A Proposer is the City's general engineering or architectural Consultant to the design -build project, except that a subconsultant to the general engineering or architectural Consultant that has not yet performed work on the contract to provide services for the design -build project may participate as a proposer or join a design -build team if it terminates the agreement to provide work and provides no work for the City's general engineering or architectural Consultant on the design -build project. 3.1.2 A Proposer has assisted or is assisting the City in the management of the design - build project, including the preparation of the request for proposals, evaluation criteria, or any other aspect of the procurement. 3.1.3 A Proposer has conducted preliminary design services for the design -build project such as conceptual layouts, preliminary design, or preparation of bridging documents. 3.1.4 A Proposer performed design work related to the design -build project for other stakeholders in the design -build project. 3.1.5 A Proposer performed design work on a previous contract that specifically excludes it from participating as a proposer or joining a design -build team for the design -build project. 3.1.6 A Proposer is under contract with any other entity or stakeholder to perform oversight of the design -build project. 0 Page 2 of 4 3.1.7 A Proposer has obtained advice from, or discussed any aspect relating to the design -build project or procurement of the design -build project with, any person or entity with an organizational conflict of interest, including, but not limited to, the Consultants of any entity that have provided technical support on the design -build project. 3.1.8 Any circumstances that would violate California Government Code Section 1090, et seq. or the Political Reform Act, Government Code Section 80000, et seq. 3.2 Proposers' Obligations Before Contract Award If a Proposer determines that a conflict of interest or potential conflict of interest exists, Proposers must immediately make a full written disclosure of the conflict or potential conflict of interest to the Purchasing Officer of the City and shall have a continuing obligation to do so until they are no longer Proposers. Such disclosure will not necessarily disqualify a Proposer from being awarded a contract, however, the Proposer shall propose measures to avoid, prevent, or mitigate all potential or actual conflicts. The City Manager, or his/her designee, shall determine whether the proposed measures are sufficient to overcome the conflict or potential conflict and whether the Proposer may continue with the procurement process. In the event the conflict of interest involves the City Manager, or his/her designee, the City Attorney would make the determination. 3.3 Proposers' Obligations After Contract Award The successful Proposer to whom a contract is awarded ("Contractor") has an ongoing obligation to monitor and disclose its conflicts or potential conflicts of interest. The City has a right to ongoing enforcement of this Policy. If an organizational conflict of interest is discovered after contract award, the Contractor must make an immediate and full written disclosure to the City Manager, or his/her designee, that includes a description of the action that the Contractor has taken or proposes to take to avoid or mitigate such conflicts. If an organizational conflict of interest is determined to exist and the Contractor was or reasonably should have been aware of an organizational conflict of interest prior to award of the contract while acting with due diligence to search for such a conflict and did not disclose the conflict, the City may terminate the contract, and Contractor shall disgorge all money paid to it under the Contract, in addition to any other remedies available to the City. If a new conflict of interest arises after contract award, and Contractor's proposed measures to avoid or mitigate the conflict are determined by the City to be inadequate to protect the City, the City may terminate the contract. If the contract is terminated, the City assumes no obligations, responsibilities and liabilities to reimburse all or any portion of the costs incurred or alleged to have been incurred by Contractor and the City further is entitled to pursue any and all available legal remedies. 4. Incorporation By Reference Page 3 of 4 This Policy shall be incorporated by reference into all related Consultant and Contractor design - build solicitations and contracts executed by the City. PASSED AND ADOPTED this 151' day of July, 2026, by the following roll call vote: AYES: Councilmembers Crane, Rodin, Criss, Orozco, and Mayor Sher. NOES: None. ABSENT: None. ABSTAIN: None. ATTEST: Araceli Sandoval, Deput City Clerk L�-t� 2L Susan Sher, Mayor Page 4 of 4 I i