HomeMy WebLinkAboutTransmission Agency of Northern California 1990-03-011 21 3' 4 5i 6 71 8' 9 10' 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 COU No. 8990-001 CONDRIACD an TRANSMISSION AGENCY OF NORTHERN CALIFORNIA PROJECT AGREEMENT NO. 3 FOR THE CALIFORNIA-OREGON TRANSMISSION PROJECT 2/23/90 l 2' 3 i 4 5' 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 221 i 23 24 25! 26 27 28 TRANSMISSION AGENCY OF NORTHERN CALIFORNIA PROJECT AGREEMENT NO. 3 FOR THE CALIFORNIA-OREGON TRANSMISSION PROJECT AMONG THE TRANSMISSI.ON_AGENCY__OF...NOR.THERN CALIFORNIA THE CITY OF ALAMEDA THE CITY OF HEALDSBURG THE CITY OF LODI THE CITY OF LOMPOC THE MODESTO IRRIGATION DISTRICT THE CITY OF PALO ALTO THE PLUMAS-SIERRA RURAL ELECTRIC COOPERATIVE THE CITY OF REDDING THE CITY OF ROSEVILLE THE SACRAMENTO MUNICIPAL UTILITY DISTRICT THE CITY OF SANTA CLARA THE TURLOCK IRRIGATION DISTRICT THE CITY OF UKIAH 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18I 19 20I 21I 22 23 24 25 26 27 28 TRANSMISSION AGENCY OF NORTHERN CALIFORNIA PROJECT AGREEMENT NO. 3 FOR THE CALIFORNIA-OREGON TRANSMISSION PROJECT TABLE OF CONTENTS SECTION PAGE Preamble. . . . . . . . ... . . . . . . . . 1 Recitals. . ..... 1 1 Definitions . . . . . . . . . . . . . . . . . 4 2 Project Participation and Authorization 12 3 Duties and Responsibilities of TANC During Phase II and Phase III . . . . . . . . . . . 15 4 Obligations of Members During Phase II and Phase III . . . . . . . . . . . . . . . . . . . 20 5 Term, Termination, and Amendments 26 6 Default . . . . . . . . . . . . . . . . . 27 7 Use of Transfer Capability . . . . . . . . . 30 8 Scheduling . . . . . . . . . . . . . . . . . 33 9 Insurance and Indemnification 34 10 Compliance with Other Instruments 34 11 Liability of TANC Officers . . . . . . . . . 34 12 Notice and Computation of Time . . . . . . . 35 13 Applicable Law . . . . . . . . . . . . . . . 36 14 Severability . . . . . . . . . . . . . . . . 36 15 Members' Right to Withdraw 36 16 Assignment of Agreement . . . . . . . . . . . 41 17 Members' Obligations Several 41 1 2 3 4 5 6 7 81 9, 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 18 Trustee as a Third Party Beneficiary . . . . 41 19 Appendices . . . . . . . . . . . . . . . . 42 20 Waiver . . . . . . . . . . . . . . . . . . . 42 21 Captions . . . . . . . . . . . . . . . . . . 42 22 Billing and Payment . . . . . . . . . . . . 42 23 Distribution of Assets . . . . . . . . . . . 44 24 Counterparts . . . . . . . . . . . . . . . 44 25 Signatures . . . . . . . . . . . . . . . . . 44 Memorandum of Understanding . . . . . . . . . . APPENDIX A Memorandum of Understanding Annex . . . . . . . APPENDIX B Participation Percentages . . . . . . . . . . APPENDIX C Prescheduling of Transmission Use and Curtailment Notification Procedures . . . . . . . . . . . . . . . APPENDIX D Billing Addresses of the Parties . . . . . . . APPENDIX E- 1 2 3 4 5 6 7 8 9 10 11 12 13'' 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PREAMBLE This Project Agreement No. 3 is made and entered into as of March 1, 1990, by and among the Transmission Agency of Northern California, hereinafter referred to as "TANC"; and the Cities of Alameda, Healdsburg, Lodi, Lompoc, Palo Alto, Redding, Roseville, Santa Clara, and Ukiah; the Sacramento Municipal Utility District; the Modesto Irrigation District; the Turlock Irrigation District;..and.the.Plumas-Sierra Rural.Electric Cooperative RECITALS WHEREAS: A. On December 10-, 1984, TANC was duly established as a •joint powers agency, pursuant to.Section 6500 et seq. of the California Government Code, by an agreement among the Members entitled "Joint Powers Agreement, Transmission Agency of Northern California"; and B. TANC, in its own name, or for the benefit of its Members, has the power to acquire by purchase or eminent domain, construct, finance, operate and maintain facilities for electric power -transmission including, without limitation, the power to purchase, lease, operate, develop, contract for, or own, new or upgraded transmission lines, and facilities for the benefit of the Members; and C. Each Member of TANC owns and operates a system for the distribution of electric power and energy,and is authorized to 1 2 3 4 5 7 8 9 10 11 12 13 14 15 16 17' 18 19 20 21 22 23 24 25 26 27 28 obtain transmission facilities or rights to use transmission facilities for its present or future requirements, through contracts with TANC or otherwise; and D. TANC, on behalf of its Members, executed the December 19, 1984, "Memorandum of Understanding, California - Oregon Transmission Project," among certain California entities and the Western Area Power Administration, which sets forth principles for the development of the California -Oregon Transmission Project -including the designation of TANC as Project Manager; and E. The Members of TANC entered into the June 19, 1985, "Project Agreement" for the purposes of issuing and selling a promissory note for financing studies and other pr.eliminary costs to be incurred prior to making a decision, after environmental and other review, of whether to undertake construction of the California -Oregon Transmission Project; and F. The Members of TANC entered into the September 30, 1985, "TANC Project Agreement No. 2 for the California -Oregon Transmission Project" for the purpose of refinancing the promissory note and to fund certain feasibility and planning studies, and to provide for TANC's share of the costs for Project Development Work for the California -Oregon Transmission Project; and G. TANC, on behalf of its Members, executed the September 30, 1985, "California -Oregon Transmission Project Development Agreement" for the purpose of completing required activities such as'obtaining approvals, certificates, licenses and permits as required by law and regulation before undertaking ) 1 2 3 4 5 6 7 8 9 10 11 12 131 141 15 16 17 18 19 20 21 22 23 24 25 26 27' 28 construction of the Project; and H. TANC, on behalf of its Members, entered into the Memorandum of Understanding Annex dated February 6, 1986, with the initial Participants and additional non --federal public entities which allocated a 3.125 percent Project entitlement I among the additional Participants and re -allocated the remaining entitlement among the initial Participants; and I. The Members of TANC desire to authorize TANC to undertake additional responsibilities as_a Participant in.the California -Oregon Transmission Project on behalf of the Members, and recognize the desire of all Participants in the California - Oregon Transmission Project for TANC to perform the duties of Project Manager, including the duties and responsibilities described in the "Memorandum of Understanding, California -Oregon Transmission Project," and the "Project Participation Agreement," as defined in this Agreement;.and J. On January 20, 1988, TANC certified the Final Environmental Impact Report for the California -Oregon Transmission Project, the Los Banos -Gates Transmission Project, and the Pacific Northwest Reinforcement Project, made findings pursuant to the California Environmental Quality Act, and approved the California -Oregon Transmission Project; and K. Each Member executing this Agreement has participated in the preparation and review of the Draft Environmental Impact Report and has reviewed and approved the Final Environmental Impact Report for the California -Oregon Transmission Project and adopted the findings made by TANC as lead agency for the California -Oregon Transmission Project. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 NOW, THEREFORE, in consideration of the mutual covenants and conditions set forth in this Agreement, TANC and the Members agree as follows: 1. DEFINITIONS Whenever used in this Agreement, the following terms shall have the following meanings. ,The singular of any term shall include the plural and the plural shall include the singular. I 1.1 "Acquisition and Construction Work" - Any work necessary or useful for acquisition and construction of the Project, including procurement of materials and any land or rights in land in connection therewith; and, in addition, that work to be done pursuant to or in the negotiation of the Intertie Agreements for: management and administrative services; economic, legal, engineering, and other activities;.and services which may be necessary or convenient in connection with the Intertie Agreements. 1.2 "Addition" - A new facility, other than a Betterment or Replacement, that is added to the Project, together with associated land rights, if any. 1.3 "Agreement" - This Project Agreement No. 3 among the Members and TANC, as amended and supplemented from time to time in accordance with the terms hereof. .1.4 "Betterment" - A new facility,.other than a Replacement, together with associated land rights, if any, which will increase the "Rated Project Transfer Capability" (as that term is defined in the Intertie Agreements) above the then- 1 2 3 4 5 6 7 8 0 10 11 12 13 14 15 i ' 16 17 18 19 20 21 22 23 24 25 2E 27 2E current Rated Project Transfer Capability or sixteen hundred (1600) megawatts, whichever is less. 1.5 "Closing Date" - The date of each issuance of TANC Project Indebtedness, as determined and announced by written notice from TANC to all TANC Members, as further described in Section 4.1.1. 1.6 "Debt Service" - With respect to any period, the aggregate of the amounts required by each Indenture to be paid during said period into any fund or account created by the Indenture for the sole purpose of paying or providing reserves for paying the.principal (including sinking fund installments) of and premium, if any, and interest on all the Indebtedness from time to time outstanding; provided, however, that Debt Service shall not include any amounts on account of acceleration of the maturity of any Indebtedness. 1.7 "Electric System" - All properties and assets, real and personal, tangible and intangible, of any Member (whether leased or owned) now or hereafter existing, used for or pertaining to the generation, transmission, transformation, distribution and sale of electric capacity and energy, including all additions, extensions, expansions, improvements and betterments thereto and equipping thereof; provided, however, that to the extent the Member is a joint owner of an asset or property, only the Member's ownership interest in such asset or property shall be considered to be part of its Electric System. 1.8 "Executive Committee" - A committee appointed by the TANC Commission to which it may delegate certain responsibilities as provided in resolutions duly adopted by the TANC Commission 1 2 3 4 5 6 7 8 9. 10 11 121 131 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 pursuant to the Joint Powers Agreement. 1.9 "Fiscal Year" - The twelve-month period terminating on September 30 of each year, or any other annual accounting period hereafter selected and designated by TANC as its Fiscal Year for purposes of this Agreement and each Indenture. 1.10 "Indebtedness" - Bonds, notes or other evidences of indebtedness (including, without limitation, contracts relating to letters of credit or other credit enhancement devices and long-term contracts which are characterized as debt by TANC at or prior to execution thereof) issued or otherwise.incurred or entered into by or on behalf of TANC in connection with the Project-. For purposes of this Agreement, Indebtedness shall be considered outstanding as of any date if such Indebtedness has not been paid or if provision for the payment of the principal of and interest on such Indebtedness' has not been made in accordance with the Indenture pursuant to which such Indebtedness has been issued or incurred. 1.11 "Indenture" - one or more indentures or other instruments approved or adopted by TANC providing for the issuance or incurring of Indebtedness. 1.12 "Interest Charge" - That charge against unpaid amounts due and owing in accordance with this Agreement assessed at an annual interest rate compounded monthly equal to the lesser of (i) two percent (2%) plus the applicable first of the month reference rate or successor, of the Bank of America N.T. & S.A., San Francisco, California, in effect from time to time during the period over which the payment is overdue or (ii) the maximum interest rate permitted by law. 1 2 3 4 5 6 7 8 9 10 111 i 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 1.13 "Intertie Agreements" - Agreements related to the Project which have been or which may be entered into by TANC and some or all of the other Participants, which include, but are not limited to, the MOU, the Project Development Agreement, the Project Participation Agreement, any amendments to the foregoing agreements, and other agreements related to the Project entered into by TANC as Project Manager or by TANC on behalf of the Members. 1.14 "Joint Powers Agreement" - The Joint Powers Agreement, Transmission Agency of Northern California, dated December 10, 1984, which established TANC as a joint powers agency pursuant to Section 6500 et seq..of the California Government.Code, as amended and supplemented from time to time. 1.15 "Management Committee" - A committee as described in the MOU and further described in the Intertie Agreements. 1.16 "Member".- Any. of the Cities of Alameda, Healdsburg, Lodi, Lompoc, Palo Alto, Redding, Roseville, Santa Clara, and Ukiah; the Sacramento Municipal Utility District; the Modesto. - Irrigation District; the Turlock Irrigation District; or the Plumas-Sierra Rural Electric Cooperative, which, at any given point in time, is a party to the Joint Powers Agreement and retains its rights and interests under this Agreement. 1.17 "MOU" - The Memorandum of Understanding, California - Oregon Transmission Project, dated December 19, 1984, among the Participants, the Department of Water and Power of the City of Los Angeles, and the California Department of Water Resources, as modified by the Memorandum of Decision of the United States Secretary of Energy, dated February 7, 1985, as interpreted by 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15I 16'. 17 18 19 20 21 22 23 24 25 26 27 28 the letter of the United States Department of Energy Acting General Counsel, dated May 4, 1985, a copy of which is attached i hereto as Appendix A, as amended by the Memorandum of Understanding Annex, and as it may be further amended. 1.18 "Memorandum of Understanding Annex" - The agreement among the Participants, the California Department of Water Resources, and the Department of Water and Power of the City of Los Angeles executed on February 6, 1986 which modified the MOU and allocated a 3.125 percent Project entitlement to certain non- federal public entities set out at 50 Fed. Reg. 42769 (1985.) and simultaneously reduced the existing Participants' entitlements by a corresponding percentage, a copy of which is attached hereto as Appendix B. 1.19 "Operating Agent" - The Participant designated in the I.ntertie Agreements to have the duties and responsibilities for the overall operation and maintenance of the Project. 1.20 "Opposing Member" - A Member which votes against a Betterment or Addition in accordance with Section 3.1.2.2.1 or 3.1.2.2.2. 1.21 "Participants" - Those entities, including TANC, which have interests in the Project through execution of the Intertie Agreements. 1.22 "Participation Percentage" - That percentage of TANC's entitlement to Transfer Capability which an individual Member of TANC has the right to use as set forth in Appendix C of this Agreement. Such percentages may be modified pursuant to Sections 2.3, 3.1.2.2, 6,. and 15. 1.23 "PDA" - Project Development Agreement. 1 2 3 4 5 6 7' 8' 9. 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 1.24 "Phase" or "Phases" - Those activities of the Project described in Section 2.2. 1.25 "Proiect" - The California -Oregon Transmission Project, which consists of electric transmission facilities between California and the Pacific Northwest, as such Project is generally described in, and as changed pursuant to, the Intertie Agreements. 1.26 "Project Development Agreement" - That agreement among the Participants dated September 30, 1985, which provides, inter alia, for the Participants to share the costs of Project Development Work. 1.27 "Project Development Work - That.work described in Appendix A of -the PDA; or consistent with and within the scope of Appendix A of the PDA and approved by the Management Committee to be performed in accordance with the PDA. 1.28 "Pro.ject.Manager" - The entity designated by the parties to the MOU and the Intertie Agreements which has the overall management responsibility for the Acquisition and Construction Work of the Project. 1.29 "Project Participation Agreement" - That agreement which may be executed by those Participants electing to proceed with Phase II and Phase III of the Project, as it may be modified and supplemented in accordance with the terms thereof. 1.30 "Replacement" - A new facility that is intended to be a direct replacement for an existing facility, which is designed primarily to maintain the existing operational reliability or capability of the Project, irrespective of whether the replacement results in an incidental increase in the "Rated 7 81 9 10 11 12 13 14 15 16 17 18 19 all 21 22 23 24 25 26 27 28 Project Transfer Capability" (as that term is defined in the Intertie Agreements), and which results in a "retirement unit" being substituted for another such retirement unit. As used herein, "retirement unit" shall mean property as defined in Section 15060 of the Federal Energy Regulatory Commission Uniform System of Accounts Prescribed for Public Utilities and Licensees Subject to the Provisions of the Federal Power Act, or its successor document. 1.31 "Revenues All income, rents, rates, fees, charges, and other moneys derived by a Member from the ownership or operation of its Electric System, including, without limiting the generality of the foregoing (i) all income, rents, rates, fees, charges, or other moneys derived from the sale, provision, and supply of electric capacity and energy and other services, facilities, and commodities sold, furnished, or supplied through the facilities of the Electric System, (ii) the earnings on and income derived from the investment of such income, rents, rates, fees, charges, or other moneys to the extent that the use of such earnings and income is limited to the Electric System by or pursuant to law and (iii) the proceeds derived by such Member directly or indirectly from the sale, lease, or other disposition of a part of the Electric System as permitted hereby; but the term "Revenues" shall not include customers' deposits or advances subject to refund or contributions in aid of construction until such deposits, advances, or contributions have become the property of the Member. 1.32 "TANG Capital Improvement Costs" - Those costs incurred in connection with Phase III of the Project allocable to 1 2 3 4 5 6 7 8 9 10 11 12 13' 14' 15 16 17 18 19 20 21 22 23 24 25 26 27 28 TANC for the purpose of making Additions, Betterments, or Replacements to the Project and such other costs relating to capital improvements to the Project properly chargeable to TANC pursuant to the Intertie Agreements. 1.33 "TANC Commission" - The governing body of TANC as described in the Joint Powers Agreement. 1.34 "TANC Coordinator" - An entity appointed by TANC to, inter alia, coordinate the Members' use of TANC's entitlement to Transfer Capability. 1.35 "TANC Protect Costs" - Those costs incurred in connection with Phase II of the Project allocable to TANC and such other costs relating to the acquisition and construction of the Project properly chargeable to TANC pursuant to the Intertie Agreements. 1.36 "TANC Project Indebtedness" - That Indebtedness to be issued by TANC to finance TANC Project Costs, TANC Project O&M Costs, TANC Capital Improvement Costs, and such other costs as are described in Section 4.1.3.1. 1.37 "TANC Project O&M Costs" - Those costs incurred in connection with Phase III of the Project allocable to TANC which are necessary to operate and maintain the Project, such other costs relating to the operation and maintenance of the Project properly chargeable to TANC pursuant to the Intertie Agreements, and costs of the TANC Coordinator. TANC Project O&M costs shall not include TANC Project Costs or TANC Capital Improvement Costs. 1.38 "Transfer Capability" - The ability of the Project or a segment thereof to transmit power, expressed in megawatts, as determined in accordance with the Intertie Agreements. As used l� I 2 3' 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 in this Agreement, the term "Transfer Capability" can refer to a rated amount or an amount available at any given time, as appropriate in the context in which such term is used. TANC and its Members acknowledge that there may be times when available Transfer Capability is less than the rated amount for the Project or a segment thereof. 1.39 "Trustee" - Any trustee, including any successor trustee, under an Indenture. I2. PROJECT PARTICIPATION AND AUTHORIZATION 2.1 Scope - TANC is hereby authorized and directed to act Ift on behalf.of the Members in-acL1y.LtJ1es related to Phase II and Phase III of the Project, as more fully described below, as a Participant pursuant to the Intertie Agreements, subject to procedures for Member approval and authorization established by the TANC Commission pursuant to this Agreement and the Joint Powers Agreement. TANC is also hereby authorized to fulfill its duties and responsibilities as Project Manager or under any other management role pursuant to the Intertie Agreements. 2.2 Phases - The Project shall proceed in accordance with *the following activities: 2.2.1 Phase I activities consist of Project Development Work; 2.2.2 Phase II activities consist of Acquisition and Construction Work; 2.2.3 Phase III activities consist of operation, maintenance, Additions, Betterments, Replacements, and the retirement or disposal of the Project. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 2.3 Participation 2.3.1 Pursuant to Paragraph 15 of the Joint Powers Agreement, the Members executing this Agreement each hereby (i) approve TANC's participation in the Project as a Participant in accordance with, and to the extent provided in, the Intertie Agreements and this Agreement and (ii) elect to participate in Phases II and III of the Project in the Participation Percentages set forth in Appendix C, as those percentages may be revised in accordance with this Agreement. In consideration of such approval and election, and payment of its share of the costs set forth in Section 4, each Member shall be entitled to its respective. Participation Percentage share of TANC's entitlement to Transfer Capability on the terms and conditions provided for by this Agreement. In the event that the first.issuance and sale of TANC Project Indebtedness does not occur within six X(6) months after the date of this Agreement, any Member may terminate its participation under this Agreement by giving written notice to TANC, in which case the Participation Percentage of such Member shall be divided pro rata among the remaining Members based on Participation Percentages, unless otherwise agreed to by such remaining Members. After the first issuance and sale of such TANC Project Indebtedness, no Member may terminate its participation in this Agreement. 2.3.2 In the event that TANC's entitlement to Transfer Capability changes from time to time, within sixty (60) days after such change, the Members shall be permitted 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 to revise the Participation Percentages set forth in Appendix C without an amendment to this Agreement, subject. to the following conditions: 2.3.2.1 The Participation Percentages set forth in Appendix C shall govern in the event that the Members are unable to agree to such a revision to Appendix C; 2.3.2.2 No Member shall be required to accept a Participation Percentage which, when multiplied -by TANC's megawatt entitlement to Transfer Capability, would exceed the megawatt amount set forth in the Appendix C, Column D, in which event such excess Participation Percentage.shall be divided pro rata among the other Members based on Participation Percentages, unless otherwise agreed to by such Members; 2.3.2.3 No Member may agree to a Participation Percentage which, when multiplied by TANC's megawatt entitlement to Transfer Capability, would be less than the megawatt amount set forth in Appendix C, Column C; 2.3.2.4 No Member may agree to a Participation Percentage which, when multiplied by TANC's megawatt entitlement to Transfer Capability, would exceed the megawatt amount set forth in Appendix C, Column D, if the effect of such agreement would be to materially, adversely alter any rights of or security for holders of TANC Project Indebtedness. 1 2.3.3 Members acknowledge and agree that, 2 notwithstanding the foregoing provisions, Member defaults 3 may result in a non -defaulting Member accepting a megawatt 4 amount in excess of the limits set forth in Appendix C, 5 Column D. Members also acknowledge and agree that, 6 notwithtstanding the foregoing provisions, no such agreement 7 shall result in aggregate Participation Percentages of the 8 Members of less than one hundred (100) percent. 9 10 3. DUTIES AND RESPONSIBILITIES OF TANC DURING PHASE II AND 11 PHASE III 12 3.1 Decisions - Decisions related to the Project shall be i 13 made by the TANC Commission at meetings to be held at times and 14 places determined by the TANC Commission; provided, that the TANC 15 Commission may delegate decisions to its Executive Committee or 16 others, between meetings, as provided in resolutions duly adopted 17 by the TANC Commission pursuant to the Joint Powers Agreement. i8 3.1.1 The exercise of the rights and obligations of 19 TANC under this Agreement shall be subject to the control at 20 all times of the TANC Commission. 21 3.1.2 Voting - Approvals or authorizations required 22 under this Agreement shall be given or withheld by the TANC 23 Commission using the voting procedures described in the 24 Joint Powers Agreement, subject to the following provisions: 25 3.1.2.1 Phase II Activities - With regard to 26 Phase II activities as described in Section 2.2.2, to 27 constitute a quorum, the combined Participation 28 Percentages of the Members not in default represented 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 '24 25 26 27 28 by the TANC Commissioners present must represent at least sixty (60) percent of the aggregate Participation Percentages of Members not in default at the time of the vote and the action must be approved by TANC Commissioners representing at least a majority of the aggregate Participation Percentages of Members not in default at the time of the vote. 3.1.2.2 Phase III Activities - With regard to Phase III activities as described in Section 2.2.3, to constitute a quorum, the combined Participation Percentages of the Members not in default represented by t least sixty (60) percent of the aggregate Participa- tion Percentages of Members not in default at the time of the vote and the action must be approved by TANC Commissioners representing at least'a majority of the aggregate Participation Percentages of Members not in default at the time of the vote, provided: 3.1.2.2.1 In the event that a Member votes against a proposed Betterment, such Opposing Member shall have no obligations stemming from such Commission action nor shall such Opposing Member have any right to participate in the benefits of such Commission action and, with regard to such benefits and obligations, the Participation Percentage of each Member except for the Opposing Member(s) shall be increased to the ratio between each 1 2 3 4 5 6 7 8 9 10 11 12 13 141 15 16 17 18 19 20 21 22 23 24 25 26 27 28 such Member's Participation Percentage and the aggregate of the Participation Percentages of the Members excluding such Opposing Member's), expressed as a percentage. 3.1.2.2.2 In the event that a Member votes against a proposed Addition to the Project in any. Fiscal Year, and TANC's share of the cost of all Additions previously approved in such Fiscal Year when added to TANC's share of the cost of the proposed Addition exceeds twenty-five million dollars ($25,000,000) adjusted in accordance with changes in the Consumer Price Index (CPI) or successor index using the January 1, 1990, level as the base year, with regard to such Opposing Member's Participation Percentage of such excess amount only, such Opposing Member shall have no obligations stemming from such Commission action nor shall such Opposing Member have any right to participate in the benefits of such Commission action. With regard to the rights and obligations associated with such excess amount, the Members excluding such Opposing Member(s) shall negotiate appropriate adjustments to their Participation Percentages. 3.1.2.2.3 In the event that a Member votes against a proposed Replacement, 1 2 3 I 4 5 6', 7 81 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 such. Member shall nevertheless be bound by the outcome of such Commission action. 3.1.2.2.4 Nothing contained herein is intended to relieve any Member from its obligations resulting from Commission action except as specifically provided in Sections 3.1.2.2.1 and 3.1.2.2.2. 3.1.2.2.5 Each agreement by the Members with respect to Betterments or Additions shall specifically recognize TANC's rights under this Agreement which secure TANC Project Indebtedness. 3.2 Specific Duties and Responsibilities - TANC, through the approval of the TANC Commission, shall be empowered to perform all duties appropriate for the implementation of Phase II and Phase III of the Project, subject to .the terms hereof, including but not limited to: 3.2.1 Act as Project Manager or in any other managerial role for the Project in accordance with the Intertie Agreements; 3.2.2 Authorize (i) the issuance or incurrence of Indebtedness and the appropriate documentation related thereto, (ii) the contract of purchase or notice of sale or other instrument under which Indebtedness is to be sold or incurred, (iii) the selection of managing underwriters for Indebtedness (if such Indebtedness is to be sold upon a negotiated basis), and (iv) the manner and timing of marketing (including the manner of sale), if applicable, 1 2 3 4 5 6 7 8 9 10 11 12 13 14� 15� 16' 17 18 19 20 21 22 23 24 25 26 27 28 interest rates, and other terms of Indebtedness; 3.2.3 Provide periodic reports of major construction and major events to the Members with respect to the Project; 3.2.4 Review, discuss, and attempt to resolve any disputes among TANC and/or the Members; 3.2.5 Negotiate, review, approve, execute, enforce and modify Intertie Agreements as a Participant on behalf of the Members for Phase II and Phase III and perform all activities necessary to fulfill TANC's obligations as a Participant under those agreements; 3.2.6 Approve and engage consultants or advisors on financial, economic, engineering, environmental, management, and legal or other matters; . 3.2.7 Review, modify, and approve TANC's insurance program including, without limitation, the establishment of a self-insurance program; 3.2.8 Incur costs, liabilities, and obligations; 3.2.9 Purchase, sell, rent, and lease equipment, apparatus, materials, and supplies and establish and maintain inventories of any of the foregoing; 3.2.10 Acquire by purchase or eminent domain any interest in property, real or personal; 3.2.11 Enforce, waive, adjust or compromise any claim by or against TANC, including claims covered by or relating to insurance policies; 3.2.12 Initiate, defend, and otherwise participate in legal and administrative proceedings; 3.2.13 Maintain for Member inspection and audit for 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 the term of this Agreement, and for three (3) years thereafter, books and cost records of TANC in accordance with generally accepted accounting principles; 3.2.14 Perform other tasks as may be necessary to fulfill its obligations as a Participant, as Project Manager, and in any other managerial role under this Agreement and the Intertie Agreements during Phase II and Phase III of the Project in a timely, cost effective manner. 4. OBLIGATIONS QDURIN.G PHASE II AND PHASE III 4..1 TANC Project Costs - Subject to Section 3.1.2.2, each Member agrees -to pay, based on its Participation Percentage, its portion of TANC Project Costs, its portion of TANC Project O&M Costs, its portion of TANC Capital Improvement Costs, and its portion of Debt Service on TANC Project Indebtedness, in each. case as provided in this Section 4.1: 4.1.1 At least sixty (60) days prior to the -initial Closing Date and at -least sixty (60) days prior to the commencement of each Fiscal Year thereafter, the TANC Commission shall develop, approve, and distribute to the Members a budget for TANC Project Costs, Debt Service for TANC Project Indebtedness, TANC Project O&M Costs, and TANC Capital Improvement Costs which the TANC Commission estimates will be incurred during the then -current Fiscal Year in the case of, the initial budget and during the next succeeding Fiscal Year for all subsequent budgets. Such budgets shall be generally based upon budgets approved by the Management Committee and upon TANC's estimates of TANC m. 10 11 12 13 14 15 16 17 18 19 2C 21 2� 2-- 2e 2! 2( 2i i 2f Project Costs, Debt Service for TANC Project Indebtedness, TANC Project 0&M Costs, and TANC Capital Improvement Costs; provided, that if a budget has not been approved by the Management Committee the budget shall be based upon TANC's estimates. Each budget other than the initial budget shall also include a variance report which compares actual expenditures with budgeted amounts for the previous Fiscal Year. As soon as practicable after the approval of each such budget, TANC shall mail the budget to.the Members. Members acknowledge and agree that Participant defaults or withdrawals that result in changes in TANC's ownership interest in -the Project will require changes in TANC's payment obligations under the Intertie Agreements approximately proportionate to the change in TANC's entitlement to Transfer Capability and a corresponding change in the Members' payment obligations hereunder. TANC; if requested by any Member, will make best efforts to remarket any entitlement to Transfer Capability that such Member or its designated agent may determine to be in excess of that Member's requirements. Remarketing efforts will be focused on the other Members, the Western' Area Power Administration, the California Department of Water Resources, and other Participants. Members also acknowledge and agree that some anticipated Participants may elect not to enter into the Intertie Agreements for Phase II and Phase III of the Project and that this Agreement is intended to permit the Project to be constructed without such anticipated Participants so that TANC's ownership interest 1 2 3 4 5 6 7 8 9 10 11 12! 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 in the Project, and thus the amount of Transfer Capability to which each Member shall be entitled pursuant to this Agreement, will vary depending on the final ownership interests established for TANC and the other Participants pursuant to the Intertie Agreements. TANC currently anticipates that, at the time of execution of the Intertie Agreements, the Intertie Agreements will establish TANC's initial ownership interest in the Project at a minimum of 42.2916% and a maximum of 93.75%. 4.1.2 Each of the Members hereby approves the issuance and sale of TANC Project Indebtedness as provided in Section 4.1.3.1 below subject to approval of the TANC Commission pursuant to Section 3.1.2. Such approvals are intended to be and are limited to the approvals.required by Paragraphs 6 and 15 of the Joint Powers Agreement. Such Indebtedness shall not constitute a debt, liability.or obligation of any of the Members and shall not constitute a debt of TANC payable by the Members pursuant to Paragraph 21 of the Joint Powers Agreement. 4.1.3 Subject to Section 3.1.2.2, each of the Members hereby severally requests and agrees as follows: 4.1.3.1 Each Member requests that TANC issue, sell, or otherwise incur Indebtedness from time to time pursuant to the provisions of Chapter 5, Division 7, Title 1 of the Government Code of the State of California or any other applicable provisions of law in amounts which will be sufficient to permit TANC to pay, when due, all TANC Project Costs, TANC 1 2 3 4 5 6 7 8 9 10 11 121 131 141 15' 16, 17'. 18 19 20 21 22 23 24 25 26 27 28 Project 0&M Costs through the first full Fiscal Year after completion of the Project, TANC Capital Improvement Costs, costs of issuance, credit enhancements and other costs incurred in connection with the issuance or incurring of TANCProject Indebtedness, and to provide for capitalized interest as determined by TANC and for required deposits to funds and accounts established by each Indenture and, in addition, to provide for the principal and interest on all Indebtedness outstanding on the initial Closing Date (all of said Indebtedness to constitute TANC Project Indebtedness). Whenever TANC deems it beneficial to the Members, as a result of Debt Service savings or otherwise, upon approval of the TANC Commission, TANC may issue Indebtedness to refund outstanding TANC Project Indebtedness (which the Members hereby authorize) and the same shall be TANC Project Indebtedness. 4.1.3.2 Each Member severally agrees to pay to ANC an amount equal to its Participation Percentage of all Debt Service on the TANC Project Indebtedness to enable TANC to pay such Debt Service at the times and in the manner set forth in the applicable Indentures. Each Member also agrees to pay to TANC, in accordance with ction 22 an amount equal to its Participation Percentage of TANC Project Costs, TANC Project O&M Costs, and TANC Capital Improvement Costs, not financed by TANC Project 11 3 4 5 6 7 8 9 10 11 12 13 14 151 16'I 17 18 19 20 21 22 23 24 25 26 i 27 28 Indebtedness as indicated in the budgets prepared pursuant to Section 4.1.1, including any budget revisions made pursuant to Section 4.1.5. 4.1.3.3 Upon failure of a Member to make any o p y tF"'h ments described in Section 4.1.3.2, TANC shall make demand upon such Member, and if said failure is not remedied within forty-five (45) days from the date of such demand, it shall constitute a default at the expiration of such forty-five (45) day period. Such default shall be handled in accordance with Section 6. Notice of such demand shall be provided to the other Members. 4.1.3.4 Each Member agrees to establish ra nd charges for its Electric System so.as to provide Revenues sufficient, together with other available funds derived from its Electric System, to pay, when due, all amounts payable by such Member under this Agreement and to pay all other amounts payable from, and all lawful charges. against or liens upon, the Revenues of its Electric System. 4 4.1.3.5 Each Member shall be obligated to make payments under this Section 4.1.3 and to budget for such payments solely from the Revenues of, and as an operating expense of, its Electric System. Each Member shall make the payments required of it by this Agreement in the amounts and at the times determined pursuant to this Agreement and such payments and the obligation to make same shall be absolute and 10 11 12 13 i 14 15 16 17 16 19 20 21 22 23 24 2E 2E 27 2E unconditional and such payments shall be made whether or not the Project or any part thereof has been completed, is operating or operable or its output or capability is suspended, interrupted, interfered with, reduced or curtailed, or terminated in whole or in part, and such payments shall not be subject to reduction whether by offset, counterclaim, recoupment or otherwise and shall not be conditioned upon the performance or nonperformance by any party to any agreement or for any other cause or reason whatsoever. 4.1.3.6 Each Member covenants and agrees that shall,. at all times so long as any TANC Project Indebtedness remains outstanding, operate the properties of its Electric System and business in connection therewith in an efficient manner and at a reasonable cost and shall maintain its Electric System in good working order and condition, and shall cooperate with TANC in the performance of the respective obligations of TANC and such Member under this Agreement. 4.1.3.7 Each Member agrees that all rights, title, and interest of TANC in and to all payments required to be made under this Section 4.1.3 by the Members pursuant to the provisions hereof may be pledged and assigned under the Indentures to secure the TANC Project Indebtedness. 4.1.4 Funds received by TANC from the issuance and sale of TANC Project Indebtedness shall be applied to one or 1 2 3 4 5 6 7 8 9 10. 11 12 13 14 15 16 17 18 19 20 21 22' 23 24I 25 26 27. 28 more of the purposes specified in Section 4.1.3.1 in accordance with the Indenture authorizing such TANC Project Indebtedness. 4.1.5 TANC may, from time to time, revise the budgets established pursuant to Section 4.1.1 as necessary. Such budgets shall include adjustments for variances between estimated and actual costs included in previous budgets. In that event, subject to Section 3.1.2, the procedures of Sections 4.1.2 through 4.1.4 shall be followed for payment of any additional costs. 5. TERM, TERMINATION, AND AMENDMENTS 5.1 Term - This Agreement shall take effect as of the date hereof and shall remain in full force and effect during the. term of the Joint Powers Agreement and the Intertie Ag.reements (as their terms may be extended) or so long as any TANC Project Indebtedness remains outstandina. whichever is longer. 5.2 Termination - This Agreement shall not be subject to termination by TANC or any Member under any circumstances, whether based upon the default of any party under this Agreement, orany other instrument, or otherwise. 5.3 Amendments - So long as any TANC Project Indebtedness is outstanding, this Agreement may be amended, modified, or otherwise changed or rescinded, except as provided in the applicable Indentures, so long as such amendment, modification, change, or rescission would not materially, adversely. alter any rights of or security for holders of such Indebtedness. Except as, provided in Section 8.3, this Agreement may be amended only by i 1 2 3 4 5 6 7 8 9 10 11 12 13'. 141 15' L 16 17 18 19 20 21 22 23 24 25 26 y 27 28 jthe written agreement of all of the parties hereto. 16. DEFAULT 6.1 Defaulting Member's Participation Percentage - Upon the failure of any Member or, with respect to its obligations under Section 15, a.former Member who has withdrawn, to meet its obligations hereunder, TANC shall give written notice of the failure to such Member or former Member who has withdrawn and, if such failure has not been cured within forty-five (45) days after the date of such notice, it shall constitute a default at the expiration of such forty-five (45) day period. Upon such default, in addition to the rights and remedies available to TANC pursuant to Section 6.2, TANC may protect and enforce its rights hereunder by suit or suits in equity or at law, whether for the specific performance of any covenant herein or for damages or in aid of the execution of any power granted herein or any other remedy available under any provision of applicable law. No remedy by the terms of this Agreement conferred upon or reserved to TANC is intended to be exclusive of any other remedy, but each and every such remedy shall be cumulative and shall be in addition to every other remedy given under this Agreement or existing at law or in equity or by statute on or after the effective date of this Agreement. 6.2 Nondefaulting Member's Participation Percentage - Upon any default described in Section 4.1.3.3, the defaulting Member shall no longer be entitled to any rights granted to the Members with respect to the -Project, and each Member severally agrees that the Participation Percentage of each nondefaulting Member 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 shall be automatically increased as follows: 6.2.1 Each Member severally agrees that the Participation Percentage of each nondefaulting Member shall be automatically increased to the ratio between such nondefaulting Member's Participation Percentage and the aggregate of the Participation Percentages of the nondefaulting Members, expressed as a percentage. For purposes of this Section 6.2.1 and Section 6.2.2, the term "Member" shall include, but not be limited to, each former Member who has withdrawn.from TANC and converted its Participation Percentage of TANC's entitlement to Transfer Capability to an ownership interest in the Project -pursuant to -Section 15, and the term "Participation Percentage" shall mean that percentage which would represent such withdrawn Member's Participation Percentage of TANC's entitlement to Transfer Capability if such conversion had not occurred. 6.2.2 Notwithstanding the provisions of Section 6.2.1, the cumulative increase for any nondefaulting Member pursuant to this Section 6.2 shall not exceed twenty-five percent (250) of its Participation Percentage in effect immediately prior to the first default without the consent of the Member; provided, that for purposes of determining such cumulative increase any increase (i) pursuant to Section 2.3 or 3.1.2.2, or (ii) which results because a Member has withdrawn from TANC and converted its Participation Percentage of TANC's entitlement to Transfer Capability to an ownership interest in the Project pursuant to Section 15, shall not be considered. The nondefaulting 2 3' 4 5 6 7 8 9 10 11 12 13 i 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Members shall be entitled to the rights which the defaulting Member loses upon the default and shall assume subject to Section 6.3 all of the obligations of the defaulting Member with respect to such rights hereunder. Increases in the Participation Percentages of the nondefaulting Members shall be applicable to any payments due and not paid by the defaulting Member at the time of the increase and all subsequent payments due and not paid by the defaulting Member. 6.3 Defaulting Member's Obligations - Each Member agrees that increases in the obligations of other Members pursuant to Section 6.2 shall not relieve the defaulting Member or -a former. Member who has withdrawn, of its liability for its obligations described hereunder. The nondefaulting Members shall have a right of recovery from the. defaulting Member to the extent of increases in their obligations resulting from such default.(plus interest at the Interest Charge) from the date of such default until paid. 4 Tax Covenant - Notwithstanding any other provision of h' greement, no Member shall transfer, assign, sell or exchange any portion of its Participation Percentage of TANC's entitlement to Transfer Capacity, or any other interest in the Project or the capacity or capability thereof, directly or indirectly, in any manner, or shall take, or to the extent it can control the same permit to be taken, any other action or actions, which would adversely affect the exclusion of the interest on any of the TANC Project Indebtedness from gross income for federal income tax purposes under Section 103 of the Internal Revenue 1! 21 3 4 6 71 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Code of 1986, as amended, and the applicable regulations thereunder (or any successors to such statute and regulations), including without limitation, by reason of classification of such TANC Project Indebtedness as a "private activity bond" within the (meaning of said Code. 17. USE OF TRANSFER'CAPABILITY 7.1 Member Use of Transfer Capability - Subject to the provisions of this Section 7, Section 6.4, and .Section 8 hereof, each Member shall have the right to use its Participation Percentage of TANC's entitlement to Transfer Capability.for any purpose, including holding such Transfer Capability in reserve or making such Transfer Capability available to a Member, Participant, or other entity, subject to the terms and conditions relating to assignments and layoffs by Participants under the Intertie Agreements; provided, that before a Member may make unneeded Transfer Capability available to a non -Member, it shall make such Transfer Capability available to the other Members on terms and conditions which are established by the TANC Commission. Nothing in this Section 7.1, however, shall prohibit a Member or its designated agent from requesting that the TANC Coordinator make all or part of such Member's unused Transfer Capability available to other Members on behalf of such Member. 7.2 Non -Member Use of Transfer Capability - Each Member or its designated agent shall notify the TANC Coordinator in the event that it does not need all or a portion of its Participation Percentage of TANC's entitlement to Transfer Capability and no other Member needs such Transfer Capability. In such event, the I TANC Coordinator shall then make such Transfer Capability 2 available to the other Participants pursuant to the provisions of 3 the Intertie Agreements. Otherwise, each Member or its 4 designated agent shall determine the disposition of its unneeded 5 Transfer Capability, which may include directing the TANC 6 Coordinator to make such Transfer Capability available to any 7 entity on such terms and conditions as such Member or its 8 designated agent may direct. 9 7.2.1 Compensation - Compensation.for the use of a 10 Member's Participation Percentage of TANC's entitlement to 11 Transfer Capability by other Participants will be as set 12 forth in the Intertie Agreements. In the event that the 13 provisions of the Intertie Agreements do not apply to the 14 transaction, compensation shall be as determined by each 15 Member making such Transfer Capability available. 16 7.2.2 Allocation of Revenue - Payments for the use 17 of TANC's unneeded entitlement to Transfer Capability by 18 non -Members -shall be collected by TANC and promptly and 19 fully credited directly to the Member making such Transfer 20 Capability available. Each such Member agrees that all 21 right, title, and interest of such Member and TANC in and to 22 such payments may be pledged and assigned under the 23 Indentures to secure payments required to be made under 24 Section 4.1.3 by or on behalf of such Member. 25 L.3 ? J40OU La offs - In accordance with Sections 10.1 and J10.2 of the MOU as implemented by the Intertie Agreements, TANC 27 shall lay off a portion of its entitlement to Transfer 28 Capability. Compensation to TANC by those entities receiving the 1 21 3 41 5 6 7 8 9 10 14' 15 16i 17 18 19 20 21 22 23 24 25 26 27 28 layoff is to be based on TANC's Project Cost including financing plus contingencies of twenty-five (25) percent. 7.3.1 Unless otherwise agreed by the Members, each Member shall provide its portion of such layoffs in accordance with the Member's Participation Percentage. 7.3.2 Payments for the layoff of TANC's entitlement to Transfer Capability as described in Sections 10.1 and 10.2 of the MOU shall be collected by TANC and promptly and fully credited to the Members based on each Member's Participation Percentage unless otherwise agreed by the Members. Each such Member agrees that all right, title, and interest of such Member and TANC in and to such payments may be pledged and assigned under the Indentures to secure payments required to be made under Section 4.1.3 by.or, on behalf of such Member. 7.4. In the event that a-Member's Participation Percentage of TANC's entitlement to Transfer Capability converted to (megawatts exceeds the megawatt amount in Appendix C, Column E, !layoffs made by TANC pursuant to Sections 7.2 and 7.3 shall first i be made from such excess amount if so requested by that Member. If more than one Member has such an excess amount and the sum of all such excess amounts exceeds the amount of the layoff, the layoff shall be made pro rata based on the ratio between each such requesting Member's excess amount and the sum of all such requesting Members' excess amounts. 7.5 Notwithstanding anything to the contrary contained in this Section 7, no layoff of Transfer Capability made pursuant to this Section 7 shall excuse a Member from making the full 1 2 3 4 5 6 7 8 9 10 11 I 121 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 payments required by Section 4 hereof nor reduce the amount or extend the time of such payments. 8. SCHEDULING 8.1 Member Scheduling Rights - During any scheduling period, each Member or its designated agent shall have the right to schedule power transactions using Transfer Capability up to the amount of its Participation Percentage of TANC's entitlement to Transfer Capability, subject to the provisions of Section 7 of this Agreement. Each Member or -its designated agent may also schedule power transactions over any additional percentage of Transfer Capability that it has a right to use. Notwithstanding the provisions of Section 8.2, each Member or its designated agent shall have the right to schedule.such transactions pursuant to its separate agreements with other entities. All power scheduled over the Project shall -be in whole megawatt amounts or as otherwise set forth in the Intertie Agreements. 8.2 Project Use Information Coordination - Each Member or its designated agent shall provide the TANC Coordinator with Project use information required to meet TANC's obligations under the Intertie Agreements as a Participant in the Project. The TANC Coordinator shall submit such information to the Operating Agent in accordance with such agreements. 8.3 Scheduling and Curtailment Procedures - Specific procedures which implement the provisions of this Section 8 and Section 7 hereof are set forth in Appendix D. The Members and their designated agents agree to comply with such procedures, as they may be modified from time to time by a vote of the TANC 1' 2 3 4 51 61 7I 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Commission pursuant to Section 3.1.2. 9. INSURANCE AND INDEMNIFICATION TANC shall maintain, or cause to be maintained in force, insurance as may be determined prudent in the judgment of the TANC Commission and as may be required by the provisions of the Intertie Agreements and any Indenture. TANC shall indemnify, defend, and hold harmless each Member, and its governing board members, officers, employees and agents, from any liability for personal injury, death, or property damage arising out of the negligent activities of TANC pursuant to this Agreement or the Intertie Agreements. 10." COMPLIANCE WITH OTHER INSTRUMENTS It is recognized by the parties hereto that, for.the benefit of the Members, TANC, in"undertaking, or causing to be undertaken, the planning, licensing, financing, construction, and operation of TANC's share of the Project, must comply with the requirements of each Indenture, the Intertie Agreements, all applicable licenses, permits, and regulatory approvals necessary therefor, and the Joint Powers Agreement. 11. LIABILITY OF TANC OFFICERS 11.1 Release - Each Member agrees that TANC's Commissioners, officers, and employees shall not be liable to the Members for direct, indirect or consequential loss or damage suffered by the Members as a result of (i) the performance or nonperformance by TANC under any Intertie Agreements or (ii) the 1 2 3 41 5 6 711 8' 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 performance or nonperformance of TANC under this Agreement. Each Member releases TANC's Commissioners, officers, and employees from any claim or liability (whether negligent or otherwise) as a result of any actions or inactions of TANC under this Agreement or the performance or nonperformance by TANC under any Intertie jAgreement. 11.2 No Modification - The provisions of this Section 11 shall not be construed so as to relieve TANG of any obligations under any of the Intertie Agreements and the provisions of this Section 11 shall not be construed to modify or amend Paragraph 2 of the Joint Powers Agreement. 12. -NOTICE AND COMPUTATION OF TIME 12.1 Manner of Notices - Any notice or demand by a Member to TANC under this Agreement shall be deemed properly given if deposited in the United States mail first class postage prepaid or its equivalent, or sent via facsimile or other electronic media and confirmed by telephone or in writing within twenty- four (24 hours), addressed to TANC at its operational office; any notice or demand by TANC to any Member under this Agreement shall be deemed properly given if deposited in the United States mail first class postage prepaid or its equivalent, or sent via facsimile or other electronic media and confirmed by telephone or in writing within twenty-four (24 hours), addressed to the addressee shown on the signature pages hereof at the address shown in Appendix E. The designations of the name and address to which any such notice or demand is directed may be changed at any time and from time to time by any party giving notice as above 1 21 3� 4I 5' 6, 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 provided in this Section. 12.2 Time Computed - In computing any period of time from such notice, such period shall commence on the date mailed or, if sent via facsimile or other electronic media, on the date sent. 13. APPLICABLE LAW This Agreement is made under and shall be governed by the laws of the State of California. 14. SEVERABILITY If any section, paragraph, clause, or provision of this Agreement, or any part thereof, shall be finally adjudicated by a court of competent jurisdiction to be invalid, the remainder of this Agreement shall remain in full force and effect as though such section, paragraph, clause, or provisions or any part thereof so adjudicated to be invalid had not been included herein. 15. MEMBER'S RIGHT TO WITHDRAW 15.1 Conversion of Participation Percentage to Undivided Ownership Interest - TANC's undivided ownership interest in the Project shall constitute rights or property acquired and owned by TANC and no Member shall have an ownership interest in the Project except upon withdrawal from TANC and conversion of its Participation Percentage to an undivided ownership interest as provided herein. After the commercial operation date of the Project, each Member not then in default shall be entitled to withdraw from TANC and convert its Participation Percentage into 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 an undivided ownership.interest in the Project. Such Member's undivided.owner.ship interest shall be equal in amount to its Participation Percentage multiplied by TANC's then undivided ownership interest in the Project. Upon such withdrawal and conversion, at the express written request of the withdrawing Member, TANC shall make best efforts to take such administrative actions, including the execution of such documents and amendments to the Intertie Agreements, as may be reasonably requested by the withdrawing Member to establish and evidence such Member's undivided ownership interest in the Project and such Member's role as a Participant under the Intertie Agreements, and all reasonable administrative and legal costs associated with such unopposed. withdrawal and conversion shall be the responsibility of such.withdrawing Member. Each Member electing to withdraw . from TANC and so'convert its Participation Percentage shall hold its ownership interest as a tenant in common with TANC and the other Participants as set forth in the Intertie Agreements. 15.2 Procedure and Conditions - Notwithstanding Paragraphs 19 and 20 of the Joint Powers Agreement, a Member may withdraw from TANC and convert its Participation Percentage into an undivided ownership interest in the Project by recruestinq that TANC assign to the Member an undivided ownership interest in -the Project as provided in Section 1 1 rights, interest, and obligations related thereto, and by giving written notice to TANC and all other former Members that have withdrawn at least one (1) i year in advance of the noticed effective date of withdrawal; provided that: 15.2.1 TANC shall have one hundred eighty (180) days, 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18' 19 201I 21 22 23 24 25 26 27 28 from written notice given pursuant to Section 15.5, to exercise a right of first refusal to any rights, interests, and obligations -in the Project (in whole or in part) which a former Member that has withdrawn determines to sell, transfer, assign, or otherwise dispose of pursuant to a bona fide written offer. in the event that any former Member that has withdrawn ceases to exist as a public agency, as defined in Section 6500 of the California Government Code, then all rights, interests, and obligations of such former Member in the Project which were derived through TANC shall, at TANC's option, revert to TANC in exchange for TANC assuming such former Member's remaining obligations in the Project; provided, that such former Member that has withdrawn has not sold, assigned, or otherwise disposed of its rights, interests, and obligations prior. to .the date. such Member. ceases to -exist as a public agency; provided further, that any former Member that has withdrawn has the right to sell, assign, or otherwise dispose of its rights, interests, and obligations to anyone as long as the sale does not violate the provisions of Section 6.4. 15.2.2 Former Members who have withdrawn shall have a right of first refusal in any right or interest in the - Project (in whole or in part) which TANC or a TANC Member determines to sell, transfer or assign to a non -Member. The rights and obligations of former Members who have withdrawn with respect to layoffs of Transfer Capability shall be as prescribed in Section 7 of this Agreement; 15.2.3 Except as provided in this Section 15, a 1 2 3 4 5' 6 7' 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 withdrawal shall have no adverse effect on the rights and obligations under the MOU of TANC, its Members, and other former Members who have withdrawn, as those rights and obligations exist on the date of execution of this Agreement; 15.2.4 A former Member who has withdrawn shall meet its pro rata share of TANC's layoff obligations under Section 7.3 of this Agreement; and 15.2.5 Neither the withdrawal of a Member from TANC nor the conversion of its Participation Percentage of TANC's entitlement to Transfer Capability to an undivided ownership interest in the Project pursuant to Section 15.1 shall relieve such Member of any of its obligations to make payments with respect to Debt Service on TANC Project Indebtedness at -the times and in the amounts specified in Section 4.1.3.2, as though such conversion had not occurred, including any amounts due thereunder as a result of an increase in such Member's Participation Percentage pursuant to Sections 2.3, 3.1.2.2, and 6.2. In addition, neither shall such action relieve the withdrawing Member of any of its obligations pursuant to Section 6.4, nor affect the rights of TANC to pursue its remedies under Section 6 against such former Member who has withdrawn. 15.2.6 Prior to withdrawal and conversion pursuant to this Section 15, a withdrawing Member shall execute such instruments and take such actions as TANC may reasonably request to protect the continuing rights of TANC in the interest transferred as set forth in this Agreement. 1 2 3 4 5'. 6' T 8'I 9,I 10'. 11 12 13 141 15 16I 17i 18 19 20 21 22, 23 24I 25I 26 27 26 15.3 Inclusion in Intertie Agreements - Implementation of this Section 15 is subject to the provisions of all applicable Intertie Agreements. TANC shall make best efforts to include in all applicable Intertie Agreements, as necessary, provisions to recognize and authorize the rights and obligations of TANC and Members who may elect to withdraw under this Section 15. 15.4 No Right to Partition - Each Member waives any rights it may have to partition TANC's ownership interest in the Project and agrees not to seek or to file any action in law or in equity to partition such interest. The Members agree that their sole right and procedure to obtain an ownership interest in the Project separate and apart from TANC is pursuant to this Section 15. 15.5 Notice - Pursuant to the provisions of Section 15.2, any former Member who has withdrawn shall have the. obligation to notify TANC and all other former Members who have withdrawn of its intent to sell, transfer, or assign its interest in the Project (in whole or in part). 15.6 Inclusion in Subsequent Project Agreements - Unless otherwise agreed by the Members, the provisions of this Section 15 shall be included in any subsequent TANC "project agreement" (as that term is defined in the Joint Powers Agreement) pertaining to the subject matter hereof. 15.7 Adjustment of Participation Percentages - Except as otherwise provided in Section 15.2.5, upon the withdrawal of a Member and conversion of its Participation Percentage to an undivided ownership interest pursuant to this Section 15, the Participation Percentage of each remaining Member which has not 1 2 3 4 5 6 7 8 9 10 11 12 13 14'. 15 16 17 18 19 20 21 22 23 24 25 26 27 28 so withdrawn and converted shall be automatically increased to the ratio between such remaining Member's Participation ;Percentage and the aggregate of the Participation Percentages of all such remaining Members, expressed as a percentage. 16. ASSIGNMENT OF AGREEMENT 16.1 No Assignment While TANC Project Indebtedness Outstanding - This Agreement shall inure to the benefit of and shall be binding upon the respective successors and assigns of the parties to this Agreement; provided, however, that, except as provided in Sections 4.1.3.7, 7.2.2, 7.3.2, and 15, neither this Agreement nor any right or interest herein shall be transferred or assigned by any party hereto so long as any TANC Project Indebtedness is outstanding. 16.2 Assignment Prior to Withdrawal - Unless a Member has withdrawn from TANC pursuant .to Section 15 of this Agreement, any assignment, in whole or in part, of a Member's Participation Percentage or individual ownership interest to a person or entity which is not a member of TANC is subject to paragraph 19 of the Joint Powers Agreement. 17. MEMBERS' OBLIGATIONS SEVERAL The obligation of each Member to make payments under this Agreement is a several obligation and not a joint obligation with those of the other Members. 18. TRUSTEE AS A THIRD PARTY BENEFICIARY The parties agree that, among other things, this Agreement 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 is also made and entered into for the benefit of the Trustee under each Indenture and the holders of outstanding TANC Project Indebtedness, as third -party beneficiaries, and the Trustee and such holders shall have the right, as third -party beneficiaries, to initiate and maintain suit to enforce this Agreement to the extent provided in any Indenture. Except as provided in this Section 18, no rights or benefits shall be created in any person or entity not a party to this Agreement. 19. APPENDICES This Agreement includes Appendices A, B, C, D, and E attached hereto and incorporated herein by this reference. 20. WAIVER Any waiver at any time by any party of its rights with respect to a default under this Agreement, or -with respect to any other matters arising in connection with this Agreement, shall not be deemed a waiver with respect to any subsequent default or other matter. 21. CAPTIONS Except as used for definitions, all indexes, titles, subject headings, section titles and similar items are provided for the purpose of reference and convenience and are not intended to be inclusive, definitive or to affect the meaning or scope of this Agreement. 22. BILLING AND PAYMENT 11 21 3 4 5 6 7 8 9 10 ill 121 13 14 15 16 17 0 18 19 20 21 22 23 24' 25I 26I 27 I 28 22.1 Unless otherwise agreed by the Members and TANC, the accounting and billing period shall be one (1) calendar month. Monthly bills sent to a Member shall be sent by United States mail first class, postage prepaid or its equivalent, to the billing address specified in Appendix E. The designation of any person specified in Appendix E may be changed at any time by advance notice given to all Members not then in default and the TANC Coordinator. 22.2 Billings for amounts payable shall be due on the twenty-fifth (25th) day after mailing of the bill. Payment shall be made at offices designated by the party to which payment is due. If the due date falls on a non -business day of either party, then the payment shall be due on the next following business day without interest. 22.3 Amounts of monthly billings not paid on or before the due date shall be payable with an Interest Charge calculated from the due date to the date of payment. 22.4 In case any portion of any monthly bill is in dispute, the entire bill shall be paid when due. Any excess amount of payments made pursuant to monthly billings, which through inadvertent error or as a result of a dispute may have been overpaid, as determined by whatever means the parties select to resolve the dispute, shall be returned by the owing party upon determination of the correct amount in accordance with the lIntertie Agreements. If the amount owing exceeds five hundred dollars ($500.00) and is more than three (3) months past due, it shall be returned with interest at the rate for an Interest Charge less two (2) percent. a 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 23. DISTRIBUTION OF ASSETS Notwithstanding anything to the contrary contained in Section 21 of the Joint Powers Agreement, but subject in all events to the provisions of the Intertie Agreements, in the event the Project terminates, subject to Section 16 TANC shall distribute to all Members not then in default TANC's share of the proceeds of the sale, transfer, or other disposition of any assets acquired in connection with the Project,:and all of its right, title, and interest therein as a Participant. Such distribution shall be in proportion to the Participation Percentages of such Members then in effect. No such distribution shall occur so long as any TANC Project Indebtedness remains outstanding. 24. COUNTERPARTS This Agreement may be executed in several counterparts, each of which shall be deemed to be an original and all of which, when taken together, shall constitute a single Agreement.. 25. SIGNATURES In witness whereof, the parties have caused this Project Agreement No. 3 to be executed as of the date first above written. The signatories to this Project Agreement No. 3 represent that they have been appropriately authorized to enter into this Project Agreement No. 3 on behalf of the party for whom they sign. 1 2 3 4 5 6 7 8 9 10 11 12 13 !, 14. 15 16 17 18 19 20 21 22 23 24 25 26 27 28 CITY OF ALAMEDA Name: Dbv las . Durein Title: Pres.,/Public Utilities Board Date: 4/10/90 CITY OF HEALDSBURG By: Name: Title: Date: CITY OF LODI By: Name: Title: Date: CITY OF LOMPOC By: Name: Title: Date: MODESTO IRRIGATION DISTRICT By: Name: Title: Date: CITY OF PALO ALTO By: Name: Title: Date: CITY OF REDDING By: Name: Title: Date: CITY OF ROSEVILLE By: Name: Title: Date: i 1 2 3 4 5 6 7 8 9 10 11 12 13I 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 CITY OF ALAMEDA By: Name: Title: Date: CITY OF HEAL7/1,7xq--�- % By: Name: Mi ae1 A. Wilson Title: City Manager Date: April 10, 1990 CITY OF LODI By: Name: Title: Date:. CITY OF LOMPOC By: Name: Title: Date: MODESTO IRRIGATION DISTRICT By: Name: Title: Date: CITY OF PALO ALTO By: Name: Title: Date: CITY OF REDDING By: Name: Title: Date: CITY OF ROSEVILLE By: Name: Title: Date: 1' 2 3 4. 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 CITY OF ALAMEDA By: Name: Title: Date: CITY OF HEALDSBURG By: Name: Title: Date: CITY OF LODI Attest: BY Name: J Title: Date: Alice M.-Reimche City Clerk CITY OF LOMPOC By: Name: Title: Date: MODESTO IRRIGATION DISTRICT By: Name: Title: Date: CITY OF PALO ALTO By: Name: Title: Date: CITY OF REDDING By: Name: Title: Date: CITY OF ROSEVILLE By: Name: Title: Date: 1 2 3 4 5. 6 71 81' 9 10 11 12 13 14 15 �16 17 18 19 20 21 22 23 24 25 26 27 28 CITY OF ALAMEDA By: Name: Title: Date: CITY OF HEALDSBURG By: Name: Title: Date: CITY OF LODI By: . Name: Title: Date: CITY OF LOMPOC By: / 4ef424z � Name: MarVin U. Loney Title: Mayor Date: MODESTO IR IGATION DISTRICT By: Name: Title: Date: CITY OF PALO ALTO By: Name: Title: Date: CITY OF REDDING By: Name: Title: Date: CITY OF ROSEVILLE By: Name: Title: Date: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 CITY OF ALAMEDA By: Name: Title: Date: CITY OF HEALDSBURG By: Name: Title: Date: CITY OF LODI By: Name: Title: Date: CITY OF By: Name: Title: Date: MODESTO test: By: Vickie Ehrler, Secretary Name: Title: Date: CITY OF By: Name: Title: Date: CITY OF By: Name: Title: Date: LOMPOC IRRIGATION DISTRICT • 1 William J. L on Jr. President th oard of Directc March 13, 1990 PALO ALTO REDDING CITY OF ROSEVILLE By: Name: Title: Date: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 CITY OF ALAMEDA By: Name: Title: Date: CITY OF HEALDSBURG By: Name: Title: Date: CITY OF LODI By: Name: Title: Date: CITY OF LOMPOC By: Name: Title: Date: MODESTO IRRIGATION DISTRICT By: Name: Title: Date: CITY OF PALO ALTO By: (A!fl= Name: Title: Mayor Date: April 16, 1990 CITY OF REDDING By: Name: Title: Date: CITY OF ROSEVILLE By: Name: Title: Date: 1 2 3 4 5 6 7 8 9 10 I 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 FORM APPROVED 44� CITY LEGAL. DEFT. CITY OF ALAMEDA By: Name: Title: Date: CITY OF HEALDSBURG By: Name: Title: Date: CITY OF LODI By: Name: Title: Date: CITY OF LOMPOC By: Name: Title: Date: MODESTO IRRIGATION DISTRICT By: Name: Title: Date: CITY OF PALO ALTO By: Name: Title: Date: CITY OF REDDIING 'I � By: Name:[tr- Title: Date: CITY OF ROSEVILLE By: Name: Title: Date: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20' 21 22 23 24 25 26 27 28 CITY OF ALAMEDA By: Name: Title: Date: CITY OF HEALDSBURG By: Name: Title: Date: CITY OF LODI By: Name: Title: Date: ` CITY OF LOMPOC By: Name: Title: Date: MODESTO IRRIGATION DISTRICT By: Name: Title: Date: CITY OF PALO ALTO By: Name: Title: Date: CITY OF REDDING By: Name: Title: Date: CITY OF RO V LL By: WVZU Name: AlleV E. kohnson Title: Cit er Date: March 15, 1990 •1 2, 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 SACRAMENTO MUNICIPAL UTILITY DISTRICT By: Name : D A. BOGG Title: GENERAL MANAGER Date: A_ PRIL 4, 1990 CITY OF SANTA CLARA By: . Name: Title: Date: TURLOCK IRRIGATION DISTRICT By: Name: - Title: Date: CITY OF UKIAH By : . Name: Title: Date PLUMAS-SIERRA RURAL ELECTRIC COOPERATIVE By: Name: Title: Date: TRANSMISSION AGENCY OF NORTHERN CALIFORNIA By: Name: Title: Date: -4 6- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 SACRAMENTO MUNICIPAL UTILITY DISTRICT By: Name: Title: Date: CITY OF SANTA CLARA By: Name: S ra o Tit1e:�remifdCity Manager Date: March 27, 1990 TURLOCK IRRIGATION DISTRICT By: Name: Title: Date: CITY OF UKIAH By: Name: Title: Date: PLUMAS-SIERRA RURAL ELECTRIC COOPERATIVE By: Name: Title: Date: TRANSMISSION AGENCY OF NORTHERN CALIFORNIA By: Name: Title: Date: 1' 2 3I 4 I 5 6 T 8 9', 10' 11 12 13 141 15. 16' 17 18 19 20 21 22 23 24 25 26 27 28 SACRAMENTO MUNICIPAL UTILITY DISTRICT By: Name: Title: Date: CITY OF SANTA CLARA By: Name: Title: Date: TURLOCK IR G .ION D T By: Name: Ernest Geddes Title: General Manager Date: April 3, 1990 CITY OF UKIAH By: Name: Title: Date: PLUMAS-SIERRA RURAL ELECTRIC COOPERATIVE By: Name: Title: Date: TRANSMISSION AGENCY OF NORTHERN CALIFORNIA By: Name: Title: Date: 1 2 3. 4 5 6 7 81', 9', 1a 11 12i 13 14 15' 16 17 18 19I 20' 21' 22 23 24 25 26 27 28 SACRAMENTO MUNICIPAL UTILITY DISTRICT By: Name: Title: Date: CITY OF SANTA CLARA By: Name: Title: Date: TURLOCK IRRIGATION DISTRICT By: Name: Title: Date: CITY OF UKIAH By: �. Name: Title: Date: Apr11 id, 1990 PLUMAS-SIERRA RURAL ELECTRIC COOPERATIVE By: Name: Title: Date: TRANSMISSION AGENCY OF NORTHERN CALIFORNIA By: Name: Title: Date: 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24. 25' 26 27I 281i SACRAMENTO MUNICIPAL UTILITY DISTRICT By: Name: Title: Date: CITY OF SANTA CLARA By: Name: Title: Date: TURLOCK IRRIGATION DISTRICT By: Name: Title: Date: CITY OF UKIAH By: Name: Title: Date: PLUMAS-SIERRA RURAL ELECTRIC COOPERATIVE By: 1�1/ l a Name: Fran V, otta Title: President Date: March 30, 1990 TRANSMISSION AGENCY OF NORTHERN CALIFORNIA By: Name: Title: Date: 11 2 3 4' 5 6' 7 8I 91' 10 11 12'. 13 14 15' 16 17 18 19 20 21 22 23 24 25 26 27 28 SACRAMENTO MUNICIPAL UTILITY DISTRICT By: Name: Title: Date: CITY OF SANTA CLARA By: Name: Title: Date: TURLOCK IRRIGATION DISTRICT By: Name: Title: Date: CITY OF UKIAH By: Name: Title: Date: PLUMAS-SIERRA RURAL ELECTRIC COOPERATIVE By: Name: Title: Date: TRANSMISSION AGENCY OF NORTHERN CALIFORNIA By: Name: h-B. Marco to Jr. Title: Chairman Date: March 21, 1990 APPENDIX A MEMORANDUM OF UNDERSTANDING CALIFORNIA-OREGON TRANSMISSION PROJECT This Memorandum of Understanding (MOU) is entered into as of the 19th day of December, 1984 by (1) the CITY OF ANAHEIM (Anaheim), CITY OF AZUSA (Azusa), CITY OF BANNING (Banning), CITY OF COLTON (Colton), CITY OF RIVERSIDE (Riverside), and CITY OF VERNON (Vernon) collectively referred to as "Southern California Public Agencies."; (2) CALIFORNIA DEPARTMENT OF WATER RESOURCES (CDWR); (3) PACIFIC GAS AND ELECTRIC COMPANY (PGandE) SAN DIEGO GAS AND ELECTRIC COMPANY (SDG&E), and SOUTHERN CALIFORNIA ED.ISON COMPANY (SCE), collectively referred to as "Investor -Owned Utilities"; (4) the WESTERN AREA POWER ADMINISTRATION (Western); and (5) the TRANSMISSION AGENCY OF NORTHERN CALIFORNIA-(Agency) (composed of the Cities of Alameda, Biggs, Gridley, Healdsburg, Lodi, Lompoc, Palo Alto, Redding, Roseville, Santa Clara, and Ukiah, the Plumas-Sierra Rural Electric Cooperative, the Sacramento Municipal Utility District, the Modesto Irrigation District, and the Turlock Irrigation District), hereinafter sometimes referred to -individually as "Participant" and collectively as "Participants", and the LOS ANGELES DEPARTMENT OF WATER AND POWER (11LADWP11), representing itself and the Cities of Glendale, Burbank and Pasadena, a non -voting member of the Management Committee. Recitals WHEREAS, the Agency, the Investor -Owned Utilities, CDWR and Western, have carried out studies related to possible alternative methods of developing additional transmission facilities between California and the Pacific Northwest, and WHEREAS, Public Law 98-360 and the Conference Report on H.R. 5653 authorize the Secretary of Energy (Secretary) to participate with non-federal entities in developing the California -Oregon Transmission Project (Project) by upgrading -1- certain facilities and authorize the Secretary to construct or participate in the construction of such additional facilities as he deems necessary to allow mutually beneficial power sales between the Pacific Northwest and California, and to accept and use --funds contributed by non-federal entities, including investor -owned and publicly owned utilities, for that purpose, and WHEREAS, pursuant to the mandate set forth in the Conference Report on H.R. 5653 and Public Law 98-360, the Secretary is directed to enter into negotiations with all interested non- federal entities for the financing, planning and construction of anew 500-kV AC line and associated facilities, and WHEREAS, the Secretary has met with the Participants and others and has conferred in and observed the negotiation of this MOU by the Participants, and WHEREAS, the Agency, the Southern California Public Agencies, the Investor -Owned Utilities, Western and the CDWR have all participated in the negotiations and in the development of the Project, and WHEREAS, the Project, when constructed, will parallel in part the DC line between California and the Pacific Northwest, and the operation of the Project may affect the operation of the DC line, and for that reason, the Participants have invited LADWP, the operator of the DC line, to be a member of the Management Committee to the extent set forth in this MOU, and WHEREAS, the Project has been evaluated from the technical viewpoint and has been found to be technically feasible, and WHEREAS, utilities in the Pacific Northwest and in California have determined that development of the Project will provide mutual benefits to their respective regions, and WHEREAS, the Participants will develop the Project consistent with applicable environmental laws, in an expeditious manner, and -2- l WHEREAS, in order to develop the Project in accordance with this MOU, the Participants intend to take all appropriate actions including the negotiation and execution of a definitive participation agreement, and other agreements as necessary, within nine months or as soon as practicable after execution hereof, and WHEREAS, CDWR and the Participants have agreed to postpone the date upon which CDWR will first be entitled to exercise its rights to buy 6.25 percent of Project transfer capability, and NOW THEREFORE, in order to expedite the signing of the Participation Agreement and other.necessary.agreements,.the following Principles are hereby agreed to and shall be implemented in such agreements. 1.0 Scope of Project 1.1 The Project includes: 1.1.1 The construction of a new 500-kV AC transmission line from the California -Oregon border area to the Redding area. 1.1.2 Reconstruction of an existing double circuit 230-kV AC line owned by Western to a single circuit 500-kV AC line from the Redding area to the Tracy Substation. 1.1.3 Construction of a new 500-kV AC line from Tracy Substation to Tesla Substation. 1.1.4 Construction of a 500-kV.AC cross -tie from the Redding area to Round Mountain Substation or its vicinity, unless the Management Committee determines that such cross -tie is not needed. 1.1.5 Construction of a 500-kV substation in the Redding area. The size, location, and configuration shall be as determined by the Management Committee. -3- -1 2.0 Associated Facilities 2.1 The Project does not include facilities south of the Tesla-Substation, however, PGandE shall upgrade or improve portions of its transmission system between Tesla Substation and Midway Substation as necessary to provide firm power transfer capability to meet its obligations hereunder as set forth in Sections 2.2, 2.3 and 2.4. 2.2 PGandE shall provide firm bi-directional transmission service over its facilities between Tesla and Midway Substations for the Southern California Public Agencies, SCE and SDG*&E in amounts equal to their respective transfer capabilities in the Project (whether obtained under Section 5 or Section 10) for the life of the Project. PGandE shall also provide up to 50 Mw of firm bi-directional transmission service between Tesla and Midway Substations for transmission entitlement that may be assignable by SMUD pursuant to Section 9.0. PGandE shall not be obligated to provide firm transmission service in excess of 700 MW for power transmitted over Project facilities and SMUD's 50 MW of assignable entitlement, provided, that such transmission service shall be provided under reasonable rates, terms and conditions. 2.3 In addition to firm transmission service provided pursuant to Section 2.2, PGandE shall make available to the Agency for the life of the Project up to 300 MW of firm bi-directional transmission service between Tesla Substation and Midway (150 MW for the M-S-R San Juan Project, plus an additional 150 MW). The Agency shall, if requested to do so by PGandE, provide, in the form of a contribution in aid of construction, a reasonable and proportionate share of j the capital required for increasing the transfer capability between Los Banos and Gates. Such -4- transfer capability.is to be developed by PGandE and will be available for service no later than January 1, 1990 and shall be provided under reasonable rates, terms and conditions. 2.4 Project Participants agree to cooperate in developing suitable transmission facilities to deliver power transmitted over the Project to the Participants, or to provide acceptable firm transmission service arrangements for such power under reasonable rates, terms and conditions. 2.5 SCE agrees to provide firm bi-directional transmission service between Midway -Substation and the Southern California Public Agencies of power, available over the Project's facilities, consistent with'the provisions of applicable individual integrated operating agreements and settlement agreements between such agencies and SCE or any successor agreements. If SCE and any such agency" cannot agree upon the terms and conditions of such a firm transmission service agreement hereunder, SCE will make a unilateral filing with the FERC of such a firm transmission service agreement under Section 205 or 206 of the Federal Power Act apd pursuant to the FERC's rules and regulations promulgated thereunder, 3.0 Project Rating Interconnection and Operation 3.1 The Project shall be designed to have a minimum transfer capability of 1600 MW including loop flow from the California -Oregon border to the Tesla Substation and'a minimum of 1900 MW of transfer capability from the Redding Substation to the Tracy Substation. The actual Project transfer capability will be determined from time to time by the Management Committee based on studies. The Management Committee has the right to review and approve all modifications to the Project, provided -5- that any modification which materially affects the transmission system of a Participant shall require the prior approval of such Participant. 3.2 The Project shall be interconnected and operated in parallel with the existing AC Intertie facilities. 3.3 The Participants shall enter into appropriate contractual arrangements: 3.3.1 With Northwest utilities to interconnect the Project with the Pacific Northwest transmission system such that access is available to a wide spectrum of utilities in the Pacific.Northwest.and Canada. Agreement shall be among the_Participants and'Northwest utilities. 3.3.2 With PGandE and Western for interconnections between the Project and Western and PGandE systems,including provisions governing the ownership of new facilities in existing substations. 3.3.3 Providing that each Participant shall have a right to displace Northwest imports scheduled by other Participants over the Project for delivery and use within a control area at times when any Participant in such control area is in a spill condition or at minimum generation, provided that displacement energy is delivered to the Participant whose energy is being displaced at a cost including penalties, if any, at or below the price of the displaced Northwest imports. 3.3.4 For the interconnection and parallel operation of the Project with existing AC .Intertie facilities. Such arrangements shall also provide for integration of the Project i with the existing AC Intertie System, including pro rata sharing of available MM. l transfer capability under outage and curtailment conditions, including curtailments due to loop flow. 3.4 PGandE shall be the operating agent for operation and maintenance of the Project, with operation and maintenance costs to be shared by Project Participants in proportion to their respective allocations under these Principles. PGandE shall coordinate with Western on the operations and maintenance on the Redding to Tracy portion of the Project. 3.5 All Participants who receive transfer capability from the Project shall coordinate schedules with PGandE. 4.0 Project Management 4.1 A Management Committee, chaired by a representative of the Agency, is hereby formed to oversee and 1 approve the planning, design, construction, operation and maintenance of the Project. Each Participant in the Project shall have representation on the Management Committee, with the members of the Agency being represented by the Agency and the Southern California Public Agencies being represented by one Participant of their choice. All actions or decisions by the Management Committee shall be by agreement of at least 75 percent interest of the voting Participants, based on Project Participation shares between the California -Oregon border area and Tesla Substation. Subcommittees shall be formed as needed to address specific aspects of the Project. CDWR, prior to exercise of rights under Section 8.1, and LADWP shall also have non -voting representation on the Management Committee. Each Participant, including each of the members of the Agency and each of the Southern California Public Agencies, shall be given advance notification of all meetings of the Management Committee and may attend meetings. -7- 1 4.2 Western shall be the lead agency for the NEPA process and the Agency shall be the lead agency for the CEQA process. All Participants agree to cooperate and support the processes necessary to obtain all necessary permits from regulatory agencies having jurisdiction. 4.3 The Agency shall be the overall Project Manager. Western, under contract to the Participants, shall be responsible for design and construction of the upgraded Western facilities, including.the proposed Redding Substation. The Agency and/or PGandE, under contract to the Participants, shall be -responsible for design and construction of all Project facilities other than Western upgraded facilities. 4.4 In exercising its non -voting representation on the Management Committee, LADWP may represent the ownership interests of itself, Burbank, Glendale and Pasadena in the DC line only as to discussions relating to operation of the DC line, and its representation shall'be limited to offering non- binding suggestions as to planning, construction, and operation of the Project, and advising the Committee as to problems which may arise through operation of the Project in parallel with the DC line. 5.0 roject Participation Shares 5.1 The Participants shall be entitled to Project transfer capability between the California -Oregon border area and Tesla Substation prior to January 1, 2005, in the following proportions: 5.1.1 The Agency shall be entitled to 43.75 percent. 5.1.2 The Investor -Owned utilities shall be entitled to 42.19 pervert. 5.1.3 The Southern California Public Agencies shall be entitled to 7.81 percent. 5.1.4 Western for DOE laboratories and federal wildlife refuges shall be entitled to 6.25 percent. 5.2 If CDWR exercises its rights and purchases its share of the Project pursuant to Section 8.1, then the Participants shall be entitled to Project transfer capability between the California -Oregon border area and Tesla Substation commencing on January 1, 2005, in the following proportions: 5.2.1 The Agency shall be entitled to 40.83 percent. 5.2.2 The Investor -Owned Utilities shall be entitled to 39..38.percent. 5.2.3 The Southern California Public Agencies shall be entitled to 7.29 percent. 5.2.4 -Western for DOE laboratories and federal wildlife refuges, shall be entitled to 6.25 percent. 5.2.5 The CDWR shall be entitled to 6.25 percent. . 5.3 If CDWR elects not to exercise its rights to purchase Project transfer capability pursuant to Section 8.1, then the Participants shall continue to be entitled to Project transfer capability in the- same percentages as specified in Section 5.1. 5.4 The Project transfer capability specified to Western in Sections 5.1, 5.2, and 5.3, is to serve DOE laboratories and federal wildlife refuges unless they make other arrangements with Western or other Participants. In addition, Western shall be provided the following transfer capability in Project facilities between the Redding Substation and Tracy Substation: 5.4.1* 300 MW under all operating conditions, with back up service provided by PGandE pursuant to Contract 14-06-200-2948A (Contract 2948A). ME 1 5.4.2 Up to an additional 300 MW (above 1900 MW), to the extent that such transfer capability is available from the Project. 5.5 During construction of the Project, to the extent transmission capacity is available, PGandE will accept CVP power at any point of interconnection between PGandE and Western for delivery to PGandE or to Western loads served from PGandE's system pursuant to Contract 2948A. Any incremental costs incurred by Western because of the outage of its facilities during construction, including wheeling charges paid to.-PGandE, shall be deemed to be.a Project cost. 6.0 Project Financing Responsibility 6.1 Prior to the effective date of any election by CDWR to exercise its rights pursuant to Section 8.1 and unless otherwise agreed pursuant to Section 6.3, the Participants shall be responsible for financing the Project and betterments in the following proportions: 6.1.1 The Agency, 46.67 percent (approximately 700/1500); 6.1.2 The Investor -Owned Utilities, 45.00 percent (approximately 675/1500); 6.1.3 The Southern California Public Agencies, 8.33 percent (approximately 125/1500). 6.2 Subsequent to the effective date of election by CDWR to exercise its rights pursuant to Section 8.1, anc unless otherwise agreed pursuant to Section 6.3, the Participants shall be responsible for any capital betterments for the Project in the following proportions: 6.2.1 The Agency, 43.55 percent; 6.2.2 The Investor -Owned Utilities, 42.00 percent; 6.2.3 The Southern California Public Agencies, 7.78 percent; 6.2.4 CDWR, 6.67 percent. -10- 6.3 A Participant may agree to assume (in part or whole) financing responsibility for another Participant's share. Such assumption shall not alter the Project Participation shares in Section 5. 7.0 Project Ownership 7.1 Except as otherwise agreed by the Participants pursuant to Section 7.6, the Project, other than the upgraded Western facilities, shall be owned in the following proportions prior to January 1, 2005, and .also thereafter, if CDWR does not exercise its rights pursuant to Section 8.1. 7.1.1 The Agency, ' 46'. 67- percent. 7.1.2 The Investor -Owned Utilities, 45.00 percent. 7.1.3 The Southern California Public Agencies, 6.33 percent. 7.2 If CDWR exercises its rights to purchase Project transfer capability pursuant to Section 8.1, then except as otherwise agreed by the Participants pursuant to Section 7.6, the Project (other than the upgraded Western facilities) shall be owned in the following proportions after January 1, 2005: 7.2.1 The Agency, 43.55 percent_ 7.2.2 The Investor -Owned Utilities, 42.00 percent. 7.2.3 The Southern California Public Agencies, 7.78 percent. 7.2.4 The CDWR, 6.67 percent. 7.3 Unless prohibited by law or unless otherwise agreed pursuant to Section 7.6, the upgraded Western facilities shall be owned in the following proportions prior to January 1, 2005: 7.3.1 The Agency, 36.84 percent (700/1900). 7.3.2 The Investor -Owned Utilities, 35.53 percent (675/1900). 7.3.3 The Southern California Public Agencies, 6.58 percent (125/1900). -11- 7.3.4 Western, 21.05 percent (400/1900). 7.4 Unless prohibited by law or unless otherwise agreed pursuant to Section 7.6, the upgraded Western facilities shall be owned in the following proportions on and after January 1, 2005, if CDWR exercises its rights to purchase pursuant to Section 8.1. 7.4.1 The Agency, 34.39 percent (approximately 653/1900). 7.4.2 The Investor -Owned Utilities, 3.3.16 percent (approximately 630/1900). 7.4.3 -The Southern California Public Agencies, 6.14 percent (approximately 117/1900). 7.4.4 Western, 21.05 percent (400/1900). 7.4.5 CDWR, 5.26 percent (100/1900). 7.5 If CDWR elects not to exercise its rights pursuant to Section 8.1, then the proportions owned on and after January 1, 2005, shall be as specified in Section 7.3. 7.6 A Participant may agree to assume ownership of all or part of another Participant's ownership share and provide firm transmission service to such other Participant in an amount that the Participant's ownership share plus transmission service hereunder shall equal the Participant's Project participation share in Section S. 8.0 Rights for the California Department of Water Resources 8.1 Effective January 1, 2005, CDWR will have a right to buy pro rata from all Participants, except Western, 6.25 percent of the Project as the Project exists as of the date CDWR exercises its right. Unless another price is *mutually agreed to by the selling Participant and CDWR, CDWR shall pay each selling Participant the or construction cost (including the original construction cost associated with -12- 1 Western's entitlement), including the interest it incurred during construction, plus the original cost of capital improvements and betterments (including the original cost of capital improvements and betterments associated with Western's entitlement), including interest it incurred during construction, allocable to the respective pro rata share of the Project that the Participant is selling to CDWR. Within one year after the Project is energized, each Participant shall provide CDWR with a statement of the original construction cost (including the original construction cost associated with Western's entitlement), including the interest it incurred during construction for its share of the Project so that CDWR can determine the cost it shall be obligated to pay such Participant if it exercises -its rights under this Section 8.1. Within one year after any capital improvements or betterments are completed prior to the date of exercise by CDWR, each Participant shall provide CDWR with a statement of construction costs incurred for such capital improvements, or betterments (including the original construction cost of capital imprQvenLents and betterments associated with.Western's entitlement) including interest it incurred during construction with respect to its share, so that CDWR can determine the cost it shall be obligated to pay such Participant if it exercises its rights under this Section 8.1. 8.2 Subject to (1) satisfaction of Section 11.4 of this MOU as to participation of PGandE in the Project, (2) execution by CDWR.of the participation agreement, and (3) construction of the Project, the term of the Extra High Voltage Contract, dated August 1, 1967, 1 among CDWR, PGandE, SDG&E, and SCE, or the successor(s) in interest to SDG&E and SCE, shall be -13- l extended for the useful life of the existing AC Intertie. Notwithstanding any terms to the contrary in the Extra High Voltage Contract, if the Parties cannot reach agreement on the rates that CDWR is to pay during the extended term of this contract, after 2004 PGandE, SCE, and SDG&E, or the successor(s) in interest to SDG&E and SCE, may unilaterally make application to FERC for a change in rates, under Section 205 of the Federal Power Act and pursuant to the FERC's Rules and Regulations promulgated thereunder. 8.2.1 CDWR shall be considered. -a Participant for the purposes of Sections 3.3..3 and 10.4. 8.3 -Upon exercise of CDWA's rights'under Section 8.1, PGandE and SCE shall provide firm transmission capacity to deliver CDWR's 100 MW to Midway and Vincent Substations, under reasonable rates, terms, and conditions. 8.4 Except as provided in Section 8.2, nothing in this agreement shall modify or change CDWR's rights under the Extra High Voltage Agreement' dated August 1, 1967. 9.0 The EHV Contract Between SMUD, PGandE, SCE, and SDG&E 9.1 PGandE, SCE, and SDG&E, pursuant to Article 33 of the August 1, 1967 contract entitled "Contract Between California Companies and Sacramento Municipal.Utility District for Extra High Voltage Transmission and Exchange Service" between SMUD, PGandE, SCE, and SDG&E (EHV Contract, consent to an assignment by SMUD of up to 50 MW of SMUD's 200 MW entitlement pursuant to the EHV Contract to California publicly owned utilities on such terms as may be negotiated between SMUD and the California publicly owned utilities; provided, however that such terms shall be consistent with, shall not amend, and shall not -14- 1 interfere with the performance of any rights or obligations under the EHV Contract. Such assignment may commence on January 1, 1985 and shall terminate on the earliest to occur of, (1) the date when the California -Oregon Transmission Project becomes operational, (2) the date when the participation of PGandE, SCE, and SDG&E is terminated because the approvals under Section 11.4 cannot be obtained or because those approvals are unsatisfactory to PGandE, SCE, and SDG&E, (3) the date when the Project is terminated prior to its operation, such termination to be deemed to have occurred.on January 1,.1993, if no work has been done on the Project for three years prior to that date. Such an assignment shall not impair SMUD`s right to utilize any assigned entitlement after termination of the assignment. 10.0 Layoff Arrangements 10.1 The Agency shall lay off on a firm basis 50 MW of Project transfer capability .to the Southern California Public Agencies between 1990 and-1994. The Agency shall lay off on a firm basis 25 MW of Project transfer capability to the Southern California Public Agencies between 1995 and 1999. 10.2 The Agency shall lay off on a firm basis Project transfer capability to the Investor -Owned Utilities, as indicated below: 1990: 200 MW 1991: 175 MW 1992: 150 MW 1993: 125 MW 1994: 100 MW 1995: 75 MW 1996: 50 MW 1997: 25 MW 1998 and thereafter: 0 MW -15- 1 10.3 Layoff of Project transfer capability pursuant to Sections 10.1 and 10.2 shall be.sold at the cost of said transfer capability based on public financing plus contingencies of 25 percent. It is recognized that the layoff amounts set forth in Sections 10.1 and 10.2 will be converted to a percentage of the minimum design transfer capability of 1600 MW and applied to the actual transfer capability determined by the Management committee. 10.4 An important goal of the Project is to.benefit the Participants and their respective ratepayers, commensurate with the risks inherent in the Project. To the extent that any Participant does not need its Project transfer capability to meet the loads of its system (directly or by exchange) and its firm layoff requirement pursuant to Sections 10.1 and 10.2 hereunder, such remaining transfer capability shall be made available to the other Participants. 10.4.1 Long-term transfer capability is transfer capability for which a five-year advance notice' is required. Short-term transfer capability is transfer capability for which less than five years notice is required. 10.4.2 Layoff transfer capability as specified in Section 10.4 shall be made available ona cost basis. Long-term transfer capability shall be offered at no less than the cost of transfer capability based on public financing plus contingencies of 25 percent. Short-term transfer capability shall be offered at no less than the cost of transfer capability based on public financing with no contingency adder. 10.4.3 If there are no Participants wishing to purchase either long-term or short-term -16- layoff at the applicable price pursuant to Section 10.4.2, then the selling Participant can use its excess transfer capability to deliver power to a Participant or to other entities under any terms and conditions or make its Project transfer capability available to others. 10.5 Nothing in Section 10.4 shall prevent any Participant from utilizing its Project transfer capability to transmit power to other Participants or entities in the Northwest. 11.0 Approval by the Secretary of Energy, Congress and other Governmental Agencies if, after a public notice procedure and due deliberation by the Secretary, this MOU is adopted by the Secretary as the 1 basis for development of the Project, the Participants agree as follows: 11.1 This MOU shall be submitted by the -Secretary in his report to Congress, pursuant to Public Law'98-360. 11.2 The Participants shall -support the passage of legislation in the form attached hereto as "Exhibit A", authorizing the implementation of the Project in accordance with this MOU. The Participants shall also support report language accompanying such legislation in the form attached as "Exhibit B", which determines -that the plan for development and operation of the Project in accordance with this MOU is in the public interest. 11.3 Contracts among the Participants shall then be negotiated to implement these principles. As a condition of execution of any contracts implementing this MOU each Participant shall furnish the other Participants with a written Opinion of Councal in which it is represented that said Participant has the authority to enter into such.contracts and to be -17- bound by the terms and conditions thereof. In the case of Agency, each major member agency thereof shall furnish such Opinion of Counsel. 11.4 The contracts negotiated to implement these Principles shall be submitted to, and Shall be subject to satisfactory approvals and permits of, local, state and federal governmental agencies having jurisdiction over the Participants to the contracts or the actions contemplated here. 11.5 If the conditions in Section 11.4 are not satisfied as to any Participant, without changes or new conditions'unacceptable'to such Participant, such Participant. shall no longer be bound by any provision of this MOU. 12.0 Signature Clause The signatories to this MOU represent that they have been appropriately authorized to enter into this MOU on behalf of the Party for whom they sign. This MOU may be executed in counterparts. This MOU is executed as of the 19th day of December, 1984. (Seal) APPPMM AS TOP �- Special Counsel to Cit. of Anaheim Dated: I CITY OF ANAHEIM By: ` �• Y Date: -- CITY OF AZUSA By: Date: -18- bound by the terms and conditions thereof. In the case of Agency, each major member agency thereof shall furnish such Opinion of Counsel_ 11.4 The contracts negotiated to implement these Principles shall be submitted to, and shall be subject to satisfactory approvals and permits of, local, state and federal governmental agencies having jurisdiction over the Participants to the contracts or the actions contemplated here. 11.5 If the conditions in Section 11.4 are -not satisfied as to any Participant, without changes or new conditions unacceptable to such Part icipaht, 'such Participant shall no longer be bound by any provision of this MOU. 12.0 Signature Clause The signatories to this MOU represent that they have been 1 appropriately authorized to enter into this MOU on behalf of the Party for whom they sign. This. MOU may be executed in counterparts. This MOU is executed as of the 19th day of December, 1984. CITY OF ANAHEIM By: Date: CITY OF AZUSA -18- Dates CITY OF VERYON By: Dates CALIFORNIA DEPART%.CEYT OF WATER MOURCES By% Date: PACIFIC GAS AND ELECTRIC COMPANY By% - Date: -19- CITY OF SAMING By= Date: CITY OF COLTOM By Date: CITY OF NIVIiRsim By= Date: CITY OF VERu=. Sy: _ Date: CALIFORdtrA DEPARZIdsbl"r OF WATaa rsocr s B►_ - Dat.z PACIFIC GAS AND riz T1tIC COMPANY sy= Onto: CITY OF BANNING By: Date: CITY OF COLTON By: Date: CITY OF RIVERSIDE : BY Date: hu11 r✓ err r48S� CITY OF VERNON By: Date: CALIFORNIA DEPARTMENT OF WATER RESOURCES By: Date: PACIFIC GAS AND ELECTRIC COMPANY By: Date: -19- By $— Oates CITY OF COLTON By= Dates CITY OF RIVERSIDE By: Date CITY OF VERNON MAYOR Date: 12-28-84 CALIFORNIA DEPARTM NT OF WATER RESOURCES Sys Dates PACIFIC OCAS AND ELECTRIC COMPANY Sy: Date: CITY OF BANNING Bv: Date: CITY OF COLTON Bv: Date: CITY OF RIVERSIDE Bv: Date: CITY OF VERY -ON 5 � Bv: Lpprored as to legal form and sufficiency: T 04"Codhs�Y, of Water Reeo Date: CALIFORNIA DEPARTMENT OF WATER RESOURCES B y . Date: PACIFIC GAS AND ELECTRIC COMPAIN'Y By: Date. — -19- CITY OF BANNING By: Date: CITY OF COLTON By: Date: CITY OF RIVERSIDE By: Date: CITY OF VERNON By: Date: CALIFORNIA DEPARTMENT OF WATER RESOURCES By: Date: PACIFIC GAS AND ELECTRIC COMPANY Date: December 18, 1984 -19- NEMDRANDLIM OF UNDFRSrANDING CALUDRDTIA-OREGON TRANSMESSION PRaJEEGT i SAN DIEGO GAS AND ELECTRIC COMPANY By: Date: pce�•,ber- iri SOUTHERN CALIFORNIA EDISON COMPANY 11 By: Date: WESTERN AREA POWER ADMINISTRATION By: - Date: TRANSMISSION AGENCY OF NORTHERN CALIFORNIA By: Date: LOS ANGELES DEPARTMENT OF WATER AND POWER By: Date: -20- I SAN DIEGO GAS AND ELECTRIC COMPANY By: Date: SOUTHERN ORNI E ISON COM By: , Date: /2 -/.F J WESTERN AREA POWER ADMINISTRATION By: Date: 1 TRANSMISSION AGENCY OF NORTHERN CALIFORNIA By: Date: LOS ANGELES DEPARTMENT OF WATER AND POWER By: Date: -20- I SAN DIEGO GAS AND ELECTRIC COMPANY By: Date: SOUTHERN CALIFORNIA EDISON COMPANY By: Date: WESTERN AREA POWER ADMINISTRATION By : - . Date • I c' Dec 8¢ */ Subject to a public involvement proceeding and, after consideration of public comments, adoption of this MOU, as may be modified based on such public comments, by the Secretary of Energy. i ! TRANSMISSION AGENCY OF NORTHERN CALIFORNIA By: Date: LOS ANGELES DEPARTMENT OF WATER AND POWER By: Date: -20- SAN DIEGO GAS AND ELECTRIC COMPANY By: Date: SOUTHERN CALIFORNIA EDISON COMPANY By: Date WESTERN AREA POWER ADMINISTRATION By: l Date: TRANSMISSION AGENCY OF NORTHERN CALIFORNIA Date:5- LOS ANGELES DEPARTMENT OF WATER AND POWER By: Date: -20- SAN DIEGO GAS AND ELECTRIC COMPANY By: Date: SOUTHERN CALIFORNIA EDISON COMPANY By: Date: WESTERN AREA POWER ADMINISTRATION By: Date: TRANSMISSION AGENCY OF NORTHERN CALIFORNIA By: Date: DEPARTMENT OF STATER AND POWER OF THE CITY OF LOS ANGELES ?ROVED AS TO r07h1 -. LEGALM Ci-N ATiOPMEY By L ---+ r BOARD OF WATER AND POWER COMMISSIONERS C7 OF THE TY OF L S - NyGELES ........ and ;Ld. n •. c�rnef e c r e t a r y rn cn co G� vn -20- The Secretary of Energy is authorized to cause the construction of a third AC transmission line from the Pacific Northwest to California in accordance with a Memorandum of Understanding submitted by the Secretary pursuant to Public Law 98-360. "Exhibit S" Suggested Report Language in AF Le iiislaaYion in Botn Houses or iations erence The Secretary has, pursuant to Public Law 98-360, reported a conceptual plan for construction of the line, which is described in detail in a Memorandum of Understanding signed by most of the privately and publicly owned utilities in California. The plan for development and operation of the new 500-kV AC line and associated facilities described in the Memorandum is in the public interest and will benefit the electric consumers of the Pacific Northwest and Southwest. •Accordingly, the Secretary is instructed to work with the California utilities and proceed with development -and operation of the Project in accordance with the Memorandum. APPENDIX B CALIFORDTIA-OREGON TRANSMISSION` PROJECT 14MORANDUM OF UNDERSTANDING ANNEX 1 2 3 4 5 6 7 8 9 10 11 12 13, 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 CONFORMED COPY CALIFORNIA-OREGON TRANSMISSION PROJECT MEMORANDUM OF UNDERSTANDING ANNEX Among City of Anaheim City of Azusa City of Banning City of Colton City of Riverside City of Vernon California Department of Water Resources Los Angeles Department of Water and Power Pacific Gas and Electric Company San Diego Gas-& Electric Company Southern California Edison Company Transmission Agency of Northern California Western Area Power Administration Carmichael Water District El Dorado Hills Community Services District San Juan Suburban Water District Shasta Dam Area Public Utility District Southern San Joaquin Valley Power Authority Trinity County Public Utility District March 19, 1986 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27' 28 TABLE OF CONTENTS SECTION PAGE RECITALS............................................. 2 1. DEFINITIONS AND CATEGORIES OF PARTICIPANTS........... 3 2. ASSUMPTION OF OBLIGATIONS AND RIGHTS.. ............... 4 3. PROJECT MANAGEMENT ................................... 5 4. MEMORANDUM OF UNDERSTANDING --PROJECT PARTICIPATION 'SHARES. ................................ 6 S. MEMORANDUM OF UNDERSTANDING --PROJECT FINANCING RESPONSIBILITY.*..**..*.**** .... o.-o ....... ** ...... 9 6. MEMORANDUM OF UNDERSTANDING --PROJECT OWNERSHIP....... 10 7. RIGHTS OF THE CALIFORNIA DEPARTMENT OF WATER RESOURCES.......................................... 15 8. PROJECT DEVELOPMENT AGREEMENT --PROJECT OWNERSHIP, ENTITLEMENT TO TRANSFER CAPABILITY OF THE PROJECT AND PROJECT FINANCING RESPONSIBILITY ............... 18 9. CHANGES IN OWNERSHIP, PARTICIPATION SHARE, AND FINANCING RESPONSIBILITY- ......................... 20 10. REIMBURSEMENT OF -CURRENT PARTICIPANTS ................ 20 11. CONSTRUCTIVE WITHDRAWAL .............................. 22 12. ASSIGNMENT...........................0............... 25 13. OPINIONS OF COUNSEL .................................. 27 14. SIGNATURE CLAUSE., ....... o ........ o...*.00 ........... 28 -i- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 MEMORANDUM OF UNDERSTANDING ANNEX CALIFORNIA-OREGON TRANSMISSION PROJECT This Memorandum of Understanding Annex ("MOU Annex") shall ae effective as of February 22, 1986, and is entered into by the "-ity of Anaheim (Anaheim), City of Azusa (Azusa), City of Banning (Banning), City of Colton (Colton), City of Riverside (Riverside), City of Vernon (Vernon), collectively referred to as "Southern California Public Agencies"; California Department of Water Resources (CDWR);Pacific Gas and Electric Company (PGandE), San Diego Gas and Electric Company (SDG&E), and Southern California Edison Company (SCE), collectively referred to as "Investor -Owned Utilities"; the Western Area Power Administration (Western); the Transmission Agency of Northern California (Agency), a joint powers agency composed of the Cities of Alameda, Biggs, Gridley, Hea.ld-sburg, Lodi, -Lompoc, Palo Alto, Redding, Roseville, Santa'Clara, and Ukiah, the Plumas-Sierra Rural Electric Cooperative, the Sacramento Municipal Utility District, the Modesto Irrigation District, and the Turlock Irrigation District; hereinafter sometimes referred to individually as "Current Participant" and collectively as "Current Participants"; the Los Angeles Department of Water and Power (LADWP), representing itself and the Cities of Glendale, Burbank, and Pasadena, a non -voting member of the Management Committee; and Southern San Joaquin Valley Power Authority (South San Joaquin), a joint powers agency; Trinity County Public Utility District (Trinity); Shasta Dam Area Public Utility (District (Shasta); San Juan Suburban Water District (San Juan); -1- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 El Dorado Hills Community Services District (El Dorado); and Carmichael Water District (Carmichael), hereinafter sometimes referred to individually as "Additional Participant" and collectively as "Additional Participants." RECITALS WHEREAS, the Current Participants, along with LADWP, have executed the Memorandum of Understanding, California -Oregon Transmission Project dated December 19, 1984 ("MOU"), and the Current Participants, except for CDWR, have executed - a Supplemental Letter Agreement to.the MOU, the Interim Cost Sharing Agreement effective April 1, 1985, and the Project Development Agreement ("PDA") effective September 30, 1985, for the purpose of developing the California -Oregon Transmission Project ("Project"), and WHEREAS, the Secretary of Energy, by his Memorandum of Decision ("MOD") of February 7, 1985 approved the MOU subject to the modifications and conditions set forth in the MOD, which MOD has been clarified by the May 4, 1985 letter from the Acting General Counsel of the Department of Energy; and WHEREAS, certain non-federal public entities were, under terms and conditions specified by Western in 50 Fed. Reg. 31912 (1985), allocated entitlements within the 3.125 per cent of Project transfer capability reserved to them by the Secretary of Energy, which non-federal public entities and their allocated entitlements are set out at 50 Fed. Reg. 42769 (1985), and WHEREAS, such non-federal public entities, designated as the Additional Participants, as one condition of receiving and -2- I using such entitlement must sign an agreement with the Current 2 Participants by which they assume all appropriate obligations and become entitled to all applicable rights and benefits of the 3 4 Project defined to date, NOW, THEREFORE, the Additional Participants, the Current 5 6 Participants, and LADWP agree as follows: 7 1. DEFINITIONS AND CATEGORIES OF PARTICIPANTS 8 9 1.1 For purposes of this MOU Annex, a "Participant" is 10 an entity having the obligations, rights -and -- benefits of a Participant as that term is used in IT 12 the MOU, the Supplemental Letter Agreement, the 13 Interim Cost Sharing Agreement, the PDA and any 14 other agreement -related to the Project which has 15 been signed by all or substantially all the 16 Current Participants and Additional-Participants.- 17 1.2 A Nonutility Participant is any Additional 18 Participant which (1) is not a public electric 19 utility regulated under applicable state law or 20 the Federal Power Act or exempted from such 21 regulation by reason of being a public entity, or 22 (2) does not have public utility responsibilities 23 with regard to serving electric power to 24 customers. Nonutility Participants have the same 25 rights, obligations and benefits as Participants 26 except as provided in Section 2.2 below. As of 27 the effective date of this Agreement, the 28 Nonutility Participants are South San Joaquin, San -3- { 1 2 3 4 5 6 7 8 9 10 �1l 12 13 I4 15 16 17 18 19I 20 21 22 23 24 25 26 27 28 Juan and Carmichael. Nothing contained herein shall preclude a Nonutility Participant from changing its status at a later date, to no longer be a Nonutility Participant. 2. ASSUMPTION OF OBLIGATIONS AND RIGHTS 2.1 Each Additional Participant agrees to and is bound hereby by all provisions, terms and conditions of the MOU as modified by the MOD of the United States Secretary of Energy, dated February 7, 1985, as interpreted by the letter of the United States Department of Energy Acting General Counsel, dated May 4, 1985, and as such MOU may be further amended, the Supplemental Letter Agreement, the Interim Cost Sharing Agreement and the PDA, all as modified by this MOU Annex, as if each Additional Participant had duly executed such agreement. 2.2 In accordance with the May 4, 1985 letter from the Acting General Counsel of the Department of Energy, which provides in part that the Secretary of Energy's MOD was not intended to impose a precedent for wheeling to end -users, Section 2.4 of the MOU and Sections 34.3 and 34.4 of the PDA, which implement Section 2.4 of the MOU, shall not be applicable to Nonutility Participants. Section 10.5 of the MOU shall not be applicable to any Nonutility Participant. -4- l 2 3 4 5' 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 3. PROJECT MANAGEMENT The following is substituted for and replaces Section 4.1 of the MOU: "4.1 A Management Committee, chaired by a. representative of the Agency, is hereby formed to oversee and approve the planning, design, construction, operation and maintenance of the Project. Each Participant in the Project shall have representation on the Management Committee, with -the members of the Agency being represented by the Agency, and the Southern California Public Agencies being represented by one Participant of their choice, and each Additional Participant being jointly represented by one Additional Participant, provided that any Additional -Participant may designate -instead a Current Participant's Management Committee Representative to represent it on the Management Committee. All actions or decisions by the Management Committee shall be by agreement of at least 75 percent interest of the Participants entitled to vote based on Project Participation shares between the California -Oregon border area and Tesla Substation, as expressed in Section 5. A Management Committee Representative who represents more than one Participant shall separately vote the interests of each Participant represented. Subcommittees shall be formed as needed to address -5- I 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 specific aspects of the Project. CDWR, prior to exercise of rights under Section 8.1, and LADWP shall also have non -voting representation on the Management Committee. Each Participant, including each of the Southern California Public Agencies and each of the Additional Participants, and each of the members of the Agency, shall be given advance notification of all meetings of the Management Committee and may attend meetings." 4. MEMORANDUM OF UNDERSTANDING --PROJECT PARTICIPATION SHARES 4.1 The following is substituted for and replaces Section 5.1 of the MOU: "5.1 The Participants shall be.entitled to Project transfer capability between the California -Oregon border area and Tesla Substation prior to January 1, 2005, in the following proportions: 5.1.1 The Agency shall be entitled to 42.2916 percent; 5.1.2.. The Investor -owned Utilities shall be entitled to 40.7837 percent; 5.1.3 The Southern California Public Agencies shall be entitled to 7.5497 percent; 5.1.4 Western for DOE laboratories and federal wildlife refuges 1 2 3 4 5 6 7 8 9 10 Il 12 13 14 15 16 I 17, 18' 19 20 21 22 23 24 25 26 27 28 4.2 shall be entitled to 6.2500 percent; 5.1.5 South San Joaquin shall be entitled to 2.0625 percent; 5.1.6 Trinity shall be entitled to .3125 percent; 5.1.7 Shasta shall be entitled to .4375 percent; 5.1.8 San Juan shall be entitled to .0625 percent; 5.1.9 El Dorado shall be entitled to .1875 percent; 5.1.10 Carmichael .0625 percent." The following is substituted for and replaces Section 5.2 of the MOU: "5.2 If .CDVIR exercises its. rights and purchases its share'of the Project in accordance with Section 8.1 of the MOU, then the Participants shall be entitled to Project transfer capability between the California -Oregon border area and Tesla Substation commencing on January 1, 2005, in the following proportions: 5.2.1 The Agency shall be entitled to 39.4690 percent; -7- 5.2.2 The Investor -Owned Utilities shall be entitled to 38.0673 2 percent; 3 5.2.3 The Southern California Public 4 Agencies shall be entitled to 5 7.0470 percent; 6 5.2.4 Western for DOE laboratories 7 and federal wildlife refuges 8 shall be entitled to 6.2500 9 10 percent;. 11 5.2.5 South San.Joaquin shall be 12 entitled to 2.0525 percent; 13 5.2.6 Trinity shall be entitled to 14 .3125 percent; ' 15 5.2.7 Shasta shall be entitled to 16 .4375 percent; 17 5.2.8 San Juan shall be entitled to 18 .0625 percent; 19 5.2.9 El Dorado shall be entitled to 20 .1875 percent; 21 5.2.10 Carmichael shall.be entitled 22 to .0625 percent; 23 5.2.11 The CDWR shall be entitled to 24 6.0417 percent." 25 26 27 ' 28 I 1 5. MEMORANDUM OF UNDERSTANDING —PROJECT FINANCING 2 RESPONSIBILITY 3 5.1 The following is substituted for and replaces 4 Section 6.1 of the MOU: 5 "6.1 Prior to the effective date of any 6 election by CDWR to exercise its rights 7 in accordance with Section 8.1 of the. 8 MOU and unless otherwise agreed in 9 accordance with Sect -ion 6.3 of the MOU, 10 the Participants, shall be responsible 11 for financing the Project and 12 betterments in the following 13 proportions: 14 6.1.1 The Agency, 45.1110 percent; 15 6.1.2 The Investor -Owned Utilities, 16 43.5026.percent; 17 6.1.3 The Southern California Public 18 Agencies, 8.0530 percent; 19 6.1.4 South San Joaquin, 2.2000 20 percent; 21 6.1.5 Trinity, .3333 percent: 22 6.1.6 Shasta, .4667 percent; 23 6.1.7 San Juan, .0667 percent; 24 6.1.8 El Dorado, .2000 percent; 25 6.1.9 Carmichael, .0667 percent." 26 5.2 The following is substituted for and replaces 27 Section 6.2 of the MOU: 28 -9- 1 2 3 4 5 6 7 8 9 I0 11 12 13 14 15 16 17 18 19 20 211 22 23 24 25 26 27 28 "6.2 Subsequent to the effective date of election by CDWR to exercise its rights in accordance with Section 8.1 of the MOU, and unless otherwise agreed in accordance with Section 6.3 of the MOU, the Participants, shall be responsible for any capital betterments for the Project in the following proportions: 6.2.1 The Agency, 42.1002 percent; 6.2.2 The-Investor=Owned Utilities, 40.6052 percent 6.2.3 The Southern California Public Agencies, 7.5168 percent; 6.2.4 The CDWR, 6.4444 percent; 6.2.5 South San Joaquin, 2.2000 percent; 6.2.6 Trinity, .3333 percent; 6.2.7 Shasta, .4667 percent; 6.2.8 San Juan, .0667 percent; 6.2.9 E1 Dorado, .2000 percent; 6.2.10 Carmichael, .0667 percent." 6. MEMORANDUM OF UNDERSTANDING --PROJECT OWNERSHIP 6.1 The following is substituted for and replaces Section 7.1 of the MOU:. "7.1 Except as otherwise agreed by the Participants in accordance with Section 7.6 of the MOU, the Project, -10- 1 2 3 4 5 6 7 8 9 . Ao 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 I� other than the upgraded Western facilities, shall be owned in the following proportions prior to January 1, 2005, and also thereafter, if CDWR does not exercise its right in accordance with Section 8.1 of the MOU: 7.1.1 The Agency, 45.1110 percent; 7.1.2 The Investor -Owned Utilities, 43.5026 percent; 7.1.3 The Southern California Public Agencies, 8.0530 percent;. 7.1.4 South San Joaquin, 2.2000 percent; 7.1.5 Trinity, .3333 percent; 7.1.6 Shasta, .4667 percent; 7.1.7 San Juan, .0667 percent; 7.1.8 E1 Dorado, .2000 percent; 7.1.9 Carmichael, .0667 percent." 6.2 The following is substituted for and replaces Section 7.2 of the MOU: "7.2 If CDWR exercises its rights to purchase Project transfer capability in accordance with Section 8.1 of the MOU, then except as otherwise agreed by the Participants in accordance with Section 7.6 of the MOU, the_Project, other than the upgraded Western facilities, shall be owned in the :29C 1 following proportions after January 1, 2 2005: 3 7.2.1 The Agency, 42.1002 percent; 4 7.2.2 The Investor -Owned Utilities, 5 40.6052 percent; 6 7.2.3 The Southern California Public 7 Agencies, 7.5168 percent; 8 7.2.4 The CDWR, 6.4444 percent; 9 7.2.5 South San Joaquin, 2.2000 10 percent; 11 7.2.6 Trinity, .3333 percent; 12 7.2.7- Shasta, .4667 percent; 13 7.2.8 San Juan, .-0667 percent; 14 7.2.9 E1 Dorado, .2000.percent; 15 7.2.10 Carmichael, .0667 percent." 16 6.3- The following is substituted for and replaces 17 Section 7.3 of the MOU: 18 07.3 Unless prohibited by law or unless 19 otherwise agreed in accordance with 20 Section 7.6 of the MOU, the portion of 21 the upgraded Western facilities not 22 owned by Western shall be owned in the 23 following proportions prior to 24 January 1, 2005: 25 7.3.1 The Agency, 45.1110 percent, 26 (approximately 677/1500); 27 28 -12- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 7.3.2 The Investor -Owned Utilities, 43.5026 percent, (approximately 652/1500); 7.3.3 The Southern California Public Agencies, 8.0530 percent (approximately 121/1500); 7.3.4 South San Joaquin, 2.200 percent (approximately 33/1500); 7.3.5 -Trinity, .3333 percent' (approximately 5/1500); 7.3.6 Shasta, .4667 percent (approximately 7/1500); 7.3.7 San Juan, .0667 percent (approximately 1/1500); 7.3.8 El Dorado, .2000 percent (approximately 3/1500); 7.3.9 Carmichael, .0667 percent (approximately 1/1500). The Participants recognize that the facilities to be owned by Western shall be determined in accordance with the provisions of the MOU, approved by the Secretary of Energy by the MOD, which. MOD was clarified by the May 4, 1985 letter from the Acting General Counsel of the Department of Energy. Further negotiations of the particulars of the -13- I ownership of facilities by Western will 2 be required as engineering of the 3 Project progresses." 4 6.4 The following is substituted for and replaces 5 Section 7.4 of the MOU: 6 "7.4 Unless prohibited by law or unless 7 otherwise agreed in accordance with 8 Section 7.6 of the MOU, the portion of g the upgraded Western facilities not 10 owned by Western shall be owned in the 11 following proportions on and after 12 January 1, 2005, if CDWR exercises its 13 rights to purchase in accordance with 14 Section 8.1 of the MOU: 15 7.4.1 The Agency, 42.1002 percent 16 (approximately 631/1500)-; 17 7.4.2 TheInvestor-Owned Utilities, 18 40.6052 percent (approximately 19 609/1500); 20 7.4.3 The Southern California Public 21 Agencies, 7.5168 percent 22 (approximately 113/1500); 23 7.4.4 The CDWR, 6.4444 percent 24 (approximately 97/1500); 25 7.4.5 South San Joaquin, 2.200 26 percent (approximately 27 33/1500); 28 -14- 1 2 3 4 5 6 7 8 9 -10 11 12 13 14 15 16 17 18 19 20 21 22, 23 24 25 26 27 28 7.4.6 Trinity, .3333 percent (approximately 5/1500); 7.4.7 Shasta, .4667 percent (approximately 7/1500); 7.4.8 San Juan, .0667 percent (approximately 1/1500); 7.4.9 El Dorado, .2000 percent (approximately 3/1500); 7.4.10 Carmichael, .0667 percent (approximately 1/1500). The Participants recognize that the facilities to be owned by Western shall be determined in accordance with the provisions of the MOU, approved by the Secretary of Energy by the MOD, which MOD was clarified by'the May 4, 1985 letter from the Acting General Counsel of the Department of Energy. Further negotiation of the particulars of the ownership of facilities by Western will be required as engineering of the Project progresses." 7. RIGHTS OF THE CALIFORNIA DEPARTMENT OF WATER RESOURCES 7.1 The following is substituted for and replaces Section 8.1 of the MOU: "8.1 Effective January 1, 2005, CDWR will have a right to buy pro rate from all } 1 Current Participants, except Western, 2 6.25 percent, as such percentage is 3 adjusted downward to accommodate the 4 allocation to Additional Participants, 5 of the Project as the Project exists as 6 of the date CDWR exercises its right. 7 Unless another price is mutually agreed 8 to by the selling Current Participant 9 and CDWR, CDWR shall pay each selling ' 10' Current Participant the original 11 construction cost (including the 12 original construction cost associated 13 with Western's entitlement), including 14 the interest it incurred during 15 construction, plus the original cost of 16 capital improvements and betterments 17 (including the original cost of capital 18 improvements and betterments associated 19 with Western's entitlement), including 20 interest it incurred during 21 construction, allocable to.the 22 respective pro rats share of the 23 Project that the Current Participant 24 is selling to CDWR. Within one year 25 after the Project is energized, each 26 Current Participant shall provide CDWR 27 with a statement of the original 28 construction cost (including the -16- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 original construction cost associated with Western's entitlement), including the interest it incurred during construction for its share of the Project so that CDWR can determine the cost it shall be obligated to pay such Current Participant if it exercises its rights under this Section 8.1. Within one year after any capital improvements or betterments are completed prior to the date. of exercise by CDWR, .each Current Participant shall provide CDWR with a statement of construction costs incurred for such capital improvements, or betterments (including the original construction cost of capital improvements and betterments associated with Western's entitlement) including interest incurred during construction with respect to its share, so that CDWR can determine the cost it shall -be obligated to pay such Current Participant if it exercises its rights under this Section 8.1" -17- P 1 8. PROJECT DEVELOPMENT AGREEMENT --PROJECT OWNERSHIP, 2 ENTITLEMENT TO TRANSFER CAPABILITY OF THE PROJECT AND 3 PROJECT FINANCING RESPONSIBILITY 4 8.1 The following is substituted for and replaces 5 Appendix F of the PDA: 6 "Appendix F 7 Project Ownership and Entitlements 8 (Expressed in Percentages) 9 Entitlement to 10 Transfer Capability Ownership .11 of the .Projectl/ Interest2/ 12 TANC 42.2916 45.1110 13 14 PGandE 20.3918 -21.7513 15 SDG&E 2.8549 3.0452 16 SCE 17.5370 13.7061 17 18 Anaheim 3.0198 3.2212 19 Azusa 0.3020 0.3221 20 Banning 0.1510 0.1611 21 Colton 0:3020 0.3221 22 Riverside 2.0762 2.2146 23 Vernon 1.6987 1.8119 24 25 Western 6.2500 0.0000 26 South San Joaquin 2.0625 2.2000 ' 27 Trinity 0.3125 0.3333 28 Shasta 0.4375 0.4667 -18- H 1 2 i 3 4 5 6 7 8 9 10 11 12 13 I4 15 16 17 18 19 20 21 22 23 24 25 26 27 28 San Juan E1 Dorado Carmichael 0.0625 0.1875 0.0625 100.0000 0.0667 0.2000 0.0667 100.0000 I, Between California -Oregon border area and Tesla Substation 2/ Excluding facilities owned by Western" 8.2 The following is substituted for and replaces Section 5.1 of -the PDA: -5.1 Unless the following percentages are otherwise modified in accordance with Section 5.4 each Participant shall be responsible for paying its share of the costs of Project. Development Work in the following Cost Sharing'Percentages: TALC 45.1110 Anaheim 3.2212 Azusa 0.3221 Banning 0.1611 Colton. 0.3221 Riverside 2.2146 Vernon 1.8119 PGandE 21.7513 SCE 18.7061 SDG&E 3.0452 Western 0.0000 South San Joaquin 2.2000 -19- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24' 25 26 27 28 Trinity 0.3333 Shasta 0.4667 San Juan 0.0667 E1 Dorado 0.2000 Carmichael 0.0667 100.00001, 9. CHANGES IN OWNERSHIP, PARTICIPATION SHARE, AND FINANCING RESPONSIBILITY 9.1 Sections 4,_ 5, .6, . 7, and. 8.of this MOU Annex shall whenever necessary be modified by restating. percentages to -conform to changes in Project Participation Share, Project Ownership and Project Financing Responsibility, as these terms are used in the MOU, in accordance with the provisions of the PDA or other agreements among the Participants which provide for such changes. 9.2 Each Participant may assign its rights and obligations in the Project in accordance with Section 17 of the PDA and any applicable provision of the Participation Agreement contemplated in Sections 2.4 and 11.4 of the PDA, including the layoff of Project transfer capability rights in accordance with Section 10.4 of the MOU. 10. REIMBURSEMENT OF CURRENT PARTICIPANTS 10.1 Not later than ten (10) days after the effective date of this MOU Annex, each Additional -20- 1 2 3 4 5 6 7 8 9I i 101 11 12 I3! 14 I5 I M i 17 18, 19 20 21 22 23 24 25 26 27 28 Participant shall reimburse each Current Participant, except CDWR, for its share of all payments made and due and payable to the Project Manager by each Current Participant as of the effective date of this MOU Annex for Project Development Work in accordance with the Interim Cost Sharing Agreement and the Project Development Agreement plus interest in accordance with Section 10.3 below. 10.2 Each .Additional. Participant's .share of such costs shall be that amount that each Additional Participant would have paid to the Project Manager for Project development work had that Additional Participant been an -original signator to the MOU and paid all amounts due and payable under the Interim -Cost Sharing Agreement and the Project Development Agreement, based upon its financing responsibility percentage. 10.3 The amount to be reimbursed by each Additional Participant to each Current Participant in accordance with this Section 10, shall include an interest charge assessed at an annual rate of interest, compounded monthly, equal to the lesser of (a) the applicable first of the month reference rate, or successor, of the Bank of America N.T. & S.A., San Francisco, California, corresponding to the period for which reimbursement is made; or (b) the maximum interest rate permitted by law. Such -21- 1 interest shall.be charged against the amount to be 2 reimbursed from the time the Current Participant 3 made its original payment to the time such 4 reimbursement is paid by the Additional 5 Participant. 6 10.4 No later than the effective date of this 7 Agreement, the Project Manager shall compute the 8 amount of funds to be reimbursed by each g Additional Participant in accordance with the 10 provisions of this Section 10 and shall provide 11 the results of this computation to each'Current 12 Participant and each Additional Participant. The 13 Project Manager shall issue a cash call to the 14 Additional Participants on behalf of the Current 15 Participants to whom reimbursements are to be made 16 and shall collect and disburse those funds 17 collected in accordance with this Section 10. In 18 no case shall the Project Manager, acting in its 19 capacity as such, be responsible on behalf of an 20 Additional Participant for any reimbursement owed 21 to any'Current Participant in accordance with this 22 Section 10. 23 24 11. CONSTRUCTIVE WITHDRAWAL 25 11.1 Should any Additional Participant fail to duly 26 sign this MOU Annex within ten (10) days after its 27 effective date, fail to reimburse Current 28 Participants in accordance with Section 10, or -22- I 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 11.2 fail to meet any condition imposed by Western in its stated allocation criteria (50 Fed. Reg. 31912) within the period established by Western, that Additional Participant shall be -deemed to have withdrawn from the Project and that Additional Participant's Share, as defined in the PDA, shall be revoked and placed in an allocation pool for reallocation to the other Additional Participants or the Current Participants (except Western)- in a manner consistent with Western's stated criteria (50 Fed. Reg. 31912). Should any portion of that additional Participant's allocation not be reallocated to the other Additional Participants, such unallocated portion shall revert to the Current Participants and shall be made available to each of them in a manner consistent with Section 13 of the PDA or appropriate provisions of the Participation Agreement, whichever is applicable. Any right to reimbursement for funds paid toward the development and operation of the Project shall be as defined in the PDA or Participation Agreement, as applicable. The following is substituted for and replaces Section 13.4 of the PDA: "13.4 If the amount of the withdrawing Participant's Share voluntarily assumed by the non -withdrawing Participants is -23- I less than 100 percent of the 2 withdrawing Participant's Share, each 3 non -withdrawing Participant shall 4 assume its respective portion of the 5 balance of the withdrawing 6 Participant's Share, in an amount 7 proportionate to that which its Cost 8 Sharing Percentage bears to the total 9 Cost Sharing Percentages of 10 non -withdrawing Participants identified 11 in Section 5.1, provided that no 12 Participant shall be obligated in total 13 for more that 1.15 times its Cost 14 Sharing Percentage as of the effective 15 date of this Agreement. A Nonutility 16 Participant shall not be obligated to 17 assume any portion of the withdrawing 18 Participant's Share." Ig 11.3 The following is added as a new Section 13.12 to 20 the PDA: 21 "13.12 If an Additional Participant withdraws 22 from the Project in accordance with 23 Section 13, or is found in default in 24 accordance with Section 20, then such 25 Additional Participant's allocation 26 shall be revoked and shall be made 27 available to the non -withdrawing 28 -24- 1 2 3 4 5. 6' 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Participants (except Western) on a pro rats basis. 12. ASSIGNMENT 12. The following is substituted for and replaces Section 17.1 of the PDA: "17.1 A Participant may assign or transfer any right or interest in this Agreement, in whole or in part, only after obtaining the written consent of the other Participants, which consent shall not be unreasonably withheld; provided that a Participant may withhold consent to any proposed assignment or transfer either (1) to an entity or association which is not CDWR, Western, or a public electric utility regulated under applicable state law or the Federal Power Act or exempted from such regulation by reason of being a public entity, or (2) to an entity or association which does not have public utility responsibilities with regard to serving electric power to customers. A Participant shall not withhold consent to any assignment or transfer between Participants allocated Project transfer capability by Western -25- as set forth in 50 Fed. Reg. 42769 I (1985) solely because that entity is a 2 Nonutility Participant, provided that 3 such assignment or transfer concerns 4 part or all of the 3.125 percent of 5 6 Project transfer capability allocated 7 by Western and interests attendant 8 thereto, and no other interest in the 9 Project. Consent to -a proposed 10- assignment to a joint powers agency 11 which is a'Participant shall not be 12 withheld solely because that entity is 13 a joint powers agency. No Participant 14 shall -bring, initiate or amend, 15 directly or indirectly including by 16 means of cross -complaint or other 17 affirmative allegation, an action or 18 proceeding before a court or an 19 administrative agency against another 26 Participant to contest the withholding 21 of consent by such Participant in 22 accordance with clauses (1) or (2) of 23 this Section 17.1 or the reasons 24 therefor or the validity of this 25 Section 17.1, other than a dispute 26 regarding the factual application of 27 such clauses. The withholding of 28 consent by a Participant in accordance -26- I with clauses (1) or (2) of this 2 Section 17.1 shall not indicate 3 approval or disapproval by any other 4 Participant of such withholding." 5 6 13. OPINIONS OF COUNSEL 7 The following is substituted for and replaces Section 11.3 8 of the MOU: 9 "11.3 Contracts among the Participants shall 10 then be -negotiated to implement these 11 principles. As a condition of 12 execution of any contracts implementing 13 this MOU each Participant shall furnish 14 the other Participants with a written 15 Opinion of Counsel in which it is 16 represented that'said' Participant has 17 the authority to enter into such 18 contracts and to be bound by the terms 19 and conditions thereof. In the case of 20 the Agency, each major member agency 21 thereof shall furnish such Opinion.of 22 Counsel. In the case of an Additional 23 Participant that is a joint powers 24 agency, the individual member agencies 25 of that joint powers agency shall not 26 be obligated to provide such Opinions 27 of Counsel but the joint powers agency 28 -27- I itself shall provide such Opinion of 2 Counsel of benalf of the agency." 3 11 .1 14. SIG?.ATL'i2E C—,USE 51 The signatories of this MOU Annex represent that they have G been appropriately authorized to enter into this MOU Annex on 7 behalf of the entity for whom they sign. This MOU Annex may be 8 executed in counterparts. 9 10i; I� B y: 32.i Same: ATTEST: f I4!1 f C Title Gate: !! ..sty Clerk, City of Ananeim I' I i i i i By: i 3 ! Name: 19 Title 201 i Date: 211 1 221 1 23fi By: 24 Name: 2J � Title: 2Gi Date: 27; 1 231. CITY OF 'EIM Tinn R Rnti� 1 Mayor i March 18, 1986 ! i C17Y OF P-►ZUS7, i CITY OF B;U MIING { I J 1 2 3 4 5 6 7 8 9 10 11 12 13 i 14! 15 16 17 18 19 20 21 22 23 24 25 26 27 28 itself shall provide such Opinion of Counsel of behalf of the agency.- 14. SIGNATURE CLAUSE The signatories of this MOU Annex represent that they have been appropriately authorized to enter into this MOU Annex on behalf of the entity for whom they sign. This MOU Annex may be executed in counterparts. CITY OF ANAHEIM By: Name: Title: Date: CITY OF AZUSA By: Name: Eugene F. Hoses Title: Mayor Date: February 18, 1986 By: Name: Title: Date: CITY OF BANNING -28- J t 1 itself shall provide such Opinion of 2 Counsel of behalf of the agency." 3 4 14. SIGNATURE CLAUSE 5 The signatories of this MOU Annex represent that they have 6 been appropriately authorized to enter into this MOU Annex on 7 behalf of the entity for whom they sign. This MOU Annex may be 8 executed in counterparts. 9 10 CITY OF ANAHEIM 11 By: 12 Name: 13 Title: 14 Date: 15 16 CITY OF AZUSA 17 By: 18 Name: 19 Title: 20 Date: 21 22 CITY B 23 ' By; 24 Name: SAM JJA DI O 25 Title: City Manager 26 Date: March 12, 1986 27 i 28 -28- ,I 2 3 4 5 6 i 8 9 10 1.1 12 13 14. 15 16' li 18 19 20 21 22 23 24 25 26 27 28 CALIFORNIA DEPARTMENT OF Approved ss to le`al tofm WATER RESOURCES •IId aeittialeacys�`��...�.� ' Name: 4!5AS"T/ /V caf cq- 4,. Departmqut " Title: IIep1f, sec"-= Water R ource8 !. Date: APR G 1y66 CARMICHAEL WATER DISTRICT By: Name: Title: Date: CITY OF COLTON By: Name: Title: Date: EL DORADO HILLS COMMUNITY SERVICES DISTRICT By: Name: Title: Date: Since.CDWR is not a party to the Project Development Agreement (PDA), CDWR's approval of this MOU Annex is not intended to express either approval or disapproval of Sections 8, 11.2, 11.3 and 12, which do nothing other than amend certain sections of the FDA. It -29- 2 3 4 5 6 8 9 l0l 1l 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 CALIFORNIA DEPARTMENT OF WATER RESOURCES By: Name: Title: Date: CHAEL WA R DISTRICT By: Name: er McGin Ly Title: Secretary/General Manager Date: February 21, 1986 CITY OF COLTON By: Name: Title: Date: EL DORADO HILLS COMMUNITY SERVICES DISTRICT By: Name: Title: Date: -29- r . t 1 2 3 4 5 6 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 CALIFORNIA DEPARTMENT OF WATER RESOURCES By: Name: Title: Date: CARMICHAEL WATER DISTRICT By: Name: Title: Date: CITY OF COLTON By: A un Name: Lze_>� Title: Mayor Date: By: Name: Title: Date: EL DORADO HILLS COMMUNITY SERVICES DISTRICT -29- 1 2 3 4 �i I 6 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 CALIFORNIA DEPARTMENT OF WATER RESOURCES By: Name: Title: Date: CARMICHAEL WATER DISTRICT By: Name: .. Title: Date: CITY OF COLTON By: Name: Title: Date: EL DORADO HILLS COMMUNITY SERVICES,DISTRICT By: Name :2„e Title: Date: ze6 -29- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 23 DWP No. 10259A As a party to the MOU but which is not a party to any other Project Agreement, the Los Angeles Department of Water and Power (LADWP) regards Sections 8, 9.2, 10, 11 and 12 of the MOU Annex, as having no involvement with LAMP. LADIVP further considers Section 3 of the MOU Annex as being the only section of this Agreement which involves LADtiP's interests in the amended MOU, which interests are limited to those expressed in Section 4.1 and 4..4 of the MOU. APMMM AS TO FORM AND LEGALITY 1AMES IL HAHN, CITY ATTORNEY 88 r AY ALPH IY W! SOON ssist t ity Attorney DEPARTh1ENT OF WATER AND POWER OF THE CITY OF LOS ANGELES by BOARD OF WATER AND POWER CCAVI SS IONTERS OF 7HE-CLTY OF LOS ANGELES By t and ecre- ary r� `nr .� Aft I LOS ANGELES DEPARTMENT OF 2 WATER AND POWER 3 By: 4 Name: 5 Title: 6 Date: 7 8 PACIFIC GAS AND ELECTRIC 9 C MPANY 10 By: �.... 11 Names George A. Maneatis, Executive Vice President 12 Title: _ Fac, and Elec. Res. Develop. 13 Dates February 21, 1986 14 15 CITY OF RIVERSIDE 16 By: 17 Name: 18 Title: 19 Date: 20 21 ` SAN DIEGO GAS ELECTRIC 22 i COMPANY 23 By: 24 Name: 25 Title: 26 Date: 27 28 -30- l 2 3 4 5 6 7 8 9 10 12 13 14 15 16 17 181 19 20 21 22 23 24 25 26 27 28 LOS ANGELES DEPARTMENT OF WATER AND POWER By: Name: Title: Date: PACIFIC GAS AND ELECTRIC COMPANY By Names Title: Date: CITY OF RIVE IDE By: Names AB BROWN Titles MAYOR Date: March 18, 1986 By : Name: Title: Dates SAN DIEGO GAS & ELECTRIC COMPANY —30— 2 3 4 5 6 7 8 9 10 11 12 13 14 15 �16 17 18 19 20 21 22 23 24 25 26 27 28 LOS ANGELES DEPARTMENT OF. WATER AND POWER By: Name: Title: Date: PACIFIC GAS AND ELECTRIC COMPANY By: Name: j Title: Date: CITY OF RIVERSIDE By: Name: Title: Date: SAN DIEGO GAS & ELECTRIC COMPANY BY = , Name: J. C. Holcombe Title: Vice President, Fuel & Power Contrac Dater _February 21. 198b s -30- 1 SAN JUAN SUBURBAN WATER 2 DISTRICT 3 By: 4 Name: 6i/e 5 Title: General Manager & SPcretary 6 Date: fZ I Z 67 7 8 SHASTA DAM AREA PUBLIC UTILITY 9 DISTRICT 10 By: 11 Name: 12 Title: 13 Date: 14 15 SOUTHERN CALIFORNIA EDISON 16 By: 17 Name: 18 Title: 19 Date: 20 21 SOUTHERN-SAN JOAQUIN VALLEY 22 POWER AUTHORITY 23 By: 24 Name: 25 Title: 26 Date: 27 28 -31- I 1 2 3 4 5 6 7 8 9 10 ll 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 By: Name: Title: Date: SAN JUAN SUBURBAN WATER DISTRICT SHASTA DAM AREA PUBL/JIC UTILITY _ DISTRICT n // By: '_1 / 0/6.- F, ,side o rdl otl5irecto S Bv: ClerkV Board of Directors Date: February 19, 1986 SOUTHERN CALIFORNIA EDISON By: Name: Title: Date: SOUTHERN SAN JOAQUIN VALLEY POWER AUTHORITY By= Name: Title: Date: -31- � I 2' 3 4 5 6 7 8 9 10 11 12 13 14 i 15 16 17 18 19 20 21 22 23 24 25 i 26 27 28 AS F. JOHN R. 81iRy SAN JUAN SUBURBAN WATER DISTRICT By: Name: Title: Date: SHASTA DAM AREA PUBLIC UTILITY DISTRICT By: Name: Title: Date: Name: Edward A. Myers, Jr. Title: Vice President Date: March 7, 1986 By: Name: Title: Date: SOUTHERN SAN JOAQUIN VALLEY POWER AUTHORITY -31- 9 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19' 20 21 22 23 24 25 26 27 28 SAN JUAN SUBURBAN WATER DISTRICT By: Name: Title: Date: SHASTA DAM AREA PUBLIC UTILITY DISTRICT By: Name: Titles Date: SOUTHERN CALIFORNIA EDISON By: Name: Title: Date: SOUTHERN SAN JOAQUIN VALLEY P R AUTHORITY By s Name: KENNETH M. WEGIS Title: CHAIRMAN OF THE BOARD Date: FEBRUARY 19, 1986 —31— 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 TRANSMISSION AGENCY OF R3'H IFORNIA By Name: Title: Date: TRINITY COUNTY PUBLIC UTILITY DISTRICT By: Name: Title: Date: CITY OF VERNON By: Name: Title: Date: WESTERN AREA POWER ADMINISTRATION By: Name: Title: Date: -32- 1 2 3 4 5 6 7 8 9 10 Il 12 131 i 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 TRANSMISSION AGENCY OF NORTHERN CALIFORNIA By: Name: Title: Date: TRINITY COUNTY PUBLIC UTILITY DISTRICT By: Names Title: )? LfhF THL- ROAR Date: 2 A CITY OF VERNON By: Name: Title: Date: WESTERN AREA POWER ADMINISTRATION By: Name: Title: Date: -32- 1 2 3� 4 5 6 7 81 9+ 1.0 I1 12 13 14 15 16 17 18 19 20 21 22 23 24 25, 26 27 28 TRANSMISSION AGENCY OF NORTHERN CALIFORNIA By: Name: Title: Date: TRINITY COUNTY PUBLIC UTILITY DISTRICT By: Name: Title: Date: CITY OF VERNON By: Name : __ Boni s C . Malh�rg APPROVED AS TO FORM Title: __Mayor BY � Date: ch 4 1956 DAVID B. BR£ARLBY CITY ATTORNEY _ ATTEST: V City C er i WESTERN AREA POWER ADM, INIS^RAT IC\; By: i Name. i Title: Date: 1 8 } l 2 3 4 5 6 7 8 s 10 11 12 13 i 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 TRANSMISSION AGENCY OF NORTHERN CALIFORNIA By: Name: Title: Date: TRINITY COUNTY PUBLIC UTILITY DISTRICT By: Name: Title: Date: CITY OF VERNON By: Name: Title: Date: WESTERN AREA POWER- ADMIN TRATION By: Name: David G. Coleman Title: Area Manager Date: February 21 , 1986 -32- 4J w 0 O O N w O Ol N O cr O O O t- o CD o rI w to N c>< N N to co N O t` t- O Cl M Ln r-i N Ln (V O N o Ln Ln to N r i lcz!' [V ,-4 N H O Cl Ln w t— O N N M o Ln M t- O O Cl m t- t- O d' N t*, O Ln M r-I O O "d' o N to O N d' d' 9 O to C4 O N N rt to N M O r-•i o O M ri tT m H Ln r-1 a $4 m N r1 w N Ol N r-I Ln Ln CT m (a \ Ln d' 1* t- m t- tr M O O to N r-i tD U •r'( to r-f N r-I N m co N M a% t- to t- M to 1~ r-1 r i N N d1 Cl M 00 L- di m ro a d V U ti♦ H P( Q 0 M [l- O v O Co rl H Ln M M N H CD o ^ \ M to m w N O to CO m M O N r-1 O 'F4 t; NI M" w H H O r-I N N H C` d N CD pq 31 v rj 4 4 9 Q� A` w 41 Qt r4 O O ri N O CO N N O N N O O O a rl .rq (a (a r1 �.. -04 41 U a} ~ ro 4-) L-L a( ^ w W ('') t` to m o 4r m O Ln O O O C1l CD Q' (U Pa H Ln co O O Ln Ln O Ln CD O CDtD C3 Pa \ t` M to tr N N M tr tt w N Cn v CDrid H CDr-i O of d' O to 4 O O N O O rl ('M N r-�i O H -ri r-I r-i 1J M ((3 O 0 1-4 $4 m -, U (a 0 •ri i-L :1 a) r-i U ••-I r -I -r 1 rts .a 41 H a" Is H -It k u 41 a, to 0 rn (a 0 •4 >::s m (a cr 4 F r1 -4 a -9-1 0 LJ U ro a Z •rL 41 •ri (a (a (a '0 f. t~ r-I Ld to m in L-. N •r-1 r-1 m O O La -tJ (a a U a, O 0 0 La 44 x a a H U P( • 4 -H a a 4J >, En H UL:) 'H•ar $4 r. 4 .ra w w w ua 0 W w 1 4J w w a -ri W .ee W w 0 0 0 0 41 4-1 O m 0 0 0f� ri O U 41 0 vi m to >1 >1 ?( Dr d) •rl >1 F. a i ?1 >1 p 4+ 71 -1 -•4 �1 4J 4J 4J4-J qz Q -W ::1 W4.) .0 U C7 .0 W A 4J •r•L •.-L •ri 0 ••a ri •rL -H (a -ri 0 -rL U U U U=4 U P4 U U uI V £-( U I I ari 4H >1 .OH 71 m 14 &4 ?,•.{ > cG U H 4J fl r-I 43 u a a 1 33�33EO -H4-) ra -f � E � �W 549c'Oa OAE 4J•-i -. A V. 44 co tam .� to G d'� •� -Hi OW 1•0W 34 P4 U W N 04 �' to P4 N . O � �EA I �� nH UCH -�i fl U aw a Q' y a o W o 04 4J 14 0 4J 4J W O 410 tata14 a' w�w � a 4j H is E., a` a •r► t~ 0� >1 obi °b� M$+ o 4 � 0.0 p. w a .0 ��D �acaa r40)coa 4—) r fl a a� vU0 a) a) rasa 0H� ca �, M a ,G a '� a ,C a O p .0 U a S ri a. $a � 0 (aa� rn (0a' 44 a)41 4-1 co roa ��O> (a E am�� ���� -Ca41 iT $4 t4 4 "i W .4J 4 44 4� N s- cw a 1.s"$4a .41�'sra Z.�� 4-1 a -a Hw AS 4J a CU ai O O G a O p fl m�, O m O� m4j+►H m;'4JH a r +J a sa a 4J W m aw V aa- 14 04s--A c a m4 �Ha �pW arom:J go4, arou0,-J 1,_ � ccaa r-,' as "M.QZ �Ma0 c2U 41 m >� m 14 a 4J La (osaai •a�ts+.o�� m O .O •O -�+ -P Nam" W� sn "i 0 0 5 •� O p i~ '�a m l0 Ea mm,Oto mc•ri41 m�� M"A� aNN+' .aa�+v�i� ��aa 2a. 2au �.0 (a (a :1a0o H H it 4J ��•$4> a $4 w 2 � am a 44-.Am waca 4 am .Q am 44).�ca HwR4 Hp,P+ Hc0.0Rl HrtAW H434Jw 1 1 1 1 N I U 1 APPENDIX D PRESCHEDULING OF TRANSMISSION USE 2 AND CURTAILMENT NOTIFICATION PROCEDURES 3 4 5 1. OPERATING AGENT INTERFACES: 6 1.1 Through the TANC Coordinator, TANG shall notify the 7 Operating Agent relative to the amounts of Transfer 8 Capability that TANC will be using, as required by the 9 Intertie Agreements. 10 1.2 It is anticipated that the Operating Agent will notify 11 TANC through the TANG Coordinator when a curtailment 12 affecting Transfer Capability is scheduled or has 13 occurred, as provided in the Intertie Agreements. 14 1.3 It is anticipated that the Operating Agent will notify 15 Members or their designated agents directly of a real- 16 time curtailment of Transfer Capability. Each Member. 17 or its designated agent will be responsible for 18 communicating and coordinating real-time power 19 schedule curtailments and all changes in schedules due 20 to curtailments occurring in real-time pursuant to its 21 separate agreements with other entities. 22 23 2. TANC TRANSFER CAPABILITY PRESCHEDULING PROCEDURES 24 Transfer Capability will be prescheduled over four different 25 time frames - long term (6 years), next operating year, next 26 operating month, and current operating month. 27 2.1 Long Term and Next Operating Year 28 2.1.1 Each year, each Member shall prepare the a 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 following estimated data pertaining to its use of Transfer Capability for each month of the following six -year period: 2.1.1.1 Member's Participation Percentage; 2.1.1.2 Contracted Transfer Capability layoffs to Members and Participants; 2.1.1.3 Contracted Transfer Capability layoffs from TANC and Participants; 2.1.1.4 Amount of Transfer Capability available for sale; and 2.1.1.5 Amounts of additional Transfer Capability desired. 2.1.2 This data will be submitted to the TANC Coordinator by July 31 of each year. 2.1.3 The TANC Coordinator shall determine the amounts of Transfer Capability owned by other Participants that is unneeded by each of those Participants (if available) and that could be used by TANC. 2.1.4 The data will be compiled by the TANG Coordinator into a document that defines the projected use of the Project by each Member, and on an aggregate TANC basis, for each month of the six year period. The document will also quantify instances where a Member D-2 2 �l 4 5 6 7 8 9 10 11 12 13 14 15 16 171 18 i 19 20 21 22! 23' 241 25 26, 1 27 28 may want additional Transfer Capability, where a Member may have Transfer Capability that it is not planning to use, and where other Participants have unneeded Transfer Capability. 2.1.5 The TANG Coordinator shall send this document to the Members by August 31 so that they will have data on projected aggregate usage and can identify potential periods when Transfer Capability can be bought and sold among the Members. 2.1.6 Those Members who have made buy/sell arrangements for Transfer Capability will notify the TANG Coordinator of these arrangements and of their effective.time .frames by September 30. 2.1.7 This new data will be utilized by the TANG Coordinator to prepare a revised document that defines the projected use of the Project by Member, and on an aggregate TANC basis, for each month of the six year period. The document will also quantify any amounts of unneeded Transfer Capability and instances where additional Transfer Capability could be utilized by TANC or by a. Member. 2.1.8 If the revised document demonstrates unneeded capacity or needs for additional D-3 V 1. 2. 3. 4 5 6 7 8' 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Transfer Capability, it will be resubmitted to the Members by October 31 so that they are aware of potential additional buy/sell opportunities. 2.1.9 Those Members making additional buy/sell arrangements will notify the TANC Coordinator of those additional arrangements and their effective time frames by November 30. 2.1.10 This updated data will be utilized by the TANC Coordinator to prepare a revised document that defines the projected use -of the Project by each Member and on an aggregate TANC basis for each month of the six year period. The document will also quantify any amounts of unneeded Transfer Capability that was not required by TANC and instances where additional Transfer Capability could be utilized by TANC. 2.2 Next Operating Month 2.2.1 Each month, each Member or its designated agent shall prepare the following estimated hourly data for each of three day -types' (weekday, Saturday, and Sunday/ Holiday) pertaining to its use of the Project for the next operating month: 2.2.1.1 Member's Participation Percentage; D-4 1 2.2.1.2 Contracted Transfer Capability 2 layoffs to Members and 3 Participants; 4 2.2.1.3 Contracted Transfer Capability 5 layoffs from Members and other 6 Participants; 7 2.2.1.4 Amount of Transfer Capability 8 available for sale;. and 9 2.2.1.5 Amounts of additional Transfer 10 Capability desired. 11 2.'2.2 This data will'be submitted to the TANC, 12 Coordinator by the 20th of the month 13 preceding the operating month in question. 14 2.2.3 The TANC Coordinator shall determine the 15 amounts of Transfer Capability owned by 16 other Participants that is unneeded by those 17 Participants (if available) and which could 18 be used by TANC. 19 2.2.4 The data will be compiled by the TANC 20 Coordinator into a document that defines the 21 projected use of the'Project by Member, and 22 on an aggregate TANG basis, for each hour of 23 the three day -types specified above. To the 24 extent possible the document will also 25 identify potential layoff opportunities 26 among the Members or between TANC and other 27 Participants. 28 2.2.5 This document will be sent to the TANC a 1 2 3 4 5 6 7 8 9 10 ii 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 11 28 Members by the 21st of the month preceding the operating month so that they will have data on projected aggregate usage and can identify potential periods when Transfer Capability can be bought and sold among the Members and between TANC and other Participants. 2.2.6 Those Members who have made buy/sell arrangements for Transfer Capability will notify the TANC Coordinator of these arrangements and of their effective time frames by the 24th of the month preceding the operating month. 2.2.7 This new.data will be utilized by the TANC Coordinator to prepare a revised document that defines the projected use of the Project by Member, and on an aggregate TANC basis, for each hour of the three day -types specified above and such data will be made available to the Members. The document will also quantify any amounts of unneeded Transfer Capability and periods of time when additional Transfer Capability could be utilized by TANC or a Member. 2.2.8 If any of the foregoing dates falls on a weekend or holiday, the submittal shall be made by the work day immediately preceding the weekend or holiday. on 1 2' 3 4'. 5' 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 i 28 2.3 Current Operatina Month 2.3.1 Data for the current operating month will be contained on a dedicated computerized "bulletin board" that will specify Member use, and to the extent available Participant I use, of Transfer Capability on an hourly basis for the month. This data will be the same as that prepared for the "Next Operating Month" as described in Section 2.2 above. 2.3.2 Using the data on the bulletin board the Members or their designated agents may make Transfer Capability buy/sell arrangements among themselves and will notify the TANC Coordinator of any changes required to the bulletin board as soon as practicable after making such change. 3. TANC CURTAILMENT NOTIFICATION PROCEDURES 3.1 Curtailment Notification Procedure (Prescheduled) - The TANC Coordinator shall promptly notify the Members upon receipt of notice from the Operating Agent of any scheduled curtailment of Transfer Capability. The TANC Coordinator may advise the Members of adjustments to Transfer Capability that could be made to minimize the effects of the curtailment on the Members. The steps in this procedure are as follows: 3.1.1 The Operating Agent notifies the TANC 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 281 Coordinator that a curtailment will occur and the magnitude of the curtailment. 3.1.2 The TANC Coordinator will update the bulletin board to reflect each Member's remaining share of Transfer Capability. 3.1.3 The TANC Coordinator will notify each Member or its designated agent of its share of the curtailment and may suggest certain actions (e.g., trading Transfer Capability) that could be used to minimize curtailment impacts. 3.1.4 In each event of a prescheduled curtailment where TANC still has sufficient Transfer Capability for the aggregate power schedules of the Members, by mutual agreement a Member may utilize another Member's unused share of Transfer Capability in order to avoid a curtailment. 3.2 Curtailment Notification Procedure (Real -Time) - The Members anticipate that (i) the Operating Agent will notify the TANG Coordinator'of real-time curtailments to Transfer Capability, (ii) the TANC Coordinator will communicate and coordinate real-time curtailments to Transfer Capability with the Members; and (iii) the Operating Agent will also notify Members or their designated agents directly of a real-time curtailment of Transfer Capability. Each Member or its designated agent will be responsible for communicating and V 21I 3'', 4 51' 6I 71 81 9 10 11 12 13 14 15 16 17 181 14 20 21 22 23 24 25 26 27 28 coordinating real-time power schedule curtailments and all changes in schedules due to curtailments occurring in real-time pursuant to its separate agreements with other entities. The TANC Coordinator shall maintain the bulletin board, based on information received from the Operating Agent on a real-time basis. It is the intent of the Members to share the use of Transfer Capability in order to avoid curtailments to the extent possible without jeopardizing service to their own customers. 3.2.1 Using the data on the bulletin board,'the Members may make Transfer Capability buy/sell arrangements among themselves and will make appropriate arrangements relative to changes in the amount of reserved transmission capacity and the corresponding power schedule changes pursuant to their separate agreements with other entities. 3.2.2 The Members will notify the TANC Coordinator of any changes in the amount of Transfer Capability they have reserved. The TANG Coordinator will update the data on the bulletin board. 9 • 1 2 3 4 5 6 7 8 9 10 11 12 13' 14 15 16' 17 18 19 20 21 22 23 24 25 26 27 28 APPENDIX E BILLING ADDRESSES OF THE PARTIES City of Alameda Bureau of Electricity 2000 Grand Street Alameda, CA 94501 City of Healdsburg c/o Northern California Power Agency 180 Cirby Way Roseville, CA 95678 City of Lodi Call Box 3006 Lodi, CA 95241-1910 City of Lompoc 100 Civic Center Plaza Lompoc, CA 93438 Modesto Irrigation District P. O. Box 4060 Modesto, CA 95352 City of Palo Alto P. 0. Box 10250 Palo Alto, CA 94303 City of Redding 760 Parkview Avenue Redding, CA 96001-3396 City of Roseville 2090 Hilltop Circle Roseville, CA 95678 Sacramento Municipal Utility District P. O. Box 15830 Sacramento, CA 95852-1830 City of Santa Clara 1500 Warburton Avenue Santa Clara, CA 95050 Turlock Irrigation District P. O. Box 949 Turlock, CA 95381 City of Ukiah 300 Seminary Avenue Ukiah, CA 95482 E-1 I Plumas-Sierra Rural Electric Cooperative P. 0. Box 2000 2 Highway 70, 3 Miles West of Portola Portola, CA 96122-2000 3 Transmission Agency of Northern California 4 P. 0. Box 661030 Sacramento, CA 95866 5 6 7 8 9 10 11 12 13 14 25 16 17 18 19 20 21 22 23 24 25 26 27 28 E-2