COU No. 8990-001
CONDRIACD an
TRANSMISSION AGENCY OF
NORTHERN CALIFORNIA
PROJECT AGREEMENT NO. 3
FOR THE
CALIFORNIA-OREGON TRANSMISSION PROJECT
2/23/90
l
2'
3
i
4
5'
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
221
i
23
24
25!
26
27
28
TRANSMISSION AGENCY OF NORTHERN CALIFORNIA
PROJECT AGREEMENT NO. 3
FOR THE
CALIFORNIA-OREGON TRANSMISSION PROJECT
AMONG
THE TRANSMISSI.ON_AGENCY__OF...NOR.THERN CALIFORNIA
THE CITY OF ALAMEDA
THE CITY OF HEALDSBURG
THE CITY OF LODI
THE CITY OF LOMPOC
THE MODESTO IRRIGATION DISTRICT
THE CITY OF PALO ALTO
THE PLUMAS-SIERRA RURAL ELECTRIC COOPERATIVE
THE CITY OF REDDING
THE CITY OF ROSEVILLE
THE SACRAMENTO MUNICIPAL UTILITY DISTRICT
THE CITY OF SANTA CLARA
THE TURLOCK IRRIGATION DISTRICT
THE CITY OF UKIAH
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18I
19
20I
21I
22
23
24
25
26
27
28
TRANSMISSION AGENCY OF NORTHERN CALIFORNIA
PROJECT AGREEMENT NO. 3
FOR THE
CALIFORNIA-OREGON TRANSMISSION PROJECT
TABLE OF CONTENTS
SECTION
PAGE
Preamble. . . . . . . . ... . . . . . . . .
1
Recitals. . .....
1
1
Definitions . . . . . . . . . . . . . . . . .
4
2
Project Participation and Authorization
12
3
Duties and Responsibilities of TANC During
Phase II and Phase III . . . . . . . . . . .
15
4
Obligations of Members During Phase II and
Phase III . . . . . . . . . . . . . . . . . .
. 20
5
Term, Termination, and Amendments
26
6
Default . . . . . . . . . . . . . . . . .
27
7
Use of Transfer Capability . . . . . . . . .
30
8
Scheduling . . . . . . . . . . . . . . . . .
33
9
Insurance and Indemnification
34
10
Compliance with Other Instruments
34
11
Liability of TANC Officers . . . . . . . . .
34
12
Notice and Computation of Time . . . . . . .
35
13
Applicable Law . . . . . . . . . . . . . . .
36
14
Severability . . . . . . . . . . . . . . . .
36
15
Members' Right to Withdraw
36
16
Assignment of Agreement . . . . . . . . . . .
41
17
Members' Obligations Several
41
1
2
3
4
5
6
7
81
9,
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
18
Trustee as a Third Party Beneficiary . . .
. 41
19
Appendices . . . . . . . . . . . . . . .
. 42
20
Waiver . . . . . . . . . . . . . . . . . .
. 42
21
Captions . . . . . . . . . . . . . . . . .
. 42
22
Billing and Payment . . . . . . . . . . .
. 42
23
Distribution of Assets . . . . . . . . . .
. 44
24
Counterparts . . . . . . . . . . . . . .
. 44
25
Signatures . . . . . . . . . . . . . . . .
. 44
Memorandum of Understanding . . . . . . . . . . APPENDIX A
Memorandum of Understanding Annex . . . . . . . APPENDIX B
Participation Percentages . . . . . . . . . . APPENDIX C
Prescheduling of Transmission Use
and Curtailment Notification
Procedures . . . . . . . . . . . . . . . APPENDIX D
Billing Addresses of the Parties . . . . . . . APPENDIX E-
1
2
3
4
5
6
7
8
9
10
11
12
13''
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
PREAMBLE
This Project Agreement No. 3 is made and entered into as of
March 1, 1990, by and among the Transmission Agency of Northern
California, hereinafter referred to as "TANC"; and the Cities of
Alameda, Healdsburg, Lodi, Lompoc, Palo Alto, Redding, Roseville,
Santa Clara, and Ukiah; the Sacramento Municipal Utility
District; the Modesto Irrigation District; the Turlock Irrigation
District;..and.the.Plumas-Sierra Rural.Electric Cooperative
RECITALS
WHEREAS:
A. On December 10-, 1984, TANC was duly established as a
•joint powers agency, pursuant to.Section 6500 et seq. of the
California Government Code, by an agreement among the Members
entitled "Joint Powers Agreement, Transmission Agency of Northern
California"; and
B. TANC, in its own name, or for the benefit of its
Members, has the power to acquire by purchase or eminent domain,
construct, finance, operate and maintain facilities for electric
power -transmission including, without limitation, the power to
purchase, lease, operate, develop, contract for, or own, new or
upgraded transmission lines, and facilities for the benefit of
the Members; and
C. Each Member of TANC owns and operates a system for the
distribution of electric power and energy,and is authorized to
1
2
3
4
5
7
8
9
10
11
12
13
14
15
16
17'
18
19
20
21
22
23
24
25
26
27
28
obtain transmission facilities or rights to use transmission
facilities for its present or future requirements, through
contracts with TANC or otherwise; and
D. TANC, on behalf of its Members, executed the
December 19, 1984, "Memorandum of Understanding, California -
Oregon Transmission Project," among certain California entities
and the Western Area Power Administration, which sets forth
principles for the development of the California -Oregon
Transmission Project -including the designation of TANC as Project
Manager; and
E. The Members of TANC entered into the June 19, 1985,
"Project Agreement" for the purposes of issuing and selling a
promissory note for financing studies and other pr.eliminary costs
to be incurred prior to making a decision, after environmental
and other review, of whether to undertake construction of the
California -Oregon Transmission Project; and
F. The Members of TANC entered into the September 30, 1985,
"TANC Project Agreement No. 2 for the California -Oregon
Transmission Project" for the purpose of refinancing the
promissory note and to fund certain feasibility and planning
studies, and to provide for TANC's share of the costs for Project
Development Work for the California -Oregon Transmission Project;
and
G. TANC, on behalf of its Members, executed the
September 30, 1985, "California -Oregon Transmission Project
Development Agreement" for the purpose of completing required
activities such as'obtaining approvals, certificates, licenses
and permits as required by law and regulation before undertaking
)
1
2
3
4
5
6
7
8
9
10
11
12
131
141
15
16
17
18
19
20
21
22
23
24
25
26
27'
28
construction of the Project; and
H. TANC, on behalf of its Members, entered into the
Memorandum of Understanding Annex dated February 6, 1986, with
the initial Participants and additional non --federal public
entities which allocated a 3.125 percent Project entitlement
I
among the additional Participants and re -allocated the remaining
entitlement among the initial Participants; and
I. The Members of TANC desire to authorize TANC to
undertake additional responsibilities as_a Participant in.the
California -Oregon Transmission Project on behalf of the Members,
and recognize the desire of all Participants in the California -
Oregon Transmission Project for TANC to perform the duties of
Project Manager, including the duties and responsibilities
described in the "Memorandum of Understanding, California -Oregon
Transmission Project," and the "Project Participation Agreement,"
as defined in this Agreement;.and
J. On January 20, 1988, TANC certified the Final
Environmental Impact Report for the California -Oregon
Transmission Project, the Los Banos -Gates Transmission Project,
and the Pacific Northwest Reinforcement Project, made findings
pursuant to the California Environmental Quality Act, and
approved the California -Oregon Transmission Project; and
K. Each Member executing this Agreement has participated in
the preparation and review of the Draft Environmental Impact
Report and has reviewed and approved the Final Environmental
Impact Report for the California -Oregon Transmission Project and
adopted the findings made by TANC as lead agency for the
California -Oregon Transmission Project.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
NOW, THEREFORE, in consideration of the mutual covenants and
conditions set forth in this Agreement, TANC and the Members
agree as follows:
1. DEFINITIONS
Whenever used in this Agreement, the following terms shall
have the following meanings. ,The singular of any term shall
include the plural and the plural shall include the singular.
I
1.1 "Acquisition and Construction Work" - Any work
necessary or useful for acquisition and construction of the
Project, including procurement of materials and any land or
rights in land in connection therewith; and, in addition, that
work to be done pursuant to or in the negotiation of the Intertie
Agreements for: management and administrative services;
economic, legal, engineering, and other activities;.and services
which may be necessary or convenient in connection with the
Intertie Agreements.
1.2 "Addition" - A new facility, other than a Betterment
or Replacement, that is added to the Project, together with
associated land rights, if any.
1.3 "Agreement" - This Project Agreement No. 3 among the
Members and TANC, as amended and supplemented from time to time
in accordance with the terms hereof.
.1.4 "Betterment" - A new facility,.other than a
Replacement, together with associated land rights, if any, which
will increase the "Rated Project Transfer Capability" (as that
term is defined in the Intertie Agreements) above the then-
1
2
3
4
5
6
7
8
0
10
11
12
13
14
15
i
' 16
17
18
19
20
21
22
23
24
25
2E
27
2E
current Rated Project Transfer Capability or sixteen hundred
(1600) megawatts, whichever is less.
1.5 "Closing Date" - The date of each issuance of TANC
Project Indebtedness, as determined and announced by written
notice from TANC to all TANC Members, as further described in
Section 4.1.1.
1.6 "Debt Service" - With respect to any period, the
aggregate of the amounts required by each Indenture to be paid
during said period into any fund or account created by the
Indenture for the sole purpose of paying or providing reserves
for paying the.principal (including sinking fund installments) of
and premium, if any, and interest on all the Indebtedness from
time to time outstanding; provided, however, that Debt Service
shall not include any amounts on account of acceleration of the
maturity of any Indebtedness.
1.7 "Electric System" - All properties and assets, real
and personal, tangible and intangible, of any Member (whether
leased or owned) now or hereafter existing, used for or
pertaining to the generation, transmission, transformation,
distribution and sale of electric capacity and energy, including
all additions, extensions, expansions, improvements and
betterments thereto and equipping thereof; provided, however,
that to the extent the Member is a joint owner of an asset or
property, only the Member's ownership interest in such asset or
property shall be considered to be part of its Electric System.
1.8 "Executive Committee" - A committee appointed by the
TANC Commission to which it may delegate certain responsibilities
as provided in resolutions duly adopted by the TANC Commission
1
2
3
4
5
6
7
8
9.
10
11
121
131
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
pursuant to the Joint Powers Agreement.
1.9 "Fiscal Year" - The twelve-month period terminating on
September 30 of each year, or any other annual accounting period
hereafter selected and designated by TANC as its Fiscal Year for
purposes of this Agreement and each Indenture.
1.10 "Indebtedness" - Bonds, notes or other evidences of
indebtedness (including, without limitation, contracts relating
to letters of credit or other credit enhancement devices and
long-term contracts which are characterized as debt by TANC at or
prior to execution thereof) issued or otherwise.incurred or
entered into by or on behalf of TANC in connection with the
Project-. For purposes of this Agreement, Indebtedness shall be
considered outstanding as of any date if such Indebtedness has
not been paid or if provision for the payment of the principal of
and interest on such Indebtedness' has not been made in accordance
with the Indenture pursuant to which such Indebtedness has been
issued or incurred.
1.11 "Indenture" - one or more indentures or other
instruments approved or adopted by TANC providing for the
issuance or incurring of Indebtedness.
1.12 "Interest Charge" - That charge against unpaid amounts
due and owing in accordance with this Agreement assessed at an
annual interest rate compounded monthly equal to the lesser of
(i) two percent (2%) plus the applicable first of the month
reference rate or successor, of the Bank of America N.T. & S.A.,
San Francisco, California, in effect from time to time during the
period over which the payment is overdue or (ii) the maximum
interest rate permitted by law.
1
2
3
4
5
6
7
8
9
10
111
i
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
1.13 "Intertie Agreements" - Agreements related to the
Project which have been or which may be entered into by TANC and
some or all of the other Participants, which include, but are not
limited to, the MOU, the Project Development Agreement, the
Project Participation Agreement, any amendments to the foregoing
agreements, and other agreements related to the Project entered
into by TANC as Project Manager or by TANC on behalf of the
Members.
1.14 "Joint Powers Agreement" - The Joint Powers Agreement,
Transmission Agency of Northern California, dated December 10,
1984, which established TANC as a joint powers agency pursuant to
Section 6500 et seq..of the California Government.Code, as
amended and supplemented from time to time.
1.15 "Management Committee" - A committee as described in
the MOU and further described in the Intertie Agreements.
1.16 "Member".- Any. of the Cities of Alameda, Healdsburg,
Lodi, Lompoc, Palo Alto, Redding, Roseville, Santa Clara, and
Ukiah; the Sacramento Municipal Utility District; the Modesto. -
Irrigation District; the Turlock Irrigation District; or the
Plumas-Sierra Rural Electric Cooperative, which, at any given
point in time, is a party to the Joint Powers Agreement and
retains its rights and interests under this Agreement.
1.17 "MOU" - The Memorandum of Understanding, California -
Oregon Transmission Project, dated December 19, 1984, among the
Participants, the Department of Water and Power of the City of
Los Angeles, and the California Department of Water Resources, as
modified by the Memorandum of Decision of the United States
Secretary of Energy, dated February 7, 1985, as interpreted by
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15I
16'.
17
18
19
20
21
22
23
24
25
26
27
28
the letter of the United States Department of Energy Acting
General Counsel, dated May 4, 1985, a copy of which is attached
i
hereto as Appendix A, as amended by the Memorandum of
Understanding Annex, and as it may be further amended.
1.18 "Memorandum of Understanding Annex" - The agreement
among the Participants, the California Department of Water
Resources, and the Department of Water and Power of the City of
Los Angeles executed on February 6, 1986 which modified the MOU
and allocated a 3.125 percent Project entitlement to certain non-
federal public entities set out at 50 Fed. Reg. 42769 (1985.) and
simultaneously reduced the existing Participants' entitlements by
a corresponding percentage, a copy of which is attached hereto as
Appendix B.
1.19 "Operating Agent" - The Participant designated in the
I.ntertie Agreements to have the duties and responsibilities for
the overall operation and maintenance of the Project.
1.20 "Opposing Member" - A Member which votes against a
Betterment or Addition in accordance with Section 3.1.2.2.1 or
3.1.2.2.2.
1.21 "Participants" - Those entities, including TANC, which
have interests in the Project through execution of the Intertie
Agreements.
1.22 "Participation Percentage" - That percentage of TANC's
entitlement to Transfer Capability which an individual Member of
TANC has the right to use as set forth in Appendix C of this
Agreement. Such percentages may be modified pursuant to Sections
2.3, 3.1.2.2, 6,. and 15.
1.23 "PDA" - Project Development Agreement.
1
2
3
4
5
6
7'
8'
9.
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
1.24 "Phase" or "Phases" - Those activities of the Project
described in Section 2.2.
1.25 "Proiect" - The California -Oregon Transmission
Project, which consists of electric transmission facilities
between California and the Pacific Northwest, as such Project is
generally described in, and as changed pursuant to, the Intertie
Agreements.
1.26 "Project Development Agreement" - That agreement among
the Participants dated September 30, 1985, which provides, inter
alia, for the Participants to share the costs of Project
Development Work.
1.27 "Project Development Work - That.work described in
Appendix A of -the PDA; or consistent with and within the scope of
Appendix A of the PDA and approved by the Management Committee to
be performed in accordance with the PDA.
1.28 "Pro.ject.Manager" - The entity designated by the
parties to the MOU and the Intertie Agreements which has the
overall management responsibility for the Acquisition and
Construction Work of the Project.
1.29 "Project Participation Agreement" - That agreement
which may be executed by those Participants electing to proceed
with Phase II and Phase III of the Project, as it may be modified
and supplemented in accordance with the terms thereof.
1.30 "Replacement" - A new facility that is intended to be
a direct replacement for an existing facility, which is designed
primarily to maintain the existing operational reliability or
capability of the Project, irrespective of whether the
replacement results in an incidental increase in the "Rated
7
81
9
10
11
12
13
14
15
16
17
18
19
all
21
22
23
24
25
26
27
28
Project Transfer Capability" (as that term is defined in the
Intertie Agreements), and which results in a "retirement unit"
being substituted for another such retirement unit. As used
herein, "retirement unit" shall mean property as defined in
Section 15060 of the Federal Energy Regulatory Commission Uniform
System of Accounts Prescribed for Public Utilities and Licensees
Subject to the Provisions of the Federal Power Act, or its
successor document.
1.31 "Revenues All income, rents, rates, fees, charges,
and other moneys derived by a Member from the ownership or
operation of its Electric System, including, without limiting the
generality of the foregoing (i) all income, rents, rates, fees,
charges, or other moneys derived from the sale, provision, and
supply of electric capacity and energy and other services,
facilities, and commodities sold, furnished, or supplied through
the facilities of the Electric System, (ii) the earnings on and
income derived from the investment of such income, rents, rates,
fees, charges, or other moneys to the extent that the use of such
earnings and income is limited to the Electric System by or
pursuant to law and (iii) the proceeds derived by such Member
directly or indirectly from the sale, lease, or other disposition
of a part of the Electric System as permitted hereby; but the
term "Revenues" shall not include customers' deposits or advances
subject to refund or contributions in aid of construction until
such deposits, advances, or contributions have become the
property of the Member.
1.32 "TANG Capital Improvement Costs" - Those costs
incurred in connection with Phase III of the Project allocable to
1
2
3
4
5
6
7
8
9
10
11
12
13'
14'
15
16
17
18
19
20
21
22
23
24
25
26
27
28
TANC for the purpose of making Additions, Betterments, or
Replacements to the Project and such other costs relating to
capital improvements to the Project properly chargeable to TANC
pursuant to the Intertie Agreements.
1.33 "TANC Commission" - The governing body of TANC as
described in the Joint Powers Agreement.
1.34 "TANC Coordinator" - An entity appointed by TANC to,
inter alia, coordinate the Members' use of TANC's entitlement to
Transfer Capability.
1.35 "TANC Protect Costs" - Those costs incurred in
connection with Phase II of the Project allocable to TANC and
such other costs relating to the acquisition and construction of
the Project properly chargeable to TANC pursuant to the Intertie
Agreements.
1.36 "TANC Project Indebtedness" - That Indebtedness to be
issued by TANC to finance TANC Project Costs, TANC Project O&M
Costs, TANC Capital Improvement Costs, and such other costs as
are described in Section 4.1.3.1.
1.37 "TANC Project O&M Costs" - Those costs incurred in
connection with Phase III of the Project allocable to TANC which
are necessary to operate and maintain the Project, such other
costs relating to the operation and maintenance of the Project
properly chargeable to TANC pursuant to the Intertie Agreements,
and costs of the TANC Coordinator. TANC Project O&M costs shall
not include TANC Project Costs or TANC Capital Improvement Costs.
1.38 "Transfer Capability" - The ability of the Project or
a segment thereof to transmit power, expressed in megawatts, as
determined in accordance with the Intertie Agreements. As used
l�
I
2
3'
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
in this Agreement, the term "Transfer Capability" can refer to a
rated amount or an amount available at any given time, as
appropriate in the context in which such term is used. TANC and
its Members acknowledge that there may be times when available
Transfer Capability is less than the rated amount for the Project
or a segment thereof.
1.39 "Trustee" - Any trustee, including any successor
trustee, under an Indenture.
I2. PROJECT PARTICIPATION AND AUTHORIZATION
2.1 Scope - TANC is hereby authorized and directed to act
Ift
on behalf.of the Members in-acL1y.LtJ1es related to Phase II and
Phase III of the Project, as more fully described below, as a
Participant pursuant to the Intertie Agreements, subject to
procedures for Member approval and authorization established by
the TANC Commission pursuant to this Agreement and the Joint
Powers Agreement. TANC is also hereby authorized to fulfill its
duties and responsibilities as Project Manager or under any other
management role pursuant to the Intertie Agreements.
2.2 Phases - The Project shall proceed in accordance with
*the following activities:
2.2.1 Phase I activities consist of Project
Development Work;
2.2.2 Phase II activities consist of Acquisition and
Construction Work;
2.2.3 Phase III activities consist of operation,
maintenance, Additions, Betterments, Replacements, and the
retirement or disposal of the Project.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
2.3 Participation
2.3.1 Pursuant to Paragraph 15 of the Joint Powers
Agreement, the Members executing this Agreement each hereby
(i) approve TANC's participation in the Project as a
Participant in accordance with, and to the extent provided
in, the Intertie Agreements and this Agreement and (ii)
elect to participate in Phases II and III of the Project in
the Participation Percentages set forth in Appendix C, as
those percentages may be revised in accordance with this
Agreement. In consideration of such approval and election,
and payment of its share of the costs set forth in
Section 4, each Member shall be entitled to its respective.
Participation Percentage share of TANC's entitlement to
Transfer Capability on the terms and conditions provided for
by this Agreement. In the event that the first.issuance and
sale of TANC Project Indebtedness does not occur within six
X(6) months after the date of this Agreement, any Member may
terminate its participation under this Agreement by giving
written notice to TANC, in which case the Participation
Percentage of such Member shall be divided pro rata among
the remaining Members based on Participation Percentages,
unless otherwise agreed to by such remaining Members. After
the first issuance and sale of such TANC Project
Indebtedness, no Member may terminate its participation in
this Agreement.
2.3.2 In the event that TANC's entitlement to
Transfer Capability changes from time to time, within sixty
(60) days after such change, the Members shall be permitted
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
to revise the Participation Percentages set forth in
Appendix C without an amendment to this Agreement, subject.
to the following conditions:
2.3.2.1 The Participation Percentages set
forth in Appendix C shall govern in the event that the
Members are unable to agree to such a revision to
Appendix C;
2.3.2.2 No Member shall be required to
accept a Participation Percentage which, when
multiplied -by TANC's megawatt entitlement to Transfer
Capability, would exceed the megawatt amount set forth
in the Appendix C, Column D, in which event such
excess Participation Percentage.shall be divided pro
rata among the other Members based on Participation
Percentages, unless otherwise agreed to by such
Members;
2.3.2.3 No Member may agree to a
Participation Percentage which, when multiplied by
TANC's megawatt entitlement to Transfer Capability,
would be less than the megawatt amount set forth in
Appendix C, Column C;
2.3.2.4 No Member may agree to a
Participation Percentage which, when multiplied by
TANC's megawatt entitlement to Transfer Capability,
would exceed the megawatt amount set forth in
Appendix C, Column D, if the effect of such agreement
would be to materially, adversely alter any rights of
or security for holders of TANC Project Indebtedness.
1 2.3.3 Members acknowledge and agree that,
2 notwithstanding the foregoing provisions, Member defaults
3 may result in a non -defaulting Member accepting a megawatt
4 amount in excess of the limits set forth in Appendix C,
5 Column D. Members also acknowledge and agree that,
6 notwithtstanding the foregoing provisions, no such agreement
7 shall result in aggregate Participation Percentages of the
8 Members of less than one hundred (100) percent.
9
10 3. DUTIES AND RESPONSIBILITIES OF TANC DURING PHASE II AND
11 PHASE III
12 3.1 Decisions - Decisions related to the Project shall be
i
13 made by the TANC Commission at meetings to be held at times and
14 places determined by the TANC Commission; provided, that the TANC
15 Commission may delegate decisions to its Executive Committee or
16 others, between meetings, as provided in resolutions duly adopted
17 by the TANC Commission pursuant to the Joint Powers Agreement.
i8 3.1.1 The exercise of the rights and obligations of
19 TANC under this Agreement shall be subject to the control at
20 all times of the TANC Commission.
21 3.1.2 Voting - Approvals or authorizations required
22 under this Agreement shall be given or withheld by the TANC
23 Commission using the voting procedures described in the
24 Joint Powers Agreement, subject to the following provisions:
25 3.1.2.1 Phase II Activities - With regard to
26 Phase II activities as described in Section 2.2.2, to
27 constitute a quorum, the combined Participation
28 Percentages of the Members not in default represented
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
'24
25
26
27
28
by the TANC Commissioners present must represent at
least sixty (60) percent of the aggregate
Participation Percentages of Members not in default at
the time of the vote and the action must be approved
by TANC Commissioners representing at least a majority
of the aggregate Participation Percentages of Members
not in default at the time of the vote.
3.1.2.2 Phase III Activities - With regard
to Phase III activities as described in Section 2.2.3,
to constitute a quorum, the combined Participation
Percentages of the Members not in default represented
by t
least sixty (60) percent of the aggregate Participa-
tion Percentages of Members not in default at the time
of the vote and the action must be approved by TANC
Commissioners representing at least'a majority of the
aggregate Participation Percentages of Members not in
default at the time of the vote, provided:
3.1.2.2.1 In the event that a
Member votes against a proposed Betterment,
such Opposing Member shall have no obligations
stemming from such Commission action nor shall
such Opposing Member have any right to
participate in the benefits of such Commission
action and, with regard to such benefits and
obligations, the Participation Percentage of
each Member except for the Opposing Member(s)
shall be increased to the ratio between each
1
2
3
4
5
6
7
8
9
10
11
12
13
141
15
16
17
18
19
20
21
22
23
24
25
26
27
28
such Member's Participation Percentage and the
aggregate of the Participation Percentages of
the Members excluding such Opposing Member's),
expressed as a percentage.
3.1.2.2.2 In the event that a
Member votes against a proposed Addition to
the Project in any. Fiscal Year, and TANC's
share of the cost of all Additions previously
approved in such Fiscal Year when added to
TANC's share of the cost of the proposed
Addition exceeds twenty-five million dollars
($25,000,000) adjusted in accordance with
changes in the Consumer Price Index (CPI) or
successor index using the January 1, 1990,
level as the base year, with regard to such
Opposing Member's Participation Percentage of
such excess amount only, such Opposing Member
shall have no obligations stemming from such
Commission action nor shall such Opposing
Member have any right to participate in the
benefits of such Commission action. With
regard to the rights and obligations
associated with such excess amount, the
Members excluding such Opposing Member(s)
shall negotiate appropriate adjustments to
their Participation Percentages.
3.1.2.2.3 In the event that a
Member votes against a proposed Replacement,
1
2
3
I
4
5
6',
7
81
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
such. Member shall nevertheless be bound by the
outcome of such Commission action.
3.1.2.2.4 Nothing contained herein
is intended to relieve any Member from its
obligations resulting from Commission action
except as specifically provided in Sections
3.1.2.2.1 and 3.1.2.2.2.
3.1.2.2.5 Each agreement by the
Members with respect to Betterments or
Additions shall specifically recognize TANC's
rights under this Agreement which secure TANC
Project Indebtedness.
3.2 Specific Duties and Responsibilities - TANC, through
the approval of the TANC Commission, shall be empowered to
perform all duties appropriate for the implementation of Phase II
and Phase III of the Project, subject to .the terms hereof,
including but not limited to:
3.2.1 Act as Project Manager or in any other
managerial role for the Project in accordance with the
Intertie Agreements;
3.2.2 Authorize (i) the issuance or incurrence of
Indebtedness and the appropriate documentation related
thereto, (ii) the contract of purchase or notice of sale or
other instrument under which Indebtedness is to be sold or
incurred, (iii) the selection of managing underwriters for
Indebtedness (if such Indebtedness is to be sold upon a
negotiated basis), and (iv) the manner and timing of
marketing (including the manner of sale), if applicable,
1
2
3
4
5
6
7
8
9
10
11
12
13
14�
15�
16'
17
18
19
20
21
22
23
24
25
26
27
28
interest rates, and other terms of Indebtedness;
3.2.3 Provide periodic reports of major construction
and major events to the Members with respect to the Project;
3.2.4 Review, discuss, and attempt to resolve any
disputes among TANC and/or the Members;
3.2.5 Negotiate, review, approve, execute, enforce
and modify Intertie Agreements as a Participant on behalf of
the Members for Phase II and Phase III and perform all
activities necessary to fulfill TANC's obligations as a
Participant under those agreements;
3.2.6 Approve and engage consultants or advisors on
financial, economic, engineering, environmental, management,
and legal or other matters;
. 3.2.7 Review, modify, and approve TANC's insurance
program including, without limitation, the establishment of
a self-insurance program;
3.2.8 Incur costs, liabilities, and obligations;
3.2.9 Purchase, sell, rent, and lease equipment,
apparatus, materials, and supplies and establish and
maintain inventories of any of the foregoing;
3.2.10 Acquire by purchase or eminent domain any
interest in property, real or personal;
3.2.11 Enforce, waive, adjust or compromise any claim
by or against TANC, including claims covered by or relating
to insurance policies;
3.2.12 Initiate, defend, and otherwise participate in
legal and administrative proceedings;
3.2.13 Maintain for Member inspection and audit for
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
the term of this Agreement, and for three (3) years
thereafter, books and cost records of TANC in accordance
with generally accepted accounting principles;
3.2.14 Perform other tasks as may be necessary to
fulfill its obligations as a Participant, as Project
Manager, and in any other managerial role under this
Agreement and the Intertie Agreements during Phase II and
Phase III of the Project in a timely, cost effective manner.
4. OBLIGATIONS QDURIN.G PHASE II AND PHASE III
4..1 TANC Project Costs - Subject to Section 3.1.2.2, each
Member agrees -to pay, based on its Participation Percentage, its
portion of TANC Project Costs, its portion of TANC Project O&M
Costs, its portion of TANC Capital Improvement Costs, and its
portion of Debt Service on TANC Project Indebtedness, in each.
case as provided in this Section 4.1:
4.1.1 At least sixty (60) days prior to the -initial
Closing Date and at -least sixty (60) days prior to the
commencement of each Fiscal Year thereafter, the TANC
Commission shall develop, approve, and distribute to the
Members a budget for TANC Project Costs, Debt Service for
TANC Project Indebtedness, TANC Project O&M Costs, and TANC
Capital Improvement Costs which the TANC Commission
estimates will be incurred during the then -current Fiscal
Year in the case of, the initial budget and during the next
succeeding Fiscal Year for all subsequent budgets. Such
budgets shall be generally based upon budgets approved by
the Management Committee and upon TANC's estimates of TANC
m.
10
11
12
13
14
15
16
17
18
19
2C
21
2�
2--
2e
2!
2(
2i
i
2f
Project Costs, Debt Service for TANC Project Indebtedness,
TANC Project 0&M Costs, and TANC Capital Improvement Costs;
provided, that if a budget has not been approved by the
Management Committee the budget shall be based upon TANC's
estimates. Each budget other than the initial budget shall
also include a variance report which compares actual
expenditures with budgeted amounts for the previous Fiscal
Year. As soon as practicable after the approval of each
such budget, TANC shall mail the budget to.the Members.
Members acknowledge and agree that Participant defaults or
withdrawals that result in changes in TANC's ownership
interest in -the Project will require changes in TANC's
payment obligations under the Intertie Agreements
approximately proportionate to the change in TANC's
entitlement to Transfer Capability and a corresponding
change in the Members' payment obligations hereunder. TANC;
if requested by any Member, will make best efforts to
remarket any entitlement to Transfer Capability that such
Member or its designated agent may determine to be in excess
of that Member's requirements. Remarketing efforts will be
focused on the other Members, the Western' Area Power
Administration, the California Department of Water
Resources, and other Participants. Members also acknowledge
and agree that some anticipated Participants may elect not
to enter into the Intertie Agreements for Phase II and
Phase III of the Project and that this Agreement is intended
to permit the Project to be constructed without such
anticipated Participants so that TANC's ownership interest
1
2
3
4
5
6
7
8
9
10
11
12!
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
in the Project, and thus the amount of Transfer Capability
to which each Member shall be entitled pursuant to this
Agreement, will vary depending on the final ownership
interests established for TANC and the other Participants
pursuant to the Intertie Agreements. TANC currently
anticipates that, at the time of execution of the Intertie
Agreements, the Intertie Agreements will establish TANC's
initial ownership interest in the Project at a minimum of
42.2916% and a maximum of 93.75%.
4.1.2 Each of the Members hereby approves the
issuance and sale of TANC Project Indebtedness as provided
in Section 4.1.3.1 below subject to approval of the TANC
Commission pursuant to Section 3.1.2. Such approvals are
intended to be and are limited to the approvals.required by
Paragraphs 6 and 15 of the Joint Powers Agreement. Such
Indebtedness shall not constitute a debt, liability.or
obligation of any of the Members and shall not constitute a
debt of TANC payable by the Members pursuant to Paragraph 21
of the Joint Powers Agreement.
4.1.3 Subject to Section 3.1.2.2, each of the
Members hereby severally requests and agrees as follows:
4.1.3.1 Each Member requests that TANC
issue, sell, or otherwise incur Indebtedness from time
to time pursuant to the provisions of Chapter 5,
Division 7, Title 1 of the Government Code of the
State of California or any other applicable provisions
of law in amounts which will be sufficient to permit
TANC to pay, when due, all TANC Project Costs, TANC
1
2
3
4
5
6
7
8
9
10
11
121
131
141
15'
16,
17'.
18
19
20
21
22
23
24
25
26
27
28
Project 0&M Costs through the first full Fiscal Year
after completion of the Project, TANC Capital
Improvement Costs, costs of issuance, credit
enhancements and other costs incurred in connection
with the issuance or incurring of TANCProject
Indebtedness, and to provide for capitalized interest
as determined by TANC and for required deposits to
funds and accounts established by each Indenture and,
in addition, to provide for the principal and interest
on all Indebtedness outstanding on the initial Closing
Date (all of said Indebtedness to constitute TANC
Project Indebtedness). Whenever TANC deems it
beneficial to the Members, as a result of Debt Service
savings or otherwise, upon approval of the TANC
Commission, TANC may issue Indebtedness to refund
outstanding TANC Project Indebtedness (which the
Members hereby authorize) and the same shall be TANC
Project Indebtedness.
4.1.3.2 Each Member severally agrees to pay
to ANC an amount equal to its Participation
Percentage of all Debt Service on the TANC Project
Indebtedness to enable TANC to pay such Debt Service
at the times and in the manner set forth in the
applicable Indentures. Each Member also agrees to pay
to TANC, in accordance with ction 22 an amount
equal to its Participation Percentage of TANC Project
Costs, TANC Project O&M Costs, and TANC Capital
Improvement Costs, not financed by TANC Project
11
3
4
5
6
7
8
9
10
11
12
13
14
151
16'I
17
18
19
20
21
22
23
24
25
26
i
27
28
Indebtedness as indicated in the budgets prepared
pursuant to Section 4.1.1, including any budget
revisions made pursuant to Section 4.1.5.
4.1.3.3 Upon failure of a Member to make any
o p y tF"'h ments described in Section 4.1.3.2, TANC
shall make demand upon such Member, and if said
failure is not remedied within forty-five (45) days
from the date of such demand, it shall constitute a
default at the expiration of such forty-five (45) day
period. Such default shall be handled in accordance
with Section 6. Notice of such demand shall be
provided to the other Members.
4.1.3.4 Each Member agrees to establish
ra nd charges for its Electric System so.as to
provide Revenues sufficient, together with other
available funds derived from its Electric System, to
pay, when due, all amounts payable by such Member
under this Agreement and to pay all other amounts
payable from, and all lawful charges. against or liens
upon, the Revenues of its Electric System.
4 4.1.3.5 Each Member shall be obligated to
make payments under this Section 4.1.3 and to budget
for such payments solely from the Revenues of, and as
an operating expense of, its Electric System. Each
Member shall make the payments required of it by this
Agreement in the amounts and at the times determined
pursuant to this Agreement and such payments and the
obligation to make same shall be absolute and
10
11
12
13
i
14
15
16
17
16
19
20
21
22
23
24
2E
2E
27
2E
unconditional and such payments shall be made whether
or not the Project or any part thereof has been
completed, is operating or operable or its output or
capability is suspended, interrupted, interfered with,
reduced or curtailed, or terminated in whole or in
part, and such payments shall not be subject to
reduction whether by offset, counterclaim, recoupment
or otherwise and shall not be conditioned upon the
performance or nonperformance by any party to any
agreement or for any other cause or reason whatsoever.
4.1.3.6 Each Member covenants and agrees
that shall,. at all times so long as any TANC
Project Indebtedness remains outstanding, operate the
properties of its Electric System and business in
connection therewith in an efficient manner and at a
reasonable cost and shall maintain its Electric System
in good working order and condition, and shall
cooperate with TANC in the performance of the
respective obligations of TANC and such Member under
this Agreement.
4.1.3.7 Each Member agrees that all rights,
title, and interest of TANC in and to all payments
required to be made under this Section 4.1.3 by the
Members pursuant to the provisions hereof may be
pledged and assigned under the Indentures to secure
the TANC Project Indebtedness.
4.1.4 Funds received by TANC from the issuance and
sale of TANC Project Indebtedness shall be applied to one or
1
2
3
4
5
6
7
8
9
10.
11
12
13
14
15
16
17
18
19
20
21
22'
23
24I
25
26
27.
28
more of the purposes specified in Section 4.1.3.1 in
accordance with the Indenture authorizing such TANC Project
Indebtedness.
4.1.5 TANC may, from time to time, revise the
budgets established pursuant to Section 4.1.1 as necessary.
Such budgets shall include adjustments for variances between
estimated and actual costs included in previous budgets. In
that event, subject to Section 3.1.2, the procedures of
Sections 4.1.2 through 4.1.4 shall be followed for payment
of any additional costs.
5. TERM, TERMINATION, AND AMENDMENTS
5.1 Term - This Agreement shall take effect as of the date
hereof and shall remain in full force and effect during the. term
of the Joint Powers Agreement and the Intertie Ag.reements (as
their terms may be extended) or so long as any TANC Project
Indebtedness remains outstandina. whichever is longer.
5.2 Termination - This Agreement shall not be subject to
termination by TANC or any Member under any circumstances,
whether based upon the default of any party under this Agreement,
orany other instrument, or otherwise.
5.3 Amendments - So long as any TANC Project Indebtedness
is outstanding, this Agreement may be amended, modified, or
otherwise changed or rescinded, except as provided in the
applicable Indentures, so long as such amendment, modification,
change, or rescission would not materially, adversely. alter any
rights of or security for holders of such Indebtedness. Except
as, provided in Section 8.3, this Agreement may be amended only by
i
1
2
3
4
5
6
7
8
9
10
11
12
13'.
141
15'
L
16
17
18
19
20
21
22
23
24
25
26
y
27
28
jthe written agreement of all of the parties hereto.
16. DEFAULT
6.1 Defaulting Member's Participation Percentage - Upon
the failure of any Member or, with respect to its obligations
under Section 15, a.former Member who has withdrawn, to meet its
obligations hereunder, TANC shall give written notice of the
failure to such Member or former Member who has withdrawn and, if
such failure has not been cured within forty-five (45) days after
the date of such notice, it shall constitute a default at the
expiration of such forty-five (45) day period. Upon such
default, in addition to the rights and remedies available to TANC
pursuant to Section 6.2, TANC may protect and enforce its rights
hereunder by suit or suits in equity or at law, whether for the
specific performance of any covenant herein or for damages or in
aid of the execution of any power granted herein or any other
remedy available under any provision of applicable law. No
remedy by the terms of this Agreement conferred upon or reserved
to TANC is intended to be exclusive of any other remedy, but each
and every such remedy shall be cumulative and shall be in
addition to every other remedy given under this Agreement or
existing at law or in equity or by statute on or after the
effective date of this Agreement.
6.2 Nondefaulting Member's Participation Percentage - Upon
any default described in Section 4.1.3.3, the defaulting Member
shall no longer be entitled to any rights granted to the Members
with respect to the -Project, and each Member severally agrees
that the Participation Percentage of each nondefaulting Member
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
shall be automatically increased as follows:
6.2.1 Each Member severally agrees that the
Participation Percentage of each nondefaulting Member shall
be automatically increased to the ratio between such
nondefaulting Member's Participation Percentage and the
aggregate of the Participation Percentages of the
nondefaulting Members, expressed as a percentage. For
purposes of this Section 6.2.1 and Section 6.2.2, the term
"Member" shall include, but not be limited to, each former
Member who has withdrawn.from TANC and converted its
Participation Percentage of TANC's entitlement to Transfer
Capability to an ownership interest in the Project -pursuant
to -Section 15, and the term "Participation Percentage" shall
mean that percentage which would represent such withdrawn
Member's Participation Percentage of TANC's entitlement to
Transfer Capability if such conversion had not occurred.
6.2.2 Notwithstanding the provisions of Section
6.2.1, the cumulative increase for any nondefaulting Member
pursuant to this Section 6.2 shall not exceed twenty-five
percent (250) of its Participation Percentage in effect
immediately prior to the first default without the consent
of the Member; provided, that for purposes of determining
such cumulative increase any increase (i) pursuant to
Section 2.3 or 3.1.2.2, or (ii) which results because a
Member has withdrawn from TANC and converted its
Participation Percentage of TANC's entitlement to Transfer
Capability to an ownership interest in the Project pursuant
to Section 15, shall not be considered. The nondefaulting
2
3'
4
5
6
7
8
9
10
11
12
13
i 14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Members shall be entitled to the rights which the defaulting
Member loses upon the default and shall assume subject to
Section 6.3 all of the obligations of the defaulting Member
with respect to such rights hereunder. Increases in the
Participation Percentages of the nondefaulting Members shall
be applicable to any payments due and not paid by the
defaulting Member at the time of the increase and all
subsequent payments due and not paid by the defaulting
Member.
6.3 Defaulting Member's Obligations - Each Member agrees
that increases in the obligations of other Members pursuant to
Section 6.2 shall not relieve the defaulting Member or -a former.
Member who has withdrawn, of its liability for its obligations
described hereunder. The nondefaulting Members shall have a
right of recovery from the. defaulting Member to the extent of
increases in their obligations resulting from such default.(plus
interest at the Interest Charge) from the date of such default
until paid.
4 Tax Covenant - Notwithstanding any other provision of
h' greement, no Member shall transfer, assign, sell or
exchange any portion of its Participation Percentage of TANC's
entitlement to Transfer Capacity, or any other interest in the
Project or the capacity or capability thereof, directly or
indirectly, in any manner, or shall take, or to the extent it can
control the same permit to be taken, any other action or actions,
which would adversely affect the exclusion of the interest on any
of the TANC Project Indebtedness from gross income for federal
income tax purposes under Section 103 of the Internal Revenue
1!
21
3
4
6
71
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Code of 1986, as amended, and the applicable regulations
thereunder (or any successors to such statute and regulations),
including without limitation, by reason of classification of such
TANC Project Indebtedness as a "private activity bond" within the
(meaning of said Code.
17. USE OF TRANSFER'CAPABILITY
7.1 Member Use of Transfer Capability - Subject to the
provisions of this Section 7, Section 6.4, and .Section 8 hereof,
each Member shall have the right to use its Participation
Percentage of TANC's entitlement to Transfer Capability.for any
purpose, including holding such Transfer Capability in reserve or
making such Transfer Capability available to a Member,
Participant, or other entity, subject to the terms and conditions
relating to assignments and layoffs by Participants under the
Intertie Agreements; provided, that before a Member may make
unneeded Transfer Capability available to a non -Member, it shall
make such Transfer Capability available to the other Members on
terms and conditions which are established by the TANC
Commission. Nothing in this Section 7.1, however, shall prohibit
a Member or its designated agent from requesting that the TANC
Coordinator make all or part of such Member's unused Transfer
Capability available to other Members on behalf of such Member.
7.2 Non -Member Use of Transfer Capability - Each Member or
its designated agent shall notify the TANC Coordinator in the
event that it does not need all or a portion of its Participation
Percentage of TANC's entitlement to Transfer Capability and no
other Member needs such Transfer Capability. In such event, the
I TANC Coordinator shall then make such Transfer Capability
2 available to the other Participants pursuant to the provisions of
3 the Intertie Agreements. Otherwise, each Member or its
4 designated agent shall determine the disposition of its unneeded
5 Transfer Capability, which may include directing the TANC
6 Coordinator to make such Transfer Capability available to any
7 entity on such terms and conditions as such Member or its
8 designated agent may direct.
9 7.2.1 Compensation - Compensation.for the use of a
10 Member's Participation Percentage of TANC's entitlement to
11 Transfer Capability by other Participants will be as set
12 forth in the Intertie Agreements. In the event that the
13 provisions of the Intertie Agreements do not apply to the
14 transaction, compensation shall be as determined by each
15 Member making such Transfer Capability available.
16 7.2.2 Allocation of Revenue - Payments for the use
17 of TANC's unneeded entitlement to Transfer Capability by
18 non -Members -shall be collected by TANC and promptly and
19 fully credited directly to the Member making such Transfer
20 Capability available. Each such Member agrees that all
21 right, title, and interest of such Member and TANC in and to
22 such payments may be pledged and assigned under the
23 Indentures to secure payments required to be made under
24 Section 4.1.3 by or on behalf of such Member.
25 L.3 ? J40OU La offs - In accordance with Sections 10.1 and
J10.2 of the MOU as implemented by the Intertie Agreements, TANC
27 shall lay off a portion of its entitlement to Transfer
28 Capability. Compensation to TANC by those entities receiving the
1
21
3
41
5
6
7
8
9
10
14'
15
16i
17
18
19
20
21
22
23
24
25
26
27
28
layoff is to be based on TANC's Project Cost including financing
plus contingencies of twenty-five (25) percent.
7.3.1 Unless otherwise agreed by the Members, each
Member shall provide its portion of such layoffs in
accordance with the Member's Participation Percentage.
7.3.2 Payments for the layoff of TANC's entitlement
to Transfer Capability as described in Sections 10.1 and
10.2 of the MOU shall be collected by TANC and promptly and
fully credited to the Members based on each Member's
Participation Percentage unless otherwise agreed by the
Members. Each such Member agrees that all right, title, and
interest of such Member and TANC in and to such payments may
be pledged and assigned under the Indentures to secure
payments required to be made under Section 4.1.3 by.or, on
behalf of such Member.
7.4. In the event that a-Member's Participation Percentage
of TANC's entitlement to Transfer Capability converted to
(megawatts exceeds the megawatt amount in Appendix C, Column E,
!layoffs made by TANC pursuant to Sections 7.2 and 7.3 shall first
i
be made from such excess amount if so requested by that Member.
If more than one Member has such an excess amount and the sum of
all such excess amounts exceeds the amount of the layoff, the
layoff shall be made pro rata based on the ratio between each
such requesting Member's excess amount and the sum of all such
requesting Members' excess amounts.
7.5 Notwithstanding anything to the contrary contained in
this Section 7, no layoff of Transfer Capability made pursuant to
this Section 7 shall excuse a Member from making the full
1
2
3
4
5
6
7
8
9
10
11
I
121
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
payments required by Section 4 hereof nor reduce the amount or
extend the time of such payments.
8. SCHEDULING
8.1 Member Scheduling Rights - During any scheduling
period, each Member or its designated agent shall have the right
to schedule power transactions using Transfer Capability up to
the amount of its Participation Percentage of TANC's entitlement
to Transfer Capability, subject to the provisions of Section 7 of
this Agreement. Each Member or -its designated agent may also
schedule power transactions over any additional percentage of
Transfer Capability that it has a right to use. Notwithstanding
the provisions of Section 8.2, each Member or its designated
agent shall have the right to schedule.such transactions pursuant
to its separate agreements with other entities. All power
scheduled over the Project shall -be in whole megawatt amounts or
as otherwise set forth in the Intertie Agreements.
8.2 Project Use Information Coordination - Each Member or
its designated agent shall provide the TANC Coordinator with
Project use information required to meet TANC's obligations under
the Intertie Agreements as a Participant in the Project. The
TANC Coordinator shall submit such information to the Operating
Agent in accordance with such agreements.
8.3 Scheduling and Curtailment Procedures - Specific
procedures which implement the provisions of this Section 8 and
Section 7 hereof are set forth in Appendix D. The Members and
their designated agents agree to comply with such procedures, as
they may be modified from time to time by a vote of the TANC
1'
2
3
4
51
61
7I
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Commission pursuant to Section 3.1.2.
9. INSURANCE AND INDEMNIFICATION
TANC shall maintain, or cause to be maintained in force,
insurance as may be determined prudent in the judgment of the
TANC Commission and as may be required by the provisions of the
Intertie Agreements and any Indenture. TANC shall indemnify,
defend, and hold harmless each Member, and its governing board
members, officers, employees and agents, from any liability for
personal injury, death, or property damage arising out of the
negligent activities of TANC pursuant to this Agreement or the
Intertie Agreements.
10." COMPLIANCE WITH OTHER INSTRUMENTS
It is recognized by the parties hereto that, for.the benefit
of the Members, TANC, in"undertaking, or causing to be
undertaken, the planning, licensing, financing, construction, and
operation of TANC's share of the Project, must comply with the
requirements of each Indenture, the Intertie Agreements, all
applicable licenses, permits, and regulatory approvals necessary
therefor, and the Joint Powers Agreement.
11. LIABILITY OF TANC OFFICERS
11.1 Release - Each Member agrees that TANC's
Commissioners, officers, and employees shall not be liable to the
Members for direct, indirect or consequential loss or damage
suffered by the Members as a result of (i) the performance or
nonperformance by TANC under any Intertie Agreements or (ii) the
1
2
3
41
5
6
711
8'
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
performance or nonperformance of TANC under this Agreement. Each
Member releases TANC's Commissioners, officers, and employees
from any claim or liability (whether negligent or otherwise) as a
result of any actions or inactions of TANC under this Agreement
or the performance or nonperformance by TANC under any Intertie
jAgreement.
11.2 No Modification - The provisions of this Section 11
shall not be construed so as to relieve TANG of any obligations
under any of the Intertie Agreements and the provisions of this
Section 11 shall not be construed to modify or amend Paragraph 2
of the Joint Powers Agreement.
12. -NOTICE AND COMPUTATION OF TIME
12.1 Manner of Notices - Any notice or demand by a Member
to TANC under this Agreement shall be deemed properly given if
deposited in the United States mail first class postage prepaid
or its equivalent, or sent via facsimile or other electronic
media and confirmed by telephone or in writing within twenty-
four (24 hours), addressed to TANC at its operational office; any
notice or demand by TANC to any Member under this Agreement shall
be deemed properly given if deposited in the United States mail
first class postage prepaid or its equivalent, or sent via
facsimile or other electronic media and confirmed by telephone or
in writing within twenty-four (24 hours), addressed to the
addressee shown on the signature pages hereof at the address
shown in Appendix E. The designations of the name and address to
which any such notice or demand is directed may be changed at any
time and from time to time by any party giving notice as above
1
21
3�
4I
5'
6,
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
provided in this Section.
12.2 Time Computed - In computing any period of time from
such notice, such period shall commence on the date mailed or, if
sent via facsimile or other electronic media, on the date sent.
13. APPLICABLE LAW
This Agreement is made under and shall be governed by the
laws of the State of California.
14. SEVERABILITY
If any section, paragraph, clause, or provision of this
Agreement, or any part thereof, shall be finally adjudicated by a
court of competent jurisdiction to be invalid, the remainder of
this Agreement shall remain in full force and effect as though
such section, paragraph, clause, or provisions or any part
thereof so adjudicated to be invalid had not been included
herein.
15. MEMBER'S RIGHT TO WITHDRAW
15.1 Conversion of Participation Percentage to Undivided
Ownership Interest - TANC's undivided ownership interest in the
Project shall constitute rights or property acquired and owned by
TANC and no Member shall have an ownership interest in the
Project except upon withdrawal from TANC and conversion of its
Participation Percentage to an undivided ownership interest as
provided herein. After the commercial operation date of the
Project, each Member not then in default shall be entitled to
withdraw from TANC and convert its Participation Percentage into
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
an undivided ownership.interest in the Project. Such Member's
undivided.owner.ship interest shall be equal in amount to its
Participation Percentage multiplied by TANC's then undivided
ownership interest in the Project. Upon such withdrawal and
conversion, at the express written request of the withdrawing
Member, TANC shall make best efforts to take such administrative
actions, including the execution of such documents and amendments
to the Intertie Agreements, as may be reasonably requested by the
withdrawing Member to establish and evidence such Member's
undivided ownership interest in the Project and such Member's
role as a Participant under the Intertie Agreements, and all
reasonable administrative and legal costs associated with such
unopposed. withdrawal and conversion shall be the responsibility
of such.withdrawing Member. Each Member electing to withdraw .
from TANC and so'convert its Participation Percentage shall hold
its ownership interest as a tenant in common with TANC and the
other Participants as set forth in the Intertie Agreements.
15.2 Procedure and Conditions - Notwithstanding Paragraphs
19 and 20 of the Joint Powers Agreement, a Member may withdraw
from TANC and convert its Participation Percentage into an
undivided ownership interest in the Project by recruestinq that
TANC assign to the Member an undivided ownership interest in -the
Project as provided in Section 1 1 rights, interest, and
obligations related thereto, and by giving written notice to TANC
and all other former Members that have withdrawn at least one (1)
i
year in advance of the noticed effective date of withdrawal;
provided that:
15.2.1 TANC shall have one hundred eighty (180) days,
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18'
19
201I
21
22
23
24
25
26
27
28
from written notice given pursuant to Section 15.5, to
exercise a right of first refusal to any rights, interests,
and obligations -in the Project (in whole or in part) which a
former Member that has withdrawn determines to sell,
transfer, assign, or otherwise dispose of pursuant to a bona
fide written offer. in the event that any former Member
that has withdrawn ceases to exist as a public agency, as
defined in Section 6500 of the California Government Code,
then all rights, interests, and obligations of such former
Member in the Project which were derived through TANC shall,
at TANC's option, revert to TANC in exchange for TANC
assuming such former Member's remaining obligations in the
Project; provided, that such former Member that has
withdrawn has not sold, assigned, or otherwise disposed of
its rights, interests, and obligations prior. to .the date.
such Member. ceases to -exist as a public agency; provided
further, that any former Member that has withdrawn has the
right to sell, assign, or otherwise dispose of its rights,
interests, and obligations to anyone as long as the sale
does not violate the provisions of Section 6.4.
15.2.2 Former Members who have withdrawn shall have a
right of first refusal in any right or interest in the -
Project (in whole or in part) which TANC or a TANC Member
determines to sell, transfer or assign to a non -Member. The
rights and obligations of former Members who have withdrawn
with respect to layoffs of Transfer Capability shall be as
prescribed in Section 7 of this Agreement;
15.2.3 Except as provided in this Section 15, a
1
2
3
4
5'
6
7'
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
withdrawal shall have no adverse effect on the rights and
obligations under the MOU of TANC, its Members, and other
former Members who have withdrawn, as those rights and
obligations exist on the date of execution of this
Agreement;
15.2.4 A former Member who has withdrawn shall meet
its pro rata share of TANC's layoff obligations under
Section 7.3 of this Agreement; and
15.2.5 Neither the withdrawal of a Member from TANC
nor the conversion of its Participation Percentage of TANC's
entitlement to Transfer Capability to an undivided ownership
interest in the Project pursuant to Section 15.1 shall
relieve such Member of any of its obligations to make
payments with respect to Debt Service on TANC Project
Indebtedness at -the times and in the amounts specified in
Section 4.1.3.2, as though such conversion had not occurred,
including any amounts due thereunder as a result of an
increase in such Member's Participation Percentage pursuant
to Sections 2.3, 3.1.2.2, and 6.2. In addition, neither
shall such action relieve the withdrawing Member of any of
its obligations pursuant to Section 6.4, nor affect the
rights of TANC to pursue its remedies under Section 6
against such former Member who has withdrawn.
15.2.6 Prior to withdrawal and conversion pursuant to
this Section 15, a withdrawing Member shall execute such
instruments and take such actions as TANC may reasonably
request to protect the continuing rights of TANC in the
interest transferred as set forth in this Agreement.
1
2
3
4
5'.
6'
T
8'I
9,I
10'.
11
12
13
141
15
16I
17i
18
19
20
21
22,
23
24I
25I
26
27
26
15.3 Inclusion in Intertie Agreements - Implementation of
this Section 15 is subject to the provisions of all applicable
Intertie Agreements. TANC shall make best efforts to include in
all applicable Intertie Agreements, as necessary, provisions to
recognize and authorize the rights and obligations of TANC and
Members who may elect to withdraw under this Section 15.
15.4 No Right to Partition - Each Member waives any rights
it may have to partition TANC's ownership interest in the Project
and agrees not to seek or to file any action in law or in equity
to partition such interest. The Members agree that their sole
right and procedure to obtain an ownership interest in the
Project separate and apart from TANC is pursuant to this
Section 15.
15.5 Notice - Pursuant to the provisions of Section 15.2,
any former Member who has withdrawn shall have the. obligation to
notify TANC and all other former Members who have withdrawn of
its intent to sell, transfer, or assign its interest in the
Project (in whole or in part).
15.6 Inclusion in Subsequent Project Agreements - Unless
otherwise agreed by the Members, the provisions of this
Section 15 shall be included in any subsequent TANC "project
agreement" (as that term is defined in the Joint Powers
Agreement) pertaining to the subject matter hereof.
15.7 Adjustment of Participation Percentages - Except as
otherwise provided in Section 15.2.5, upon the withdrawal of a
Member and conversion of its Participation Percentage to an
undivided ownership interest pursuant to this Section 15, the
Participation Percentage of each remaining Member which has not
1
2
3
4
5
6
7
8
9
10
11
12
13
14'.
15
16
17
18
19
20
21
22
23
24
25
26
27
28
so withdrawn and converted shall be automatically increased to
the ratio between such remaining Member's Participation
;Percentage and the aggregate of the Participation Percentages of
all such remaining Members, expressed as a percentage.
16. ASSIGNMENT OF AGREEMENT
16.1 No Assignment While TANC Project Indebtedness
Outstanding - This Agreement shall inure to the benefit of and
shall be binding upon the respective successors and assigns of
the parties to this Agreement; provided, however, that, except as
provided in Sections 4.1.3.7, 7.2.2, 7.3.2, and 15, neither this
Agreement nor any right or interest herein shall be transferred
or assigned by any party hereto so long as any TANC Project
Indebtedness is outstanding.
16.2 Assignment Prior to Withdrawal - Unless a Member has
withdrawn from TANC pursuant .to Section 15 of this Agreement, any
assignment, in whole or in part, of a Member's Participation
Percentage or individual ownership interest to a person or entity
which is not a member of TANC is subject to paragraph 19 of the
Joint Powers Agreement.
17. MEMBERS' OBLIGATIONS SEVERAL
The obligation of each Member to make payments under this
Agreement is a several obligation and not a joint obligation with
those of the other Members.
18. TRUSTEE AS A THIRD PARTY BENEFICIARY
The parties agree that, among other things, this Agreement
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
is also made and entered into for the benefit of the Trustee
under each Indenture and the holders of outstanding TANC Project
Indebtedness, as third -party beneficiaries, and the Trustee and
such holders shall have the right, as third -party beneficiaries,
to initiate and maintain suit to enforce this Agreement to the
extent provided in any Indenture. Except as provided in this
Section 18, no rights or benefits shall be created in any person
or entity not a party to this Agreement.
19. APPENDICES
This Agreement includes Appendices A, B, C, D, and E
attached hereto and incorporated herein by this reference.
20. WAIVER
Any waiver at any time by any party of its rights with
respect to a default under this Agreement, or -with respect to any
other matters arising in connection with this Agreement, shall
not be deemed a waiver with respect to any subsequent default or
other matter.
21. CAPTIONS
Except as used for definitions, all indexes, titles, subject
headings, section titles and similar items are provided for the
purpose of reference and convenience and are not intended to be
inclusive, definitive or to affect the meaning or scope of this
Agreement.
22. BILLING AND PAYMENT
11
21
3
4
5
6
7
8
9
10
ill
121
13
14
15
16
17
0 18
19
20
21
22
23
24'
25I
26I
27
I
28
22.1 Unless otherwise agreed by the Members and TANC, the
accounting and billing period shall be one (1) calendar month.
Monthly bills sent to a Member shall be sent by United States
mail first class, postage prepaid or its equivalent, to the
billing address specified in Appendix E. The designation of any
person specified in Appendix E may be changed at any time by
advance notice given to all Members not then in default and the
TANC Coordinator.
22.2 Billings for amounts payable shall be due on the
twenty-fifth (25th) day after mailing of the bill. Payment shall
be made at offices designated by the party to which payment is
due. If the due date falls on a non -business day of either
party, then the payment shall be due on the next following
business day without interest.
22.3 Amounts of monthly billings not paid on or before the
due date shall be payable with an Interest Charge calculated from
the due date to the date of payment.
22.4 In case any portion of any monthly bill is in dispute,
the entire bill shall be paid when due. Any excess amount of
payments made pursuant to monthly billings, which through
inadvertent error or as a result of a dispute may have been
overpaid, as determined by whatever means the parties select to
resolve the dispute, shall be returned by the owing party upon
determination of the correct amount in accordance with the
lIntertie Agreements. If the amount owing exceeds five hundred
dollars ($500.00) and is more than three (3) months past due, it
shall be returned with interest at the rate for an Interest
Charge less two (2) percent.
a
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
23. DISTRIBUTION OF ASSETS
Notwithstanding anything to the contrary contained in
Section 21 of the Joint Powers Agreement, but subject in all
events to the provisions of the Intertie Agreements, in the event
the Project terminates, subject to Section 16 TANC shall
distribute to all Members not then in default TANC's share of the
proceeds of the sale, transfer, or other disposition of any
assets acquired in connection with the Project,:and all of its
right, title, and interest therein as a Participant. Such
distribution shall be in proportion to the Participation
Percentages of such Members then in effect. No such distribution
shall occur so long as any TANC Project Indebtedness remains
outstanding.
24. COUNTERPARTS
This Agreement may be executed in several counterparts, each
of which shall be deemed to be an original and all of which, when
taken together, shall constitute a single Agreement..
25. SIGNATURES
In witness whereof, the parties have caused this Project
Agreement No. 3 to be executed as of the date first above
written. The signatories to this Project Agreement No. 3
represent that they have been appropriately authorized to enter
into this Project Agreement No. 3 on behalf of the party for whom
they sign.
1
2
3
4
5
6
7
8
9
10
11
12
13 !,
14.
15
16
17
18
19
20
21
22
23
24
25
26
27
28
CITY OF ALAMEDA
Name: Dbv las . Durein
Title: Pres.,/Public Utilities Board
Date: 4/10/90
CITY OF HEALDSBURG
By:
Name:
Title:
Date:
CITY OF LODI
By:
Name:
Title:
Date:
CITY OF LOMPOC
By:
Name:
Title:
Date:
MODESTO IRRIGATION DISTRICT
By:
Name:
Title:
Date:
CITY OF PALO ALTO
By:
Name:
Title:
Date:
CITY OF REDDING
By:
Name:
Title:
Date:
CITY OF ROSEVILLE
By:
Name:
Title:
Date:
i
1
2
3
4
5
6
7
8
9
10
11
12
13I
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
CITY OF ALAMEDA
By:
Name:
Title:
Date:
CITY OF HEAL7/1,7xq--�-
%
By:
Name: Mi ae1 A. Wilson
Title: City Manager
Date: April 10, 1990
CITY OF LODI
By:
Name:
Title:
Date:.
CITY OF LOMPOC
By:
Name:
Title:
Date:
MODESTO IRRIGATION DISTRICT
By:
Name:
Title:
Date:
CITY OF PALO ALTO
By:
Name:
Title:
Date:
CITY OF REDDING
By:
Name:
Title:
Date:
CITY OF ROSEVILLE
By:
Name:
Title:
Date:
1'
2
3
4.
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
CITY OF ALAMEDA
By:
Name:
Title:
Date:
CITY OF HEALDSBURG
By:
Name:
Title:
Date:
CITY OF LODI
Attest: BY
Name: J
Title:
Date:
Alice M.-Reimche
City Clerk CITY OF LOMPOC
By:
Name:
Title:
Date:
MODESTO IRRIGATION DISTRICT
By:
Name:
Title:
Date:
CITY OF PALO ALTO
By:
Name:
Title:
Date:
CITY OF REDDING
By:
Name:
Title:
Date:
CITY OF ROSEVILLE
By:
Name:
Title:
Date:
1
2
3
4
5.
6
71
81'
9
10
11
12
13
14
15
�16
17
18
19
20
21
22
23
24
25
26
27
28
CITY OF ALAMEDA
By:
Name:
Title:
Date:
CITY OF HEALDSBURG
By:
Name:
Title:
Date:
CITY OF LODI
By: .
Name:
Title:
Date:
CITY OF LOMPOC
By: / 4ef424z �
Name: MarVin U. Loney
Title: Mayor
Date:
MODESTO IR IGATION DISTRICT
By:
Name:
Title:
Date:
CITY OF PALO ALTO
By:
Name:
Title:
Date:
CITY OF REDDING
By:
Name:
Title:
Date:
CITY OF ROSEVILLE
By:
Name:
Title:
Date:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
CITY OF ALAMEDA
By:
Name:
Title:
Date:
CITY OF HEALDSBURG
By:
Name:
Title:
Date:
CITY OF LODI
By:
Name:
Title:
Date:
CITY OF
By:
Name:
Title:
Date:
MODESTO
test: By:
Vickie Ehrler, Secretary Name:
Title:
Date:
CITY OF
By:
Name:
Title:
Date:
CITY OF
By:
Name:
Title:
Date:
LOMPOC
IRRIGATION DISTRICT
• 1
William J. L on Jr.
President th oard of Directc
March 13, 1990
PALO ALTO
REDDING
CITY OF ROSEVILLE
By:
Name:
Title:
Date:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
CITY OF ALAMEDA
By:
Name:
Title:
Date:
CITY OF HEALDSBURG
By:
Name:
Title:
Date:
CITY OF LODI
By:
Name:
Title:
Date:
CITY OF LOMPOC
By:
Name:
Title:
Date:
MODESTO IRRIGATION DISTRICT
By:
Name:
Title:
Date:
CITY OF PALO ALTO
By: (A!fl=
Name:
Title: Mayor
Date: April 16, 1990
CITY OF REDDING
By:
Name:
Title:
Date:
CITY OF ROSEVILLE
By:
Name:
Title:
Date:
1
2
3
4
5
6
7
8
9
10
I
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
FORM APPROVED
44�
CITY LEGAL. DEFT.
CITY OF ALAMEDA
By:
Name:
Title:
Date:
CITY OF HEALDSBURG
By:
Name:
Title:
Date:
CITY OF LODI
By:
Name:
Title:
Date:
CITY OF LOMPOC
By:
Name:
Title:
Date:
MODESTO IRRIGATION DISTRICT
By:
Name:
Title:
Date:
CITY OF PALO ALTO
By:
Name:
Title:
Date:
CITY OF REDDIING 'I �
By:
Name:[tr-
Title:
Date:
CITY OF ROSEVILLE
By:
Name:
Title:
Date:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20'
21
22
23
24
25
26
27
28
CITY OF ALAMEDA
By:
Name:
Title:
Date:
CITY OF HEALDSBURG
By:
Name:
Title:
Date:
CITY OF LODI
By:
Name:
Title:
Date: `
CITY OF LOMPOC
By:
Name:
Title:
Date:
MODESTO IRRIGATION DISTRICT
By:
Name:
Title:
Date:
CITY OF PALO ALTO
By:
Name:
Title:
Date:
CITY OF REDDING
By:
Name:
Title:
Date:
CITY OF RO V LL
By:
WVZU
Name: AlleV E. kohnson
Title: Cit er
Date: March 15, 1990
•1
2,
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
SACRAMENTO MUNICIPAL UTILITY DISTRICT
By:
Name :
D A. BOGG
Title:
GENERAL MANAGER
Date:
A_ PRIL 4, 1990
CITY OF
SANTA CLARA
By: .
Name:
Title:
Date:
TURLOCK
IRRIGATION DISTRICT
By:
Name: -
Title:
Date:
CITY OF UKIAH
By : .
Name:
Title:
Date
PLUMAS-SIERRA RURAL ELECTRIC
COOPERATIVE
By:
Name:
Title:
Date:
TRANSMISSION AGENCY OF NORTHERN
CALIFORNIA
By:
Name:
Title:
Date:
-4 6-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
SACRAMENTO MUNICIPAL UTILITY DISTRICT
By:
Name:
Title:
Date:
CITY OF SANTA CLARA
By:
Name: S ra o
Tit1e:�remifdCity Manager
Date: March 27, 1990
TURLOCK IRRIGATION DISTRICT
By:
Name:
Title:
Date:
CITY OF UKIAH
By:
Name:
Title:
Date:
PLUMAS-SIERRA RURAL ELECTRIC
COOPERATIVE
By:
Name:
Title:
Date:
TRANSMISSION AGENCY OF NORTHERN
CALIFORNIA
By:
Name:
Title:
Date:
1'
2
3I
4
I
5
6
T
8
9',
10'
11
12
13
141
15.
16'
17
18
19
20
21
22
23
24
25
26
27
28
SACRAMENTO MUNICIPAL UTILITY DISTRICT
By:
Name:
Title:
Date:
CITY OF SANTA CLARA
By:
Name:
Title:
Date:
TURLOCK IR G .ION D T
By:
Name: Ernest Geddes
Title: General Manager
Date: April 3, 1990
CITY OF UKIAH
By:
Name:
Title:
Date:
PLUMAS-SIERRA RURAL ELECTRIC
COOPERATIVE
By:
Name:
Title:
Date:
TRANSMISSION AGENCY OF NORTHERN
CALIFORNIA
By:
Name:
Title:
Date:
1
2
3.
4
5
6
7
81',
9',
1a
11
12i
13
14
15'
16
17
18
19I
20'
21'
22
23
24
25
26
27
28
SACRAMENTO MUNICIPAL UTILITY DISTRICT
By:
Name:
Title:
Date:
CITY OF SANTA CLARA
By:
Name:
Title:
Date:
TURLOCK IRRIGATION DISTRICT
By:
Name:
Title:
Date:
CITY OF UKIAH
By: �.
Name:
Title:
Date: Apr11 id, 1990
PLUMAS-SIERRA RURAL ELECTRIC
COOPERATIVE
By:
Name:
Title:
Date:
TRANSMISSION AGENCY OF NORTHERN
CALIFORNIA
By:
Name:
Title:
Date:
1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24.
25'
26
27I
281i
SACRAMENTO MUNICIPAL UTILITY DISTRICT
By:
Name:
Title:
Date:
CITY OF SANTA CLARA
By:
Name:
Title:
Date:
TURLOCK IRRIGATION DISTRICT
By:
Name:
Title:
Date:
CITY OF UKIAH
By:
Name:
Title:
Date:
PLUMAS-SIERRA RURAL ELECTRIC
COOPERATIVE
By: 1�1/ l a
Name: Fran V, otta
Title: President
Date: March 30, 1990
TRANSMISSION AGENCY OF NORTHERN
CALIFORNIA
By:
Name:
Title:
Date:
11
2
3
4'
5
6'
7
8I
91'
10
11
12'.
13
14
15'
16
17
18
19
20
21
22
23
24
25
26
27
28
SACRAMENTO MUNICIPAL UTILITY DISTRICT
By:
Name:
Title:
Date:
CITY OF SANTA CLARA
By:
Name:
Title:
Date:
TURLOCK IRRIGATION DISTRICT
By:
Name:
Title:
Date:
CITY OF UKIAH
By:
Name:
Title:
Date:
PLUMAS-SIERRA RURAL ELECTRIC
COOPERATIVE
By:
Name:
Title:
Date:
TRANSMISSION AGENCY OF NORTHERN
CALIFORNIA
By:
Name: h-B. Marco to Jr.
Title: Chairman
Date: March 21, 1990
APPENDIX A
MEMORANDUM OF UNDERSTANDING
CALIFORNIA-OREGON TRANSMISSION PROJECT
This Memorandum of Understanding (MOU) is entered into as of
the 19th day of December, 1984 by (1) the CITY OF ANAHEIM
(Anaheim), CITY OF AZUSA (Azusa), CITY OF BANNING (Banning), CITY
OF COLTON (Colton), CITY OF RIVERSIDE (Riverside), and CITY OF
VERNON (Vernon) collectively referred to as "Southern California
Public Agencies."; (2) CALIFORNIA DEPARTMENT OF WATER RESOURCES
(CDWR); (3) PACIFIC GAS AND ELECTRIC COMPANY (PGandE) SAN DIEGO
GAS AND ELECTRIC COMPANY (SDG&E), and SOUTHERN CALIFORNIA ED.ISON
COMPANY (SCE), collectively referred to as "Investor -Owned
Utilities"; (4) the WESTERN AREA POWER ADMINISTRATION (Western);
and (5) the TRANSMISSION AGENCY OF NORTHERN CALIFORNIA-(Agency)
(composed of the Cities of Alameda, Biggs, Gridley, Healdsburg,
Lodi, Lompoc, Palo Alto, Redding, Roseville, Santa Clara, and
Ukiah, the Plumas-Sierra Rural Electric Cooperative, the
Sacramento Municipal Utility District, the Modesto Irrigation
District, and the Turlock Irrigation District), hereinafter
sometimes referred to -individually as "Participant" and
collectively as "Participants", and the LOS ANGELES DEPARTMENT OF
WATER AND POWER (11LADWP11), representing itself and the Cities of
Glendale, Burbank and Pasadena, a non -voting member of the
Management Committee.
Recitals
WHEREAS, the Agency, the Investor -Owned Utilities, CDWR and
Western, have carried out studies related to possible alternative
methods of developing additional transmission facilities between
California and the Pacific Northwest, and
WHEREAS, Public Law 98-360 and the Conference Report on
H.R. 5653 authorize the Secretary of Energy (Secretary) to
participate with non-federal entities in developing the
California -Oregon Transmission Project (Project) by upgrading
-1-
certain facilities and authorize the Secretary to construct or
participate in the construction of such additional facilities as
he deems necessary to allow mutually beneficial power sales
between the Pacific Northwest and California, and to accept and
use --funds contributed by non-federal entities, including
investor -owned and publicly owned utilities, for that purpose,
and
WHEREAS, pursuant to the mandate set forth in the Conference
Report on H.R. 5653 and Public Law 98-360, the Secretary is
directed to enter into negotiations with all interested non-
federal entities for the financing, planning and construction of
anew 500-kV AC line and associated facilities, and
WHEREAS, the Secretary has met with the Participants and
others and has conferred in and observed the negotiation of this
MOU by the Participants, and
WHEREAS, the Agency, the Southern California Public
Agencies, the Investor -Owned Utilities, Western and the CDWR have
all participated in the negotiations and in the development of
the Project, and
WHEREAS, the Project, when constructed, will parallel in
part the DC line between California and the Pacific Northwest,
and the operation of the Project may affect the operation of the
DC line, and for that reason, the Participants have invited
LADWP, the operator of the DC line, to be a member of the
Management Committee to the extent set forth in this MOU, and
WHEREAS, the Project has been evaluated from the technical
viewpoint and has been found to be technically feasible, and
WHEREAS, utilities in the Pacific Northwest and in
California have determined that development of the Project will
provide mutual benefits to their respective regions, and
WHEREAS, the Participants will develop the Project
consistent with applicable environmental laws, in an expeditious
manner, and
-2-
l
WHEREAS, in order to develop the Project in accordance with
this MOU, the Participants intend to take all appropriate actions
including the negotiation and execution of a definitive
participation agreement, and other agreements as necessary,
within nine months or as soon as practicable after execution
hereof, and
WHEREAS, CDWR and the Participants have agreed to postpone
the date upon which CDWR will first be entitled to exercise its
rights to buy 6.25 percent of Project transfer capability, and
NOW THEREFORE, in order to expedite the signing of the
Participation Agreement and other.necessary.agreements,.the
following Principles are hereby agreed to and shall be
implemented in such agreements.
1.0 Scope of Project
1.1 The Project includes:
1.1.1 The construction of a new 500-kV AC
transmission line from the California -Oregon
border area to the Redding area.
1.1.2 Reconstruction of an existing double circuit
230-kV AC line owned by Western to a single
circuit 500-kV AC line from the Redding area
to the Tracy Substation.
1.1.3 Construction of a new 500-kV AC line from
Tracy Substation to Tesla Substation.
1.1.4 Construction of a 500-kV.AC cross -tie from
the Redding area to Round Mountain Substation
or its vicinity, unless the Management
Committee determines that such cross -tie is
not needed.
1.1.5 Construction of a 500-kV substation in the
Redding area. The size, location, and
configuration shall be as determined by the
Management Committee.
-3-
-1
2.0 Associated Facilities
2.1 The Project does not include facilities south of the
Tesla-Substation, however, PGandE shall upgrade or
improve portions of its transmission system between
Tesla Substation and Midway Substation as necessary
to provide firm power transfer capability to meet its
obligations hereunder as set forth in Sections 2.2,
2.3 and 2.4.
2.2 PGandE shall provide firm bi-directional transmission
service over its facilities between Tesla and Midway
Substations for the Southern California Public
Agencies, SCE and SDG*&E in amounts equal to their
respective transfer capabilities in the Project
(whether obtained under Section 5 or Section 10) for
the life of the Project. PGandE shall also provide
up to 50 Mw of firm bi-directional transmission
service between Tesla and Midway Substations for
transmission entitlement that may be assignable by
SMUD pursuant to Section 9.0. PGandE shall not be
obligated to provide firm transmission service in
excess of 700 MW for power transmitted over Project
facilities and SMUD's 50 MW of assignable
entitlement, provided, that such transmission service
shall be provided under reasonable rates, terms and
conditions.
2.3 In addition to firm transmission service provided
pursuant to Section 2.2, PGandE shall make available
to the Agency for the life of the Project up to
300 MW of firm bi-directional transmission service
between Tesla Substation and Midway (150 MW for the
M-S-R San Juan Project, plus an additional 150 MW).
The Agency shall, if requested to do so by PGandE,
provide, in the form of a contribution in aid of
construction, a reasonable and proportionate share of
j the capital required for increasing the transfer
capability between Los Banos and Gates. Such
-4-
transfer capability.is to be developed by PGandE and
will be available for service no later than
January 1, 1990 and shall be provided under
reasonable rates, terms and conditions.
2.4 Project Participants agree to cooperate in developing
suitable transmission facilities to deliver power
transmitted over the Project to the Participants, or
to provide acceptable firm transmission service
arrangements for such power under reasonable rates,
terms and conditions.
2.5 SCE agrees to provide firm bi-directional
transmission service between Midway -Substation and
the Southern California Public Agencies of power,
available over the Project's facilities, consistent
with'the provisions of applicable individual
integrated operating agreements and settlement
agreements between such agencies and SCE or any
successor agreements. If SCE and any such agency"
cannot agree upon the terms and conditions of such a
firm transmission service agreement hereunder, SCE
will make a unilateral filing with the FERC of such a
firm transmission service agreement under Section 205
or 206 of the Federal Power Act apd pursuant to the
FERC's rules and regulations promulgated thereunder,
3.0 Project Rating Interconnection and Operation
3.1 The Project shall be designed to have a minimum
transfer capability of 1600 MW including loop flow
from the California -Oregon border to the Tesla
Substation and'a minimum of 1900 MW of transfer
capability from the Redding Substation to the Tracy
Substation. The actual Project transfer capability
will be determined from time to time by the
Management Committee based on studies. The
Management Committee has the right to review and
approve all modifications to the Project, provided
-5-
that any modification which materially affects the
transmission system of a Participant shall require
the prior approval of such Participant.
3.2 The Project shall be interconnected and operated in
parallel with the existing AC Intertie facilities.
3.3 The Participants shall enter into appropriate
contractual arrangements:
3.3.1 With Northwest utilities to interconnect the
Project with the Pacific Northwest
transmission system such that access is
available to a wide spectrum of utilities in
the Pacific.Northwest.and Canada. Agreement
shall be among the_Participants and'Northwest
utilities.
3.3.2 With PGandE and Western for interconnections
between the Project and Western and PGandE
systems,including provisions governing the
ownership of new facilities in existing
substations.
3.3.3 Providing that each Participant shall have a
right to displace Northwest imports scheduled
by other Participants over the Project for
delivery and use within a control area at
times when any Participant in such control
area is in a spill condition or at minimum
generation, provided that displacement energy
is delivered to the Participant whose energy
is being displaced at a cost including
penalties, if any, at or below the price of
the displaced Northwest imports.
3.3.4 For the interconnection and parallel
operation of the Project with existing AC
.Intertie facilities. Such arrangements shall
also provide for integration of the Project
i
with the existing AC Intertie System,
including pro rata sharing of available
MM.
l
transfer capability under outage and
curtailment conditions, including
curtailments due to loop flow.
3.4 PGandE shall be the operating agent for operation and
maintenance of the Project, with operation and
maintenance costs to be shared by Project
Participants in proportion to their respective
allocations under these Principles. PGandE shall
coordinate with Western on the operations and
maintenance on the Redding to Tracy portion of the
Project.
3.5 All Participants who receive transfer capability from
the Project shall coordinate schedules with PGandE.
4.0 Project Management
4.1 A Management Committee, chaired by a representative
of the Agency, is hereby formed to oversee and
1
approve the planning, design, construction, operation
and maintenance of the Project. Each Participant in
the Project shall have representation on the
Management Committee, with the members of the Agency
being represented by the Agency and the Southern
California Public Agencies being represented by one
Participant of their choice. All actions or
decisions by the Management Committee shall be by
agreement of at least 75 percent interest of the
voting Participants, based on Project Participation
shares between the California -Oregon border area and
Tesla Substation. Subcommittees shall be formed as
needed to address specific aspects of the Project.
CDWR, prior to exercise of rights under Section 8.1,
and LADWP shall also have non -voting representation
on the Management Committee. Each Participant,
including each of the members of the Agency and each
of the Southern California Public Agencies, shall be
given advance notification of all meetings of the
Management Committee and may attend meetings.
-7-
1
4.2 Western shall be the lead agency for the NEPA process
and the Agency shall be the lead agency for the CEQA
process. All Participants agree to cooperate and
support the processes necessary to obtain all
necessary permits from regulatory agencies having
jurisdiction.
4.3 The Agency shall be the overall Project Manager.
Western, under contract to the Participants, shall be
responsible for design and construction of the
upgraded Western facilities, including.the proposed
Redding Substation. The Agency and/or PGandE, under
contract to the Participants, shall be -responsible
for design and construction of all Project facilities
other than Western upgraded facilities.
4.4 In exercising its non -voting representation on the
Management Committee, LADWP may represent the
ownership interests of itself, Burbank, Glendale and
Pasadena in the DC line only as to discussions
relating to operation of the DC line, and its
representation shall'be limited to offering non-
binding suggestions as to planning, construction, and
operation of the Project, and advising the Committee
as to problems which may arise through operation of
the Project in parallel with the DC line.
5.0 roject Participation Shares
5.1 The Participants shall be entitled to Project
transfer capability between the California -Oregon
border area and Tesla Substation prior to January 1,
2005, in the following proportions:
5.1.1 The Agency shall be entitled to 43.75
percent.
5.1.2 The Investor -Owned utilities shall be
entitled to 42.19 pervert.
5.1.3 The Southern California Public Agencies shall
be entitled to 7.81 percent.
5.1.4 Western for DOE laboratories and federal
wildlife refuges shall be entitled to 6.25
percent.
5.2 If CDWR exercises its rights and purchases its share
of the Project pursuant to Section 8.1, then the
Participants shall be entitled to Project transfer
capability between the California -Oregon border area
and Tesla Substation commencing on January 1, 2005,
in the following proportions:
5.2.1 The Agency shall be entitled to 40.83
percent.
5.2.2 The Investor -Owned Utilities shall be
entitled to 39..38.percent.
5.2.3 The Southern California Public Agencies shall
be entitled to 7.29 percent.
5.2.4 -Western for DOE laboratories and federal
wildlife refuges, shall be entitled to 6.25
percent.
5.2.5 The CDWR shall be entitled to 6.25 percent.
. 5.3 If CDWR elects not to exercise its rights to purchase
Project transfer capability pursuant to Section 8.1,
then the Participants shall continue to be entitled
to Project transfer capability in the- same
percentages as specified in Section 5.1.
5.4 The Project transfer capability specified to Western
in Sections 5.1, 5.2, and 5.3, is to serve DOE
laboratories and federal wildlife refuges unless they
make other arrangements with Western or other
Participants. In addition, Western shall be provided
the following transfer capability in Project
facilities between the Redding Substation and Tracy
Substation:
5.4.1* 300 MW under all operating conditions, with
back up service provided by PGandE pursuant
to Contract 14-06-200-2948A (Contract 2948A).
ME
1
5.4.2 Up to an additional 300 MW (above 1900 MW),
to the extent that such transfer capability
is available from the Project.
5.5 During construction of the Project, to the extent
transmission capacity is available, PGandE will
accept CVP power at any point of interconnection
between PGandE and Western for delivery to PGandE or
to Western loads served from PGandE's system pursuant
to Contract 2948A. Any incremental costs incurred by
Western because of the outage of its facilities
during construction, including wheeling charges paid
to.-PGandE, shall be deemed to be.a Project cost.
6.0 Project Financing Responsibility
6.1 Prior to the effective date of any election by CDWR
to exercise its rights pursuant to Section 8.1 and
unless otherwise agreed pursuant to Section 6.3, the
Participants shall be responsible for financing the
Project and betterments in the following proportions:
6.1.1 The Agency, 46.67 percent (approximately
700/1500);
6.1.2 The Investor -Owned Utilities, 45.00 percent
(approximately 675/1500);
6.1.3 The Southern California Public Agencies, 8.33
percent (approximately 125/1500).
6.2 Subsequent to the effective date of election by CDWR
to exercise its rights pursuant to Section 8.1, anc
unless otherwise agreed pursuant to Section 6.3, the
Participants shall be responsible for any capital
betterments for the Project in the following
proportions:
6.2.1 The Agency, 43.55 percent;
6.2.2 The Investor -Owned Utilities, 42.00 percent;
6.2.3 The Southern California Public Agencies,
7.78 percent;
6.2.4 CDWR, 6.67 percent.
-10-
6.3 A Participant may agree to assume (in part or whole)
financing responsibility for another Participant's
share. Such assumption shall not alter the Project
Participation shares in Section 5.
7.0 Project Ownership
7.1 Except as otherwise agreed by the Participants
pursuant to Section 7.6, the Project, other than the
upgraded Western facilities, shall be owned in the
following proportions prior to January 1, 2005, and
.also thereafter, if CDWR does not exercise its rights
pursuant to Section 8.1.
7.1.1 The Agency, ' 46'. 67- percent.
7.1.2 The Investor -Owned Utilities, 45.00 percent.
7.1.3 The Southern California Public Agencies, 6.33
percent.
7.2 If CDWR exercises its rights to purchase Project
transfer capability pursuant to Section 8.1, then
except as otherwise agreed by the Participants
pursuant to Section 7.6, the Project (other than the
upgraded Western facilities) shall be owned in the
following proportions after January 1, 2005:
7.2.1 The Agency, 43.55 percent_
7.2.2 The Investor -Owned Utilities, 42.00 percent.
7.2.3 The Southern California Public Agencies, 7.78
percent.
7.2.4 The CDWR, 6.67 percent.
7.3 Unless prohibited by law or unless otherwise agreed
pursuant to Section 7.6, the upgraded Western
facilities shall be owned in the following
proportions prior to January 1, 2005:
7.3.1 The Agency, 36.84 percent (700/1900).
7.3.2 The Investor -Owned Utilities, 35.53 percent
(675/1900).
7.3.3 The Southern California Public Agencies, 6.58
percent (125/1900).
-11-
7.3.4 Western, 21.05 percent (400/1900).
7.4 Unless prohibited by law or unless otherwise agreed
pursuant to Section 7.6, the upgraded Western
facilities shall be owned in the following
proportions on and after January 1, 2005, if CDWR
exercises its rights to purchase pursuant to
Section 8.1.
7.4.1 The Agency, 34.39 percent (approximately
653/1900).
7.4.2 The Investor -Owned Utilities, 3.3.16 percent
(approximately 630/1900).
7.4.3 -The Southern California Public Agencies, 6.14
percent (approximately 117/1900).
7.4.4 Western, 21.05 percent (400/1900).
7.4.5 CDWR, 5.26 percent (100/1900).
7.5 If CDWR elects not to exercise its rights pursuant to
Section 8.1, then the proportions owned on and after
January 1, 2005, shall be as specified in Section
7.3.
7.6 A Participant may agree to assume ownership of all or
part of another Participant's ownership share and
provide firm transmission service to such other
Participant in an amount that the Participant's
ownership share plus transmission service hereunder
shall equal the Participant's Project participation
share in Section S.
8.0 Rights for the California Department of Water Resources
8.1 Effective January 1, 2005, CDWR will have a right to
buy pro rata from all Participants, except Western,
6.25 percent of the Project as the Project exists as
of the date CDWR exercises its right. Unless another
price is *mutually agreed to by the selling
Participant and CDWR, CDWR shall pay each selling
Participant the or construction cost (including
the original construction cost associated with
-12-
1
Western's entitlement), including the interest it
incurred during construction, plus the original cost
of capital improvements and betterments (including
the original cost of capital improvements and
betterments associated with Western's entitlement),
including interest it incurred during construction,
allocable to the respective pro rata share of the
Project that the Participant is selling to CDWR.
Within one year after the Project is energized, each
Participant shall provide CDWR with a statement of
the original construction cost (including the
original construction cost associated with Western's
entitlement), including the interest it incurred
during construction for its share of the Project so
that CDWR can determine the cost it shall be
obligated to pay such Participant if it exercises -its
rights under this Section 8.1. Within one year after
any capital improvements or betterments are completed
prior to the date of exercise by CDWR, each
Participant shall provide CDWR with a statement of
construction costs incurred for such capital
improvements, or betterments (including the original
construction cost of capital imprQvenLents and
betterments associated with.Western's entitlement)
including interest it incurred during construction
with respect to its share, so that CDWR can determine
the cost it shall be obligated to pay such
Participant if it exercises its rights under this
Section 8.1.
8.2 Subject to (1) satisfaction of Section 11.4 of this
MOU as to participation of PGandE in the Project, (2)
execution by CDWR.of the participation agreement, and
(3) construction of the Project, the term of the
Extra High Voltage Contract, dated August 1, 1967,
1 among CDWR, PGandE, SDG&E, and SCE, or the
successor(s) in interest to SDG&E and SCE, shall be
-13-
l
extended for the useful life of the existing AC
Intertie. Notwithstanding any terms to the contrary
in the Extra High Voltage Contract, if the Parties
cannot reach agreement on the rates that CDWR is to
pay during the extended term of this contract, after
2004 PGandE, SCE, and SDG&E, or the successor(s) in
interest to SDG&E and SCE, may unilaterally make
application to FERC for a change in rates, under
Section 205 of the Federal Power Act and pursuant to
the FERC's Rules and Regulations promulgated
thereunder.
8.2.1 CDWR shall be considered. -a Participant for
the purposes of Sections 3.3..3 and 10.4.
8.3 -Upon exercise of CDWA's rights'under Section 8.1,
PGandE and SCE shall provide firm transmission
capacity to deliver CDWR's 100 MW to Midway and
Vincent Substations, under reasonable rates, terms,
and conditions.
8.4 Except as provided in Section 8.2, nothing in this
agreement shall modify or change CDWR's rights under
the Extra High Voltage Agreement' dated August 1,
1967.
9.0 The EHV Contract Between SMUD, PGandE, SCE, and SDG&E
9.1 PGandE, SCE, and SDG&E, pursuant to Article 33 of the
August 1, 1967 contract entitled "Contract Between
California Companies and Sacramento Municipal.Utility
District for Extra High Voltage Transmission and
Exchange Service" between SMUD, PGandE, SCE, and
SDG&E (EHV Contract, consent to an assignment by
SMUD of up to 50 MW of SMUD's 200 MW entitlement
pursuant to the EHV Contract to California publicly
owned utilities on such terms as may be negotiated
between SMUD and the California publicly owned
utilities; provided, however that such terms shall be
consistent with, shall not amend, and shall not
-14-
1
interfere with the performance of any rights or
obligations under the EHV Contract. Such assignment
may commence on January 1, 1985 and shall terminate
on the earliest to occur of, (1) the date when the
California -Oregon Transmission Project becomes
operational, (2) the date when the participation of
PGandE, SCE, and SDG&E is terminated because the
approvals under Section 11.4 cannot be obtained or
because those approvals are unsatisfactory to PGandE,
SCE, and SDG&E, (3) the date when the Project is
terminated prior to its operation, such termination
to be deemed to have occurred.on January 1,.1993, if
no work has been done on the Project for three years
prior to that date. Such an assignment shall not
impair SMUD`s right to utilize any assigned
entitlement after termination of the assignment.
10.0 Layoff Arrangements
10.1 The Agency shall lay off on a firm basis 50 MW of
Project transfer capability .to the Southern
California Public Agencies between 1990 and-1994.
The Agency shall lay off on a firm basis 25 MW of
Project transfer capability to the Southern
California Public Agencies between 1995 and 1999.
10.2 The Agency shall lay off on a firm basis Project
transfer capability to the Investor -Owned Utilities,
as indicated below:
1990: 200 MW
1991: 175 MW
1992: 150 MW
1993: 125 MW
1994: 100 MW
1995: 75 MW
1996: 50 MW
1997: 25 MW
1998 and thereafter: 0 MW
-15-
1
10.3 Layoff of Project transfer capability pursuant to
Sections 10.1 and 10.2 shall be.sold at the cost of
said transfer capability based on public financing
plus contingencies of 25 percent. It is recognized
that the layoff amounts set forth in Sections 10.1
and 10.2 will be converted to a percentage of the
minimum design transfer capability of 1600 MW and
applied to the actual transfer capability determined
by the Management committee.
10.4 An important goal of the Project is to.benefit the
Participants and their respective ratepayers,
commensurate with the risks inherent in the
Project. To the extent that any Participant does not
need its Project transfer capability to meet the
loads of its system (directly or by exchange) and its
firm layoff requirement pursuant to Sections 10.1 and
10.2 hereunder, such remaining transfer capability
shall be made available to the other Participants.
10.4.1 Long-term transfer capability is transfer
capability for which a five-year advance
notice' is required. Short-term transfer
capability is transfer capability for which
less than five years notice is required.
10.4.2 Layoff transfer capability as specified in
Section 10.4 shall be made available ona
cost basis. Long-term transfer capability
shall be offered at no less than the cost of
transfer capability based on public financing
plus contingencies of 25 percent. Short-term
transfer capability shall be offered at no
less than the cost of transfer capability
based on public financing with no contingency
adder.
10.4.3 If there are no Participants wishing to
purchase either long-term or short-term
-16-
layoff at the applicable price pursuant to
Section 10.4.2, then the selling Participant
can use its excess transfer capability to
deliver power to a Participant or to other
entities under any terms and conditions or
make its Project transfer capability
available to others.
10.5 Nothing in Section 10.4 shall prevent any Participant
from utilizing its Project transfer capability to
transmit power to other Participants or entities in
the Northwest.
11.0 Approval by the Secretary of Energy, Congress and other
Governmental Agencies
if, after a public notice procedure and due deliberation by
the Secretary, this MOU is adopted by the Secretary as the
1
basis for development of the Project, the Participants
agree as follows:
11.1 This MOU shall be submitted by the -Secretary in his
report to Congress, pursuant to Public Law'98-360.
11.2 The Participants shall -support the passage of
legislation in the form attached hereto as
"Exhibit A", authorizing the implementation of the
Project in accordance with this MOU. The
Participants shall also support report language
accompanying such legislation in the form attached as
"Exhibit B", which determines -that the plan for
development and operation of the Project in
accordance with this MOU is in the public interest.
11.3 Contracts among the Participants shall then be
negotiated to implement these principles. As a
condition of execution of any contracts implementing
this MOU each Participant shall furnish the other
Participants with a written Opinion of Councal in
which it is represented that said Participant has the
authority to enter into such.contracts and to be
-17-
bound by the terms and conditions thereof. In the
case of Agency, each major member agency thereof
shall furnish such Opinion of Counsel.
11.4 The contracts negotiated to implement these
Principles shall be submitted to, and Shall be
subject to satisfactory approvals and permits of,
local, state and federal governmental agencies having
jurisdiction over the Participants to the contracts
or the actions contemplated here.
11.5 If the conditions in Section 11.4 are not satisfied
as to any Participant, without changes or new
conditions'unacceptable'to such Participant, such
Participant. shall no longer be bound by any provision
of this MOU.
12.0 Signature Clause
The signatories to this MOU represent that they have been
appropriately authorized to enter into this MOU on behalf
of the Party for whom they sign. This MOU may be executed
in counterparts. This MOU is executed as of the 19th day
of December, 1984.
(Seal)
APPPMM AS TOP �-
Special Counsel to Cit. of Anaheim
Dated:
I
CITY OF ANAHEIM
By:
` �• Y
Date: --
CITY OF AZUSA
By:
Date:
-18-
bound by the terms and conditions thereof. In the
case of Agency, each major member agency thereof
shall furnish such Opinion of Counsel_
11.4 The contracts negotiated to implement these
Principles shall be submitted to, and shall be
subject to satisfactory approvals and permits of,
local, state and federal governmental agencies having
jurisdiction over the Participants to the contracts
or the actions contemplated here.
11.5 If the conditions in Section 11.4 are -not satisfied
as to any Participant, without changes or new
conditions unacceptable to such Part icipaht, 'such
Participant shall no longer be bound by any provision
of this MOU.
12.0 Signature Clause
The signatories to this MOU represent that they have been
1
appropriately authorized to enter into this MOU on behalf
of the Party for whom they sign. This. MOU may be executed
in counterparts. This MOU is executed as of the 19th day
of December, 1984.
CITY OF ANAHEIM
By:
Date:
CITY OF AZUSA
-18-
Dates
CITY OF VERYON
By:
Dates
CALIFORNIA DEPART%.CEYT OF
WATER MOURCES
By%
Date:
PACIFIC GAS AND ELECTRIC COMPANY
By% -
Date:
-19-
CITY OF SAMING
By=
Date:
CITY OF COLTOM
By
Date:
CITY OF NIVIiRsim
By=
Date:
CITY OF VERu=.
Sy: _
Date:
CALIFORdtrA DEPARZIdsbl"r OF
WATaa rsocr s
B►_ -
Dat.z
PACIFIC GAS AND riz T1tIC COMPANY
sy=
Onto:
CITY OF BANNING
By:
Date:
CITY OF COLTON
By:
Date:
CITY OF RIVERSIDE
:
BY
Date: hu11 r✓ err r48S�
CITY OF VERNON
By:
Date:
CALIFORNIA DEPARTMENT OF
WATER RESOURCES
By:
Date:
PACIFIC GAS AND ELECTRIC COMPANY
By:
Date:
-19-
By $—
Oates
CITY OF COLTON
By=
Dates
CITY OF RIVERSIDE
By:
Date
CITY OF VERNON
MAYOR
Date: 12-28-84
CALIFORNIA DEPARTM NT OF
WATER RESOURCES
Sys
Dates
PACIFIC OCAS AND ELECTRIC COMPANY
Sy:
Date:
CITY OF BANNING
Bv:
Date:
CITY OF COLTON
Bv:
Date:
CITY OF RIVERSIDE
Bv:
Date:
CITY OF VERY -ON
5 �
Bv:
Lpprored as to legal form
and sufficiency:
T
04"Codhs�Y,
of
Water Reeo
Date:
CALIFORNIA DEPARTMENT OF
WATER RESOURCES
B y .
Date:
PACIFIC GAS AND ELECTRIC COMPAIN'Y
By:
Date. —
-19-
CITY OF BANNING
By:
Date:
CITY OF COLTON
By:
Date:
CITY OF RIVERSIDE
By:
Date:
CITY OF VERNON
By:
Date:
CALIFORNIA DEPARTMENT OF
WATER RESOURCES
By:
Date:
PACIFIC GAS AND ELECTRIC COMPANY
Date: December 18, 1984
-19-
NEMDRANDLIM OF UNDFRSrANDING
CALUDRDTIA-OREGON TRANSMESSION PRaJEEGT
i
SAN DIEGO GAS AND ELECTRIC COMPANY
By:
Date: pce�•,ber- iri
SOUTHERN CALIFORNIA EDISON COMPANY 11
By:
Date:
WESTERN AREA POWER ADMINISTRATION
By: -
Date:
TRANSMISSION AGENCY OF
NORTHERN CALIFORNIA
By:
Date:
LOS ANGELES DEPARTMENT OF
WATER AND POWER
By:
Date:
-20-
I
SAN DIEGO GAS AND ELECTRIC COMPANY
By:
Date:
SOUTHERN ORNI E ISON COM
By: ,
Date: /2 -/.F J
WESTERN AREA POWER ADMINISTRATION
By:
Date:
1 TRANSMISSION AGENCY OF
NORTHERN CALIFORNIA
By:
Date:
LOS ANGELES DEPARTMENT OF
WATER AND POWER
By:
Date:
-20-
I SAN DIEGO GAS AND ELECTRIC COMPANY
By:
Date:
SOUTHERN CALIFORNIA EDISON COMPANY
By:
Date:
WESTERN AREA POWER ADMINISTRATION
By : - .
Date • I c' Dec 8¢
*/ Subject to a public involvement proceeding
and, after consideration of public comments,
adoption of this MOU, as may be modified
based on such public comments, by the
Secretary of Energy.
i
! TRANSMISSION AGENCY OF NORTHERN CALIFORNIA
By:
Date:
LOS ANGELES DEPARTMENT OF WATER AND POWER
By:
Date:
-20-
SAN DIEGO GAS AND ELECTRIC COMPANY
By:
Date:
SOUTHERN CALIFORNIA EDISON COMPANY
By:
Date
WESTERN AREA POWER ADMINISTRATION
By:
l Date:
TRANSMISSION AGENCY OF
NORTHERN CALIFORNIA
Date:5-
LOS ANGELES DEPARTMENT OF
WATER AND POWER
By:
Date:
-20-
SAN DIEGO GAS AND ELECTRIC COMPANY
By:
Date:
SOUTHERN CALIFORNIA EDISON COMPANY
By:
Date:
WESTERN AREA POWER ADMINISTRATION
By:
Date:
TRANSMISSION AGENCY OF
NORTHERN CALIFORNIA
By:
Date:
DEPARTMENT OF
STATER AND POWER
OF THE
CITY OF
LOS ANGELES
?ROVED AS TO r07h1 -. LEGALM
Ci-N ATiOPMEY
By
L
---+
r
BOARD
OF WATER
AND POWER COMMISSIONERS
C7
OF THE
TY OF
L S - NyGELES
........
and
;Ld. n •. c�rnef
e c r e t a r y
rn
cn
co G�
vn
-20-
The Secretary of Energy is authorized to cause the
construction of a third AC transmission line from the Pacific
Northwest to California in accordance with a Memorandum of
Understanding submitted by the Secretary pursuant to Public
Law 98-360.
"Exhibit S"
Suggested Report Language in AF
Le iiislaaYion in Botn Houses or
iations
erence
The Secretary has, pursuant to Public Law 98-360, reported a
conceptual plan for construction of the line, which is described
in detail in a Memorandum of Understanding signed by most of the
privately and publicly owned utilities in California. The plan
for development and operation of the new 500-kV AC line and
associated facilities described in the Memorandum is in the
public interest and will benefit the electric consumers of the
Pacific Northwest and Southwest. •Accordingly, the Secretary is
instructed to work with the California utilities and proceed with
development -and operation of the Project in accordance with the
Memorandum.
APPENDIX B
CALIFORDTIA-OREGON
TRANSMISSION` PROJECT
14MORANDUM OF UNDERSTANDING
ANNEX
1
2
3
4
5
6
7
8
9
10
11
12
13,
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
CONFORMED COPY
CALIFORNIA-OREGON TRANSMISSION PROJECT
MEMORANDUM OF UNDERSTANDING ANNEX
Among
City of Anaheim
City of Azusa
City of Banning
City of Colton
City of Riverside
City of Vernon
California Department of Water Resources
Los Angeles Department of Water and Power
Pacific Gas and Electric Company
San Diego Gas-& Electric Company
Southern California Edison Company
Transmission Agency of Northern California
Western Area Power Administration
Carmichael Water District
El Dorado Hills Community Services District
San Juan Suburban Water District
Shasta Dam Area Public Utility District
Southern San Joaquin Valley Power Authority
Trinity County Public Utility District
March 19, 1986
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27'
28
TABLE OF CONTENTS
SECTION PAGE
RECITALS.............................................
2
1.
DEFINITIONS AND CATEGORIES OF PARTICIPANTS...........
3
2.
ASSUMPTION OF OBLIGATIONS AND RIGHTS.. ...............
4
3.
PROJECT MANAGEMENT ...................................
5
4.
MEMORANDUM OF UNDERSTANDING --PROJECT PARTICIPATION
'SHARES. ................................
6
S.
MEMORANDUM OF UNDERSTANDING --PROJECT FINANCING
RESPONSIBILITY.*..**..*.**** .... o.-o ....... ** ......
9
6.
MEMORANDUM OF UNDERSTANDING --PROJECT OWNERSHIP.......
10
7.
RIGHTS OF THE CALIFORNIA DEPARTMENT OF WATER
RESOURCES..........................................
15
8.
PROJECT DEVELOPMENT AGREEMENT --PROJECT OWNERSHIP,
ENTITLEMENT TO TRANSFER CAPABILITY OF THE PROJECT
AND PROJECT FINANCING RESPONSIBILITY ...............
18
9.
CHANGES IN OWNERSHIP, PARTICIPATION SHARE, AND
FINANCING RESPONSIBILITY- .........................
20
10.
REIMBURSEMENT OF -CURRENT PARTICIPANTS ................
20
11.
CONSTRUCTIVE WITHDRAWAL ..............................
22
12.
ASSIGNMENT...........................0...............
25
13.
OPINIONS OF COUNSEL ..................................
27
14.
SIGNATURE CLAUSE., ....... o ........ o...*.00 ...........
28
-i-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
MEMORANDUM OF UNDERSTANDING ANNEX
CALIFORNIA-OREGON TRANSMISSION PROJECT
This Memorandum of Understanding Annex ("MOU Annex") shall
ae effective as of February 22, 1986, and is entered into by the
"-ity of Anaheim (Anaheim), City of Azusa (Azusa), City of Banning
(Banning), City of Colton (Colton), City of Riverside
(Riverside), City of Vernon (Vernon), collectively referred to as
"Southern California Public Agencies"; California Department of
Water Resources (CDWR);Pacific Gas and Electric Company
(PGandE), San Diego Gas and Electric Company (SDG&E), and
Southern California Edison Company (SCE), collectively referred
to as "Investor -Owned Utilities"; the Western Area Power
Administration (Western); the Transmission Agency of Northern
California (Agency), a joint powers agency composed of the Cities
of Alameda, Biggs, Gridley, Hea.ld-sburg, Lodi, -Lompoc, Palo Alto,
Redding, Roseville, Santa'Clara, and Ukiah, the Plumas-Sierra
Rural Electric Cooperative, the Sacramento Municipal Utility
District, the Modesto Irrigation District, and the Turlock
Irrigation District; hereinafter sometimes referred to
individually as "Current Participant" and collectively as
"Current Participants"; the Los Angeles Department of Water and
Power (LADWP), representing itself and the Cities of Glendale,
Burbank, and Pasadena, a non -voting member of the Management
Committee; and Southern San Joaquin Valley Power Authority (South
San Joaquin), a joint powers agency; Trinity County Public
Utility District (Trinity); Shasta Dam Area Public Utility
(District (Shasta); San Juan Suburban Water District (San Juan);
-1-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
El Dorado Hills Community Services District (El Dorado); and
Carmichael Water District (Carmichael), hereinafter sometimes
referred to individually as "Additional Participant" and
collectively as "Additional Participants."
RECITALS
WHEREAS, the Current Participants, along with LADWP, have
executed the Memorandum of Understanding, California -Oregon
Transmission Project dated December 19, 1984 ("MOU"), and the
Current Participants, except for CDWR, have executed - a
Supplemental Letter Agreement to.the MOU, the Interim Cost
Sharing Agreement effective April 1, 1985, and the Project
Development Agreement ("PDA") effective September 30, 1985, for
the purpose of developing the California -Oregon Transmission
Project ("Project"), and
WHEREAS, the Secretary of Energy, by his Memorandum of
Decision ("MOD") of February 7, 1985 approved the MOU subject to
the modifications and conditions set forth in the MOD, which MOD
has been clarified by the May 4, 1985 letter from the Acting
General Counsel of the Department of Energy; and
WHEREAS, certain non-federal public entities were, under
terms and conditions specified by Western in 50 Fed. Reg.
31912 (1985), allocated entitlements within the 3.125 per cent of
Project transfer capability reserved to them by the Secretary of
Energy, which non-federal public entities and their allocated
entitlements are set out at 50 Fed. Reg. 42769 (1985), and
WHEREAS, such non-federal public entities, designated as
the Additional Participants, as one condition of receiving and
-2-
I using such entitlement must sign an agreement with the Current
2 Participants by which they assume all appropriate obligations and
become entitled to all applicable rights and benefits of the
3
4 Project defined to date,
NOW, THEREFORE, the Additional Participants, the Current
5
6 Participants, and LADWP agree as follows:
7
1. DEFINITIONS AND CATEGORIES OF PARTICIPANTS
8
9 1.1 For purposes of this MOU Annex, a "Participant" is
10 an entity having the obligations, rights -and
--
benefits of a Participant as that term is used in
IT
12 the MOU, the Supplemental Letter Agreement, the
13 Interim Cost Sharing Agreement, the PDA and any
14
other agreement -related to the Project which has
15 been signed by all or substantially all the
16 Current Participants and Additional-Participants.-
17 1.2 A Nonutility Participant is any Additional
18 Participant which (1) is not a public electric
19 utility regulated under applicable state law or
20 the Federal Power Act or exempted from such
21 regulation by reason of being a public entity, or
22 (2) does not have public utility responsibilities
23 with regard to serving electric power to
24 customers. Nonutility Participants have the same
25 rights, obligations and benefits as Participants
26 except as provided in Section 2.2 below. As of
27 the effective date of this Agreement, the
28 Nonutility Participants are South San Joaquin, San
-3-
{ 1
2
3
4
5
6
7
8
9
10
�1l
12
13
I4
15
16
17
18
19I
20
21
22
23
24
25
26
27
28
Juan and Carmichael. Nothing contained herein
shall preclude a Nonutility Participant from
changing its status at a later date, to no longer
be a Nonutility Participant.
2. ASSUMPTION OF OBLIGATIONS AND RIGHTS
2.1 Each Additional Participant agrees to and is bound
hereby by all provisions, terms and conditions of
the MOU as modified by the MOD of the United
States Secretary of Energy, dated February 7,
1985, as interpreted by the letter of the United
States Department of Energy Acting General
Counsel, dated May 4, 1985, and as such MOU may be
further amended, the Supplemental Letter
Agreement, the Interim Cost Sharing Agreement and
the PDA, all as modified by this MOU Annex, as if
each Additional Participant had duly executed such
agreement.
2.2 In accordance with the May 4, 1985 letter from the
Acting General Counsel of the Department of
Energy, which provides in part that the Secretary
of Energy's MOD was not intended to impose a
precedent for wheeling to end -users, Section 2.4
of the MOU and Sections 34.3 and 34.4 of the PDA,
which implement Section 2.4 of the MOU, shall not
be applicable to Nonutility Participants.
Section 10.5 of the MOU shall not be applicable to
any Nonutility Participant.
-4-
l
2
3
4
5'
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
3. PROJECT MANAGEMENT
The following is substituted for and replaces Section 4.1
of the MOU:
"4.1 A Management Committee, chaired by a.
representative of the Agency, is hereby formed to
oversee and approve the planning, design,
construction, operation and maintenance of the
Project. Each Participant in the Project shall
have representation on the Management Committee,
with -the members of the Agency being represented
by the Agency, and the Southern California Public
Agencies being represented by one Participant of
their choice, and each Additional Participant
being jointly represented by one Additional
Participant, provided that any Additional
-Participant may designate -instead a Current
Participant's Management Committee Representative
to represent it on the Management Committee. All
actions or decisions by the Management Committee
shall be by agreement of at least 75 percent
interest of the Participants entitled to vote
based on Project Participation shares between the
California -Oregon border area and Tesla
Substation, as expressed in Section 5. A
Management Committee Representative who represents
more than one Participant shall separately vote
the interests of each Participant represented.
Subcommittees shall be formed as needed to address
-5-
I
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
specific aspects of the Project. CDWR, prior to
exercise of rights under Section 8.1, and LADWP
shall also have non -voting representation on the
Management Committee. Each Participant, including
each of the Southern California Public Agencies
and each of the Additional Participants, and each
of the members of the Agency, shall be given
advance notification of all meetings of the
Management Committee and may attend meetings."
4. MEMORANDUM OF UNDERSTANDING --PROJECT PARTICIPATION SHARES
4.1 The following is substituted for and replaces
Section 5.1 of the MOU:
"5.1 The Participants shall be.entitled to
Project transfer capability between the
California -Oregon border area and Tesla
Substation prior to January 1, 2005, in
the following proportions:
5.1.1 The Agency shall be entitled
to 42.2916 percent;
5.1.2.. The Investor -owned Utilities
shall be entitled to 40.7837
percent;
5.1.3 The Southern California Public
Agencies shall be entitled to
7.5497 percent;
5.1.4 Western for DOE laboratories
and federal wildlife refuges
1
2
3
4
5
6
7
8
9
10
Il
12
13
14
15
16
I
17,
18'
19
20
21
22
23
24
25
26
27
28
4.2
shall be entitled to 6.2500
percent;
5.1.5 South San Joaquin shall be
entitled to 2.0625 percent;
5.1.6 Trinity shall be entitled to
.3125 percent;
5.1.7 Shasta shall be entitled to
.4375 percent;
5.1.8 San Juan shall be entitled to
.0625 percent;
5.1.9 El Dorado shall be entitled to
.1875 percent;
5.1.10 Carmichael .0625 percent."
The following is substituted for and replaces
Section 5.2 of the MOU:
"5.2 If .CDVIR exercises its. rights and
purchases its share'of the Project in
accordance with Section 8.1 of the MOU,
then the Participants shall be entitled
to Project transfer capability between
the California -Oregon border area and
Tesla Substation commencing on
January 1, 2005, in the following
proportions:
5.2.1 The Agency shall be entitled
to 39.4690 percent;
-7-
5.2.2
The Investor -Owned Utilities
shall be entitled to 38.0673
2
percent;
3
5.2.3
The Southern California Public
4
Agencies shall be entitled to
5
7.0470 percent;
6
5.2.4
Western for DOE laboratories
7
and federal wildlife refuges
8
shall be entitled to 6.2500
9
10
percent;.
11
5.2.5
South San.Joaquin shall be
12
entitled to 2.0525 percent;
13
5.2.6
Trinity shall be entitled to
14
.3125 percent;
' 15
5.2.7
Shasta shall be entitled to
16
.4375 percent;
17
5.2.8
San Juan shall be entitled to
18
.0625 percent;
19
5.2.9
El Dorado shall be entitled to
20
.1875 percent;
21
5.2.10
Carmichael shall.be entitled
22
to .0625 percent;
23
5.2.11
The CDWR shall be entitled to
24
6.0417 percent."
25
26
27
' 28
I
1 5. MEMORANDUM OF UNDERSTANDING —PROJECT FINANCING
2 RESPONSIBILITY
3 5.1 The following is substituted for and replaces
4 Section 6.1 of the MOU:
5 "6.1 Prior to the effective date of any
6 election by CDWR to exercise its rights
7 in accordance with Section 8.1 of the.
8 MOU and unless otherwise agreed in
9 accordance with Sect -ion 6.3 of the MOU,
10 the Participants, shall be responsible
11 for financing the Project and
12 betterments in the following
13 proportions:
14 6.1.1 The Agency, 45.1110 percent;
15 6.1.2 The Investor -Owned Utilities,
16 43.5026.percent;
17 6.1.3 The Southern California Public
18 Agencies, 8.0530 percent;
19 6.1.4 South San Joaquin, 2.2000
20 percent;
21 6.1.5 Trinity, .3333 percent:
22 6.1.6 Shasta, .4667 percent;
23 6.1.7 San Juan, .0667 percent;
24 6.1.8 El Dorado, .2000 percent;
25 6.1.9 Carmichael, .0667 percent."
26 5.2 The following is substituted for and replaces
27 Section 6.2 of the MOU:
28
-9-
1
2
3
4
5
6
7
8
9
I0
11
12
13
14
15
16
17
18
19
20
211
22
23
24
25
26
27
28
"6.2 Subsequent to the effective date of
election by CDWR to exercise its rights
in accordance with Section 8.1 of the
MOU, and unless otherwise agreed in
accordance with Section 6.3 of the MOU,
the Participants, shall be responsible
for any capital betterments for the
Project in the following proportions:
6.2.1 The Agency, 42.1002 percent;
6.2.2 The-Investor=Owned Utilities,
40.6052 percent
6.2.3 The Southern California Public
Agencies, 7.5168 percent;
6.2.4 The CDWR, 6.4444 percent;
6.2.5 South San Joaquin, 2.2000
percent;
6.2.6 Trinity, .3333 percent;
6.2.7 Shasta, .4667 percent;
6.2.8 San Juan, .0667 percent;
6.2.9 E1 Dorado, .2000 percent;
6.2.10 Carmichael, .0667 percent."
6. MEMORANDUM OF UNDERSTANDING --PROJECT OWNERSHIP
6.1 The following is substituted for and replaces
Section 7.1 of the MOU:.
"7.1 Except as otherwise agreed by the
Participants in accordance with
Section 7.6 of the MOU, the Project,
-10-
1
2
3
4
5
6
7
8
9
. Ao
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
I�
other than the upgraded Western
facilities, shall be owned in the
following proportions prior to
January 1, 2005, and also thereafter,
if CDWR does not exercise its right in
accordance with Section 8.1 of the MOU:
7.1.1 The Agency, 45.1110 percent;
7.1.2 The Investor -Owned Utilities,
43.5026 percent;
7.1.3 The Southern California Public
Agencies, 8.0530 percent;.
7.1.4 South San Joaquin, 2.2000
percent;
7.1.5 Trinity, .3333 percent;
7.1.6 Shasta, .4667 percent;
7.1.7 San Juan, .0667 percent;
7.1.8 E1 Dorado, .2000 percent;
7.1.9 Carmichael, .0667 percent."
6.2 The following is substituted for and replaces
Section 7.2 of the MOU:
"7.2 If CDWR exercises its rights to
purchase Project transfer capability in
accordance with Section 8.1 of the MOU,
then except as otherwise agreed by the
Participants in accordance with
Section 7.6 of the MOU, the_Project,
other than the upgraded Western
facilities, shall be owned in the
:29C
1 following proportions after January 1,
2 2005:
3 7.2.1 The Agency, 42.1002 percent;
4 7.2.2 The Investor -Owned Utilities,
5 40.6052 percent;
6 7.2.3 The Southern California Public
7 Agencies, 7.5168 percent;
8 7.2.4 The CDWR, 6.4444 percent;
9 7.2.5 South San Joaquin, 2.2000
10 percent;
11 7.2.6 Trinity, .3333 percent;
12 7.2.7- Shasta, .4667 percent;
13 7.2.8 San Juan, .-0667 percent;
14 7.2.9 E1 Dorado, .2000.percent;
15 7.2.10 Carmichael, .0667 percent."
16 6.3- The following is substituted for and replaces
17 Section 7.3 of the MOU:
18 07.3 Unless prohibited by law or unless
19 otherwise agreed in accordance with
20 Section 7.6 of the MOU, the portion of
21 the upgraded Western facilities not
22 owned by Western shall be owned in the
23 following proportions prior to
24 January 1, 2005:
25 7.3.1 The Agency, 45.1110 percent,
26 (approximately 677/1500);
27
28
-12-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
7.3.2 The Investor -Owned Utilities,
43.5026 percent,
(approximately 652/1500);
7.3.3 The Southern California Public
Agencies, 8.0530 percent
(approximately 121/1500);
7.3.4 South San Joaquin, 2.200
percent (approximately
33/1500);
7.3.5 -Trinity, .3333 percent'
(approximately 5/1500);
7.3.6 Shasta, .4667 percent
(approximately 7/1500);
7.3.7 San Juan, .0667 percent
(approximately 1/1500);
7.3.8 El Dorado, .2000 percent
(approximately 3/1500);
7.3.9 Carmichael, .0667 percent
(approximately 1/1500).
The Participants recognize that the
facilities to be owned by Western shall
be determined in accordance with the
provisions of the MOU, approved by the
Secretary of Energy by the MOD, which.
MOD was clarified by the May 4, 1985
letter from the Acting General Counsel
of the Department of Energy. Further
negotiations of the particulars of the
-13-
I ownership of facilities by Western will
2 be required as engineering of the
3 Project progresses."
4 6.4 The following is substituted for and replaces
5 Section 7.4 of the MOU:
6 "7.4 Unless prohibited by law or unless
7 otherwise agreed in accordance with
8 Section 7.6 of the MOU, the portion of
g the upgraded Western facilities not
10 owned by Western shall be owned in the
11 following proportions on and after
12 January 1, 2005, if CDWR exercises its
13 rights to purchase in accordance with
14 Section 8.1 of the MOU:
15 7.4.1 The Agency, 42.1002 percent
16 (approximately 631/1500)-;
17 7.4.2 TheInvestor-Owned Utilities,
18 40.6052 percent (approximately
19 609/1500);
20 7.4.3 The Southern California Public
21 Agencies, 7.5168 percent
22 (approximately 113/1500);
23 7.4.4 The CDWR, 6.4444 percent
24 (approximately 97/1500);
25 7.4.5 South San Joaquin, 2.200
26 percent (approximately
27 33/1500);
28
-14-
1
2
3
4
5
6
7
8
9
-10
11
12
13
14
15
16
17
18
19
20
21
22,
23
24
25
26
27
28
7.4.6 Trinity, .3333 percent
(approximately 5/1500);
7.4.7 Shasta, .4667 percent
(approximately 7/1500);
7.4.8 San Juan, .0667 percent
(approximately 1/1500);
7.4.9 El Dorado, .2000 percent
(approximately 3/1500);
7.4.10 Carmichael, .0667 percent
(approximately 1/1500).
The Participants recognize that the
facilities to be owned by Western shall
be determined in accordance with the
provisions of the MOU, approved by the
Secretary of Energy by the MOD, which
MOD was clarified by'the May 4, 1985
letter from the Acting General Counsel
of the Department of Energy. Further
negotiation of the particulars of the
ownership of facilities by Western will
be required as engineering of the
Project progresses."
7. RIGHTS OF THE CALIFORNIA DEPARTMENT OF WATER RESOURCES
7.1 The following is substituted for and replaces
Section 8.1 of the MOU:
"8.1 Effective January 1, 2005, CDWR will
have a right to buy pro rate from all
} 1
Current Participants, except Western,
2
6.25 percent, as such percentage is
3
adjusted downward to accommodate the
4
allocation to Additional Participants,
5
of the Project as the Project exists as
6
of the date CDWR exercises its right.
7
Unless another price is mutually agreed
8
to by the selling Current Participant
9
and CDWR, CDWR shall pay each selling
' 10'
Current Participant the original
11
construction cost (including the
12
original construction cost associated
13
with Western's entitlement), including
14
the interest it incurred during
15
construction, plus the original cost of
16
capital improvements and betterments
17
(including the original cost of capital
18
improvements and betterments associated
19
with Western's entitlement), including
20
interest it incurred during
21
construction, allocable to.the
22
respective pro rats share of the
23
Project that the Current Participant
24
is selling to CDWR. Within one year
25
after the Project is energized, each
26
Current Participant shall provide CDWR
27
with a statement of the original
28
construction cost (including the
-16-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
original construction cost associated
with Western's entitlement), including
the interest it incurred during
construction for its share of the
Project so that CDWR can determine the
cost it shall be obligated to pay such
Current Participant if it exercises its
rights under this Section 8.1. Within
one year after any capital improvements
or betterments are completed prior to
the date. of exercise by CDWR, .each
Current Participant shall provide CDWR
with a statement of construction costs
incurred for such capital improvements,
or betterments (including the original
construction cost of capital
improvements and betterments associated
with Western's entitlement) including
interest incurred during construction
with respect to its share, so that CDWR
can determine the cost it shall -be
obligated to pay such Current
Participant if it exercises its rights
under this Section 8.1"
-17-
P
1
8. PROJECT
DEVELOPMENT AGREEMENT --PROJECT OWNERSHIP,
2
ENTITLEMENT TO TRANSFER CAPABILITY OF THE
PROJECT AND
3
PROJECT
FINANCING RESPONSIBILITY
4
8.1
The following is substituted for
and replaces
5
Appendix F of the PDA:
6
"Appendix F
7
Project Ownership and Entitlements
8
(Expressed in Percentages)
9
Entitlement to
10
Transfer Capability
Ownership
.11
of the .Projectl/
Interest2/
12
TANC
42.2916
45.1110
13
14
PGandE
20.3918
-21.7513
15
SDG&E
2.8549
3.0452
16
SCE
17.5370
13.7061
17
18
Anaheim
3.0198
3.2212
19
Azusa
0.3020
0.3221
20
Banning
0.1510
0.1611
21
Colton
0:3020
0.3221
22
Riverside
2.0762
2.2146
23
Vernon
1.6987
1.8119
24
25
Western
6.2500
0.0000
26
South San
Joaquin 2.0625
2.2000
' 27
Trinity
0.3125
0.3333
28
Shasta
0.4375
0.4667
-18-
H
1
2
i
3
4
5
6
7
8
9
10
11
12
13
I4
15
16
17
18
19
20
21
22
23
24
25
26
27
28
San Juan
E1 Dorado
Carmichael
0.0625
0.1875
0.0625
100.0000
0.0667
0.2000
0.0667
100.0000
I, Between California -Oregon border area and Tesla Substation
2/ Excluding facilities owned by Western"
8.2 The following is substituted for and replaces
Section 5.1 of -the PDA:
-5.1 Unless the following percentages are
otherwise modified in accordance with
Section 5.4 each Participant shall be
responsible for paying its share of the
costs of Project. Development Work in
the following Cost Sharing'Percentages:
TALC 45.1110
Anaheim 3.2212
Azusa 0.3221
Banning 0.1611
Colton. 0.3221
Riverside 2.2146
Vernon 1.8119
PGandE 21.7513
SCE 18.7061
SDG&E 3.0452
Western 0.0000
South San Joaquin 2.2000
-19-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24'
25
26
27
28
Trinity 0.3333
Shasta 0.4667
San Juan 0.0667
E1 Dorado 0.2000
Carmichael 0.0667
100.00001,
9. CHANGES IN OWNERSHIP, PARTICIPATION SHARE, AND FINANCING
RESPONSIBILITY
9.1 Sections 4,_ 5, .6, . 7, and. 8.of this MOU Annex shall
whenever necessary be modified by restating.
percentages to -conform to changes in Project
Participation Share, Project Ownership and Project
Financing Responsibility, as these terms are used
in the MOU, in accordance with the provisions of
the PDA or other agreements among the Participants
which provide for such changes.
9.2 Each Participant may assign its rights and
obligations in the Project in accordance with
Section 17 of the PDA and any applicable provision
of the Participation Agreement contemplated in
Sections 2.4 and 11.4 of the PDA, including the
layoff of Project transfer capability rights in
accordance with Section 10.4 of the MOU.
10. REIMBURSEMENT OF CURRENT PARTICIPANTS
10.1 Not later than ten (10) days after the effective
date of this MOU Annex, each Additional
-20-
1
2
3
4
5
6
7
8
9I
i
101
11
12
I3!
14
I5
I
M
i
17
18,
19
20
21
22
23
24
25
26
27
28
Participant shall reimburse each Current
Participant, except CDWR, for its share of all
payments made and due and payable to the Project
Manager by each Current Participant as of the
effective date of this MOU Annex for Project
Development Work in accordance with the Interim
Cost Sharing Agreement and the Project Development
Agreement plus interest in accordance with
Section 10.3 below.
10.2 Each .Additional. Participant's .share of such costs
shall be that amount that each Additional
Participant would have paid to the Project Manager
for Project development work had that Additional
Participant been an -original signator to the MOU
and paid all amounts due and payable under the
Interim -Cost Sharing Agreement and the Project
Development Agreement, based upon its financing
responsibility percentage.
10.3 The amount to be reimbursed by each Additional
Participant to each Current Participant in
accordance with this Section 10, shall include an
interest charge assessed at an annual rate of
interest, compounded monthly, equal to the lesser
of (a) the applicable first of the month reference
rate, or successor, of the Bank of America N.T. &
S.A., San Francisco, California, corresponding to
the period for which reimbursement is made; or (b)
the maximum interest rate permitted by law. Such
-21-
1 interest shall.be charged against the amount to be
2 reimbursed from the time the Current Participant
3 made its original payment to the time such
4 reimbursement is paid by the Additional
5 Participant.
6 10.4 No later than the effective date of this
7 Agreement, the Project Manager shall compute the
8 amount of funds to be reimbursed by each
g Additional Participant in accordance with the
10 provisions of this Section 10 and shall provide
11 the results of this computation to each'Current
12 Participant and each Additional Participant. The
13 Project Manager shall issue a cash call to the
14 Additional Participants on behalf of the Current
15 Participants to whom reimbursements are to be made
16 and shall collect and disburse those funds
17 collected in accordance with this Section 10. In
18 no case shall the Project Manager, acting in its
19 capacity as such, be responsible on behalf of an
20 Additional Participant for any reimbursement owed
21 to any'Current Participant in accordance with this
22 Section 10.
23
24 11. CONSTRUCTIVE WITHDRAWAL
25 11.1 Should any Additional Participant fail to duly
26 sign this MOU Annex within ten (10) days after its
27 effective date, fail to reimburse Current
28 Participants in accordance with Section 10, or
-22-
I
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
11.2
fail to meet any condition imposed by Western in
its stated allocation criteria (50 Fed. Reg.
31912) within the period established by Western,
that Additional Participant shall be -deemed to
have withdrawn from the Project and that
Additional Participant's Share, as defined in the
PDA, shall be revoked and placed in an allocation
pool for reallocation to the other Additional
Participants or the Current Participants (except
Western)- in a manner consistent with Western's
stated criteria (50 Fed. Reg. 31912). Should any
portion of that additional Participant's
allocation not be reallocated to the other
Additional Participants, such unallocated portion
shall revert to the Current Participants and shall
be made available to each of them in a manner
consistent with Section 13 of the PDA or
appropriate provisions of the Participation
Agreement, whichever is applicable. Any right to
reimbursement for funds paid toward the
development and operation of the Project shall be
as defined in the PDA or Participation Agreement,
as applicable.
The following is substituted for and replaces
Section 13.4 of the PDA:
"13.4 If the amount of the withdrawing
Participant's Share voluntarily assumed
by the non -withdrawing Participants is
-23-
I less than 100 percent of the
2 withdrawing Participant's Share, each
3 non -withdrawing Participant shall
4 assume its respective portion of the
5 balance of the withdrawing
6 Participant's Share, in an amount
7 proportionate to that which its Cost
8 Sharing Percentage bears to the total
9 Cost Sharing Percentages of
10 non -withdrawing Participants identified
11 in Section 5.1, provided that no
12 Participant shall be obligated in total
13 for more that 1.15 times its Cost
14 Sharing Percentage as of the effective
15 date of this Agreement. A Nonutility
16 Participant shall not be obligated to
17 assume any portion of the withdrawing
18 Participant's Share."
Ig 11.3 The following is added as a new Section 13.12 to
20 the PDA:
21 "13.12 If an Additional Participant withdraws
22 from the Project in accordance with
23 Section 13, or is found in default in
24 accordance with Section 20, then such
25 Additional Participant's allocation
26 shall be revoked and shall be made
27 available to the non -withdrawing
28
-24-
1
2
3
4
5.
6'
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Participants (except Western) on a pro
rats basis.
12. ASSIGNMENT
12. The following is substituted for and replaces
Section 17.1 of the PDA:
"17.1 A Participant may assign or transfer
any right or interest in this
Agreement, in whole or in part, only
after obtaining the written consent of
the other Participants, which consent
shall not be unreasonably withheld;
provided that a Participant may
withhold consent to any proposed
assignment or transfer either (1) to an
entity or association which is not
CDWR, Western, or a public electric
utility regulated under applicable
state law or the Federal Power Act or
exempted from such regulation by reason
of being a public entity, or (2) to an
entity or association which does not
have public utility responsibilities
with regard to serving electric power
to customers. A Participant shall not
withhold consent to any assignment or
transfer between Participants allocated
Project transfer capability by Western
-25-
as set forth in 50 Fed. Reg. 42769
I
(1985) solely because that entity is a
2
Nonutility Participant, provided that
3
such assignment or transfer concerns
4
part or all of the 3.125 percent of
5
6
Project transfer capability allocated
7
by Western and interests attendant
8
thereto, and no other interest in the
9
Project. Consent to -a proposed
10-
assignment to a joint powers agency
11
which is a'Participant shall not be
12
withheld solely because that entity is
13
a joint powers agency. No Participant
14
shall -bring, initiate or amend,
15
directly or indirectly including by
16
means of cross -complaint or other
17
affirmative allegation, an action or
18
proceeding before a court or an
19
administrative agency against another
26
Participant to contest the withholding
21
of consent by such Participant in
22
accordance with clauses (1) or (2) of
23
this Section 17.1 or the reasons
24
therefor or the validity of this
25
Section 17.1, other than a dispute
26
regarding the factual application of
27
such clauses. The withholding of
28
consent by a Participant in accordance
-26-
I with clauses (1) or (2) of this
2 Section 17.1 shall not indicate
3 approval or disapproval by any other
4 Participant of such withholding."
5
6 13. OPINIONS OF COUNSEL
7 The following is substituted for and replaces Section 11.3
8 of the MOU:
9 "11.3 Contracts among the Participants shall
10 then be -negotiated to implement these
11 principles. As a condition of
12 execution of any contracts implementing
13 this MOU each Participant shall furnish
14 the other Participants with a written
15 Opinion of Counsel in which it is
16 represented that'said' Participant has
17 the authority to enter into such
18 contracts and to be bound by the terms
19 and conditions thereof. In the case of
20 the Agency, each major member agency
21 thereof shall furnish such Opinion.of
22 Counsel. In the case of an Additional
23 Participant that is a joint powers
24 agency, the individual member agencies
25 of that joint powers agency shall not
26 be obligated to provide such Opinions
27 of Counsel but the joint powers agency
28
-27-
I itself shall provide such Opinion of
2 Counsel of benalf of the agency."
3
11
.1 14. SIG?.ATL'i2E C—,USE
51 The signatories of this MOU Annex represent that they have
G been appropriately authorized to enter into this MOU Annex on
7 behalf of the entity for whom they sign. This MOU Annex may be
8 executed in counterparts.
9
10i;
I�
B y:
32.i
Same:
ATTEST: f
I4!1 f
C
Title
Gate:
!! ..sty Clerk, City of Ananeim
I'
I i i
i
i
By:
i 3
!
Name:
19
Title
201
i
Date:
211
1
221
1
23fi
By:
24
Name:
2J �
Title:
2Gi Date:
27;
1
231.
CITY OF 'EIM
Tinn R Rnti� 1
Mayor i
March 18, 1986 !
i
C17Y OF P-►ZUS7,
i
CITY OF B;U MIING
{
I
J
1
2
3
4
5
6
7
8
9
10
11
12
13
i
14!
15
16
17
18
19
20
21
22
23
24
25
26
27
28
itself shall provide such Opinion of
Counsel of behalf of the agency.-
14. SIGNATURE CLAUSE
The signatories of this MOU Annex represent that they have
been appropriately authorized to enter into this MOU Annex on
behalf of the entity for whom they sign. This MOU Annex may be
executed in counterparts.
CITY OF ANAHEIM
By:
Name:
Title:
Date:
CITY OF AZUSA
By:
Name: Eugene F. Hoses
Title: Mayor
Date: February 18, 1986
By:
Name:
Title:
Date:
CITY OF BANNING
-28-
J
t
1 itself shall provide such Opinion of
2 Counsel of behalf of the agency."
3
4 14. SIGNATURE CLAUSE
5 The signatories of this MOU Annex represent that they have
6 been appropriately authorized to enter into this MOU Annex on
7 behalf of the entity for whom they sign. This MOU Annex may be
8 executed in counterparts.
9
10 CITY OF ANAHEIM
11 By:
12 Name:
13 Title:
14 Date:
15
16 CITY OF AZUSA
17 By:
18 Name:
19 Title:
20 Date:
21
22 CITY B
23 '
By;
24 Name: SAM JJA DI O
25 Title: City Manager
26 Date: March 12, 1986
27
i 28
-28-
,I
2
3
4
5
6
i
8
9
10
1.1
12
13
14.
15
16'
li
18
19
20
21
22
23
24
25
26
27
28
CALIFORNIA DEPARTMENT OF
Approved ss to le`al tofm
WATER RESOURCES
•IId aeittialeacys�`��...�.�
'
Name:
4!5AS"T/ /V
caf cq- 4,. Departmqut
"
Title:
IIep1f, sec"-=
Water R ource8 !.
Date:
APR G 1y66
CARMICHAEL WATER DISTRICT
By:
Name:
Title:
Date:
CITY OF COLTON
By:
Name:
Title:
Date:
EL DORADO HILLS COMMUNITY
SERVICES DISTRICT
By:
Name:
Title:
Date:
Since.CDWR is not
a party
to the Project Development
Agreement (PDA), CDWR's approval of this MOU Annex is not
intended to express either approval
or disapproval of
Sections 8, 11.2, 11.3
and 12,
which do nothing other than
amend certain sections
of the
FDA.
It
-29-
2
3
4
5
6
8
9
l0l
1l
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
CALIFORNIA DEPARTMENT OF
WATER RESOURCES
By:
Name:
Title:
Date:
CHAEL WA R DISTRICT
By:
Name: er McGin Ly
Title: Secretary/General Manager
Date: February 21, 1986
CITY OF COLTON
By:
Name:
Title:
Date:
EL DORADO HILLS COMMUNITY
SERVICES DISTRICT
By:
Name:
Title:
Date:
-29-
r . t
1
2
3
4
5
6
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
CALIFORNIA DEPARTMENT OF
WATER RESOURCES
By:
Name:
Title:
Date:
CARMICHAEL WATER DISTRICT
By:
Name:
Title:
Date:
CITY OF COLTON
By: A un
Name:
Lze_>�
Title: Mayor
Date:
By:
Name:
Title:
Date:
EL DORADO HILLS COMMUNITY
SERVICES DISTRICT
-29-
1
2
3
4
�i
I
6
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
CALIFORNIA DEPARTMENT OF
WATER RESOURCES
By:
Name:
Title:
Date:
CARMICHAEL WATER DISTRICT
By:
Name: ..
Title:
Date:
CITY OF COLTON
By:
Name:
Title:
Date:
EL DORADO HILLS COMMUNITY
SERVICES,DISTRICT
By:
Name :2„e
Title:
Date: ze6
-29-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
23
DWP No. 10259A
As a party to the MOU but which is not a party
to any other Project Agreement, the Los Angeles Department of
Water and Power (LADWP) regards Sections 8, 9.2, 10, 11 and 12
of the MOU Annex, as having no involvement with LAMP. LADIVP
further considers Section 3 of the MOU Annex as being the only
section of this Agreement which involves LADtiP's interests in
the amended MOU, which interests are limited to those
expressed in Section 4.1 and 4..4 of the MOU.
APMMM AS TO FORM AND LEGALITY
1AMES IL HAHN, CITY ATTORNEY
88
r
AY
ALPH IY W! SOON
ssist t ity Attorney
DEPARTh1ENT OF WATER AND POWER
OF THE CITY OF LOS ANGELES
by
BOARD OF WATER AND POWER CCAVI SS IONTERS
OF 7HE-CLTY OF LOS ANGELES
By t
and
ecre- ary
r�
`nr
.�
Aft
I
LOS ANGELES DEPARTMENT OF
2
WATER AND POWER
3
By:
4
Name:
5
Title:
6
Date:
7
8
PACIFIC GAS AND ELECTRIC
9
C MPANY
10
By:
�....
11
Names
George A. Maneatis,
Executive Vice President
12
Title:
_ Fac, and Elec. Res. Develop.
13
Dates
February 21, 1986
14
15
CITY OF RIVERSIDE
16
By:
17
Name:
18
Title:
19
Date:
20
21
`
SAN DIEGO GAS ELECTRIC
22
i
COMPANY
23
By:
24
Name:
25
Title:
26
Date:
27
28
-30-
l
2
3
4
5
6
7
8
9
10
12
13
14
15
16
17
181
19
20
21
22
23
24
25
26
27
28
LOS ANGELES DEPARTMENT OF
WATER AND POWER
By:
Name:
Title:
Date:
PACIFIC GAS AND ELECTRIC
COMPANY
By
Names
Title:
Date:
CITY OF RIVE IDE
By:
Names AB BROWN
Titles MAYOR
Date: March 18, 1986
By :
Name:
Title:
Dates
SAN DIEGO GAS & ELECTRIC
COMPANY
—30—
2
3
4
5
6
7
8
9
10
11
12
13
14
15
�16
17
18
19
20
21
22
23
24
25
26
27
28
LOS ANGELES DEPARTMENT OF.
WATER AND POWER
By:
Name:
Title:
Date:
PACIFIC GAS AND ELECTRIC
COMPANY
By:
Name: j
Title:
Date:
CITY OF RIVERSIDE
By:
Name:
Title:
Date:
SAN DIEGO GAS & ELECTRIC
COMPANY
BY = ,
Name: J. C. Holcombe
Title: Vice President, Fuel & Power Contrac
Dater _February 21. 198b
s
-30-
1
SAN JUAN SUBURBAN WATER
2
DISTRICT
3
By:
4
Name:
6i/e
5
Title:
General Manager & SPcretary
6
Date:
fZ I Z 67
7
8
SHASTA DAM AREA PUBLIC UTILITY
9
DISTRICT
10
By:
11
Name:
12
Title:
13
Date:
14
15
SOUTHERN CALIFORNIA EDISON
16
By:
17
Name:
18
Title:
19
Date:
20
21
SOUTHERN-SAN JOAQUIN VALLEY
22
POWER AUTHORITY
23
By:
24
Name:
25
Title:
26
Date:
27
28
-31-
I 1
2
3
4
5
6
7
8
9
10
ll
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
By:
Name:
Title:
Date:
SAN JUAN SUBURBAN WATER
DISTRICT
SHASTA DAM AREA PUBL/JIC UTILITY
_ DISTRICT n //
By: '_1 / 0/6.-
F, ,side o rdl otl5irecto S
Bv:
ClerkV Board of Directors
Date: February 19, 1986
SOUTHERN CALIFORNIA EDISON
By:
Name:
Title:
Date:
SOUTHERN SAN JOAQUIN VALLEY
POWER AUTHORITY
By=
Name:
Title:
Date:
-31-
� I
2'
3
4
5
6
7
8
9
10
11
12
13
14
i
15
16
17
18
19
20
21
22
23
24
25
i
26
27
28
AS F.
JOHN R.
81iRy
SAN JUAN SUBURBAN WATER
DISTRICT
By:
Name:
Title:
Date:
SHASTA DAM AREA PUBLIC UTILITY
DISTRICT
By:
Name:
Title:
Date:
Name: Edward A. Myers, Jr.
Title: Vice President
Date: March 7, 1986
By:
Name:
Title:
Date:
SOUTHERN SAN JOAQUIN VALLEY
POWER AUTHORITY
-31-
9
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19'
20
21
22
23
24
25
26
27
28
SAN JUAN SUBURBAN WATER
DISTRICT
By:
Name:
Title:
Date:
SHASTA DAM AREA PUBLIC UTILITY
DISTRICT
By:
Name:
Titles
Date:
SOUTHERN CALIFORNIA EDISON
By:
Name:
Title:
Date:
SOUTHERN SAN JOAQUIN VALLEY
P R AUTHORITY
By s
Name: KENNETH M. WEGIS
Title: CHAIRMAN OF THE BOARD
Date: FEBRUARY 19, 1986
—31—
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
TRANSMISSION AGENCY OF
R3'H IFORNIA
By
Name:
Title:
Date:
TRINITY COUNTY PUBLIC UTILITY
DISTRICT
By:
Name:
Title:
Date:
CITY OF VERNON
By:
Name:
Title:
Date:
WESTERN AREA POWER
ADMINISTRATION
By:
Name:
Title:
Date:
-32-
1
2
3
4
5
6
7
8
9
10
Il
12
131
i
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
TRANSMISSION AGENCY OF
NORTHERN CALIFORNIA
By:
Name:
Title:
Date:
TRINITY COUNTY PUBLIC UTILITY
DISTRICT
By:
Names
Title: )? LfhF THL- ROAR
Date: 2 A
CITY OF VERNON
By:
Name:
Title:
Date:
WESTERN AREA POWER
ADMINISTRATION
By:
Name:
Title:
Date:
-32-
1
2
3�
4
5
6
7
81
9+
1.0
I1
12
13
14
15
16
17
18
19
20
21
22
23
24
25,
26
27
28
TRANSMISSION AGENCY OF
NORTHERN CALIFORNIA
By:
Name:
Title:
Date:
TRINITY COUNTY PUBLIC UTILITY
DISTRICT
By:
Name:
Title:
Date:
CITY OF VERNON
By:
Name : __ Boni s C . Malh�rg
APPROVED AS TO FORM Title: __Mayor
BY � Date: ch 4 1956
DAVID B. BR£ARLBY
CITY ATTORNEY _ ATTEST: V
City C er
i
WESTERN AREA POWER
ADM, INIS^RAT IC\;
By:
i
Name. i
Title:
Date:
1
8
} l
2
3
4
5
6
7
8
s
10
11
12
13
i
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
TRANSMISSION AGENCY OF
NORTHERN CALIFORNIA
By:
Name:
Title:
Date:
TRINITY COUNTY PUBLIC UTILITY
DISTRICT
By:
Name:
Title:
Date:
CITY OF VERNON
By:
Name:
Title:
Date:
WESTERN AREA POWER-
ADMIN TRATION
By:
Name:
David G. Coleman
Title:
Area Manager
Date:
February 21 , 1986
-32-
4J
w 0
O
O N w
O
Ol
N O
cr
O
O
O
t-
o
CD
o
rI
w
to
N
c>< N N
to
co
N O
t`
t-
O
Cl
M
Ln
r-i
N
Ln
(V
O
N
o
Ln
Ln
to
N
r i
lcz!'
[V
,-4
N
H
O
Cl
Ln
w
t—
O
N
N
M
o
Ln
M
t-
O
O
Cl
m
t-
t-
O
d'
N
t*,
O
Ln
M
r-I
O
O
"d'
o
N
to
O
N
d'
d'
9
O
to
C4
O
N
N
rt
to
N
M
O
r-•i
o
O
M
ri
tT
m
H
Ln
r-1
a
$4
m
N
r1
w
N
Ol
N
r-I
Ln
Ln
CT
m
(a
\
Ln
d'
1*
t-
m
t-
tr
M
O
O
to
N
r-i
tD
U •r'( to
r-f
N
r-I
N
m
co
N
M
a%
t-
to
t-
M
to
1~
r-1
r i
N
N
d1
Cl
M
00
L-
di
m
ro
a
d
V U
ti♦
H P(
Q 0
M
[l-
O
v
O
Co
rl
H
Ln
M
M
N
H
CD
o
^
\
M
to
m
w
N
O
to
CO
m
M
O
N
r-1
O
'F4
t;
NI
M"
w
H
H
O
r-I
N
N
H
C`
d
N
CD
pq 31
v rj
4
4
9
Q�
A`
w
41 Qt
r4
O
O
ri
N
O
CO
N
N
O
N
N
O
O
O
a
rl
.rq
(a (a
r1
�..
-04
41
U a}
~
ro
4-) L-L
a(
^ w W
('')
t`
to
m
o
4r
m
O
Ln
O
O
O
C1l
CD
Q' (U Pa
H
Ln
co
O
O
Ln
Ln
O
Ln
CD
O
CDtD
C3
Pa
\
t`
M
to
tr
N
N
M
tr
tt
w
N
Cn
v
CDrid
H
CDr-i
O
of
d'
O
to
4
O
O
N
O
O
rl
('M
N
r-�i
O
H
-ri
r-I
r-i
1J
M
((3
O
0
1-4
$4
m
-,
U
(a
0
•ri
i-L
:1
a)
r-i
U
••-I
r -I
-r 1
rts
.a
41
H
a"
Is
H
-It
k
u
41
a,
to
0
rn
(a
0
•4
>::s
m
(a
cr
4
F
r1
-4
a
-9-1
0
LJ
U
ro
a
Z
•rL
41
•ri
(a
(a
(a
'0
f.
t~
r-I
Ld
to
m
in
L-.
N
•r-1
r-1
m
O
O
La
-tJ
(a
a
U
a,
O
0
0
La
44
x
a
a
H
U
P(
• 4
-H
a
a
4J
>,
En
H
UL:)
'H•ar
$4
r.
4
.ra
w
w
w
ua
0
W
w
1
4J
w
w
a
-ri
W
.ee
W
w
0
0
0
0
41
4-1
O
m
0
0
0f�
ri
O
U
41
0
vi
m
to
>1
>1
?(
Dr
d)
•rl
>1
F.
a i
?1
>1
p
4+
71
-1
-•4
�1
4J
4J
4J4-J
qz
Q
-W
::1
W4.)
.0
U
C7
.0
W
A
4J
•r•L
•.-L
•ri
0
••a
ri
•rL
-H
(a
-ri
0
-rL
U
U
U
U=4
U
P4
U
U
uI
V
£-(
U
I I ari 4H >1 .OH 71 m 14 &4
?,•.{ > cG U H 4J fl r-I 43 u a a
1 33�33EO -H4-) ra -f � E
� �W 549c'Oa OAE 4J•-i
-. A V. 44 co tam .� to G
d'� •� -Hi OW 1•0W 34
P4 U W N 04 �' to P4 N .
O � �EA I
��
nH UCH -�i
fl U
aw a Q' y a o W o 04 4J
14 0 4J 4J
W O 410 tata14 a' w�w �
a 4j H is E., a` a •r► t~
0� >1 obi °b� M$+
o 4 � 0.0 p. w a
.0 ��D �acaa r40)coa 4—)
r fl a
a� vU0 a) a) rasa 0H�
ca �, M a ,G a '� a ,C a O p .0
U a S ri a. $a � 0 (aa� rn (0a'
44 a)41 4-1 co
roa
��O> (a E am�� ���� -Ca41
iT $4 t4 4 "i W .4J 4 44 4� N
s-
cw a 1.s"$4a .41�'sra Z.��
4-1 a -a
Hw AS 4J a CU ai O O G a O p fl m�,
O m O� m4j+►H m;'4JH a r
+J a sa
a
4J W m aw V aa- 14 04s--A c a m4
�Ha �pW arom:J go4, arou0,-J 1,_ �
ccaa r-,' as "M.QZ �Ma0 c2U
41 m >� m 14
a
4J La (osaai •a�ts+.o��
m O .O •O -�+ -P
Nam" W� sn "i 0 0 5 •� O p i~ '�a m
l0 Ea mm,Oto mc•ri41
m�� M"A� aNN+' .aa�+v�i� ��aa
2a. 2au �.0 (a (a :1a0o
H H it 4J
��•$4> a $4 w 2 � am a
44-.Am waca 4 am .Q am 44).�ca
HwR4 Hp,P+ Hc0.0Rl HrtAW H434Jw
1 1 1 1
N
I
U
1
APPENDIX D
PRESCHEDULING OF TRANSMISSION USE
2
AND CURTAILMENT NOTIFICATION PROCEDURES
3
4
5
1. OPERATING AGENT INTERFACES:
6
1.1
Through the TANC Coordinator, TANG shall notify the
7
Operating Agent relative to the amounts of Transfer
8
Capability that TANC will be using, as required by the
9
Intertie Agreements.
10
1.2
It is anticipated that the Operating Agent will notify
11
TANC through the TANG Coordinator when a curtailment
12
affecting Transfer Capability is scheduled or has
13
occurred, as provided in the Intertie Agreements.
14
1.3
It is anticipated that the Operating Agent will notify
15
Members or their designated agents directly of a real-
16
time curtailment of Transfer Capability. Each Member.
17
or its designated agent will be responsible for
18
communicating and coordinating real-time power
19
schedule curtailments and all changes in schedules due
20
to curtailments occurring in real-time pursuant to its
21
separate agreements with other entities.
22
23
2. TANC
TRANSFER CAPABILITY PRESCHEDULING PROCEDURES
24
Transfer Capability will be prescheduled over four different
25
time frames - long term (6 years), next operating year, next
26
operating
month, and current operating month.
27
2.1
Long Term and Next Operating Year
28
2.1.1 Each year, each Member shall prepare the
a
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
following estimated data pertaining to its
use of Transfer Capability for each month of
the following six -year period:
2.1.1.1 Member's Participation
Percentage;
2.1.1.2 Contracted Transfer Capability
layoffs to Members and
Participants;
2.1.1.3 Contracted Transfer Capability
layoffs from TANC and
Participants;
2.1.1.4 Amount of Transfer Capability
available for sale; and
2.1.1.5 Amounts of additional Transfer
Capability desired.
2.1.2 This data will be submitted to the TANC
Coordinator by July 31 of each year.
2.1.3 The TANC Coordinator shall determine the
amounts of Transfer Capability owned by
other Participants that is unneeded by each
of those Participants (if available) and
that could be used by TANC.
2.1.4 The data will be compiled by the TANG
Coordinator into a document that defines the
projected use of the Project by each Member,
and on an aggregate TANC basis, for each
month of the six year period. The document
will also quantify instances where a Member
D-2
2
�l
4
5
6
7
8
9
10
11
12
13
14
15
16
171
18
i
19
20
21
22!
23'
241
25
26,
1 27
28
may want additional Transfer Capability,
where a Member may have Transfer Capability
that it is not planning to use, and where
other Participants have unneeded Transfer
Capability.
2.1.5
The TANG Coordinator shall send this
document to the Members by August 31 so that
they will have data on projected aggregate
usage and can identify potential periods
when Transfer Capability can be bought and
sold among the Members.
2.1.6
Those Members who have made buy/sell
arrangements for Transfer Capability will
notify the TANG Coordinator of these
arrangements and of their effective.time
.frames by September 30.
2.1.7
This new data will be utilized by the TANG
Coordinator to prepare a revised document
that defines the projected use of the
Project by Member, and on an aggregate TANC
basis, for each month of the six year
period. The document will also quantify any
amounts of unneeded Transfer Capability and
instances where additional Transfer
Capability could be utilized by TANC or by a.
Member.
2.1.8
If the revised document demonstrates
unneeded capacity or needs for additional
D-3
V
1.
2.
3.
4
5
6
7
8'
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Transfer Capability, it will be resubmitted
to the Members by October 31 so that they
are aware of potential additional buy/sell
opportunities.
2.1.9 Those Members making additional buy/sell
arrangements will notify the TANC
Coordinator of those additional arrangements
and their effective time frames by
November 30.
2.1.10 This updated data will be utilized by the
TANC Coordinator to prepare a revised
document that defines the projected use -of
the Project by each Member and on an
aggregate TANC basis for each month of the
six year period. The document will also
quantify any amounts of unneeded Transfer
Capability that was not required by TANC and
instances where additional Transfer
Capability could be utilized by TANC.
2.2 Next Operating Month
2.2.1 Each month, each Member or its designated
agent shall prepare the following estimated
hourly data for each of three day -types'
(weekday, Saturday, and Sunday/ Holiday)
pertaining to its use of the Project for the
next operating month:
2.2.1.1 Member's Participation
Percentage;
D-4
1
2.2.1.2 Contracted Transfer Capability
2
layoffs to Members and
3
Participants;
4
2.2.1.3 Contracted Transfer Capability
5
layoffs from Members and other
6
Participants;
7
2.2.1.4 Amount of Transfer Capability
8
available for sale;. and
9
2.2.1.5 Amounts of additional Transfer
10
Capability desired.
11
2.'2.2 This data will'be submitted to the TANC,
12
Coordinator by the 20th of the month
13
preceding the operating month in question.
14
2.2.3 The TANC Coordinator shall determine the
15
amounts of Transfer Capability owned by
16
other Participants that is unneeded by those
17
Participants (if available) and which could
18
be used by TANC.
19
2.2.4 The data will be compiled by the TANC
20
Coordinator into a document that defines the
21
projected use of the'Project by Member, and
22
on an aggregate TANG basis, for each hour of
23
the three day -types specified above. To the
24
extent possible the document will also
25
identify potential layoff opportunities
26
among the Members or between TANC and other
27
Participants.
28
2.2.5 This document will be sent to the TANC
a
1
2
3
4
5
6
7
8
9
10
ii
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
11
28
Members by the 21st of the month preceding
the operating month so that they will have
data on projected aggregate usage and can
identify potential periods when Transfer
Capability can be bought and sold among the
Members and between TANC and other
Participants.
2.2.6 Those Members who have made buy/sell
arrangements for Transfer Capability will
notify the TANC Coordinator of these
arrangements and of their effective time
frames by the 24th of the month preceding
the operating month.
2.2.7 This new.data will be utilized by the TANC
Coordinator to prepare a revised document
that defines the projected use of the
Project by Member, and on an aggregate TANC
basis, for each hour of the three day -types
specified above and such data will be made
available to the Members. The document will
also quantify any amounts of unneeded
Transfer Capability and periods of time when
additional Transfer Capability could be
utilized by TANC or a Member.
2.2.8 If any of the foregoing dates falls on a
weekend or holiday, the submittal shall be
made by the work day immediately preceding
the weekend or holiday.
on
1
2'
3
4'.
5'
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
i
28
2.3 Current Operatina Month
2.3.1 Data for the current operating month will be
contained on a dedicated computerized
"bulletin board" that will specify Member
use, and to the extent available Participant
I
use, of Transfer Capability on an hourly
basis for the month. This data will be the
same as that prepared for the "Next
Operating Month" as described in Section 2.2
above.
2.3.2 Using the data on the bulletin board the
Members or their designated agents may make
Transfer Capability buy/sell arrangements
among themselves and will notify the TANC
Coordinator of any changes required to the
bulletin board as soon as practicable after
making such change.
3. TANC CURTAILMENT NOTIFICATION PROCEDURES
3.1 Curtailment Notification Procedure (Prescheduled) -
The TANC Coordinator shall promptly notify the Members
upon receipt of notice from the Operating Agent of any
scheduled curtailment of Transfer Capability. The
TANC Coordinator may advise the Members of adjustments
to Transfer Capability that could be made to minimize
the effects of the curtailment on the Members. The
steps in this procedure are as follows:
3.1.1 The Operating Agent notifies the TANC
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
281
Coordinator that a curtailment will occur
and the magnitude of the curtailment.
3.1.2 The TANC Coordinator will update the
bulletin board to reflect each Member's
remaining share of Transfer Capability.
3.1.3 The TANC Coordinator will notify each Member
or its designated agent of its share of the
curtailment and may suggest certain actions
(e.g., trading Transfer Capability) that
could be used to minimize curtailment
impacts.
3.1.4 In each event of a prescheduled curtailment
where TANC still has sufficient Transfer
Capability for the aggregate power schedules
of the Members, by mutual agreement a Member
may utilize another Member's unused share of
Transfer Capability in order to avoid a
curtailment.
3.2 Curtailment Notification Procedure (Real -Time) - The
Members anticipate that (i) the Operating Agent will
notify the TANG Coordinator'of real-time curtailments
to Transfer Capability, (ii) the TANC Coordinator will
communicate and coordinate real-time curtailments to
Transfer Capability with the Members; and (iii) the
Operating Agent will also notify Members or their
designated agents directly of a real-time curtailment
of Transfer Capability. Each Member or its designated
agent will be responsible for communicating and
V
21I
3'',
4
51'
6I
71
81
9
10
11
12
13
14
15
16
17
181
14
20
21
22
23
24
25
26
27
28
coordinating real-time power schedule curtailments and
all changes in schedules due to curtailments occurring
in real-time pursuant to its separate agreements with
other entities. The TANC Coordinator shall maintain
the bulletin board, based on information received from
the Operating Agent on a real-time basis. It is the
intent of the Members to share the use of Transfer
Capability in order to avoid curtailments to the
extent possible without jeopardizing service to their
own customers.
3.2.1 Using the data on the bulletin board,'the
Members may make Transfer Capability
buy/sell arrangements among themselves and
will make appropriate arrangements relative
to changes in the amount of reserved
transmission capacity and the corresponding
power schedule changes pursuant to their
separate agreements with other entities.
3.2.2 The Members will notify the TANC Coordinator
of any changes in the amount of Transfer
Capability they have reserved. The TANG
Coordinator will update the data on the
bulletin board.
9 •
1
2
3
4
5
6
7
8
9
10
11
12
13'
14
15
16'
17
18
19
20
21
22
23
24
25
26
27
28
APPENDIX E
BILLING ADDRESSES OF THE PARTIES
City of Alameda
Bureau of Electricity
2000 Grand Street
Alameda, CA 94501
City of Healdsburg
c/o Northern California Power Agency
180 Cirby Way
Roseville, CA 95678
City of Lodi
Call Box 3006
Lodi, CA 95241-1910
City of Lompoc
100 Civic Center Plaza
Lompoc, CA 93438
Modesto Irrigation District
P. O. Box 4060
Modesto, CA 95352
City of Palo Alto
P. 0. Box 10250
Palo Alto, CA 94303
City of Redding
760 Parkview Avenue
Redding, CA 96001-3396
City of Roseville
2090 Hilltop Circle
Roseville, CA 95678
Sacramento Municipal Utility District
P. O. Box 15830
Sacramento, CA 95852-1830
City of Santa Clara
1500 Warburton Avenue
Santa Clara, CA 95050
Turlock Irrigation District
P. O. Box 949
Turlock, CA 95381
City of Ukiah
300 Seminary Avenue
Ukiah, CA 95482
E-1
I Plumas-Sierra Rural Electric Cooperative
P. 0. Box 2000
2 Highway 70, 3 Miles West of Portola
Portola, CA 96122-2000
3
Transmission Agency of Northern California
4 P. 0. Box 661030
Sacramento, CA 95866
5
6
7
8
9
10
11
12
13
14
25
16
17
18
19
20
21
22
23
24
25
26
27
28
E-2