HomeMy WebLinkAboutPacific Gas & Electric (PG&E) 2026-06-22COU No. 2526-228
Pacific Gas and AUTHORIZATION TO RECEIVE CUSTOMER
Electric CompanyL INFORMATION OR ACT UPON A CUSTOMER'S BEhAL_r
THIS IS A LEGALLY BINDING CONTRACT, PLEASE READ CAREFULLY
.{ (Please Prrt of ; i;:a,1
e-C d''}'� — - -- --- C • if / - IG h Gam'
TiTO `IFAPPLICAkE -
— of (Customer) have the following mailing address
NAME OF COSTOMER OF RECORD '
DD '
SGfw+, f%s�r� r4rJr, (] � F ,S �L ,and do hereby appoint
-- x MA _ NG ADLIIRESS CITY STATE L_7� zoo
0
EcoGreen Solutions f 27671 La Paz Road, Suite 100
NAME OF THIRD PARTY MAILING
ADDRESS
Laguna Niguel Ca 92677
CITY STATE _ - . Zh5
To act as my agent and consultant (Agent) for the listed account(s) and in the categories indicated below:
ACCOUNTS INCLUDED IN THIS AUTHORIZATION:
o Kfq � 9g.5 8a8_s3 __
SERV CF A -RES.: CITY SERVICE ACCOUNT NUMBEA _
2.
SERVICE AZZ.RESS vil" SERVICE ACCOUNT NUMBER
3.
SERVICE ADDRESS CITY SEki DICE ACCOUNT NUMBER
I[ or more than three accounts, please lisl additional accounts on a separate sheet and arach it to this farm)
INFORMATION, ACTS AND FUNCTIONS AUTHORIZED -- This authorization provides authority to the Agent. The Agent must thereafter
provide specific written instructions/requests (e-mail is acceptable) about the particular account(s) before any information is released
or action is taken. In certain instances, the requested act or function may result in cost to you, the customer. Requests for
information may be limited to the most recent 12 month period.
i (Customer) authorize my Agent to act on my behalf to perform the following specific acts and functions QnLptial all applicable boxes)-.
t. Request and receive billing records. bilfng history and all meter usage data used for bill calculation for all of my accounl(s) as specified
herein, regarding utility services furnished by the Utility'.
---� 2. Request and receive copies of correspondence in connection vrith my account(s) concerning (initial all that apply)
—� a. Verification of rate, date of rate change, and related information;
- - b, Contracts and Service Agreements;
c. Previous or proposed issuance of adlustmenlslcrediIs, or
d. Other previously issued or unresolved; disputed billing adjustments.
55TI 3 Request'nvestigation of my uh ity bill(s).
A. Request special metering, and the tight to access interval usage and other meterng data on my account(s).
NIA 5. Request rate analysis,
NIA 6. Request rate changes,
-� ] 7. Request and receive verificat'an of balances on my account(s) and discontinuance notices.
1 The Utility w0 provide standard cuslomer information without c^argo up to two times •n a 12-month period per service account. Alter Iwo requests In a yeg.`
may be responsible for charges that may Ce incurred to process this request.
t Information collected on this form is used in accordance with PG&E's Privacy Policy Page 1 of 2
The Privacy Policy is available at pge.comlprivacy. Form 79-1095
Advice 5058-Gf7572-E
Automated Document, Preliminary Statement A April 2025
Pacific Gas and AUTHORIZATION TO RECEIVE CUSTOMER
aearic Company- INFORMATION OR ACT UPON A CUSTOMER'S BEHALF
I {CUSTOMER) AUTHORIZE THE RELEASE OF MY ACCOUNT INFORMATION AND AUTHORIZE MY AGENT TO ACT ON MY BEHALF ON
THE FOLLOWING BASIS2 (initial one box only):
2 If no time period is specified, authorization will be limited to a one-time authorization
IVIA One time authorization only (limited to a one-time request for information and/or the acts and functions specified above at the time of
receipt of this Authorization)
IV1A One year authorization . Requests for information and/or for the acts and functions specified above will be accepted and processed
each time requested within the twelve month period from the date of execution of this Authorization.
> �� Authorization is given for the period commencing with the date of execution until T 10/7/2028 (Limited in duration to
three years from the date of execution.) Requests for information and/or for the acts and functions specified above will be accepted and
processed each time requested within the authorization period specified herein
RELEASE OF ACCOUNT INFORMATION:
The Utility will provide the information requested above, to the extent available, via any one of the following. My (Agent) preferred
format is (check all that apply):
❑ Hard copy via US Mail (if applicable).
❑ Facsimile at this telephone number
xQ Electronic format via electronic mail (if applicable) to this e-mail address. submissions@ecogreen-solutions.net
-� I (Customer),54_ CC_ r_ $4.0 rOV6 (print name of authorized signatory) declare under penalty of perjury under the laws of the
State of California ,at I am authcofifized to execute this document on behalf of the Customer of Record listed at the top of this form and that I have
authority to financially bind the Customer of Record, I further certify that my Agent has authority to act on my behalf and request the release of
information for the accounts listed on this form and perform the spec fsc acts and functions fisted above. I understand the Utility reserves the right to
verify any authorization request submitted before releasing information or taking any action on my behalf. I authorize the Utility to release the requested
information on my account or facilities to the above Agent who is acting on my behalf regarding the matters listed above. I hereby release, hold
harmless, and indemnify the Utility from any liability, claims, demands causes of action damages, or expenses resulting from: 1) any release of
information to my Agent pursuant to this Authorization; 2) the unauthorized use of this information by my Agent; and 3) from any actions taken by my
Agent pursuant to this Authorization, including rate changes. I understand that I may cancel this authorization at any time by submitting a written
request. I understand that this agreement at all times shall be subject to such modifications as the California Public Utilities Commission may direct from
time to time in the exercise of its jurisdiction [This form must be signed by someone who has authority to financially bind the customer (for
example, CFO of a company or City Manager of a municipality).]
AUTHORIZED CUSTOMER SIGNATURE TELEPHONE NUMBER
} Executed this 22nd day of June 24 Z& at
(1
MONTH YEAR CITY AND STATE WHERE EXECUTED
I (Agent). hereby release, hold harmless, and indemnify the Utility from any liability, claims demand, causes of action, damages, or expenses
resulting from the use of customer information obtained pursuant to this authorization and from the taking of any action pursuant to this
authorization, including rate changes.
d�7_� �- 949-364-6800
AGENT SIGNATURE > TELEPHONE NUMBER
EcoGreen Solutions --
COMPANY
Executed this day of
MONTH YEAR
Automated Document, Preliminary Statement A Page 2 of 2
Form 79-1095
Advice 5058-G-G/7572-E
April 2025
The Energy Efficiency Retrofit Loan Program (the "Program") is funded by California
utility customers and administered by Pacific Gas and Electric Company (PG&E) under
the auspices of the California Public Utilities Commission (CPUC). The Program provides
qualified PG&E customers with a means to finance energy -efficient (EE) retrofit projects
implemented under select PG&E EE Programs (the "Qualified Program").
The loans issued under the Program are interest -free, unsecured loans to fully or partially reimburse qualified
PG&E :ustcmers for the costs they incur in connection with a qualified retrofit project [the "Retrofit Project"I,
which term shall mean the erergy efficiency retrofit project described in Customer's relevant Energy Efficiency
Program Apph,-ation.
1. Conditions for Eligibility: Participation in the Program is limited to PG&E customers that meet the following
condit ons and satisfy these conditions throughout the duration of the Retrofit Project up to and including the
date of Final Verification (defined below in Section 8L la) the PG&E customer- must be a business
("Commercial Customer"I or a federal, state, county or local government agency ("Government Customer"]. `
Commercial Customers and Government Customers are collectively referred to as "Customer;" (b) Customer
..:urrently receives service from PG&E at the location of the Retrofit Project (the -Location-]: (c) Customer has
continually maintained an active PG&E account for the previous 24 months and has a minimum of 12 months
of historical metered energy usage at Customer's current Location; (d) at the time the Customer's Program
Appl cation is Approved and Customer's Loan Agreement is executed, and at the time the loan is to be funded
following completion of the Retrofit Project and ati-faction of all other requirements of the Loan Agreement,
Customer must be in good credit standing, as determined by PG&E through credit rev'ewwhich may include a
commercial credit check and a bill history review, which may be based upon the following and other criteria:
a. No 24-hour disconnection notices in the last 12 months;
b. No returned payments within the last 12 months,
c. No more than 1 payment arrangement in the last 12 months.
d. No broken payment arrangements within the last 12 months;
e. No deposit assessed within the last 12 months; and
f. The Retrofit Project qualifies, and Customer is el gible for an Incentive under the Quatified Program,
2. Loan Features: The loans offered under the Program are interest -free W--. I and free of any fees, late payment
penalties or other charges. The loan term-. and tond'tions are set to provide simple paybw k from energy
savings during the maximum allowed loan term and are calculated by div ding the loan am;.unt (eligible
project cost less Qualified Program Incentives) by the estimated monthly energy sav:-°g•, r:=suiting from the
Retrofit Project. The ensuing number of monthly payments must not exceed the Maximum Loan Term set
forth in chart below ["Loan Annnunt and Term Lim tatiom." ).
Loan Amount and Term Limitations
Interest 0%. with no additional fees or charges
Minimum Loan Amount $5,000
Maximum Loan Amount $250.000 [up to $4,000,000 per premises
with approved exception)
Maximum Loan Term, not to 120 months
exceed the Expected Useful Life
IEULI of the measures
'Residential custmners are inerigible.
continued an no,I page
3. Eligibility, Prior to purchasing and installing any energy efficient measures or equipment under the Qualified
Program, Customer must satisfy the eligibility requirements of both the Program and Qualified Program.
4. Project Review: PG&E will assist Customers in understanding the energy effic enr_y measures availabte under
the Qualified Program and will answer their questions concerning this Program After Cu!;tomer has dec'ded
upon the measures that comprise the Retrofit Project, PG&E will request that project engineering documentation
is developed on behalf of the customer by their installer, and that the package is reviewed by an 'ndependent
engineer prior to submission to PG&E. Projects costs and energy savings from this documentation are required
in order to calculate the Loan Terms and prepare the Loan Documents. Thereafter, PG&E will provide Customer
with a Loan Agreement, the Application, the applicable On -Bill Financing (OBF) Gas and/or Electric Rate
Schedule and Loan Catculation Summary Sheet [collectively, the "Loan Documents").
5. Loan Documents: If the terms of the loan are acceptable, Customer shall execute the Loan Documents and
return them to PG&E prior to the commencement of the Retrofit Project. Incomplete or incorrect applications
cannot be processed and may result in the delay of PG&E's approval and possible disqualification from the
Program. Customer may withdraw this Application for any reason without penalty by sending written notice
to PG&E.
G. Changes to Project Scope and/or Cost: It is common for a project's scope and/or cost to alter during the
installation phase. Refer to "Changes to Project Scope and/or Cost" section of the OBF Customer and
Contractor Handbook for requirements if the project scope and/or cost changes after the loan agreement
is executed.
7. Customer's Responsibilities for Contractor and Vendor: Upon execution of the loan agreement between the
Customer and PG&E. Customer may begin the Retrofit Project pursuant to the contract agreed upon by
Customer, its contractor or vendor. PG&E does not endorse or recommend any particular contractor or, vendor
nor does PG&E review any contractor or vendor proposals. Rather, Customer shall be solely responsible for
reviewing the feasibility of the contractor's and vendor's proposals) and verifying their respective qualifications,
pricing, energy savings, warranties and the terms and conditions of the contractor's and/or vendor's contract
with Customer.
8. PG&E Disclaimers: Customer's design of the retrofit project and selection and use of energy efficiency
equipment, measures and selection of contractors and vendors is at customer's sole discretion and at
customers sole risk. To the extent permitted by applicable law. PG&E expressly and specifically disclaims any
liability in respect of any advice, information or other instruction provided by or on behalf of PG&E to customer
in connection with the qualified program, program or retrofit project. PG&E does not warrant or bear any
responsibility for any of the following:
a. The work performed by customer's contractor(s) or vendor(s), that the retro€il project is appropriate for
the location;
b. The retrofit will result in or yield any energy efficiency savings or a specific amount of energy efficiency
savings or other- reduction in customer's PG&E utility bill after completion of the retrofit project;
c. The contractor's or vendor's services wilt be timely, complete or error -free, or that defects in the retrofit
project will be corrected by such individuals;
d. Any errors, omissions, defects or delays in the design or construction of the retrofit project or the operation
of any energy efficiency measures installed at the location.
9. Verification: Upon completion of the Retrofit Project, Customer shall request PG&E's post -install project review
[submission may be provided by the customers installer) and final verification that the Retro€it Project has been
completed in conformity with the requirements of the Qualified Program and that customer remains eligible
Ithe "Final Verification*').
a. If there has been any change to the Retrofit Project's scope, cost and/or incentives available under the
Qualified Program or energy savings, Customer will be required to enter into a Loan Modification Agreement
with PG&E, which may include now contract terms reflecting the changes in the Retrofit Project. [If a Loan
Modification Agreement is required, it shad be deemed part of the 'Loan Documents'.) See "Changes to
Project Scope and/or Cost" section of the OBF Customer- and Conti -actor Handbook for further- information.
b. If the changes to the Retrofit Project are such that it no longer meets the Program's payback criteria or other
conditions, the Retrofit Project will he considered ineligible, the Loan Agreement will be terminated, and no
loan proceeds will be disbursed.
c. If PG&E determines, in its absolute discretion, that customer's credit has deteriorated or has otherwise
placed customer's repayment of the loan at risk, the loan proceeds shall not be issued, even though the
retrofit project may have been satisfactorily completed at customer's expense.
continued on next p.3ge
10. Disbursements: Subject to and following PG&E's satisfactory Final Verrf cation, an ir,centive J(,:::k and
the loan proceeds will be issued to Customer or, at Customer's written direction, tr; Cuslomer's :: rntrart, r
or vendor.
11. General Provisions:
a. Applications for loans under the Program will be accepted from qualified Customers on a first -come,
first -served basis until the funds allocated by PG&E for the Program are no longer available. The
Program may be modified or terminated by the CPUC or PG&E at any time and without prior notice.
However, termination of the Program following execution of a Loan Agreement by Customer will not
affect that Loan Agreement, or, if Customer thereafter satisfies all Program conditions, the
disbursement.
b. The loan proceeds may only be used to pay or reimburse Customer for implementing or installing
energy -efficient measures or equipment through the Oualiified Program.
c. If there is any conflict between the terms of any document relating to the Program, the Loan Documents
shall control.
d. For all retrofit projects, including but not limited to streetlight. HVAC and lighting retrofits. Customer
acknowledges and understands that Customer is able to use the installation vendor or contractor of
their choice.
e. The customer confirms that the OBF loan funds are required for the project to be completed, and that
without the loan funds the project would not otherwise be able to be completed with the same scope or
within the same time -frame.
f. Energy Efficiency funds, including On -Bill Finance loan funds, are public funds. Depending on the project
that receives Energy Efficiency or On -Bill Finance loan funds may be considered a public work [as defined
under Labor Code section 1720 et. seq.). For information on the rules and regulations that apply to public
works, including payment of prevailing wages, see the Department of Industrial Relations.
I have read, understand and agree to all of the Energy Efficiency Retrofit Loan Program requirements
and terms and conditions set forth in this Program description.
understand that loan ;:atculations will be based on pre- nspection results and on the applicable program
documentation, and that my agen. y/. ornpany must meet a:l e.iglb lrty criteria and requirements in order
to partt-ipate n the Program. Any unapproved changes to project :;rope, costs or run hours, or to my
agency s/company's creditworthiness, between the time the Loar Documents are accepted and signed,
and the Retrofit Prote.:_t is {.ompleted and the project's and my agency's/company's continued etigibility
are verified, could resu.t in loan ineligibil ty.
� > C J
{ 4 OK14�)
Legal Name f Business li.e.. the formal name on your tax returrrl
> �45c Se.h ���orwv
AuthorTZed Represente's Printed Name
Tax identification information (select one]-
----- > I y ^ 6aa y yG
Federal. Tax ID Number
FOR PG&E USE ONLY:
Authorized Representatives Signature
G; I A4tnA6r 06/22/2026
Titte < J
N/A
Social Security Number
PG&E OBF Administrator Printed Name Date
Reirolit Program Appticatton Number OBF Application Number
Accelerated Replacement Affidavit
I, G J4r► r �� r''rd , hereby certify that I am authorized to make this
declarati n as the Cu mer or as an authorized representative of C: d _ a4 L -c h
By signing below, I certify that the existing equipment being replaced is in operating condition to the
best of my knowledge. I acknowledge that misrepresentation will result in a rejection of all or part of the
project and that the Customer may be required to return the incentives associated with this project. I
further acknowledge that misrepresentation will result in future projects submitted by the Customer
being subjected to additional scrutiny and may result in Customer probation or suspension from current
and future incentive programs."
C, � O- Uk; 4 a,
Customer Name
5�S
Customer Signature
Lumen Increase Affidavit
I, .54 L 5 �� f0 rr+y , hereby agree to the proposed lumen increase of at least
20% by t tiffs project. a change in level of service offered to me was thoroughly reviewed with
EcoGreen Solutions and specification sheets for installed equipment were provided.
Customer Name
Customer Signature
$0 Up Front Cost Energy Efficiency Upgrades
We've helped 1000's of companies save energy and cut costs by upgrading their
existing equipment for $0 Up Front Cost utilizing the companies' energy efficiency
programs.
EcoGreen solutions is a federal Department of Energy recognized Energy Services
Company as well as a Trade Professional & Authorized Agent with SCE, SDG&E, PG&E
along with several others. We specialize in heling companies leverage the utility
company program to take advantage of the various rebates and incentives available.
Below are highlights of some of the benefits of the programs & equipment upgrades:
Dramatically reduced energy usage across multiple technologies based on your
current equipment
We provide solutions for HVAC, 3-Phase Motors, Refrigeration, Air Compressors,
Variable Frequency Drives, Pool Pumps, Steam Line Insulation, Interior &
Exterior Lighting and Agricultural/Artificial Lighting
➢ LED lamps and fixtures eliminate the high cost of replacement & maintenance
while providing increased safety due to improved light levels
➢ Enhanced value of your property and curbside appeal
➢ No money up front while helping to save the environment
➢ 0% interest fixed financing available
➢ Several substantial tax incentives available for energy efficiency upgrades
➢ All paperwork taken care by EcoGreen Solutions and full turnkey solutions
available
We have worked with several cities (Gilroy, Davis, Lincoln, Dixon, Los Banos, Fort
Bragg), state agencies (CADMV, CALFIRE, CADPR, and CADEDD), school districts like
(Fallbrook, Newport -Mesa, San Jacinto, Atascadero USD, and large businesses all over
the West Coast including Jaguar/Land Rover, Infiniti, and Audi, Applebees etc.
We also specialize in helping nurseries, farms, offices buildings, multi -tenant,
wastewater treatment plants, food processing, heavy industrial, and municipal
customers. References available upon request.