Loading...
HomeMy WebLinkAboutPacific Gas & Electric (PG&E) 2026-06-22COU No. 2526-228 Pacific Gas and AUTHORIZATION TO RECEIVE CUSTOMER Electric CompanyL INFORMATION OR ACT UPON A CUSTOMER'S BEhAL_r THIS IS A LEGALLY BINDING CONTRACT, PLEASE READ CAREFULLY .{ (Please Prrt of ; i;:a,1 e-C d''}'� — - -- --- C • if / - IG h Gam' TiTO `IFAPPLICAkE - — of (Customer) have the following mailing address NAME OF COSTOMER OF RECORD ' DD ' SGfw+, f%s�r� r4rJr, (] � F ,S �L ,and do hereby appoint -- x MA _ NG ADLIIRESS CITY STATE L_7� zoo 0 EcoGreen Solutions f 27671 La Paz Road, Suite 100 NAME OF THIRD PARTY MAILING ADDRESS Laguna Niguel Ca 92677 CITY STATE _ - . Zh5 To act as my agent and consultant (Agent) for the listed account(s) and in the categories indicated below: ACCOUNTS INCLUDED IN THIS AUTHORIZATION: o Kfq � 9g.5 8a8_s3 __ SERV CF A -RES.: CITY SERVICE ACCOUNT NUMBEA _ 2. SERVICE AZZ.RESS vil" SERVICE ACCOUNT NUMBER 3. SERVICE ADDRESS CITY SEki DICE ACCOUNT NUMBER I[ or more than three accounts, please lisl additional accounts on a separate sheet and arach it to this farm) INFORMATION, ACTS AND FUNCTIONS AUTHORIZED -- This authorization provides authority to the Agent. The Agent must thereafter provide specific written instructions/requests (e-mail is acceptable) about the particular account(s) before any information is released or action is taken. In certain instances, the requested act or function may result in cost to you, the customer. Requests for information may be limited to the most recent 12 month period. i (Customer) authorize my Agent to act on my behalf to perform the following specific acts and functions QnLptial all applicable boxes)-. t. Request and receive billing records. bilfng history and all meter usage data used for bill calculation for all of my accounl(s) as specified herein, regarding utility services furnished by the Utility'. ---� 2. Request and receive copies of correspondence in connection vrith my account(s) concerning (initial all that apply) —� a. Verification of rate, date of rate change, and related information; - - b, Contracts and Service Agreements; c. Previous or proposed issuance of adlustmenlslcrediIs, or d. Other previously issued or unresolved; disputed billing adjustments. 55TI 3 Request'nvestigation of my uh ity bill(s). A. Request special metering, and the tight to access interval usage and other meterng data on my account(s). NIA 5. Request rate analysis, NIA 6. Request rate changes, -� ] 7. Request and receive verificat'an of balances on my account(s) and discontinuance notices. 1 The Utility w0 provide standard cuslomer information without c^argo up to two times •n a 12-month period per service account. Alter Iwo requests In a yeg.` may be responsible for charges that may Ce incurred to process this request. t Information collected on this form is used in accordance with PG&E's Privacy Policy Page 1 of 2 The Privacy Policy is available at pge.comlprivacy. Form 79-1095 Advice 5058-Gf7572-E Automated Document, Preliminary Statement A April 2025 Pacific Gas and AUTHORIZATION TO RECEIVE CUSTOMER aearic Company- INFORMATION OR ACT UPON A CUSTOMER'S BEHALF I {CUSTOMER) AUTHORIZE THE RELEASE OF MY ACCOUNT INFORMATION AND AUTHORIZE MY AGENT TO ACT ON MY BEHALF ON THE FOLLOWING BASIS2 (initial one box only): 2 If no time period is specified, authorization will be limited to a one-time authorization IVIA One time authorization only (limited to a one-time request for information and/or the acts and functions specified above at the time of receipt of this Authorization) IV1A One year authorization . Requests for information and/or for the acts and functions specified above will be accepted and processed each time requested within the twelve month period from the date of execution of this Authorization. > �� Authorization is given for the period commencing with the date of execution until T 10/7/2028 (Limited in duration to three years from the date of execution.) Requests for information and/or for the acts and functions specified above will be accepted and processed each time requested within the authorization period specified herein RELEASE OF ACCOUNT INFORMATION: The Utility will provide the information requested above, to the extent available, via any one of the following. My (Agent) preferred format is (check all that apply): ❑ Hard copy via US Mail (if applicable). ❑ Facsimile at this telephone number xQ Electronic format via electronic mail (if applicable) to this e-mail address. submissions@ecogreen-solutions.net -� I (Customer),54_ CC_ r_ $4.0 rOV6 (print name of authorized signatory) declare under penalty of perjury under the laws of the State of California ,at I am authcofifized to execute this document on behalf of the Customer of Record listed at the top of this form and that I have authority to financially bind the Customer of Record, I further certify that my Agent has authority to act on my behalf and request the release of information for the accounts listed on this form and perform the spec fsc acts and functions fisted above. I understand the Utility reserves the right to verify any authorization request submitted before releasing information or taking any action on my behalf. I authorize the Utility to release the requested information on my account or facilities to the above Agent who is acting on my behalf regarding the matters listed above. I hereby release, hold harmless, and indemnify the Utility from any liability, claims, demands causes of action damages, or expenses resulting from: 1) any release of information to my Agent pursuant to this Authorization; 2) the unauthorized use of this information by my Agent; and 3) from any actions taken by my Agent pursuant to this Authorization, including rate changes. I understand that I may cancel this authorization at any time by submitting a written request. I understand that this agreement at all times shall be subject to such modifications as the California Public Utilities Commission may direct from time to time in the exercise of its jurisdiction [This form must be signed by someone who has authority to financially bind the customer (for example, CFO of a company or City Manager of a municipality).] AUTHORIZED CUSTOMER SIGNATURE TELEPHONE NUMBER } Executed this 22nd day of June 24 Z& at (1 MONTH YEAR CITY AND STATE WHERE EXECUTED I (Agent). hereby release, hold harmless, and indemnify the Utility from any liability, claims demand, causes of action, damages, or expenses resulting from the use of customer information obtained pursuant to this authorization and from the taking of any action pursuant to this authorization, including rate changes. d�7_� �- 949-364-6800 AGENT SIGNATURE > TELEPHONE NUMBER EcoGreen Solutions -- COMPANY Executed this day of MONTH YEAR Automated Document, Preliminary Statement A Page 2 of 2 Form 79-1095 Advice 5058-G-G/7572-E April 2025 The Energy Efficiency Retrofit Loan Program (the "Program") is funded by California utility customers and administered by Pacific Gas and Electric Company (PG&E) under the auspices of the California Public Utilities Commission (CPUC). The Program provides qualified PG&E customers with a means to finance energy -efficient (EE) retrofit projects implemented under select PG&E EE Programs (the "Qualified Program"). The loans issued under the Program are interest -free, unsecured loans to fully or partially reimburse qualified PG&E :ustcmers for the costs they incur in connection with a qualified retrofit project [the "Retrofit Project"I, which term shall mean the erergy efficiency retrofit project described in Customer's relevant Energy Efficiency Program Apph,-ation. 1. Conditions for Eligibility: Participation in the Program is limited to PG&E customers that meet the following condit ons and satisfy these conditions throughout the duration of the Retrofit Project up to and including the date of Final Verification (defined below in Section 8L la) the PG&E customer- must be a business ("Commercial Customer"I or a federal, state, county or local government agency ("Government Customer"]. ` Commercial Customers and Government Customers are collectively referred to as "Customer;" (b) Customer ..:urrently receives service from PG&E at the location of the Retrofit Project (the -Location-]: (c) Customer has continually maintained an active PG&E account for the previous 24 months and has a minimum of 12 months of historical metered energy usage at Customer's current Location; (d) at the time the Customer's Program Appl cation is Approved and Customer's Loan Agreement is executed, and at the time the loan is to be funded following completion of the Retrofit Project and ati-faction of all other requirements of the Loan Agreement, Customer must be in good credit standing, as determined by PG&E through credit rev'ewwhich may include a commercial credit check and a bill history review, which may be based upon the following and other criteria: a. No 24-hour disconnection notices in the last 12 months; b. No returned payments within the last 12 months, c. No more than 1 payment arrangement in the last 12 months. d. No broken payment arrangements within the last 12 months; e. No deposit assessed within the last 12 months; and f. The Retrofit Project qualifies, and Customer is el gible for an Incentive under the Quatified Program, 2. Loan Features: The loans offered under the Program are interest -free W--. I and free of any fees, late payment penalties or other charges. The loan term-. and tond'tions are set to provide simple paybw k from energy savings during the maximum allowed loan term and are calculated by div ding the loan am;.unt (eligible project cost less Qualified Program Incentives) by the estimated monthly energy sav:-°g•, r:=suiting from the Retrofit Project. The ensuing number of monthly payments must not exceed the Maximum Loan Term set forth in chart below ["Loan Annnunt and Term Lim tatiom." ). Loan Amount and Term Limitations Interest 0%. with no additional fees or charges Minimum Loan Amount $5,000 Maximum Loan Amount $250.000 [up to $4,000,000 per premises with approved exception) Maximum Loan Term, not to 120 months exceed the Expected Useful Life IEULI of the measures 'Residential custmners are inerigible. continued an no,I page 3. Eligibility, Prior to purchasing and installing any energy efficient measures or equipment under the Qualified Program, Customer must satisfy the eligibility requirements of both the Program and Qualified Program. 4. Project Review: PG&E will assist Customers in understanding the energy effic enr_y measures availabte under the Qualified Program and will answer their questions concerning this Program After Cu!;tomer has dec'ded upon the measures that comprise the Retrofit Project, PG&E will request that project engineering documentation is developed on behalf of the customer by their installer, and that the package is reviewed by an 'ndependent engineer prior to submission to PG&E. Projects costs and energy savings from this documentation are required in order to calculate the Loan Terms and prepare the Loan Documents. Thereafter, PG&E will provide Customer with a Loan Agreement, the Application, the applicable On -Bill Financing (OBF) Gas and/or Electric Rate Schedule and Loan Catculation Summary Sheet [collectively, the "Loan Documents"). 5. Loan Documents: If the terms of the loan are acceptable, Customer shall execute the Loan Documents and return them to PG&E prior to the commencement of the Retrofit Project. Incomplete or incorrect applications cannot be processed and may result in the delay of PG&E's approval and possible disqualification from the Program. Customer may withdraw this Application for any reason without penalty by sending written notice to PG&E. G. Changes to Project Scope and/or Cost: It is common for a project's scope and/or cost to alter during the installation phase. Refer to "Changes to Project Scope and/or Cost" section of the OBF Customer and Contractor Handbook for requirements if the project scope and/or cost changes after the loan agreement is executed. 7. Customer's Responsibilities for Contractor and Vendor: Upon execution of the loan agreement between the Customer and PG&E. Customer may begin the Retrofit Project pursuant to the contract agreed upon by Customer, its contractor or vendor. PG&E does not endorse or recommend any particular contractor or, vendor nor does PG&E review any contractor or vendor proposals. Rather, Customer shall be solely responsible for reviewing the feasibility of the contractor's and vendor's proposals) and verifying their respective qualifications, pricing, energy savings, warranties and the terms and conditions of the contractor's and/or vendor's contract with Customer. 8. PG&E Disclaimers: Customer's design of the retrofit project and selection and use of energy efficiency equipment, measures and selection of contractors and vendors is at customer's sole discretion and at customers sole risk. To the extent permitted by applicable law. PG&E expressly and specifically disclaims any liability in respect of any advice, information or other instruction provided by or on behalf of PG&E to customer in connection with the qualified program, program or retrofit project. PG&E does not warrant or bear any responsibility for any of the following: a. The work performed by customer's contractor(s) or vendor(s), that the retro€il project is appropriate for the location; b. The retrofit will result in or yield any energy efficiency savings or a specific amount of energy efficiency savings or other- reduction in customer's PG&E utility bill after completion of the retrofit project; c. The contractor's or vendor's services wilt be timely, complete or error -free, or that defects in the retrofit project will be corrected by such individuals; d. Any errors, omissions, defects or delays in the design or construction of the retrofit project or the operation of any energy efficiency measures installed at the location. 9. Verification: Upon completion of the Retrofit Project, Customer shall request PG&E's post -install project review [submission may be provided by the customers installer) and final verification that the Retro€it Project has been completed in conformity with the requirements of the Qualified Program and that customer remains eligible Ithe "Final Verification*'). a. If there has been any change to the Retrofit Project's scope, cost and/or incentives available under the Qualified Program or energy savings, Customer will be required to enter into a Loan Modification Agreement with PG&E, which may include now contract terms reflecting the changes in the Retrofit Project. [If a Loan Modification Agreement is required, it shad be deemed part of the 'Loan Documents'.) See "Changes to Project Scope and/or Cost" section of the OBF Customer- and Conti -actor Handbook for further- information. b. If the changes to the Retrofit Project are such that it no longer meets the Program's payback criteria or other conditions, the Retrofit Project will he considered ineligible, the Loan Agreement will be terminated, and no loan proceeds will be disbursed. c. If PG&E determines, in its absolute discretion, that customer's credit has deteriorated or has otherwise placed customer's repayment of the loan at risk, the loan proceeds shall not be issued, even though the retrofit project may have been satisfactorily completed at customer's expense. continued on next p.3ge 10. Disbursements: Subject to and following PG&E's satisfactory Final Verrf cation, an ir,centive J(,:::k and the loan proceeds will be issued to Customer or, at Customer's written direction, tr; Cuslomer's :: rntrart, r or vendor. 11. General Provisions: a. Applications for loans under the Program will be accepted from qualified Customers on a first -come, first -served basis until the funds allocated by PG&E for the Program are no longer available. The Program may be modified or terminated by the CPUC or PG&E at any time and without prior notice. However, termination of the Program following execution of a Loan Agreement by Customer will not affect that Loan Agreement, or, if Customer thereafter satisfies all Program conditions, the disbursement. b. The loan proceeds may only be used to pay or reimburse Customer for implementing or installing energy -efficient measures or equipment through the Oualiified Program. c. If there is any conflict between the terms of any document relating to the Program, the Loan Documents shall control. d. For all retrofit projects, including but not limited to streetlight. HVAC and lighting retrofits. Customer acknowledges and understands that Customer is able to use the installation vendor or contractor of their choice. e. The customer confirms that the OBF loan funds are required for the project to be completed, and that without the loan funds the project would not otherwise be able to be completed with the same scope or within the same time -frame. f. Energy Efficiency funds, including On -Bill Finance loan funds, are public funds. Depending on the project that receives Energy Efficiency or On -Bill Finance loan funds may be considered a public work [as defined under Labor Code section 1720 et. seq.). For information on the rules and regulations that apply to public works, including payment of prevailing wages, see the Department of Industrial Relations. I have read, understand and agree to all of the Energy Efficiency Retrofit Loan Program requirements and terms and conditions set forth in this Program description. understand that loan ;:atculations will be based on pre- nspection results and on the applicable program documentation, and that my agen. y/. ornpany must meet a:l e.iglb lrty criteria and requirements in order to partt-ipate n the Program. Any unapproved changes to project :;rope, costs or run hours, or to my agency s/company's creditworthiness, between the time the Loar Documents are accepted and signed, and the Retrofit Prote.:_t is {.ompleted and the project's and my agency's/company's continued etigibility are verified, could resu.t in loan ineligibil ty. � > C J { 4 OK14�) Legal Name f Business li.e.. the formal name on your tax returrrl > �45c Se.h ���orwv AuthorTZed Represente's Printed Name Tax identification information (select one]- ----- > I y ^ 6aa y yG Federal. Tax ID Number FOR PG&E USE ONLY: Authorized Representatives Signature G; I A4tnA6r 06/22/2026 Titte < J N/A Social Security Number PG&E OBF Administrator Printed Name Date Reirolit Program Appticatton Number OBF Application Number Accelerated Replacement Affidavit I, G J4r► r �� r''rd , hereby certify that I am authorized to make this declarati n as the Cu mer or as an authorized representative of C: d _ a4 L -c h By signing below, I certify that the existing equipment being replaced is in operating condition to the best of my knowledge. I acknowledge that misrepresentation will result in a rejection of all or part of the project and that the Customer may be required to return the incentives associated with this project. I further acknowledge that misrepresentation will result in future projects submitted by the Customer being subjected to additional scrutiny and may result in Customer probation or suspension from current and future incentive programs." C, � O- Uk; 4 a, Customer Name 5�S Customer Signature Lumen Increase Affidavit I, .54 L 5 �� f0 rr+y , hereby agree to the proposed lumen increase of at least 20% by t tiffs project. a change in level of service offered to me was thoroughly reviewed with EcoGreen Solutions and specification sheets for installed equipment were provided. Customer Name Customer Signature $0 Up Front Cost Energy Efficiency Upgrades We've helped 1000's of companies save energy and cut costs by upgrading their existing equipment for $0 Up Front Cost utilizing the companies' energy efficiency programs. EcoGreen solutions is a federal Department of Energy recognized Energy Services Company as well as a Trade Professional & Authorized Agent with SCE, SDG&E, PG&E along with several others. We specialize in heling companies leverage the utility company program to take advantage of the various rebates and incentives available. Below are highlights of some of the benefits of the programs & equipment upgrades: Dramatically reduced energy usage across multiple technologies based on your current equipment We provide solutions for HVAC, 3-Phase Motors, Refrigeration, Air Compressors, Variable Frequency Drives, Pool Pumps, Steam Line Insulation, Interior & Exterior Lighting and Agricultural/Artificial Lighting ➢ LED lamps and fixtures eliminate the high cost of replacement & maintenance while providing increased safety due to improved light levels ➢ Enhanced value of your property and curbside appeal ➢ No money up front while helping to save the environment ➢ 0% interest fixed financing available ➢ Several substantial tax incentives available for energy efficiency upgrades ➢ All paperwork taken care by EcoGreen Solutions and full turnkey solutions available We have worked with several cities (Gilroy, Davis, Lincoln, Dixon, Los Banos, Fort Bragg), state agencies (CADMV, CALFIRE, CADPR, and CADEDD), school districts like (Fallbrook, Newport -Mesa, San Jacinto, Atascadero USD, and large businesses all over the West Coast including Jaguar/Land Rover, Infiniti, and Audi, Applebees etc. We also specialize in helping nurseries, farms, offices buildings, multi -tenant, wastewater treatment plants, food processing, heavy industrial, and municipal customers. References available upon request.