Loading...
HomeMy WebLinkAboutEBA Engineering 2025-09-03; Amendment 1 2026-04-20COU No. 2526-099-A1 CITY OF UKIAH AMENDMENT NO. 1 TO PROFESSIONAL SERVICES CONTRACT 2526-099-A1 BETWEEN EBA ENGINEERING and THE CITY OF UKIAH This Amendment No. 1, entered on April 20th, 2026 revises the Agreement for Professional services dated September 25th, 2025 between the City of Ukiah and EBA Engineering, for professional services relating to Landfill Closure Consulting and Engineering Services. This Amendment No. 1 adds additional Scope of Work per Exhibit 1 and adds an additional $145,330. This revises the total, not-to-exceed amount to $395,330. Except as expressly amended by this Amendment, all other terms remain unchanged and in full force and effect. IN WITNESS WHEREOF, THE PARTIES HAVE EXECUTED THIS AMENDMENT ON THE EFFECTIVE DATE: EBA ENGINEERING BY: DATE: PRINT NAME: CITY OF UKIAH BY: DATE: SAGE SANGIACOMO, CITY MANAGER ATTEST BY: DATE: KRISTINE LAWLER, CITY CLERK 4/21/2026 Nazar Eljumaily, President 04/23/2026 04/24/2026 825 Sonoma Avenue, Suite C  Santa Rosa, California 95404 (707)544-0748  FAX (707)544-0866  www.ebagroup.com February 5, 2026 (revised April 7, 2026) Mr. Tim Eriksen Public Works Director City of Ukiah (City) 300 Seminary Avenue Ukiah, CA 95482-5400 RE: UPDATED GENERAL SERVICES PROPOSAL LANDFILL CLOSURE SERVICES CITY OF UKIAH LANDFILL, MENDOCINO COUNTY, CALIFORNIA EBA JOB No. 02-907 Dear Mr. Eriksen: Per your request, EBA Engineering (EBA) is providing the City with this update to the original General Services Proposal dated July 7, 2025 to outline estimated future costs related to the landfill closure services for the City of Ukiah Landfill (Landfill). As of March 31, 2026, the entirety of the original $250,000 contract was expended. In addition to ongoing meetings and correspondence with the City and regulatory agencies, other services partially or fully completed under the original agreement have included: a preliminary closure assessment; various responses to the Fifth Amendment of Notice and Order 2013-01 dated January 30, 2025 as issued by the Local Enforcement Agency (LEA); surface emissions monitoring and reporting; an aerial topographic survey of the Landfill; updating of the construction drawings and landfill gas (LFG) collection system design, Technical Specifications, and Construction Quality Assurance (CQA) Plan, including sampling and testing of on-site LFG; preparation of flare specifications, bid assistance, and meetings; implementation of refuse confirmation borings; and preparation of an updated water corrective action cost estimate for financial assurance purposes. In regards to moving forward, the intent is to have all the design, permitting, and document submittals completed by August 2026 in advance of the North Coast Regional Water Quality Control Board’s (NCRWQCB’s) issuance of the closure and postclosure maintenance Waste Discharge Requirements (WDR) and Monitoring and Reporting Program (MRP) that are tentatively scheduled for December 2026 or February 2027. The services to be provided that extend beyond the March 2026 contract completion are summarized below. Please note that the task numbers identified below coincide with the Exhibit 1 Ukiah LF - Updated General Services Proposal Revised 04.07.26 2 task numbers utilized in the original general services contract, as applicable. Task numbers that are missing correspond to tasks that have already be completed, while new task numbers represent new scopes of work that were added following the original contract execution. Task 1 – General Research, Correspondence & Meetings: Continued attendance and participation in meetings with the City and multiple regulatory agencies, including the LEA, CalRecycle, Mendocino County Air Quality Management District (MCAQMD), California Air Resources Board (CARB), and NCRWQCB, as well as other miscellaneous requests from the City as needed over the period of April through August, 2026. For the purpose of this Proposal, EBA is assuming the above services will include the participation in three (3) regulatory progress meetings by Mr. Max Kruzic and Mr. Mike Delmanowski and eight (8) additional hours per month by both individuals and two (2) hours per month by our Principal Engineer (Mr. Damon Morelli), as needed. Estimated Cost = $19,140. Task 6 – Update Construction Drawings: Completion of design modifications to the construction drawings based on changes in grades due to landfill settlement and consultation feedback from WatershedGeo (i.e., ClosureTurf manufacturer), as well as subcontractor services related to structural design of the flare station’s concrete sub-slabs and design/code review of the previous electrical design in response to the new flare manufacturer’s design. Also complete updates to the Technical Specifications and CQA Plan. Estimated Cost = $35,840. Task 7 – LFG System Updating/Permitting: Completion of the LFG collection system modifications, technical assistance to the flare contractor during the design phase, and implementation of the Authority to Construct permit process for the flare and LFG collection system through the MCAQMD. Estimated Cost = $19,820. Task 8 – Streambed Alteration: Implement the 401, 404, and 1602 Federal and State streambed alteration permitting processes. Estimated Cost = $20,000. Task 9 – Updated Water Corrective Action Estimate: Completion of the Landfill’s water corrective action cost estimate for financial assurance purposes as requested by the NCRWQCB. Estimated Cost = $3,100. Task 11 – Prepare Draft WDR-MRP: Prepare draft WDR and draft MRP as discussed with the NCRWQCB in a meeting on March 13, 2026 and as described in an EBA proposal previously provided to the City also dated March 13, 2026. Estimated Cost = $10,000. Task 12 – Update Closure Engineer’s Estimate: Update the final closure cost estimate to reflect changes to the final design and to represent current dollars. Per discussions with Mr. Eriksen on March 3, 2026, this work will be subcontracted to an independent third party who specializes in developing construction estimates. This provision was deemed prudent based on recent construction bids Ukiah LF - Updated General Services Proposal Revised 04.07.26 3 for the South Coast Landfill (similar cover system design; i.e., ClosureTurf) that revealed appreciably higher costs than previous engineered estimates. Estimated Cost = $8,460. Task 13 – Joint Technical Document (JTD) Addendum Preparation & Submittal: Prepare a JTD amendment to address informational requests from the RWQCB in support of their development of the closure WDRs, including updates to sections and appendices that have changed since the April 2019 Final Closure and Postclosure Maintenance Plan and presentation of other miscellaneous documents. Estimated Cost = $8,970. Task 14 – Explosive Gas Work Plan Implementation: Implementation of Phase I of the Excessive Gas Remediation Work Plan. Phase I consists of a site-wide assessment of the integrity and functionality of the perimeter LFG monitoring network which was requested by CalRecycle in a letter dated August 12, 2025. The Excessive Gas Remediation Work Plan was subsequently revised to include this additional scope of work. Estimated Cost = $20,000. The total cost to provide the above described services is $145,330. All of the above services represent “not to exceed” costs, except for the Task 1 and Task 13 bullet items which are partially dictated by requests from the City and/or regulatory agencies that cannot be fully defined at this time and are out of EBA’s control. Also not included herein is the cost to implement Phase II and Phase III of Task 14 for evaluation and corrective action measures as described in the Revised Excessive Gas Remediation Work Plan dated October 24, 2025 for which the associated estimated costs will be provided upon completion of Phase I. EBA appreciates the opportunity to provide the City with this Proposal. If you should have any questions or would like to discuss further, please do not hesitate to contact our office at (707) 544-0784. Regards, EBA ENGINEERING Mike Delmanowski, P.G., C.E.G., C.Hg. Senior Hydrogeologist