Loading...
HomeMy WebLinkAboutResolution 2021-01 MCWDRESOLUTION No. 2021-01 Before the Board of Directors of MILLVIEW COUNTY WATER DISTRICT WHEREAS the Thomas Family constructed a twelve (12") inch water pipeline on an easement it held from Masonite Corporation. WHEREAS the pipeline creates a service loop which is of value to the District; WHEREAS the pipeline was constructed by a local firm of impeccable reputation and the District is satisfied that the pipeline was properly installed; NOW THEREFORE BE IT RESOLVED by the Board of Directors of Millview County Water District as follows: 1. The pipeline depicted in Exhibit A is accepted by the District as a district facility and the District will now assume the maintenance and operation of the pipeline, PASSED AND ADOPTED by the Board of Directors of MILLVIEW COUNTY WATER DISTRICT at a regular meeting thereof held on the 15 day of March 2021 by the following vote: Ayes: Budro\d, ('Y 5+0_kI� ) C, rdoza,, Jonos, Green Noes: $ Abstain: -& Absent: 19. By: x wl? KEN EftJDROW, President AttestV-�� z I A Q-k A 1 1 �41 0 : 48?4IRETT, Secretary