CITY OF UKIAH
RECYCLED WATER PROJECT – PHASE 4 DESIGN, ESDC, and CM
CHANGE ORDER 5
November 6, 2025
Carollo has been supporting the CM and ESDC effort for the Phase 4 Construction of the
Recycled Water Project. The original CM/ESDC contract was set up for 24 months of onsite
support per all documentation sent to the state and the construction contract. That period ended
in mid-August. At the direction of the City, Carollo remained onsite for an additional two and a
half months. Prior to this work the City was notified that this work was not included in our scope
of work nor budget. The budget was shared with the City for continued support and Carollo was
directed to remained onsite.
Since that time the City has also requested to maintain support from Carollo’s CM through the
end of 2025 at limited capacity. This Change Order documents the out-of-scope work that is
purely based on the extended construction and close out window schedule.
Construction was extended from August 15th to October 31, 2025.
Modified project elements are as followed:
Maintain CM and inspection services on-site through October 31st, 2025.
CM and inspector requested to be on-site November 4th through 6th 2025.
CM to help support at limited capacity through December 31st, 2025
A detailed estimate for work under this CO is provided as Exhibit A.
Exhibit 1
Exhibit A - (Nov 6 2025)
City of Ukiah
Recycled Water Project - Phase 4
CO 5 For Approval
PIC/PM PE Proc Struct Elec Permit Eng CAD QC/QC DP PIC CM CM Inspector EPIC Inspector Field Clerk Total Labor Crawford PECE ODC Total
Task Task Description 2025 $364 $343 $343 $343 $343 $303 $290 $247 $364 $158 $320 $263 $246 $252 $138 $16.00
8.0 Engineering Services During Construction
8.1 Pre-Construction Conference and weekly meetings 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 0 $0 $0 $0
8.2 Engineer's Site Observation 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 0 $0 $0 $0
8.3 Submittals Review 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 0 $0 $0 $0
8.4 Respond to Requests for Information (RFIs) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 0 $0 $0 $0
8.5 Review and Preparation of Design Clarifications 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 0 $0 $0 $0
8.6 Record Drawings 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 0 $0 $0 $0
8.7 Substantial and Final Completion Assistance 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 0 $0 $0 $0
8.8 Training and Commissioning 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 0 $0 $0 $0
8.9 Operations and Maintenance Manuals 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 0 $0 $0 $0
Task 8.0 Totals = 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 Task 8.0 Totals = $0
9.0 Construction Management
9.1 Preconstruction Services 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 0 $0 $0 $0
9.2 Services During Construction 0 0 0 0 0 0 0 0 0 10 0 521 521 40 0 1,092 $276,846 $0 $17,472 $18,000 0 $0 $35,472 $312,318
9.3 Material Testing 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 $0 0 $0 $0 $0
9.4 Startup and Testing 0 0 0 0 0 0 0 0 0 0 0 70 0 0 0 70 $22,400 $0 $1,120 0 $0 $1,120 $23,520
Task 9.0 Totals = 0 0 0 0 0 0 0 0 0 10 0 591 521 40 0 1,162 $299,246 Task 9.0 Totals = $335,838
Project Totals = 0 0 0 0 0 0 0 0 0 10 0 591 521 40 0 1,162 $299,246 $0 $0 $18,592 $18,000 0 $0 $36,592 $335,837.58
Subconsultants
Fee
Mileage
Other Direct Costs (ODC)
Carollo Labor
Includes 10%
Subconsultant
Page 1 of 2
Agenda Item No: 8.h.
MEETING DATE/TIME: 12/17/2025
ITEM NO: 2025-1402
AGENDA SUMMARY REPORT
SUBJECT: Approval of Contract Amendment and Corresponding Budget Amendment with Carollo Engineers
for Engineering Services and Construction Management in the Amount of $335,837.58 for the Recycled Water
Project – Phase 4.
DEPARTMENT: Public Works PREPARED BY: Seth Strader, Public Works Management Analyst II
PRESENTER: Sean White, Water Resources Director
ATTACHMENTS:
1. Amendment 1314-231-A10
2. Recycled Water Phase 4_Carollo CM and ESDC services
Summary: Council will consider approval of contract amendment and corresponding budget amendment with
Carollo Engineers for Engineering Services and Construction Management in the amount of $335,837.58 for
the Recycled Water Project – Phase 4.
Background: The City previously approved Contract Amendment 10 authorizing Task Orders 8 and 9 for
Engineering Services During Construction (ESDC) and Construction Management (CM) associated with
Phase 4 of the Recycled Water Project (Attachment 1). The original CM/ESDC contract was structured for 24
months of on-site support in accordance with documentation submitted to the State and incorporated into the
construction contract. That original contract period concluded in mid-August 2025.
Due to construction schedule delays and logistical impacts beyond the original project timeline, the City
directed Carollo Engineers to remain on-site for continued construction support. This additional effort was
outside the original contract scope and budget. Carollo provided the City with a detailed cost estimate for the
extended support, and the City authorized continued services to maintain construction oversight and
compliance.
Construction was formally extended from August 15, 2025, through October 31, 2025, with additional close-out
activities extending into the end of 2025.
Discussion: With Phase 4 construction extended beyond the original contract term, continued CM and ESDC
support from Carollo Engineers is required to ensure proper project execution, inspection coverage, regulatory
compliance, and project close-out. Carollo has continued to provide these services at the direction of the City
due to the extended construction and close-out window.
The extended scope of work includes the following services:
Continued on-site CM and inspection services through October 31, 2025.
On-site CM and inspection support from November 4–6, 2025 for critical project activities.
Limited-capacity CM support through December 31, 2025 to assist with project close-out.
These services are essential to maintain construction oversight, manage final inspections, resolve punch list
items, support regulatory documentation, and ensure successful completion of the project. A detailed cost
Page 2 of 2
estimate for the extended services has been provided for this request amendment to the contract (Attachment
2).
All additional expenses for this amendment are fully reimbursable through the State Revolving Fund (SRF)
grant awarded to the City for the design and construction of the Recycled Water Project.
Staff request Council approve the contract amendment and corresponding budget amendment with Carollo
Engineers for Engineering Services and Construction Management in the amount of $335,837.58 for the
Recycled Water Project – Phase 4.
Recommended Action: Approve contract amendment and corresponding budget amendment with Carollo
Engineers for Engineering Services and Construction Management in the Amount of $335,837.58 for the
Recycled Water Project – Phase 4.
BUDGET AMENDMENT REQUIRED: YES
CURRENT BUDGET AMOUNT:
PROPOSED BUDGET AMOUNT: 335,837.58
FINANCING SOURCE: State Revolving Fund (SRF)
REVENUE: No GRANT: Yes
PREVIOUS CONTRACT/PURCHASE ORDER NO.: Contract 1314231
COORDINATED WITH: Jason Benson, Senior Civil Engineer
STRATEGIC PLAN (SP):
CLIMATE INITIATIVES (CI):
GENERAL PLAN ELEMENTS (GP):
CONTRACT No.:
SUBMITTED BY: Date:
PERSON/COMPANY:
PROJECT NAME:
City Council Approval: Date:
Agenda Item No.:
Budget No(s):
Revenue Contract: Grant:
Expiration Date:
Please attach:
Sourcing method and justification (attach documentation if necessary)
Post meeting staff report showing approval
Documentation or description showing funding
Insurance Documents
ADDITIONAL COMMENTS:
CONTRACT INFORMATION
1314-231-A11
Myles Fisette 12/22/25
Carollo Engineers
Recycled Water Project Phase 4
12/17/25
8.h.
83027330.80230.18052: $335,837.58