Loading...
HomeMy WebLinkAboutUVBGSP_PMAsIntroduction to Projects and Management Actions 1 Projects and Management Actions 2 PMAs should be identified well in advance and introduced to the numerical model as future scenarios: To evaluate impacts of their implementation on achieving the sustainability goal by 2042 and avoiding undesirable results through 2092 To respond to changing conditions in the Basin Proposed Themes for Scenarios Using Possible PMAs: Conjunctive Use Wastewater Reuse for Irrigation Demand Management Others? We need to start identifying PMAs now. 2 Examples and Next Steps 3 Potential Recharge Project Locations: To assess potential with model and setup special studies We need multiple locations for geophysical study feasibility. Next Steps: Need your input on existing and potential projects such as potential recharge locations or RW water project Detailed information to quantify scenarios and model forecast Interview with stakeholders to explore, assess, and confirm PMAs Existing Project Potential Project 3