HomeMy WebLinkAbout3f UVBGSP CommPlan_Amended_2_8_21_Clean FEBRUARY 2021 Ukiah Valley Basin Groundwater Sustainability Agency Communication and Engagement Plan Prepared by: LARRY WALKER ASSOCIATES GEI CONSULTANTS SCI CONSULTING GROUP UNIVERSITY OF CALIFORNIA COOPERATIVE EXTENSION This Page Intentionally Left Blank Table of Contents Introduction 3 Project Organization 4 Consultant Team 4 Technical Advisory Committee (TAC) 4 Department of Water REsources (DWR) Point of Contact 5 Goals and Desired Outcomes 7 UVBGSA and UVB GSP 7 UVBGSA Decision-Making Process 10 Communication objectives to support the GSP 11 Overriding concerns, major concerns or challenges 11 Stakeholders Involved in the Project 12 Methods for Promoting Active Stakeholder Involvement 14 Use of Public Input and Response 14 Communications Strategy 15 Internal Communication 15 External Communication 16 Public Meetings 16 Stakeholder Survey and Mapping 18 Venues for Engaging 18 C&E Implementation Timeline 19 Evaluation and Assessment 20 Appendix A. GSP Development Schedule 1 Appendix B. GSP Register of Attendees at all Public Meeting 2 Table of Figures Figure 1. DWR Point of Contacts 6 Figure 2. UVBGSA JPA members and their respective boundaries. 9 Figure 3. General review process of deliverables. 10 Figure 4. C&E implementation timeline. 20 Appendices Appendix A. GSP Development Schedule 1 Appendix B. GSP Register of Attendees at all Public Meeting 2 Introduction This Project Communication Plan (CommPlan) is developed to promote the efficient and effective coordination of internal/external communications and stakeholder engagement in the Ukiah Valley Basin Groundwater Sustainability Agency (UVBGSA) effort to develop a Groundwater Sustainability Plan (GSP). The CommPlan will serve as the primary guideline for addressing the requirements outlined in Department of Water Resources (DWR) Groundwater Sustainability Plans (GSP) Regulations Section § 354.10: “Each Plan shall include a summary of information relating to notification and communication by the Agency with other agencies and interested parties including the following: (a) A description of the beneficial uses and users of groundwater in the basin, including the land uses and property interests potentially affected by the use of groundwater in the basin, the types of parties representing those interests, and the nature of consultation with those parties. (b) A list of public meetings at which the Plan was discussed or considered by the Agency. (c) Comments regarding the Plan received by the Agency and a summary of any responses by the Agency. (d) A communication section of the Plan that includes the following: (1) An explanation of the Agency’s decision-making process. (2) Identification of opportunities for public engagement and a discussion of how public input and response will be used. (3) A description of how the Agency encourages the active involvement of diverse social, cultural, and economic elements of the population within the basin. (4) The method the Agency shall follow to inform the public about progress implementing the Plan, including the status of projects and actions.” The CommPlan serves as the communication and engagement plan for the Ukiah Valley Basin (UVB) GSP and is developed in response to the following requirement of the DWR evaluation criterion in GSP Regulations Section § 355.4.b.(4): “Whether the interests of the beneficial uses and users of groundwater in the basin, and the land uses and property interests potentially affected by the use of groundwater in the basin, have been considered.” The CommPlan will be updated as needed throughout the project term. This will ensure that up-to-date information related to project communication is contained in the CommPlan. The CommPlan will be executed by members of the UVBGSA through the lifetime of the GSP. The UVBGSA will communicate GSP updates through the UVBGSA page on the County of Mendocino website, the County of Mendocino social media channels and periodic public meetings. This CommPlan will serve as a repository for all mailing lists, outreach and engagement activities and stakeholder communications. Project Organization The Ukiah Valley Basin GSP is being developed for the Ukiah Valley Basin Groundwater Sustainability Agency (UVBGSA). Larry Walker Associates, Inc. in collaboration with GEI Consultants, University of California Cooperative Extension (UCCE), and SCI Consulting Group (LWA Team) are responsible for the development of the GSP at the direction of the UVBGSA. The UVBGSA Board of Directors (the Board) is shown in Table 1. The Board acts as the GSP’s overall Project Management Team (PMT) and is scheduled to meet on the second Thursday of every month at 1:30 PM in the Mendocino County Board of Supervisors Chambers. All meetings are open to the public with notices, agendas, and minutes posted on Mendocino County’s (County) website. Public engagement is encouraged at the Board’s meetings and an e-Notification capability will be offered by the County to reinforce this purpose for interested parties. Draft deliverables, draft GSP chapters and other important development milestones are scheduled to be discussed at the scheduled Board meetings in order to promote transparency regarding the decision-making process. Table 1. UVBGSA Board of Directors. Member Agency Director Alternate Director  County of Mendocino Glenn McGourty Maureen Mulhern  City of Ukiah Douglas F. Crane   Russian River Flood Control Alfred White John Reardan  Upper Russian River Water Agency James Green Ken Todd  Tribal Seat Vacant   Agricultural Seat Zachary Robinson Levi Paulin   CONSULTANT TEAM As mentioned above, the consultant team is led by Larry Walker Associates, Inc. in collaboration with GEI Consultants, UCCE, and SCI Consulting Group. Dr. Laura Foglia, LWA Project Manager (PM), will serve as the primary point of contact for the LWA Team, providing clear, consistent, and effective communication with the PMT and the County. TECHNICAL ADVISORY COMMITTEE (TAC) UVBGSA has convened a TAC to provide input and recommendations on the technical aspects of the GSP development process. TAC members and the represented agencies are shown in Table 2. TAC meetings are scheduled at a similar frequency to the Board’s meetings, on the second Wednesday of every month, at 1:00 PM. All meetings are open to the public with notices, agendas, and minutes posted on Mendocino County’s (County) website. Subscribers to the e-notification system will be notified automatically for the TAC meetings. Table 2. UVB TAC members. Member Agency Member  County of Mendocino James Linderman  City of Ukiah Sean White  Upper Russian River Water Agency Ken Todd  Russian River Flood Control Elizabeth Salomone  Sonoma County Water Agency Don Seymour  Mendocino County Resource Conservation District Mike Webster  California Land Stewardship Institute Laurel Marcus  Tribal Representative Javier Silva  Agricultural Representative Levi Paulin   DEPARTMENT OF WATER RESOURCES (DWR) POINT OF CONTACT All high and medium priority groundwater basins in California are assigned a Point of Contact (POC) from the DWR Region Offices. POCs assist GSAs and stakeholders in the basin to connect with the statewide Sustainable Groundwater Management Program and to locate resources for assistance. Mr. Dominic Gutierrez from the Division of Integrated Regional Water Management of the DWR North Central Region Office is the POC for this GSP and can be reached via email at: Dominic.Gutierrez@water.ca.gov. POC information for the Regional Office corresponding to the UVB GSP is shown below in Figure 1.  Figure 1. DWR Point of Contacts Goals and Desired Outcomes In August 2014, the California Legislature passed the Sustainable Groundwater Management Act (SGMA), which went into effect January 1, 2015. SGMA, a package of three bills (AB 1739 Dickinson, SB 1168 Pavley, and SB 1319 Pavley), requires the long-term and sustainable management of groundwater resources and places this responsibility on local authorities. Groundwater Sustainability Agencies (GSAs) were required to be formed by June 30, 2017 as the responsible authorities for developing GSPs and achieving SGMA’s implementation goals and mandates. The key objective of the Ukiah Valley Basin GSP will be to address groundwater sustainability by designing strategies that avoid and prevent undesirable results to regional groundwater resources over the next 20 years, and beyond. Because SGMA requires local stakeholders and beneficial users to be part of the GSP planning and implementation process, the UVBGSA will identify and engage stakeholders to integrate their input into the decision-making, coordination, and management processes. Specific processes are not outlined for the consideration of these interests in the legislation and it is upon the UVBGSA to define such processes. However, SGMA specifically requires public meetings to be held during the GSP development and implementation when: When the GSA intends to adopt or amend a GSP (CA Water Code Section § 10728.4); Prior the GSA imposing or increasing a fee (CA Water Code Section § 10730.(b)(1)) In order to meet these requirements, UVBGSA is implementing an adaptive management strategy as explained in detail in the sections below. This strategy contains three phases: (1) planning, (2) implementation, and (3) evaluation/response, and is intended to work fundamentally as described in the Community Water Center whitepaper on this topic. For the planning phase, this CommPlan will serve as the document for communication and engagement in the GSP development and will be updated as necessary. For the implementation phase, the methods and strategies to be used are described in the Communications Strategy Section. Finally, for the third phase, the Evaluation and Assessment Section identifies questions to assess the effectiveness of the C&E plan and to deliver effective and comprehensive responses. UVBGSA AND UVB GSP In May 2017, UVBGSA was created to by a Joint Powers Agreement (JPA) to serve as the official GSA for the UVB to comply with SGMA. Under the agreement, the UVBGSA shall take actions deemed necessary to ensure sustainable management of the UVB, as required by SGMA. The UVBGSA consists of a variety of local public agencies with water supply, water management and land use responsibilities. These include the County of Mendocino, the City of Ukiah, the Upper Russian River Water Agency, and the Russian River Flood Control and Water Conservation and Improvement District. The boundaries of these agencies are shown in Figure . The County of Mendocino exercises land use authority on the land overlying the basin. The City of Ukiah is a local municipality that exercises water supply, water management and land use authority within the City’s boundaries. The Upper Russian River Water Agency is a JPA representing Millview County Water District, Willow County Water District, Calpella County Water District, and Redwood Valley Water District. The County Water Districts have water supply and water management responsibilities within the UVB. The Russian River Flood Control and Water Conservation and Improvement District is a special district created by State statute (State of California Statute, Act 4830). The District exercises water supply and water management authority within the UVB. The UVBGSA Board also includes a tribal representative and an agricultural representative, as noted in Table 1. Representation by these stakeholder groups on the Board of Directors was a decision made by the members of the JPA. In accordance with SGMA priorities established by DWR, the UVBGSA must develop and submit its GSP by January 31, 2022; the plan must include actions to maintain or achieve sustainability within twenty years of the GSP’s adoption. The information contained in the GSP will comprehensively characterize the conditions in the UVB, determine strategies for sustainably managing groundwater resources, satisfy the requirements of SGMA, be consistent with Emergency Regulations and guidance prepared by DWR, be implementable by stakeholders of the UVB, and describe monitoring and reporting to DWR. Moreover, in order to reach the best outcome for the GSA and local stakeholders, and to satisfy SGMA requirements, all beneficial uses and the interests of beneficial users of groundwater must be considered through the active involvement of local stakeholders. / Figure 2. UVBGSA JPA members and their respective boundaries. UVBGSA DECISION-MAKING PROCESS The general voting procedure of the UVBGSA is outlined in the JPA. Each member of the Board has one vote. Unless otherwise specified, all affirmative decisions of the Board require the affirmative vote of a simple majority of all the Board’s Directors participating in voting, provided that, if a Director is disqualified from voting on a matter before the Board because of a conflict of interest, that Director shall be excluded from the calculation of the total number of Directors that constitute a majority. The Board of Directors shall strive for consensus of all members on all items. With respect to GSP development, the above-mentioned procedure will be used for all subjects that require Board’s action. Since the beginning of this GSP development, discussions and/or presentations have been conducted in the TAC and Board public meetings to facilitate input from stakeholders and interested parties. Key documents have been made available in advance of meeting on either the County’s website or via the C&E Tool, whichever was determined appropriate, as a working draft document. Comments made by the TAC, the Board, or by the public have been addressed in a reasonable timeline (if possible, by the next public meeting) and the final draft of the deliverable has been presented and an action taken by the Board in the next scheduled meeting. During all public meetings, time-limited opportunities have been offered to the public to comment on all public agenda items. In addition, an opportunity for public comment on items not on the agenda was provided. The LWA Team, the Board, and the TAC have come up with a preferred method of communication with regards to GSP deliverables and additional matters that need the Board’s approval and/or the TAC’s involvement and direction. As a soft arrangement, meaning the timeline can be adjusted respective to the task in hand, the LWA Team will provide a month for the TAC to review a document or elaborate on a subject that is scheduled to be acted upon in the upcoming meeting. GSA Board will be provided with at least two weeks advance time before an official review/presentatio n of a document for approval at a Board meeting. As explained, all efforts will be made so that discussions and/or presentations are conducted in the TAC and Board public meetings to facilitate input from stakeholders and interested parties. In addition, key documents will be available in advance on County’s website, whichever appropriate, as a working draft document. Comments made by the TAC, the Board, or by the public will be addressed in a reasonable timeline (if possible up to the next public meeting) and the final draft of the deliverable will be presented and action taken by the Board in the next scheduled meeting. This procedure is illustrated in Figure 3. During all public meetings, time constrained opportunities will be offered for the public to comment on all public agenda items. In addition, an opportunity for public comment on items not on the agenda will be provided. / Figure 3. General review process of deliverables. COMMUNICATION OBJECTIVES TO SUPPORT THE GSP The UVBGSA will strive to build broad support for key elements of the GSP and will facilitate the effective engagement of stakeholders and beneficial users of groundwater to achieve the best outcome for its GSP. The following are the guiding principles of the GSP communication strategy: Inform the public with balanced information to assist them in understanding the issues to be addressed, alternative management measures, opportunities, and/or solutions. Consult with the public by obtaining feedback and public comments on analyses and decisions. UVBGSA will encourage the public to be involved in the decision-making process since they are affected by the GSP and can influence the outcome. Involve beneficial users and work with them throughout the process to ensure that their concerns, aspirations, and their overall input is understood and considered. Collaborate with stakeholders in the decision-making process including the development of management alternatives and identification of preferred solutions. Empower the members of the GSA by fully considering their priorities and sufficiently implementing them in the GSP. Inform all engaged on how their input affected the decision. Ensure process integrity and transparency. Utilize facilitation and outreach methods that minimize the cost and environmental impacts of travel. Leverage available technological platforms to increase collaboration and efficiency. Maintain appropriate alignment between engagement, content development, and project management. Details of the methods and strategies used to accomplish these objectives are laid out in the following sections. OVERRIDING CONCERNS, MAJOR CONCERNS OR CHALLENGES A challenge in developing and implementing the GSP is the time constraint that may limit the capability to build relationships and underlying trust between all sectors of the public involved and/or affected by the GSP. UVBGSA made the necessary efforts through several public meetings, adequate outreach and notices, and involving major beneficial users in its board of directors during the formation of the GSA. The GSP development process brings about new challenges that will need broader involvement and trust to be established. Conflicting interests on the use of the shared resources may arise that can only be resolved through an effective decision-making process. It is also possible that needs and interests of particular stakeholders may change throughout the development process, complicating the dynamics of the planning process. The CommPlan and its thorough implementation will assist the UVBGSA in overcoming these types of challenges. In addition, public outreach and stakeholder engagement takes time and resources to be done well. This can become a significant challenge since both the time and the resources available to the UVBGSA are limited. However, the Board believes that its planned strategies and venues of engagement will enable its communication and engagement efforts to be effective. The Board is confident that a balanced and effective investment in effective communication and engagement will lead to improved outcomes, optimized resources, broad support, and reduced conflicts, which subsequently outweighs its respective cost. Stakeholders Involved in the Project SGMA (CA Water Code Section § 10723.2) and GSP Regulations Section § 354.10.(a) collectively require the UVBGSA to consider interests of all beneficial uses and users of groundwater basin and provide a description of those users and uses, the types of parties representing those interests, and the nature of consultation with those parties. Table 3 summarizes the list of stakeholders identified by the UVBGSA. This list will be updated as necessary. Table 3. Identified stakeholders and interested parties for the UVB. Category of Interest Stakeholder Groups Contact Person  UVBGSA Board of Directors  Land Use County of Mendocino Glenn McGourty  Land Use/Urban Use City of Ukiah Douglas F. Crane  Integrated Water Management Russian River Flood Control Alfred White  Urban Use Upper Russian River Water Agency James Green  California Native American tribes Tribal Seat Vacant  Agricultural Use/ Private Users Agricultural Seat Zachary Robinson  UVB TAC Members  Land Use County of Mendocino James Linderman  Land Use/Urban Use City of Ukiah Sean White  Urban Use Upper Russian River Water Agency Ken Todd  Integrated Water Management Russian River Flood Control Elizabeth Salomone  Land Use Sonoma County Water Agency Don Seymour  Urban/ Agricultural Use Mendocino County Resource Conservation District Mike Webster  General Public/Land Use California Land Stewardship Institute Laurel Marcus  California Native American tribes Tribal Representative Javier Silva  Agricultural Use/ Private Users Agricultural Representative Levi Paulin  Public Water Systems  Urban Use Redwood Valley County Water District Millview County Water District    Urban Use Redwood Valley County Water District Millview County Water District    Willow County Water District    Calpella County Water District   Private Water Companies  Urban Use City of 10,000 Buddha’s    Rogina Water Company    Yokayo Water Systems   California Native American Tribes  California Native American tribes Redwood Valley Rancheria Tribal Representative on UVBGSA and the TAC   Coyote Valley Reservation    Pinoleville Pomo Nation    Potter Valley Rancheria    Guidiville Rancheria    Hopland Reservation   Agriculture  Agricultural Use Mendocino County Farm Bureau Devon Jones   Mendocino County Wine Growers Association Agricultural Representative on UVBGSA and the TAC   Pear Growers    Cannabis Cultivation   State Entities  Environmental and Ecosystem UC Davis Cooperative Extension   State Lands Department of Water Resources (DWR)   State Lands/Environmental and Ecosystem North Coast Regional Water Quality Control Board   State Lands/Environmental and Ecosystem California Department of Fish and Wildlife (CDFW)   Federal Entities  Federal Lands/Environmental and Ecosystem/Integrated Water Management US Army Corps of Engineers   Federal Lands/Environmental and Ecosystem US Fish and Wildlife Service (USFWS)    Environmental and Ecosystem NOAA Fisheries   Environmental and Ecosystem Forest Service   UVB Residents  General Public Public    Disadvantaged Communities    Citizen Groups    METHODS FOR PROMOTING ACTIVE STAKEHOLDER INVOLVEMENT As UVBGSA moves towards developing its GSP, it will initially focus on stakeholder identification and assessment. The LWA Team will conduct stakeholder interviews at the outset of the planning effort to understand the interests, concerns, opportunities, and resources that exist in the stakeholder community. During the GSP development process, the Board will evolve its outreach efforts by identifying additional stakeholders, understanding their interests and concerns, and providing a transparent and responsive communication venue for their engagement. This will happen through the following approach: Develop and maintain an updated interested parties’ list through UVBGSA stakeholder identification and outreach, voluntary subscription, and e-notification system. Conduct interviews with key stakeholders at the outset of the GSP planning effort. Hold regular public meetings of the UVBGSA Board and the TAC, encouraging public participation through County website. Convene a collaborative decision-making process through public meetings with the goal of building a shared understanding and reducing conflicts. This will provide an additional venue for interested parties to get involved in the more technical side of development and implementation of GSP. Provide alternative opportunities for stakeholders or interested parties that face more barriers to participation such as holding interviews with the LWA Team, translated materials, evening meetings, etc. Use the UVBGSA website to provide increased access to data and information in a user-friendly form. Provide emails/newsletters to interested parties updating them on newly developed documents or information and seeking their participation and/or comments. Methods outlined above will help UVBGSA conduct the implementation phase of its adaptive management strategy. USE OF PUBLIC INPUT AND RESPONSE The Board’s success in implementing their adaptive management strategy will depend, in part, on how it responds to public input. Moreover, a recognizable employment of the public input boosts engagement and increases the trust in the process and plan. The UVBGSA will respond to constructive public comments and concerns and demonstrate how they shaped the outcome at hand. Efforts will include: Making draft deliverables provided for the TAC or the UVBGSA review available to the public to materialize a more fruitful public discussion during the public meetings scheduled for deciding on those deliverables. Publishing Board-approved draft final GSP Chapters for public comment with reasonable commenting periods. If necessary, responses to comments will be published to elaborate on how they were implemented or considered in revising the documents. Continued implementation of the methods for promoting active engagement of the public with a focus on obtaining comments and responding to concerns. At key C&E milestones described in the C&E Implementation Timeline Section, UVBGSA evaluated the effectiveness of its communication strategy by answering the following questions: Is there a shared understanding of the GSP’s goals and its implementation timeline? Are stakeholders educated about the GSP development process and their own role? Has the GSA received positive press coverage? Do diverse stakeholders feel included? Has there been behavioral changes related to the program goals? Or, is improved trust/relationships in evidence among participants? Has the CommPlan been implemented and updated? Has the interested parties’ list been expanded? Have there been well-attended and robust public hearings at all of the necessary junctures? Are all established venues for stakeholders open and effective? Are there formal mechanisms to assess outcomes and make improvements? Reviewing these results helped identify the strengths and weaknesses of the communication strategy and how to improve it. Communications Strategy As explained in the previous sections, UVBGSA will use a multitude of communication methods to convey information and obtain input from stakeholders. The applicability of each method will depend on the goal of the intended communication. As a general rule of thumb, the communication strategy is divided into external and internal communications as explained below. UVBGSA will implement a comprehensive communication and engagement plan that meets SGMA requirements and will try to optimize its strategies in external and internal communications to maximize the end benefits. INTERNAL COMMUNICATION Internal communication is defined as any communication between and among the UVBGSA Board members, Mendocino County, the TAC or other convened committees, and the LWA Team that is necessary to keep the planning effort moving forward and to execute the scope of services articulated in the contract with the LWA Team. The Board, County, and the TAC will convey internal communications among their own members or with each other using their preferred methods such as emails, phone conversations, etc., consistent with applicable regulatory requirements. If a meeting is arranged between any combination of the three, notes will be taken and kept on record by an assigned member of the participants. The LWA Team will take and keep notes of the meetings with the Board and the TAC. These notes will be made available following the approval of the Board via the UVBGSA website. The LWA Team will provide monthly progress reports to the Board. EXTERNAL COMMUNICATION External communication is defined as any communication of the UVBGSA, the TAC, the LWA Team, or any other committee with the public (which includes DWR POC). These communications may occur through emails and newsletters, public meetings, mailed flyers/brochures/advertisement, handouts, group interviews and radio broadcasts. For all public meetings, including but not limited to regular Board and TAC meetings, agenda for the meeting is posted online on the County website and subscribers to the e-notification system are notified. An electronic flyer for the meeting is also included in the newsletter and interested parties are notified through their preferred contact method. Meeting minutes are recorded as the normal procedure of the Board and the TAC and will be posted afterwards on County website. In addition, the LWA Team keeps record of all its communication with external parties including group interviews. Those records will be available through appropriate procedures if approved by the Board. Online and web-based resources including the County website and County Social Media outlets are regularly updated and utilized for informing the public of the project status, posting draft GSP Chapters, publishing notices, receiving comments, demonstrating how public input is being implemented, disclosing results and data, and sharing news and updates. Public Meetings All UVBGSA Board and TAC meetings are open to the public and designed to encourage input, discussion, and questions from public audience members. The minutes of UVBGSA Board and TAC meetings reflect the questions and comments raised by members and the general public. Currently scheduled public meetings are shown in Table 4. This schedule is subject to change as the GSP development process progresses and the GSP development schedule is updated (Appendix A). Meetings with the UVBGSA Board and the TAC are multi-purpose venues for public engagement and outreach. The LWA Team will provide progress reports at the meetings unless directed otherwise by the Board; presentations for the Board members or the TAC may be conducted to assist in the decision-making process or to provide for information to the public; public comments regarding scheduled and non-scheduled items will be received; and, actions will be taken and decisions will be made with regards to the GSP development and implementation. Table 4. UVBGSA important meeting dates for GSP development process. Date Subject of Discussion at UVBGSA Meeting (1:30 PM) Subject of Discussion at TAC Meeting (9:30 AM)  13 September 2018 Introduction Project Schedule    8 November 2018 Communication Plan and Data Management Plan Needs Assessment Data Gap Analysis Monitoring Network Analysis  14 February 2019 Communication Plan Data Management Plan Data Gap Analysis Monitoring Network Analysis   16 April 2019  Phase I Deliverables Data Acquisition & Confidentiality Requirements  6 June 2019 Prop. 68 Solicitation Schedule Hydrogeologic Conceptual Model TSS Application  15 October 2019 HCM Update Prop 68 Update TSS Update DMS Draft Deliver Draft HCM Commenting and Review Prop 68 Update, TSS Update  9 January 2020 Groundwater Model Ch.2 GSP Update Sustainable Management Criteria Measurable Objectives, TSS Update, TAC Meetings Moved to day before Board Meets  12 March 2020 Sustainable Management Criteria Measurable Objectives Sustainable Goal Development Water Quality SMC Survey Review  13 May 2020  Preliminary SW/GW SMC Historical GW Elevation Trends  10 September 2020 Monitoring Network Future Scenarios PVP Updates SW GW Interaction Results Water Budget WQ SMC Delivery Future Scenarios Current and Baseline Water Budget Remote Monitoring Studies  14 October 2020  SMC Development GW Decline and SW Depletion Well Instrumentation  12 November 2020  SMC MT/MO Development Model Results      13 January 2021  Model Results ISW/GDE Discussions  11 February 2021 Draft SMC’s Approved SMC Discussion  11 March 2021 Final GSP Implementation Plan Draft GSP Monitoring Network Finalized  8 April 2021 Final GSP Implementation Plan Draft GSP  13 May 2021 Final GSP Draft/ GSP Submittal Draft GSP  10 June 2021 Final GSP Draft/ GSP Submittal Draft GSP       Table 5. UVBGSA Public Meeting Dates Date Subject of Discussion at Public Meeting  29 September 2020 Introduction of UVBGSA and GSP Project Schedule, Implementation Plan, Schedule for Future Public Meetings Venues for Engagement  23 February 2021 Draft GSP Public Comment SMC and Potter Valley Project Presentation  20 April 2021 Draft GSP Public Comment  25 May 2021 Draft GSP Public Comment  22 June 2021 Draft GSP Public Comment      If determined essential by the Board, additional public meetings may be scheduled to further distribute the information to the public at specified locations and times. These meetings will be appropriately advertised through the County website, emails and newsletters, interested party list subscribers, and postal mail or flyers. Stakeholder Survey and Mapping At the outset of the GSP development effort, the LWA Team will convene meetings with identified key stakeholders to gather important information using a survey form tailored to the UVB GSP effort. The LWA Team will contact representatives for the key stakeholder organizations to learn more about them, describe the GSP development process, and will invite them to engage in the process. Prior to these meetings. The LWA Team will develop background information, maps, and a stakeholder survey form. Follow up communications may be made to answer questions that come up or to better understand stakeholder interests, issues, and challenges. After the stakeholder surveys are completed, the LWA team will compile the information received in a “Lay of the Land” document. This document will summarize information received from stakeholders regarding initial concerns/issues, interests, challenges, preferred methods of communication, and desired level of engagement. Venues for Engaging To achieve the goals and objectives of the CommPlan, the UVBGSA will utilize multiple outreach venues as wells as broader communication tools. This will allow stakeholder engagement at different levels best suited to stakeholder needs. The Board will use these venues to provide regular feedback and updates and to receive comments. Due to the ongoing COVID-19 pandemic and in accordance with County and State health orders, these venues will be hosted virtually until new incidences of COVID-19 are reduced to a safe level within the county and we are able to return to in person meetings. These venues are discussed in previous sections and are listed below: Public meetings of the Board and Advisory Committees: for all interested parties. Advertised and announced through appropriate means such as email newsletters, interested parties subscription lists, e-notification system, flyers and banners, etc. Stakeholder interviews and/or work group meetings Community or regional forums: conducted on as needed basis by the UVBGSA, the LWA Team, or appropriate public agencies identified by the Board. Public workshops/briefings: Conducted if deemed necessary by the Board with the help of the LWA Team, DWR, and/or other appropriate public agencies for information sharing and receipt of input. Digital venues: County website and Zoom Meetings will be used as the main online resources for conducting and tracking engagement and outreach activities. Emails and newsletters will be delivered to the interested parties’ list and subscribers. Available social media outlets will be used as needed. Mailing services: provided on as needed basis and may include one or a combination of informational brochures, advertisement, flyers, handouts, etc. After the COVID-19 pandemic started, in accordance with County and State health orders, the venues were hosted virtually until new incidences of COVID-19 were reduced to a safe level within the county and people could return to in person meetings. C&E IMPLEMENTATION TIMELINE Implementation of the C&E Plan (CommPlan) will follow the timeline shown in Figure . The implementation timeline is subject to periodic update and change dependent on the status of the project and the GSP development schedule (Appendix A). / Figure 4. C&E implementation timeline. Evaluation and Assessment At key C&E milestones laid out in the C&E Implementation Timeline Section, the UVBGSA will evaluate the effectiveness of its responses to the following questions: Is there a shared understanding of the GSP’s goals and its implementation timeline? Are stakeholders educated about the GSP development process and their own role? Has the GSA received positive press coverage? Do diverse stakeholders feel included? Has there been behavior changes related to the program goals? Or is improved trust/relationships in evidence among participants? Has the CommPlan been implemented and updated? Has the interested parties’ list been expanded? Have there been well-attended and robust public hearings at all of the necessary junctures? Are all established venues for stakeholders open and effective? Are there formal mechanisms to assess outcomes and make improvements? Reviewing these results will help identify what worked well, what did not work as planned, and to summarize lessons learned. Appendix A. GSP Development Schedule / Appendix B. GSP Register of Attendees at all Public Meeting