Loading...
HomeMy WebLinkAboutWest Yost & Associates 2025-07-11COU No. 2526-079 AGREEMENT FOR PROFESSIONAL CONSULTING SERVICES This Agreement, made and entered into this 11th day of July, 2025 (“Effective Date”), by and between CITY OF UKIAH, CALIFORNIA, hereinafter referred to as "City" and West Yost, a corporation organized and in good standing under the laws of the state of California, hereinafter referred to as "Consultant". RECITALS This Agreement is predicated on the following facts: a.City requires consulting services related to Russian River Watershed Association 2025- 2026 Work Plan. b.Consultant represents that it has the qualifications, skills, experience and properly licensed to provide these services, and is willing to provide them according to the terms of this Agreement. c.City and Consultant agree upon the Scope-of-Work and Work Schedule attached hereto as Attachment "A", describing contract provisions for the project and setting forth the completion dates for the various services to be provided pursuant to this Agreement. TERMS OF AGREEMENT 1.0 DESCRIPTION OF PROJECT 1.1 The Project is described in detail in the attached Scope-of-Work (Attachment "A"). 2.0 SCOPE OF SERVICES 2.1 As set forth in Attachment "A". 2.2. Additional Services. Additional services, if any, shall only proceed upon written agreement between City and Consultant. The written Agreement shall be in the form of an Amendment to this Agreement. 3.0 CONDUCT OF WORK 3.1 Time of Completion. Consultant shall commence performance of services as required by the Scope-of-Work upon receipt of a Notice to Proceed from City and shall complete such services within fiscal year 2025-2026. Consultant shall complete the work to the City's reasonable satisfaction, even if contract disputes arise or Consultant contends it is entitled to further compensation. 4.0 COMPENSATION FOR SERVICES 4.1 Basis for Compensation. For the performance of the professional services of this Agreement, Consultant shall be compensated on a time and expense basis not to exceed a guaranteed maximum dollar amount of $718,597 less a credit to the City for Administrative Agency services ($6,000). Labor charges shall be based upon hourly billing rates for the various classifications of personnel employed by Consultant to PAGE 1 OF 7 COU No. 2526-079 PAGE 2 OF 7 perform the Scope of Work as set forth in the attached Attachment A, which shall include all indirect costs and expenses of every kind or nature, except direct expenses. The direct expenses and the fees to be charged for same shall be as set forth in Attachment A. Consultant shall complete the Scope of Work for the not-to -exceed guaranteed maximum, even if actual time and expenses exceed that amount. 4.2 Changes. Should changes in compensation be required because of changes to the Scope -of-Work of this Agreement, the parties shall agree in writing to any changes in compensation. "Changes to the Scope-of-Work" means different activities than those described in Attachment "A" and not additional time to complete those activities than the parties anticipated on the date they entered this Agreement. 4.3 Sub-contractor Payment. The use of sub-consultants or other services to perform a portion of the work of this Agreement shall be approved by City prior to commencement of work. The cost of sub-consultants shall be included within guaranteed not-to -exceed amount set forth in Section 4.1. 4.4 Terms of Payment. Payment to Consultant for services rendered in accordance with this contract shall be based upon submission of monthly invoices for the work satisfactorily performed prior to the date of the invoice less any amount already paid to Consultant, which amounts shall be due and payable thirty (30) days after receipt by City. The invoices shall provide a description of each item of work performed, the time expended to perform each task, the fees charged for that task, and the direct expenses incurred and billed for. Invoices shall be accompanied by documentation sufficient to enable City to determine progress made and to support the expenses claimed. 5.0 ASSURANCES OF CONSULTANT 5.1 Independent Contractor. Consultant is an independent contractor and is solely responsible for its acts or omissions. Consultant (including its agents, servants, and employees) is not the City's agent, employee, or representative for any purpose. It is the express intention of the parties hereto that Consultant is an independent contractor and not an employee, joint venturer, or partner of City for any purpose whatsoever. City shall have no right to, and shall not control the manner or prescribe the method of accomplishing those services contracted to and performed by Consultant under this Agreement, and the general public and all governmental agencies regulating such activity shall be so informed. Those provisions of this Agreement that reserve ultimate authority in City have been inserted solely to achieve compliance with federal and state laws, rules, regulations, and interpretations thereof. No such provisions and no other provisions of this Agreement shall be interpreted or construed as creating or establishing the relationship of employer and employee between Consultant and City. Consultant shall pay all estimated and actual federal and state income and self- employment taxes that are due the state and federal government and shall furnish and pay worker's compensation insurance, unemployment insurance and any other benefits required by law for himself and his employees, if any. Consultant agrees to indemnify and hold City and its officers, agents and employees harmless from and against any claims or demands by federal, state or local government agencies for any such taxes or benefits due but not paid by Consultant, including the legal costs associated with defending against any audit, claim, demand or law suit. COU No. 2526-079 PAGE 3 OF 7 Consultant warrants and represents that it is a properly licensed professional or professional organization with a substantial investment in its business and that it maintains its own offices and staff which it will use in performing under this Agreement. 5.2 Conflict of Interest. Consultant understands that its professional responsibility is solely to City. Consultant has no interest and will not acquire any direct or indirect interest that would conflict with its performance of the Agreement. Consultant shall not in the performance of this Agreement employ a person having such an interest. If the City Manager determines that the Consultant has a disclosure obligation under the City’s local conflict of interest code, the Consultant shall file the required disclosure form with the City Clerk within 10 days of being notified of the City Manager’s determination. 6.0 INDEMNIFICATION 6.1 Insurance Liability. Without limiting Consultant's obligations arising under Paragraph 6.2 Consultant shall not begin work under this Agreement until it procures and maintains for the full period of time allowed by law, surviving the termination of this Agreement insurance against claims for injuries to persons or damages to property, which may arise from or in connection with its performance under this Agreement. A. Minimum Scope of Insurance Coverage shall be at least as broad as: 1. Insurance Services Office ("ISO) Commercial General Liability Coverage Form No. CG 20 10 10 01 and Commercial General Liability Coverage – Completed Operations Form No. CG 20 37 10 01. 2. ISO Form No. CA 0001 (Ed. 1/87 ) covering Automobile Liability, Code 1 "any auto" or Code 8, 9 if no owned autos and endorsement CA 0025. 3. Worker's Compensation Insurance as required by the Labor Code of the State of California and Employers Liability Insurance. 4. Errors and Omissions liability insurance appropriate to the consultant’s profession. Architects’ and engineers’ coverage is to be endorsed to include contractual liability. B. Minimum Limits of Insurance Consultant shall maintain limits no less than: 1. General Liability: $1,000,000 combined single limit per occurrence for bodily injury, personal injury and property damage including operations, products and completed operations. If Commercial General Liability Insurance or other form with a general aggregate limit is used, the general aggregate limit shall apply separately to the work performed under this Agreement, or the aggregate limit shall be twice the prescribed per occurrence limit. 2. Automobile Liability: $1,000,000 combined single limit per accident for bodily injury and property damage. COU No. 2526-079 PAGE 4 OF 7 3. Worker's Compensation and Employers Liability: Worker's compensation limits as required by the Labor Code of the State of California and Employers Liability limits of $1,000,000 per accident. 4. Errors and Omissions liability: $1,000,000 per occurrence. C. Deductibles and Self-Insured Retentions Any deductibles or self-insured retentions must be declared to and approved by the City. At the option of the City, either the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects to the City, its officers, officials, employees and volunteers; or the Consultant shall procure a bond guaranteeing payment of losses and related investigations, claim administration and defense expenses. D. Other Insurance Provisions The policies are to contain, or be endorsed to contain, the following provisions: 1. General Liability and Automobile Liability Coverages a. The City, it officers, officials, employees and volunteers are to be covered as additional insureds as respects; liability arising out of activities performed by or on behalf of the Consultant, products and completed operations of the Consultant, premises owned, occupied or used by the Consultant, or automobiles owned, hired or borrowed by the Consultant for the full period of time allowed by law, surviving the termination of this Agreement. The coverage shall contain no special limitations on the scope-of-protection afforded to the City, its officers, officials, employees or volunteers. b. The Consultant's insurance coverage shall be primary insurance as respects to the City, its officers, officials, employees and volunteers. Any insurance or self-insurance maintained by the City, its officers, officials, employees or volunteers shall be in excess of the Consultant's insurance and shall not contribute with it. c. Any failure to comply with reporting provisions of the policies shall not affect coverage provided to the City, its officers, officials, employees or volunteers. d. The Consultant's insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer's liability. 2. Worker's Compensation and Employers Liability Coverage The insurer shall agree to waive all rights of subrogation against the City, its officers, officials, employees and volunteers for losses arising from Consultant's performance of the work, pursuant to this Agreement. COU No. 2526-079 PAGE 5 OF 7 3. Professional Liability Coverage If written on a claims-made basis, the retroactivity date shall be the effective date of this Agreement. The policy period shall extend one year from date of final approved invoice for this project. 4. All Coverages Each Insurance policy required by this clause shall be endorsed to state that coverage shall not be suspended, voided, canceled by either party, reduced in coverage or in limits except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City. E. Acceptability of Insurers Insurance is to be placed with admitted California insurers with an A.M. Best's rating of no less than A- for financial strength, AA for long-term credit rating and AMB-1 for short-term credit rating. F. Verification of Coverage Consultant shall furnish the City with Certificates of Insurance and with original Endorsements effecting coverage required by this Agreement. The Certificates and Endorsements for each insurance policy are to be signed by a person authorized by that insurer to bind coverage on its behalf. The Certificates and Endorsements are to be on forms provided or approved by the City. Where by statute, the City's Workers' Compensation - related forms cannot be used, equivalent forms approved by the Insurance Commissioner are to be substituted. All Certificates and Endorsements are to be received and approved by the City before Consultant begins the work of this Agreement. The City reserves the right to require complete, certified copies of all required insurance policies, at any time. If Consultant fails to provide the coverages required herein, the City shall have the right, but not the obligation, to purchase any or all of them. In that event, the cost of insurance becomes part of the compensation due the contractor after notice to Consultant that City has paid the premium. G. Subcontractors Consultant shall include all subcontractors or sub-consultants as insured under its policies or shall furnish separate certificates and endorsements for each sub- contractor or sub-consultant. All coverage for sub-contractors or sub-consultants shall be subject to all insurance requirements set forth in this Paragraph 6.1. 6.2 Indemnification. Notwithstanding the foregoing insurance requirements, and in addition thereto, Consultant agrees, for the full period of time allowed by law, surviving the termination of this Agreement, to indemnify the City for any claim, cost or liability that arises out of, or pertains to, or relates to any negligent act or omission or the willful misconduct of Consultant in the performance of services under this contract by Consultant, but this indemnity does not apply to liability for damages for death or bodily injury to persons, injury to property, or other loss, arising from the sole negligence, willful COU No. 2526-079 PAGE 6 OF 7 misconduct or defects in design by the City, or arising from the active negligence of the City. “Indemnify,” as used herein includes the expenses of defending against a claim and the payment of any settlement or judgment arising out of the claim. Defense costs include all costs associated with defending the claim, including, but not limited to, the fees of attorneys, investigators, consultants, experts and expert witnesses, and litigation expenses. References in this paragraph to City or Consultant, include their officers, employees, agents, and subcontractors. 7.0 CONTRACT PROVISIONS 7.1 Ownership of Work. All documents furnished to Consultant by City and all documents or reports and supportive data prepared by Consultant under this Agreement are owned and become the property of the City upon their creation and shall be given to City immediately upon demand and at the completion of Consultant's services at no additional cost to City. Deliverables are identified in the Scope-of-Work, Attachment "A". All documents produced by Consultant shall be furnished to City in digital format and hardcopy. Consultant shall produce the digital format, using software and media approved by City. 7.2 Governing Law. Consultant shall comply with the laws and regulations of the United States, the State of California, and all local governments having jurisdiction over this Agreement. The interpretation and enforcement of this Agreement shall be governed by California law and any action arising under or in connection with this Agreement must be filed in a Court of competent jurisdiction in Mendocino County. 7.3 Entire Agreement. This Agreement plus its Attachment(s) and executed Amendments set forth the entire understanding between the parties. 7.4 Severability. If any term of this Agreement is held invalid by a court of competent jurisdiction, the remainder of this Agreement shall remain in effect. 7.5 Modification. No modification of this Agreement is valid unless made with the agreement of both parties in writing. 7.6 Assignment. Consultant's services are considered unique and personal. Consultant shall not assign, transfer, or sub-contract its interest or obligation under all or any portion of this Agreement without City's prior written consent. 7.7 Waiver. No waiver of a breach of any covenant, term, or condition of this Agreement shall be a waiver of any other or subsequent breach of the same or any other covenant, term or condition or a waiver of the covenant, term or condition itself. 7.8 Termination. This Agreement may only be terminated by either party: 1) for breach of the Agreement; 2) because funds are no longer available to pay Consultant for services provided under this Agreement; or 3) City has abandoned and does not wish to complete the project for which Consultant was retained. A party shall notify the other party of any alleged breach of the Agreement and of the action required to cure the breach. If the breaching party fails to cure the breach within the time specified in the notice, the contract shall be terminated as of that time. If terminated for lack of funds or COU No. 2526-079 DEPUTY CITY CLERK PAGE 7 OF 7 abandonment of the project, the contract shall terminate on the date notice of termination is given to Consultant. City shall pay the Consultant only for services performed and expenses incurred as of the effective termination date. In such event, as a condition to payment, Consultant shall provide to City all finished or unfinished documents, data, studies, surveys, drawings, maps, models, photographs and reports prepared by the Consultant under this Agreement. Consultant shall be entitled to receive just and equitable compensation for any work satisfactorily completed hereunder, subject to off-set for any direct or consequential damages City may incur as a result of Consultant's breach of contract. 7.9 Execution of Agreement. This Agreement may be executed in duplicate originals, each bearing the original signature of the parties. Alternatively, this Agreement may be executed and delivered by facsimile or other electronic transmission, and in more than one counterpart, each of which shall be deemed an original, and all of which together shall constitute one and the same instrument. When executed using either alternative, the executed agreement shall be deemed an original admissible as evidence in any administrative or judicial proceeding to prove the terms and content of this Agreement. 8.0 NOTICES Any notice given under this Agreement shall be in writing and deemed given when personally delivered or deposited in the mail (certified or registered) addressed to the parties as follows: CITY OF UKIAH WEST YOST ASSOCIATES, INC. DEPT. OF PUBLIC WORKS 2020 RESEARCH PARK DR, SUITE 100 300 SEMINARY AVENUE DAVIS, CA 95482 UKIAH, CALIFORNIA 95482-5400 9.0 SIGNATURES IN WITNESS WHEREOF, the parties have executed this Agreement the Effective Date: CONSULTANT BY: __________________________ ____________________ Date PRINT NAME: _________________ __________________ IRS IDN Number CITY OF UKIAH BY: ____________________ Date CITY MANAGER ATTEST ____________________ Date July 15, 2025 07/21/2025 07/22/2025 PREPARED BY Russian River Watershed Association 2025-2026 Work Plan PREPARED FOR Russian River Watershed Association Attachment A 2025-2026 Work Plan Prepared for Russian River Watershed Association Project No. 592-40-25-18 Project Manager: Vanessa Apodaca Date QA/QC Review: Andy Rodgers Date 6/26/2025 6/26/2025 i RRWA June 2025 N:\C\592\40-24-17\ENGR\A.3.E Table of Contents Purpose and Organization of the Work Plan ........................................................................................ 1 Cost Allocation ................................................................................................................................... 1 Work Plan Updates Or Modifications .................................................................................................. 4 A. EXECUTIVE DIRECTOR SERVICES ..................................................................................................... 4 Purpose ................................................................................................................................................... 4 Tasks ................................................................................................................................................. 4 Deliverables ..................................................................................................................................... 6 Permit Requirements addressed through Deliverables ................................................................... 6 Phase I Permit Requirement ..................................................................................................... 6 Phase II Permit Requirement .................................................................................................... 6 Budget .............................................................................................................................................. 7 B. GENERAL BENEFIT PROJECTS .......................................................................................................... 7 B.1 Outreach Strategies .......................................................................................................................... 7 Purpose ............................................................................................................................................ 7 Tasks ................................................................................................................................................. 7 Deliverables ..................................................................................................................................... 9 Permit Requirements Addressed through Deliverables ................................................................ 10 Phase I Permit Requirements .................................................................................................. 10 Phase II Permit Requirements ................................................................................................. 10 Budget ............................................................................................................................................ 10 B.2 Russian River-Friendly Landscaping Event ..................................................................................... 11 Purpose .......................................................................................................................................... 11 Tasks ............................................................................................................................................... 11 Deliverables ................................................................................................................................... 11 Permit Requirements Addressed Through Deliverables ................................................................ 11 Phase I Permit Requirement ................................................................................................... 11 Phase II Permit Requirement .................................................................................................. 11 Budget ............................................................................................................................................ 11 B.3 Regulatory Forum and Advocacy ................................................................................................... 12 Purpose .......................................................................................................................................... 12 Tasks ............................................................................................................................................... 12 Deliverables ................................................................................................................................... 12 Permit Requirements Addressed Through Deliverables ................................................................ 13 Phase I & II Permit Requirements ........................................................................................... 13 Budget ............................................................................................................................................ 13 B.4 Regional Stormwater Program Support ......................................................................................... 13 Purpose .......................................................................................................................................... 13 Tasks ............................................................................................................................................... 13 Deliverables ................................................................................................................................... 14 Permit Requirements Addressed Through Deliverables ................................................................ 15 Phase I Permit Requirement ................................................................................................... 15 Phase II Permit Requirement .................................................................................................. 15 ii RRWA June 2025 N:\C\592\40-24-17\ENGR\A.3.E Table of Contents Budget ............................................................................................................................................ 16 C. Special Benefit Projects ................................................................................................................ 16 C.1 Phase 1 Permit Renewal ................................................................................................................. 16 Purpose .......................................................................................................................................... 16 Tasks ............................................................................................................................................... 16 Deliverables ................................................................................................................................... 16 Permit Requirements Addressed through Deliverables ................................................................ 17 Phase I Permit Requirements .................................................................................................. 17 Phase II Permit Requirements ................................................................................................. 17 Budget ............................................................................................................................................ 17 C.2 Phase I Child Outreach Plan | Ukiah and Sonoma County ............................................................. 17 Purpose .......................................................................................................................................... 17 Tasks ............................................................................................................................................... 17 Deliverables ................................................................................................................................... 17 Permit Requirements Addressed through Deliverables ................................................................ 18 Phase I Permit Requirement ................................................................................................... 18 Phase II Permit Requirement .................................................................................................. 18 Budget ............................................................................................................................................ 18 C.3 Regional Our Water Our World Contract ....................................................................................... 18 Purpose .......................................................................................................................................... 18 Tasks ............................................................................................................................................... 18 Deliverables ................................................................................................................................... 19 Permit Requirement Addressed by Deliverable ............................................................................ 19 Phase I Permit Requirement ................................................................................................... 19 Phase II Permit Requirement .................................................................................................. 19 Budget ............................................................................................................................................ 19 C.4 Sonoma State WATERS Project ...................................................................................................... 20 Purpose .......................................................................................................................................... 20 Tasks ............................................................................................................................................... 20 Deliverables ................................................................................................................................... 20 Permit Requirement Addressed by Deliverable ............................................................................ 20 Phase I Permit Requirement ................................................................................................... 20 Phase II Permit Requirement .................................................................................................. 20 Budget ............................................................................................................................................ 20 C.5 to C.8 Streets to Creeks .................................................................................................................. 20 Purpose .......................................................................................................................................... 20 Tasks ............................................................................................................................................... 21 Deliverables ................................................................................................................................... 21 Permit Requirements Addressed by Deliverables ......................................................................... 21 Phase I Permit Requirement ................................................................................................... 21 Phase II Permit Requirement .................................................................................................. 22 Budget ............................................................................................................................................ 22 C.9 Grant Support ................................................................................................................................. 22 iii RRWA June 2025 N:\C\592\40-24-17\ENGR\A.3.E Table of Contents Purpose .......................................................................................................................................... 22 Tasks ............................................................................................................................................... 22 Deliverables ................................................................................................................................... 22 Permit Requirement Addressed Through Deliverable ................................................................... 22 Phase I Permit Requirement ................................................................................................... 22 Phase II Permit Requirement .................................................................................................. 22 Budget ............................................................................................................................................ 22 C.10 Operators Forum .......................................................................................................................... 23 Purpose .......................................................................................................................................... 23 Tasks ............................................................................................................................................... 23 Deliverables ................................................................................................................................... 23 Permit Requirement Addressed Through Deliverable ................................................................... 23 Phase I Permit Requirement ................................................................................................... 23 Phase II Permit Requirement .................................................................................................. 23 Budget ............................................................................................................................................ 23 LIST OF TABLES Table 1. Member Agency Percentages of Total Operating Budgets ............................................................. 1 Table 2. Special Benefit Project Allocation ................................................................................................... 3 LIST OF ATTACHMENTS Appendix A – Master Budget and Executive Director Services Budget Appendix B - General Benefit Projects Budget Appendix C - Special Benefit Projects Budget 1 Russian River Watershed Association 2025-2026 Work Plan N:\C\592\40-24-17\ENGR\A.3.E RRWA Work Plan | Fiscal Year 2025-2026 PURPOSE AND ORGANIZATION OF THE WORK PLAN This Work Plan has been prepared in accordance with Section B, Paragraph 16 of the First Amendment to the Memorandum of Understanding (MOU) creating the Russian River Watershed Association (RRWA) which was adopted in May 2004. The Work Plan addresses Executive Director (ED) Services, General Benefit Projects and Special Benefit Projects. This Work Plan is organized into the following sections: • Cost Allocation • Work Plan Updates or Modifications • Scope of Services A. ED Services B. General Benefit Projects C. Special Benefit Projects • Attachments: Budget Spreadsheets (Attachment 1 and Appendices A-C) COST ALLOCATION The cost allocation for this Work Plan follows Section B, Paragraph 18 of the MOU. For the ED Services and the General Benefit Projects, cost-share is determined by allocating half of the total cost equally among member agencies and allocating the other half in proportion to each agency’s operating budget. The operating budget proportions (shown as percentages of the combined operating budgets) used for the cost allocation formula for the 2025-2026 RRWA Work Plan are shown in Table 1. RRWA 2025-2026 Work Plan 2 Russian River Watershed Association 2025-2026 Work Plan N:\C\592\40-24-17\ENGR\A.3.E Table 1. Member Agency Percentages of Total Operating Budgets Member Agency Percentage Share (2025-2026) City of Cloverdale 2.09 City of Cotati 1.52 City of Healdsburg 3.32 City of Santa Rosa 22.99 City of Sebastopol 1.77 City of Ukiah 4.29 Mendocino County 3.82 Sonoma County 44.88 Sonoma Water 10.91 Town of Windsor 4.41 TOTAL 100% The cost allocation for Special Benefit Projects is in proportion to the benefits received by each participating member agency. These projects do not require each member agency to participate if there is no benefit to a given agency. As such, Special Benefit project costs are shared by participating agencies. The cost allocations for the Special Benefit Projects for the 2025-2026 Work Plan are shown in Table 2. RRWA 2025-2026 Work Plan 3 Russian River Watershed Association 2025-2026 Work Plan N:\C\592\40-24-17\ENGR\A.3.E Table 2. Special Benefit Project Allocation Task/Program Allocation C.1 Phase 1 Permit Renewal Divided evenly between all member agencies except Mendocino County C.2 Phase I Child Outreach Plan Divided evenly between Ukiah and Sonoma County C.3 Regional Our Water Our World Contract Divided evenly between Cloverdale, Healdsburg, Ukiah, Mendocino County, Sonoma County, Sonoma Water, and Windsor C.4 Sonoma State WATERS Project 50% of the total budget divided evenly between all member agencies except Sebastopol and Mendocino County plus 50% of the total budget times the total operating budget percentages assigned to each agency excluding Sebastopol and Mendocino County C.5 Streets to Creeks Administration Divided evenly between all member agencies C.6 Streets to Creeks Campaign 1 50% of the total budget divided evenly between Cotati and Mendocino County plus 50% of the total budget times the total operating budget percentages assigned to Cotati and Mendocino County C.7 Streets to Creeks Campaign 2 50% of the total budget divided evenly between all member agencies except Cotati and Mendocino County plus 50% of the total budget times the total operating budget percentages assigned to each agency excluding Cotati and Mendocino County C.8 Streets to Creeks Promotional Items 50% of the total budget divided evenly between all member agencies except Sebastopol and Mendocino County plus 50% of the total budget times the total operating budget percentages assigned to each agency excluding Sebastopol and Mendocino County C.9 Grant Support Divided evenly between Santa Rosa, Sonoma Water, and Windsor C.10 Operators' Forum Divided evenly between Cloverdale, Santa Rosa, Ukiah, Sonoma Water, and Windsor RRWA 2025-2026 Work Plan 4 Russian River Watershed Association 2025-2026 Work Plan N:\C\592\40-24-17\ENGR\A.3.E WORK PLAN UPDATES OR MODIFICATIONS For the 2025-2026 fiscal year, RRWA will implement the annual Work Plan but allow for updates and modifications at any time during the year. This “Work Plan modification policy” was developed for the 2006-2007 Work Plan and was the result of the Board of Directors’ desire to allow more flexibility as new needs, opportunities, schedules, and/or details arise that could not have been anticipated during the annual Work Plan development process. Once interim Work Plan programs are developed, budgets, funding and allocations will be determined by the steps below over approximately a five-month period: • Initial Technical Working Group (TWG) meeting: Scope and budget estimates developed, and funding sources identified. • Initial Board of Directors (BOD) review: Board considers program and member agencies opt in or out. • Final TWG: Budgets and allocations refined and finalized. • Final BOD: Program considered for approval. A. EXECUTIVE DIRECTOR SERVICES Purpose The ED Services provides for management of the RRWA’s activities, association communications, BOD and TWG meetings, executive staff meetings, legal services, strategic planning, and Work Plan development. For the 2025-2026 Work Plan, Andy Rodgers of West Yost Associates (West Yost) will serve as ED. Various staff members from West Yost will continue supporting project management, specialist, technical and administrative functions. Tasks The work will be carried out primarily by the ED and West Yost staff (these roles combined are referred to as RRWA staff) with in-kind support from the member agencies. The Administrative Agency, the City of Ukiah, will provide treasury and contractual services. The Town of Windsor will host regular Board of Directors (BOD) and Technical Working Group (TWG) meetings and post agendas for these meetings. Member agency staff will attend the TWG meetings along with RRWA staff. Specific tasks, deliverables and schedules are as follows (schedules for tasks are ongoing throughout the year, unless otherwise specified): • BOD meeting planning and coordination, including notifications, presentations, agendas, guest speakers, handouts, and minutes. BOD meetings are held per BOD direction, not to exceed four, 2-hour BOD meetings or the equivalent within the Work Plan year. Participation by the ED and one RRWA staff member at all meetings. RRWA 2025-2026 Work Plan 5 Russian River Watershed Association 2025-2026 Work Plan N:\C\592\40-24-17\ENGR\A.3.E • BOD field trip includes planning, presentations, guest speakers, handouts, and logistics for a field trip event. Assumes one half-day event during the work plan year as directed by the BOD. Participation by ED and two staff members. • Executive Programs & Initiatives Committee (EPIC) coordination, preparation, planning of presentations, agendas, handouts, and summary notes, and participation in Executive Committee meetings. Up to four, one-hour meetings per year. Participation by two staff members at all meetings. • TWG meeting coordination, preparation, planning of presentations, agendas, handouts, and summary notes. Two optional hybrid and two virtual 2-hour TWG meetings per year. Hybrid meetings to be in April and October. Meetings structured to discuss the workplan project tasks in detail with focus on task scoping, progress reporting (metrics, dates, % complete, etc.), completed milestones, and cost reporting. Participation by up to two staff members at all meetings. • General association communications include general communication (e-mails, phone calls, etc.), maintaining mailing and distribution lists, and miscellaneous coordination activities. Coordination with partner agencies such as Resource Conservation Districts, Land Paths, Laguna Foundation, Resources Legacy Fund, Occidental Arts and Ecology Center, Russian Riverkeeper, Tribes, Russian River Watershed Coalition, Sonoma County Regional Climate Protection Authority, Respect Russian River, Russian River Confluence, SMART, and The Great Redwood Trail Agency. Promote fundraising events and provide resources for entities that implement programs supporting member agency objectives. Respond to inquiries from members and potential new members. • Project management and controls includes budget tracking, internal process meetings, quarterly financial progress reports, and invoicing. $6,000 ODC to Administrative Agency (City of Ukiah) for their time administering the contract and processing invoices. • Legal services will be obtained at the direction of the BOD or if an independent third-party review is needed. Obtain as-needed contracted legal services for review of agreements with potential grantor, new members or other need(s) and manage contracted legal services. • Strategic plan will conclude previous year's planning efforts and begin implementation of the three-year RRWA strategic plan. Provide EPIC and TWG progress updates at regular meetings during the year. Efforts include preparing draft documents; facilitating EPIC, TWG, and BOD comments; contacting follow-up communications and meeting scheduling. • Beginning in September 2025, coordinate and develop 2026-2027 Work Plan and budget at the direction of the BOD and TWG. Prepare draft versions for discussion and comments. Prepare final draft for adoption in February 2026. RRWA 2025-2026 Work Plan 6 Russian River Watershed Association 2025-2026 Work Plan N:\C\592\40-24-17\ENGR\A.3.E Deliverables A.1 A & B BOD Coordination & Meeting Participation and Field Trip Agenda packets will be distributed prior to BOD meetings, including agendas, handouts, and minutes from the previous meeting. Email notifications, calendar invites, presentation slides with notes handouts, meeting materials and meeting minutes. A.2.A Executive Programs & Initiatives Committee Coordination & Meeting Participation Preparation and planning of Executive Committee meetings including agendas, handouts, and summary notes from the previous meeting. Email notifications, calendar invites, meeting materials, and summary notes. A.2.B TWG Coordination & Meeting Participation Meeting packets distributed prior to TWG meetings, including the agendas, draft presentations, handouts, and summary notes from the previous meeting. Email notifications, calendar invites, meeting materials, and summary notes. A.3.A. General Association Communications Upload distribution list to SharePoint quarterly. Promote events and resources for entities that implement programs supporting member agency objectives. A.3.B. Project Management and Controls Monthly invoicing, year-end budget summaries, and quarterly financial progress reports. A.3.D Strategic Plan Provide EPIC and TWG progress updates at regular meetings during the year. Prepare draft documents, facilitating EPIC, TWG, and BOD comments, follow-up communications and meeting scheduling. A.3.E. Coordinate and Develop 2026-2027 Work Plan 2026-2027 Work Plan and Budget. Permit Requirements addressed through Deliverables Phase I Permit Requirement VI.A.4. The permit allows Co-Permittees to work collaboratively to implement the requirements of the permit wherever such opportunities exist. Co-Permittees are encouraged to seek out collaborative opportunities. BOD, Executive Committee, and TWG meetings provide support for coordinated collaboration. Phase II Permit Requirement E.7.a. All Permittees shall comply with the requirements of education and outreach by contributing to a regional outreach and education collaborative effort. BOD and TWG meetings provide support for coordinated collaboration and opportunities to hear public comment. RRWA 2025-2026 Work Plan 7 Russian River Watershed Association 2025-2026 Work Plan N:\C\592\40-24-17\ENGR\A.3.E Budget The budget for ED Services is $199,599 including Administrative Agency cost ($6,000) for Administrative Agency functions in accordance with the MOU, travel costs, strategic planning consultant ($17,500) and reserve for legal fees ($4,000). (See Attachment 1, Appendix A for budget spreadsheet) exclusive of in-kind services. B. GENERAL BENEFIT PROJECTS B.1 Outreach Strategies Purpose This program will focus on response to BOD and TWG requests to support watershed-wide initiatives as identified during the work plan year. In 2025-2026, RRWA will strive to meet the following objectives: • Develop outreach and advocate to increase RRWA’s “whole watershed” perspective for programs carried out under the Work Plan, by our member agencies, and by other watershed organizations. • Undertake public outreach activities to encourage environmental stewardship and pollution prevention. • Optimize the RRWA membership benefits. Tasks Specific tasks, deliverables and schedules are as follows (schedules for tasks are ongoing throughout the year unless otherwise specified): • Provide outreach to increase RRWA’s “whole watershed” perspective for programs carried out under the Work Plan, by our member agencies, and by other watershed organizations. • Student Video Contest: The RRWA video contest is coordinated by in-kind support provided by Sonoma Water. RRWA staff will assist in identifying the video topic, support development of informational material for video contest notification mailing, and coordinate presenting the awards. The student video contest produces three winners and awards cash prizes which are provided by Sonoma Water. Schedule: The video contest awards will be given in conjunction with a late spring/early summer 2026 RRWA BOD meeting, if possible. • Promote RRWA and sponsor clean-up events including $1,500 for Russian Riverkeeper cleanup, $500 for coastal cleanup $300 for Mendocino County cleanup; Daily Acts cobranding support $1,000; $500 for Mendocino County Earth Day, $300 for Cloverdale's La Familia Sana and/or Resilient Cloverdale, $1,000 for California Product Stewardship Council, and $1,100 for California Landscape Contractors Association; and sponsor/table as the Steelhead RRWA 2025-2026 Work Plan 8 Russian River Watershed Association 2025-2026 Work Plan N:\C\592\40-24-17\ENGR\A.3.E Festival and Fiesta de Independencia as $1,000 level sponsors. Support and coordinate regional outreach efforts including the facilitation of public event attendance and other local events that provide opportunities to engage with the public, including ideal opportunities for engaging with the Spanish speaking community; coordinate with Member Agencies on event attendance. • Outreach Communications, Development, and Implementation: Conduct outreach on behalf of member agencies to promote organization initiatives and address regulatory outreach requirements; presentations to outside organizations; support previous outreach campaign efforts and respond to inquiries and requests for information, including ADA services for online posted materials as needed. • Maximize RRWA participation by members, partners, and the public. • Undertake public outreach activities to encourage environmental stewardship and pollution prevention. • Website maintenance: Website updates will be made regularly, including general maintenance, posting of meeting dates, agendas and summaries, Russian River Friendly Landscape related materials and member agency public events. RRWA staff will oversee hosting responsibilities, including website backup, security, and feature upgrades. • Watershed Map: RRWA staff will maintain and update the online interactive map of the Russian River watershed including improving existing layers or adding additional layers as directed. • Maintain Social Media Presence: RRWA staff will maintain social media accounts to engage the online community. Social media accounts will promote environmental events, programs, and educational materials generated by both RRWA staff and by member agencies. Utilize existing stormwater outreach, RRWA website content, and RRFL resource library to create "edu-memes" (picture posts with succinct messaging) for Facebook, Instagram and for member usage. Assumes approximately 1 hour per week for developing and posting content and 1 hour per week for response to inquiries. Other direct costs (ODC) include ad placement costs. Provide two outreach performance metric updates. RRWA 2025-2026 Work Plan 9 Russian River Watershed Association 2025-2026 Work Plan N:\C\592\40-24-17\ENGR\A.3.E Deliverables B.1.A Outreach Communications, Development, and Implementation Respond to BOD & TWG requests to support watershed-wide initiatives as identified during the work plan year. Support previous outreach campaign efforts and respond to inquiries and requests for information; presentations to outside organizations; assistance to Sonoma Water on student video contest, including ADA services for online posted materials as needed. B.1.B Sponsorships and Events Sponsor clean-up events including $1,500 for Russian Riverkeeper cleanup, $500 for coastal cleanup, and $300 for Mendocino County cleanup; provide $1,000 for Daily Acts cobranding support; sponsor Steelhead Festival at $1,000 level; sponsor Fiesta de Independencia at $1,000 level; provide $500 for Mendocino County Earth Day; provide $300 for Cloverdale's La Familia Sana and/or Resilient Cloverdale; provide $1,000 for California Product Stewardship Council; and provide $1,100 for California Landscape Contractors Association. Support and coordinate regional outreach efforts including the facilitation of public event attendance and other local events that provide opportunities to engage with the public, including ideal opportunities for engaging with the Spanish speaking community; coordinate with Member Agencies on event attendance. Includes staffing at two tabling events. B.1.C Regional RRWA Program Outreach Coordination and Participation Preparation, planning, and participation in RRWA program Subcommittee meetings. Meeting frequency as directed by Subcommittees. Meeting preparation and deliverables include agendas and handouts. Participation by two staff members at all meetings. • Respond to inquiries and requests for use of Russian River Friendly Landscaping (RRFL) Guidelines. Continue enhancing/maintaining website library of RRFL materials. Maintain RRFL signage program in conjunction with RRFL subcommittee. Coordinate and facilitate residential and commercial outreach strategies for the program as directed by the RRFL subcommittee. • Regional coordination between member agencies and with program partners regarding efforts to oversee Stewardship Programs implemented by PhRMA in conjunction with Safe Medicine Disposal RRWA 2025-2026 Work Plan 10 Russian River Watershed Association 2025-2026 Work Plan N:\C\592\40-24-17\ENGR\A.3.E Subcommittee. Provide support services and outreach for events and campaign. • Support development of the RR watershed network as part of DWR's grant-funded RR Resiliency Plan managed by Sonoma Water. B.1.D. Website Maintenance Maintain website content such as posting of meeting dates, agendas and summaries, and updating content. ODC for 12-month website maintenance and technical support plan. B.1.E Watershed Map Maintain online interactive map of the Russian River watershed. Execute updates, such as improve existing layers or adding layer sources on map updates. ODC includes web map hosting. B.1.F. Social Media Maintain existing social media accounts. Create content and utilize existing outreach library to create "edu-memes." ODC includes ad placement costs. Provide outreach performance metric updates to TWG. Permit Requirements Addressed through Deliverables Phase I Permit Requirements VI.B.2.a.iii. Develop and implement an outreach program to residents on proper lawn care and water conservation practices. This outreach shall include proper pesticide/fertilizer application and the prevention of the discharge of pollutants to the storm drain through proper irrigation. VI.B.2.a.vi.Work with local watershed groups or committees to educate the public about stormwater pollution prevention. VI.B.2.a.vii. Organize or patriciate in events targeted to residents to educate and involve the community in stormwater and non-stormwater pollution prevention and cleanup. Phase II Permit Requirements E.8.(i) Involve the public in the implementation of activities related to the Public Involvement and Participation Program and encourage volunteerism and activism in the community. E.8(ii)(c) Create opportunities for citizens to participate in the implementation of BMPs through sponsoring activities. Budget The budget for this program is $156,667. ODC of $11,935 includes sponsorships of programs and special events, exclusive of in-kind services (see Attachment 1, Appendix B for budget spreadsheet). RRWA 2025-2026 Work Plan 11 Russian River Watershed Association 2025-2026 Work Plan N:\C\592\40-24-17\ENGR\A.3.E B.2 Russian River-Friendly Landscaping Event Purpose RRWA will continue to enhance the Russian River-Friendly Landscaping (RRFL) program targeting non-residential sites utilizing the strategies identified in past RRFL events for landscape professionals. The signage program for eligible landscapes that was initiated in 2014 will continue this Work Plan year. RRWA staff will maintain contact with industry professionals regarding use of the RRFL program, respond to inquiries, and maintain an email list of interested parties. Tasks Specific tasks and deliverables are as follows (Schedules for tasks are ongoing throughout the year unless otherwise specified): Coordinate and facilitate an in-person event as directed by and in conjunction with the RRFL subcommittee. Create RRFL materials supporting the event. ODC for speaker and facility fees and incidental event purchases. Deliverables B.2.A Event or Workshop Series for Landscape Professionals Coordinate and facilitate an in-person RRFL Biennial as directed by and in conjunction with the RRFL subcommittee. Create RRFL materials supporting Biennial Event. ODC for speaker and facility fees and incidental event purchases. Permit Requirements Addressed Through Deliverables Phase I Permit Requirement VI.C.2.a.iv. Educate industrial/commercial facilities with the objective of reducing pollutants in storm water runoff. Phase II Permit Requirement E.7.a.(ii)(g) Convey messages to explain the benefits of water-efficient and stormwater friendly landscaping. E.7.a.(ii)(c). Develop and convey stormwater messages that focus on local pollutants of concern and regional water quality issues. Budget The budget for this program is $29,019. ODC of $2,200 for speaker and facility fees and incidental event purchases (see Attachment 1, Appendix B for budget spreadsheet). RRWA 2025-2026 Work Plan 12 Russian River Watershed Association 2025-2026 Work Plan N:\C\592\40-24-17\ENGR\A.3.E B.3 Regulatory Forum and Advocacy Purpose The purpose of this program is to foster a system of communication by assessing RRWA member agency issues and developing a coordinated voice for regular dialogue on permitting and policy issues with regulatory agencies, such as the Regional Water Quality Control Board (RWQCB) and the State Water Resources Control Board (SWRCB). The work will include regular prioritization of member agency permitting and policy issues to be addressed at quarterly meetings with the RWQCB Executive Officer and staff. This program also allows for the completion of in-depth issue/comment/response letters to such agencies on behalf of RRWA member agencies. Tasks RRWA staff will coordinate and facilitate meetings with the RWQCB Executive Officer. Issues and topics for these meetings will be developed during TWG and BOD meetings. RRWA staff will take the lead on researching and crafting up to 12 comment letters. Specific tasks and deliverables are as follows (Schedules for tasks are ongoing throughout the year unless otherwise specified): • Research, Read, Review and Author Response Letters: At direction of the BOD or TWG, RRWA will research, compile viewpoint/opinion, write, review, prepare drafts, coordinate signatures and distribute up to 12 comment letters. Monitor member agency permitting and policy issues and coordinate responses of member agencies. Support agencies in the review of state and federal initiatives that may affect member agencies. • Presentation at Regional Board Meeting: RRWA executive director will present at one (1) RWQCB meeting with RRWA board officer(s) including meeting preparation, participation and travel time. • Biannual Meeting with Regional Board Executive Officer: RRWA will attend two (2) meetings and up to one contingency meeting per year with the RRWA BOD Chair and Vice Chair, and Regional Water Board executive staff to discuss current and relevant Russian River watershed priorities. RRWA will provide meeting facilitation including scheduling, draft agendas, meeting preparation, participation and travel time. Deliverables B.3.A Research, read, review & author response letters. Verbal comments as appropriate. Prioritization of issues and topics. Research, view-point/opinion compilation, writing, review, prepare drafts, coordinate signatures and distribution of up to 12 comment letters. Monitor member agency permitting and policy issues and Coordinate responses of member agencies. Support agencies in the review of state and federal initiatives that may affect member agencies. B.3.B Presentation at Regional Board meetings Annual presentation to RWQCB by Board of Directors Chair and Executive Director. The once-per-year presentation to RWQCB provides an overview of RRWA, information about the RRWA 2025-2026 Work Plan 13 Russian River Watershed Association 2025-2026 Work Plan N:\C\592\40-24-17\ENGR\A.3.E Russian River watershed, the regional collaboration achieved by RRWA members, and highlights the many successful RRWA programs. B.3.C Bi-annual meetings with Regional Board EO Two, and up to one contingency, meetings per year between RRWA BOD Chair and Vice- Chair, RWQCB Executive Officer and staff, and RRWA Executive Director including meeting preparation, participation, and travel time. Permit Requirements Addressed Through Deliverables Phase I & II Permit Requirements Proactive regulatory engagement and advocacy on behalf of member agencies can bring additional clarity to permit requirements, consistency and cost-effective implementation in the region, and potentially adjusted future pathways to compliance. Budget The budget for this program is $30,693. (see Attachment 1, Appendix B for budget spreadsheet). B.4 Regional Stormwater Program Support Purpose The purpose of this program is to provide support to member agencies with Phase I and II Municipal Separate Storm Sewer System (MS4) permits and to provide support for other regional efforts related to stormwater. Tasks The program will produce on the following tasks which are ongoing throughout the year if not otherwise specified: • Stormwater Activities Memorandum: RRWA staff will develop a Technical Memorandum (TM) that describes all stormwater related activities undertaken on behalf of the member agencies during the 2024-2025 fiscal year. This TM will be delivered to agencies at the end of August 2025, so agencies can incorporate the information into their annual reports for submittal to the RWQCB. • CASQA Group Membership: The RRWA will coordinate CASQA group membership including invoicing and managing the membership; subscription to the Industrial/Commercial and Construction BMP Manuals; and subscription to the Our Water Our World program. Includes four membership slots for RRWA staff. ODC includes group membership, centralized OWOW program administration. RRWA 2025-2026 Work Plan 14 Russian River Watershed Association 2025-2026 Work Plan N:\C\592\40-24-17\ENGR\A.3.E • Educational Placemats: RRWA staff will continue to provide partners with bilingual placemats and continue to seek out new partners throughout the watershed. Maintain metrics on distribution totals by location. ODC includes material costs. • Creek Week: RRWA staff will support Member Agencies in outreach efforts to engage the community to participate in Creek Week events; develop a landing page of Creek Week events happening through the watershed; link cleanup events on the interactive watershed atlas; adopt a Creek Week proclamation; provide a post-event metric report. Deliverables B.4.A Stormwater Activities Memorandum Develop Technical Memo describing all Stormwater related activities undertaken on behalf of member agencies during 2024-2025. Report delivered by the end of August 2025 for incorporation into Annual Reports. B.4.B CASQA Group Membership Coordinate CASQA group membership, including invoicing and managing the membership, subscription to the Industrial/Commercial and Construction Best Management Practice (BMP) Manuals, includes four membership slots for RRWA staff. Task also includes area-wide funding for centralized Our Water Our World (OWOW) program coordination and administration. ODCs are $13,750 for group membership and $8,250 for OWOW program administration, and $900 for BMP Manuals. B.4.C Educational Placemats Continue to provide partners with placemats, including bilingual placemats, update placemat as directed by the TWG, continue to seek out new partners throughout the watershed. B.4.D Creek Week Support Member Agencies in outreach efforts to engage the community to participate in Creek Week events; develop a landing page of Creek Week events happening through the watershed; link cleanup events on the interactive watershed atlas; adopt a Creek Week proclamation, provide a post-event metric report. RRWA 2025-2026 Work Plan 15 Russian River Watershed Association 2025-2026 Work Plan N:\C\592\40-24-17\ENGR\A.3.E Permit Requirements Addressed Through Deliverables Phase I Permit Requirement Support of regional watershed-wide collaboration. VI.B.1. Develop an outreach strategy that involves and engages communities within the Russian River watershed to participate in mitigating the impacts to stormwater pollution. VI.B.3.a.i. Develop age-appropriate educational materials to distribute to children for the purpose of promoting healthy watershed concepts. VI.B.2.a.i. Develop and distribute an “only rain down the drain” or similar themed campaign with the goal of providing general storm water pollution prevention education. VI.B.2.a.ii. Develop and distribute residential educational materials on the proper handling and disposal of waste including, pharmaceuticals, hazardous waste, trash, and green waste. VI.B.2.b. Maintain stormwater websites which include educational materials. VI.B.2.c. Educate and involve ethnic communities in stormwater pollution prevention. VI.B.2.a.v. Conduct stormwater pollution prevention public service announcements and advertising campaigns. VI.B.2.a.vii. Organize or patriciate in events targeted to residents to educate and involve the community in stormwater and non-stormwater pollution prevention and cleanup. VI.B.2.a.vi.Work with local watershed groups or committees to educate the public about stormwater pollution prevention. VI.B.3.a.iii. Identify interactive opportunities for children to learn about stormwater pollution prevention. Phase II Permit Requirement Support of regional watershed-wide collaboration. E.7.a.(ii)(c) Develop and convey stormwater messages that focuses on local pollutants of concern and regional water quality issues. E.7.a.(ii)(d) Develop and disseminate appropriate educational materials to target audiences and translate into applicable languages. E.8.(i) Involve the public in the implementation of activities related to the Public Involvement and Participation Program and encourage volunteerism and activism in the community. RRWA 2025-2026 Work Plan 16 Russian River Watershed Association 2025-2026 Work Plan N:\C\592\40-24-17\ENGR\A.3.E Budget The budget for this program is $49,598. ODC of $26,950, includes CASQA group membership (including four membership slots for RRWA staff), Our Water Our World program administration funding, BMP manuals, and placemat printing, exclusive of in-kind services (see Attachment 1, Appendix B for budget spreadsheet). C. SPECIAL BENEFIT PROJECTS C.1 Phase 1 Permit Renewal Purpose The purpose of this program is to provide collaborative program implementation support for the Phase I Permit. This project may include preparing and administering a Request for proposals (RFP) to update the Stormwater Low Impact Development Manual and calculator and issuing an RFP for developing a monitoring workplan. No subconsultant costs are included. Tasks Specific tasks and deliverables are as follows (Schedules for tasks are ongoing throughout the year unless otherwise specified): • May include preparing and administering an RFP to update the Stormwater Low Impact Development Manual and calculator and issuing an RFP for developing a monitoring workplan. Deliverables C.1.A Phase 1 Permit: General Support Support TWG with preparing and administering an RFP to update to the Stormwater Low Impact Development (LID) Manual and calculator as directed by the TWG. Placeholder to be used as needed. Efforts include meeting to identify the scope, creating a draft RFP, receiving and addressing TWG comments, identifying consultants and clearinghouses for the solicitation, issuing the RFP, fielding questions, issuing addendums, receiving the proposals and transmitting them to the TWG. RRWA 2025-2026 Work Plan 17 Russian River Watershed Association 2025-2026 Work Plan N:\C\592\40-24-17\ENGR\A.3.E Permit Requirements Addressed through Deliverables Phase I Permit Requirements VI.A.4. The permit allows Co-Permittees to work collaboratively to implement the requirements of the permit wherever such opportunities exist. Co-Permittees are encouraged to seek out collaborative opportunities. Co-Permittee meetings provide support for coordinating collaboration. Phase II Permit Requirements Not applicable. Budget The budget for this program is $27,486 for participating agencies, exclusive of in-kind services (see Attachment 1, Appendix C for budget spreadsheet). C.2 Phase I Child Outreach Plan | Ukiah and Sonoma County Purpose The purpose of this program is to undertake public outreach activities to school age children to encourage environmental stewardship and pollution prevention and support Co-Permittees with developing a collection of outreach materials to address outreach requirements of the Phase 1 MS4 Permit. Tasks Coordinate Ukiah and County of Sonoma’s participation in Sonoma Water’s Water Education Program; includes coordinating with Sonoma Water to set up the program and assistance with soliciting participation to local schools. Deliverables C.2.A Water Education Program Coordination Coordinate Ukiah and County of Sonoma’s participation in Sonoma Water’s Water Education Program; includes contract administration, coordinating with Sonoma Water to set up the program, and assistance with soliciting participation to local schools. ODC includes contract cost at $10,000 (not to exceed) per participating agency. Labor hours are based off prior year's efforts. RRWA 2025-2026 Work Plan 18 Russian River Watershed Association 2025-2026 Work Plan N:\C\592\40-24-17\ENGR\A.3.E Permit Requirements Addressed through Deliverables Phase I Permit Requirement VI.B.3. Develop a Children Outreach Program to provide school aged children (K-12) with educational information on storm water pollution. VI.B.3.a.i. Develop age-appropriate educational materials to distribute to children for the purpose of promoting healthy watershed concepts. VI.B.3.a.iii. Identify interactive opportunities for children to learn about stormwater pollution prevention. Phase II Permit Requirement E.7.a.(ii)(c). Develop and convey stormwater messages that focus on local pollutants of concern and regional water quality issues. E.7.a.(ii)(j) Provide schools with materials to effectively educate school-age children about stormwater runoff. Budget The budget for this program is $24,347, including OCD of $22,000 for sub-consultant services, exclusive of in-kind services. (see Attachment 1, Appendix C for budget spreadsheet). C.3 Regional Our Water Our World Contract Purpose The purpose of this program is to manage a contract with a private contractor implementing the Our Water Our World (OWOW) program to retail nurseries throughout the watershed. The contractor will continue coordination and implementation of integrated pest management education and outreach at retailers and public center locations to reduce residential use of harmful pesticides, herbicides, and fertilizers. Tasks RRWA will manage the regional contract for OWOW to coordinate and implement pesticide- related education and outreach at nurseries. RRWA 2025-2026 Work Plan 19 Russian River Watershed Association 2025-2026 Work Plan N:\C\592\40-24-17\ENGR\A.3.E Deliverables C.3.A Regional Our Water Our World Program Implementation Coordinate agency participation in the regional OWOW program which implements pesticide, herbicide, and fertilizer-related education and outreach at nurseries and hardware stores. The OWOW program provides outreach to the public and training for retail staff to educate on less toxic products and practices. There are currently nine locations participating in the program through RRWA within the participating agencies' geographical boundaries. ODC includes contract cost. Labor hours include contract administration, program oversight, event promotion, material ordering, and optimizing unified messaging with other RRWA programs. Printing costs and purchase of other promotional supplies are not included but may be purchased if budget is available. Permit Requirement Addressed by Deliverable Phase I Permit Requirement VI.B.2.a.ii.d Develop and distribute residential educational materials on the proper handling and disposal of pesticides and fertilizers waste. VI.B.2.a.iii. Develop and distribute proper pesticide/fertilizer application and the prevention of the discharge of pollutants to the storm drain through proper irrigation. Phase II Permit Requirement E.7.a.(ii)(c) Develop and convey stormwater messages that focus on local pollutants of concern, target audience, and regional water quality issues. E.7.a.(ii)(i). Develop and convey messages specific to proper application of pesticides, herbicides, and fertilizers. Budget The budget for this program is $25,632 including ODC of $19,250 for sub-consultant services, exclusive of in-kind services (see Attachment 1, Appendix C for budget spreadsheet). RRWA 2025-2026 Work Plan 20 Russian River Watershed Association 2025-2026 Work Plan N:\C\592\40-24-17\ENGR\A.3.E C.4 Sonoma State WATERS Project Purpose The purpose of this task is to develop and implement a project that utilizes an evolving University-Agency partnership to explore urban and rural creek water quality. Tasks In partnership with Sonoma State University (SSU), Sonoma Water, and Santa Rosa, sponsor and support the ongoing project as part of the Watershed Academics to Enhance Regional Sustainability (WATERS) program. The program will include refocused themes for input and feedback by EPIC and TWG forums and eventual presentation to the BOD. Deliverables C.4.A Sonoma State WATERS Project In partnership with Sonoma State University (SSU), Sonoma Water, and Santa Rosa, sponsor and support the ongoing project as part of the Watershed Academics to Enhance Regional Sustainability (WATERS) program. The program will include refocused themes for input and feedback by EPIC and TWG forums and eventual presentation to the BOD. ODC includes contract cost. Permit Requirement Addressed by Deliverable Phase I Permit Requirement Support of regional watershed-wide collaboration Phase II Permit Requirement Support of regional watershed-wide collaboration. Budget The budget for this program is $27,883 including OCD of $19,250 for sub-consultant services, exclusive of in-kind services. ODC includes contract cost (see Attachment 1, Appendix C for budget spreadsheet). C.5 to C.8 Streets to Creeks Purpose The purpose of this project is to undertake public outreach activities to encourage environmental stewardship and pollution prevention. RRWA 2025-2026 Work Plan 21 Russian River Watershed Association 2025-2026 Work Plan N:\C\592\40-24-17\ENGR\A.3.E Tasks Support further development of the Streets to Creeks outreach campaign and campaign material; incorporate outreach material into RRWA materials and social media; administer vendor payment and campaign content when needed. Deliverables C.5.A Streets to Creeks Administration Facilitate and administer Street to Creeks contract. ODC includes contract cost. C.6.A Streets to Creeks Campaign 1 Support further development of the Streets to Creeks outreach campaign; incorporate outreach material into RRWA materials and social media. C.7.A Streets to Creeks Campaign 2 Support further development of the Streets to Creeks outreach campaign and campaign material; incorporate customized outreach material into RRWA materials and social media. Customized outreach material examples include, but are not limited to, trash focused outreach and/or other messaging around pollutants of concern. ODC includes vendor fees. C.8.A Streets to Creeks Promotional Items Facilitate ordering promotional items for tabling events. Permit Requirements Addressed by Deliverables Phase I Permit Requirement VI.B.1. Develop an outreach strategy that involves and engages communities within the Russian River watershed to participate in mitigating the impacts to stormwater pollution. VI.B.2.a.i. Develop and distribute an "only rain down the drain" campaign with the goal of providing general stormwater pollution prevention education. VI.B.2.a.vii. Organize or patriciate in events targeted to residents to educate and involve the community in stormwater and non-stormwater pollution prevention and cleanup. VI.B.2.a.v. Conduct stormwater pollution prevention public service announcements and advertising campaigns. VI.B.2.a.vi.Work with local watershed groups or committees to educate the public about stormwater pollution prevention. RRWA 2025-2026 Work Plan 22 Russian River Watershed Association 2025-2026 Work Plan N:\C\592\40-24-17\ENGR\A.3.E Phase II Permit Requirement E.7.a.(ii)(c). Develop and convey stormwater messages that focus on local pollutants of concern and regional water quality issues. E.7.a.(ii)(d) Develop and disseminate appropriate educational materials to target audiences and translate into applicable languages. Budget The budget for this program is $120,123 exclusive of in-kind services. ODC includes vendor fees and promotional items (see Attachment 1, Appendix C for budget spreadsheet). C.9 Grant Support Purpose The purpose of this program is to support grant funding opportunities for member agency and regional projects. Research and report upcoming funding opportunities. Tasks RRWA staff will research and report upcoming watershed related funding opportunities and support member agency grant funded projects. Deliverables C.9.A Grant Support and Advocacy Support grant funding opportunities for member agency projects and regional projects. Research and report upcoming funding opportunities. Permit Requirement Addressed Through Deliverable Phase I Permit Requirement Not applicable. Phase II Permit Requirement Not applicable Budget The budget for this program is $17,706 (see Attachment 1, Appendix C for budget spreadsheet). RRWA 2025-2026 Work Plan 23 Russian River Watershed Association 2025-2026 Work Plan N:\C\592\40-24-17\ENGR\A.3.E C.10 Operators Forum Purpose The purpose of this project is to support TWG’s management of and implantation of a wastewater treatment operators’ forum in which staff from treatment facilities convene for regional information sharing and to identify potential cost saving measures. Tasks RRWA staff will support TWG in their convening of up to two Operator’s Forums. Deliverables C.10.A Operators Forum Support Support ongoing Wastewater Operators' Forum for regional facilities. Support TWG's management and implementation to convene a bi-annual working group comprised of wastewater operation staff to tour local treatment facilities, network, and identify potential cost saving measures through regional information sharing. Staff time includes event facilitation assistance and participation. ODC includes food costs and event materials. Forum attendance by up to two staff members. Permit Requirement Addressed Through Deliverable Phase I Permit Requirement Not applicable. Phase II Permit Requirement Not applicable Budget The budget for this program is $9,844 exclusive of in-kind services. ODC includes $550 for purchasing food for operators (see Attachment 1, Appendix C for budget spreadsheet). APPENDIX A: 2025-2026 RRWA Work Plan - Master Budget - Adopted February 27, 2025 RRWA Staff Subs and ODCs Total Budget Cloverdale Cotati Healdsburg Santa Rosa Sebastopol Ukiah Mendocino County Sonoma County Sonoma Water Windsor Total Allocation A-Executive Director Services A.1 Board of Directors $33,146 $0 $33,146 $2,003 $1,910 $2,207 $5,468 $1,950 $2,368 $2,291 $9,095 $3,465 $2,388 $33,146 A.2 Member Agency Staff $45,466 $0 $45,466 $2,748 $2,619 $3,027 $7,500 $2,675 $3,249 $3,142 $12,476 $4,754 $3,276 $45,466 A.3 General Administration $90,737 $30,250 $120,987 $7,311 $6,970 $8,055 $19,959 $7,119 $8,645 $8,362 $33,199 $12,649 $8,718 $120,987 $169,349 $30,250 $199,599 $12,062 $11,499 $13,289 $32,927 $11,744 $14,263 $13,795 $54,770 $20,868 $14,382 $199,599 B-General Benefit Projects B.1 Outreach Strategies $144,732 $11,935 $156,667 $9,467 $9,026 $10,431 $25,845 $9,218 $11,195 $10,828 $42,989 $16,380 $11,289 $156,667 B.2 Russian River Friendly Landscaping Event $26,819 $2,200 $29,019 $1,754 $1,672 $1,932 $4,787 $1,707 $2,074 $2,006 $7,963 $3,034 $2,091 $29,019 B.3 Regulatory Forum and Advocacy $30,693 $0 $30,693 $1,855 $1,768 $2,044 $5,063 $1,806 $2,193 $2,121 $8,422 $3,209 $2,212 $30,693 B.4 Regional Stormwater Program Support $22,648 $26,950 $49,598 $2,997 $2,857 $3,302 $8,182 $2,918 $3,544 $3,428 $13,610 $5,186 $3,574 $49,598 $224,892 $41,085 $265,977 $16,073 $15,323 $17,709 $43,877 $15,649 $19,006 $18,383 $72,984 $27,808 $19,165 $265,977 C-Special Benefit Projects C.1 Phase 1 Permit Renewal $27,486 $0 $27,486 $3,054 $3,054 $3,054 $3,054 $3,054 $3,054 $0 $3,054 $3,054 $3,054 $27,486 C.2 Phase I Child Outreach Plan $2,347 $22,000 $24,347 $0 $0 $0 $0 $0 $12,174 $0 $12,174 $0 $0 $24,347 C.3 Regional Our Water Our World Contract $6,382 $19,250 $25,632 $3,662 $0 $3,662 $0 $0 $3,662 $3,662 $3,662 $3,662 $3,662 $25,632 C.4 Sonoma State WATERS Project $8,633 $19,250 $27,883 $2,051 $1,967 $2,232 $5,138 $0 $2,376 $0 $8,370 $3,354 $2,394 $27,883 C.5 Streets to Creeks Administration $1,909 $16,500 $18,409 $1,841 $1,841 $1,841 $1,841 $1,841 $1,841 $1,841 $1,841 $1,841 $1,841 $18,409 C.6 Streets to Creeks Campaign 1 $1,020 $6,160 $7,180 $0 $2,817 $0 $0 $0 $0 $4,363 $0 $0 $0 $7,180 C.7 Streets to Creeks Campaign 2 $14,847 $68,640 $83,487 $6,138 $0 $6,680 $15,358 $5,997 $7,110 $0 $25,010 $10,029 $7,163 $83,487 C.8 Streets to Creeks Promotional Items $1,437 $9,610 $11,047 $812 $779 $884 $2,036 $0 $941 $0 $3,316 $1,329 $948 $11,047 C.9 Grant Support $17,706 $0 $17,706 $0 $0 $0 $5,902 $0 $0 $0 $0 $5,902 $5,902 $17,706 C.10 Operators' Forum $9,294 $550 $9,844 $1,969 $0 $0 $1,969 $0 $1,969 $0 $0 $1,969 $1,969 $9,844 $91,061 $161,960 $253,021 $19,527 $10,459 $18,354 $35,298 $10,892 $33,127 $9,865 $57,426 $31,139 $26,933 $253,021 RRWA Total for FY 2025-2026 $485,302 $233,295 $718,597 $47,661 $37,281 $49,351 $112,102 $38,286 $66,396 $42,043 $185,180 $79,816 $60,481 $718,597 Allocation Notes: C.1: Divided evenly between all member agencies except Mendocino County C.2: Divided evenly between Ukiah and Sonoma County C.3: Divided evenly between Cloverdale, Healdsburg, Ukiah, Mendocino County, Sonoma County, Sonoma Water, and Windsor C.4: 50% of the total budget divided evenly between all member agencies except Sebastopol and Mendocino County plus 50% of the total budget times the total operating budget percentages assigned to each agency excluding Sebastopol and Mendocino County C.5: Divided evenly between all member agencies C.6: 50% of the total budget divided evenly between Cotati and Mendocino County plus 50% of the total budget times the total operating budget percentages assigned to Cotati and Mendocino County C.7: 50% of the total budget divided evenly between all member agencies except Cotati and Mendocino County plus 50% of the total budget times the total operating budget percentages assigned to each agency excluding Cotati and Mendocino County C.8: 50% of the total budget divided evenly between all member agencies except Sebastopol and Mendocino County plus 50% of the total budget times the total operating budget percentages assigned to each agency excluding Sebastopol and Mendocino County C.9: Divided evenly between Santa Rosa, Sonoma Water, and Windsor C.10: Divided evenly between Cloverdale, Santa Rosa, Ukiah, Sonoma Water, and Windsor C A S H R E Q U I R E M E N T C A S H A L L O C A T I O N Russian River Watershed Association 2025-2026 Work Plan Adopted February 27, 2025 Last Revised 2-19-2025 APPENDIX A: 2025-2026 RRWA Work Plan Executive Director Services - Adopted February 27, 2025 Executive Director Project Manager Technical Support Program Specialist Program Support Total Hours Total Labor Costs Sub/ODC Markup Other Direct Costs (ODCs)Cash Totals $369 $317 $255 $224 $185 10.0% A.1 Board of Directors 36 34 4 36 0 110 $33,146 $0 $0 $33,146 A Board of Directors (BOD) Coordination & Meeting Participation 30 28 0 28 0 86 $26,218 $0 $0 $26,218 Prepare and plan Board of Directors (BOD) meeting presentations, agendas, guest speaker coordination, handouts, and minutes. Assumes four, 2-hour in-person BOD meetings per year or the equivalent. Participation by Executive Director (ED) and one staff member at all meetings. B BOD Field Trip 6 6 4 8 0 24 $6,928 $0 $0 $6,928 Planning, presentations, guest speakers, handouts, and logistics for a field trip event. Assumes one half-day event during the work plan year as directed by the BOD. Participation by ED and two staff members. A.2 Member Agency Staff 40 54 12 47 0 153 $45,466 $0 $0 $45,466 A Executive Programs & Initiatives Committee (EPIC) Coordination & Meeting Participation 12 20 0 15 0 47 $14,128 $0 $0 $14,128 Prepare and plan EPIC meetings. Up to four, one-hour meetings per year. Meeting preparation and deliverables include agendas, handouts, and summary of action and discussion items. Meeting summaries will also be provided to Technical Working Group (TWG). Participation by two staff members at all meetings. B Technical Working Group (TWG) Coordination & Meeting Participation 28 34 12 32 0 106 $31,338 $0 $0 $31,338 Prepare and plan TWG presentations, agendas, handouts, and summary notes. Two optional hybrid and two virtual 2-hour TWG meetings per year. Hybrid meetings to be in April and October. Meetings structured to discuss the workplan project tasks in detail with focus on task scoping, progress reporting (metrics, dates, % complete, etc.), completed milestones, and cost reporting. Participation by up to two staff members at all meetings. A.3 General Administration 42 79 72 119 28 340 $90,737 $2,750 $27,500 $120,987 A General Association Communications 15 25 10 80 0 130 $33,930 $0 $0 $33,930 General communication (e-mails, phone calls etc.), mailing and distribution lists, and miscellaneous coordination activities. Coordination with partner agencies such as Resource Conservation Districts, Land Paths, Laguna Foundation, Resources Legacy Fund, Occidental Arts and Ecology Center, Russian Riverkeeper, Tribes, Russian River Watershed Coalition, Sonoma County Regional Climate Protection Authority, Respect Russian River, Russian River Confluence, SMART, Tribes, and The Great Redwood Trail Agency. Promote fundraising events and resources for entities that implement programs supporting member agency objectives. Respond to inquiries from members and potential new members. B Project Management and Controls 6 24 22 30 0 82 $22,152 $600 $6,000 $28,752 Budget tracking, internal process meetings, quarterly financial progress reports, and invoicing. $6,000 ODC to Administrative Agency (City of Ukiah) for their time administering the contract and processing invoices. C Legal Services 1 2 0 1 0 4 $1,227 $400 $4,000 $5,627 At the direction of the BOD, and if an independent third-party review is needed. Obtain as- needed contracted legal services review of Agreement with potential grantor, new members or other need. Placeholder to be used as needed. ODC includes contract cost. D Strategic Plan 8 8 0 0 28 44 $10,668 $1,750 $17,500 $29,918 Conclude previous year's planning efforts and begin implementation of the three-year RRWA strategic plan. Provide EPIC and TWG progress updates at regular meetings during the year. Efforts include preparing draft documents, facilitating EPIC, TWG, and BOD comments, follow- up communications and meeting scheduling. E Coordinate and Develop the 2026-27 Work Plan 12 20 40 8 0 80 $22,760 $0 $0 $22,760 Coordinate and develop 2026-2027 Work Plan and budget. Provide New Board Member orientations. Executive Director Services Totals 118 167 88 202 28 603 $169,349 $2,750 $27,500 $199,599 RRWA STAFF/ CONSULTANT SERVICES Assumptions/Comments Russian River Watershed Association 2025-2026 Work Plan Adopted February 27, 2025 Last Revised 2-19-2025 APPENDIX B: 2025-2026 RRWA Work Plan General Benefit Projects - Adopted February 27, 2025 Executive Director Project Manager Technical Support Program Specialist Program Support Total Hours Total Labor Costs Sub/ODC Markup Other Direct Costs (ODCs)Cash Totals $369 $317 $255 $224 $185 10.0% B.1 Outreach Strategies 66 79 106 205 121 577 $144,732 $1,085 $10,850 $156,667 A Outreach Communications, Development, and Implementation 12 50 40 48 5 155 $42,155 $0 $0 $42,155 Respond to BOD & TWG requests to support watershed-wide initiatives as identified during the work plan year. Support previous outreach campaign efforts and respond to inquiries and requests for information; presentations to outside organizations; assistance to Sonoma Water on student video contest, including ADA services for online posted materials as needed. B Sponsorships and Events 8 17 44 22 0 91 $24,489 $820 $8,200 $33,509 Sponsor clean-up events including $1,500 for Russian Riverkeeper cleanup, $500 for coastal cleanup, and $300 for Mendocino County cleanup; provide $1,000 for Daily Acts cobranding support; sponsor Steelhead Festival at $1,000 level; sponsor Fiesta de Independencia at $1,000 level; provide $500 for Mendocino County Earth Day; provide $300 for Cloverdale's La Familia Sana and/or Resilient Cloverdale; provide $1,000 for California Product Stewardship Council; and provide $1100 for California Landscape Contractors Association. Support and coordinate regional outreach efforts including the facilitation of public event attendance and other local events that provide opportunities to engage with the public, including ideal opportunities for engaging with the Spanish speaking community; coordinate with Member Agencies on event attendance. Includes staffing at two tabling events. C Regional RRWA Program Outreach Coordination and Participation 44 4 10 71 18 147 $39,288 $0 $0 $39,288 Prepare, plan, and participate in RRWA Program Advisory Committee (PAC) meetings. Meeting frequency as directed by PAC. Meeting preparation and deliverables include agendas and handouts. Participation by two staff members at all meetings. • Respond to inquiries and requests for use of Russian River Friendly Landscaping (RRFL) Guidelines. Continue enhancing/maintaining website library of RRFL materials. Maintain RRFL signage program in conjunction with RRFL PAC. Coordinate and facilitate residential and commercial outreach strategies for the program as directed by the RRFL PAC. • Regional coordination between member agencies and with program partners regarding efforts to oversee Stewardship Programs implemented by PhRMA in conjunction with the Safe Medicine Disposal PAC. Provide support services and outreach for events and campaigns. • Support development of the RR watershed network as part of DWR's grant-funded RR Resiliency Plan managed by Sonoma Water. D Website Maintenance 0 2 0 12 28 42 $8,502 $90 $900 $9,492 Maintain website content such as posting of meeting dates, agendas and summaries, and updating content. ODC for 12-month website maintenance and technical support plan. E Watershed Map 0 2 0 32 0 34 $7,802 $75 $750 $8,627 Maintain online interactive map of the Russian River watershed. Execute updates, such as improve existing layers or adding layer sources on map updates. ODC includes web map hosting. F Social Media 2 4 12 20 70 108 $22,496 $100 $1,000 $23,596 Maintain existing social media account(s) to engage online community and to promote events, programs, projects, and member agency content. Create content and utilize existing stormwater outreach library to create "edu-memes" (picture posts with succinct messaging) for Facebook and for member usage. Assumes approximately 1 hour per week for posting content and 1 hour per week for response to inquiries as needed. $1,000 ODC includes ad placement costs. Provide outreach performance metric updates to TWG. RRWA STAFF/ CONSULTANT SERVICES Assumptions/Comments Russian River Watershed Association 2025-2026 Work Plan Adopted February 27, 2025 Last Revised 2-19-2025 Executive Director Project Manager Technical Support Program Specialist Program Support Total Hours Total Labor Costs Sub/ODC Markup Other Direct Costs (ODCs)Cash Totals $369 $317 $255 $224 $185 10.0% RRWA STAFF/ CONSULTANT SERVICES Assumptions/Comments B.2 Russian River Friendly Landscaping Event 14 4 12 60 21 111 $26,819 $200 $2,000 $29,019 A Event for Landscape Professionals 14 4 12 60 21 111 $26,819 $200 $2,000 $29,019 Coordinate and facilitate an in-person event as directed by and in conjunction with the RRFL PAC. Create RRFLG materials supporting the event. ODC for speaker and facility fees and incidental event purchases.Topics would include stormwater management, tree care during turf replacement, LID maintenance, weed management, integrated pest management, and soil health. B.3 Regulatory Forum and Advocacy 32 13 0 56 12 113 $30,693 $0 $0 $30,693 A Research, read, review, & author response letters. Verbal comments as appropriate. 16 4 0 44 12 76 $19,248 $0 $0 $19,248 Research, view-point/opinion compilation, writing, review, prepare drafts, coordinate signatures and distribution of up to 12 comment letters. Monitor member agency permitting and policy issues and Coordinate responses of member agencies. Support agencies in the review of state and federal initiatives that may affect member agencies. B Presentation at Regional Board Meeting 7 0 0 6 0 13 $3,927 $0 $0 $3,927 Coordinate and prepare annual presentation to RWQCB by Board of Directors Chair and Executive Director. The once-per-year presentation to RWQCB provides an overview of RRWA, information about the Russian River watershed, the regional collaboration achieved by RRWA members, and highlights the many successful RRWA programs. C Bi-annual Meeting with Regional Board Executive Officer 9 9 0 6 0 24 $7,518 $0 $0 $7,518 Two meetings and up to one contingency meeting per year between RRWA BOD Chair and Vice-Chair, RWQCB Executive Officer and staff, and RRWA Executive Director including meeting preparation, participation, and travel time. B.4 Regional Stormwater Program Support 1 14 0 59 25 99 $22,648 $2,450 $24,500 $49,598 A Stormwater Activities Memorandum 1 10 0 6 0 17 $4,883 $0 $0 $4,883 Develop Technical Memo describing all Stormwater related activities undertaken on behalf of member agencies during the 2024-2025 Fiscal Year. Report delivered by the end of August 2025 for incorporation into Annual Reports. B CASQA Group Membership 0 2 0 12 0 14 $3,322 $2,290 $22,900 $28,512 Coordinate CASQA group membership, including invoicing and managing the membership, subscription to the Industrial/Commercial and Construction Best Management Practice (BMP) Manuals, includes four membership slots for RRWA staff. Task also includes area-wide funding for centralized Our Water Our World (OWOW) program coordination and administration. ODCs are $13,750 for group membership and $8,250 for OWOW program subscription fee, and $900 for BMP Manuals. C Educational Placemats 0 0 0 25 25 50 $10,225 $160 $1,600 $11,985 Continue to provide partners with bilingual placemats and continue to seek out new partners throughout the watershed. Maintain metrics on distribution totals by location. ODC includes material costs. D Creek Week 0 2 0 16 0 18 $4,218 $0 $0 $4,218 Support Member Agencies in outreach efforts to engage the community to participate in Creek Week events; develop a landing page of Creek Week events happening through the watershed; link cleanup events on the interactive watershed atlas; adopt a Creek Week proclamation, provide a post-event metric report. TOTAL General Benefit Projects 113 110 118 380 179 900 $224,892 $3,735 $37,350 $265,977 Russian River Watershed Association 2025-2026 Work Plan Adopted February 27, 2025 Last Revised 2-19-2025 APPENDIX C: 2025-2026 RRWA Work Plan Special Benefit Projects - Adopted February 27, 2025 Executive Director Project Manager Technical Support Project Specialist Program Support Total Hours Total Labor Costs Sub/ODC Markup Other Direct Costs (ODCs)Cash Totals $369 $317 $255 $224 $185 10.0% C.1 Phase 1 Permit Renewal Cloverdale, Healdsburg, Santa Rosa, Ukiah, Sebastopol, Sonoma County, Sonoma Water, Cotati, Windsor 4 30 56 0 12 102 $27,486 $0 $0 $27,486 A Phase 1 Permit: General Support 4 30 56 0 12 102 $27,486 $0 $0 $27,486 At the direction of the TWG, provide collaborative program implementation support for the Phase I Permit. This project may include preparing and administering an RFP to update the Stormwater Low Impact Development Manual and calculator and issuing an RFP for developing a monitoring workplan. No subconsultant costs are included. C.2 Phase I Child Outreach Plan Ukiah, Sonoma County 1 2 0 6 0 9 $2,347 $2,000 $20,000 $24,347 A Water Education Program Coordination 1 2 0 6 0 9 $2,347 $2,000 $20,000 $24,347 Coordinate Ukiah, and County of Sonoma’s participation in Sonoma Water’s Water Education Program; includes contract administration, coordinating with Sonoma Water to set up the program, and assistance with soliciting participation to local schools. ODC includes contract cost at $10,000 (not to exceed) per participating agency. C.3 Regional Our Water Our World Contract Cloverdale, Healdsburg, Ukiah, Mendocino County, Sonoma County, Sonoma Water, Windsor 0 6 0 20 0 26 $6,382 $1,750 $17,500 $25,632 A Regional Our Water Our World Program Implementation 0 6 0 20 0 26 $6,382 $1,750 $17,500 $25,632 Coordinate agency participation in the regional OWOW program which implements pesticide, herbicide, and fertilizer-related education and outreach at nurseries and hardware stores. The OWOW program provides outreach to the public and training for retail staff to educate on less toxic products and practices. There are currently nine locations participating in the program through RRWA within the participating agencies' geographical boundaries. ODC includes contract cost. Labor hours include contract administration, program oversight, event promotion, material ordering, and optimizing unified messaging with other RRWA programs. Printing costs and purchase of other promotional supplies are not included, but may be purchased if budget is available. C.4 Sonoma State WATERS Project Cloverdale, Healdsburg, Santa Rosa, Ukiah, Sonoma County, Sonoma Water, Cotati, Windsor 6 2 0 25 1 34 $8,633 $1,750 $17,500 $27,883 A Sonoma State WATERS Project 6 2 0 25 1 34 $8,633 $1,750 $17,500 $27,883 In partnership with Sonoma State University (SSU), Sonoma Water, and Santa Rosa, sponsor and support the ongoing project as part of the Watershed Academics to Enhance Regional Sustainability (WATERS) program. ODC includes contract cost. The program will include refocused themes for input and feedback by EPIC and TWG forums and eventual presentation to the BOD. RRWA STAFF/ CONSULTANT SERVICES Assumptions/Comments Russian River Watershed Association 2025-2026 Work Plan Adopted February 27, 2025 Last Revised 2-19-2025 Executive Director Project Manager Technical Support Project Specialist Program Support Total Hours Total Labor Costs Sub/ODC Markup Other Direct Costs (ODCs)Cash Totals $369 $317 $255 $224 $185 10.0% RRWA STAFF/ CONSULTANT SERVICES Assumptions/Comments C.5 Streets to Creeks Administration All RRWA Members 0 2 5 0 0 7 $1,909 $1,500 $15,000 $18,409 A Streets to Creeks Administration 0 2 5 0 0 7 $1,909 $1,500 $15,000 $18,409 Facilitate and administer Street to Creeks vendor payment. ODC includes vendor fees. C.6 Streets to Creeks Campaign 1 Cotati, Mendocino County 0 1 1 2 0 4 $1,020 $560 $5,600 $7,180 A Streets to Creeks Campaign 1 0 1 1 2 0 4 $1,020 $560 $5,600 $7,180 Support further development of the Streets to Creeks outreach campaign and campaign material; incorporate outreach material into RRWA materials and social media. ODC includes vendor fees. C.7 Streets to Creeks Campaign 2 Cloverdale, Healdsburg, Santa Rosa, Sebastopol, Ukiah, Sonoma County, Sonoma Water, Windsor 3 15 25 10 2 55 $14,847 $6,240 $62,400 $83,487 A Streets to Creeks Campaign 2 3 15 25 10 2 55 $14,847 $6,240 $62,400 $83,487 Support further development of the Streets to Creeks outreach campaign and campaign material; incorporate customized outreach material into RRWA materials and social media. Customized outreach material examples include, but are not limited to, trash focused outreach and/or other messaging around pollutants of concern. ODC includes vendor fees. C.8 Streets to Creeks Promotional Items Cloverdale, Cotati, Healdsburg, Santa Rosa, Ukiah, Sonoma County, Sonoma Water, Windsor 0 1 0 5 0 6 $1,437 $874 $8,736 $11,047 A Streets to Creeks Promotional Items 0 1 0 5 0 6 $1,437 $874 $8,736 $11,047 Support ordering promotional items for tabling events. ODC includes vendor fees for promotional items. C.9 Grant Support Sonoma Water, Santa Rosa, Windsor 4 18 36 6 0 64 $17,706 $0 $0 $17,706 A Grant Support and Advocacy 4 18 36 6 0 64 $17,706 $0 $0 $17,706 Support grant funding opportunities for member agency projects and regional projects. Research and report upcoming funding opportunities. C.10 Operators' Forum Sonoma Water, Santa Rosa, Ukiah, Windsor, Cloverdale 0 2 18 0 22 42 $9,294 $50 $500 $9,844 A Operators' Forum Support 0 2 18 0 22 42 $9,294 $50 $500 $9,844 Support ongoing Wastewater Operators' Forum for regional facilities. Support TWG's management and implementation to convene a bi-annnual working group comprised of wastewater operation staff to tour local treatment facilities, network, and identify potential cost saving measures through regional information sharing. Staff time includes event facilitation assisstance and participation. ODC includes food costs and event materials. Forum attendence by up to two staff members. TOTAL Special Benefit Projects 18 79 141 74 37 349 $91,061 $14,724 $147,236 $253,021 Russian River Watershed Association 2025-2026 Work Plan Adopted February 27, 2025 Last Revised 2-19-2025 (Effective January 1, 2025, through December 31, 2025)* POSITIONS ENGINEERING Principal/Vice President $373 Engineer/Scientist/Geologist Manager I / II $352 /$369 Principal Engineer/Scientist/Geologist I / II $317 /$338 Senior Engineer/Scientist/Geologist I / II $286 /$300 Associate Engineer/Scientist/Geologist I / II $237 /$255 Engineer/Scientist/Geologist I / II / III $185 /$215 /$224 Engineering Aide $111 Field Monitoring Services $138 Administrative I / II / III / IV $102 /$127 /$152 /$168 ENGINEERING TECHNOLOGY Engineering Tech Manager I / II $366 /$369 Principal Tech Specialist I / II $336 /$348 Senior Tech Specialist I / II $308 /$321 Senior GIS Analyst $278 GIS Analyst $264 Technical Specialist I / II / III / IV $196 /$224 /$251 /$280 Technical Analyst I / II $141 /$168 Technical Analyst Intern $113 Cross-Connection Control Specialist I / II / III / IV $147 /$159 /$179 /$198 CAD Manager $222 CAD Designer I / II $172 /$194 CONSTRUCTION MANAGEMENT Senior Construction Manager $355 Construction Manager I / II / III / IV $211 /$226 /$239 /$303 Resident Inspector (Prevailing Wage Groups 4 / 3 / 2 / 1)$190 /$211 /$235 /$244 Apprentice Inspector $172 CM Administrative I / II $91 /$124 Field Services $244 2025 Billing Rate Schedule LABOR CHARGES (DOLLARS PER HOUR) ■ Hourly rates include charges for technology and communication, such as general and CAD computer software, telephone calls, routine in-house copies/prints, postage, miscellaneous supplies, and other incidental project expenses. ■ Outside services, such as vendor reproductions, prints, and shipping; major West Yost reproduction efforts; as well as engineering supplies, etc., will be billed at the actual cost plus 15%. ■ The Federal Mileage Rate will be used for mileage charges and will be based on the Federal Mileage Rate applicable to when the mileage costs were incurred. Travel other than mileage will be billed at cost. ■ Subconsultants will be billed at actual cost plus 10%. ■ Expert witness services, research, technical review, analysis, preparation, and meetings will be billed at 150% of standard hourly rates. Expert witness testimony and depositions will be billed at 200% of standard hourly rates. ■ A finance charge of 1.5% per month (an annual rate of 18%) on the unpaid balance will be added to invoice amounts if not paid within 45 days from the date of the invoice. * This schedule is updated annually Page 1 of 2 (Effective January 1, 2025, through December 31, 2025)* Equipment Charges EQUIPMENT 2" Purge Pump & Control Box $300 /day Aquacalc / Pygmy or AA Flow Meter $28 /day Emergency SCADA System $35 /day Field Vehicles (Groundwater)$1.02 /mile Gas Detector $80 /day Generator $60 /day Hydrant Pressure Gauge $10 /day Hydrant Pressure Recorder, Impulse (Transient)$55 /day Hydrant Pressure Recorder, Standard $40 /day Low Flow Pump Back Pack $135 /day Low Flow Pump Controller $200 /day Powers Water Level Meter $32 /day Precision Water Level Meter 300ft $30 /day Precision Water Level Meter 500ft $40 /day Precision Water Level Meter 700ft $45 /day QED Sample Pro Bladder Pump $65 /day Skydio 2+ Drone (2 hour minimum)$100 /hour Storage Tank $20 /day Sump Pump $24 /day Transducer Communications Cable $10 /day Transducer Components (per installation)$23 /day Trimble GPS – Geo 7x $220 /day Tube Length Counter $22 /day Turbidity Meter $30 /day Turbidity Meter (2100Q Portable)$35 /day Vehicle (Construction Management)$10 /hour Water Flow Probe Meter $20 /day Water Quality Meter $50 /day Water Quality Multimeter $185 /day Well Sounder $30 /day BILLING RATES 2025 Billing Rate Schedule * This schedule is updated annually Page 2 of 2