Loading...
HomeMy WebLinkAboutWhitchurch Engineering 2022-09-20; Amendement 3 2025-04-02Apr 8, 2025 Kristine Lawler (Apr 9, 2025 07:31 PDT) Kristine Lawler Apr 9, 2025 Exhibit 1 WHITCHURCH ENGINEERING March 25th,2025 Mary Horger Financial Services Manager City of Ukiah Phone: (707)463-6233 Email: mhoruer@citvofukiah.com RE: Change Order—Additional Construction Assistance City of Ukiah's Electrical Service Building at 1350 Hastings Rd Ms. Horger, Please find our costs and justifications for providing additional construction assistance for the City of Ukiah's Electrical Service Building. Whitchurch Engineering provided a change order on September 91h, 2024, to provide continued construction assistance which had exceeded the cost and assumptions in the original contract.The change order was limited to 5 new RFI's and 3 project meetings. These assumptions were based on the contractor's schedule at that time, showing support for structural,mechanical,electrical and plumbing scopes was to complete by October 15th,2024. After executing the change order,the contractor issued 32 new RFI's(RFI-050 through RFI-081),of which 22 RFI's required a response from Whitchurch Engineering. Additionally,the contractor issued 8 of his own change orders (COR-008 through CO11-015), and requested a design change for the steel fascia beam. Regular support for the project was extended into December 2024,at which time our participation in regular meetings was not required. In February 2025,an electrical incident occurred,for which Whitchurch reviewed design basis and component sizes for.Two representatives attended a meeting with the owners and contractors to evaluate the situation,and provide recommendations to remedy the situation. The additional cost requested is$11,610.A full description of services and breakdown of hours is provided on th.e attached page Should you have any questions regarding the changes and additional fees,please don't hesitate to contact our office. Sincerely, � Jeffrey Laikam,PE Engineering Manager,C nt a 4ea tions I ■' f www. whitchurchengineering.ca m Fortuna CA•-610901Street 1 Phone (707)725.6926 T Page 1 of 2 Eureka CA-716 Harris Street • Phone:(707)444-1420 Whitchurch Engineering,Inc. Change Order for additional Construction r ` Assistance at the City of Ukiah Electrical Service Building at 1350 Hastings Rd Description of Changes and Cost Breakdown A. Additional RFI/COR/Submittal Support: 1. MEP RFI's-$4 400 a. 16 RFI's in addition to the 5 assumed(21 RFI's Total) i. Eric Allen(MEP Design Engineer)—32 hours @ 137.50/hr 2. _Structural RFI's-5320 a. Contractor RF169—Steel Fascia i. Brett Whitchurch(Senior Civil Engineer)—2 hours @$160/hr 3. MEP Submittal Review-5825 b. 3 new MEP Submittals ii. Eric Allen(MEP Design Engineer)—6 hours @ 137.50/hr 4. Change Order Review-$2.520 a. 8 Contractor Change Order Reviews(COR-008—COR-015) i. Eric Allen(MEP Design Engineer)—12 hours @ 137.50/hr ii. Derek Long(Project Manager)—6 hours @$145/hr B. Redesign of Steel Fascia: 1. Re-Design Blocking and Anchorage for Steel Fascia-$2,140 a. Structural Design/Drafting. i. Brett Whitchurch(Senior Civil Engineer)—6 hours @$160/hr ii. Derek Long(Project Manager)—2 hours @$145/hr iii. Drafter-4 hours @$90/hr b. Meetings/Discussion/Assessment i. Brett Whitchurch(Senior Civil Engineer)—1.5 hours @$160/hr ii. Derek Long(Project Manager)—2 hours @$145/hr C. Electrical Breaker Incident Support: 1. _Root Cause Meetings-$1,405 a. Meeting/Calls with Owner,Contractor,and Subs i. Derek Long(Project Manager)-3 hours @$145/hr ii. Eric Allen(MEP Design Engineer)—2 hours @ 137.50/hr b. Verification of Design/Component Sizing/Loads i. Eric Allen(MEP Design Engineer)—4 hours @$137.50/hr ii. Derek Long(Project Manager)—1 hours @$145/hr 16611bi, www. whitc hurchengineering.com Fortuna CA-6109"'Street Phone:(7071 725.6926 Page 2 of 2 Eureka CA—716 Harris Street Phone:(707)444-1420