Loading...
HomeMy WebLinkAboutWhitchurch Engineering 2023-05-03 WTP; Amendment 1 2024-05-22COU 2223-203-A1 CITY OF UKIAH AMENDMENT NO. 1 TO PROFESSIONAL SERVICES AGREEMENT BETWEEN WHITCHURCH ENGINEERING and THE CITY OF UKIAH This Amendment No. 1, entered on May 22, 2024, revises the Agreement for Professional services dated May 3, 2023 between the City of Ukiah and Whitchurch Engineering for professional design services. This Amendment No. 1 adds an additional $5,340, as described in Exhibit 1. This revises the total, not-to-exceed amount to $24,840. Except as expressly amended by this Amendment, all other terms remain unchanged and in full force and effect. IN WITNESS WHEREOF, THE PARTIES HAVE EXECUTED THIS AMENDMENT ON THE EFFECTIVE DATE: CONSULTANT BY: DATE: PRINT NAME: CITY OF UKIAH BY: DATE: SAGE SANGIACOMO, CITY MANAGER ATTEST BY: DATE: KRISTINE LAWLER, CITY CLERK 5-22-2024 Jeffrey Laikam Jun 24, 2024 Kristine Lawler (Jun 24, 2024 11:14 PDT) Kristine Lawler Jun 24, 2024 Exhibit 1 Whitchurch Engineering, Inc. Change Order for Mechanical Revisions to the Water Treatment Plant HVAC Design Description of Changes and Cost Breakdown A. Scope of Services: 1. Gather model numbers and configuration for the additional,existing units to be replaced. 2. Acquire additional measurements to orient for overall building background drawings to specify conditioned zones to be identified. 3. Generate drafted background drawings in AUTOCAD. 4. Overlay proposed equipment on drawings to match existing equipment configuration. 5. Ventilation and conditioning cooling load calculations to verify sizing of existing and proposed HVAC units. 6. Specify new, California compliant equipment that used R410 refrigerant instead of existing R22. a. Additional specification effort was put toward finding equivalent 480V outdoor equipment to avoid: electrical supply conductor replacement, relocation of branch circuits to new panels, updating transformer electrical load, new breakers, and circuit reconfiguration. 7. Internal review, sign and stamp of new plan set with additional sheet for auxiliary room HVAC replacement. B. Cost of Design Changes—See attached invoice for hours by employee/title and total cost. 1. Previously Invoiced through 9/6/23: $18,037.50 2. New Invoice:$6,802.50 Fortuna CA-610 911 Street Phone:Q07)725-6926 Page 2 of 2 Eureka CA-716 Harris Street Phone:(707)444-1420 Whitchurch Engineering, Inc INVOICE 610 9th Street Fortuna,CA 95540 Invoice Date: 5/15/24 (707)725-6926 Total Amount: $6,802.50 Number: COU-245715 Invoice Period: 09/01/23-05/15/24 Project Code: COU2303 City of Ukiah c/o Mary Horger 411 W Clay Street Ukiah,CA 95482 Invoice Details Description Quantity Rate Amount Eric Allen Associate Engineer 28.50 $125.00 $3,562.50 Aaron Bennett Supervising Engineer 6.00 $175.00 $1,050.00 Jeffrey Laikam Engineering Manager 0.25 $200.00 $50.00 Jared Meeks Project Engineer 19.50 $80.00 $1,560.00 Title 24 Abbay 1.00 $400.00 $400.00 Technical Guy Kitahara 2.00 $90.00 $180.00 Drafting TOTAL AMOUNT DUE $6,802.50 HVAC Design for City of Ukiah Water Treatment Plan 935 River Street Ukiah, CA Remit payment to Whitchurch Engineering, Inc. We currently accept:cash, personal,bank or cashiers check,or money order. All accounts are due within 30-days of invoice date. Past due accounts are subject to interest at 1-1/2%per month(18%annual).