HomeMy WebLinkAboutMin 07-20-06 wks fire mplanCITY OF UKIAH CITY COUNCIL
SPECIAL MEETING - MINUTES
FIRE DEPARTMENT MASTER PLAN
WORKSHOP
CITY HALL COUNCIL CHAMBERS
300 SEMINARY AVENUE
UKIAH, CA 95482
July 20, 2006
5:30 p.m.
le
m
e
ROLL CALL:
Councilmembers Present: Crane, McCowen, Rodin, Baldwin
Councilmembers Absent: MayorAshiku
Staff Present: City Manager Horsley, Fire Chief Latipow, recorder Cynthia Stanford
PLEDGE OF ALLEGIANCE:
Fire Chief Kurt Latipow led the Pledge of Allegiance
PRESENTATION OF THE "FIRE PROTECTION AND EMERGENCY SERVICES MASTER
PLAN: FOR THE CITY OF UKIAH FIRE DEPARTMENT"
Fire Chief Latipow gave an opening statement regarding the Fire Department's
participation in the process of preparing the Master Plan and then introduced the
presenters; Ronny J. Coleman and associate Bob Marcucci of Emergency Services
Consulting, Inc.
Mr. Coleman discussed the purpose and process of what is contained in the Fire
Protection/Emergency Services Master Plan 2006 document. During the preparation of
the Master Plan Mr. Coleman and Mr. Marcucci reviewed historical data, spoke to over
100 citizens, Councilmembers, staff, and stakeholders, made 3 trips to Ukiah as well as
held a workshop. The intent of the Master Plan is to provide a general direction for the
Fire Department's present and future role in the community as outlined below.
PURPOSE OF THE MASTER PLAN:
· Give general direction
· Identify risks, hazards, and values present in the community that require fire
protection
· Budgetary actions
· Where the Fire Department is today, what is at risk in the community, and goals
to accomplish
· assemble resources, determine types of services and whether they are linked
with the needs of the community:
· look at options/alternatives and formulate decisions
P~el
Mr. Coleman gave a description of the layout of the Master Plan, discussed various
sections and how the Master Plan is organized, and what assessments were used to
arrive at the options and alternatives presented. Mr. Coleman pointed out Section IX
which has suggested recommendations and an action plan. In preparing the Master Plan
Mr. Coleman considered 10 points as follows:
· governance
· risk
· financial implications
· management direction
· program activities
· infrastructure including station and apparatus
· training system
· staffing system
· internal management system
· relationship to the community
Mr. Coleman went on to discuss the remainder of the Master Plan including contemporary
issues, setting standards, financing the Department, the Department's vision and
recommendations for the future of the Fire Department.
In Mr. Coleman's interview process he was presented with numerous perspectives of the
mission of Ukiah Fire Department. The following is representative of his discussions and
observations.
What should the Fire Department be doing? Protection of life and property from
natural and man made disasters.
What do you believe is a reasonable expectation of the types of services that
should be provided? Fight fires, respond to medical emergencies, public education,
fire prevention, disaster preparedness, fire investigations and general public
assistance.
What are the challenges and opportunities that you see for this Department? Staff
turnover, full-time staffing level, preservation of the volunteer program, apparatus &
equipment replacement, dealing with growth, changing community expectations,
policy decisions regarding Emergency Medical Services, and overall assessment of
EMS Program Activity.
How long do you think it would take the Fire Department to respond? Most
expectations were a 5-6 minute response. Everyone is programmed to call 911
when they have any kind of an emergency.
What individual needs does this community have that the Fire Department could
help with? Deal with growth in the areas of responsibility and growth in cost of
providing service, training and response coverage, balance between revenue and
tax base.
Mr. Coleman explained that the Master Plan discusses in great detail where the Fire
Page 2
Department is today and where does it want to be in 5 years, in 10 years. He went on to
discuss EMS services, structure fires, mutual aid, and response time performance. The
following are the recommendations of the Master Plan:
MISSION/GOALS:
Short
Term Recommendations:
Adopt specific goals and objectives
· Adopt specific performance measures
· Automate the fire prevention bureau
· Add a fire inspector to the bureau
· Adopt official levels of service - suburban environment based on population density
· Obtain consensus on capital items
· AEDs in public buildings
· Develop officer training capability- invest in training
· Improve upon volunteer recruitment and retention
· Improve upon volunteer support
· Improve upon pre-fire planning efforts- economic infrastructure
Lon~ Term Recommendations: · Reestablish Ukiah Valley Regional Fire System
· Convene a committee to rewrite the Section on Fire and EMS in the General Plan
for submittal later
· Appoint transitional Fire Chief
· Contract with Howard Forest for Dispatch (or be a part of the Regional Study by
PD)
· Allow the Fire Chief to "over hire" once a year to improve upon the overtime
situation.
Mr. Coleman went on to state that we need to strike a balance while we plan for the future.
The future consists of 1) costs/consequences- costs will continue to increase, so plan for
cost/consequence avoidance and 2) core competencies- The Master Plan proposes that
Ukiah Fire Department remain a suburban fire department, continue with the current
format, and consider becoming part of a regional system.
Councilmember Baldwin asked if there were any questions from the Council and there
were none.
Councilmember Baldwin asked if there were any public comment or questions at this time
and there were none.
A general discussion ensued with the Council, Mr. Coleman and Fire Chief Latipow which
included the following topics:
· smart growth movement/densification (going above 2 story height limit)
· changes in traffic circulation
· urban/wildland interface problems, i.e., defense level for western hills - response
level and time
· Brush Street Triangle
· regionalization - growth potential outside City limits
Page 3
· population increase
· residential development
· tax/revenue agreement between the City and County
Councilmember McCowen asked for clarification regarding the chart on pg.7,
Recommendation 1, "Anticipated Benefits" and whether cost containment was the most
likely anticipated benefit of reunification when he was thinking the greater benefit might be
increased efficiency and delivery of service. A discussion ensued regarding how to
contain costs, increase effectiveness/response time, cost savings, safety and efficiency.
Mr. Coleman went on to state that Regionalization creates greater efficiency, cost
containment and a better delivery system.
Councilmember McCowen referenced pg.47, ISO recommendations made in 2003 and
questioned to what degree those recommendations had been implemented. Mr. Coleman
deferred to Fire Chief Latipow to answer.
Fire Chief Latipow commented on the following: The Fire Department has adopted the
recommendations within the ISO reports as much as possible given staffing and fiscal
constraints including
· implementing the pump testing program
· the OES pumper on loan from the State is included in the annual ladder and pump
testing
· improved training program and structuring the training program in such a way that it
is tied to specific goals and objectives
· the Department anticipates the launching of our pre-fire planning as soon as we get
the new Fire Prevention Captain
· Fire Marshal is working with Public Works Department and new construction
developers to upgrade hydrant outlets per ISO recommendation
· potential to resurrect hydrant testing program with Public Works Department,
however current call volume is too great and staffing is not adequate to permit this
now
Fire Chief Latipow estimated that about half of the ISO recommendations have been
adopted at this point.
Councilmember McCowen raised the issue of dispatch services. A discussion ensued
regarding dispatch issues, built-in delays, contracting with Howard Forest, interagency
dispatching with the Sheriff's Office, dispatcher training, and that the current dispatch
system is topping out on call volume. City Manager Horsley relayed information from her
meeting with Sysco Systems. Mr. Coleman stated that the purpose of a regional fire
dispatch center would be to ease the burden on the current police and fire dispatch center.
Benj Thomas from the audience asked Mr. Coleman to discuss the issue of difficulties
posed by mandated training requirements and the impact on fire departments that are
largely volunteer. Mr. Coleman explained that these mandates pose hardships on all
departments in the state in that they required more training hours than firefighters have
available. The average firefighter receives about 2 hours of training per shift day and a
volunteer firefighter receives about 2 hours of training per week. There is constant
slippage between requirements and number of hours available leaving departments to
Page 4
take care of more critical mandates and letting the less critical ones slip by the side.
Coleman stated that the best thing to do was to maintain an ongoing comprehensive
training program with complete documentation.
Mr,
Councilmember McCowen asked for Mr. Coleman's recommendation to address current
situation of training/duties. Mr. Coleman stated that insufficient training is not the problem
for the Fire Department, it is the workload vs. lack of daily training.
Councilmember McCowen brought up the issue of the integrity of our Communications
Center uninterrupted power supply (pg. 94) A discussion ensued regarding whether we
could assess the back-up system or test it. A general discussion ensued regarding
dispatching EMS calls and whether dispatchers are thoroughly trained for EMS/Fire
dispatching.
Councilmember Crane questioned whether it may be appropriate for ambulance charges
to reflect more of the dispatch costs. Discussion ensued regarding currently undervaluing
the ambulance service and fees, responding to 911 calls, call volume vs ambulance fees.
Councilmember McCowen commented on the finding (pg. 100) of the high level at which
Ukiah Fire Department functions. For the Department's small size this represents a great
deal of work on the part of staff to provide such a high level of service. Councilmember
McCowen stated he though this was outstanding. Mr. Coleman stated that Ukiah Fire
Department has a broad based comprehensive way of running their department and that
he was impressed with the level of production by staff.
A discussion ensued between the Councilmembers, Mr. Coleman and Fire Chief Latipow
which involved topics of consolidation/regionalization, LAFCO involvement, a new JPA,
EMS response/transport, funding/revenues, staffing levels, per capita fire costs, fire
prevention fee schedule update, equipment replacement costs with staggered purchases
and long range plan/amortization issues.
Councilmember Crane and Mr. Coleman discussed volunteer firefighter involvement and
retention.
Councilmember Crane and Mr. Coleman discussed sprinklers, classifications, benefit to
community vs cost of sprinklers and the effect of the City's sprinkler ordinance in reducing
fire risk to a moderate level.
Councilmembers Crane, McCowen, Rodin, and Baldwin offered suggestions for
corrections and clarifications to be incorporated into the final Master Plan. (See
Attachment for specific suggestions.)
Further comments and questions by the City Council may be submitted by phone or in
writing to ESI.
In response to a question from Councilmember McCowen, Fire Chief Latipow stated he
agrees with the recommendations contained in the document and believes the document
is a place to build the foundation and move on from regardless of how controversial some
of the recommendations are.
Page 5
4. REVIEW AND CONSIDERATION OF MASTER PLAN ADOPTION
Revisions to the Master Plan will be made as discussed above and the Master Plan will be
presented to the City Council at a later date.
.
AUTHORIZATION TO EXPEND FUNDS IN AN AMOUNT NOT TO EXCEED $307000 TO
HI-TECH EMERGENCY VEHICLE SERVICE FOR REPAIRS TO THE FIRF
DEPARTMENT'S FIRE TRUCK.
MIS Baldwin/McCowen that Council authorize the expenditure of funds in an amount not
to exceed $30,000 to Hi-Tech Emergency Vehicle Service for repairs to the Fire
Department's fire truck. Carried by the following roll call vote: AYES: Councilmembers
Crane, McCowen, Rodin and Baldwin. NOES: None. ABSENT: Mayor Ashiku. ABSTAIN:
None.
6. ADJOURNMENT OF WORKSHOP
The workshop was adjourned at 7:45 p.m.
Recording Secretary was Cindy Stanford.
P~e6
Attachment to Master Plan Workshop Minutes of 7/20/2006
Suggested corrections and/or clarifications
PAGE # COMMENT RESOLUTION
10, Change "Establish an acceptable level of service" Phrase will be changed in the
4th bullet to Master Plan (MP)
"Establish a definition of acceptable level of
service".
11, The word "new", what is meant? Answer: Each N/A
line 2 year you exPect a department to have incremental
improvement in performance- continuing process
of renewal.
14, "review by client" please define. Answer: The Final document will be
Object 5 Client is the City of Ukiah presented after this review
42 "(3,000 gallons per minute)" - should be 3,500 Will correct this typo in the
MP
43, 35' or greater -is this correct? This is an estimate
line 9
44, "lesser" - this should state "greater" Will correct this typo in the
Distribution MP
47 "lower classification"- should it state "higher" - Wording will be changed in
3rd line Answer: there is not difference if it is anything MP
other than 4. It should state "lower number"
53, "Airport Blvd." - should it be Hastings Road? - Wording will be changed in
line 3 Answer: City Manager Horsley said Airport Road MP
is the correct wording
73-77 Would like years on these tables Will clarify this in the final MP
107, Benefit that is "unfounded" - should be "unfunded" Will correct typo in final MP
bottom
168 "Reinstitute Pre-Fire Program" - Could this This section will be expanded
description be broadened? Would like this portion in the final MP
expanded.
171 "Over Hires"- Depth of personnel- more depth in This section will be expanded
personnel- would like suggestions/process in and suggestions included in
implementation final MP