This Amendment No. 2, entered on August 23, 2023, revises the Agreement for
Engineering Services dated February 18, 2022, between the City of Ukiah and BKF
Engineers, as follows.
1.Revising the guaranteed maximum dollar amount by an additional $167,266 for
the additional design services needed for bid document preparation, monument re-
establishment for the Urban Core Rehabilitation and Transportation Project as per
Exhibit 1.
Except as expressly amended by this Amendment, all other terms remain unchanged and
in full force and effect.
IN WITNESS WHEREOF, THE PARTIES HAVE EXECUTED THIS
AMENDMENT ON THE EFFECTIVE DATE:
BKF ENGINEERS
BY: DATE:
PRINT NAME:
CITY OF UKIAH
BY: DATE:
SAGE SANGIACOMO, CITY MANAGER
ATTEST
BY: DATE:
KRISTINE LAWLER, CITY CLERK
08/23/2023
Jason Kirchmann
COU No. 2122-190-A2
Sep 6, 2023
Kristine Lawler (Sep 7, 2023 07:40 PDT)Sep 7, 2023
BKF ENGINEERS
200 4th Street, Suite 300, Santa Rosa, CA 95401 | 707.583.8500
July 17, 2023
BKF No C20212351-10
Andrew Stricklin, Associate Engineer
Dept. of Public Works
City of Ukiah
300 Seminary Avenue
Ukiah, CA 95482
Transmitted Via Email
Subject: Ukiah East Perkins Widening Project
Additional Service Request No. 2
Bid Document Preparation Support Services
Combined Bidding and Monument Re-Establishment for Perkins Street,
Gobbi Street, and Main Street Projects, Known as the
Urban Core Rehabilitation and Transportation Project
Dear Andrew,
BKF is pleased to submit this additional service request for engineering services to provide the City with support
related to a combined bid package and a combined monument re-establishment program for the merger of the
Perkins Street, Gobbi Street, and Main Street projects. We understand that the City recently received funding from
the California CYC Local Partnership Competitive Program Grant that will cover the construction of the three
aforementioned projects (now known collectively as the Urban Core Rehabilitation and Transportation Project”) to
be merged into a single project for award to a single general contractor. As the design of the improvements for
each project have been executed separately, and in the case of Main Street, completed by another design firm, the
City has requested that BKF support the merging of the project by preparing a combined bid package, comprised
of merged drawings, a single Specification package, and single Engineer’s Cost Opinion/Bid Schedule. Additionally,
the City is aware that all three project areas have existing monuments that must be preserved following construction,
and that all three areas also have missing centerline monuments. To support construction and future Right of Way
retracement, the City is also looking for BKF to provide a Monument Preservation and Re-Establishment Program
for these same three project areas. The following scope is presented to address your request for additional services.
Scope of Services
TASK 12: COMBINED PROJECT BID DOCUMENT PREPARATION SUPPORT
Under this task, BKF will prepare a comprehensive Plans, Specifications, and Estimate (PS&E) package for bidding
and construction. This package will merge together the following separately-prepared pavement rehabilitation and
utility replacements projects:
·Gobbi Street Utility Replacement Project (prepared by BKF Engineers)
·Perkins Street Intersection Widening Project (prepared by BKF Engineers)
·Main Street Utility Replacement Project (prepared by Coastland Civil Engineers)
Drawings will be combined under a single cover and will include separate “chapters” associated with each project,
under which the complete individually prepared plans will be presented. One set of General Notes will be developed
EXHIBIT 1
July 17, 2023
Page 2 of 5 BKF ENGINEERS
to cover the entire combined project, but project-specific construction notes, legends, and abbreviations will be
retained. Construction details for each project will not be merger, and will remain under the cover of each project
“chapter” due to the project-specific nature of many of the details.
BKF will utilize Specifications and Engineer’s Cost Opinions, developed for each project, as a starting point for the
merger of these documents. Final deliverables to the City will include one (1) combined plan set package, one (1)
combined Project Specifications manual, and one combined Engineer’s Opinion of Probable Construction Costs.
These documents will be provided to the City electronically, and can be produced in hard-copy format if requested.
We have included up to eight (8) hours of staff time for meetings and coordination calls with the City to discuss
items such as project name and number, measurement and payment approach, project area descriptions, and to
identify funding-specifics requirements that will need to be established in the Specifications.
TASK 13: MONUMENT PRESERVATION AND RE-ESTABLISHMENT
Gobbi Street Right of Way Retracement, Monument Preservation, Monument Re-Establishment and Record
of Survey: Based upon BKF’s previous work on the Gobbi Street Utility Replacement Project, it is the understanding
of the City and BKF that sections of the Gobbi Street Right of Way have not been previously surveyed, or cannot be
retraced from found monumentation, and that retracement of unrecorded or un-monumented sections of right of
way will require a Record of Survey in accordance with Section 8762 of the California Land Surveyor’s Act. It is also
understood that existing monuments marking the centerline of Gobbi Street, and monuments marking some of the
side lines of individual properties fronting Gobbi Street, exist within the project limits exist, and that permanent
monuments must be reset in order to perpetuate the position of destroyed monuments in accordance with Section
8771 of the California Land Surveyor’s Act. Additionally, it is understood that the City would like centerline
monuments set or reset at intersections previously un-marked by monuments, or marked by monuments destroyed
prior to this project. In total it is estimated that eight to ten (8-10) centerline monuments will be set or reset, and
one to three (1-3) side line monuments will be reset in the Gobbi Street section of this project.
BKF will utilize boundary information previously collected under the Gobbi Street Utility Replacement Project to
expand the right of way retracement to include previously un-surveyed sections of Gobbi Street right of way within
the Gobbi Street project limits, and will submit a Record of Survey to the Mendocino County Surveyor’s Office in
accordance with Section 8762 of the California Land Surveyor’s Act. Said Record of Survey will document
retracement of the Gobbi Street right of way as well as document resetting not more than ten (10) centerline
monuments and not more than three (3) side line monuments post construction. BKF will be responsible for re-
setting side line monuments destroyed during the course of construction, however, BKF will not be responsible for
construction of centerline monuments. BKF engineers will be responsible for setting reference points to facilitate
construction of centerline monuments by others, and BKF will also be responsible for stamping centerline
monuments following monument construction by others. It is understood that lane closures may be needed during
the course of centerline monument referencing, construction and stamping, and the cost of lane closure and
centerline monument construction is not included in this contract.
Perkins Street Monument Preservation, Monument Re-Establishment and Record of Survey: Based upon
BKF’s previous work on the Perkins Street Intersection Widening Project, it is understood that the City has approved
BKF to submit a Record of Survey to the Mendocino County Surveyor’s Office documenting retracement of the
Perkins Street right of way within the project limits. It is understood that said Record of Survey is intended to
document retracement of sections of the Perkins Street right of way that have not been previously surveyed, and
that retracement of unrecorded sections of right of way requires a Record of Survey in accordance with Section
8762 of the California Land Surveyor’s Act. It is also understood that existing monuments marking the centerline of
Perkins Street, and monuments marking some of the side lines of individual properties fronting Perkins Street, exist
within the project limits exist, and that permanent monuments must be reset in order to perpetuate the position of
destroyed monuments in accordance with Section 8771 of the California Land Surveyor’s Act. Additionally, it is also
understood that the City would like centerline monuments set or reset at intersections previously un-marked by
monuments, or marked by monuments destroyed prior to this project. In total it is estimated that five to seven (5-
July 17, 2023
Page 3 of 5 BKF ENGINEERS
7) centerline monuments will be set or reset, and six to eight (6-8) side line monuments will be reset in the Perkins
Street section of this project.
BKF will expand the Record of Survey authorized by the City to document retracement of the Perkins Street Right
of Way to also document re-setting not more than seven (7) centerline monuments and not more than eight (8)
side line monuments post construction. BKF will be responsible for re-setting side line monuments destroyed during
the course of construction, however, BKF will not be responsible for construction of centerline monuments. BKF will
be responsible for setting reference points to facilitate construction of centerline monuments by others, and BKF
will also be responsible for stamping centerline monuments following construction by others. It is understood that
lane closures may be needed during the course of centerline monument referencing, construction and stamping,
and the cost of lane closure and centerline monument construction is not included in this contract.
Main Street Monument Preservation, Monument Re-Establishment and Record of Survey: BKF has not
previously provided any surveying or engineering services in association with the Main Street Utility Replacement
Project, however, it is understood that a retracement of the Main Street right of way within the project limits was
performed by Cinquini & Passarino, Inc. (CPI). In an effort to preserve City funds, BKF has decided to partner with
CPI on as a subconsultant to utilize the efficiencies that their team would bring for the monument preservation and
record of survey work needed on Main Street. It is understood that monuments marking the centerline of Main
Street must be reset in order to perpetuate the position of destroyed monuments in accordance with Section 8771
of the California Land Surveyor’s Act. Additionally, it is understood that the City would like centerline monuments
set or re-set at centerline intersections previously un-marked by monuments, or marked by monuments destroyed
prior to this project. In total it is estimated that eleven (11) centerline monuments will be re-set and six (6) additional
centerline monuments will be set at intersections currenting without monuments for the Main Street section of this
project.
Following construction, CPI, working as a sub-consultant to BKF, will prepare a Record of Survey to document re-
setting/new setting of the centerline monuments. CPI will not be responsible for construction of centerline
monuments, but will set reference points for monument construction and will provide stamped brass disk for
installation at the monuments. It is understood that lane closures may be needed during the course of centerline
monument referencing, and the cost of lane closure and centerline monument construction is not included in this
contract.
TASK 14: RIGHT OF WAY EASEMENT PREPARATION
Gobbi Street Right of Way Easement Legal Description & Plat Preparation: Based upon BKF’s previous work
on the Gobbi Street Utility Replacement Project, it is understood that the sections of the existing and proposed
public improvements fall outside existing public right of ways, and it is estimated that the City will need to acquire
right of way easements affecting seven (7) properties within the project limits.
BKF will prepare not more than seven (7) legal descriptions and plats describing and depicting right of way
easements within the Gobbi Street project area. BKF will work with the City to determine the limits of easement
areas, and will be responsible for preparation of the legal descriptions and plats describing and depicting the
easement areas. BKF will not be responsible for preparation of grant documents, easement recording, or facilitating
acquisition of easement rights with individual property owners.
Perkins Street Right of Way Easement Legal Description & Plat Preparation: Based upon BKF’s previous work
on the Perkins Street Intersection Widening Project, it is understood that the sections of the existing and proposed
public improvements fall outside existing public right of ways, and it is estimated that the City will need to acquire
right of way easements affecting ten (10) properties within the project limits.
BKF will prepare not more than ten (10) legal descriptions and plats describing and depicting right of way easements
within the Perkins Street project area. BKF will work with the City to determine the limits of easement areas, and will
be responsible for preparation of the legal descriptions and plats describing and depicting the easement areas. BKF
July 17, 2023
Page 4 of 5 BKF ENGINEERS
will not be responsible for preparation of grant documents, easement recording, or facilitating acquisition of
easement rights with individual property owners.
Main Street Right of Way Easement Legal Description & Plat Preparation: Based upon evaluation of the
Improvement Plans For: Main Street Utility Improvement Project prepared by Coastland Civil Engineers, it is
understood that the sections of the existing and proposed public improvements fall outside existing public right of
ways, and it is estimated that the City will need to acquire right of way easements affecting five (5) properties within
the project limits.
BKF will prepare not more than five (5) legal descriptions and plats describing and depicting right of way easements
within the Main Street project area. BKF will work with the City to determine the limits of easement areas, and will
be responsible for preparation of the legal descriptions and plats describing and depicting the easement areas. BKF
will not be responsible for preparation of grant documents, easement recording, or facilitating acquisition of
easement rights with individual property owners.
OPTIONAL TASK 15: BID AND CONSTRUCTION PHASE SUPPORT SERVICES
Bid Support Services: BKF can assist the City during the construction bid solicitation process on an as-needed
basis. Bid support services can include the following:
a. Responding to Requests for Information (RFIs) during the bid process
b. Assisting the City with issuing bid addendum packages
c. Summarizing and tabulating received bids
This scope assumes that BKF would support the bidding of the combined project. We will address design-related
questions as they pertain to either the Perkins Street or Gobbi Street project, but will coordinate with Coastland Civil
Engineering to facilitate technical design responses for any questions related to the Main Street project.
Construction Support Services: BKF can allocate time to support the Contractor and Design Team during the
construction phase of the Perkins Street and Gobbi Street projects. Anticipated services include written responses
to RFIs, review of submittals, and drawing revisions as needed. Preparation of record drawings based on the
Contractor’s as-builts can also be provided as part of this service. It is assumed that the City will either retain the
services of Coastland Civil Engineering for Construction Support for the Main Street project, or will engage the
services of a City-authorized third-party Construction Manager to make interpretations of and changes to the Main
Street design during construction.
Construction Meetings: BKF can attend site meetings with the Contractor during the construction process.
Anticipated meetings include the following:
a.pre-construction meeting
b.three (3) interim site visits
c.final punch-list walk
Scope Qualifications and Assumptions
BKF’s services are limited to those expressly set forth in the scope. BKF shall have no other obligations or
responsibilities for the project, except as provided in this proposal letter, or as agreed to in writing. BKF will provide
our services consistent with the professional skill and care ordinarily provided by consultants practicing in the same
locality under similar circumstances. Our services shall be limited to those expressly summarized in this proposal
and we shall have no other obligations or responsibilities, unless otherwise agreed upon.
As we will be processing design documents from others, the following assumptions apply to our services:
·The City will provide BKF with a digital, signed copy of the Main Street design drawings, special provisions
(in word format) and the Engineer’s Opinion of Probable Construction Costs (in excel format)
·It is assumed that the City will retain the services of the Main Street designer for bid and construction phase
July 17, 2023
Page 5 of 5 BKF ENGINEERS
support. BKF will not be providing any bid or construction related support regarding the design elements
or drawing interpretations for the Main Street project.
Schedule
BKF is able to commence working on this project immediately upon your authorization to proceed. We understand
that the combined bid documents need to be completed by the end of September 2023 to allow time for City
Council authorization, bidding, and award prior to the end the 2023 year.
Fees for Professional Services
SCOPE OF SERVICES:
BKF proposes to provide the services on a Time & Materials basis as noted in the table below.
TASK DESCRIPTION FEE
12 Combined Project Bid Document Preparation Support $20,492
13 Monument Preservation and Re-Establishment $96,766
14 Right of Way Easement Preparation $50,008
TOTAL CIVIL FEE $167,266
In addition, please budget $1,000 for reimbursable expenses. Reimbursable expenses are anticipated for
reproduction, mileage, express and messenger deliveries, and computer deliverable plots. Reimbursable expenses
will be billed on a cost plus 10-percent markup basis.
OPTIONAL SERVICES:
At your request, BKF can provide the following optional services on a time and materials not to exceed basis in
accordance with the attached rate schedule.
OPTIONAL TASK FEE
Optional Task 15 – Bid and Construction Phase Support Services $33,937
This additional service request is an amendment to our Professional Services Agreement between BKF Engineers
and the City of Ukiah, dated February 18, 2022. All terms of said agreement will remain the same except for the
scope and fee items explicitly stated herein.
Should you have any questions, or would like additional clarification on any aspect of the scope of work, please feel
free to contact me at 707-583-8536.
Respectfully,
BKF Engineers
___________________________
Becky Dower, PE
Project Manager