Loading...
HomeMy WebLinkAbout2021-04-21 PacketPage 1 of 5 City Council Regular Meeting AGENDA Register for Ukiah City Council Regular Meeting at: https://attendee.gotowebinar.com/rt/3862698010362077965 After registering, you will receive a confirmation email containing information about joining the  webinar. Alternatively, you may view the meeting (without participating) by clicking on the name of the  meeting at www.cityofukiah.com/meetings.  April 21, 2021 ­ 6:00 PM 1. ROLL CALL     2. PLEDGE OF ALLEGIANCE     3. PROCLAMATIONS/INTRODUCTIONS/PRESENTATIONS      3.a. Proclamation Recognizing May 2­8, 2021, as Teacher Appreciation Week.    Recommended Action: Present proclamation.     Attachments:  1.Teacher Appreciation Proclamation       4. PETITIONS AND COMMUNICATIONS     5. APPROVAL OF MINUTES      5.a. Approval of the Minutes for the April 6, 2021, Special Meeting.    Recommended Action: Approve the Minutes of April 6, 2021, a Special Meeting, as submitted.     Attachments:  1.2021­04­06 Draft Minutes ­ Special Meeting        5.b. Approval of the Minutes for the April 7, 2021, Special Meeting.    Recommended Action: Approve the Minutes of April 7, 2021, a Special Meeting, as submitted.     Attachments:  1.2021­04­07 Draft Minutes ­ Special Meeting        5.c. Approval of the Minutes for the April 7, 2021, Regular Meeting.    Recommended Action: Approve the Minutes of April 7, 2021, a Regular Meeting, as submitted.     Attachments:  1.2021­04­07 Draft Minutes ­ Regular Meeting       Page 1 of 142 Page 2 of 5 6. RIGHT TO APPEAL DECISION       Persons who are dissatisfied with a decision of the City Council may have the right to a review of that decision by a court. The  City has adopted Section 1094.6 of the California Code of Civil Procedure, which generally limits to ninety days (90) the time  within which the decision of the City Boards and Agencies may be judicially challenged.     7. CONSENT CALENDAR       The following items listed are considered routine and will be enacted by a single motion and roll call vote by the City Council.  Items may be removed from the Consent Calendar upon request of a Councilmember or a citizen in which event the item will  be considered at the completion of all other items on the agenda. The motion by the City Council on the Consent Calendar will  approve and make findings in accordance with Administrative Staff and/or Planning Commission recommendations.      7.a. Report of Disbursements for the Month of March 2021.    Recommended Action: Approve the Report of Disbursements for the Month of March 2021.      Attachments:  1.March 2021 Summary of Disbursements 2.Account Codes for Reference  3.Object codes for Reference 4.March 2021 Disbursement Detail        7.b. Adopt a Resolution Authorizing Participation in the California Intergovernmental Risk Authority  (CIRA), with Regard to the Workers' Compensation Program, Effective 7/01/2021.    Recommended Action: Adopt a Resolution authorizing participation in the California  Intergovernmental Risk Authority (CIRA), with regard to the Workers' Compensation Program,  effective 7/01/2021.     Attachments:  1.Resolution to Participate in CIRA Workers Comp Program        7.c. Consider Approval of Budget Amendment in the Amount of $75,000 for the Yokayo Court  Electrical System Improvement Project.      Recommended Action: Approve budget amendment in the amount of $75,000 for the Yokayo  Court Electrical System Improvement Project.      Attachments: None        7.d. Notification of Purchase Order #47128 issued to JM Integration, to furnish and install one  PowerEdge T640 Tower Server for the Wastewater Treatment Plant in the Amount of  $16,095.31.    Recommended Action: Receive Notification of Purchase Order #47128 issued to JM Integration,  to furnish and install one PowerEdge T640 Tower Server for the Wastewater Treatment Plant in  the Amount of $16,095.31.     Attachments:  1.JM Integration Proposal March 22 2021        7.e. Council will Consider Approval of Budget Amendment in the Amount of $250,000 for the State  Street Electric Utility Underground Project.      Recommended Action: Approve budget amendment for the State Street Electric Utility  Underground Project in the amount of $250,000     Attachments: None       Page 2 of 142 Page 3 of 5  7.f. Notification of Purchase Order #47143 issued to Bartley Pump PM, LLC to Provide Emergency  Trouble Shooting and Repair at Well #4 for the Water Resources Department in the Amount of  $19,693, and Authorize Additional Repairs as Needed.    Recommended Action: Notification of Purchase Order #47143 issued to Bartley Pump PM, LLC to  provide emergency troubleshooting and repair at Well #4 for the Water Resources Department in  the amount of $19,693, and authorize additional repairs as needed.     Attachments:  1.Bartley Pump Proposal        7.g. Requesting Approval of an Amended and Restated Agreement with the County of Mendocino,  for Sharing Financing Costs of the Animal Shelter Construction and for Sharing Cost of Animal  Shelter Services, and Approval of a Settlement Agreement, in the Total Amount of  $150,930.50.    Recommended Action: Approve an amended and restated agreement with the County of  Mendocino, for sharing financing costs of the Animal Shelter construction and for sharing cost of  Animal Shelter services, and approve Settlement agreement, in the total amount of $150,930.50.      Attachments:  1.County BOS 01 196 2.County BOS 00 319 3.Amended and Restated Animal Shelter Agreement 4.Settlement Agreement and Release Animal Shelter       8. AUDIENCE COMMENTS ON NON­AGENDA ITEMS       The City Council welcomes input from the audience. If there is a matter of business on the agenda that you are interested in,  you may address the Council when this matter is considered. If you wish to speak on a matter that is not on this agenda, you  may do so at this time. In order for everyone to be heard, please limit your comments to three (3) minutes per person and not  more than ten (10) minutes per subject. The Brown Act regulations do not allow action to be taken on audience comments in  which the subject is not listed on the agenda.     9. COUNCIL REPORTS     10. CITY MANAGER/CITY CLERK REPORTS     11. PUBLIC HEARINGS (6:15 PM)     12. UNFINISHED BUSINESS      12.a. Receive Status Report and Consider Any Action or Direction Related to the Novel Coronavirus  (COVID­19) Emergency Including Operational Preparedness and Response; Continuity of City  Operations and Services; Community and Business Impacts; and Any Other Related Matters.    Recommended Action: Receive status report and consider any action or direction related to the  Novel Coronavirus (COVID­19) Emergency including operational preparedness and response;  continuity of City operations and services; community and business impacts; and any other  related matters.     Attachments: None       Page 3 of 142 Page 4 of 5  12.b. Update on Emergency Repair of the Yosemite Drive Water Main and Determine that  Emergency Conditions Continue to Require the Emergency Repair.    Recommended Action: Determine that emergency conditions continue to require the repair of the  Yosemite Drive Water Main without competitive bidding.     Attachments:  1.Resolution 2020­63 Yosemite Drive Water Main Emergency Work       13. NEW BUSINESS      13.a. Receive Updates on City Council Committee and Ad Hoc Assignments, and, if Necessary,  Consider Modifications to Assignments and/or the Creation/Elimination of Ad Hoc(s).     Recommended Action: Receive report(s).  The Council will consider modifications to committee  and ad hoc assignments along with the creation/elimination ad hoc(s).          Attachments:  1.2021 City Council Special Assignments       14. CLOSED SESSION ­ CLOSED SESSION MAY BE HELD AT ANY TIME DURING THE MEETING      14.a. Conference with Legal Counsel—Anticipated Litigation (Government Code Section 54956.9(d)(2 & 3)) Significant exposure to litigation pursuant to paragraph (2) or (3) of subdivision (d) of Section  54956.9: (Number of potential cases: 1)    Recommended Action: Confer in Closed Session     Attachments: None        14.b. Conference with Legal Counsel—Anticipated Litigation (Government Code Section 54956.9(d)(2)) Significant exposure to litigation pursuant to Government Code Section 54956.9(d)(2)(Number  of potential cases: 2)    Recommended Action: Confer in Closed Session     Attachments: None        14.c. Conference with Legal Counsel—Anticipated Litigation (Government Code Section 54956.9(d)(2)) Significant exposure to litigation pursuant to paragraph (2) of subdivision (d) of Gov’t Code  Section 54956.9: (1 potential case concerning incident and arrest by Ukiah Police Department  occurring on April 1, 2021.)    Recommended Action: Confer in Closed Session     Attachments: None        14.d. Conference with Legal Counsel – Existing Litigation  (Government Code Section 54956.9(d)(1)) Name of case: Vichy Springs Resort v. City of Ukiah, Et Al; Case No. SCUK­CVPT­2018­70200    Recommended Action: Confer in Closed Session     Attachments: None       Page 4 of 142 Page 5 of 5  14.e. Conference with Legal Counsel – Existing Litigation  (Government Code Section 54956.9(d)(1)) Name of case: Vichy Springs Resort v. City of Ukiah, Et Al; Case No. SCUK­CVPT­20­74612    Recommended Action: Confer in Closed Session     Attachments: None        14.f. Conference with Legal Counsel – Existing Litigation  (Cal. Gov’t Code Section 54956.9(d)(1)) Name of case: City of Ukiah v. Questex, LTD, et al, Mendocino County Superior Court, Case    No. SCUK­ CVPT­15­66036    Recommended Action: Confer in Closed Session     Attachments: None        14.g. Conference with Real Property Negotiators  (Cal. Gov’t Code Section 54956.8) Property:  APN Nos: 157­050­03, 157­060­02, 157­050­04, 157­050­03, 157­030­02, 157­050­ 01, 157­050­02, 157­050­10, 157­050­09, 157­070­01, 157­070­02, 003­190­01 Negotiator: Sage Sangiacomo, City Manager;  Negotiating Parties: Dave Hull and Ric Piffero  Under Negotiation: Price & Terms of Payment    Recommended Action: Confer in Closed Session     Attachments: None        14.h. Conference with Labor Negotiator (54957.6) Agency Representative: Sage Sangiacomo, City Manager Employee Organizations: All Bargaining Units    Recommended Action: Confer in Closed Session     Attachments: None       15. ADJOURNMENT     Please be advised that the City needs to be notified 72 hours in advance of a meeting if any specific accommodations or interpreter services are needed  in order for you to attend.  The City complies with ADA requirements and will attempt to reasonably accommodate individuals with disabilities upon  request.  Materials related to an item on this Agenda submitted to the City Council after distribution of the agenda packet are available for public  inspection at the front counter at the Ukiah Civic Center, 300 Seminary Avenue, Ukiah, CA  95482, during normal business hours, Monday through  Friday, 8:00 am to 5:00 pm.   I hereby certify under penalty of perjury under the laws of the State of California that the foregoing agenda was posted on the bulletin board at the main  entrance of the City of Ukiah City Hall, located at 300 Seminary Avenue, Ukiah, California, not less than 72 hours prior to the meeting set forth on this  agenda. Kristine Lawler Dated: 4­16­21   Page 5 of 142 Page 1 of 2 Agenda Item No: 3.a. MEETING DATE/TIME: 4/21/2021 ITEM NO: 2021-807 AGENDA SUMMARY REPORT SUBJECT: Proclamation Recognizing May 2-8, 2021, as Teacher Appreciation Week. DEPARTMENT: City Clerk PREPARED BY: Maya Simerson, Project & Grant Administrator, Kristine Lawler, City Clerk PRESENTER: Mayor Orozco ATTACHMENTS: 1. Teacher Appreciation Proclamation Summary: The City Council will present a proclamation recognizing May 2-8, 2021, as Teacher Appreciation Week. Background: Teacher Appreciation Week is celebrated in the first full week of May, from May 2 through May 8 in 2021, and is when teachers get the extra credit they deserve. Teaching is known to be a time-consuming and challenging profession, so this week is our chance to say thank you to those that play or have played such a huge role in our lives. Teaching is one of the oldest professions – in 561BC, the first private teacher in history was one of the most learned men of all time, Confucius. In Ancient Greece, there was huge value placed on educating children, and in the 1600s the Pilgrims also placed a similar emphasis on the practice. By the 19th century, politicians began to believe that education was needed for political order, and elementary through college education was widespread and public, and the need for teachers has been growing ever since! Though the origins of Teacher Appreciation Week are somewhat murky, it’s clear that it was in 1944 that an Arkansas school teacher, Mattye White Woodridge, wrote to politicians and educational professionals about the demand for a day to appreciate teachers. However, it wasn’t for nearly a decade until the idea was introduced to Congress by none other than Eleanor Roosevelt. In 1953, she was successful in convincing lawmakers to adopt the day. After the National Education Association (NEA) and Kansas and Indiana state affiliates lobbied Congress again to create National Teacher Day on March 7, 1980, they continued to observe it yearly even though Congress did not. They did this until 1985 when the Assembly transformed the single day into the first full week of May. Discussion: Teacher Appreciation Day is described by the NEA, which spearheads the weeklong event, as “a day for honoring teachers and recognizing the lasting contributions they make to our lives.” The City Council will present a proclamation honoring teachers and recognizing May 2-8, 2021, as Teacher Appreciation Week. Recommended Action: Present proclamation. BUDGET AMENDMENT REQUIRED: N/A Page 6 of 142 Page 2 of 2 CURRENT BUDGET AMOUNT: N/A PROPOSED BUDGET AMOUNT: N/A FINANCING SOURCE: N/A PREVIOUS CONTRACT/PURCHASE ORDER NO.: N/A COORDINATED WITH: N/A Page 7 of 142 ROCLAMATION CITY OF UKIAH RECOGNIZING UKIAH SCHOOL TEACHERS FOR EXCEPTIONAL SERVICE TO THE CITIZENS OF THE CITY OF UKIAH AND THE GREATER UKIAH VALLEY THROUGH PROVIDING OUTSTANDING WORK IN THEIR CLASSROOMS. WHEREAS, Ukiah school teachers are responsible for shaping the minds and hearts of just over 6,000 students in our community in order to ensure they all have an equal chance at life through education; and WHEREAS, teachers spend countless hours preparing lessons, creating safe and loving school cultures, building deep partnerships with families and communities, collaborating with colleagues, and reflecting on their craft; and WHEREAS, teachers go above and beyond the call of duty to fill many roles, such as, mentors, role models, coaches and motivators, in doing so teachers mold future citizens through guidance and education; and WHEREAS, teachers encounter students of widely differing backgrounds; and WHEREAS, our country’s future depends upon providing quality education to all students; and WHEREAS, during this past year teachers have pivoted to providing combinations of distance learning, hybrid learning and in-person instruction due to the pandemic; and WHEREAS, our community, and this Council, recognizes and supports each of its teachers in educating the students of Ukiah schools. THEREFORE BE IT RESOLVED that the City Council of the City of Ukiah proclaims May 2 - 8, 2021, to be TEACHER APPRECIATION WEEK. Signed and sealed, this 21st day of April in the year Two Thousand and Twenty-one. ____________________________ Juan V. Orozco City Council, Mayor ATTACHMENT 1 Page 8 of 142 AGENDA ITEM 5a Page 1 of 1 CITY OF UKIAH CITY COUNCIL MINUTES Special Meeting Virtual Meeting: https://attendee.gotowebinar.com/rt/993588385031958539 Ukiah, CA 95482 April 6, 2021 5:30 p.m. 1. ROLL CALL AND PLEDGE OF ALLEGIANCE Ukiah City Council met at a Special Meeting on April 6, 2021, having been legally noticed on April 5, 2021. The meeting was held virtually at the following link: https://attendee.gotowebinar.com/rt/993588385031958539 Mayor Orozco called the meeting to order at 5:42 p.m. Roll was taken with the following Councilmembers Present: Douglas F. Crane, Mari Rodin, Josefina Duenas, Jim O. Brown, and Juan V. Orozco. Staff Present: Sage Sangiacomo, City Manager; David Rapport, City Attorney; and Kristine Lawler, City Clerk. MAYOR OROZCO PRESIDING. The Pledge of Allegiance was led by . 2. AUDIENCE COMMENTS ON NON-AGENDA ITEMS No public comments were received. THE CITY COUNCIL ADJOURNED FOR CLOSED SESSION AT 5:35 P.M. 3. CLOSED SESSION a. Conference with Legal Counsel—Anticipated Litigation Government Code Section 54956.9(d)(2) Significant exposure to litigation pursuant to paragraph (2) of subdivision (d) of Gov’t Code Section 54956.9: (1 potential case concerning incident and arrest by Ukiah Police Department occurring on April 1, 2021.) Report out: The Council authorized the City Attorney to coordinate the procurement of an independent investigator related to the April 1, 2021, police incident. Motion by Vice Mayor Brown, Seconded by Councilmember Crane; motion carried with a 5-0 vote. 4. ADJOURNMENT There being no further business, the meeting adjourned at 7:57 p.m. ________________________________ Kristine Lawler, City Clerk Page 9 of 142 AGENDA ITEM 5b Page 1 of 1 CITY OF UKIAH CITY COUNCIL MINUTES Special Meeting Virtual Meeting Link: https://attendee.gotowebinar.com/rt/9199312935703156493 Ukiah, CA 95482 April 7, 2021 4:00 p.m. 1. ROLL CALL AND PLEDGE OF ALLEGIANCE Ukiah City Council met at a Special Meeting on April 7, 2021, having been legally noticed on April 2, 2021. The meeting was held virtually at the following link: https://attendee.gotowebinar.com/rt/9199312935703156493. Mayor Orozco called the meeting to order at 4:0 p.m. Roll was taken with the following Councilmembers Present: Douglas F. Crane, Mari Rodin (via phone while driving), Josefina Duenas (arriving at 4:24 p.m.), Jim O. Brown, and Juan V. Orozco. Staff Present: Sage Sangiacomo, City Manager; and Kristine Lawler, City Clerk. MAYOR OROZCO PRESIDING. The Pledge of Allegiance was led by Neil Davis, Community Services Program Administrator. 2.AUDIENCE COMMENTS ON NON-AGENDA ITEMS Public Comment: Sarah Reith and Adrian Baumann. 3. UNFINISHED BUSINESS a.Mid-year Budget Report and Mid-Year Departmental Budget and Objectives Progress Review or Fiscal Year 2020-21 and Review of Draft Objectives for Fiscal Year 2021-22. Presenter: Dan Buffalo, Finance Director. DEPARTMENT REPORTS: Community Services Department: Overview – Neil Davis, Program Administrator (4:17 p.m.) Museum – David Burton, Museum Director (4:20 p.m.) Golf – Maya Simerson, Project and Grant Administrator (4:31 p.m.) Aquatics – Jake Burgess, Recreation Supervisor (4:35 p.m.) Recreation – Jake Burgess, Recreation Supervisor (4:37 p.m.) Alex Rorabaugh Recreation Center (ARRC) – Jake Burgess, Recreation Supervisor (4:42 p.m.) Building Maintenance – Neil Davis, Program Administrator (4:44 p.m.) Conference Center – Neil Davis, Program Administrator (4:46 p.m.) Parks – Neil Davis, Program Administrator (4:50 p.m.) Ukiah Valley Fire Authority – Doug Hutchison, Fire Chief. (5:00 p.m.) Note: The Public Works presentation was postponed to another meeting. 4. NEW BUSINESS 5. ADJOURNMENT There being no further business, the meeting adjourned at 5:11 p.m. ________________________________ Kristine Lawler, City Clerk Page 10 of 142 AGENDA ITEM 5c Page 1 of 6 CITY OF UKIAH CITY COUNCIL MINUTES Regular Meeting Virtual Meeting Link: https://attendee.gotowebinar.com/rt/9199312935703156493 Ukiah, CA 95482 April 7, 2021 6:00 p.m. 1. ROLL CALL AND PLEDGE OF ALLEGIANCE Ukiah City Council met at a Regular Meeting on April 7, 2021, having been legally noticed on April 2, 2021. The meeting was held virtually using the following link: https://attendee.gotowebinar.com/rt/9199312935703156493. Mayor Orozco called the meeting to order at 6:03 p.m. Roll was taken with the following Councilmembers Present: Douglas F. Crane, Mari Rodin, Josefina Dueňas, Jim O. Brown, and Juan V. Orozco. Staff Present: Sage Sangiacomo, City Manager; David Rapport, City Attorney; and Kristine Lawler, City Clerk. MAYOR OROZCO PRESIDING. The Pledge of Allegiance was led by Mayor Orozco. 3. PROCLAMATIONS/INTRODUCTIONS/PRESENTATIONS b. Proclamation Recognizing April as Arts, Creativity, and Culture Month. Presenter: Mayor Orozco. Proclamation was received by Alyssum Weir, Arts Council of Mendocino County Executive Director. a. Introduction of Melissa Eleftherion Carr, New Ukiah Poet Laureate. Presenter: Mayor Orozco. Roberta Werdinger, out-going Poet Laureate, introduced incoming Poet Laureate, Melissa Eleftherion Carr, both of whom read poems. c. Proclamation Recognizing April 11th – 17th as National Public Safety Telecommunicators Week in the City of Ukiah. Presenter: Mayor Orozco. Proclamation was received by Tracey Porter, Communications/Records Supervisor. 4. PETITIONS AND COMMUNICATIONS 5. APPROVAL OF MINUTES a. Approval of the Minutes for the March 17, 2021, Special Meeting. b. Approval of the Minutes for the March 17, 2021, Regular Meeting. Motion/Second: Crane/Rodin to approve Minutes of March 17, 2021, special and regular meetings, with an administrative correction to the meeting time on the Special meeting. Motion carried by the following roll call votes: AYES: Crane, Rodin, Duenas, Brown and Orozco. NOES: None. ABSENT: None. ABSTAIN: None. 6. RIGHT TO APPEAL DECISION 7. CONSENT CALENDAR Page 11 of 142 City Council Minutes for April 7, 2021, Continued: Page 2 of 6 a. Consideration of Adoption of Resolution (2021-11) Appointing Randal A. Beckler to the Airport Commission – City Clerk. b. Consideration and Possible Award of a Contract (COU No. 2021-184) with AP Triton LLC for Consulting Services for the Ukiah Valley Fire Authority's Pre-Hospital Emergency Medical Services, Including Possible Formation of a Joint Powers Agreement, and Approval of Corresponding Budget Amendment – Fire. c. Adoption of Ordinance Amending a Land Use Designation of the Airport Industrial Park Planned Development for LACO Associates, on behalf of Fowler Auto Center, at 1117 Commerce Drive; APN 180-070-03; File No. 20-5874 – Community Development. ORDINANCE NO. 1213 ORDINANCE OF THE CITY COUNCIL OF THE CITY OF UKIAH AMENDING THE AIRPORT INDUSTRIAL PARK PLANNED DEVELOPMENT d. Award Bid for Purchase of One Dodge Durango Pursuit in the Amount of $60,478.68 from Elk Grove Auto Group – Police. e. Award Contract (COU No. 2021-185) to Coastal Mountain Electric for the Overhead to Underground Electric Cutover for the State Street Electric Underground Project in the Amount of $39,992.00 – Electric Utility. Motion/Second: Crane/Brown to approve Consent Calendar Items 7a-7e, as submitted. Motion carried by the following roll call votes: AYES: Crane, Rodin, Duenas, Brown and Orozco. NOES: None. ABSENT: None. ABSTAIN: None. 8. AUDIENCE COMMENTS ON NON-AGENDA ITEMS Public Comment: Chris Phillips. Councilmember Directive to direct staff to connect Vice Mayor Brown with Mr. Phillips. 9. COUNCIL REPORTS Presenter: Councilmember Duenas. 10. CITY MANAGER/CITY CLERK REPORTS Presenters: Sage Sangiacomo, City Manager; and:  Update of Drought and Water Conditions – Sean White, Water Resources Director.  Update on Construction Projects – Tim Eriksen, Public Works Director/City Engineer. 11. PUBLIC HEARINGS (6:15 PM) a. Conduct a Public Hearing to Consider Adoption of a Resolution Approving the Submittal of One or More Applications in Response to the 2021 State Community Development Block Grant Program NOFA; and Approve Corresponding Budget Amendments if Awarded Funding for the Application(s). Presenter: Craig Schlatter, Community Development Director. PUBLIC HEARING OPENED AT 7:01 P.M. No public comment was received. PUBLIC HEARING CLOSED AT 7:02 P.M. Page 12 of 142 City Council Minutes for April 7, 2021, Continued: Page 3 of 6 Motion/Second: Crane/Rodin to adopt resolution (2021-12) authorizing the submittal of one or more applications (COU No. 2021-186) in response to the 2021 State CDBG NOFA and authorizing the City Manager to execute all related documents; and approve the corresponding budget amendments if awarded funding for the application(s). Motion carried by the following roll call votes: AYES: Crane, Rodin, Duenas, Brown, and Orozco. NOES: None. ABSENT: None. ABSTAIN: None. 12. UNFINISHED BUSINESS a. Receive Status Report and Consider Any Action or Direction Related to the Novel Coronavirus (COVID-19) Emergency Including Operational Preparedness and Response; Continuity of City Operations and Services; Community and Business Impacts; and Any Other Related Matters. Presenter: Tami Bartolomei, Office of Emergency Services Coordinator. Report was received. b. Review of Applications Received, and Possible Adoption of Resolution Making Appointments to Fill Two Vacancies on the City of Ukiah Planning Commission. Presenters: Kristine Lawler, City Clerk and Craig Schlatter, Community Development Director. Applicant Statements: Alex de Grassi, Sarah Marshall, Douglas Johnson, and Michelle Johnson. (Note from Clerk: In respect to the council discussion regarding the applicants, a distinction was drawn, using parliamentary procedure, between nominations that were being considered and nominations that were made. The record reflects only the latter) Motion by Councilmember Rodin to nominate Alex de Grassi. Motion fails for lack of a second Motion by Mayor Orozco to nominate Sarah Marshall. Motion fails for lack of a second Motion by Councilmember Duenas to nominate Michelle Johnson and Alex de Grassi. Motion fails for lack of a second Public Comment: Veronica Perry. Motion/Second: Brown/Crane to nominate Michelle Johnson. Motion carried by the following roll call votes: AYES: Crane, Rodin, Duenas, Brown, and Orozco. NOES: None. ABSENT: None. ABSTAIN: None. City Attorney Rapport stated that there was a conflict of interest for Councilmember Rodin in respect to Sarah Marshall due to Ms. Marshall being a tenet of Councilmember Rodin’s; and recommended that she recuse herself from any decisions that affects Ms. Marshall. Motion by Councilmember Rodin to nominate Alex de Grassi. Motion fails for lack of a second Motion/Second: Crane/Brown to nominate Douglas Johnson. Motion carried by the following roll call votes: AYES: Crane, Rodin, and Brown. NOES: Duenas and Orozco. ABSENT: None. ABSTAIN: None. Page 13 of 142 City Council Minutes for April 7, 2021, Continued: Page 4 of 6 RECESS: 8:04 – 8:12 P.M. for Staff to consult with the City Attorney in respect to the conflict of interest. City Attorney Rapport stated that Councilmember Rodin did not use her official position to grant a foreseeable financial interest to benefit herself because she didn’t move to nominate or vote to approve Sarah Marshall. Since Councilmember Rodin’s votes were not an exercise of a conflict of interest, her votes count for both the nomination of Michelle Johnson and Douglas Johnson. Motion/Second: Crane/Brown to adopt the resolution (2021-13) accepting the nominations and making the appointments of Michelle Johnson and Douglas Johnson to the Planning Commission, terms to expire on April 7, 2025. Motion carried by the following roll call votes: AYES: Crane, Duenas, and Brown. NOES: Rodin and Orozco. ABSENT: None. ABSTAIN: None. Public Comment, continued: Veronica Perry. c. Approval of Contract with Team Ghilotti, Inc. of Petaluma in the Amount of $353,141.07 for the Construction of the Transportation Improvements for the Gobbi and Waugh Traffic Signal Project, Specification No. 20-11, and Approval of Corresponding Budget Amendment. Presenter: Tim Eriksen, Public Works Director/City Engineer. Motion/Second: Brown/Crane to approve contract (COU No. 2021-187) with Team Ghilotti, Inc. of Petaluma in the amount of $353,141.07 for the construction of the Transportation Improvements for the Gobbi and Waugh Traffic Signal Project, Specification No. 20-11; and approval of a corresponding budget amendment. Motion carried by the following roll call votes: AYES: Crane, Rodin, Duenas, Brown, and Orozco. NOES: None. ABSENT: None. ABSTAIN: None. d. Update on Emergency Repair of the Yosemite Drive Water Main and Determine that Emergency Conditions Continue to Require the Emergency Repair. Presenter: Tim Eriksen, Public Works Director/City Engineer. Motion/Second: Crane/Brown to determine that emergency conditions continue to require the repair of the Yosemite Drive Water Main without competitive bidding. Motion carried by the following roll call votes: AYES: Crane, Rodin, Duenas, Brown, and Orozco. NOES: None. ABSENT: None. ABSTAIN: None. e. Discuss and Consider Approval of Resolution Confirming an Emergency Order of the City Manager of the City of Ukiah in His Capacity as the Director of Emergency Services extending the operation period of the Inland Winter Homeless Shelter located at 1045 South State Street in Ukiah through April 30, 2022. Presenter: Sage Sangiacomo, City Manager. Public Comment: Maureen Mulheren, Mendocino County 2nd District Supervisor. Motion/Second: Crane/Rodin to approve Resolution (2021-14) confirming Emergency Order of the City Manager of the City of Ukiah, in his capacity as the Director of Emergency Services for the City, extending the operation period of the Inland Winter Homeless Shelter located at 1045 South State Street in Ukiah through April 30, 2022. Motion carried by the following roll call votes: AYES: Crane, Rodin, Duenas, Brown, and Orozco. NOES: None. ABSENT: None. ABSTAIN: None. Page 14 of 142 City Council Minutes for April 7, 2021, Continued: Page 5 of 6 13. NEW BUSINESS a. Consideration and Possible Adoption of Resolution Adopting the City of Ukiah Housing Rehabilitation Program Guidelines, to Possibly be Funded by the State Community Development Block Grant Program. Presenter: Craig Schlatter, Community Development Director. Motion/Second: Brown/Crane to adopt resolution (2021-15) adopting the City of Ukiah Housing Rehabilitation Program Guidelines with modification as presented by Director Schlatter*. Motion carried by the following roll call votes: AYES: Crane, Rodin, Duenas, Brown, and Orozco. NOES: None. ABSENT: None. ABSTAIN: None. *Modification as presented by Director Schlatter: On page 329 of the April 7, 2021, Council packet, the sentence reading: To the extent that an amortized loan payment will not cause housing costs to exceed 49% of gross monthly income should become: To the extent that an amortized loan payment will not cause housing costs plus other monthly debt payments to exceed 49% of gross monthly income. b. Consideration and Possible Authorization for the Purchase and Services of an Automated License Plate Reader System to Vigilant Solutions in the Amount of $42,610.20 Plus Tax Over Five Years, and Authorizing the City Manager to Execute a Five-Year Professional Services Agreement with Vigilant Solutions for Related Services. Presenters: Traci Boyl, City Manager's Office Management Analyst and Noble Waidelich, Captain Ukiah Police Department. Motion/Second: Crane/Rodin to award contract (COU No. 2021-188) for the purchase and services of an Automated License Plate Reader System to Vigilant Solutions in the amount not-to-exceed $42,610.20 over five years, and authorizing the City Manager to execute a five-year Professional Services Agreement with Vigilant Solutions for related services. Motion carried by the following roll call votes: AYES: Crane, Rodin, Duenas, Brown, and Orozco. NOES: None. ABSENT: None. ABSTAIN: None. c. Adopt Resolution Approving Revised City of Ukiah Electric Utility Renewable Energy Resources Procurement Plan and Enforcement Program. Presenter: Mel Grandi, Electric Utility Director. Motion/Second: Crane/Brown to adopt resolution (2021-16) approving the Revised City of Ukiah Electric Utility Renewable Energy Resources Procurement Plan (RPS) and Enforcement Program. Motion carried by the following roll call votes: AYES: Crane, Rodin, Duenas, Brown, and Orozco. NOES: None. ABSENT: None. ABSTAIN: None. d. Adopt Resolution Approving the 2025 Base Resource Contract with Western Area Power Administration and Authorize City Manager to Execute the Contract on the City's Behalf. Presenter: Mel Grandi, Electric Utility Director. Motion/Second: Crane/Rodin to adopt Resolution (2021-17) approving the 2025 Base Resource Contract (COU No. 2021-191) with Western Area Power Administration, and authorize City Manager to execute the contract on the City's behalf. Motion carried by the following roll call votes: AYES: Crane, Rodin, Duenas, Brown, and Orozco. NOES: None. ABSENT: None. ABSTAIN: None. e. Receive Updates on City Council Committee and Ad Hoc Assignments and, if Necessary, Consider Modifications to Assignments and/or the Creation/Elimination of Ad hoc(s). Presenters: City Manager Sangiacomo and Councilmember Rodin. Page 15 of 142 City Council Minutes for April 7, 2021, Continued: Page 6 of 6 Councilmember Directive to meet with staff regarding annexation issues before the next LAFCo meeting. Motion/Second: Rodin/Duenas to appoint Councilmember Crane and Vice Mayor Brown to serve on an ad hoc to meet with the Upper Russian River Water Agency (URRWA). Motion carried by the following roll call votes: AYES: Crane, Rodin, Duenas, Brown, and Orozco. NOES: None. ABSENT: None. ABSTAIN: None. Council Consensus to leave agenda order as is. 14. CLOSED SESSION a. Conference with Legal Counsel—Anticipated Litigation (Government Code Section 54956.9(d)(2)) Significant exposure to litigation pursuant to Government Code Section 54956.9(d)(2)(Number of potential cases: 3)" b. Conference with Legal Counsel—Anticipated Litigation (Government Code Section 54956.9(d)(4)) Deciding whether to initiate litigation pursuant to paragraph (4) of subdivision (d) of Government Code Section 54956.9 (Potential Cases: 1)" c. Conference with Legal Counsel – Existing Litigation (Government Code Section 54956.9(d)(1)) Name of case: Vichy Springs Resort v. City of Ukiah, Et Al; Case No. SCUK-CVPT-2018-70200 d. Conference with Legal Counsel – Existing Litigation (Cal. Gov’t Code Section 54956.9(d)(1)) Name of case: City of Ukiah v. Questex, LTD, et al, Mendocino County Superior Court, Case No. SCUK- CVPT-15-66036 e. Conference with Labor Negotiator (54957.6) Agency Representative: Sage Sangiacomo, City Manager Employee Organizations: All Bargaining Units f. Conference with Real Property Negotiators (Cal. Gov’t Code Section 54956.8) Property: APN Nos: 157-050-03, 157-060-02, 157-050-04, 157-050-03, 157-030-02, 157-050- 01, 157-050-02, 157-050-10, 157-050-09, 157-070-01, 157-070-02, 003-190-01 Negotiator: Sage Sangiacomo, City Manager; Negotiating Parties: Dave Hull and Ric Piffero Under Negotiation: Price & Terms of Payment Direction was given to staff. 15. ADJOURNMENT There being no further business, the meeting adjourned at 9:26 p.m. ________________________________ Kristine Lawler, City Clerk Page 16 of 142 Page 1 of 2 Agenda Item No: 7.a. MEETING DATE/TIME: 4/21/2021 ITEM NO: 2019-82 AGENDA SUMMARY REPORT SUBJECT: Report of Disbursements for the Month of March 2021. DEPARTMENT: Finance PREPARED BY: Candice Rasmason, Accounts Payable PRESENTER: Consent Calendar ATTACHMENTS: 1. March 2021 Summary of Disbursements 2. Account Codes for Reference 3. Object codes for Reference 4. March 2021 Disbursement Detail Summary: The Council will review and consider approval of the Report of Disbursements for the month of March 2021. Background: Payments made during the month of March 2021 are summarized on the Report of Disbursements. Further detail is supplied on the Schedule of Bills, representing the four (4) individual payment cycles within the month. Accounts Payable Check Numbers (City & UVFA): 3041889-3041931; 3041932-3042067; 3042068-3042156; 3042157-304224 Accounts Payable Wire Transfers: 41 Payroll Check Numbers: 508674-508724; 508725-508771 Payroll Manual Check Numbers: N/A Direct Deposit Numbers: 103573-103795; 103796-104021 Manual Direct Deposit Numbers: N/A Void Check Numbers: 3041626, 3031265, 3041902 Void Direct Deposit Numbers: N/A Discussion: This report is submitted in accordance with Ukiah City Code Division 1, Chapter 7, Article 1. Attachment #1: March 2021 Summary of Disbursements Attachment #2: Account Codes for Reference Attachment #3: Object Codes for Reference Attachment #4: March 2021 Disbursement Detail Page 17 of 142 Page 2 of 2 Recommended Action: Approve the Report of Disbursements for the Month of March 2021. BUDGET AMENDMENT REQUIRED: N/A CURRENT BUDGET AMOUNT: N/A PROPOSED BUDGET AMOUNT: N/A FINANCING SOURCE: N/A PREVIOUS CONTRACT/PURCHASE ORDER NO.: N/A COORDINATED WITH: N/A Page 18 of 142 Attachment 1 FUNDS: 100 General Fund $109,366.72 700 Sanitary Disposal Site Fund $16,921.71 101 GF-(Sub-Fund) Visit Ukiah 701 Landfill Corrective Fund 105 Measure S General Fund 702 Disposal Closure Reserve Fund $7,193.38 110 Special General Fund 704 Post Closure Fund - Solid Waste 120 Streets Capital Improvement $19,170.68 710 Ambulance Services Fund $7,174.45 200 City Adminstrative Services $84,097.29 720 Golf Fund $1,617.85 201 Worker's Comp Fund 730 Confernence Center Fund $3,111.64 202 Liability Fund 750 Visit Ukiah 203 Garage Fund $8,708.43 777 Airport Fund $24,235.99 204 Purchasing Fund $126.59 778 Airport Capital Improvement Fund 205 Billing & Collections Fund $25,021.53 779 Special Aviation Fund 206 Public Safety Dispatch Fund $14,313.03 800 Electric Fund $681,060.35 207 Payroll Posting Fund $293,810.52 801 Electric Capital Reserve Fund $8,583.54 208 Building Maintenance/Corp Yard Fund $503,966.32 803 Lake Mendocino Bond Reserve 209 IT Fund $74,717.53 805 Street Lighting Fund $12,225.53 220 Equipment Reserve Fund 806 Public Benefits Fund $15,226.14 249 City Housing Bond Proceeds 807 Electric Capital & Trade Fund 250 Special Revenue Fund $0.00 820 Water Fund $78,024.17 251 Special Projects Reserve Fund 822 Water Capital Improvement Fund $8,021.98 253 CITY PROP 172 $433.52 830 Recycled Water Fund $78,122.94 300 Park Development Fund 840 City/District Sewer Fund $118,290.48 301 Anton Stadium Fund $0.00 841 Sewer Contruction Fund 302 Observatory Park Fund 843 Sewer Capital Fund 304 Swimming Pool Fund $0.00 900 Special Deposit Trust $535.80 305 Riverside Park Fund $0.00 901 General Service (Accts Recv)$619.00 306 Skate Park Fund $0.00 902 U.S.W. Billing & Collection $86,843.91 310 Museum Grants 903 Public Safety - AB 109 $0.00 311 Alex Rorbaugh Recreation Center Fund $2,200.62 905 Federal Emergency Shelter Grant 312 Downtown Business Improvement Fund 905 Mendocino Emergency Service Authority 313 LMIHF Housing Asset Fund 911 Russian River Watershed Association $110,792.73 314 Winter Special Events 915 UVFD $7,328.28 315 Advanced Planning Fund $0.00 916 UVFD PROP 172 $433.53 500 2106 Gas Tax Fund 917 UVFD Measure B $4,973.35 501 2107 Gas Tax Fund 918 UVFD Mitigation $1,361.78 503 2105 Gas Tax Fund 940 Sanitation District Special Fund 505 Signalization Fund 942 Rate Stabilization - UVSD Fund 506 Bridge Fund 943 Sanitation District Capital Improvement Fund 507 1998 STIP Augmentation Fund 952 REDIP Sewer Enterprise Fund 508 SB325 Reimbursement Fund 960 Community Redevelopment Agency 509 S.T.P. Fund $885.06 961 RDA Housing Pass-Through 510 Trans-Traffic Congest Relief Fund 962 Redevelopment Housing Fund 511 Rail Trail Fund 963 Housing Debt 600 Community Development Block Grant 964 RDA Capital Pass-Through 601 EDBG 94-333 Revolving Loan 965 Redevelopment Capital Improvement Fund 602 Community Development Fund 966 Redevelopment Debt Service 603 08-HOME-4688 967 Housing Bond Proceeds 604 CDBG Grant 09-STBG-6417 968 Non-Housing Bond Proceeds 605 11-HOME-7654 Fund $0.00 969 RDA Obligation Retirement Fund 606 CDBG Grant 10-EDEF-7261 844/944 Sewer Capital Projects Fund $18,618.45 607 Prop 84 Grant Fund 609 13-CDBG-8940 610 City RDA Projects Fund 613 Home Program Activities $3,631,688.00 630 Asset Seizure Fund 631 Asset Seizure Fund (Drug/Alcohol)Retainage Withheld $15,941.55 633 H & S Education 11489(B)(2)(A1)611 CDBG 16-CDBG-11147 634 Federal Asset Seizure Grants 635 SUP Law Enforcement Service Fund 636 CBTHP Officer $1,897.07 637 Local Law Enforcement Block Grant 638 Asset Forfeiture 11470.2 H & S 639 Special Revenue - Police 640 Parking District Fund $657.34 691 Museum Fund 695 Transfer Station Fund PAYROLL CHECK NUMBERS: 508674-508724 DIRECT DEPOSIT NUMBERS: 103573-103795 TOTAL DEMAND PAYMENTS- A/P CHECKS $6,078,318.78 PAYROLL PERIOD: 2/21/21-3/6/21 TOTAL DEMAND PAYMENTS- EFT's $77.00 PAYROLL CHECK NUMBERS: 508725-508771 TOTAL PAYROLL CHECKS & DIRECT DEPOSITS $995,133.33 DIRECT DEPOSIT NUMBERS: 103796-104021 TOTAL PAYROLL EFT's (TAXES, PERS, VENDORS)$588,997.16 PAYROLL PERIOD: 3/7/21-3/20/21 * vendor name( if applicable) PAYROLL CHECK NUMBERS: DIRECT DEPOST NUMBERS: PAYROLL PERIOD: VOID CHECK NUMBERS: 3041626, 3031265, 3041902 TOTAL PAYMENTS $7,662,526.27 WIRE TRANSFER NUMBERS: 41 CERTIFICATION OF CITY CLERK This register of Payroll and Demand Payments was duly approved by the City Council on ____________________. City Clerk APPROVAL OF CITY MANAGER CERTIFICATION OF DIRECTOR OF FINANCE I have examined this Register and approve same.I have audited this Register and approve for accuracy and available funds. ____________________________________________________________________________________________ City Manager Director of Finance MANUAL CHECK NUMBERS: CITY OF UKIAH REPORT OF DISBURSEMENTS REGISTER OF PAYROLL AND DEMAND PAYMENTS FOR THE MONTH OF MARCH Page 19 of 142 Account Code Summary Attachment 2 10000000 General Fund 20524412 Water Department - Meter Readers 10020210 Patrol 20526430 Electric Department - Meter Readers 10020214 Police Reserves 20620231 Ukiah Dispatch 10020216 COPS Grant 20620232 Ft Bragg Dispatch 10020218 Police - CSO 20700000 Payroll Posting Fund 10020224 Police - Major Crimes Task Force 20822500 Building Maintenance 10021210 Fire Administration 20824300 Corporation Yard 10021312 Fire Volunteer Station 20913900 IT Fund 10022100 Parks 22013300 FA Replace - Finance UB 10022300 Aquatics 22020200 FA Replace - Police Operations 10022800 Recreation 22021210 FA Replace - Fire Administration 10022810 Recreation Administration 22022900 FA Replace - Information Technology 10022821 Adult Basketball 22024100 FA Replace - Garage 10022822 Adult Softball 22024220 FA Replace - Streets 10022824 Co-Ed Volleyball 22024413 FA Replace - Water Distribution Cap 10022831 Youth Basketball 22024414 FA Replace - Water Distribution O&M 10022832 Youth Softball 22024421 FA Replace - City Wastewater 10022840 Day Camp 25024210 Engineering Reserve 10022850 Classes & Clinics 25024300 Corporation Yard Reserve 10022860 Special Activities 25122900 CIP - IT 10023100 Community Planning 25123100 CIP - Planning 10023320 Building Inspection 25124210 CIP - Engineering 10024210 Engineering 25124220 CIP - Streets 10024214 Traffic Signals 25124410 CIP - Water 10024224 Storm Drains 25124421 CIP - City Wastewater 10024620 Streets 25126410 CIP - Electric 10112700 Visit Ukiah 30022200 Park Development 20010000 City Council 30122210 Anton Stadium 20012100 City Manger 30222220 Observatory Park 20012200 City-Wide Admin 30522250 Riverside Park 20012300 Community Outreach 30622260 Skate Park 20012500 City Clerk 30822280 Project Planning 20012600 Economic Development 31022700 Museum Grant 20012800 Emergency Management 31122000 Alex Rorabaugh Recreation Center 20013200 Budget Management 31217100 Downtown Business Improvement District 20013210 Accounts Payable 50524210 Engineering - Signalization Fund 20013220 Payroll 50624210 Capital Engineering 20013400 Accounting 50824210 SB325 - Engineering 20014000 City Attorney 50824220 SB325 - Streets 20015100 City Treasurer 50924210 STP - Engineering 20016100 Human Resources 50924220 STP - Streets 20112400 Worker's Compensation Fund 51024220 Trans - Traffic Slurry Seal 20212400 Liability Fund 510X9999 Trans -Traffic Project 20324100 Garage Fund 60217441 Grant - CDBG 602 20413500 Purchasing Fund 60317442 Grant - HOME 603 20513300 Billing and Collections 60417441 Grant - CDBG 604 20514000 Billing and Collections - City Attorney 60517442 Grant - HOME 605 Page 20 of 142 Account Code Summary Attachment 2 60517462 FTHB Activity Delivery 60517461 First Time Homebuyer Program 60517467 FTHB - PIR 80026130 Electric Substation 60600000 CDBG Grant 10-EDEF-7261 Fund 80026140 Reimbursable Work for Others 60617441 Grant - CDBG 606 80026200 Electric Metering 60617451 General Administration 80026300 Electric Generation 60617452 AD ED Direct Financial Assistance 80026312 Mendocino Hydro 60617453 ED Direct Financial Assistance 80026330 Hydro Electric 60717443 Grant Prop 84 80026400 Electric Administration 60724413 Prop 84 Water Distribution Cap 80026410 Electric General Administration 60900000 13-CDBG-8940 80026430 Interdepartmental Charges 60917458 13-CDBG-8940 80326330 Hydro Plant 63020210 Asset Seizure Expenditure 80526610 Street Lighting 63120210 Drug & Alcohol Education 80626500 Public Benefit 63320210 H&S Asset Seizure Expenditure 82027110 Water 63420250 Fed Asset Seizure Expenditure 82027111 Water - Production O&M 63520210 SLESF 82027113 Water - Distribution Capital 63820210 Asset Forfeiture 11470 82027114 Water - Distribution O&M 64020213 Parking Enforcement 82027115 Water - Production Capital 69122700 Museum 82227113 Water - Distribution Capital 70024500 Landfill 700 84027220 Wastewater 70224500 Landfill Closure 84027221 Wastewater City - O&M 70424500 Landfill Post closure 84027222 Wastewater City - Capital 72022400 Golf 84027225 Wastewater Treatment - O&M 73022600 Conference Center 84027226 Wastewater Treatment - Capital 75017110 Visit Ukiah 84227220 Wastewater 77725200 Airport Operations 84327222 Wastewater City - Capital 77817411 FAA Grant 84427221 Wastewater City Capital - O&M 80026100 Electric Administration 84427222 Wastewater City - Capital 80026110 Electric Overhead 90000000 Special Deposit Trust Fund 80026120 Electric Underground 91190100 Russian River Watershed Assoc 80100000 Infrastructure 96900000 Successor Agency Page 21 of 142 12102 INVENTORY OF SUPPLIES 52526 FRAUD INVEST. ASSESSMENT 12103 STORES PURCHASES 52527 A.D.P. PREMIUM & DEDUCTIBLE 12104 INVENTORY - PURCHASES 52528 LIABILITY INSURANCE 12105 STORES ISSUES 52529 EARTHQUAKE & FLOOD PREMIUMS 51211 PERS UNFUNDED LIABILITY 52530 POLLUTION-ENVIRON INS PREMIUM 51280 OVERTIME/CALLOUT MEALS 52531 UMEMPLOY. INS EXPENSE 51285 CALLOUT MILEAGE REIMBURSEMENTS 52532 SAFETY & TRAINING SUPPORT 52100 CONTRACTED SERVICES 52600 RENT 52107 CONTRACTED SERVICES-EIR 52841 SUCCESSOR AGENCY ADMIN 52108 CONTRACT SERVICES-GPU 54100 SUPPLIES 52110 AMBULANCE BILLING 54101 POSTAGE 52111 MAINT. CONTRCTS - DEFIBRULATOR 54102 SMALL TOOLS 52112 M. S. OVERSIGHT 54105 PHOTOGRAPHIC EXPENSE 52113 PLANNING STUDIES 54106 SPECIALTY SUPPLIES 52114 COMPLIANCE STUDIES 54120 PW - SPECIAL SUPPLIES 52120 LABOR CHARGES FROM OTHER DEPAR 54121 PW - ASPHALT CONCRETE 52130 EDUCATIONAL & MARKETING MATL'S 54122 PW - AGGREGATE BASE 52131 ASSISTANCE TO SENIORS 54123 PW - CRACK SEALANT 52132 EMERGENCY ASSISTANCE 54124 PW - CONCRETE/SUPPLIES 52133 MONTHLY DISCOUNT PROGRAM 54125 PW - TRAFFIC PAINT 52134 CONTRACT ADMINISTRATION 54126 PW-PREMARKS 52135 ENERGY CONSERVATION PROGRAM 54127 PW - SIGN POSTS/SHEETING 52136 PHOTOVOLTAIC RATES/INCENTIVE 54128 PW - COLD PATCH MATERIAL 52137 PUBLIC BENEFITS PROGRAM MGMT 54129 PW - TACK OIL 52138 NCPA PUBLIC BENEFITS PROGRAM 54130 PW - SAFETY 52139 RESEARCH, DEVELOPMENT & DEMO 54131 PW - BARRICADES & CONES 52140 LITIGATION EXPENSES 54160 HR - CITY LIABILITY & CONTRACT 52145 DETACHMENT-SEWER-UVSD 54161 HR - BACKGROUND & PHYSICALS 52150 LEGAL SERVICES/EXPENSES 54162 HR - ADVERTISING 52151 AFLAC & PERS INSUR ADMIN FEES 54163 HR - INTERVIEW SUPPLIES 52170 UKIAH WASTE SOLUTIONS 54164 HR - FORMS & OTHER DIV. EXP. 52171 RESIDENTIAL BILLING CHARGE 54165 HR - NEW EMPLOYEE FINGERPRINT 52172 COMMERCIAL OVERSIGHT FEE 54166 HR - DOT TESTING PROGRAM 52180 SECURITY SERVICES 54167 HR - EMPLOYEE DEVELOPMENT 52301 PROPERTY TAX ADMIN FEE 54168 HR - REMIF SAFETY TRNG & SUPPO 52302 AMBULANCE FEES 54201 PRISONER EXPENSE 52303 REHIT SUPPORT 54202 MAJOR CRIME INVETIGATIONS 52304 LAFCO FEES AND PROP TAX EXP 54320 SOFTWARE 52500 TRUSTEE FEES 54330 COMPUTER AND TECHNOLOGY 52510 ADVERTISING & PROMOTION 54500 EQUIP RENTS AND LEASES 52515 ADVERTISING & PUBLICATION 54700 FINES & PENALTIES 52521 LIABILITY INSURANCE PREMIUM 55100 TELEPHONE 52522 LIABILITY INSURANCE DEDUCT 55200 PG&E 52523 BOILER/MACHINERY PREMIUMS 55210 UTILITIES 52524 PROPERTY INSURANCE 56100 VEHICLE & EQUIPMENT MAINT. & R 52525 WORKER'S COMP. EXPENSE 56110 CITY GARAGE - PARTS Object Code Summary Attachment 3 Page 22 of 142 56121 R & M RADIO EQUIPMENT 56111 CITY GARAGE - LABOR 56122 R & M NON-AUTO EMS EQUIPMENT 56112 EQUIPMENT PARTS FOR RESALE 56123 R & M COMPUTERS 56120 EQUIPMENT MAINTENANCE & REPAIR 56124 MAINT CONTRACT DEFIBULATORS 80235 SYSTEM MAINTENANCE 56130 EXTERNAL SERVICES 80236 EMERGENCY/CONTINGENCY 56210 FUEL & FLUIDS 90100 LOAN PROCEEDS 56300 BUILDING MAINT. & REPAIR 90101 LOAN PAYMENT RECEIVED 56410 EQUIPMENT RENTAL - PRIVATE 90301 LOAN REPAYMENT 56504 FACILITY MAINTENANCE & REPAIR 90410 BOND PROCEEDS 56600 AIRFIELD MAINTENANCE & REPAIR 56700 LANDFILL CLOSURE EXPENSE 57100 CONFERENCE & TRAINING 57101 CONF & TRAINING-AQUATICS 57102 CONF & TRAINING-PARKS STAFF 57200 MEETINGS 57300 MEMBERSHIPS & SUBSCRIPTIONS 58101 NCPA PLANT GENERATION 58102 NCPA POWER PURCHASES 58103 NCPA TRANSMISSION 58104 NCPA MANAGEMENT SERVICES 58105 NCPA THIRD PARTY SALES 58106 NCPA PASS THROUGH COSTS 58107 NCPA COMMITMENTS ACTIVITY 58201 WATER PURCHASES 58202 WATER TREATMENT PLANT CHEMICAL 58401 AVIATION FUEL 58410 GARAGE LUBRICANTS & PARTS 58510 REIMBRSABLE JOBS 59100 PROPERTY TAXES PAID 59101 FEES 59102 FRANCHISE FEES 59350 PURCHASE DISCOUNTS TAKEN 59400 OTHER EXPENSES 70101 LOAN PAYMENTS MADE 70102 BOND INTEREST PAYMENTS 70110 BOND ISSUANCE COSTS 70201 LOAN PRINCIPAL PAYMENTS 70202 BOND PRINCIPAL PAYMENTS 80100 MACHINERY & EQUIPMENT 80200 BUILDINGS ACQUISITION 80210 LAND ACQUISITION 80220 BUILDING IMPROVEMENTS 80230 INFRASTRUCTURE 80231 RECYCLING STUDY 50% GRANT MATC 80232 LINE REPLACEMENTS 80233 MAIN REPLACEMENTS 80234 INFLOW/INFILTRATION Page 23 of 142 Attachment 4 Page 24 of 142 Page 25 of 142 Page 26 of 142 Page 27 of 142 Page 28 of 142 Page 29 of 142 Page 30 of 142 Page 31 of 142 Page 32 of 142 Page 33 of 142 Page 34 of 142 Page 35 of 142 Page 36 of 142 Page 37 of 142 Page 38 of 142 Page 39 of 142 Page 40 of 142 Page 41 of 142 Page 42 of 142 Page 43 of 142 Page 44 of 142 Page 45 of 142 Page 46 of 142 Page 47 of 142 Page 48 of 142 Page 49 of 142 Page 50 of 142 Page 51 of 142 Page 52 of 142 Page 53 of 142 Page 54 of 142 Page 55 of 142 Page 56 of 142 Page 57 of 142 Page 58 of 142 Page 59 of 142 Page 60 of 142 Page 61 of 142 Page 62 of 142 Page 63 of 142 Page 64 of 142 Page 65 of 142 Page 66 of 142 Page 67 of 142 Page 68 of 142 Page 69 of 142 Page 70 of 142 Page 71 of 142 Page 72 of 142 Page 73 of 142 Page 74 of 142 Page 75 of 142 Page 76 of 142 Page 77 of 142 Page 78 of 142 Page 79 of 142 Page 1 of 2 Agenda Item No: 7.b. MEETING DATE/TIME: 4/21/2021 ITEM NO: 2021-728 AGENDA SUMMARY REPORT SUBJECT: Adopt a Resolution Authorizing Participation in the California Intergovernmental Risk Authority (CIRA), with Regard to the Workers' Compensation Program, Effective 7/01/2021. DEPARTMENT: Human Resources / Risk Management PREPARED BY: Sheri Mannion, H.R. Director/Risk Manager PRESENTER: Consent Calendar ATTACHMENTS: 1. Resolution to Participate in CIRA Workers Comp Program Summary: Council will consider adopting a Resolution of the City of Ukiah authorizing participation in the California Intergovernmental Risk Authority (CIRA), with regard to the Workers' Compensation Program, effective 7/01/2021. Background: Rather than purchase commercial insurance through a commercial insurance carrier, the City of Ukiah participates in an intergovernmental arrangement through which a group of cities and towns (referred to as the members) contribute to a shared fund that pays for liability and workers’ compensation claims and provides risk management services. That fund is often commonly referred to as a pool. Pools are empowered to exist through the sections of the California Government Code known as joint powers authority (JPA), which allow two or more like entities to pool funds to pay for claims. At its December 2, 2020, regular meeting, Council received information and a presentation regarding the merger of the City's JPA insurance pool Redwood Municipal Insurance Fund (REMIF) and the Public Agency Risk Authority of California (PARSAC) into a new pool called California Intergovernmental Risk Authority (CIRA). On December 16, 2020, Council adopted Resolution 2020-67 approving and adopting the JPA agreement to join CIRA, effective 7/01/2021. Discussion: To continue participation in the workers’ compensation program, but moving the program from REMIF to CIRA, requires application and approval from the California Department of Industrial Relations (DIR), the Division of Workers’ Compensation. Further, the DIR requires approval and authorization by the pool members to participate in the CIRA workers’ compensation program. With the merger, new claims with a date of loss on or after 7/01/21 will fall under the obligation of CIRA. Further, the attached Resolution (Attachment 1) authorizes staff to execute any other document(s) (such as the application) that may be necessary or appropriate to enter into and implement the agreement on behalf of the City. Lastly, the resolution consents the City of Ukiah to be governed and abide by the master program documents, the memoranda of coverage, and other documents and policies that are adopted by CIRA. Council is asked to adopt the attached Resolution and further direct staff to work with CIRA on steps necessary to ensure participation in the workers’ compensation program. Recommended Action: Adopt a Resolution authorizing participation in the California Intergovernmental Risk Authority (CIRA), with regard to the Workers' Compensation Program, effective 7/01/2021. BUDGET AMENDMENT REQUIRED: N/A CURRENT BUDGET AMOUNT: N/A Page 80 of 142 Page 2 of 2 PROPOSED BUDGET AMOUNT: N/A FINANCING SOURCE: N/A PREVIOUS CONTRACT/PURCHASE ORDER NO.: N/A COORDINATED WITH: N/A Page 81 of 142 CITY OF UKIAH RESOLUTION NO. 2020-XX RESOLUTION OF THE CITY OF UKIAH AUTHORIZING PARTICIPATION IN CALIFORNIA INTERGOVERNMENTAL RISK AUTHORITY (CIRA) EFFECTIVE 7/1/2021. WHEREAS, the California Intergovernmental Risk Authority (CIRA) provides risk-sharing, pooled workers’ compensation coverage as a certificated self-insured under the master certificate 5017 with the office of self-insured plans; and WHEREAS, the City has been a member of the Redwood Empire Municipal Insurance Fund (REMIF) as a certificated self-insured under the master certificate 5013 with the office of self- insured plans; and WHEREAS, the Board of REMIF has taken action to join CIRA effective 7/1/2021 for all workers’ compensation obligations that occur and/or are determined with a date of injury 7/1/2021 or after; and WHEREAS, the City of Ukiah has decided to approve the action of the Board of REMIF and join CIRA as a member under master certificate 5017 effective 7/1/2021 for all workers’ compensation obligations that occur and/or are determined with a date of injury 7/1/2021 or after. NOW, THEREFORE, BE IT RESOLVED by the City Council, of the City of Ukiah as follows: 1.The City hereby approves and authorizes participation in the CIRA workers’ compensation program effective 7/1/2021 for all workers’ compensation obligations that occur and/or are determined with date of injury of 7/1/2021 or after. 2.The Human Resources/Risk Management Director is authorized to execute any other document(s) that may be necessary or appropriate to enter into and implement the agreement on behalf of the City. 3.The City consents to be governed and abide by the master program documents, the memoranda of coverage, and other documents and policies as adopted by the California Intergovernmental Risk Authority (CIRA) under master certificate 5017. This resolution was passed and adopted by the City Council of the City of Ukiah at its regular meeting on this 21st day of April 2021, by the following vote: Attachment 1 Page 82 of 142 AYES: NOES: ABSENT: ABSTAIN: APPROVED:______________________________ Juan V. Orozco, Mayor ATTEST:______________________________ Kristine Lawler, City Clerk Page 83 of 142 Page 1 of 1 Agenda Item No: 7.c. MEETING DATE/TIME: 4/21/2021 ITEM NO: 2021-803 AGENDA SUMMARY REPORT SUBJECT: Consider Approval of Budget Amendment in the Amount of $75,000 for the Yokayo Court Electrical System Improvement Project. DEPARTMENT: Electric Utility PREPARED BY: Cindy Sauers, Electric Utility Director PRESENTER: Consent Calendar ATTACHMENTS: None Summary: Council will consider approving a budget amendment in the amount of $75,000 for the Yokayo Court Electrical Infrastructure Improvement Project. Background: In January 2021, Council approved the Yokayo Court Electrical System Improvement work in the amount of $106,917. At that time, the funding for this project was available in the Electric Utility's Capital Underground Infrastructure account, but was not encumbered due to contract signing delays. Subsequently, other projects encumbered the available account funds prior to the contract being executed. As a result, a budget amendment is being requested to provide adequate contract funding. Discussion: Staff is asking Council to approve a budget amendment in the amount of $75,000 to cover expenses related to the project. Recommended Action: Approve budget amendment in the amount of $75,000 for the Yokayo Court Electrical System Improvement Project. BUDGET AMENDMENT REQUIRED: Yes CURRENT BUDGET AMOUNT: 80126100.80230.18043 $230,000. PROPOSED BUDGET AMOUNT: 80126100.80230.18043 $305,000. FINANCING SOURCE: Electric Capital Improvement Fund 801 PREVIOUS CONTRACT/PURCHASE ORDER NO.: COORDINATED WITH: Mel Grandi, Electric Utility Director Page 84 of 142 Page 1 of 2 Agenda Item No: 7.d. MEETING DATE/TIME: 4/21/2021 ITEM NO: 2021-804 AGENDA SUMMARY REPORT SUBJECT: Notification of Purchase Order #47128 issued to JM Integration, to furnish and install one PowerEdge T640 Tower Server for the Wastewater Treatment Plant in the Amount of $16,095.31. DEPARTMENT: Water Resources PREPARED BY: Jarod Thiele, Public Works Management Analyst PRESENTER: Consent Calendar ATTACHMENTS: 1. JM Integration Proposal March 22 2021 Summary: Council will receive notification of Purchase Order #47128 issued to JM Integration, to furnish and install one PowerEdge T640 Tower Server for the Wastewater Treatment Plant in the Amount of $16,095.31. Background: Pursuant to the requirements of Section 1522 of the Municipal Code, staff is reporting to City Council the expenditure for furnishing and installing one PowerEdge T640 Tower Server for the Waste Water Treatment Plant in the amount of $16,095.31. JM Integration was chosen for this project after the Purchasing Division had recently gone through a complete Request for Proposal process in order to complete SCADA upgrades for the Water Treatment Plant. Discussion: The SCADA system at the Wastewater Treatment Plant (WWTP) is similar to the system at the Water Treatment Plant (WTP). This system provides all remote control operating and data acquisition for all components at the WWTP. In order to upgrade the current software, the purchase of new hardware is required. Staff contact JM Integration for a proposal (Attachment 1) in order for this work to be performed. Subsequently, Purchase Order 47128 in the amount of $16,095.31 was issued to authorize the purchase. Recommended Action: Receive Notification of Purchase Order #47128 issued to JM Integration, to furnish and install one PowerEdge T640 Tower Server for the Wastewater Treatment Plant in the Amount of $16,095.31. BUDGET AMENDMENT REQUIRED: No CURRENT BUDGET AMOUNT: 84027225.80100.18137- $200,000 PROPOSED BUDGET AMOUNT: N/A FINANCING SOURCE: Wastewater Fund PREVIOUS CONTRACT/PURCHASE ORDER NO.: PO 47128 COORDINATED WITH: Alan Hodge, WWTP Supervisor; Mary Williamson, Buyer II Page 85 of 142 Page 2 of 2 Page 86 of 142 Attachment 1 Page 87 of 142 Page 88 of 142 Page 1 of 1 Agenda Item No: 7.e. MEETING DATE/TIME: 4/21/2021 ITEM NO: 2021-805 AGENDA SUMMARY REPORT SUBJECT: Council will Consider Approval of Budget Amendment in the Amount of $250,000 for the State Street Electric Utility Underground Project. DEPARTMENT: Electric Utility PREPARED BY: Cindy Sauers, Electric Utility Director PRESENTER: Consent Calendar ATTACHMENTS: None Summary: Council will consider approving a budget amendment in the amount of $250,000 for the State Street Electric Utility Underground Project. Background: On February 19, 2020, Council awarded the contract for the Downtown Utility Upgrade and Electrical Underground Project. The project included installation of conduit and infrastructure to underground the electric, phone and cable television facilities on State Street between Clay to Mill Streets. The original contract for the electric portion of the project was $559,576. Discussion: The contractor completed installation of the electric portion of the project in March 2021. The approved contract costs are based on individual task line item bid costs. Change orders amounted to $37,900 and final quantities of individual line items resulted in an increase of just over $200,000. Staff is requesting a budget amendment in the amount of $250,000 to cover the project costs. Recommended Action: Approve budget amendment for the State Street Electric Utility Underground Project in the amount of $250,000 BUDGET AMENDMENT REQUIRED: Yes CURRENT BUDGET AMOUNT: 80126100.80230.18048; $878,131.91. PROPOSED BUDGET AMOUNT: 80126100.80230.18048; $1,128,131.91 FINANCING SOURCE: Electric Capital Improvement Fund 801 PREVIOUS CONTRACT/PURCHASE ORDER NO.: Contract 1920217 COORDINATED WITH: Mel Grandi, Electric Utility Director Page 89 of 142 Page 1 of 2 Agenda Item No: 7.f. MEETING DATE/TIME: 4/21/2021 ITEM NO: 2021-806 AGENDA SUMMARY REPORT SUBJECT: Notification of Purchase Order #47143 issued to Bartley Pump PM, LLC to Provide Emergency Trouble Shooting and Repair at Well #4 for the Water Resources Department in the Amount of $19,693, and Authorize Additional Repairs as Needed. DEPARTMENT: Water Resources PREPARED BY: Jarod Thiele, Public Works Management Analyst PRESENTER: Consent Calendar ATTACHMENTS: 1. Bartley Pump Proposal Summary: The City Council will receive notification of Purchase Order #47143 issued to Bartley Pump PM, LLC to provide emergency troubleshooting and repair at Well #4 for the Water Resources Department in the amount of $19,693, and will consider authorizing additional repairs as needed. Background: Pursuant to the requirements of Section 1522 of the Municipal Code, staff is reporting to City Council the expenditure to provide emergency trouble shooting and repair on pump at Well #4 for the Water Treatment Plant in the amount of $19,693. Discussion: Well #4 had been offline for a period of time, as it was not needed due to the low water demand from the winter months. Once water demand increased, staff began to prepare it to go back online. During normal startup operations, an abnormal amount of sand began to appear in instrumentation and overboard discharge water. Staff operated the well off and on over a period of approximately one month and the sand issue still continued. Staff contacted Bartley Pump PM, LLC for a proposal (Attachment 1) to perform troubleshooting work because of the past work they have performed for the City, as well as their ability to respond in a very timely manner. Work under this contract will involve a sand production test, removal of the pump, and video inspection. Staff is requesting approval of additional repairs, if needed. Recommended Action: Notification of Purchase Order #47143 issued to Bartley Pump PM, LLC to provide emergency troubleshooting and repair at Well #4 for the Water Resources Department in the amount of $19,693, and authorize additional repairs as needed. BUDGET AMENDMENT REQUIRED: No CURRENT BUDGET AMOUNT: 82027110.52100- $215,000 PROPOSED BUDGET AMOUNT: N/A FINANCING SOURCE: Water Fund PREVIOUS CONTRACT/PURCHASE ORDER NO.: 47143 COORDINATED WITH: Michelle Wagenet, WTP Supervisor; Mary Williamson, Buyer II Page 90 of 142 Page 2 of 2 Page 91 of 142 Quote REMIT TO: Bartley Pump PM LLC 4000 S. Moorland Ave. Santa Rosa, CA 95407 T 707-584-9191 F 707-584-9198 www.pumpmannorcal.com DIR# 1000054366 Customer: RE: JOBSITE: NOTE:This quote is for us to come out and perform a sand production test per QUANT ITEM DESCRIPTION TAXABLE TOTAL 0 0 0 -$ 0 0 NO MATERIALS USED FOR THIS PORTION -$ 0 0 0 -$ Total for materials -$ Sales Tax -$ Freight -$ LABOR DESCRIPTION Labor for one man to come and perform a sand production test per AWWA 1,104.00$ Labor to pull pump from well and prep for well video 3,760.00$ Well video to inspect condition of casing and screen 499.00$ ESTIMATED Labor to run swab in well to try to get continuity on the gravel 3,760.00$ Labor to bail fill from bottom of well and dispose on site.1,175.00$ Labor to re-install your existing pump if it checks out ok after inspection.3,760.00$ 0 -$ PRIMA PULSE to help get gravel moving. We will not charge this is we get it 5,635.00$ NOTE: Labor for swabbing is an estimate. If we get continuity quickly then nothing will change, if it takes a little longer we may need to adjust this labot colomn -$ 0 -$ TOTAL 19,693.00$ Sincerely, Ron Foster Operations Manager License No. 1033562: Class A General Engineering & C-57 Drilling Contractor C-10 Electrical Contractor & C-55 Water Treatment & C-16 Fire Protection & C61/D21 Pumps and Machines Thursday, April 8, 2021 300 Seminary Ave. Ukiah, CA City of Ukiah Well #4 Sand and gravel issues 56 Lorraine St Attachment 1 Page 92 of 142 Customer Address City and State Regarding Job Address: Total Proposal Amount: 1. 2. 3. 4. General Conditions of this Contract: 1. 2. 3. 4. City of Ukiah 56 Lorraine St Well #4 Sand and gravel issues Ukiah, CA 300 Seminary Ave. Date Work to Begin: Substantial commencement of work shall occur when we first supply workers to the jobsite. Our failure without lawful excuse to substantially commence work within 20 days from that approximate date is a violation of the Contractor’s License Law. Due to uncertainties in weather, materials availability and equipment availability, all dates are approximate. Right to Stop Work: We shall have the right to stop work if any payment due us under this agreement is not made on time. We may keep the job idle until all payments due are received. Cancellation: You acknowledge you have received two copies of “Notice of Right to Cancel” attached to this contract which allows you three business days to cancel this contract. In addition to this right which is required by law, we will allow you to cancel this contract at any time up until we have actually begun work. You agree that if you cancel the contract after the initial three-day period required by law, that you will pay for all costs incurred to us on your behalf including but not limited to: permit fees, consultant fees, non-stock/non-returnable materials ordered for your work, restocking charges by distributors on returnable materials ordered for your Project, and freight charges. Limitations: No action of any character arising from or related to this contract, or the performance thereof, shall be commenced by either party against the other after a period of two years from completion of the work or cessation of the work. Payment Terms: You agree to pay a deposit of 10% of the contract amount (or estimated price) shown on Page One or $1000, whichever is less, upon notification that we are ready to commence work. You agree to pay for the work immediately upon completion. If the work takes longer than 30 days, at our option you agree to pay a progress payment each 30 days for the progress attained as an estimated percent complete of the total contract amount (or estimated price). Such progress payments are due immediately upon invoicing. Interest on monies owed to us under this contract past 30 days due shall accrue interest at a rate of 1.25% per month on the principal balance. Upon payment being made for any portion of the work being performed, we shall, prior to any further payment being made, furnish to you a full and unconditional release from any claim or Mechanic's lien for that portion of the work for which payment has been made. Time and Materials Contract: If Page One of this contract is marked “Time and Materials (Approximate)” then the contract amount shown on Page One is an estimate. The final amount billed for the work will be based upon unit prices which shall be adjusted to reflect the actual in-place or as-used quantities. Offer Duration: This offer is valid for 30 days. General Exclusions from this Contract unless otherwise noted: Permits and permit fees, insurance certificates, bonding fees. Winterization of uncompleted work. Seeding or erosion control work. Testing & Inspection (unless otherwise stated above). All trenching and excavation work will done by others. Before Bartley Pump PM LLC installs and pipe or conduit, the ditch must be the proper depth, (to meet local codes, or regulations) and be free of any man made obstructions, including underground utilities. All existing utilities will be located and marked in the field prior to us starting our work. Should the owner, Owner’s Agent, public body, or inspector direct any modification or addition to the work covered by this contract, the contract price shall be adjusted accordingly. Work site must be safely accessible & must be clear of brush, debris, & overhead obstacles (including trees & power lines) All material is guaranteed to be as specified, and the above work to be performed in accordance with drawings and/or specifications provided, industry standards and manufacturer specifications, and is to be completed in a workmanlike manner. 19,693.00$ Flat Bid Contract: If page one of this contract is marked "Flat Bid (Not Approximate)" then the full amount of the contract is shown on page one. This amount may be increased or decreased by change orders. Contract April 8, 2021 License No. 1033562: Class A General Engineering & C-57 Drilling Contractor C-10 Electrical Contractor & C-55 Water Treatment Contractor & C61/D21 Pumps and Machines DIR# 1000054366 Page 93 of 142 Customer Information: Name: Address: Phone: Email: Billing Information (If Different From Above) Name: Address: Phone: Email: Job Site Information (Please make note of anything specific we may need to know for the site i.e. Gate Code, Special Access Information etc.) THIS PAGE MUST BE SIGNED TO COMMENCE WORK Filing of Complaints: Contractors are required by law to be licensed and regulated by the Contractors State License Board, which has jurisdiction to investigate complaints against contractors if a complaint regarding a patent act or omission pertaining to structural defects must be filed within 10 years of the date of the alleged violation. Any questions concerning the contractor may be referred to the Registrar, Contractors State License Board, P.O. Box 26000, Sacramento, CA 95826. By signing this and the estimate page (page one) you are hereby authorizing Bartley Pump PM LLC to furnish all material, labor and equipment required to complete the work described in the above proposal, for which you agree to pay the amount stated in signed proposal and in accordance to the terms thereof. You also acknowledge having read this contract in its entirety and have received a copy of the "Notice to Owner", attached. / / Customer Signature Date / / Bartley Pump PM LLC PumpMan NorCal. Representative Signature Date Please fill out the information below for our records. Warranties: We represent and warrant that we hold an unencumbered Contractor’s License to perform the services included in this contract, and that we will maintain and keep such license in good standing and in full force and effect at all times while performing the work under this contract. We do not warrant the materials or supplies we use against defects in workmanship or materials but we will use our best efforts to enforce any warranties against the manufacturer or supplier on your behalf. We guarantee our own work to be free of defects for a period of one year from the date of installation. No other warranties are offered or implied. Acknowledgement by Owner of Receipt of Notice to Owner: You acknowledge that you have received a copy of the “Notice to Owner” (attached) as specified by Section 7081.5 of the California Business and Professions Code. STATE LAW REQUIRES ANYONE WHO CONTRACTS TO DO CONSTRUCTION WORK TO BE LICENSED BY THE CONTRACTORS STATE LICENSE BOARD IN THE LICENSE CATEGORY IN WHICH THE CONTRACTOR IS GOING TO BE WORKING-IF THE TOTAL PRICE OF THE JOB IS $500 OR MORE (INCLUDING LABOR AND MATERIALS) “LICENSED CONTRACTORS ARE REGULATED BY LAWS DESIGNED TO PROTECT THE PUBLIC. IF YOU CONTRACT WITH SOMEONE WHO DOES NOT HAVE A LICENSE, THE CONTRACTORS STATE LICENSE BOARD MAY BE UNABLE TO ASSIST YOU WITH A COMPLAINT. YOUR ONLY REMEDY AGAINST AN UNLICENSED CONTRACTOR MAY BE IN CIVIL COURT, AND YOU MAY BE LIABLE FOR DAMAGES ARISING OUT OF ANY INJURIES TO THE CONTRACTOR OR HIS OR HER EMPLOYEES. YOU MAY CONTACT THE CONTRACTORS STATE LICENSE BOARD TO FIND OUT IF THE CONTRACTOR HAS A VALID LICENSE. THE BOARD HAS COMPLETE INFORMATION ON THE HISTORY OF LICENSED CONTRACTORS, INCLUDING ANY POSSIBLE SUSPENSIONS, REVOCATIONS, JUDGEMENTS, AND CITATIONS. THE BOARD HAS OFFICES THROUGHOUT CALIFORNIA. PLEASE CHECK THE GOVERNMENT PAGES OF THE WHITE PAGES FOR THE OFFICE NEAREST YOU OR CALL 1- 800-321-CSLB FOR MORE INFORMATION.” Page 94 of 142 This means that after a court hearing, your home, land, and property could be sold by a court officer and the proceeds of the sale used to satisfy what you owe. This can happen even if you have paid your contractor in full if the contractor’s subcontractors, laborers, or suppliers remain unpaid. To preserve your rights to file a claim of lien against your property, certain claimants such as subcontractors or material suppliers are each required to provide you with a document called a “Preliminary Notice”. Contractors and laborers who contract with owners directly do not have to provide such notice since you are aware of their existence as an owner. A preliminary notice is not a lien against your property. Its purpose is to notify you of persons or entities that may have a right to file a lien against your property. Generally, the maximum time allowed for filing a mechanics’ lien against your property is 90 days after substantial completion of your project. To protect yourself under this option, you must be certain that all material suppliers, subcontractors, and laborers have signed the “Waiver and Release” form. If a mechanic’s lien has been filed against your property, it can only be voluntarily released by a recorded “Release of Mechanics’ Lien” signed by the person or entity that filed the mechanics’ lien against your property unless the lawsuit to enforce the lien was not timely filed. You should not make any final payments until any and all such liens are removed. You should consult an attorney if a lien is filed against your property.” (Rev. 4/9) “Under the California Mechanics’ Lien Law, any contractor, subcontractor, laborer, supplier, or other person or entity who helps to improve your property, but is not paid for his or her work or supplies, has a right to place a lien on your home, land, or property where the work was performed and to sue you in court to obtain payment. TO INSURE EXTRA PROTECTION FOR YOURSELF AND YOUR PROPERTY, YOU MAY WISH TO TAKE ONE OR MORE OF THE FOLLOWING STEPS: (1) Require that your contractor supply you with a payment and performance bond (not a license bond), which provides that the bonding company will either complete the project or pay damages up to the amount of the bond. This payment and performance bond as well as a copy of the construction contract should be filed with the county recorder for your further protection. The payment and performance bond will usually cost from 1 to 5 percent of the contract amount depending on the contractor’s bonding ability. If a contractor cannot obtain such bonding, it may indicate his or her financial incapacity. (2) Require that payments be made directly to subcontractors and material suppliers through a joint control. Funding services may be available, for a fee, in your area which will establish voucher or other means of payment to your contractor. These services may also provide you with lien waivers and other forms of protection. Any joint control agreement should include the addendum approved by the registrar. (3) Issue joint checks for payment, made out to both your contractor and subcontractors or material suppliers involved in the project. The joint checks should be made payable to the persons or entities which send preliminary notices to you. Those persons or entities have indicated that they may have lien rights on your property, therefore you need to protect yourself. This will help to insure that all persons due payment are actually paid. (4) Upon making payment on any complete phase of the project, and before making any further payments, require your contractor to provide you with unconditional “Waiver and Release” forms signed by each material supplier, subcontractor, and laborer involved in that portion of the work for which payment was made. The statutory lien releases are set forth in exact language in Section 3262 of the Civil Code. Most stationery stores will sell the “Waiver and Release” forms if your contractor does not have them. The material suppliers, subcontractors, and laborers that you obtain releases from are those persons or entities who have filed preliminary notices with you. If you are not certain of the material suppliers, subcontractors, and laborers working on your project, you may obtain a list from your contractor. On projects involving improvements to a single- family residence or a duplex owned by the individuals, the persons signing these releases the right to file a mechanics’ lien claim against your property. In other types of construction, this protection may still be important, but may not be as complete. NOTICE TO OWNER Page 95 of 142 Notice of Cancellation Date of Contract Signature You may cancel this transaction, without any penalty or obligation, within three business days from the above date. If you cancel, any property traded in, any payments made by you under the contract sale, and any negotiable instrument executed by you will be returned within 10 days following receipt by the seller of your cancellation notice, and any security interest arising out of the transaction will be canceled. If you cancel, you must make available to the seller at your residence, in substantially as good condition as when received, any goods delivered to you under this contract or sale, or you may, if you wish, comply with instructions of the seller regarding the return shipment of the goods at the seller’s expense and risk. If you do make the goods available to the seller and the seller does not pick them up within 20 days of the day of your notice of cancellation, you may retain or dispose of the goods without further obligation. If you fail to make the goods available to the seller, or if you agree to return the goods to the seller and fail to do so, then you remain liable for performance of all obligation under the contract. To cancel this transaction, mail or deliver a signed and dated copy of the cancellation notice, or any other written notice, or fax to: Bartley Pump PM LLC DBA PumpMan NorCal 4000 S. Moorland Ave. Santa Rosa, CA 95407 707-584-9191 Not later than midnight of (Three business days from above date) I hereby cancel this transaction as of (Today's Date) Customer Signature ONLY SIGN IF YOU WISH TO CANCEL WORK & CONDITIONS ABOVE ARE MET. / / NOTICE OF RIGHT TO CANCEL / / / / Page 96 of 142 Notice of Cancellation Date of Contract Signature You may cancel this transaction, without any penalty or obligation, within three business days from the above date. If you cancel, any property traded in, any payments made by you under the contract sale, and any negotiable instrument executed by you will be returned within 10 days following receipt by the seller of your cancellation notice, and any security interest arising out of the transaction will be canceled. If you cancel, you must make available to the seller at your residence, in substantially as good condition as when received, any goods delivered to you under this contract or sale, or you may, if you wish, comply with instructions of the seller regarding the return shipment of the goods at the seller’s expense and risk. If you do make the goods available to the seller and the seller does not pick them up within 20 days of the day of your notice of cancellation, you may retain or dispose of the goods without further obligation. If you fail to make the goods available to the seller, or if you agree to return the goods to the seller and fail to do so, then you remain liable for performance of all obligation under the contract. To cancel this transaction, mail or deliver a signed and dated copy of the cancellation notice, or any other written notice, or fax to: Bartley Pump PM LLC DBA PumpMan NorCal 4000 S. Moorland Ave. Santa Rosa, CA 95407 707-584-9191 Not later than midnight of (Three business days from above date) I hereby cancel this transaction as of (Today's Date) Customer Signature ONLY SIGN IF YOU WISH TO CANCEL WORK & CONDITIONS ABOVE ARE MET. NOTICE OF RIGHT TO CANCEL (CUSTOMER COPY) / / / / / / Page 97 of 142 Page 1 of 2 Agenda Item No: 7.g. MEETING DATE/TIME: 4/21/2021 ITEM NO: 2021-802 AGENDA SUMMARY REPORT SUBJECT: Requesting Approval of an Amended and Restated Agreement with the County of Mendocino, for Sharing Financing Costs of the Animal Shelter Construction and for Sharing Cost of Animal Shelter Services, and Approval of a Settlement Agreement, in the Total Amount of $150,930.50. DEPARTMENT: City Manager / Admin PREPARED BY: Maya Simerson, Project & Grant Administrator PRESENTER: Maya Simerson, Project & Grant Administrator ATTACHMENTS: 1. County BOS 01 196 2. County BOS 00 319 3. Amended and Restated Animal Shelter Agreement 4. Settlement Agreement and Release Animal Shelter Summary: Council to consider the approval of an Amended and Restated Agreement with the County of Mendocino, for sharing financing costs of the Animal Shelter construction and for sharing cost of Animal Shelter services, and approval of a Settlement Agreement, in the total amount of $150,930.50 ($90,000 to settle the County claim for shelter services provided in fiscal years 2015-16 to 2018-19, plus, per the Shelter Services Agreement, $43,522.48 for 2019-20 and $17,408.22 for first two quarters of fiscal year 2020-21.) Background: In August of 2001 the City and the County entered into an ‘Agreement for the Cost Sharing of Construction Costs for the County Animal Shelter Facility’ BOS Agreement # 01-196, Attachment #1. The cost sharing is based on the City’s pro-rata share of actual construction costs, which was determined by the percentage of animals that are housed at the facility. The debt schedule was established and commenced in fiscal year 2001-2002. In fiscal year 2010-2011 the County refinanced the debt, and altered the schedule of payments. The refinancing saved both the County and the City a considerable amount of funds. The debt is scheduled to be paid off at the end of fiscal year 2029-2030. In addition to the debt service paid by the City, our agency also pays for operational costs of the shelter. The formula for these costs was derived and adopted in Paragraph 6.e of the October 24, 2000 ‘Agreement for Purchase and Sale of Animal Shelter Real Property and for Animal Shelter Services’ BOS Agreement # 00- 319. This formula was incorporated into the Agreement in Paragraph 3. A copy of the agreement can be found as Attachment #2. In fiscal year 2011-2012 and fiscal year 2012-2013 the County issued single year agreements with the City for the shelter costs. No further agreements were issued from that date forward. Discussion: The City’s most recent contract with the County for animal shelter services (BOS Agreement # 12-087) expired in fiscal year 2012-2013. The City continued to pay for shelter services outside of a contract for fiscal years 2013-2014 and 2014-2015. From fiscal year 2015-2016 through fiscal year 2018-2019, the City and County have unsuccessfully attempted to reach consensus on a new contract. Negotiations on the development of a new contract have been hindered by lack of shelter/operation data and staffing changes at the County. Fortunately, the recent shelter management has been very engaged on this issue and worked on the County’s ability to provide more accurate data, and on the development of a new billing methodology. Page 98 of 142 Page 2 of 2 The Shelter Manager has developed a system to accomplish more accurate accountability for the animals brought into the shelter from within the City limits. The County has developed and implemented this new system to better track animals to be charged to the City and is proposing to bill the City on a per animal basis. The City staff recommends the proposed changes in the billing formula for shelter services. The staff of both agencies have worked together to develop an Amended and Restated Agreement for Sharing Financing Costs of the Animal Shelter Construction and for Sharing Cost of Animal Shelter Services. This agreement utilizes the new billing system for the shelter service costs and continues to utilize the existing formula for the debt service portion of the agreement. Please review as Attachment #3. The City has paid the debt service portion of the invoices from the County but not the operational charges since fiscal year 2014-2015. The City suspended making payments, because operational charges changed significantly, due to a possible miscalculation, and this triggered the ongoing discussion with the County. The staff for both the City and the County recommend an agreement for the fiscal years in question under which the City will pay the County $90,000 to cover the costs of shelter services received in fiscal year 2015-2016 through fiscal year 2018-2019. Pursuant to the proposed Shelter Services Agreement, the City will pay the County $43,522.28 for fiscal year 2019-2020 and $17,408.22 for the first two quarters of fiscal year 2020- 2021. In total the City will pay $150,930.50 and will be current for all outstanding charges through December 2020. Please refer to the proposed ‘Settlement Agreement and Release’ attached as Attachment #4. Pursuant to the Settlement Agreement, the County must pay the City for overdue parking permit fees that the County has withheld since November of 2019 in the amount of $18,198.75. The Mendocino County Board of Supervisors have approved the two agreements at their April 6th board meeting. City staff recommends Council approval of the Amended and Restated Agreement for Sharing Financing Costs of the Animal Shelter Construction and for Sharing Cost of Animal Shelter Services, and approval of the Settlement Agreement in the Amount of $150,930.50. Recommended Action: Approve an amended and restated agreement with the County of Mendocino, for sharing financing costs of the Animal Shelter construction and for sharing cost of Animal Shelter services, and approve Settlement agreement, in the total amount of $150,930.50. BUDGET AMENDMENT REQUIRED: No CURRENT BUDGET AMOUNT: 10020217.52100: $215,997 PROPOSED BUDGET AMOUNT: N/A FINANCING SOURCE: N/A PREVIOUS CONTRACT/PURCHASE ORDER NO.: COORDINATED WITH: Sage Sangiacomo, City Manager and David Rapport, City Attorney Page 99 of 142 Page 100 of 142 Page 101 of 142 Page 102 of 142 Page 103 of 142 Page 104 of 142 Page 105 of 142 Page 106 of 142 Page 107 of 142 Page 108 of 142 Page 109 of 142 Page 110 of 142 Page 111 of 142 Page 112 of 142 Page 113 of 142 Page 114 of 142 Page 115 of 142 Page 116 of 142 1 AMENDED AND RESTATED AGREEMENT FOR SHARING FINANCING COST OF ANIMAL SHELTER CONSTRUCTION AND FOR SHARING COST OF ANIMAL SHELTER SERVICERS This Agreement is made and entered into this _____day of ___________, 2021 (Effective Date”), by and between the County of Mendocino (“County”), a political subdivision of the State of California and the City of Ukiah (“City”), a general law municipal corporation. RECITALS: 1. On October 24, 2000, the City and County entered an Agreement for the Purchase and Sale of Animal Shelter Real Property and Animal Shelter Services (“Purchase and Service Agreement”) assigned Number 00-319 by the County. Under the Purchase and Service Agreement, the City sold to County about 33,000 square feet of real property (“Shelter Real Property”) and a building used as the County animal shelter. The City agreed to share in the cost to finance and construct an improved animal shelter on the Shelter Real Property. The City agreed to pay its proportional share of those costs until the financing was repaid or the City stopped receiving animal shelter services at the County facility. Through the 2005-06 fiscal year, the County agreed to license City animals at no cost to the City and to perform animal shelter services for the City as payment for the purchase of the Shelter Real Property. Beginning in fiscal year 2006-07, the City and the County agreed that the County would continue to provide animal shelter services to the City for a percentage of the County’s actual costs of such operations based on the number of City animals received at the shelter compared to the total number of animals received at the shelter. The formula for computing and allocating those costs was contained in an Exhibit B to the Purchase and Service Agreement. 2. On August 1, 2001, the City and County entered an Agreement for Cost Sharing of Facility Construction and Financing Costs for the County Animal Shelter Facility in Ukiah (“Cost Sharing Agreement”), assigned Number 01-196 by the County. Under the Cost Sharing Agreement, the City agreed to pay a proportional share of the cost to finance and construct a new animal shelter on the Shelter Real Property. Exhibit A to the Cost Sharing Agreement set forth the method for computing the City’s share of those costs. In sections 4 and 5 of the Cost Sharing Agreement the City’s share of the Construction and Financing Costs was based on the five year average number of City animals as a percentage of the total number of animals received at the shelter. 3. The City and the County want to continue sharing the Construction and Financing Costs as provided in the Cost Sharing Agreement but want to revise the method for determining the charges to the City for animal shelter services provided in the Purchase and Service Agreement. Page 117 of 142 2 4. The purpose of this Agreement is to amend and restate the Purchase and Services Agreement and the Cost Sharing Agreement in one agreement which shall supersede and replace those agreements. AGREEMENT: In consideration of and reliance upon the above-recitals and other good and valuable consideration the receipt and adequacy of which is hereby acknowledged, the parties agree as follows. 1. Definitions. As used in this agreement the terms in quotes below have the meaning as provided in this Section 1. 1.1 “Animal shelter” means the reconstructed shelter on the Shelter Real Property. 1.2 “Animal shelter debt service” means the annual debt service for the cost of financing and the actual construction cost of the Animal shelter or that amount resulting from a refinancing of those costs, if refinanced to reduce interest costs of the financing. The initial Animal shelter debt service was computed using the steps set forth in the attached Exhibit A. 1.3 “Apportionment ratio” means a fraction in which the total Shelter services provided by the County each fiscal year to City animals served at the Animal shelter is the numerator and the total Shelter service provided to all animals served at the Animal shelter is the denominator. 1.4 “City animal” means an animal licensed to a resident of Ukiah or an unlicensed domestic animal or wildlife not otherwise known to reside in the unincorporated area that was picked up within the Ukiah city limits and delivered to the shelter. 1.5 “Shelter services” means the following services for dogs and cats provided at the animal shelter: a. Food and Board b. Vaccinations for Parvo, Rabies, Bordetella, PVRCP c. Deworm and Heartworm medication d. Microchips e. Spay and neuter services f. Disposal, including wildlife delivered to the shelter 2. City Share of Construction and Financing Costs. As long as the City receives Shelter services for City animals at the Animal shelter , it shall pay its proportionate share of construction and financing costs of the Animal shelter commencing in fiscal year 2001-2002 and ending on the date annual debt service payments terminate because the financing has been fully repaid or the date the City terminates its use of the Animal shelter for City animals, whichever is earliest. In the event of termination by the City, notice must be Page 118 of 142 3 provided in writing to the County at least 120 days prior to the end of the fiscal year and shall be effective only upon the first day of the succeeding fiscal year. 2.1 City’s proportionate share of Animal shelter debt service each fiscal year shall be computed by multiplying the Animal shelter debt service by the Apportionment ratio for each fiscal year, averaged over the prior five fiscal years The current five year average (2015-16 to 2019-20) is included as page 2 in the attached Exhibit A with County animal statistics by jurisdiction as page 3. County shall adopt and follow a procedure for identifying as City or non-City animals and recording all animals received and provided Shelter services which records shall be made available to the City upon request for inspection, copying and audit. 2.2. If, at any time during the term of this Agreement, the Animal shelter debt service is refinanced to lower interest costs, County agrees to pass those savings along to City. 3. Animal Licensing. County shall license dogs belonging to City residents in the same way and for the same fees as dogs belonging to residents of the unincorporated portions of the County. The County shall compute t he cost of Shelter services net of the dog license revenue the County receives which are credited by the County to Animal shelter costs shared by the City under this Agreement. After applying those revenues to the cost of the dog licensing program, County shall credit the remaining revenues from dog license fees to pay Animal shelter costs in proportion to the number of dogs received at the Animal shelter to the total number of dogs received at all County operated animal shelters. Each year on the anniversary of the Effective Date, the County shall report to the City in writing the total annual revenues received for dog licenses, the annual costs to operate the licensing program, the remaining revenues used to operate animal shelters, the total number of dogs received at all County animal shelters in the year ending on the anniversary of the Effective Date and the number of dogs received at the Animal shelter during that same time period. The County shall provide the City with any documents or calculations reasonably requested by City to determine whether the County is complying with this Section 3 of this Agreement. 4. Conditions of Premises. The parties acknowledge that the County had sole possession of the shelter facility prior to its reconstruction under a lease from CITY for almost thirty years before it constructed and has maintained the Animal shelter. 4.1. Shelter real property sold “AS IS.” When the County purchased the Shelter real property, the City made no representation or warranty concerning its condition and County agreed to accept the premises in its “AS IS” condition. County hereby acknowledges that it has not relied upon any representation, statement or warranty concerning the condition of the premises by City or any of its officers, agents or employees in deciding to purchase the Shelter real property. 4.2 County to indemnify City. County agrees to waive and release City from any and all liability, cost or obligation arising from any defect in or condition of the Shelter real property or the improvements constructed thereon, including, but not limited to, conditions involving the presence of hazardous or toxic substances thereon . In addition, Page 119 of 142 4 County agrees to fully indemnify and defend City from and against any such cost, obligation, claim or liability, including all costs incurred by City in defending against any such claim, liability, cost or obligation, such as, but not limited to, attorneys’ fees, fees of experts and investigators, and litigation expenses. 5. City Share of Shelter Services Costs. 5.1. The County shall submit to the City each fiscal year on or before July 31st, a report on the cost of providing Animal shelter services to City animals for the fiscal year then ended. The report (“Report”) shall be in the format and contain the information set forth in the attached Exhibit B. At City’s request the County shall provide City with the records and/or data used to determine the cost of each Animal shelter service, the Animal shelter services provided to each City animal and identity of each City animal which was used to compute the charges to the City for its share of Shelter services costs. 5.2. On or before August 31, 2021 the City shall make payment to the County in accordance with this Agreement for animal control services for the third and fourth quarters of fiscal year 2020-21. On or before August 31st, each fiscal year thereafter, unless disputed by City, the City shall pay County for the costs charged to the City for Animal shelter services as set forth in the Report. The formula used to compute the City’s share of Animal shelter services costs may be revised from time to time, if approved in writing by both parties. 5.3 County agrees to share with City any financial benefits it may derive from any future reimbursement under SB90 related to increased costs mandated by SB1785. Such sharing of benefits shall be reflected in reduced charges for Animal shelter services as reported in Reports. 6. Force Majeure. The time for performing any condition under this Agreement shall be extended, and the obligations of City or County suspended, by the number of days during which the performance of that condition is prevented due to fire, flood, unusual weather events, strikes, labor disputes, shortages, utility curtailments, power failures, explosions, civil disturbances, the time required to satisfy government regulatory requirements beyond the minimum periods permitted by law, acts of God, shortages of equipment or supplies, unavailability of transportation, acts or omissions of third parties or any other reason beyond the reasonable control of City or County. 7. Integration. This Agreement (including all Exhibits attached hereto) constitutes the entire contract between the parties hereto and may not be modified except by an instrument in writing signed and authorized by the parties. 8. County Indemnification of City. County shall indemnify and hold harmless City, its agents, officers and employees against any and all claims, lawsuits, actions, liability, damages, expenses and costs (including attorney’s fees), brought for injuries to any person or persons, or injuries to or destruction of property arising out the negligence of the County in the performance of this contract. Where County is found to have caused the injury, damage, Page 120 of 142 5 or loss only in part, County shall hold City harmless only to the extent the County caused the injury, damage, or loss. City agrees to timely notify County of any such negligence claim and to cooperate with County to allow County to defend such a claim. 9. City Indemnification of County. City shall indemnify and hold harmless County, its agents, officers and employees against any and all claims, lawsuits, actions, liability, damages, expenses and costs (including attorney’s fees), brought for injuries to any person or persons, or injuries to or destruction of property arising out of the negligence of the City in the performance of this contract. Where City is found to have caused the injury, damage, or loss only in part, City shall hold County harmless only to the extent City caused the injury, damage, or loss. County agrees to timely notify City of any such negligence claim and to cooperate with City to allow City to defend such a claim. 10. Insurance. Each party shall name the other as an additional insured under their respective public liability insurance policies. 11. Notice. Whenever notice, payment or other communication is required or permitted under this Agreement, it shall be deemed to have been given when personally delivered, telefaxed or emailed (if receipt acknowledged) or deposited into the United States mail with proper first -class postage affixed thereto and addressed as follows: CITY: COUNTY C/o City Manager ’s Office Clerk of Board Office City of Ukiah County of Mendocino Ukiah Civic Center County Administration Center 300 Seminary Avenue 501 Low Gap Road Ukiah, Ca. 95482 Ukiah, Ca. 95482 FAX: 463-6204 FAX: 463-4245 11. Counterparts: This Agreement may be executed in duplicate each with original signatures or in counterparts. A copy with counterpart original signatures or an executed copy with original signatures shall be admissible in any administrative or judicial proceeding as evidence of the terms of this Agreement. 12. Partial Invalidity: If any term or provision of this Agreement shall be deemed to be invalid or unenforceable to any extent, the remainder of this Agreement will not be affected thereby, and each remaining term and provision of this Agreement will be valid and be enforced to the fullest extent permitted by law. 13. Waivers: No waiver of any breach of any covenant or provision contained herein will be deemed a waiver of any preceding or succeeding breach thereof, or of any other covenant or provision contained herein. No extension of time for performance of any obligation or act will be deemed an extension of time for performance of any other obligation or act except those of the waiving party, which will be extended by a period of time equal to the period of the delay. Page 121 of 142 6 14. Successors and Assigns: This Agreement is binding upon and inures to the benefit of the permitted successors and assigns of the parties hereto. WHEREFORE, the parties have entered this Agreement on the Effective Date. CITY OF UKIAH COUNTY OF MENDOCINO _______________________ ____________________________ By: Juan Orozco, Mayor By: ATTEST: ATTEST: Kristine Lawler, City Clerk , Clerk of the Board _______________________ ____________________________ APPROVED AS TO FORM: APPROVED AS TO FORM: David J. Rapport, City Attorney Christian Curtis , County Counsel _______________________ ____________________________ Page 122 of 142 Ex h i b i t A Page 123 of 142 Page 124 of 142 Page 125 of 142 Page 126 of 142 Page 127 of 142 Page 1 of 5 SETTLEMENT AGREEMENT AND RELEASE THIS SETTLEMENT AGREEMENT AND RELEASE ("Agreement") is made and entered into this _____ day of _________________, 2021, by and between COUNTY OF MENDOCINO ("County") and CITY OF UKIAH (“City”). County and City may be referred to in this Agreement individually as a “Party” and collectively as “Parties.” RECITALS A. The County contends that for fiscal years 2015, 2016, 2017 and 2018, the City has not paid for animal shelter services provided to the City by the County at the Animal Shelter located at 298 Plant Road, Ukiah, California (“Ukiah Animal Shelter”), under an Agreement for Cost Sharing of Facility Construction and Financing Costs for the County Animal Shelter Facility in Ukiah (“Cost Sharing Agreement”), assigned Number 01-196 by the County. The County contends that the City is liable for the cost of these services pursuant to the Cost Sharing Agreement and under common law counts and other legal or equitable bases. B. The City has disputed this contention and the amount claimed by the County to be due from the City. C. While this dispute has been pending, the County deducted as an off-set of amounts claimed by the County for animal shelter services provided to the City, $18,198.75 from amounts that it owed the City for parking permits issued for parking lots A, B, C, and D, for the period or periods of November 2019 to January 2021. (“Overdue Parking Permit Fees”). D. The Parties desire to enter into this Settlement Agreement in full settlement and discharge of all claims which have, or might be made, by reason of the allegations described above. AGREEMENT The Parties hereby agree as follows: 1.0 Payment from the City. On or before ___________, 2021, the City shall pay County a total of One Hundred Fifty Thousand Nine Hundred Thirty Dollars and Fifty Cents ($150,930.50), consisting of Ninety Thousand Dollars ($90,000) for the fiscal Page 128 of 142 Page 2 of 5 years 2015-16 to 2018-19; Forty-Three Thousand Five Hundred Twenty-Two Dollars and Twenty-Eight Cents ($43,522.28) for Fiscal Year 2019-20 and Seventeen Thousand Four Hundred Eight Dollars and Twenty-Two Cents ($17,408.22) for the first and second quarters of Fiscal Year 2020-2021. Payment of this amount will constitute a full and final settlement of all legal or equitable claims the County has or could make against the City or its officers, employees, agents and elected or appointed officials for compensation, damages or other payment from the City related to the construction, financing and operation of the County Animal Shelter and the provision of animal shelter services to the City for any period of time prior to the second quarter of fiscal year 2020- 2021 (ending on December 31, 2020). 2.0 Amended and Restated Agreement On or before _________, 2021, the Parties shall fully authorize and execute the Amended and Restated Agreement for Sharing Financing Cost of Animal Shelter Construction and For Sharing Cost of Animal Shelter Services (“Amended Agreement”), an unexecuted true and correct copy of which is attached hereto as Exhibit A. On or before August 31, 2021, the City shall make payment to the County as provided in Section 5.2 of the Amended Agreement. 3.0 County Payments On or before June 30, 2021, County shall pay City the Overdue Parking Permit Fees. 4.0 Release and Discharge 4.1 Upon full execution of this Agreement and the Amended Agreement the Parties expressly release, waive, and relinquish and forever discharge each other from all claims, actions, liabilities, and causes of action, of every nature and kind whatsoever, whether known or unknown, suspected or unsuspected, asserted or unasserted, or hereafter discovered or ascertained, in law or equity, by reason of any matter, cause or thing whatsoever, it has, or may have, with respect to the claims set forth in the Recitals or which ma y hereafter accrue or otherwise be acquired by it , on account of, or in any way grow out of the allegations described in the Recitals. 4.2 This Release on the part of Parties shall be a fully binding and complete settlement between the Parties, their assigns, and successors. 5.0 No Admissions Page 129 of 142 Page 3 of 5 5.1 Parties acknowledge and agree that the Release set forth above is a general release. It is understood and agreed by the Parties that this settlement is a compromise of disputed claims, and the settlement is not to be construed as an admission of liability on the part of any party. 6.0 Attorney’s Fees and Costs Each Party hereto shall bear all attorneys’ fees and costs arising from the actions of its own counsel, if any, in connection with the claims described in the Recitals, this Settlement Agreement, the matters and documents referred to herein, and all related matters. This includes any statutory attorney fees authorized by any state or federal law. 7.0 Representation of Comprehension of Document In entering into this Settlement Agreement, the Parties represent that they relied upon the advice of attorneys, who are the attorneys of the Parties’ own choice, concerning the legal consequences of this Settlement Agreement; that the terms of this Settlement Agreement have been completely read and explained to the Parties; and that the terms of this Settlement Agreement are fully understood and voluntarily accepted by the Parties. 8.0 Governing Law This Settlement Agreement shall be construed and interpreted in accordance with the laws of the State of California. 9.0 Section 1542 of the Civil Code of the State of California The undersigned Plaintiff does hereby waive any and all rights based upon the provisions of Section 1542 of the Civil Code of the State of California, which reads as follows: A GENERAL RELEASE DOES NOT EXTEND TO CLAIMS THAT THE CREDITOR OR RELEASING PARTY DOES NOT KNOW OR SUSPECT TO EXIST IN HIS OR HER FAVOR AT THE TIME OF EXECUTING THE RELEASE AND THAT, IF KNOWN BY HIM OR HER, WOULD HAVE MATERIALLY AFFECTED HIS OR HER SETTLEMENT WITH THE DEBTOR OR RELEASED PARTY. For your protection, California law requires the following to appear on this form: ANY PERSON WHO KNOWINGLY PRESENTS A FALSE OR FRAUDULANT CLAIM FOR THE PAYMENT OF A LOSS IS Page 130 of 142 Page 4 of 5 GUILTY OF A CRIME AND MAY BE SUBJECT TO FINES AND CONFINEMENT IN STATE PRISON. (Cal. Ins. Code, § 1871.2) 10.0 Notice Whenever notice, payment or other communication is required or permitted under this Agreement, it shall be deemed to have been given when personally delivered, telefaxed or emailed (if receipt acknowledged) or deposited into the United States mail with proper first-class postage affixed thereto and addressed as follows: CITY: COUNTY C/o City Manager’s Office Clerk of Board Office City of Ukiah County of Mendocino Ukiah Civic Center County Administration Center 300 Seminary Avenue 501 Low Gap Road Ukiah, Ca. 95482 Ukiah, Ca. 95482 FAX: 463-6204 FAX: 463-4245 11.0 Entire Agreement and Successors-In-Interest This Settlement Agreement contains the entire agreement between Parties with regard to the matters set forth herein and shall be binding upon and inure to the benefit of the executors, administrators, personal representatives, heirs, successors and assigns of each. IN WITNESS WHEREOF, the Parties, by their duly authorized representatives, Dated: ____________, 2021 City of Ukiah By: _________________________________ Mayor Juan Orozco Dated: ____________, 2021 COUNTY OF MENDOCINO BOARD OF SUPERVISORS By: _________________________________ Dan Gjerde, Chairperson Page 131 of 142 Page 5 of 5 Dated: ____________, 2021 COUNTY OF MENDOCINO RISK MANAGEMENT By: _________________________________ ___________________, Risk Manager APPROVED AS TO FORM AND CONTENT: Dated: ____________, 2021 By: _________________________________ David J. Rapport, City Attorney Dated: ____________, 2021 By: _________________________________ Christian Curtis, County Counsel Page 132 of 142 Page 1 of 2 Agenda Item No: 12.a. MEETING DATE/TIME: 4/21/2021 ITEM NO: 2020-352 AGENDA SUMMARY REPORT SUBJECT: Receive Status Report and Consider Any Action or Direction Related to the Novel Coronavirus (COVID-19) Emergency Including Operational Preparedness and Response; Continuity of City Operations and Services; Community and Business Impacts; and Any Other Related Matters. DEPARTMENT: City Manager / Admin PREPARED BY: Tami Bartolomei, Office of Emergency Management Coordinator PRESENTER: Tami Bartolomei, Office of Emergency Management Coordinator ATTACHMENTS: None Summary: The City Council will receive a status report and consider any action or direction related to the Novel Coronavirus (COVID-19) Emergency including operational preparedness and response; continuity of City operations and services; community and business impacts; and any other related matters. Background: On March 4, 2020, California Governor Gavin Newsom declared a State of Emergency in California in response to the COVID-19 pandemic. The County of Mendocino declared a State of Emergency related to the COVID-19 on March 4, 2020. On March 17, 2020, the City Manager, acting as the Director of Emergency Services, declared the existence of a local emergency. On March 18, 2020, City Council approved a Resolution ratifying the proclamation declaring the existence of a local emergency. Since the onset of the emergency, the City of Ukiah has worked to respond to the public health and safety needs of the community in cooperation with the County of Mendocino and other partners. The local response for public health is lead regionally by the County of Mendocino and the County's Public Health Officer. In addition, the City of Ukiah has worked to maintain the continuity of public services including public safety, water, sewer, electric, airport, public works, and other essential activities. Discussion: As the coronavirus “COVID-19” continues to evolve, the City of Ukiah continues to monitor the situation and respond to emerging needs of the community. The City is in continued contact with local and state agencies, as well as community partners, hospitals, schools, and neighboring cities to ensure we have the most updated information pertaining to COVID-19 and are coordinating efforts. Reports and/or information from the City of Ukiah's Emergency Operation Center (EOC) may include, as necessary: * Emergency Operation Center (EOC) Status * COVID-19 Case Updates * Public Information Officer * Medical Services Page 133 of 142 Page 2 of 2 * School/Education * Public Safety (Police/Fire/EMS) * Shelter in Place Monitoring and Compliance * Community Service Groups * Homeless Response * Business Impacts/Services * Public Infrastructure/Construction Status * City Finance * Recovery Efforts and Planning * Other Related matters Staff will provide a status report to City Council and will seek direction or action on operational preparedness and response; continuity of City operations and services; community and business impacts; and any other related matters. Go to the City's website (www.cityofukiah.com) for direct access to information related to the Novel Coronavirus (COVID-19) emergency including local updates, City Services, Community/Resident Information, and Business Resources. Recommended Action: Receive status report and consider any action or direction related to the Novel Coronavirus (COVID-19) Emergency including operational preparedness and response; continuity of City operations and services; community and business impacts; and any other related matters. BUDGET AMENDMENT REQUIRED: N/A CURRENT BUDGET AMOUNT: N/A PROPOSED BUDGET AMOUNT: N/A FINANCING SOURCE: N/A PREVIOUS CONTRACT/PURCHASE ORDER NO.: N/A COORDINATED WITH: Sage Sangiacomo, City Manager Page 134 of 142 Page 1 of 2 Agenda Item No: 12.b. MEETING DATE/TIME: 4/21/2021 ITEM NO: 2020-669 AGENDA SUMMARY REPORT SUBJECT: Update on Emergency Repair of the Yosemite Drive Water Main and Determine that Emergency Conditions Continue to Require the Emergency Repair. DEPARTMENT: Public Works PREPARED BY: Jarod Thiele, Public Works Management Analyst PRESENTER: Tim Eriksen, Public Works Director/City Engineer ATTACHMENTS: 1. Resolution 2020-63 Yosemite Drive Water Main Emergency Work Summary: The City Council will review the status of the emergency award of contract to repair the Yosemite Drive Water Main, to comply with Public Contract Code Section 22050. Background: At their regular meeting of November 4, 2020, the City Council voted to adopt a resolution finding that emergency conditions would not allow sufficient time to publicly bid the repair of the Yosemite Drive Water Main. Please refer to Attachment 1 for a copy of the resolution. The City Council awarded a contract to Wipf Construction under Public Contract Code Section 22050 to repair the Yosemite Drive Water Main. That section allows such repairs without competitive bidding in an emergency, if the City Council on a 4/5 vote makes specified finding. However, please note, that staff solicited quotes from two additional companies before making the award recommendation. Discussion: Under Public Contract Code 22050, Subsection (c)(1) the City Council is required to review the emergency action taken on November 4th at every regularly scheduled meeting thereafter until the action is terminated. In reviewing the action, the City Council must determine whether the emergency conditions excusing competitive bidding continue for the repair of the Yosemite Drive Water Main. It must make that finding by a 4/5 vote. The water main, water services, and trench paving work are complete. The final work to reconstruct the portion of the street damaged by the repeated water main breaks will commence as soon as weather and contractor availability permit. Recommended Action: Determine that emergency conditions continue to require the repair of the Yosemite Drive Water Main without competitive bidding. BUDGET AMENDMENT REQUIRED: N/A CURRENT BUDGET AMOUNT: N/A PROPOSED BUDGET AMOUNT: N/A FINANCING SOURCE: N/A PREVIOUS CONTRACT/PURCHASE ORDER NO.: N/A COORDINATED WITH: Tim Eriksen, Director of Public Works/City Engineer; Mary Horger, Financial Services Manager Page 135 of 142 Page 2 of 2 Page 136 of 142 1 RESOLUTION NO. 2020-63 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF UKIAH APPROVING PURSUANT TO PUBLIC CONTRACT CODE SECTION 22050 THE EMERGENCY PROCUREMENT WITHOUT PUBLIC BIDDING OF CONSTRUCTION SERVICES TO REPAIR THE WATER MAIN ON YOSEMITE DRIVE WHEREAS: 1.During normal operation of the City of Ukiah’s Water Distribution System, a portion of water main failed repeatedly on Yosemite Drive; and 2.Without the normal operation of this water main, the City is unable to provide necessary and immediate services to its residents which could lead to public health hazards; and 3.With damage caused to public property including streets, curb, gutter; and 4.With damage caused to private property including driveway aprons and driveways; and 5.The City Engineer estimates that it would take 120 days to develop plans and specifications to bid the construction work required to repair the water main and damaged public and private property, to advertise requests for bids, to award the bid and to commence construction and an additional 2-3 weeks to complete the work; and 6.Under Public Contract Code Section 22050(a)(1) in the case of an emergency, the City, pursuant to a four-fifths vote of the City Council, may repair or replace a public facility and procure the necessary equipment, services, and supplies for those purposes, without giving notice for bids to let contracts; and 7.Under Public Contract Code Section 22050(a)(2) before the City Council takes such action, it must make a finding, based on substantial evidence set forth in the minutes of its meeting, that the emergency will not permit a delay resulting from a competitive solicitation for bids, and that the action is necessary to respond to the emergency; NOW, THEREFORE, BE IT RESOLVED that: 1.Based on the foregoing recitals and information, the City Council finds that an emergency condition exists that must be repaired to avoid public health hazards that could result, if the repair work was put out for competitive bids in compliance with the procedures required by the Uniform Construction Cost Accounting Act. 2.The City Council authorizes the procurement of construction services to repair the water main and damaged public and private property without providing notice inviting bids. 3.The City Council authorizes the City Procurement Officer to contract with Wipf Construction to repair the backwash basins at the WTP on the amount of $178,642. ATTACHMENT 1 Page 137 of 142 2 4.Awarding a contract to repair the water main and damaged public and private property is categorically exempt from environmental review under the California Environmental Quality Act as a Class 2 categorical exemption, because it involves the replacement or reconstruction of existing utility systems and/or facilities involving negligible or no expansion of capacity. (14 CCR §15302.) 5.The emergency action taken by this resolution shall terminate upon the City Council’s approval of a certificate of completion for the water main and public and private property repair work. PASSED AND ADOPTED this 4th day of November, 2020, by the following roll call vote: AYES: NOES: ABSENT: ABSTAIN: Douglas F. Crane, Mayor ATTEST: Kristine Lawler, City Clerk Councilmembers Mulheren, Brown, Scalmanini, Orozco, and Mayor Crane None None None Page 138 of 142 Page 1 of 1 Agenda Item No: 13.a. MEETING DATE/TIME: 4/21/2021 ITEM NO: 2019-62 AGENDA SUMMARY REPORT SUBJECT: Receive Updates on City Council Committee and Ad Hoc Assignments, and, if Necessary, Consider Modifications to Assignments and/or the Creation/Elimination of Ad Hoc(s). DEPARTMENT: City Clerk PREPARED BY: Kristine Lawler, City Clerk PRESENTER: Mayor Orozco and Various Councilmembers ATTACHMENTS: 1. 2021 City Council Special Assignments Summary: City Council members will provide reports and updates on their committee and ad hoc assignments. If necessary, the Council may consider modifications. Background: City Council members are assigned to a number of committees and ad hoc activities. These assignments are included as Attachment 1. Discussion: Previously, the City Council discussed having more time allocated to reporting on committee and ad hoc activities. Often, the Council Reports section of the regular agenda is rushed due to impending business (i.e., public hearings), and not enough time is afforded for reports beyond community activities. In an effort to foster regular updates on committee and ad hoc assignments, this item is being placed on the agenda to provide the City Council members an expanded opportunity to report on assignments and modify assignments as necessary. Recommended Action: Receive report(s). The Council will consider modifications to committee and ad hoc assignments along with the creation/elimination ad hoc(s). BUDGET AMENDMENT REQUIRED: No CURRENT BUDGET AMOUNT: N/A PROPOSED BUDGET AMOUNT: N/A FINANCING SOURCE: N/A PREVIOUS CONTRACT/PURCHASE ORDER NO.: N/A COORDINATED WITH: N/A Page 139 of 142  2021 CITY COUNCIL SPECIAL ASSIGNMENTS COUNTY/REGIONAL OnGoing One + Alternate MTG DATE/TIME MEETING LOCATION MAILING ADDRESS/CONTACT COMMITTEE FUNCTION ASSIGNED TO PRINCIPAL STAFF SUPPORT Disaster Council Shall meet a minimum of once a year at a time and place designated upon call of the chair Place designated upon call of the chair or, if she/he is unavailable or unable to call such meeting, the first vice chair and then the City Manager or her/his designee. Office of Emergency Management 300 Seminary Ave. Ukiah, CA 95482 467-5765 - Tami Bartolomei Develop any necessary emergency and mutual aid plans, agreements, ordinances, resolutions, rules, and regulations. Orozco Duenas- Alternate Tami Bartolomei, Office of Emergency Management Coordinator; 467-5765 tbartolomei@cityofukiah.com Greater Ukiah Business & Tourism Alliance 3rd Tuesday of month, 11:30 a.m. 200 S School St. Ukiah, CA 95482 200 S School St. Ukiah, CA 95482 Promotes tourism and works to strengthen and promote the historic downtown and businesses within the greater Ukiah area Duenas Rodin - Alternate Shannon Riley,Deputy City Manager; 467-5793 sriley@cityofukiah.com Mendocino Council of Governments (MCOG) 1st Monday of month, 1:30 p.m. Board of Supervisors Chambers 501 Low Gap Road Ukiah, CA Executive Director 367 N. State Street, Ste. 206 Ukiah, CA 95482 463-1859 Plan and allocate State funding, transportation, infrastructure and project County wide Brown Rodin- Alternate Tim Eriksen, Public Works Director/City Engineer; 463-6280 teriksen@cityofukiah.com Mendocino County Inland Water and Power Commission (IWPC) 2nd Thursday of month, 6:00 p.m. Civic Center 300 Seminary Avenue conference room 5 IWPC Staff P.O. Box 1247 Ukiah, CA 95482 391-7574 - Candace Horsley Develops coordination for water resources and current water rights: Potter Valley project - Eel River Diversion Orozco Brown- Alternate Sean White,Director of Water Resources; 463-5712 swhite@cityofukiah.com Mendocino Solid Waste Management Authority (MSWMA) 3rd Thursday of every other month (varies), 10:00 a.m. Willits Council Chambers Solid Waste Director 3200 Taylor Drive Ukiah, CA 95482 468-9710 County-wide Solid Waste JPA Brown Duenas- Alternate Tim Eriksen, Public Works Director/City Engineer; 463-6280 teriksen@cityofukiah.com Mendocino Transit Authority (MTA) Board of Directors Last Wednesday of month, 1:30 p.m. Alternating locations - Ukiah Conference Center or Fort Bragg, or Point Arena Executive Director 241 Plant Road Ukiah, CA 95482 462-1422 County-wide bus transportation issues and funding Duenas Orozco - Alternate Tim Eriksen, Public Works Director/City Engineer; 463-6280 teriksen@cityofukiah.com North Coast Opportunities (NCO)4th Wednesday of month, 2 p.m. Alternating locations - Ukiah and Lakeport Ross Walker, Governing Board Chair North Coast Opportunities 413 North State Street Ukiah, CA 95482 Assist low income and disadvantaged people to become self reliant Bartolomei (appointed 12/19/18) Tami Bartolomei, Community Services Administrator; 467-5765 tbartolomei@cityofukiah.com North Coast Rail Authority (NCRA)2nd Wednesday of month, 10:30 a.m.Various Locations - announced 419 Talmage Road, Suite M Ukiah, CA 95482 463-3280 Provides a unified and revitalized rail infrastructure meeting the freight and passenger needs of the region Shannon Riley, Deputy City Manager Shannon Riley,Deputy City Manager; 467-5793 sriley@cityofukiah.com Russian River Watershed Association (RRWA) 4th Thursday of month, 9:00 a.m. (only 5 times a year) Windsor Town Hall Russian River Watershed Association Attn: Daria Isupov 425 South Main St., Sebastopol, CA 95472 508-3670 Consider issues related to Russian river - plans projects and funding requests Rodin Brown- Alternate Tim Eriksen, Public Works Director/City Engineer; 463-6280 teriksen@cityofukiah.com Ukiah Valley Basin Groundwater Sustainability Agency (GSA) 2nd Thursday of month, 1:30 p.m. Board of Supervisors Chambers; 501 Low Gap Road Ukiah, CA County Executive Office Nicole French 501 Low Gap Rd., Rm. 1010 Ukiah, CA 95482 463-4441 GSA serves as the Groundwater Sustainability Agency in the Ukiah Valley basin Crane Orozco- Alternate Sean White, Director of Water Resources; 463-5712 swhite@cityofukiah.com COUNTY/REGIONAL One + Staff Alternate MTG DATE/TIME MEETING LOCATION MAILING ADDRESS/CONTACT COMMITTEE FUNCTION ASSIGNED TO PRINCIPAL STAFF SUPPORT Economic Development & Financing Corporation (EDFC) 2nd Thursday of month, 2:00 p.m. Primarily 631 S. Orchard Street (location varies) Executive Director 631 South Orchard Avenue Ukiah, CA 95482 467-5953 Multi-agency co-op for economic development and business loan program Riley (appointed 12/19/18) Shannon Riley, Deputy City Manager; 467-5793 sriley@cityofukiah.com Sun House Guild ex officio 2nd Tuesday of month, 4:30 p.m. Sun House 431 S. Main St. Ukiah, CA 431 S. Main Street Ukiah, CA 95482 467-2836 Support and expand Grace Hudson Museum Orozco Neil Davis- Alternate David Burton, Museum Director; 467-2836 dburton@cityofukiah.com Continued - COUNTY/REGIONAL One + Staff Alternate MTG DATE/TIME MEETING LOCATION MAILING ADDRESS/CONTACT COMMITTEE FUNCTION ASSIGNED TO PRINCIPAL STAFF SUPPORT Mendocino Youth Project JPA Board of Directors 3rd Wednesday of month, 7:45 a.m. 776 S. State Street Conference Room Mendocino Co. Youth Project 776 S. State Street, Ste. 107 Ukiah, CA 95482 707-463-4915 Targets all youth with a focus on drug and alcohol prevention, healthy alternatives and empowering youth to make healthy choices Cedric Crook, Patrol Lieutenant Cedric Crook, Patrol Lieutenant Nob; 463- 6771; ccrook@cityofukiah.com Northern California Power Agency (NCPA) 4th Thursday of month, 9:00 a.m. (see NCPA calendar) Roseville, CA and other locations 651 Commerce Drive Roseville, CA 95678 916-781-4202 Pool of public utilities for electric generation and dispatch Crane Grandi - Alternate Mel Grandi, Electric Utility Director; 463-6295 mgrandi@cityofukiah.com 1 4/16/2021 Page 140 of 142  2021 CITY COUNCIL SPECIAL ASSIGNMENTS LOCAL/COUNTY/REGIONAL/LIASONS OnGoing One or Two Council and/or Staff MTG DATE/TIME LOCATION MAILING ADDRESS/CONTACT COMMITTEE FUNCTION ASSIGNED TO PRINCIPAL STAFF SUPPORT Adventist Health Community Advisory Council Quarterly: Aug. 27, 6:45 a.m. Nov 5, 6:45 a.m. 275 Hospital Drive Ukiah, CA 95482 275 Hospital Drive Ukiah, CA 95482 707-463-7623 Allyne Brown - Allyne.Brown@ah.org Provides the Adventist Health Ukiah Valley (AHUV) Governing Board and Administration with advice, support, and suggestions on matter of importance to Mendocino, Lake and Sonoma Counties. Brown Rodin - Alternate Kristine Lawler, City Clerk, 463-6217 klawler@cityofukiah.com League of California Cities Redwood Empire Legislative Committee Prior to Division Meetings, meets 3x in person and then via conference call Various locations that are announced Redwood Empire League President; Public Affairs Program Manager (916) 658-8243 Elected city officials and professional city staff attend division meetings throughout the year to share what they are doing and advocate for their interests in Sacramento Rodin Orozco-Alternate Sage Sangiacomo, City Manager; 463-6221 ssangiacomo@cityofukiah.com City Selection Committee Called as required by the Clerk of the Board BOS Conference Room 501 Low Gap Rd. Rm. 1090 Ukiah, CA C/O: BOS 501 Low Gap Rd., Rm 1090 Ukiah, CA 95482 463-4441 Makes appointments to LAFCO and Airport Land Use Commission Mayor Kristine Lawler, City Clerk; 463-6217 klawler@cityofukiah.com Investment Oversight Committee Varies Civic Center 300 Seminary Ave. Ukiah, CA 95482 Civic Center 300 Seminary Ave. Ukiah, CA 95482 Reviews City investments, policies, and strategies Crane Orozco, Alternate Alan Carter, Treasurer Dan Buffalo, Director of Finance; 463-6220 dbuffalo@cityofukiah.com Library Advisory Board 3rd Wednesdays of alternate months; 1:00 p.m. Various Mendocino County Libraries Ukiah County Library 463-4491 Review library policy and activities Supervisor Mulheren Kristine Lawler, City Clerk; 463-6217; klawler@cityofukiah.com Ukiah Players Theater Board of Directors 3rd Tuesday of month, 6:00 p.m 1041 Low Gap Rd Ukiah, CA 95482 462-1210 1041 Low Gap Rd Ukiah, CA 95482 462-1210 To oversee the activities, organization and purpose of the Ukiah Players Theater Greg Owen, Airport Manager (appointed 12/19/18) Kristine Lawler, City Clerk; 463-6217 klawler@cityofukiah.com Ukiah Unified School District (UUSD) Committee Quarterly 511 S. Orchard, Ste. D Ukiah, CA 95482 511 S. Orchard Ukiah, CA 95482 Information exchange with UUSD Board Chair, Mayor, Superintendent, and City Manager Mayor, City Manager and Police Chief Sage Sangiacomo, City Manager; 463-6221 ssangiacomo@cityofukiah.com Russian River Flood Control District (RRFCD) Liaison 1st Monday of month, 5:30 p.m. 151 Laws Ave.,Suite D Ukiah, CA 151 Laws Ave., Ukiah, CA 95482; rrfc@pacific.net; 462-5278 Proactively manage the water resources of the upper Russian River for the benefit of the people and environment of Mendocino County White/Orozco Sean White, Director of Water Resources; 463-5712 swhite@cityofukiah.com HHSA Advisory Board 2nd Wednesday of month; 9:00 a.m. Big Sur Room County Department of Social Services Executive Director Jackie Williams - 462-1934 c/o Ford St. Project 139 Ford St. Ukiah CA 95482 Discussions and possible work on health and human service issues Brown - Liaison Shannon Riley, Deputy City Manager; 467- 5793 sriley@cityofukiah.com Mendocino County Local Area Formation Commission (LAFCO) 1st Monday of month, 9:00 a.m.Board of Supervisors Chambers Executive Director 200 S. School Street, Ste. 2 Ukiah, CA 95482 463-4470 Required by legislation - planning spheres of influence, annexation, service areas, and special districts (positions not active) Crane Rodin Craig Schlatter, Director of Community Development; 463-6219; cschlatter@cityofukiah.com Mendocino County Airport Land Use Commission As needed BOS Conference Room 501 Low Gap Rd., Rm. 1090, Ukiah, CA Mendocino County Executive Office 501 Low Gap Rd. Rm. 1010 Ukiah, CA 95482 To formulate a land use compatibility plan, provide for the orderly growth of the airport and the surrounding area, and safeguard the general welfare of the inhabitants within the vicinity Owen/Schlatter Greg Owen, Airport Manager; 467-2855; gowen@cityofukiah.com Craig Schlatter, Director of Community Development; 463-6219; cschlatter@cityofukiah.com Mendocino County 1st District Liaison Monthly; TBD Civic Center Annex conference room #5 411 West Clay St. Ukiah, CA 95482 Civic Center 300 Seminary Ave. Ukiah, CA 95482 To coordinate activities and policy development with the City's 1st District Supervisor Brown Crane- Alternate Sage Sangiacomo, City Manager; 463-6221; ssangiacomo@cityofukiah.com Mendocino County 2nd District Liaison 1st Wednesdays of month, 8:00 a.m. Civic Center Annex conference room #5 411 West Clay St. Ukiah, CA 95482 Civic Center 300 Seminary Ave. Ukiah, CA 95482 To coordinate activities and policy development with the County's 2nd District Supervisor Brown Shannon Riley, Deputy City Manager; 467- 5793 sriley@cityofukiah.com LOCAL/COUNTY/REGIONAL/LIASONS OnGoing One or Two Council and/or Staff MTG DATE/TIME LOCATION MAILING ADDRESS/CONTACT COMMITTEE FUNCTION ASSIGNED TO PRINCIPAL STAFF SUPPORT Fire Executive Committee 2nd Wednesdays of month, 3:45 p.m. Ukiah Valley Conference Center, 200 S. School Street Ukiah, CA Stephanie Abba Civic Center 300 Seminary Ave. Ukiah, CA 95482 sabba@cityofukiah.com Per the recently adopted agreement between the City of Ukiah and the Ukiah Valley Fire Protection District Orozco/Brown Doug Hutchison, Fire Chief; 463-6263; dhutchison@cityofukiah.com STANDING COMMITTEES MTG DATE/TIME LOCATION MAILING ADDRESS/CONTACT COMMITTEE FUNCTION ASSIGNED TO PRINCIPAL STAFF SUPPORT Equity and Diversity TBD Virtual Meeting Room (link to be created) Civic Center 300 Seminary Ave. Ukiah, CA 95482 Improve diversity and equity in the City’s workforce and municipal services Orozco/Duenas Traci Boyl, City Manager's Office Management Analyst; 467-5720 tboyl@cityofukiah.com 2 4/16/2021 Page 141 of 142 COMMITTEE ASSIGNED TO PRINCIPAL STAFF SUPPORT Electric Grid Operational Improvements Crane/Orozco Mel Grandi, Electric Utility Director; 463-6295 mgrandi@cityofukiah.com Trench Cut Policy Development Crane/Brown Tim Eriksen, Public Works Director/City Engineer; 463-6280 teriksen@cityofukiah.com Budget Development Best Practices and Financial Policy For FY 21/22 Budget Crane/Brown Dan Buffalo, Director of Finance; 463-6220 dbuffalo@cityofukiah.com Sheri Mannion, Human Resource Director/Risk Manager; 463-6272, smannion@cityofukiah.com Advance Planning & Policy for Sphere of Influence (SOI), Municipal Service Review (MSR), Annexation, Tax Sharing, Detachment, and Out of Area Service Agreements Crane/Rodin Sage Sangiacomo, City Manager 463-6221 ssangiacomo@cityofukiah.com Shannon Riley, Deputy City Manager 467-5793 sriley@cityofukiah.com Craig Schlatter, Community Development Director 463-6219 cschlatter@cityofukiah.com Sean White, Director of Water Resources; 463-5712 swhite@cityofukiah.com Tim Eriksen, Public Works Director/City Engineer; 463-6280 teriksen@cityofukiah.com Mel Grandi, Electric Utility Director; 463-6295 mgrandi@cityofukiah.com Dan Buffalo, Director of Finance; 463-6220 dbuffalo@cityofukiah.com 2021 Electric Rate Study Crane/Duenas Mel Grandi, Electric Utility Director; 463‐6295  mgrandi@cityofukiah.com Housing Element and Implementation Review Rodin/Orozco Craig Schlatter, Community Development Director 463-6219 cschlatter@cityofukiah.com Planning Commissioner Appointment Process Crane/Rodin Craig Schlatter,Community Development Director 463‐6219 cschlatter@cityofukiah.com Darcy Vaughn, Assistant City Attorney 462‐6846 dvaughn@cityofukiah.onmicrosoft.com UVSD/ City Relations Ad hoc committee to address specific issues with the Ukiah Valley Sanitation District, including discussion of overall sewer system service delivery policies, operating policy revisions, potential revisions to the current Operating Agreement, and cost sharing Crane/Brown Dan Buffalo, Director of Finance;  463‐6220 dbuffalo@cityofukiah.com Sean White, Water Resources Director 463‐5712 swhite@cityofukiah.com  Upper Russian River Water Agency/City Relations Crane/Brown Sean White, Director of Water Resources;  463‐5712 swhite@cityofukiah.com    2021 AD HOC COMMITTEES 3 4/16/2021 Page 142 of 142