Loading...
HomeMy WebLinkAboutWhitchurch Engineering 2022-09-20COU No. 2223-108 AGREEMENT FOR PROFESSIONAL CONSULTING SERVICES [Design Professional] This Agreement, made and entered into this 20th day of September, 2022 (“Effective Date”), by and between CITY OF UKIAH, CALIFORNIA, hereinafter referred to as "City" and Whitchurch Engineering, Inc., a corporation organized and in good standing under the laws of the state of California, hereinafter referred to as "Consultant". RECITALS This Agreement is predicated on the following facts: a. City requires consulting services related to Professional Design Services for the Tenant Improvements at the Hastings Electric Service Center. b. Consultant represents that it has the qualifications, skills, experience and properly licensed to provide these services, and is willing to provide them according to the terms of this Agreement. c. City and Consultant agree upon the Scope-of-Work and Work Schedule attached hereto as Attachment "A", describing contract provisions for the project and setting forth the completion dates for the various services to be provided pursuant to this Agreement. TERMS OF AGREEMENT 1.0 DESCRIPTION OF PROJECT 1.1 The Project is described in detail in the attached Scope-of-Work (Attachment "A"). 2.0 SCOPE OF SERVICES 2.1 As set forth in Attachment "A". 2.2. Additional Services. Additional services, if any, shall only proceed upon written agreement between City and Consultant. The written Agreement shall be in the form of an Amendment to this Agreement. 3.0 CONDUCT OF WORK 3.1 Time of Completion. Consultant shall commence performance of services as required by the Scope-of-Work upon receipt of a Notice to Proceed from City. Consultant shall complete the work by February 6, 2023, and shall complete the work to the City's reasonable satisfaction, even if contract disputes arise or Consultant contends it is entitled to further compensation. 4.0 COMPENSATION FOR SERVICES 4.1 Basis for Compensation. For the performance of the professional services of this Agreement, Consultant shall be compensated on a time and expense basis not to exceed a guaranteed maximum dollar amount of $104,918. Labor charges shall be based upon hourly billing rates for the various classifications of personnel employed by Consultant to perform the Scope of Work as set forth in the attached Attachment B, which shall include all indirect costs and Contract 2223-108 – Whitchurch Engineering PAGE 2 OF 7 expenses of every kind or nature, except direct expenses. The direct expenses and the fees to be charged for same shall be as set forth in Attachment B. Consultant shall complete the Scope of Work for the not-to-exceed guaranteed maximum, even if actual time and expenses exceed that amount. 4.2 Changes. Should changes in compensation be required because of changes to the Scope-of- Work of this Agreement, the parties shall agree in writing to any changes in compensation. "Changes to the Scope-of-Work" means different activities than those described in Attachment "A" and not additional time to complete those activities than the parties anticipate d on the date they entered this Agreement. 4.3 Sub-contractor Payment. The use of sub-consultants or other services to perform a portion of the work of this Agreement shall be approved by City prior to commencement of work. The cost of sub-consultants shall be included within guaranteed not-to-exceed amount set forth in Section 4.1. 4.4 Terms of Payment. Payment to Consultant for services rendered in accordance with this contract shall be based upon submission of monthly invoices for the work satisfactorily performed prior to the date of invoice less any amount already paid to Consultant, which amounts shall be due and payable thirty (30) days after receipt by City. The invoices shall provide a description of each item of work performed, the time expended to perform each task, the fees charged for that task, and the direct expenses incurred and billed for. Invoices shall be accompanied by documentation sufficient to enable City to determine progress made and the expenses claimed. 5.0 ASSURANCES OF CONSULTANT 5.1 Independent Contractor. Consultant is an independent contractor and is solely responsible for its acts or omissions. Consultant (including its agents, servants, and employees) is not City's agent, employee, or representative for any purpose. It is the express intention of the parties hereto that Consultant is an independent contractor and not an employee, joint venturer, or partner of City for any purpose whatsoever. City shall have no right to, and shall not control the manner or prescribe the method of accomplishing those services contracted to and performed by Consultant under this Agreement, and the general public and all governmental agencies regulating such activity shall be so informed. Those provisions of this Agreement that reserve ultimate authority in City have been inserted solely to achieve compliance with federal and state laws, rules, regulations, and interpretations thereof. No such provisions and no other provisions of this Agreement shall be interpreted or construed as creating or establishing the relationship of employer and employee between Consultant and City. Consultant shall pay all estimated and actual federal and state income and self-employment taxes that are due the state and federal government and shall furnish and pay worker's compensation insurance, unemployment insurance and any other benefits required by law for himself and his employees, if any. Consultant agrees to indemnify and hold City and its officers, agents and employees harmless from and against any claims or demands by federal, state or local government agencies for any such taxes or benefits due but not paid by Consultant, including the legal costs associated with defending against any audit, claim, demand or law suit. Contract 2223-108 – Whitchurch Engineering PAGE 3 OF 7 Consultant warrants and represents that it is a properly licensed professional or professional organization with a substantial investment in its business and that it maintains its own offices and staff which it will use in performing under this Agreement. 5.2 Conflict of Interest. Consultant understands that its professional responsibility is solely to City. Consultant has no interest and will not acquire any direct or indirect interest that would conflict with its performance of the Agreement. Consultant shall not in the performance of this Agreement employ a person having such an interest. If the City Manager determines that the Consultant has a disclosure obligation under the City’s local conflict of interest code, the Consultant shall file the required disclosure form with the City Clerk within 10 days of being notified of the City Manager’s determination. 6.0 INDEMNIFICATION 6.1 Insurance Liability. Without limiting Consultant's obligations arising under Paragraph 6.2 Consultant shall not begin work under this Agreement until it procures and maintains for the full period of time allowed by law, surviving the termination of this Agreement insurance against claims for injuries to persons or damages to property, which may arise from or in connection with its performance under this Agreement. A. Minimum Scope of Insurance Coverage shall be at least as broad as: 1. Insurance Services Office ("ISO) Commercial General Liability Coverage Form No. CG 20 10 10 01. 2. ISO Form No. CA 0001 (Ed. 1/87) covering Automobile Liability, Code 1 "any auto" or Code 8, 9 if no owned autos and endorsement CA 0025. 3. Worker's Compensation Insurance as required by the Labor Code of the State of California and Employers Liability Insurance. 4. Errors and Omissions liability insurance appropriate to the consultant’s profession. Architects’ and engineers’ coverage is to be endorsed to include contractual liability. B. Minimum Limits of Insurance Consultant shall maintain limits no less than: 1. General Liability: $1,000,000 combined single limit per occurrence for bodily injury, personal injury and property damage. If Commercial General Liability Insurance or other form with a general aggregate limit is used, the general aggregate limit shall apply separately to the work performed under this Agreement, or the aggregate limit shall be twice the prescribed per occurrence limit. 2. Automobile Liability: $1,000,000 combined single limit per accident for bodily injury and property damage. Contract 2223-108 – Whitchurch Engineering PAGE 4 OF 7 3. Worker's Compensation and Employers Liability: Worker's compensation limits as required by the Labor Code of the State of California and Employers Liability limits of $1,000,000 per accident. 4. Errors and Omissions liability: $1,000,000 per occurrence. C. Deductibles and Self-Insured Retentions Any deductibles or self-insured retentions must be declared to and approved by the City. At the option of the City, either the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects to the City, its officers, officials, and employees; or the Consultant shall procure a bond guaranteeing payment of losses and related investigations, claim administration and defense expenses. D. Other Insurance Provisions The policies are to contain, or be endorsed to contain, the following provisions: 1. General Liability and Automobile Liability Coverages a. The City, it officers, officials, and employees are to be covered as additional insureds as respects; liability arising out of activities performed by or on behalf of the Consultant, premises owned, occupied or used by the Consultant, or automobiles owned, hired or borrowed by the Consultant for the full period of time allowed by law, surviving the termination of this Agreement. The coverage shall contain no special limitations on the scope-of-protection afforded to the City, its officers, officials, and employees. b. The Consultant's insurance coverage shall be primary insurance as respects to the City, its officers, officials, and employees. Any insurance or self-insurance maintained by the City, its officers, officials, and employees shall be in excess of the Consultant's insurance and shall not contribute with it. c. Any failure to comply with reporting provisions of the policies shall not affect coverage provided to the City, its officers, officials, or employees. d. The Consultant's insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer's liability. 2. Worker's Compensation and Employers Liability Coverage The insurer shall agree to waive all rights of subrogation against the City, its officers, officials, and employees for losses arising from Consultant's performance of the work, pursuant to this Agreement. 3. Professional Liability Coverage Contract 2223-108 – Whitchurch Engineering PAGE 5 OF 7 If written on a claims-made basis, the retroactivity date shall be the effective date of this Agreement. The policy period shall extend from one year of the date of the final approved invoice for this project. 4. All Coverages Each Insurance policy required by this clause shall be endorsed to state that coverage shall not be suspended, voided, canceled by either party, reduced in coverage or in limits except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City. E. Acceptability of Insurers Insurance is to be placed with admitted California insurers with an A.M. Best's rating of no less than A- for financial strength, AA for long-term credit rating and AMB-1 for short-term credit rating. F. Verification of Coverage Consultant shall furnish the City with Certificates of Insurance and with original Endorsements effecting coverage required by this Agreement. The Certificates and Endorsements for each insurance policy are to be signed by a person authorized by that insurer to bind coverage on its behalf. The Certificates and Endorsements are to be on forms provided or approved by the City. All Certificates and Endorsements are to be received and approved by the City before Consultant begins the work of this Agreement. The City reserves the right to require complete, certified copies of all required insurance policies, at any time. If Consultant fails to provide the coverages required herein, the City shall have the right, but not the obligation, to purchase any or all of them. In that event, after notice to Consultant that City has paid the premium, the cost of insurance may be deducted from the compensation otherwise due the contractor under the terms of this Contract. G. Subcontractors Consultant shall include all sub-contractors or sub-consultants as insured under its policies or shall furnish separate certificates and endorsements for each sub-contractor or sub-consultant. All coverage for sub-contractors or sub-consultants shall be subject to all insurance requirements set forth in this Paragraph 6.1. 6.2 Indemnification. Notwithstanding the foregoing insurance requirements, and in addition thereto, Consultant agrees, for the full period of time allowed by law, surviving the termination of this Agreement, to indemnify the City for any claim, cost or liability that arises out of, or pertains to, or relates to any negligent act or omission or the willful misconduct of Consultant and its agents in the performance of services under this contract, but this indemnity does not apply to liability for damages for death or bodily injury to persons, injury to property, or other loss, arising from the sole negligence, willful misconduct or defects in design by the City, or arising from the active negligence of the City. “Indemnify,” as used herein includes the expenses of defending against a claim and the payment of any settlement or judgment arising out of the claim. Defense costs include all costs associated with defending the claim, including, but not limited to, the fees of attorneys, investigators, consultants, experts and expert witnesses, and litigation expenses. Contract 2223-108 – Whitchurch Engineering PAGE 6 OF 7 References in this paragraph to City or Consultant, include their officers, employees, agents, and subcontractors. 7.0 CONTRACT PROVISIONS 7.1 Documents and Ownership of Work. All documents furnished to Consultant by City and all documents or reports and supportive data prepared by Consultant under this Agreement are owned and become the property of the City upon their creation and shall be given to City immediately upon demand and at the completion of Consultant's services at no additional cost to City. Deliverables are identified in the Scope-of-Work, Attachment "A". All documents produced by Consultant shall be furnished to City in digital format and hardcopy. Consultant shall produce the digital format, using software and media approved by City. 7.2 Governing Law. Consultant shall comply with the laws and regulations of the United States, the State of California, and all local governments having jurisdiction over this Agreement. The interpretation and enforcement of this Agreement shall be governed by California law and any action arising under or in connection with this Agreement must be filed in a Court of competent jurisdiction in Mendocino County. 7.3 Entire Agreement. This Agreement plus its Attachment(s) and executed Amendments set forth the entire understanding between the parties. 7.4 Severability. If any term of this Agreement is held invalid by a court of competent jurisdiction, the remainder of this Agreement shall remain in effect. 7.5 Modification. No modification of this Agreement is valid unless made with the agreement of both parties in writing. 7.6 Assignment. Consultant's services are considered unique and personal. Consultant shall not assign, transfer, or sub-contract its interest or obligation under all or any portion of this Agreement without City's prior written consent. 7.7 Waiver. No waiver of a breach of any covenant, term, or condition of this Agreement shall be a waiver of any other or subsequent breach of the same or any other covenant, term or condition or a waiver of the covenant, term or condition itself. 7.8 Termination. This Agreement may only be terminated by either party: 1) for breach of the Agreement; 2) because funds are no longer available to pay Consultant for services provided under this Agreement; or 3) City has abandoned and does not wish to complete the project for which Consultant was retained. A party shall notify the other party of any alleged breach of the Agreement and of the action required to cure the breach. If the breaching party fails to cure the breach within the time specified in the notice, the contract shall be terminated as of that time. If terminated for lack of funds or abandonment of the project, the contract shall terminate on the date notice of termination is given to Consultant. City shall pay the Consultant only for services performed and expenses incurred as of the effective termination date. In such event, as a condition to payment, Consultant shall provide to City all finished or unfinished documents, data, studies, surveys, drawings, maps, models, photographs and reports prepared by the Consultant under this Agreement. Consultant shall be entitled to receive just and equitable compensation for any work satisfactorily completed hereunder, subject to off-set for any direct or consequential damages City may incur as a result of Consultant's breach of contract. Contract 2223-108 – Whitchurch Engineering PAGE 7 OF 7 7.9 Execution of Agreement. This Agreement may be executed in duplicate originals, each bearing the original signature of the parties. Alternatively, this Agreement may be executed and delivered by facsimile or other electronic transmission, and in more than one counterpart, each of which shall be deemed an original, and all of which together shall constitute one and the same instrument. When executed using either alternative, the executed agreement shall be deemed an original admissible as evidence in any administrative or judicial proceeding to prove the terms and content of this Agreement. 8.0 NOTICES Any notice given under this Agreement shall be in writing and deemed given when personally delivered or deposited in the mail (certified or registered) addressed to the parties as follows: CITY OF UKIAH WHITCHURCH ENGINEERING, INC. ELECTRIC UTILITY DEPARTMENT JEFFREY LAIKAM, PE 300 SEMINARY AVENUE 610 9TH STREET UKIAH, CALIFORNIA 95482-5400 FORTUNA, CALIFORNIA 95540 9.0 SIGNATURES IN WITNESS WHEREOF, the parties have executed this Agreement the Effective Date: CONSULTANT BY: __________________________ ___09/26/2022_______ Date PRINT NAME: _Jeffrey Laikam, PE____ __68-0482707_____ IRS IDN Number CITY OF UKIAH BY: ____________________ SAGE SANGIACOMO Date CITY MANAGER ATTEST ____________________ KRISTINE LAWLER Date CITY CLERK Nov 9, 2022 Kristine Lawler (Nov 9, 2022 10:40 PST) Kristine Lawler Nov 9, 2022 Whitchurch Engineering, Inc. RFP Response for Professional Design Services Tenant Improvements at the Hastings Electric Service Center www.whitchurchengineering.com Page 4 of 21 Fortuna CA – 610 9th Street Phone: (707) 725-6926 Eureka CA – 716 Harris Street Phone: (707) 444-1420 B. Project Understanding and Proposed Approach Whitchurch Engineering (WEI) reviewed the Request for Proposal, Scope of Work and 30% design drawings (100% Schematic Drawing Set by Ren/Alexander Design) to develop our approach to this project. Our goal, as the prime consultant, is to provide building design in accordance with the 30% design drawings that will satisfy the City of Ukiah’s requirements and requests for the building. As a multidisciplinary engineering firm, WEI will provide engineering for all aspects (structural, mechanical, electrical, plumbing and Title 24) of the tenant improvements. WEI employs a wide range of licensed Civil Engineers, two of which possess a Master of Science degree in structural engineering, licensed Mechanical Engineers and a licensed Electrical Engineer. Our intention is to self-perform all of the engineering tasks with the exception of the Title 24 calculations which will be subcontracted. The staff structure utilized to manage this project will be the following: 1.Principal/Senior Management – Senior management will perform the final quality control review prior to sending deliverables out to the client. 2.Project manager (licensed civil engineer who formerly held a Type A California Contractor’s License) duties will: a.Coordinate between the client and architect, and the WEI design team b.Provide tasks for discipline supervisors to assign c.Provide initial scheduling information and biweekly schedule reports to the client d.Track discipline costs 3.Discipline supervisors (Civil with emphasis in structural and MEP supervisor) a.Coordinate with project manager, the client and the design engineers b.Assign discrete engineering tasks to lead design engineers c.Provide checking and verifying for each design deliverable d.Assist with discipline specific cost benefit analysis for alternatives in design 4.Design Engineers a.Perform task assignments as provided by the discipline supervisor b.Perform calculations as required by design task c.Alter/Create drawings to support calculation and design requirements d.Provide schedule updates biweekly to support project manager 5.Drafter a.Draft discipline specific plan sheets as requested by each design engineer (mechanical, electrical, plumbing, structural) b.Revise drawings per design engineer requests c.Create electronic and paper format drawing sets for submittal ATTACHMENT A Whitchurch Engineering, Inc. RFP Response for Professional Design Services Tenant Improvements at the Hastings Electric Service Center www.whitchurchengineering.com Page 5 of 21 Fortuna CA – 610 9th Street Phone: (707) 725-6926 Eureka CA – 716 Harris Street Phone: (707) 444-1420 WEI works frequently with architects developing engineered construction drawings from 30% design drawings. If selected for this project, our priority would be to assist the architect and client to select the optimal design for the building’s final end use. We will perform this assistance by answering the following questions and analyzing the design criteria for the client and architect to select the correct building configuration. This list of questions is preliminary but represents our initial design approach: 1. Determine the weight (live load) that could be stored above the offices without altering the existing concrete slab. 2. Determine the quantity of slab to be replaced to achieve a targeted storage load (125/250 psf). 3. Determine the quantity and placement of HVAC units for the proposed building configuration. 4. Determine the quantity of climate zones that can be provided with standard HVAC equipment. 5. Evaluate costs associated with selection/design of a sophisticated climate zone configuration. 6. Identify potential subpanel locations. The project flow will follow this outline: 1. Preliminary information gathering 2. Configuration decision making based on preliminary information gathering 3. Preparation of 60% construction documents which includes structural calculations and drawings as well as mechanical, electrical and plumbing calculations and drawings. 4. Architect and Client confirmation review (approx. 1 week duration) 5. Preparation of 95% final design construction documents 6. Submittal of 95% final design construction documents to Building Department 7. Plan check response 8. Resubmittal of 100% final design construction documents 9. Issuance of Building Permit/ Bidding 10. Construction begins After the preliminary design information is gathered and configuration decisions are confirmed, creation of the final design construction documents will be initiated. The project manager will provide biweekly project updates to ensure the drawings and other documentation are progressing appropriately. At the 60% level of completion, each discipline will submit its drawing set to the project manager to confirm design intent and verify that the architect and client design requirements are satisfied. This review of drawings by the client and architect will be allocated one week of review time to maintain the schedule. The specific disciplines may submit their drawings on a staggered time line. After the client and architect review of the 60% drawings, comments will be addressed and the final design construction drawings will be taken to the 95% level of completion and submitted to the building department. Plan check comments will be addressed. Final design construction documents will be issued. Whitchurch Engineering, Inc. RFP Response for Professional Design Services Tenant Improvements at the Hastings Electric Service Center www.whitchurchengineering.com Page 6 of 21 Fortuna CA – 610 9th Street Phone: (707) 725-6926 Eureka CA – 716 Harris Street Phone: (707) 444-1420 C. Project Team Our team is comprised of experienced design engineers and supporting personnel. Each having a specialty that relates to the proposed project. Below are their brief bio’s. Resumes can be found in Appendix 1. Jeffrey Laikam, PE – Engineering Manager/Team Lead Mr. Laikam has more than 22 years of experience, including a combined eighteen years with Whitchurch Engineering with eight years serving as Senior Design Engineer and Engineering Supervisor for the Humboldt Bay Power Plant (HBPP) nuclear decommissioning project. Managing the Fortuna Office engineering staff, his expertise includes contract and project management, land development, work planning and scheduling, development of proposals, client development and project budget, schedule and scope management. He also serves as Scotia Community Services District Engineer and City of Ferndale Deputy City Engineer. Derek Long, PE – Project Manager Derek is a licensed professional civil engineer and general contractor with 10 years of progressive experience, including engineering support services for the Humboldt Bay Power Plant (HBPP) nuclear decommissioning project. His expertise includes project management, structural design and implementation, land development, work planning and scheduling, budget control, and permit assistance. His additional highlights are building/facility construction & demolition, subdivision improvements, construction oversight & inspections, storm drainage, roadway improvements, fire water and domestic water system modifications, and sewer system improvements. Aaron Bennett, PE, ME – Mechanical Engineering Supervisor Mr. Bennett has 17 years experience and is a self-motivated Senior Engineer having worked in nuclear decommissioning, demolition, restoration, and construction industries for over 12 years. He is a licensed Senior Civil Engineer, licensed Mechanical Engineer, and experienced Project Planner. He understands the necessity for establishment and maintenance of good client and stakeholder relationships for successful project completion. Aaron recently completed the Humboldt Bay Power Plant Decommissioning and Restoration Project. He retained over project entirety for engineering and planning expertise for site owner during self-performed scope and later as a subcontractor to the prime civil works contractor. He is well diversified in all aspects of project planning and engineering with excellent understanding of field construction support needs and intelligent site infrastructure planning. Brett Whitchurch, PE – Structural Design Supervisor Brett started his engineering career as a summer intern for the strictly regulated Humboldt Bay Power Plant (HBPP) decommissioning project. This site was scrutinized by the California Coastal Commission and the Nuclear Regulatory Commission because of its location in Humboldt Bay and onsite materials. Since that time, his primary focus is utilizing his structural expertise for commercial structures and multi-family housing projects. Brett provides structural design and calculation resolving California Coastal Commission requirements for high seismic load and wind values applied to structures through design. Brett is currently preparing for the SE (Structural Engineer) exam. Whitchurch Engineering, Inc. RFP Response for Professional Design Services Tenant Improvements at the Hastings Electric Service Center www.whitchurchengineering.com Page 7 of 21 Fortuna CA – 610 9th Street Phone: (707) 725-6926 Eureka CA – 716 Harris Street Phone: (707) 444-1420 Brian Finck, EE – Electrical Engineering Brian is a licensed professional electrical engineer with more than 25 years’ experience. He specializes in control systems design, engineering for forestry products. water quality products, signaling systems and solar powered radar. He has spent a majority of his career working with Caltrans and provided his electrical expertise to the Humboldt Bay Power Plant decommissioning project. Project highlights include a 500kv switchyard design, 57kv substation design, and preliminary design on high voltage systems. Chad Pasquini - Certified Building Official Chad has spent his entire career in the building industry. His most recent 19-years has been as a Certified Building Official, Building Inspector, Plans Examiner, and Code Enforcement Officer ensuring the health and safety of the public. His experience encompasses a full range of development review from residential additions through large commercial projects. He ensures compliance with all applicable building and energy codes, coordinates and schedules with permitting agencies and helps to expedite plan issuance. Chad aids architects, contractors, designers, engineers, and home owners to achieve their goals in completing building projects from the ground up such as new single-family residences, residential remodels and additions, land use permits, commercial tenant improvements, new commercial construction, and hotels, apartments, and multi-story buildings. Abbay Technical Services – Subconsultant for Title 24 Energy Calculations Established in 1985 By William N. Abbay to provide California Title 24 energy calculation. Anne M. McQueeney came on board in 1990 and mentored with Bill for 11 years before purchasing the business in 2001. Anne has done thousands of energy calculations for residential and commercial buildings throughout all 16 climate zones in the California. Anthony K. McQueeney, her son, has been learning the Energy Code since 2020 and has since become a Certified Energy Analyst through the California Association of Building Energy Consultants. Anthony is now working on taking over the business and continuing to provide accurate and valuable T24 Services throughout the California. Whitchurch Engineering, Inc. RFP Response for Professional Design Services Tenant Improvements at the Hastings Electric Service Center www.whitchurchengineering.com Page 8 of 21 Fortuna CA – 610 9th Street Phone: (707) 725-6926 Eureka CA – 716 Harris Street Phone: (707) 444-1420 D. Experience and References Multi-Family Residential Development, Ventura County, Moorpark, CA Working with McSorley Architecture, this residential development will include 11 structures mixed with three and four story buildings, a community building, and covered parking. The structures are wood framed and foundations are slab on grade. Currently in final design phase. Client: Garrett McSorely, McSorely Architecture Phone: 707.633.9283 Email: garrett.mcsorley@gmail.com WEI is providing: • Structural calculations • Roof framing details • Multi-floor framing details • Structural Notes, Sections, Detailing throughout • Foundation Plans • Locate meter groups: propose 8 residential service meter groups, single phase supply to each group. (2) additional service meters would be located at each of the common buildings. • Load calculations • Site plan with meter locations and feeder conduit routing • Specification of service equipment • Site electrical layout with light stanchion/pole placement, EV charger station location • Site photo metrics diagram • Evaluate individual electrical demand for each building configuration • Size feeders from meters to individual units. • Prepare PG&E electrical application • Electrical Power/Communication Plan • Floor plan layout and equipment locations • Electrical Notes & Energy Notes • Service Load Demand and Connected Load calculations • Voltage Drop Calculations • Single-Line Diagram for Current Carrying Conductors • Grounding - Diagram • Electrical Equipment Selection • Conductor / Conduit sizing and Specifications • Panel Schedules Whitchurch Engineering, Inc. RFP Response for Professional Design Services Tenant Improvements at the Hastings Electric Service Center www.whitchurchengineering.com Page 9 of 21 Fortuna CA – 610 9th Street Phone: (707) 725-6926 Eureka CA – 716 Harris Street Phone: (707) 444-1420 Multi-Use New Construction, Humboldt County, Eureka, CA Working with McSorley Architecture, this state-of-the-art multi-use structure contains commercial/retail space and multi-family residences including a rooftop patio. Design and engineering are currently at 100% and the project is in bidding phase. Client: Garrett McSorely, McSorely Architecture Phone: 707.633.9283 Email: garrett.mcsorley@gmail.com WEI provided: • Structural calculations • Roof framing details • Multi-floor framing details • Structural Notes, Sections, Detailing throughout • Foundation Plans • Electrical Power/Communication Plan • Floor plan layout and equipment locations • Electrical Notes & Energy Notes • Service Load Demand and Connected Load calculations (NEC 220) • Voltage Drop Calculations • Single-Line Diagram for Current Carrying Conductors • Grounding - Diagram (NEC 250) • Electrical Equipment Selection • Conductor / Conduit sizing and Specifications • Lighting Plan and Schedule • Lighting Calculations (Title 24) • Panel Schedules / Load Balancing • Sales area Equipment and Raceway Specifications / Notes Whitchurch Engineering, Inc. RFP Response for Professional Design Services Tenant Improvements at the Hastings Electric Service Center www.whitchurchengineering.com Page 10 of 21 Fortuna CA – 610 9th Street Phone: (707) 725-6926 Eureka CA – 716 Harris Street Phone: (707) 444-1420 Humboldt Bay Power Plant – Building conversion, Humboldt County, Eureka, CA WEI was tasked to convert a previous laboratory/shipping and storage building into usable office space. This included twelve private offices, entry area, training and conference room, break room and storage closet. Work involved both demolition and new construction. Some existing interior and exterior walls were removed, along with existing doors and frames. All interior and exterior components of the mechanical system were also removed. New office spaces, HVAC, interior windows, doors, cabinetry, counters and shelving were designed. Electrical and plumbing systems were revised. Seismic and structural design for the associated mechanical equipment was provided along with egress and accessibility access, parking lot areas, grading and drainage designs. As Engineers of Record, certification was submitted to the building department to obtain occupancy permitting confirming plans were to current code requirements. Client: Kristin Zaitz, PG&E, Civil/Systems Engineering Manager Phone: 805-550-2632 Email: KMMh@pge.com Whitchurch Engineering, Inc. RFP Response for Professional Design Services Tenant Improvements at the Hastings Electric Service Center www.whitchurchengineering.com Page 11 of 21 Fortuna CA – 610 9th Street Phone: (707) 725-6926 Eureka CA – 716 Harris Street Phone: (707) 444-1420 Orr Creek Commons II - Mendocino County, Ukiah Currently under construction, WEI worked closely with Lapotre Architects on this 40-unit multi-family residential development for the Rural Community Housing Development Corporation (RCHDC). Client: Philippe Lapotre, Lapotre Architects Phone: 707.442-8867 Email: plapotre@plarchitect.com WEI Provided: − Roof Framing plans − 2nd Floor Framing Plans − Foundation Plans − Structural Notes − Structural Sections − Structural Details − Structural calculations − Address structural plan check comments − Attend 30%, 60% and 90% coordination meetings − Electrical Power/Communication Plan & Electrical Notes − Electrical load calculations − One-Line Diagram for electrical and grounding − Electrical equipment schedule − Equipment specifications (report) − Lighting Plan − Lighting calcs − Lighting schedule − Panel Schedules − Prepare PG&E electrical application − Plumbing Plans − HVAC and Ducting Plans − Prepare plumbing calculations o Total developed length diagram o Fixture unit table o Details − Plumbing fixture schedule and pipe schedule − Prepare HVAC sizing and ventilation calculations − Gas meter calcs, meter sizing and layout − Mechanical equipment schedule o Equipment specifications (report) o Sequence of operations Whitchurch Engineering, Inc. RFP Response for Professional Design Services Tenant Improvements at the Hastings Electric Service Center www.whitchurchengineering.com Page 14 of 21 Fortuna CA – 610 9th Street Phone: (707) 725-6926 Eureka CA – 716 Harris Street Phone: (707) 444-1420 G. Exceptions 1. RFP - Attachment A, Insurance Requirements for Consultants: General Liability (GL) insurance requires “operations, products and completed operations, as applicable”. This requested GL coverage applies more to companies that manufacture/sell products and/or perform construction or installation at clients’ homes or business. As engineers we provide a professional service and this type of coverage is more appropriate under our Professional Liability. If awarded the project, WEI would request this coverage be removed from the GL requirements. 2. Also, for Insurance, the request to cover volunteers as additional insured is too broad. Our GL would be vulnerable as the work we are providing would not encompass the use of volunteers. Volunteers may be utilized at a different capacity by other organizations however, as engineers we cannot control who is onsite and should not be responsible for the actions of others beyond our control. Our GL is typically written to cover The City, its officers, officials, and employees only and we would ask for volunteers to be removed from this requirement. Whitchurch Engineering, Inc. RFP Response for Professional Design Services Tenant Improvements at the Hastings Electric Service Center www.whitchurchengineering.com Page 15 of 21 Fortuna CA – 610 9th Street Phone: (707) 725-6926 Eureka CA – 716 Harris Street Phone: (707) 444-1420 Appendix 1 - Resumes Whitchurch Engineering, Inc. RFP Response for Professional Design Services Tenant Improvements at the Hastings Electric Service Center www.whitchurchengineering.com Page 16 of 21 Fortuna CA – 610 9th Street Phone: (707) 725-6926 Eureka CA – 716 Harris Street Phone: (707) 444-1420 Jeffrey Laikam, Professional Engineer, Engineering Manager Mr. Laikam has more than 22 years of experience, including a combined eighteen years with Whitchurch Engineering with eight years serving as Senior Design Engineer and Engineering Supervisor for the Humboldt Bay Power Plant (HBPP) nuclear decommissioning project. Managing the Fortuna Office engineering staff, his expertise includes contract and project management, land development, work planning and scheduling, development of proposals, client development and project budget, schedule and scope management. He also serves as Scotia Community Services District Engineer and City of Ferndale Deputy City Engineer. SELECT PROJECT EXPERIENCE Scotia Community Services District District Engineer Scotia Kreations AutoBody – Commercial Remodel, Addition, Tenant Improvements 13,026 sq ft Fortuna PG&E, Humboldt Bay Power Plant Building Remodel from laboratory/shipping to office space Eureka Blue Lake Rancheria, New 20,000 sq ft facility with 80,000 parking area Blue Lake Fortuna Senior Center – New 7,700 sq ft Building Fortuna New Commercial Structure, 10,000 sq ft including 6,000 outpatient medical facility Oroville Moorpark, Multi-Family Development 11-Structures including community building and covered parking Moorpark Fortuna Fire Department – New 6,380 sq ft Commercial Structure Fortuna Commercial Tenant Improvements, building design for 1,600 sq ft addition Eureka EDUCATION B.S., Environmental Resources Engineering Humboldt State University REGISTRATIONS Licensed Professional Engineer CA 68586 Qualified Stormwater Pollution Prevention Plans (SWPPP) Developer and Practitioner CA 23928 AREAS OF EXPERTISE Project Management Contract Management Budget Control/Analysis Proposal Review Land Development Permit Assistance Project Scheduling TOTAL YEARS EXPERIENCE 22 years Ferndale Deputy City Engineer Ferndale Scotia Community Services District, Scotia Museum, Remodel and Accessibility Improvements Scotia Orr Creek Commons Multi-Story Affordable Senior Housing Development Phases I & II, 80-Units Ukiah The Plateau - Multi-Story Housing Project – 23 Senior Units, 20 Supportive Housing Units, 25 Family Townhomes Fort Bragg Sunset Apartments - Multi-Story, Multi-Phased, 43-units Phase 1 Eureka Oak Valley Villas – Site Civil Engineering for New Multi-family Residential Housing Clear Lake The Cottages at Rigby – 26 Residential Housing Units Plus Common Use Building & Laundry Facility, Site Civil, Structural, Construction Inspections Rio Dell County of Humboldt – Veterans Hall Accessibility Modifications / Upgrades Ferndale Whitchurch Engineering, Inc. RFP Response for Professional Design Services Tenant Improvements at the Hastings Electric Service Center www.whitchurchengineering.com Page 17 of 21 Fortuna CA – 610 9th Street Phone: (707) 725-6926 Eureka CA – 716 Harris Street Phone: (707) 444-1420 Derek Long, Professional Engineer, Project Manager Derek is a licensed professional civil engineer and general contractor with 10 years of progressive experience, including engineering support services for the Humboldt Bay Power Plant (HBPP) nuclear decommissioning project. His expertise includes project management, structural design and implementation, land development, work planning and scheduling, budget control, and permit assistance. His additional highlights are building/facility construction & demolition, subdivision improvements, construction oversight & inspections, storm drainage, roadway improvements, fire water and domestic water system modifications, and sewer system improvements. SELECT PROJECT EXPERIENCE EDUCATION B.S., Civil EngineeringGonzaga UniversitySpokane Washington REGISTRATIONS Licensed Professional Engineer CA 85055 Licensed General Engineering Contractor CA 1041498 Qualified Stormwater Pollution Prevention Plans (SWPPP) Developer CA 85055 AREAS OF EXPERTISE Project Management AutoCAD Civil 3D RISA-3D and Stru-Calc Structural Analysis Site Civil Engineering Construction Oversight TOTAL YEARS EXPERIENCE 10 years Fortuna Senior Center – New 7,700 sq ft Building Fortuna Fortuna Fire Department – New Three Story Training Facility Fortuna Wendt Construction - Tenant Improvements, 19,200 sq ft Multi-Use Building Rio Dell New Commercial Structure - 10,000 sq ft including 6,000 outpatient medical facility Oroville Scotia Community Services District - Parks Accessibility Upgrades including Restroom Scotia Eel River Brewing Company – Tenant Improvements including new Warehouse and Office Space Fortuna Oak Valley Villas – Site Civil Engineering for New Multi-family Residential Housing Clear Lake Resident Owned Parks – Construction Oversight for Gas/Electric System Upgrades Arcata Dayle’s Diesel - New 9,600 sq ft Commercial Repair Shop and Office Space Fortuna Double D Steak House – Accessibility Compliance, Outdoor Seating addition Fortuna Lucina Holdings – Tenant Improvements, Mechanical Design for Medical Office Fortuna Whitchurch Engineering, Inc. RFP Response for Professional Design Services Tenant Improvements at the Hastings Electric Service Center www.whitchurchengineering.com Page 18 of 21 Fortuna CA – 610 9th Street Phone: (707) 725-6926 Eureka CA – 716 Harris Street Phone: (707) 444-1420 New Commercial Structure, 10,000 sq ft including 6,000 outpatient medical facility Oroville Blue Lake Rancheria, New 20,000 sq ft facility with 80,000 parking area Blue Lake Mendocino Animal Hospital Tenant Improvements - Mechanical Ukiah Market Expansion, Tenant Improvements, Addition, Commercial Kitchen, South State Street Ukiah Fortuna Fire Department – New 6,380 sq ft Commercial Structure Fortuna Fortuna Senior Center – New 7,700 sq ft Building Fortuna PG&E, Humboldt Bay Power Plant Building Remodel from laboratory/shipping to office space Eureka RCHCD Emergency Electrical Power Systems calculations and design Ukiah Scotia Community Services District, Scotia Museum, Remodel/Mechanical and Accessibility Improvements Scotia Resident Owned Parks – Electrical Distribution Upgrade Eureka Aaron Bennett, Mechanical & Civil Engineer, Engineering Supervisor Aaron is an experienced civil and mechanical engineer with a keen understanding of maintaining strong client and stakeholder relationships culminating in successful project completions. He has provided his expertise in project planning, design, and field construction support for residential, commercial, and industrial projects. Aaron provides intelligent site infrastructure planning for complex projects and thrives in an environment of strict timelines and budgetary constraints. In a supervisory role, Aaron is responsible for the mechanical engineering department’s project management and staff relating to design and support for all aspects of the company’s mechanical projects. SELECT PROJECT EXPERIENCE Eureka Mall Space #33 7,968 sq ft Merchant/Retail Conversion to Office Space Eureka Orr Creek Commons Multi-Story Affordable Housing Development Phases I & II Ukiah The Plateau - Multi-Story Housing Project – 23 Senior Units, 20 Supportive Housing Units, 25 Family Townhomes Fort Bragg Sunset Apartments - Multi-Story, Multi- Phased, 43-units Phase 1 Eureka Pine Hill, Multi-Story, Multi-Phased Affordable Housing Eureka Mixed Use Multi-Family, Commercial, Retail Building Eureka Blue Lake Rancheria – Multi-Story 20,000 sq ft facility Blue Lake Eureka Rescue Mission – Women’s Shelter Renovation Eureka Eureka Natural Foods – Dining Expansion Utility Relocation Eureka EDUCATION B.S., Mechanical Engineering, University of Idaho REGISTRATIONS Licensed Professional Engineer CA No. 79365 PE CA No. 38514 ME AREAS OF EXPERTISE Project Stakeholder Coordination Schedule Development & Optimization Mechanical Design Review & Development Instrumentation & Equipment Troubleshooting Rick Mitigation & Hazard Evaluation Technical & Contract Oversight TOTAL YEARS EXPERIENCE 17 years Whitchurch Engineering, Inc. RFP Response for Professional Design Services Tenant Improvements at the Hastings Electric Service Center www.whitchurchengineering.com Page 19 of 21 Fortuna CA – 610 9th Street Phone: (707) 725-6926 Eureka CA – 716 Harris Street Phone: (707) 444-1420 Southern Trinity Health Services, Tenant Improvements converting an old hardware store to a medical & dental clinic Scotia Frito Lay New 7,283 sq ft Distribution Center including Warehouse, Offices, & Conference Room Blue Lake Market Expansion, Tenant Improvements, Addition, Commercial Kitchen, South State Street Ukiah Harbers Insurance Office Remodel and Addition, 4,158 sq ft Fortuna Kreations AutoBody – Commercial Remodel, Addition, Tenant Improvements 13,026 sq ft Fortuna Moorpark, Multi-Family Development 11-Structures including community building and covered parking Moorpark Elk Valley Casino, 43,160 sq ft and Associated Development Improvements Crescent City Brett Whitchurch, Professional Engineer, Structural Supervisor Brett started his engineering career as a summer intern for the strictly regulated Humboldt Bay Power Plant (HBPP) decommissioning project. This site was scrutinized by the California Coastal Commission and the Nuclear Regulatory Commission because of its location in Humboldt Bay and onsite materials. Since that time, his primary focus is utilizing his structural expertise for commercial structures and multi-family housing projects. Brett provides structural design and calculation resolving California Coast Commission requirements for high seismic load and wind values applied to structures through design. Brett is currently preparing for the SE (Structural Engineer) exam. SELECT PROJECT EXPERIENCE Eureka Mall Space #33 7,968 sq ft Merchant/Retail Conversion to Office Space Eureka PG&E, Humboldt Bay Power Plant Building Remodel from laboratory/shipping to office space Eureka Blue Lake Rancheria, New 20,000 sq ft facility with 80,000 parking area Blue Lake Orr Creek Commons Multi-Story Affordable Senior Housing Development Phases I & II, 80-Units Ukiah Willow Terrace - Multi-Story, 38-Unit Supportive Housing Development Ukiah The Plateau - Multi-Story Housing Project – 23 Senior Units, 20 Supportive Housing Units, 25 Family Townhomes Fort Bragg Mixed Use Multi-Family, Four Story, Commercial, Retail Building Eureka Sunset Apartments - Multi-Story, Multi-Phased, 43-units Phase 1 Eureka EDUCATION B.S., Civil Engineering, Emphasis in Structural, University of California, Davis M.S., Civil Engineering, Emphasis in Structural, University of California, Davis REGISTRATIONS Licensed Professional Engineer CA No. 90914 AREAS OF EXPERTISE Structural Design and Review Technical Writing Engineering Evaluations RISA-3D Advanced Structural Modeling and Dynamic Analysis Modeling TOTAL YEARS EXPERIENCE 10 years Whitchurch Engineering, Inc. RFP Response for Professional Design Services Tenant Improvements at the Hastings Electric Service Center www.whitchurchengineering.com Page 20 of 21 Fortuna CA – 610 9th Street Phone: (707) 725-6926 Eureka CA – 716 Harris Street Phone: (707) 444-1420 Brian Finck, Professional Electrical Engineer Brian is a licensed professional electrical engineer with more than 25 years’ experience. He specializes in control systems design, engineering for forestry products. water quality products, signaling systems and solar powered radar. He has spent a majority of his career working with Caltrans and provided his electrical expertise to the Humboldt Bay Power Plant decommissioning project. Project highlights include a 500kv switchyard design, 57kv substation design, and preliminary design on high voltage systems. SELECT PROJECT EXPERIENCE EDUCATION B.S., Electrical Engineering University of North Dakota REGISTRATIONS Licensed Professional Electrical Engineer CA 17756 AREAS OF EXPERTISE Electrical Field Support Plan Review Conduit/Feeder Schedules Electrical Diagrams Substation Design COMPANY EXPERIENCE Whitchurch Engineering Project Based 2018 – Present Lutech Resources Project Based Jan 2015 -Present Caltrans (State of CA) Project Based June 2000 – Present Daqota Systems, Inc Project Based June 1999 – Jan 2015 Black & Veatch June 1999 – June 2000 • TOTAL YEARS EXPERIENCE 25 years PG&E, Humboldt Bay Power Plant Building Remodel from laboratory/shipping to office space Eureka The Plateau - Multi-Story Housing Project – 23 Senior Units, 20 Supportive Housing Units, 25 Family Townhomes Fort Bragg Redwood Coast – Humboldt County Airport – Construction Renovation Electrical Inspections McKinleyville CalFire - Rohnerville Air Attack Base Upgrades – Electrical Plans Fortuna Humboldt Bay Power Plant Decommissioning – Eureka Decommissioning Electrical Engineer - Provide Electrical Field Support for Caisson Ventilation - Provide Electrical Field Support for Ground Water Treatment System (GWTS) - Review / Approve Electrical Plans by others - Support ISFSI Electrical Activities - Write Design Change Notices (DCNs), Field Change Notices, and Work Instruction to provide direction for field staff Electrical Engineering - 500 kv switchyard design, site layout, four position ring bus, grounding design and details, raceway and lighting details bus connection details, control and protection, AC and DC station service, review/approve work by others - 57 kv substation design, soil resistivity testing, 3.0 MVAr capacitor bank control and protection design - 72 kv breaker replacement, bus connection details, wiring schematics and diagrams - Designed, Tested, Wrote Ladder Logic & Started PLC controlled systems - Allen-Bradley PLC-5, SLC-500, IMC S Class Motion Controllers, Modicon, Square D, Westinghouse - Tested & Started Allen-Bradley Drive Control Systems, AC & DC Drive Systems, Baldor AC Drives - Programmed MMI’s, PanelView, Wonderware - Preliminary design on High Voltage Systems - Conducted Fault Studies - Prepared Conduit & Feeder Schedule - One-Line Diagrams - Switch Gear Detailing - Underground Detailing - Substation Design Whitchurch Engineering, Inc. RFP Response for Professional Design Services Tenant Improvements at the Hastings Electric Service Center www.whitchurchengineering.com Page 21 of 21 Fortuna CA – 610 9th Street Phone: (707) 725-6926 Eureka CA – 716 Harris Street Phone: (707) 444-1420 Building Official/Plans Examiner City of Arcata – 2003 to 2016 Chief Building Official Humboldt County – 2017 to 2019 PG&E, Humboldt Bay Power Plant Building Remodel from laboratory/shipping to office space Eureka Frito Lay New 7,283 sq ft Distribution Center including Warehouse, Offices, & Conference Room Blue Lake County of Humboldt – Accessibility Design and Permitting Assistance – County Administrative Offices Eureka County of Humboldt – Accessibility Design and Permitting Assistance – Humboldt County Airport McKinleyville Market Expansion, Tenant Improvements, Addition, Commercial Kitchen, South State Street Ukiah Yurok Tribe Emergency Operations Center, 18,652 sq ft community shelter/operations center - 3rd Party Inspections Klamath Kreations AutoBody – Commercial Remodel, Addition, Tenant Improvements 13,026 sq ft Fortuna EDUCATION Butte College, CA Building Inspection Technology Certification REGISTRATIONS I.C.C. Certified Building Inspector, 5116805-10 I.A.P.M.O. Certified Mechanical Inspector, 090648 I.A.P.M.O. Certified Plumbing Inspector, 098501 I.C.C. Certified Electrical Inspector, 5116805-E1 I.C.C. Certified Building Plans Examiner, 5116805-B3 C.A.C.E.O. Certified Code Enforcement Officer 1 I.C.C. Certified Building Official, 5116805 TOTAL YEARS EXPERIENCE 19 years Fortuna Senior Center – New 7,700 sq ft Building Fortuna Scotia Community Services District, Scotia Museum, Remodel and Accessibility Improvements Scotia Mixed Use, Multi-Story, Multi-Family, Commercial, Retail Building Inspector of Record Eureka County of Humboldt – Accessibility Design and Permitting Assistance – Clam Beach McKinleyville Mixed Use, Multi-Story, Multi-Family, Commercial, Retail Building Inspector of Record Eureka Phyllis Rex Samoa Coast Townhomes – Multi-Story - 80-unit affordable housing complex Inspector of Record Samoa Strombeck Apartment Complex – Multi-Story – 60 units Inspector or Record Arcata Danco Senior Housing Development – Multi-Story Inspector of Record Arcata Chad Pasquini, Certified Building Official Chad has spent his entire career in the building industry. His most recent 19-years has been as a Certified Building Official, Building Inspector, Plans Examiner, and Code Enforcement Officer ensuring the health and safety of the public. His experience encompasses a full range of development review from residential additions through large commercial projects. This includes working with residents and their agents to resolve and remediate code violations. He ensures compliance with all applicable building and energy codes, coordinates and schedules with permitting agencies and helps to expedite plan issuance. Chad aids architects, contractors, designers, engineers, and home owners to achieve their goals in completing building projects from the ground up such as new single-family residences, residential remodels and additions, land use permits, commercial tenant improvements, new commercial construction, and hotels, apartments, and multi-story buildings. SELECT PROJECT EXPERIENCE ID Task Name Duration Start Finish 1 Hastings Electric Service Center Tenant Improvements 2 Preliminary Information Gathering 5 days Tue 9/27/22 Mon 10/3/22 3 Configuration Decision Making (All Scopes)4 days Tue 10/4/22 Fri 10/7/22 4 Preparation of 60% Construction Documents 25 days Mon 10/10/22 Fri 11/11/22 5 Structural 20 days Mon 10/10/22 Fri 11/4/22 6 Mechanical 20 days Mon 10/10/22 Fri 11/4/22 7 Electrical 25 days Mon 10/10/22 Fri 11/11/22 8 Plumbing 10 days Mon 10/10/22 Fri 10/21/22 9 Architect and Clieint Confirmation Reviews (All Scopes)5 days Mon 11/14/22 Fri 11/18/22 10 Preparation of 95% Final Design / Constructon Documents 20 days Mon 11/21/22 Fri 12/16/22 11 Submittal of 95% Final Design / Construction Documents 1 day Mon 12/19/22 Mon 12/19/22 12 Plan Check (assume 30‐calendar days) by City of Ukiah 23 days Mon 12/19/22 Wed 1/18/23 13 Address Plan Check Comments (if any) and prepare for  100% Submittal 12 days Thu 1/19/23 Fri 2/3/23 14 Submit 100% Final Design / Construction Documents for  Permitting 1 day Mon 2/6/23 Mon 2/6/23 15 24 29 3 8 13 18 23 28 3 8 13 18 23 28 2 7 12 17 22 27 2 7 12 17 22 27 1 6 11 16 21 26 31 5 10 September 2022 October 2022 November 2022 December 2022 January 2023 February 2023 Task Split Milestone Summary Project Summary Inactive Task Inactive Milestone Inactive Summary Manual Task Duration-only Manual Summary Rollup Manual Summary Start-only Finish-only External Tasks External Milestone Deadline Progress Manual Progress Page 1 Project: Simple Project Plan Date: Fri 9/16/22 Whitchurch Engineering, Inc. RFP Response for Professional Design Services Tenant Improvements at the Hastings Electric Service Center www.whitchurchengineering.com Page 2 of 4 Fortuna CA – 610 9th Street Phone: (707) 725-6926 Eureka CA – 716 Harris Street Phone: (707) 444-1420 Fee Proposal Total Contract Price (Not to Exceed): $91,300 1.Structural Scope: $28,500 Percentage of Scope Task Title Hours per Scope Task Rate Per Hour 10% Principal/Senior Management 12 $205 15% Project Manager 26 $130 20% Discipline Supervisors 35 $140 35% Design Engineers 96 $90 20% Drafter 55 $90 Expenses Max 4 Site Visits for Inspections and Initial Walkdown @ $100 hr 32 $3,200 Miles = 1144 $0.85 $972.50 2.Mechanical Engineering Scope: $30,000 Percentage of Scope Task Title Hours per Scope Task Rate Per Hour 10% Principal/Senior Management 16 $180 15% Project Manager 32 $130 20% Discipline Supervisors 33 $165 35% Design Engineers 92 $105 20% Drafter 62 $90 Expenses Max 2 Site Visits for Inspections and Initial Walkdown @ $105 hr 16 $1,680 Miles = 572 $0.85 $486.20 3.Electrical Engineering Scope: $22,000 Percentage of Scope Task Title Hours per Scope Task Rate Per Hour 10% Principal/Senior Management 10 $180 15% Project Manager 22 $130 20% Discipline Supervisors 21 $175 35% Design Engineers 62 $105 20% Drafter 42 $90 Expenses Max 2 Site Visits for Inspections and Initial Walkdown @ $175 hr 16 $2,800 Miles = 572 $0.85 $486.20 ATTACHMENT B Whitchurch Engineering, Inc. RFP Response for Professional Design Services Tenant Improvements at the Hastings Electric Service Center www.whitchurchengineering.com Page 3 of 4 Fortuna CA – 610 9th Street Phone: (707) 725-6926 Eureka CA – 716 Harris Street Phone: (707) 444-1420 4.Plumbing Scope: $8,300 Percentage of Scope Task Title Hours per Scope Task Rate Per Hour 10% Principal/Senior Management 4 $180 15% Project Manager 8 $130 20% Discipline Supervisors 7 $165 35% Design Engineers 20 $105 20% Drafter 13 $90 Expenses Max 2 Site Visits for Inspections and Initial Walkdown @ $105 hr 16 $1,680 Miles = 572 $0.85 $486.20 5.Title 24 Scope: $2,500 - Sub Consultant Abbay Technical Services – 25 hours @ $100/hr Whitchurch Engineering, Inc. RFP Response for Professional Design Services Tenant Improvements at the Hastings Electric Service Center www.whitchurchengineering.com Page 4 of 4 Fortuna CA – 610 9th Street Phone: (707) 725-6926 Eureka CA – 716 Harris Street Phone: (707) 444-1420 This Proposal does not include the following services in the Total Contract Price. Fees to complete these services will be billed Time & Materials at the rates outlined below: Task Cost Site Visits in addition to those listed in task items 1-5 $130/hr plus mileage Meetings in addition to those listed in task items 1-5 $105-$180 /hr plus mileage Response to RFI’s $130 /hr Preparation of Bid Documents $130/hr Significant Design Changes after 60% Review by Client and Architect $105-$180/hr Permitting Fees due to City of Ukiah for Application, Plan Check, or Permit Issuance – See City of Ukiah Fee Schedule Review of Fire Suppression submittal $165/hr Existing Utility Location $105-$175/hr plus travel and locator expenses Design of Water Connection for Fire Suppression System $105-$180/hr Response to Plan Check by outside agency $105-$205/hr Final Installation Proof of Operation $105/hr Air Balance Testing $105/hr Design for Use and Storage of Hazardous Materials and/or Control Areas $105-$165/hr Supplier Equipment Inspection and Testing $105-$165/hr As-built drawing preparation/creation $105-$165/hr Firms Hourly Rate Schedule: - Senior Engineer $ 115 - 220 /hr - Project Engineer $ 75 - 130 /hr - Surveyor $ 85 - 150 /hr - Survey Tech $ 75 - 110 /hr - Drafting/Technical $ 55 - 95 /hr - Administration $ 45 - 80 /hr - Designer $ 75 - 120 /hr - Survey Equipment $ 300 per day - Subject Matter Expert $ 90 - 225 /hr - Materials Cost plus 20% - Sub-consultants Cost plus 20% - Mileage $0.85/mile Whitchurch Engineering, Inc. RFP Response for Professional Design Services Tenant Improvements at the Hastings Electric Service Center Fortuna CA – 610 9th Street Phone: (707) 725-6926 Eureka CA – 716 Harris Street Phone: (707) 444-1420 www. w h i tc h u r c h e n g i n e e r i n g . c o m Page 2 of 2 Addendum #1 1.Construction Administration: All Disciplines: $13,617.20 Task Description Hours Rate Per Hour/Mile Total Cost Project Coordination to include: Walkdown, Kickoff, and Bi- Monthly Progress Meetings 20 $130 $2,600 Construction Assistance to include: •RFI Response •Design Changes •Design/Specification Clarifications •Submittal Review 50 $130 $6,500 Construction Inspections – In addition to those listed above 16 $100 $1,600 Mileage @ 572 miles per trip (assumed 6 trips) $0.85 $2917.20 Total $13,617.20 Assumptions: 1.Project duration 4 months with 2 project coordination meetings per month (Remote meetings). 2.One contractor site walkdown (in person) and one project kickoff meeting (Remote meeting). 3.Assumed 2 hours per RFI Response and 15 RFIs total. Additional RFI response will be provided on a time and materials basis as required. 4.Design Changes based on unidentified conditions or constructability issues. Changes in Design Scope are not included. 5.Submittal Reviews limited to items specified on approved Final Design Drawings. 6.Construction Inspections/Special Inspections limited to items requiring inspection as specified on approved Final Design Drawings, i.e. Shear Wall Nailing (two inspections), Epoxy Rod Installation (two inspections), Footing, Rebar, and Concrete testing (one inspection).