HomeMy WebLinkAboutLotten, Ryan 2020-07-20 CITY OF UKIAH
PHOTOVOLTAIC INTERCONNECTION AGREEMENT FOR NET
ENERGY METERING FROM SOLAR ELECTRIC GENERATING FACILITIES
OF 1 KW(KILOWATT)T0100 KW(KILOWATT)
DECLARATIONS
("Customer-Generator"), and the City of Ukiah, referred to
collectively as "Parties" and individually as "Party, consistent with, and in order to effectuate, the
provisions of Section 2827 if the California Public Utilities Code and the City of Ukiah's applicable electric
rate schedules enter into this "Photovoltaic Interconnection Agreement for Net Energy Metering From
Solar Electric Generating Facilities of 1 kW to 100 W'. This Agreement applies to the Customer-
Generator's generating facilities identified below with the specific characteristics and generating capacity,
and does not allow interconnection or operation of facilities different than those described. Accordingly,
the Parties agree as follows;
1. DESCRIPTION OF CUSTOMER-GENERATOR'S SOLAR ELECTRIC GENERATING FACILITY(Facility"):
A. Project Identification Number:
(Utility Log Number)
B. Interconnected Equipment:
Table 1 — List of generating equipment interconnected with the City of Ukiah Electric
Utility with an inverter (List the information requested below for all inverters
interconnected with the City of Ukiah Electric Utility's distribution system. If more than
one generator shares the inverter, write, "Shared" on the same line as that generator
under the manufacturer column and do not enter the inverter rating. Attach list of
additional equipment if applicable.)
PV Array Rating Manufacturer for Inverter Inverter Inverter Rating
(watts) used with PV Array Model (watts)
Number
1 Sao �iJp�l�1� �o 300
2
Table 2—List of generating equipment interconnected with the City of Ukiah Electric
Utility without an inverter.
(List the information requested below for all generators directly interconnected without
an inverter to the City of Ukiah Electric Utility's distribution system. Attach list of
additional equipment if applicable.)
Effective:December 2018 Page 1 of 6
PV Array Rating Manufacturer for Inverter Inverter Inverter Rating
(watts) used with PV Array Model (watts)
Number
1
2
C. Site Address: 10 IA,10 O2
D. Facility will be ready for operation on or about 101
(Date)
E. Loca ion of City f Ukiah D signated Switching: �i�A 1�/
6�2-t/tz lot-, C-1VR 6-e
F. Location of City of Ukiah Customer Contact: ''T G✓ ✓��'1� D�
G. Operating Option
Customer-Generator has elected to operate its solar-electric generating facility in
parallel with the City of Ukiah's distribution facilities. The solar-electric generating
facility is intended primarily to offset part or all of the Customer-Generator's own
electric requirements.
Customer-Generator shall not commence operation of the Facility until the City of Ukiah
Electric Utility has given written approval of the interconnection facility.
2. CUSTOMER BILLING AND PAYMENT OPTIONS
Charges for other than electricity usage must be paid. Power generated by the Customer-
Generator does not offset charges for other than electricity usage.
Customer-Generator's electric rate schedule shall remain the same. Summer and winter times
are the same as the current rate schedule definitions. Customer-Generator may (at its option)
pay any amount for electric utility charges monthly, with the understanding that any and all
payments will be reconciled annually as set forth herein. At the end of every twelve (12) month
period following the date of final interconnection of the Customer-Generator's PV system, the
City of Ukiah will calculate the Customer-Generators charges for any net-energy consumption as
defined in the Customer-Generator's electric rate schedule. The Customer-Generator's total
payments for the twelve (12) months will then be subtracted from the total charges. The
Customer-Generator will then be billed for any balance due.
Annual Net Surplus Generation: If a Customer-Generator produces more power than they
consume at the end of the twelve (12) month period,they are considered to be a net generator.
The City of Ukiah Electric Utility will determine the amount of net surplus power generated and
provide a monetary payment to the Customer-Generator for their surplus power. The monetary
value per kWh of net surplus generation shall be based on the most recently published Ukiah
Effective;December 2018 Page 2 of 6
F
Electric Utility budget, calculated as the dollar value of the expected avoided generation and
production-related costs divided by the forecasted annual energy sales.
3. INTERRUPTION OR REDUCTION OF DELIVERIES
A. The City of Ukiah shall not be obligated to accept or pay for and may require Customer-
Generator to interrupt or reduce deliveries of as-available energy: (a)when necessary in
order to construct, install, maintain, repair, replace, remove, investigate, or inspect any
of its equipment or part of its system;or(b)if it determines that curtailment,interruption,
or reduction is necessary because of emergencies, forced outages, force majeure, or
compliance with prudent electrical practices,or system operation.
B. Whenever possible,the City of Ukiah shall give Customer-Generator reasonable notice of
the possibility that interruption or reduction of deliveries may be required.
C. Notwithstanding any other provisions of the Agreement, if at any time the City of Ukiah
determines that either (a) the facility may endanger the City of Ukiah personnel, or (b)
the continued operation of Customer-Generator's facility may endanger the integrity of
the City of Ukiah's electric system, the City of Ukiah shall have the right to disconnect
Customer-Generator's facility from the .City of Ukiah's electrical system. Customer-
Generator's Facility shall remain disconnected until such time as the City of Ukiah is
satisfied that the conditions) 'referenced in (a) or (b) of this Section 4.0 have been
corrected.
4. INTERCONNECTION
A. Customer-Generator shall deliver the as-available energy to the City of Ukiah at the
utility's solar bi-directional watt-hour meter.
B. Customer-Generator shall pay for designing, installing, operating, and maintaining the
solar-electric generating facility in accordance with all applicable laws and regulations and
shall comply with the City of Ukiah's Appendix A, which is attached hereto.
C. The City of Ukiah shall furnish and install standard watt-hour and bi-directional watt-hour
meters. Customer-Generator shall provide and install meter sockets, related equipment
and installation costs.
D. Customer-Generator shall not commence parallel operation of the generating facility until
written approval of the interconnection facilities has been given bythe City of Ukiah. Such
approval shall not be unreasonably withheld. The City of Ukiah shall have the right to
have representatives present at the initial testing of Customer-Generator's protective
apparatus.
S. MAINTENANCE AND PERMITS
Customer-Generator shall: (a) maintain the solar-electric generating facility and interconnection
facilities in a safe and prudent manner and in conformance with all applicable laws and
regulations including, but not limited to, the City of Ukiah's Appendix A, and (b) obtain any
governmental authorization and permits required for the construction and operation of the
solar-electric generating facility and interconnection facilities. Customer-Generator shall
reimburse the City of Ukiah for any and all losses, damages, claims, penalties, or liability it incurs
as a result of Customer-Generator's failure to obtain or maintain any governmental
authorization and permits required for construction and operation of Customer-Generator's
generating facility. The City of Ukiah will have the right to inspect and test the automatic
disconnect circuit on periodic basis to insure proper operation defined in Appendix A.
Effective:December 2018 Page 3 of 6
6. ACCESS TO PREMISES
The City of Ukiah may enter Customer-Generator's premises: (a) to inspect at all reasonable
hours Customer-Generator's protective devices and read or test meter; and (b) to disconnect,
without notice, the interconnection facilities if, in the City of Ukiah's opinion, a hazardous
condition exists and such immediate action is necessary to protect persons, or the City of
Ukiah's facilities, or property of others from damage or interference caused by Customer-
Generator's solar-electric facilities, or lack of properly operating protective devices.
7. INDEMNITY AND LIABILITY
A. The Customer-Generator shall protect and defend the City against any claim for money
made against the City, if the claim is based on any act or omission of the Customer-
Generator in performing under this Agreement,regardless of whether the act or omission
involves allegedly negligent or intentionally wrongful conduct,or if the claim results from
the engineering, design, construction, maintenance, repair, improvement, replacement,
operation, supervision, testing or ownership of the Customer-Generator's facility.
Collectively, these activities will be referred to in this Agreement as "operation of the
facility". The Customer-Generator will protect the City and its officers, agents,
employees, and contractors. This obligation applies to the acts or omissions of the
Customer-Generator's officers, agents, employees, contractors,and volunteers.
In addition,the Customer-Generator shall pay any loss of expense incurred by the
City caused by the operation of the Customer-Generator's facility.
Under its obligation to defend the City,the Customer-Generator shall provide at
its expense such attorneys, investigators, consultants, experts or other professionals as
may be necessary to defend any such claim or demand and shall pay all expenses
associated with such defense, including any expenses incurred by the City to assist or
participate in such defense. If Customer-Generator fails to provide competent
representation when necessary to prevent any prejudice to the City's interests, the City
may retain such services and incur such expenses as may be reasonably prudent to
protect its interest and Customer-Generator shall pay any such expenses incurred by the
City within 30 days of the date the City provides the Customer-Generator with written
notice of the expense and a demand for payment.
In agreeing to indemnify City under this paragraph 7.A,the Customer-Generator
shall pay any settlement orjudgment resulting from a claim,demand,and cause of action
or suit covered by this paragraph. The Customer-Generator will not be required to
protect the City against a claim that is based on the sole active negligence of the City or
its officers,agents, employees,or contractors(other than the Customer-Generator).
The City will provide this same protection to the Customer-Generator for any
claim based on the operation of the City's facilities, or the sole and active negligence of
the City or its officers, agents, employees or contractors (other than the Customer-
Generator)in operating its facilities.
This indemnification and hold harmless provision of this Agreement shall remain
in effect,even if the Agreement is otherwise terminated or fully performed.
B. Notwithstanding the indemnity of Section 7.A and except for a Party's willful misconduct
or sole negligence, each Party shall be responsible for damages to its facilities resulting
from electrical disturbances or faults.
C. The provisions of this Section 7 shall not be construed to relieve any insurer of its
obligations to pay any insurance claims in accordance with the provisions of any valid
insurance policy.
Effective:December 2018 Page 4 of 6
D. Except as otherwise provided in Section 7.A,neither Party shall be liable to the other Party
for consequential damages incurred by that Party.
E. If Customer-Generator fails to comply with the insurance provisions of this Agreement, if
any,Customer-Generator shall,at its own cost,defend,save harmless and indemnify the
City of Ukiah, its directors, officers, employees, agents, assignees, and successors in
interest from and against any kind or nature (including attorney's fee and other costs of
litigation) resulting from the death or injury to any person or damage to any property,
including the personnel property of the City of Ukiah,to the extent that the City of Ukiah
would have been protected had Customer-Generator complied with all such insurance
provisions. The inclusion of this Section 7.E is not intended to create any express or
implied right in Customer-Generator to elect not to provide any such required insurance.
S. INSURANCE
A. To the extent that Customer-Generator has currently in force all risk property insurance
and comprehensive personal liability insurance, Customer-Generator agrees that it will
maintain such insurance in force for the duration of this Agreement in no less amounts
than those currently in effect. The City of Ukiah shall have the right to inspect or obtain
a copy of the original policy or policies of insurance prior to commencing operation.
B. Customer-Generator shall meet the standards and rules set forth in Appendix A, have the
appropriate liability insurance required in Section 8.A and shall not be required to
purchase any additional liability insurance.
C. Such insurance required in Section &A shall, by endorsement to the policy or policies,
provide for thirty (30) calendar days written notice to the City Electric Utility prior to
cancellation,termination,alteration,or material change of such insurance.
9. GOVERNING LAW
This Agreement shall be interpreted, governed, and construed under the laws of the State of
California as if executed and to be performed wholly within the State of California.
10. AMENDMENT,MODIFICATIOS OR WAIVER
Any amendment or modifications to the Agreement shall be in writing and agreed to by both
Parties. The failure of any Party at any time or times to require performance of any provision
hereof shall in no manner affect the right at a later time to enforce the same. No waiver by any
party of the breach of any term of covenant contained in this Agreement, whether by conduct
or otherwise, shall be deemed to be construed as a further or continuing waiver of any such
breach or a waiver of breach of any other term or covenant unless such waiver is in writing.
11. APPENDIX
This Agreement includes the following Appendix A, which is attached and incorporated by
reference:
Appendix A: City of Ukiah's Photovoltaic Interconnection Standards.
Effective:December 2018 Page 5 of 6
12. NOTICES
All written notices shall be directed as follows:
City of Ukiah
Electric Utility Department
411 W.Clay
Ukiah,CA 95482
Customer-Generator's notice to the City of Ukiah pursuant to this Section 12 shall refer to the
Project Identification Number set forth in Section LA
13. TERM OF AGREEMENT
This Agreement shall be in effect when signed by the Customer-Generator and the City of Ukiah
and shall remain in effect thereafter month-to-month unless terminated by either Party on
thirty(30)days' prior written notice in accordance with Section 12.
14. ADDITIONAL REQUIRED DOCUMENTS
In addition to this signed Interconnection Agreement, the following documents must be
submitted to the City of Ukiah Electric Utility:
- Completed Building Permit Application
- Copy of rebate approval letter
- One signed copy of the interconnection agreement
- Application for residential/commercial utility service
- W-9 Internal revenue service(if a commercial installation)
Four copies of plans—2 wet signed
- 8%z X 11 plot plan
Two sets of truss calculations or engineered calculations if required
- PV system design and electrical one-line drawing
15. SIGNATURES
IN WITNESS WHEREOF, the Parties hereto have caused two originals of this Agreement to be
executed by their duly authorized representatives.
This Agreement is effective as of the last date set forth below.
(Customer-Generator)
/ City of Ukiah
By: �Lo/ JIZ� By. .�
Name: Gl Name:
Title: G�:/t"�SS '� Title:
Date: Date: 7 o "as O T
Effective:December 2018 Page 6 of 6