HomeMy WebLinkAboutGhilotti Construction Company, Inc. 2019-12-05; Amendment 2COU 2122-188-A2
CITY OF UKIAH
AMENDMENT NO.2
TO
PROFESSIONAL SERVICES CONTRACT 2122188
BETWEEN
GHD INC and THE CITY OF UKIAH
This Amendment No. 2, entered on September 13, 2022, revises the Agreement for
consulting services for preparing the plans, specifications and estimate for the Talmage
Road Rehabilitation Project dated February 18, 2022 between the City of Ukiah and
GHD Inc, as follows.
1. Add additional Design Services for Design of Bike Lanes to the scope of work,
per attached Exhibit 1.
2. Add an additional $38,992 for professional consulting services related to the
design of the Talmage Road Rehabilitation Project, for a revised, total contract
amount not -to -exceed $292,385.
IN WITNESS WHEREOF, THE PARTIES HAVE EXECUTED THIS
AMENDMENT ON THE EFFECTIVE DATE:
CONSULTANT
PRINT NAME: MatthevV G. Ken
CITY OF UKIAH
BY:
SAGE SANGIACOMO, CITY MANAGER
ATTEST
BY: Kristine Lawler (Sep 29, 2022 09:25 PDT)
KRISTINE LAWLER, CITY CLERK
DATE: September 14, 2022
DATE: Sep 29, 2022
DATE: Sep 29, 2022
EXHIBIT I
943 Reserve Drive
Roseville, CA 95678
USA
www.ghd.com
Your ref: 2122188
Our ref: 12571020
10 August 2022
Andrew Stricklin
Public Works Department
City of Ukiah
300 Seminary Ave
Ukiah, CA 95482-5400
RE: Proposal for Professional Engineering Services: Talmage Road Rehabilitation Project,
Amendment 2 for Design of Bike Lanes.
Dear Andrew:
GHD is pleased to provide this proposal for an amendment to our professional services contract for the above
referenced project to design new bike lanes west of railroad tracks and up west to South State Street.
Background
GHD is currently under contract with the City to provide design services for the Talmage Road Rehabilitation
project. This project includes the resurfacing of approximately 1700 feet of roadway between State Street
and Airport Park Boulevard. The project also includes the addition of sidewalk and pedestrian paths to
complete gaps in the existing corridor. The original scope of work includes a pedestrian bridge crossing of
Doolin Creek at the west end of the project and a culvert extension where Doolin Creek passes under
Talmage Road. This amendment will cover our additional work associated with the development of
alternatives to the bridge and designing a culvert extension that replaces the bridge alternative. The
amendment also includes efforts to design new bike lanes on both sides of Talmage Road all the way up to
State Street along with the associated drainage, structural, survey and right-of-way (ROW), civil, and striping
work.
Scope of Work
At the request of the City, additional design by GHD will include culvert extensions at both crossings of Doolin
Creek, roadway widening on the east side of Perry Street, and bike lanes between South State Street and
the Great Redwood Trail.
The culvert extension option on the south side of Talmage Road along the east side of the gas station will
help to mitigate the challenge between existing grades at the adjacent sidewalk and finished grades at the
deck of the bridge. The hydraulic analysis memo will be updated to reflect the corresponding floodplain
calculations.
To accommodate a 5 foot wide bike lane in both directions of Talmage Road, the roadway section will need
to be widened which will push the proposed sidewalk onto private property (see exhibit EX-105). The City
discussed the proposed improvements with the owner of the subject property (APN 223-140-53) and received
tentative approval for the project impact. GHD will assist the City in preparing the legal descriptions and plats
for the additional ROW required. In addition, GHD will assist in preparation of any Temporary Construction
The Power of Commitment
GHD 12571020
Easements (TCEs) or Permits to Enter (if required). GHD anticipated that 4 title reports will be needed, the
cost of which is included in this amendment proposal.
Project Management
This task will include the additional labor effort for the alternative analysis along with the associated work with
managing this task including coordination, and project delivery. We have estimated 14 hours will be required
for this task.
Survey
This task will include the additional labor and expense cost for:
• Field survey and mapping at the west side of Perry Street
• Legal descriptions and plats for the project impacts on the property on the west side of Perry Street
• Legal descriptions and plats for the project impacts on the property on the east side of Perry Street
• Gas station property Temporary Construction Easement
• West Betty Street Permit to Enter
• Four title reports required for the above -mentioned work
We have estimated 48 hours will be required for this task.
Civil
This task includes the additional labor spent to date that was out of scope preparing alternative options for
the City as well as the labor required to update the civil design. We have estimated 40 hours will be required
for this task.
Structural
This task includes the additional labor associated with design the additional length of culvert extension where
Doolin Creek crosses under Talmage Road as well as the new culvert extension at the east side of the gas
station that will replace the proposed bridge. We have estimated 40 hours will be required for this task.
Hydraulics
This task includes the labor for the additional hydraulic analysis and memorandum revisions for the culvert
extension at the gas station and revised length of the culvert extension at the Talmage Road crossing. We
have estimated 12 hours will be required for this task.
PG&E Pole Relocation Coordination
This task includes the labor for the coordination for the PG&E utility pole relocation located along the north
side of Talmage Road. We have estimated 24 hours will be required for this task.
General Assumptions/Exclusions
This proposal is based on the following assumptions:
1. Meetings are not required but can be provided on an additional time -and -materials basis.
2. We anticipate having one site meeting with PG&E to discuss the pole relocation.
3. Four title reports are included in this scope of work. Any additional title reports can be provided for
an additional fee.
4. FEMA coordination is not required.
12571020 1 RE: Proposal for Professional Engineering Services: Talmage Road Rehabilitation Project, Amendment 2 for Design of Bike Lanes.
Schedule
We will begin work on this scope immediately. The civil and structural elements will be included in the 60%
submittal. The PG&E coordination will also begin immediately. Some of the survey items will be submitted
separately with subsequent design progression.
Deliverable
Our deliverable for this task will be the addition of the ROW linework to the digital survey base file in Civil 3D
dwg format as well as a pdf of the survey control drawing in dwg and pdf format.
• Updated ROW linework
• Updated hydraulics memorandum with the culverts extension at the gas station and additional culvert
extension for the twin box culverts under Talmage Road.
• Structural drawings for both culvert extensions. Note that the Talmage Road culvert extension was
part of our original contract, but it will need to be extended another 5-feet for the bike lane addition.
• PG&E utility pole relocation agreement
• Legal descriptions and plat maps for the private property impacts
Fee Proposal
Our understanding is that the contract mechanism will be through an amendment to the existing Professional
Service Agreement with the City for the road rehabilitation project. GHD proposes to complete this additional
scope for the time -and -materials fee not to exceed $38,992 without the prior written authorization of the City.
Services not included in this proposal can be provided by a negotiated fee at the attached updated rate
schedule. The approximate breakdown of costs are as follows:
• Project Management - $3483
• Survey - $12,701
• Civil - $6600
• Structural — $6796
• Hydraulics — $1860
• PG&E Pole Relocation Coordination — $7092
We appreciate the City's collaborative efforts in working with us to investigate design options and make these
adjustments to the project design, and believe the project is better as a result. Please let us know if you have
any questions.
Regards
I�Tw�
Erik Fanselau
Project Manager
916-256-2677
Erik.fanselau@ghd.com
Matt Kennedy
Project Director
,#
707-540-3376
Matt.kennedy@ghd.com
12571020 1 RE: Proposal for Professional Engineering Services: Talmage Road Rehabilitation Project, Amendment 2 for Design of Bike Lanes.
Project Name
Prepared by:
Reviewed by:
Job Number:
Talmage Road Rehabilitation Project
Erik Fanselau
Matt Kennedy
12571020
GHD - PROJECT FEE ESTIMATING SHEET
Client: City of Ukiah
Date: August 10, 2022
LABOR COSTS
FEE COMPUTATION
TASK
LABOR CATEGORY >
RATE >
Principal
$268.00
/Hr
PM
$228.00
/Hr
Electrical
$289.00
/Hr
Civil
Engineer
$183.00
/Hr
Staff Civil
Engr
$163.00
/Hr
Drainage
Engr
$202.00
/Hr
Hydraulic
Engr
$166.00
/Hr
Structural
Engr.
$166.00
/Hr
Spatial
Scientist
$225.00
/Hr
Land
Surveyor
$187.00
/Hr
2-Person
Survey
$400.00
/Hr
Permitting
$228.00
/Hr
Sr. CAD
Tech
$153.00
/Hr
CAD Tech
$131.00
/Hr
Word
Processing
$80.00
/Hr
Project
Admin
$150.00
/Hr
TOTAL
HOURS
OTHER
DIRECT
COSTS (1)
GHD FULLY
BURDENED
LABOR COSTS
SUB
Crawford Associates
(Geotech)
TOTAL
SUB FEES
W/MARKUP
15%
TOTAL
FEE
Task 1 Project Management
1.1 PM
2
8
4
2
14
$91.00
$3,392.001
1 $0.001
$3,483.00
0
$0.00
$0.001
1 $0.001
$0.00
0
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
Subtotal Task 1
21
8
0
4
0
0
0
0
0
0
0
0
0
0
0
2
14
$91.00
$3,392.001
$0.001
$0.001
$3,483.00
Task 2 Topographic Mapping and Legal Descriptions
2.1 Labor
47
1
48
$312.00
$9,189.00
$0.00
$9,501.00
2.2 Title Reports 4 assumed
0
$3,200.00
$0.00
$0.001
$3,200.00
0
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.001
$0.00
Subtotal Task 2
0
0
01
0
0
01
0
0
01
47
1
0
0
01
0
0
48
$3,512.00
$9,189.00
$0.00
$0.001
$12,701.00
Task 3 Hydraulics
3.1 Calculations and Memorandum
6
6
12
$78.00
$1,782.00
$0.00
$1,860.00
0
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
Subtotal Task 3
0
0
0
0
0
0
6
0
0
0
0
0
0
6
0
0
12
$78.00
$1,782.00
$0.00
$0.00
$1,860.00
Task 4 Structural
4.1 Structural Design
32
8
40
$260.00
$6,536.00
1 $0.001
$6,796.00
0
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
Subtotal Task 41
01
0
0
0
0
0
0
32
0
0
0
0
8
01
0
0
40
$260.00
$6,536.00
$0.001
$0.001
$6,796.00
Task 5 Civil
5.1 Civil
I
I
1
1 301
1
1
1
1
1
1
1
1
1 101
1
1 40
$260.001
$6,800.001
1 $0.001
$7,060.00
Subtotal Task 51
01
01
01
301
01
01
01
01
01
01
01
01
01
101
01
01
40
$260.001
$6,800.001
$0.001
$0.001
$7,060.00
Task 6 PG&E Pole Relocation
6.1 PG&E Coordination
1 241
1
1
1
1
1
1
1
1
1
1
1
24
$156.001
$6,936.001
1 $0.001
$7,092.00
0
$0.001
$0.001
1 $0.001
$0.00
Subtotal Task 61
01
01
241
01
01
01
01
01
01
01
01
01
01
01
01
0
24
$156.001
$6,936.001
$0.001
$0.001
$7,092.00
0
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$0.00
$0.00
$0.00
$0.001
$0.00
PROJECT TASK TOTALS 1 21 81 241 341 01 01 61 321 01 471 11 01 81 161 01 21 178
$4,357.001 $34,635.001 $0.001 $0.001 $38,992.00
(1) OTHER DIRECT COSTS include telephone, vehicle mileage, printing, reproduction and other miscellaneous direct expenses.
8/10/2022 Page 1
Attachment
FY2023 Standard Fee Schedule
GHD Description
2022/23 US Rate
GHD Description
2022/23 US Rate
PROFESSIONAL
ADMINISTRATION
Senior Technical Director 1
$
340.00
Business Services Manager 1
$
280.00
Senior Technical Director 2
$
315.00
Business Services Manager 2
$
235.00
Senior Technical Director 3
$
283.00
Senior Admin Officer 1
$
182.00
Technical Director 1
$
263.00
Senior Admin Officer 2
$
152.00
Technical Director 2
$
237.00
Admin Officer 1
$
137.00
Senior Professional 1
$
215.00
Admin Officer 2
$
125.00
Senior Professional 2
$
195.00
Admin Officer 3
$
80.00
Professional 1
$
185.00
SITE BASED
Professional 2
$
158.00
Senior Construction Manager
$
315.00
Professional 3
$
137.00
Construction Manager
$
265.00
Vacationer/ Intern
$
126.00
Lead Site Engineer/Supervisor
Senior Site Engineer
Site Engineer
$
$
$
237.00
215.00
195.00
CONSULTANT
Executive Consultant 1 $ 425.00
Exectutive Consultant 2
$
385.00
Lead Inspector
$
184.00
Senior Consultant 1
$
315.00
Senior Inspector
$
137.00
Senior Consultant 2
$
280.00
Inspector / Specialist 1
$
120.00
Consultant 1
$
235.00
Inspector / Specialist 2
$
110.00
Consultant 2
$
190.00
Clerk / Specialist 3
$
105.00
Consultant 3
$
150.00
Senior Site Manager 1
Senior Site Manager 2
Senior Site Manager 3
Senior Site Manager 4
Operator/Labourer 1
Operator/Labourer 2
Operator/Labourer 3
$
$
$
$
$
$
$
127.00
115.00
105.00
95.00
85.00
80.00
60.00
TECHNICAL
Lead Design Technician 1
Lead Design Technician 2
Lead Design Technician 3
Senior Design Technician 1
Senior Design Technician 2
$
$
$
$
$
315.00
289.00
264.00
238.00
220.00
PROJECT SUPPORT
Design Technician 1
$
195.00
Business Services Manager 1
$
340.00
Design Technician 2 $ 184.00
Drafting/Design 1
$
168.00
Business Services Manager 2
$
315.00
Drafting/Design 2
Drafting/Design 3
Drafting/Design 4
Intern Drafting/Design
$
$
$
$
153.00
137.00
127.00
115.00
Senior Admin Officer 1
Senior Admin Officer 2
Admin Officer 1
Admin Officer 2
Admin Officer 3
$
$
$
$
$
263.00
232.00
215.00
195.00
178.00
Admin Officer 4
$
153.00
Admin Officer 5
$
137.00
Admin Officer 6
$
80.00
FY2023 Rate Schedule Notes
1) Rates are for employees of GHD companies.
2) An administration fee will apply to all invoices to cover in-house disbursements (Associated
Project Costs) on a project. This will be charged at a rate of either:
• 6% of total professional fees
• Office hourly rate of USD $6.50, Field Services/Construction Inspector hourly rate of USD $11.50
3) All travel will be invoiced at economy class rates. Lodging and meal expenses will be at cost
plus agreed markup unless a per diem rate is negotiated.
4) All other project related disbursements, expenses and subcontractor costs will be
invoiced with a markup of 15%.
5) Fee schedule is subject to change annually.
6) Leased and personnel vehicles, field equipment and disposable field supplies will be invoiced at
established rates. Personal vehicle milage rates will be charged in accordance with government regulated
standard rates.
Rate Schedule Notes GHD FY2023
SHEET GENERAL NOTES
I � I
1 / I AKIN 1. CONTRACTOR SHALL PERFORM ALL UNDERGROUND UTILITY
/ OOC 2005-02197 WORK, CONCRETE WORK, SURFACE RESTORATION WORK,
I AL YEA APN 003- 140-43 AND PERFORM ALL DIGOUT AND REPAIR WORK, SUCH AS
DOC 2008- 15667 / PLACING LEVELING COURSE AND SEPARATION FABRIC, PRIOR
APN 003- 140-46 / TO FINAL HOT MIX PAVING.
I \ 2. APPLY TACK COAT TO ALL ADJACENT (E) AC IMPROVEMENTS
"TALMAGE RD-CL" OR CONCRETE SURFACES AND AT JOINT BETWEEN (E) AND
O STA:10+47.62, 31.05' L I \ 1 (N) IMPROVEMENTS.
I \\ CONFORM 3. SEE SHEETS G-006 AND G-007 FOR TYPICAL SECTIONS.
T ..
o 4. SEE CURB RAMPS ENLARGED PLANS FOR HORIZONTAL AND
VERTICAL INFORMATION NOT SHOWN.
.--
i
i
__ __ - ___ _ _ ____
..
__ _ _ _ _ _ _ -�...................
_________ W
----"-"""""--- __________ _ LOCATION FEXI TIN UTILITIES ANDSTRUCTURESARE FR M
I
- _ _ _ - - " " 2O EXISTING U S O
________----------- ____---------------- --"-"""""----- _ - AVAILABLE RECORD MAPS, EXACT LOCATION AND COMPLETENESS
..... .......... ..................................................._.. -_....__._.._._.___..___. _._. W
---------------------- _ _ _ _ W ARE NOT GUARANTEED. CONTRACTOR SHALL NOTIFY
( --- - - - - -- - "------Z------"-""-"------ - - - "" -- -- - - -- -- --- --- - - -- --- -- - --- " _ --_ - UNDERGROUND SERVICE ALERT (USA) AT (800) 227-2600 OR DIAL
_ _ -_ __ _ __ - -" "" - - - 11 AMINIM M F4 HOURS PRIOR ANY EXCAVATIONAND
_ - - 8 U O 8 OU S O O
_ _ _ _ _.._._.__._. __ _ _ _
_ _ _ __ _ _ _ _ _ __ __ - _ _ _ __ _ _ _ _ __ _ _ _ _ _._. ._......__._._ _..._._. _. _--- -T-
. .............
............... .........._._._.__..__._.._.._.__._.._.__.__._... _.._._ __._._.. _ POTHOLE FOR EXACT LOCATION.
I - --
____ _ _ _ _ _ ____ __ _ _ _ _ ________ __"--- _ _ _ _ _ _- 'TALMAGE RD-CL"=-_-._._.._._.__._._..t.__c__.._._...... ^TALMAGE RD-CL'
______ _ ______ _ ___ ___ ___ - ____ _____ _ ______ + ________ _=__ _ _ ___
__
-.:. _
_ _.._. _._. _......BTA.12 07.48, 18.76'R... ..........-_.. _. _.__._......... _ _ _ _ _
SHEET LEGEND
....... ................. ..STA:12+43.94,35.17'R.-...................._.
OBEG:L- END 4
AND 2 5 HMA OVERLAY VARYING THICKNESS
_ - -------------------
F M COURSE HMA LEVELING V
_ _ �
` ! l r, ��" ;- f ✓- �- ,'� ) -• J _ _ _ (A ® DIGOUT SECTION
i/� p \ TALMAGE RD-CL" _ _
/ 6 _ °_ --s STA:11+61.99, 19.9fi' R
BE _ o / -_
X
G MINOR CONCRETE SIDEWALK AND DRIVEWAY
X - - - PER CITY STD 101/102.
"TALMAGE RD-CL" MATCH (E) PAVEMENT UTILITY POLE • �•
/�'� • o - — STA:10+57.92, 33.40' R I "TALMAGE D-CL" TO BE RELOCATED X "TALNIAGE RD-CL
/ w / CONFORM STA:11+62.61, 27.45' R 2
_ — PROPOSED SIDEWALK \/ O BEG STA:12+39.83, 44.29' R
o MATCH (E) PAVEMENT N X � ENDO
N D0 \ TESORO SILRRA "TALMAGE RD-CL' DOC 1979-01797
C11 } OF- Ux1A
61$ OO I I ! /% PROPERTIES LLC STA:12+03.36, 27.88' R PEDESTRIAN BRIDGE. APN 003- 140-42
DOC 1979-017-47 III* OC 2007-08555 BEGO SEE SHEET C-102
APN 003-140-4� -N 10.3-140-33
LAYOUT PLAN - STA 10+00 TO STA 13+00
0 10' 20' 40'
SCALE: 1" = 20'
9i00 10+00 11+00 12+00 13+00
640 640
635 635
Q SHEET KEYNOTES
630 630
1. INSTALL CURB AND GUTTER PER MODIFIED CITY
STANDARD 102
625 625 2. INSTALL SIDEWALK PER CITY STANDARD 102
z z
0 0
3. INSTALL CURB RAMP PER CITY STANDARD 111
620 — — _ _ 620
4. INSTALL (N) BRIDGE
615 615 5. INSTALL (N) CULVERT
E
610 610
605 605
9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00
wLL
wLL
wLL
wLL
wLL
w
LL
D
D
D
PROFILE - STA 10+00 TO STA 13+00
SCALE: 1" = 20', VERT 1
Bar is one inch on
original size sheet
0�1"
Author D. DE LEON Drafting Check E. FANSELAU Project Manager E. FANSELAU
Designer M. EOFF Design Check M. KENNEDY Project Director M. KENNEDY
Plot Date: 6 May 2022-4:53 PM Plotted By: Mays Eaff Filename: llghdnehghd1U51RosellleNrojeds15611f257102MTech106- Digital _Designl4CAD 2020hests112571020-GHD-PAP.dwg
Cent CITY OF UKIAH
1
Project TALMAGE ROAD REHABILITATION
—.ghd.com PROJECT
Conditions of Use
This documentand the ideas one designs incorporated herein,asan instrument of professional servia, is the property of Project No. Date Scale
GHD. This document may only be used by GHD's client (and any other person who GHD has agreed can use this
comment)for the Purpose for which it was prepared and must not be used by any other pereon or for any other purpose. �2571 U20 May 6, 2022 AS SHOWN
30% SUBMITTAL
Title
LAYOUT PLAN & PROFILE -
TALMAGE ROAD STA. 10+00 -
STA. 13+00
C-101
ASFOUR
DOC 2015-09664
APN 003-140-49
Title Report
( A I 1 x I "TALMAGE RD-CL"
DON 2021-0. "TALMAGE 565' L STA:15+56.26, 48.46' L
APN 003-144STA:15+22.53, 45.65' L CONFORM
OEND "TALMAGE RD-CL'
"TALMAGE RD-CL' MATCH TO E C8B
() STA :15+58.55, 37.21' L
STA:14+69.33 37.95' L
b gEG TALMAGE RD-CL" � X BEG OO
MATCH TO (E) SIDEWALK STA :15+17.58, 44.END CONFORM
"TALMAGE RD-CL"
"TALMAGE RD-CL" ) MATCH CO ORMI (A 1 STA:15+63.44, 38.24' L
STA:14+69.35, 32.63' L ) x BEG O
Oi BEG 2 TALMAGE RD-CL" CONFORM
STA '15+2019 28 91' L
TALMAGE RD-CL"
STA16+65.97, 16.59' L
Title Report OS CULVERTCL
✓BT 1N✓ESTMENTS
DOC 2019-5564
APN 003-140-53
1 -- MATCH TO (E) C&B ' I '-
L �� OCURB RAMP CL _
"TALMAGE
a _
_ s _ _ _
-
RD-CL'
/
o X
/ _-� _ --_
X -
_ _ _
STA:15+65.56, 21.79' L JOINT POLE IN
CURB RAMP PROPOSED
CLO
/
•
--- _ __ __ _ _
SIDEWALK
...... .. ..:.. ... ...... .... ....... .. _ _ ......
U .... , _-----__' ---- -------------------------- ��_--
__ _ _
_
P TY LI
ROPER NE 2
_ .-..'-
- -- - .. .
_ - _
2
J
._... _. ...__ ... -_ ........ ._.. y................
LLI _.._. _.__.._.._. _._. _.____.. _ _
W............................................
_ _ _ _ _ _ __ _ _ _.__. _..___..... _ _...... _ _ __ _ _
.... __. .. .. _ . --
- _
_ __ __ __ _ _ _ __ _ _- -_-__ _- -__ _ _
-
-_-__
....._..__._.._.____. __
2.._.._. _._. _.__.._. .....__.________._._.._. .......:... .... ....... .............:� ._.._.__.__._.._.__._.._..
_.__... ...... _._......
_._.._._._._.___________________._._... PRIVATE PROPERTYIMPACTS _.__._.__.
_._._•_............ ... .. ... ...... .. . . .. . -
__._.._�_.
-
_._.._._._.k,_ ____._.._. _._. _. _._... _._ .�............ ... ......... _._.
y_..: r.�.`
.. ........
W- _------- ..... . .. . .... .. ...
!n
....
_.._. _._.._.. _...... _.__._.
-------------------------------------
....................l.__._...._._.__._.__-_-------._-------- _
_ - .---- ...........
U-- ...... _
_ _ _ _ _ _ __ _ _ _ _ _______ _
-- --- - - - -
-
13+00
635
630
625
620
Ed
a
615
610
605
600
13+00
CITY OF UK1AH
DOC 1979-1797
l �
LAYOUT PLAN - STA 13+00 TO STA 18+00
SCALE: 1"= 20'
14+00 15+00
W
M
W
N
(1)
0 10, 20' 40'
Mov6cm P01l'FIi POLF
oenrsa
EXHIBIT EX-105
CULVERT EXTENSION.
SEE SHEETS C-102 & S 301 l /
✓
I�
<+)
O
F-
/
F
/
__ma`s
2
__ __ __ _ _ ____
_ _ _ __ _ __ _ _ __ ____ __-
_ __ _ - _ __ _ _ _ -
-:_r.t _ _ _ _ __ _ _ _ __ _ __ _ _ __ - _ _-_ _ _
W
_ _ _ _ _ _ __ __ _ _ _ _ _ _ __ _____ _ _ _�._.._._. __.
W
rn
__
_ _ _ _ _ _ __ _ __ _ _ __ _ _ _ _ __ _ _ _ _ _
_ _ _ _ _ _ _ __ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ ..
J
...:.............................. ... .... ...........:...:........................:...........-----' - -
-------- -
-- - --- - -
- -- --- -----
- - - - -- - - - ------ ----------------------
"TALMAGE RD-CL' —
STA:17+12.97, 29.92' R
F
N
x/ CONFORM
I - — "TALMAGE RD-CL' /
2 I STA:17+13.09, 37.34' R
�\— CONFORM r� Title ep0/rt
r
(� DEMO (E) CURB RAMP 0
&SIDEWALK APN 033-
M
18+00
635
630
625
620
0
Ed
615
610
605
600
18+00
LL wLL
wLL
wLL
wLL
wLL
wLL
wLL
wLL
wLL
w
m
$
PROFILE - STA 13+00 TO STA 18+00
SCALE: V = 20', VERT V = 5'
SHEET GENERAL NOTES
1. CONTRACTOR SHALL PERFORM ALL UNDERGROUND UTILITY
WORK, CONCRETE WORK, SURFACE RESTORATION WORK,
AND PERFORM ALL DIGOUT AND REPAIR WORK, SUCH AS
PLACING LEVELING COURSE AND SEPARATION FABRIC, PRIOR
TO FINAL HOT MIX PAVING.
2. APPLY TACK COAT TO ALL ADJACENT (E) AC IMPROVEMENTS
OR CONCRETE SURFACES AND AT JOINT BETWEEN (E) AND
(N) IMPROVEMENTS.
3. SEE SHEETS G-006 AND G-007 FOR TYPICAL SECTIONS.
4. SEE CURB RAMPS ENLARGED PLANS FOR HORIZONTAL AND
VERTICAL INFORMATION NOT SHOWN.
LOCATION OF EXISTING UTILITIES AND STRUCTURES ARE FROM
AVAILABLE RECORD MAPS EXACT LOCATION AND COMPLETENESS
ARE NOT GUARANTEED. CONTRACTOR SHALL NOTIFY
UNDERGROUND SERVICE ALERT (USA) AT (800) 227-2600 OR DIAL
811 A MINIMUM OF 48 HOURS PRIOR TO ANY EXCAVATION AND
POTHOLE FOR EXACT LOCATION.
SHEET LEGEND I
HMA LEVELING COURSE VARYING THICKNESS
AND 2.5" HMA OVERLAY
® DIGOUT SECTION
MINOR CONCRETE SIDEWALK AND DRIVEWAY
PER CITY STD 101/102.
Q SHEET KEYNOTES
1. INSTALL CURB AND GUTTER PER MODIFIED CITY
STANDARD 102
2. INSTALL SIDEWALK PER CITY STANDARD 102
3. INSTALL CURB RAMP PER CITY STANDARD 111
4. INSTALL (N) BRIDGE
5. INSTALL (N) CULVERT
30% SUBMITTAL
Br is one inch on
orginalsie sheet
r
Wffi
0
wvm. ghd.m.
IIMIConditions of Use
This document and theieeas and designs incorporates herein, as an instrument of professional service, is the propertyot
GHD. This document may only be used by GHD's client (and any other person who GHD has agreed can use this
document)for the Purpose for which itwas prepared and must not beused byany other person orfor any other purpose.
Ctle"t CITY OF UKIAH
Project TALMAGE ROAD REHABILITATION
PROJECT
Title
LAYOUT PLAN & PROFILE -
TALMAGE ROAD STA. 13+00
STA.18+00 -
No. Issue Checked Approved Date
Author D. DE LEON Drafting Check E. FANSELAU Project Manager E. FANSELAU
Designer M.EOFF Design Check M.KENNEDY Project Director M.KENNEDY
Project No. Date Scale
12571020 May 6,2022 ASSHOWN
C-102
Plot Date:6 May 2022-4:53 PM Plotted By: Mays Ear Filename: llghdnehgh&US\Ro,.IilletP.,eds15611f257102MTech106-
Dial Desgnl4CAD 202(sSheets112571020-GHD-PAP.dwg
M
N
.z`
f
TALMAGE RD-CL"
1
"TALMAGE RD-CL" G STA :19-69.96, 20.91' L
—� /STA :19+4472, 20.88' L z CONFORM
CONFORM z "TALMAGE RD-CL'
Z
1
1
STA :19+72.55,21.34'L
�— TALMAGED-CL" i "TALMAGE RD-CL- fBEG O+ L1NNlLL
197
R1
— _ _ _ _ _ _STA:19+23.70 15.7V L �STA:19+42.10, 20.92' L = CONFORM DOC BK 190H PG
BEG APN 003— 140— 10
CURL
/
POTENTIAL TREE REMOVAL.�J
�END
/
(TREE - 2.3'DIAM
PROVIDE V CLEARANCE
JST INVESTMENTS '
DOC 2019-5364 1 X 2
2 "TALMAGE RD-CL'
r
TO (N) SIDEWALK
j APN 003-140-52 1
\ STA:21+75.44, 7.87' L
"TALMAGE RD-CL"
\ "TALMAGE RD-CL' l PROPE TY 'TALMAGE RD-CL" CONFORM
\ \ STA:19+18.7( LINE 19O+89.80, 18.49' L\ POLE IN ( SIDEWALK
STA:22+52.. 24.END
CO ORM
X BEG 16
\ \ m O POLE -
26 END \
\
F — _ — — — — — — -- ------ --- —_ — — — — — —
- -
------
LU
-
.-
....... —_ - - -
_---_._
-
..........__.......
LU ________________________ ..............-......_._
__ ---
.............................................. _ - _............ ........_..__._...._-_ .:uk......................... .._._.__._.
.................................------. ti.__._._.._._.._. ._-__._-_.-_ _
W ........_._.__._..... -_._.._._.._.. ..
SS MH MAV NEED
_ _._.._. ....... ................. .................. F................__._................_._.__._........._._._ _._._.._........_.._._.__._...
... .......................... ................. .
..... _________________________ ....-.................._.._._. _.....-..- .........-. .__._._.._._.__._._.�.-_; 2Yt00. _._.__._._......._._.__._._.
............ .............._.._._.__._._.._._... __ _ _ _ -- - -_ - _ _ _ _
w TO BE MOVEDIADJUSTED
W......
Z...................................--- .--------------------- .....__._.._......_-- _._._ _._.._-
J ................. _._.-......
.................................................................. .. .__._ ._...... ... _._._..__._ ...... - - __
----------------
-------------------------- ---------------------------------------------------------
---------------------------- -
_.. -�------ ---- ---------------------------- --
_------------------------ .......4—---____.__.. - - -
.........................._.._._.__._._......._._.__._._.._. _.._._.._.._.__.._.__._.....-.�__.........__._._y
- - - - ------ - -------tom -----------
-
1 )
1 AL VARADO
DOC 2016-104:
1 APN 003-150-48
"TALMAGE RD-CL"
�\ STA:22+52.66, 19.64' L
O.. .... .... ... . ........ .. _ ............ ......
. . ... . . . ... ..
. .... .. . . . .
oo
._
.�....
fq D.—
'� 1
/ "TALMAGE RD-CL"
RUDDICl4 3TA:19+32.02, 31.
m
—
— —
2
in
— — —
'TALMAGE RD C
TALMAGE RD-CL" 3TA:22+63.39, 209.85 R
STA:21+75.03, 22.22' R — —
DOC 2013— 12110 BEG `
MENDOCINO COUNT`
CONFORM MATCH (E) SIDEWALK
CO ORM
APN 0 230-34 TALMAGE RD-CL.. \ )
STA:19+32.05, 37.14' R __ _
BEG )
FARM BUREAU
DOC 1976-75230
1 PN 003-2--0-
N
�
)
� CONFORM
LAYOUT PLAN - STA 18+00 TO STA 23+00
SCALE: 1"= 20'
20+00
18+00
w LL w LL w LL w LL w LL w LL w LL w LL w LL w LL
N
PROFILE - STA 18+00 TO STA 23+00
SCALE: V = 20', VERT V. = 5'
0
/ W
W
x
W
23 y
W
Z
J
x
U
H
Q
� � o
� � M
N
1
�. F
U
f
"TALMAGE RD-CU
STA:22+63.38, 24.85' R 1
END Of
MATCH (E) C8G
23+00
630
625
620
615
z
0
Ed
610
605
600
SHEET GENERAL NOTES
1. CONTRACTOR SHALL PERFORM ALL UNDERGROUND UTILITY
WORK, CONCRETE WORK, SURFACE RESTORATION WORK,
AND PERFORM ALL DIGOUT AND REPAIR WORK, SUCH AS
PLACING LEVELING COURSE AND SEPARATION FABRIC, PRIOR
TO FINAL HOT MIX PAVING.
2. APPLY TACK COAT TO ALL ADJACENT (E) AC IMPROVEMENTS
OR CONCRETE SURFACES AND AT JOINT BETWEEN (E) AND
(N) IMPROVEMENTS.
3. SEE SHEETS G-006 AND G-007 FOR TYPICAL SECTIONS.
4. SEE CURB RAMPS ENLARGED PLANS FOR HORIZONTAL AND
VERTICAL INFORMATION NOT SHOWN.
LOCATION OF EXISTING UTILITIES AND STRUCTURES ARE FROM
AVAILABLE RECORD MAPS, EXACT LOCATION AND COMPLETENESS
ARE NOT GUARANTEED. CONTRACTOR SHALL NOTIFY
UNDERGROUND SERVICE ALERT (USA) AT (800) 227-2600 OR DIAL
811 A MINIMUM OF 48 HOURS PRIOR TO ANY EXCAVATION AND
POTHOLE FOR EXACT LOCATION.
SHEET LEGEND
HMA LEVELING COURSE VARYING THICKNESS
AND 2.5" HMA OVERLAY
® DIGOUT SECTION
MINOR CONCRETE SIDEWALK AND DRIVEWAY
PER CITY STD 101/102.
Q SHEET KEYNOTES
1. INSTALL CURB AND GUTTER PER MODIFIED CITY
STANDARD 102
2. INSTALL SIDEWALK PER CITY STANDARD 102
3. INSTALL CURB RAMP PER CITY STANDARD 111
4. INSTALL (N) BRIDGE
5. INSTALL (N) CULVERT
30% SUBMITTAL
r Client CITY OF UKIAH Title
orginalsze sheet r is one inch on � LAYOUT PLAN & PROFILE -
0�1" 1
0 Project TALMAGE ROAD REHABILITATION TALMAGE ROAD STA. 18+00 -
wvm.ghd.com PROJECT STA.23+00
No. Issue Checked Approved Date Conditions of Use
Author D. DE LEON Drafting Check E. FANSELAU Project Manager E. FANSELAU This document and ins ideas and designs incorporated herein, as an instrument of professional service, is the propedyof Project No. Date Scale
GHD. This document may only be used by GHD's client (and any other person who GHD has agreed can use this
Designer M.EOFF Design Check M.KENNEDY Project Director M.KENNEDY document)forthePurposeforwhichitwaspreparedandmustnotbeusedbyanyotherpersonorforanyotherpuryoee. 12571020 May 6,2022 ASSHOWN C-103
Plot Date:6 May 2022-4:53 PM Plotted By: Mays Ear Filename: llghdnehghdlUSlRoselilleNrojeds15611f257102MTech106- Digital _Designl4CAD 2020heets112571020-GHD-PAP.dwg
1
;<
1
"TALMAGE RD-CL'
(
3TA:24+54.48, 53.37' L
'TALMAGE RD.CL"
BEG 0
"TALMAGE RD-CL" C
CONFORM
STA2�-06.06, 35.36' L
1
ALt/ARADO
3TA:24+33.62, 51.70' L
CITY OF UKIAH
END (�
2022-07406
CONFORM
= x
DOC BK 2043 PG 276
MATCH E) SIDEWALK VOGEL
"TALMAGE RD-CL"
DOC
APN 003-150-49
APN 003-150-40
( DOC 2012— 10; r_
STA:23+62.95, 27.81' L
I a
z
"TALMAGE RD-CL'
APN 003— 150-3£-'
CONFORM
1
STA :24+65.82, 49.69' L
(
v
ADD TRUNCATED
PROPERN LINE
DOMES?
BEG OR
CONFORM PROPERTY LINE
_
"TALMAGE RD-CL'
STA:25+20.97, 31.26'L I
—
- "
VU�c—
DON 2013—OSOBO
APN 003-150-47
I _ —
_ —
-_-- __
- -_- -_- - _ _ '_
_ 2
i END 1
\ MATCHH((E)C8&
•,
-. ._._. _.F_ .
O \ _. _.. _-_TALMAGE RD-CL"_. �? ____.__.
52.08, 52.57 L _ _ _
- - _
-____=_ _"_ULI _ U
---------------
LU
00►LU
W
ULI
ZJF i -._-.-__-.-._----_---________-_ --_-_-_-_-_-----------_-.-_-.-_-_ -_—---- -_--------------------
------
---
__ -_—_ __ _ _ __- _--_ _--_-_---_--_ _ --__--
--_------_--_--
_ _ -__ ZW
_
ILL—
--------- . ------Il--_'�
1=-=...........--------— '
-- --- --
-------
--
----------_- _ _ _ _ --- --__ _ U - - - _
----------------------------- ---------
o — ^
CV / — —
i 7�7=
` ) �-_--- -___
v I �
W
"TALMAGE RD-CL" LALANOS
CONFORMFORM �� co
STA:23+63.03,3o DOC 2014-05377
APN 780-070-02
TALMME LIMITED ) N COON
DEVELOPMENT CCOO'
DOC 2003-20217 \I I I DEVELOPMENT
APN 180-070-01 APN 1800 070-29 �
LAYOUT PLAN - STA 23+00 TO STA 26+00 0 10, 20' 40'
23+00
625
620
615
610
z
0
a
605
600
595
590
23+00
u
23+50
SCALE: 1" = 20'
24+00
rt
a
at
26+00
625
620
615
610
z
0
a
605
600
595
590
26+00
LL wLL wLL wLL wLL wLL w
6 Po Po 6
PROFILE - STA 23+00 TO STA 26+00
SCALE: V = 20', VERT V = 5'
c
r
SHEET GENERAL NOTES
1. CONTRACTOR SHALL PERFORM ALL UNDERGROUND UTILITY
WORK, CONCRETE WORK, SURFACE RESTORATION WORK,
AND PERFORM ALL DIGOUT AND REPAIR WORK, SUCH AS
PLACING LEVELING COURSE AND SEPARATION FABRIC, PRIOR
TO FINAL HOT MIX PAVING.
2. APPLY TACK COAT TO ALL ADJACENT (E) AC IMPROVEMENTS
OR CONCRETE SURFACES AND AT JOINT BETWEEN (E) AND
(N) IMPROVEMENTS.
3. SEE SHEETS G-006 AND G-007 FOR TYPICAL SECTIONS.
4. SEE CURB RAMPS ENLARGED PLANS FOR HORIZONTAL AND
VERTICAL INFORMATION NOT SHOWN.
LOCATION OF EXISTING UTILITIES AND STRUCTURES ARE FROM
AVAILABLE RECORD MAPS, EXACT LOCATION AND COMPLETENESS
ARE NOT GUARANTEED. CONTRACTOR SHALL NOTIFY
UNDERGROUND SERVICE ALERT (USA) AT (800) 227-2600 OR DIAL
811 A MINIMUM OF 48 HOURS PRIOR TO ANY EXCAVATION AND
POTHOLE FOR EXACT LOCATION.
SHEET LEGEND I
HMA LEVELING COURSE VARYING THICKNESS
AND 2.5" HMA OVERLAY
® DIGOUT SECTION
MINOR CONCRETE SIDEWALK AND DRIVEWAY
PER CITY STD 101/102.
Q SHEET KEYNOTES
1. INSTALL CURB AND GUTTER PER MODIFIED CITY
STANDARD 102
2. INSTALL SIDEWALK PER CITY STANDARD 102
3. INSTALL CURB RAMP PER CITY STANDARD 111
4. INSTALL (N) BRIDGE
5. INSTALL (N) CULVERT
30% SUBMITTAL
Bar is one inch on 01 r 0°ent CITY OF UKIAH Title
original size sheet LAYOUT PLAN & PROFILE -
01" 1
0 Project TALMAGE ROAD REHABILITATION TALMAGE ROAD STA. 23+00 -
wvm.ghd.com PROJECT STA.26+00
No. Issue Checked Approved Date Conditions of Use
Author D. DE LEON Drafting Check E. FANSELAU Project Manager E. FANSELAU This document and theieeas and designs incorporated herein, as an instrument of professional service, is the propertyof Project No. Date Scale
GHD. This document may only be used by GHD's client (and any other person who GHD has agreed can use this
Designer M.EOFF Design Check M.KENNEDY Project Director M.KENNEDY document)forthePurposeforwhichitwaspreparedandmustnotbeusedbyanyotherpersonorforanyotherpuryoee. 12571020 May 6,2022 ASSHOWN C-104
Plot Date:6 May 2022-4:53 PM Plotted By: Mays Eaff Filename: llghdnehghdlUSlRosevilleNrojeds156111257102MTech106-Dighal_Designl4CAD 2020heets112571020-GHD-PAP.dwg
ROW?
Richard to confirm
Title Report
TALMAGE RD-CL"
TA:26+29.60, 49.12' L1
CONFORM
PROPERTY LINE -\
V�_J
"TALMAGE RD-CL' \ "TALMAGE RD-CL' STA
STA:26+29.46, 68.98' L CONFORM
+60.48, 57.74' L
— — — — — /
END t CONFORM
MATCH (E) C8G )
1RU57
RBRE FAMUlx11076
Sot 5o,e2� / ON�P�ERQ L— 1
APN p03� / III 1
1,
"TALMAGE RD-CL"
STA26+36 61 51 13' L
--- - -" CONFORM
"TALMAGE RD-CL"
-= STA:26+32.38, 37.83' L:-= \ '
RAMP CIL - -
_36.
CL"
-
O STA:26+07.88, 36.72'L=_.[_-------
BEG
-=y=-
UESIDEWALK: .... .... .... ...... .......:
_-=--:"TALNIAGE RD-CL"�
N ___ __ -
�y} ..+:MATCH(E)C8G
co _=-__-----
)y,l
-
----------------
---____ _
04
26+00
625
620
615
610
0
605
600
595
590 —
26+00
w
26+50
o _
NCATED DOMES?
____-_"TALMAGE RD-CL"
STA:28+86.82, 34.10. L
_ - _ -- -_- ---_ - - - - - - - CONFORM
-- -- _ -- -_- -- -- "TALMAGE RD-CL'
_ ' --_ -_- "_- - _ -_- - - STA:28+79.12, 31.03' R
- _- - CONFORM
s BANK OF
LAYOUT PLAN - STA 26+00 TO STA 29+32
SCALE: 1"= 20'
27+00
27+50
28+00
28+50
29+50
625
620
615
610
O
605
600
595
590
29+50
LL wLL
wLL
wLL
wLL
wLL
w
LL
S
o 8
0
SHEET GENERAL NOTES
1. CONTRACTOR SHALL PERFORM ALL UNDERGROUND UTILITY
WORK, CONCRETE WORK, SURFACE RESTORATION WORK,
AND PERFORM ALL DIGOUT AND REPAIR WORK, SUCH AS
PLACING LEVELING COURSE AND SEPARATION FABRIC, PRIOR
TO FINAL HOT MIX PAVING.
2. APPLY TACK COAT TO ALL ADJACENT (E) AC IMPROVEMENTS
OR CONCRETE SURFACES AND AT JOINT BETWEEN (E) AND
(N) IMPROVEMENTS.
3. SEE SHEETS G-006 AND G-007 FOR TYPICAL SECTIONS.
4. SEE CURB RAMPS ENLARGED PLANS FOR HORIZONTAL AND
VERTICAL INFORMATION NOT SHOWN.
LOCATION OF EXISTING UTILITIES AND STRUCTURES ARE FROM
AVAILABLE RECORD MAPS, EXACT LOCATION AND COMPLETENESS
ARE NOT GUARANTEED. CONTRACTOR SHALL NOTIFY
UNDERGROUND SERVICE ALERT (USA) AT (800) 227-2600 OR DIAL
811 A MINIMUM OF 48 HOURS PRIOR TO ANY EXCAVATION AND
POTHOLE FOR EXACT LOCATION.
SHEET LEGEND
- _ HMA LEVELING COURSE VARYING THICKNESS
AND 2.5" HMA OVERLAY
DIGOUT SECTION
MINOR CONCRETE SIDEWALK AND DRIVEWAY
PER CITY STD 101/102.
Q SHEET KEYNOTES
1. INSTALL CURB AND GUTTER PER MODIFIED CITY
STANDARD 102
2. INSTALL SIDEWALK PER CITY STANDARD 102
3. INSTALL CURB RAMP PER CITY STANDARD 111
4. INSTALL (N) BRIDGE
5. INSTALL (N) CULVERT
PROFILE - STA 26+00 TO STA 29+32
SCALE: 1" = 20', VERT 1"= 5'
30% SUBMITTAL
� r
0lient CITY OF UKIAH
Title
Bar Inchon
^
LAYOUT PLAN & PROFILE -
ginalsi
original size sheet
��1"l
Project TALMAGE ROAD REHABILITATION
TALMAGE ROAD STA. 26+00�_J
ghd.m.
PROJECT
STA.29+32
No. Issue Checketl Approved Date
Conditions of UseAuthor
D. DE LEON Drafting Check E. FANSELAU Project Manager E. FANSELAU
This document and insideas and designs incorporated herein, as an instrument of prfessional servce, is the property of
Project No. Date Scale
Designer M.EOFF Design Check M.KENNEDY Project Director M.KENNEDY
GHD. This document may only be used by GHD's client (andany other person who GHD has agreed can use this
document)forthepurposeforwhichitwaspreparedandmustnotbeusedbyanyotherpersonorforanyotherpurpose.
12571020 May6,2022 ASSHOWN
C-10
Plot Date:6 May 2022-4:53 PM Plotted By: Mays Ear Filename: llghdnehghdlUSlRoselilleNrojeds15611f257102MTech106- Digital _Designl4CAD 2020heets112571020-GHD-PAP.dwg