HomeMy WebLinkAboutGhilotti Construction Company, Inc. 2019-12-05; Amendment 2 COU 2122-188-A2 CITY OF UKIAH AMENDMENT NO. 2 TO PROFESSIONAL SERVICES CONTRACT 2122188 BETWEEN GHD INC and THE CITY OF UKIAH This Amendment No. 2, entered on September 13, 2022, revises the Agreement for consulting services for preparing the plans, specifications and estimate for the Talmage Road Rehabilitation Project dated February 18, 2022 between the City of Ukiah and GHD Inc, as follows. I. Add additional Design Services for Design of Bike Lanes to the scope of work, per attached Exhibit 1. 2. Add an additional $38,992 for professional consulting services related to the design of the Talmage Road Rehabilitation Project, for a revised, total contract amount not-to-exceed$292,385. IN WITNESS WHEREOF, THE PARTIES HAVE EXECUTED THIS AMENDMENT ON THE EFFECTIVE DATE: CONSULTANT - Z BY: 6 .- DATE: September 14, 2022 PRINT NAME: Matthe 4G. Kenne CITY OF UKIAH BY: S� DATE: Sep 29, 2022 SAGE SANGIACOMO, CITY MANAGER ATTEST A"=¢ Sep 29, 2022 BY: Kristine Lawler(Sep 29,2022 09:25 PDT) DATE: KRISTINE LAWLER, CITY CLERK EXHIBIT I 943 Reserve Drive Roseville, CA 95678 USA www.ghd.com Your ref: 2122188 Our ref: 12571020 10 August 2022 Andrew Stricklin Public Works Department City of Ukiah 300 Seminary Ave Ukiah, CA 95482-5400 RE: Proposal for Professional Engineering Services: Talmage Road Rehabilitation Project, Amendment 2 for Design of Bike Lanes. Dear Andrew: GHD is pleased to provide this proposal for an amendment to our professional services contract for the above referenced project to design new bike lanes west of railroad tracks and up west to South State Street. Background GHD is currently under contract with the City to provide design services for the Talmage Road Rehabilitation project. This project includes the resurfacing of approximately 1700 feet of roadway between State Street and Airport Park Boulevard. The project also includes the addition of sidewalk and pedestrian paths to complete gaps in the existing corridor. The original scope of work includes a pedestrian bridge crossing of Doolin Creek at the west end of the project and a culvert extension where Doolin Creek passes under Talmage Road. This amendment will cover our additional work associated with the development of alternatives to the bridge and designing a culvert extension that replaces the bridge alternative. The amendment also includes efforts to design new bike lanes on both sides of Talmage Road all the way up to State Street along with the associated drainage, structural, survey and right-of-way(ROW), civil, and striping work. Scope of Work At the request of the City,additional design by GHD will include culvert extensions at both crossings of Doolin Creek, roadway widening on the east side of Perry Street, and bike lanes between South State Street and the Great Redwood Trail. The culvert extension option on the south side of Talmage Road along the east side of the gas station will help to mitigate the challenge between existing grades at the adjacent sidewalk and finished grades at the deck of the bridge. The hydraulic analysis memo will be updated to reflect the corresponding floodplain calculations. To accommodate a 5 foot wide bike lane in both directions of Talmage Road, the roadway section will need to be widened which will push the proposed sidewalk onto private property (see exhibit EX-105). The City discussed the proposed improvements with the owner of the subject property(APN 223-140-53)and received tentative approval for the project impact. GHD will assist the City in preparing the legal descriptions and plats for the additional ROW required. In addition, GHD will assist in preparation of any Temporary Construction The Power of Commitment GHD 12571020 Easements (TCEs)or Permits to Enter (if required). GHD anticipated that 4 title reports will be needed, the cost of which is included in this amendment proposal. Project Management This task will include the additional labor effort for the alternative analysis along with the associated work with managing this task including coordination, and project delivery. We have estimated 14 hours will be required for this task. Survey This task will include the additional labor and expense cost for: • Field survey and mapping at the west side of Perry Street • Legal descriptions and plats for the project impacts on the property on the west side of Perry Street • Legal descriptions and plats for the project impacts on the property on the east side of Perry Street • Gas station property Temporary Construction Easement • West Betty Street Permit to Enter • Four title reports required for the above-mentioned work We have estimated 48 hours will be required for this task. Civil This task includes the additional labor spent to date that was out of scope preparing alternative options for the City as well as the labor required to update the civil design. We have estimated 40 hours will be required for this task. Structural This task includes the additional labor associated with design the additional length of culvert extension where Doolin Creek crosses under Talmage Road as well as the new culvert extension at the east side of the gas station that will replace the proposed bridge. We have estimated 40 hours will be required for this task. Hydraulics This task includes the labor for the additional hydraulic analysis and memorandum revisions for the culvert extension at the gas station and revised length of the culvert extension at the Talmage Road crossing. We have estimated 12 hours will be required for this task. PG&E Pole Relocation Coordination This task includes the labor for the coordination for the PG&E utility pole relocation located along the north side of Talmage Road. We have estimated 24 hours will be required for this task. General Assumptions/Exclusions This proposal is based on the following assumptions: 1. Meetings are not required but can be provided on an additional time-and-materials basis. 2. We anticipate having one site meeting with PG&E to discuss the pole relocation. 3. Four title reports are included in this scope of work. Any additional title reports can be provided for an additional fee. 4. FEMA coordination is not required. 12571020 1 RE:Proposal for Professional Engineering Services:Talmage Road Rehabilitation Project,Amendment 2 for Design of Bike Lanes. 2 Schedule We will begin work on this scope immediately. The civil and structural elements will be included in the 60% submittal. The PG&E coordination will also begin immediately. Some of the survey items will be submitted separately with subsequent design progression. Deliverable Our deliverable for this task will be the addition of the ROW linework to the digital survey base file in Civil 3D dwg format as well as a pdf of the survey control drawing in dwg and pdf format. • Updated ROW linework • Updated hydraulics memorandum with the culverts extension at the gas station and additional culvert extension for the twin box culverts under Talmage Road. • Structural drawings for both culvert extensions. Note that the Talmage Road culvert extension was part of our original contract, but it will need to be extended another 5-feet for the bike lane addition. • PG&E utility pole relocation agreement • Legal descriptions and plat maps for the private property impacts Fee Proposal Our understanding is that the contract mechanism will be through an amendment to the existing Professional Service Agreement with the City for the road rehabilitation project. GHD proposes to complete this additional scope for the time-and-materials fee not to exceed $38,992 without the prior written authorization of the City. Services not included in this proposal can be provided by a negotiated fee at the attached updated rate schedule. The approximate breakdown of costs are as follows: • Project Management-$3483 • Survey-$12,701 • Civil-$6600 • Structural—$6796 • Hydraulics—$1860 • PG&E Pole Relocation Coordination—$7092 We appreciate the City's collaborative efforts in working with us to investigate design options and make these adjustments to the project design, and believe the project is better as a result. Please let us know if you have any questions. Regards �Xw I�Tw� - ti Erik Fanselau Matt Kennedy Project Manager Project Director, 916-256-2677 707-540-3376 Erik.fanselau@ghd.com Matt.kennedy@ghd.com 12571020 1 RE:Proposal for Professional Engineering Services:Talmage Road Rehabilitation Project,Amendment 2 for Design of Bike Lanes. 3 GHD-PROJECT FEE ESTIMATING SHEET Client: City of Ukiah Project Name: Talmage Road Rehabilitation Project Date: August 10,2022 Prepared by: Erik Fanselau Reviewed by: Matt Kennedy Job Number: 12571020 LABOR COSTS FEE COMPUTATION LABOR CATEGORY> Civil Staff Civil Drainage Hydraulic Structural Spatial Land 2-Person Sr.CAD Word Project TOTAL OTHER GHD FULLY SUB TOTAL TOTAL Principal PM Electrical Engineer Engr Engr Engr Engr. Scientist Surveyor Survey Permitting Tech CAD Tech processing Admin HOURS DIRECT BURDENED Crawford Associates SUB FEES FEE RATE> $268.00 $228.00 $289.00 $183.00 $163.00 $202.00 $166.00 $166.00 $225.00 $187.00 $400.00 $228.00 $153.00 $131.00 $80.00 $150.00 COSTS(1) LABOR COSTS (Geotech) W/MARKUP TASK /Hr /Hr /Hr /Hr /Hr /Hr /Hr /Hr /Hr /Hr /Hr /Hr /Hr /Hr /Hr /Hr 15% Task 1 Project Management 1.1 PM 2 8 4 2 14 $91.00 $3,392.001 1 $0.001 $3,483.00 0 $0.00 $0.001 1 $0.001 $0.00 0 $0.00 $0.00 $0.00 $0.00 0 $0.00 $0.00 $0.00 $0.00 Subtotal Task 1 21 8 0 4 0 0 0 0 0 0 0 0 0 0 0 2 14 $91.00 $3,392.001 $0.001 $0.001 $3,483.00 Task 2 Topographic Mapping and Legal Descriptions 2.1 Labor 47 1 48 $312.00 $9,189.00 $0.00 $9,501.00 2.2 Title Reports 4 assumed 0 $3,200.00 $0.00 $0.001 $3,200.00 0 $0.00 $0.00 $0.00 $0.00 0 $0.00 $0.00 $0.001 $0.00 Subtotal Task 2 0 0 01 0 0 01 0 0 01 47 1 0 0 01 0 0 48 $3,512.00 $9,189.00 $0.00 $0.001 $12,701.00 Task 3 Hydraulics 3.1 Calculations and Memorandum 6 6 12 $78.00 $1,782.00 $0.00 $1,860.00 0 $0.00 $0.00 $0.00 $0.00 0 $0.00 $0.00 $0.00 $0.00 0 $0.00 $0.00 $0.00 $0.00 0 $0.00 $0.00 $0.00 $0.00 Subtotal Task 3 0 0 0 0 0 0 6 0 0 0 0 0 0 6 0 0 12 $78.00 $1,782.00 $0.00 $0.00 $1,860.00 Task 4 Structural 4.1 Structural Design 32 8 40 $260.00 $6,536.00 1 $0.001 $6,796.00 0 $0.00 $0.00 $0.00 $0.00 0 $0.00 $0.00 $0.00 $0.00 Subtotal Task 41 01 0 0 0 0 0 0 32 0 0 0 0 8 01 0 0 40 $260.00 $6,536.00 $0.001 $0.001 $6,796.00 Task 5 Civil 5.1 Civil I I 1 1 301 1 1 1 1 1 1 1 1 1 101 1 1 40 $260.001 $6,800.001 1 $0.001 $7,060.00 Subtotal Task 51 01 01 01 301 01 01 01 01 01 01 01 01 01 101 01 01 40 $260.001 $6,800.001 $0.001 $0.001 $7,060.00 Task 6 PG&E Pole Relocation 6.1 PG&E Coordination 1 241 1 1 1 1 1 1 1 1 1 1 1 24 $156.001 $6,936.001 1 $0.001 $7,092.00 0 $0.001 $0.001 1 $0.001 $0.00 Subtotal Task 61 01 01 241 01 01 01 01 01 01 01 01 01 01 01 01 0 24 $156.001 $6,936.001 $0.001 $0.001 $7,092.00 0 $0.00 $0.00 $0.00 $0.00 0 $0.00 $0.00 $0.00 $0.00 0 $0.00 $0.00 $0.00 $0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0.00 $0.00 $0.00 $0.001 $0.00 PROJECT TASK TOTALS 1 21 81 241 341 01 01 61 321 01 471 11 01 81 161 01 21 178 $4,357.001 $34,635.001 $0.001 $0.001 $38,992.00 (1)OTHER DIRECT COSTS include telephone,vehicle mileage,printing,reproduction and other miscellaneous direct expenses. 8/10/2022 Page 1 Attachment FY2023 Standard Fee Schedule GHD Description 2022/23 US Rate GHD Description 2022/23 US Rate PROFESSIONAL ADMINISTRATION Senior Technical Director 1 $ 340.00 Business Services Manager 1 $ 280.00 Senior Technical Director 2 $ 315.00 Business Services Manager 2 $ 235.00 Senior Technical Director 3 $ 283.00 Senior Admin Officer 1 $ 182.00 Technical Director 1 $ 263.00 Senior Admin Officer 2 $ 152.00 Technical Director 2 $ 237.00 Admin Officer 1 $ 137.00 Senior Professional 1 $ 215.00 Admin Officer 2 $ 125.00 Senior Professional 2 $ 195.00 Admin Officer 3 $ 80.00 Professional 1 $ 185.00 SITE BASED Professional 2 $ 158.00 Senior Construction Manager $ 315.00 Professional 3 $ 137.00 Construction Manager $ 265.00 Vacationer/ Intern $ 126.00 Lead Site Engineer/Supervisor $ 237.00 CONSULTANT Senior Site Engineer $ 215.00 Executive Consultant 1 $ 425.00 Site Engineer $ 195.00 Exectutive Consultant 2 $ 385.00 Lead Inspector $ 184.00 Senior Consultant 1 $ 315.00 Senior Inspector $ 137.00 Senior Consultant 2 $ 280.00 inspector/Specialist 1 $ 120.00 Consultant 1 $ 235.00 inspector/Specialist 2 $ 110.00 Consultant 2 $ 190.00 Clerk/Specialist 3 $ 105.00 Consultant 3 $ 150.00 Senior Site Manager 1 $ 127.00 TECHNICAL Senior Site Manager 2 $ 115.00 Lead Design Technician 1 $ 315.00 Senior Site Manager 3 $ 105.00 Lead Design Technician 2 $ 289.00 Senior Site Manager 4 $ 95.00 Lead Design Technician 3 $ 264.00 Operator/Labourer 1 $ 85.00 Senior Design Technician 1 $ 238.00 Operator/Labourer 2 $ 80.00 Senior Design Technician 2 $ 220.00 Operator/Labourer 3 $ 60.00 Design Technician 1 $ 195.00 PROJECT SUPPORT Design Technician 2 $ 184.00 Business Services Manager 1 $ 340.00 Drafting/Design 1 $ 168.00 Business Services Manager 2 $ 315.00 Drafting/Design 2 $ 153.00 Senior Admin Officer 1 $ 263.00 Drafting/Design 3 $ 137.00 Senior Admin Officer 2 $ 232.00 Drafting/Design 4 $ 127.00 Admin Officer 1 $ 215.00 Intern Drafting/Design $ 115.00 Admin Officer 2 $ 195.00 Admin Officer 3 $ 178.00 Admin Officer 4 $ 153.00 Admin Officer 5 $ 137.00 Admin Officer 6 $ 80.00 FY2023 Rate Schedule Notes 1) Rates are for employees of GHD companies. 2) An administration fee will apply to all invoices to cover in-house disbursements (Associated Project Costs)on a project. This will be charged at a rate of either: • 6% of total professional fees • Office hourly rate of USD $6.50, Field Services/Construction Inspector hourly rate of USD $11.50 3) All travel will be invoiced at economy class rates. Lodging and meal expenses will be at cost plus agreed markup unless a per diem rate is negotiated. 4) All other project related disbursements, expenses and subcontractor costs will be invoiced with a markup of 15%. 5) Fee schedule is subject to change annually. 6) Leased and personnel vehicles, field equipment and disposable field supplies will be invoiced at established rates. Personal vehicle milage rates will be charged in accordance with government regulated standard rates. Rate Schedule Notes GHD FY2023 Mov6cm row6a POLF oanrse rice Report 5.1- 3.2 EXHIBIT EX-105 SHEET GENERAL NOTES 1 A I 1 x I "TALMAGE RD-CL" ASFOUR -0, "TALMAGE RD-CL" DON 203-140-4 OON 2021 I CONFORM 48.46'L _ '_ 1. CONTRACTOR SHALL PERFORM ALL UNDERGROUND UTILITY APN 003-140-49 APN 003-144STA 15+225345END 1 I CONFORM TALMAGE RD-CL" _ WORK,CONCRETE WORK,SURFACE RESTORATION WORK, "TALMAGE RD-CL' STA:16+65 CULVERT L "TALMAGE RD-CL' MATCH TO E C8B � I ,- ,;:` nwp AND PERFORM ALL DIGOUT AND REPAIR WORK,SUCH AS () STA15+58.55,37.21'L Title Report Os CULVERT CL PLACING LEVELING COURSE AND SEPARATION FABRIC,PRIOR STA:14+69.33 37.95'L m BEG t b BEG I TALMAGE RD-5-L X O 187/NI019-5564 //� ) � - TO FINAL HOT MIX PAVING. ( STA:1$+17.58,44.95'L CONFORM ^�� I MATCH TO(E)SIDEWALK 2 END � DOC 2019-5364 OO "TALMAGE RD-CL" APN 003-140-53 // _ _ _ __ _ _ 2. APPLY TACK COAT TO ALL ADJACENT(E)AC IMPROVEMENTS 1 'TALMAGE RD-CL" MATCH COAFORMI N 1 STA:15+63.44,38.24'L OR CONCRETE SURFACES AND AT JOINT BETWEEN(E)AND \ STA:14+69.35,32.63'L x BEG O (N)IMPROVEMENTS. TALMAGE RD-CL" / // Oi BEG 2 CONFORM j /�j MATCH TO(E)C&B STA:15+20.19,28.91'L __ __ / a 3. SEE SHEETS G-006 AND G-007 FOR TYPICAL SECTIONS. L�� t OCURB RAMP CL / CULVERT "TALMAGE RD-CL' CULV EXTENSION. 1 / 4. SEE CURB RAMPS ENLARGED PLANS FOR HORIZONTAL AND X X _ _-_"_- -" _ STA:15+65.56,21.79'L JOINT POLE IN / i- i CURB RAMP SEE S 02&S 301 - VERTICAL INFORMATION NOT SHOWN. --- — ,— ___ ' t ... • _ _________ SIDEWALK - _ S SHEETS C-1 CL PROPOSED - _____________ __ __ O SIDEW I _________ _____________S--: ._.__._._.__....... --- ° PROPERTY LINE 2 // ( // O U _ ___-:_:::: --"----""""" __ 2 LOCATION OF EXISTING UTILITIES AND STRUCTURES ARE FROM r - ----- - - - - — - U AVAILABLE RECORD MAPS EXACT LOCATION AND COMPLETENESS ""-- ARE NOT GUARANTEED.CONTRACTOR SHALL NOTIFY LU UNDERGROUND SERVICE ALERT(USA)AT(800)227-2600 OR DIAL - - - - - PRIVATE ERTY IMPACTS PROP --- - - - - - - - - - - - - -" _ TO ANY EXCAVATION AND k_ 811 A MINIMUM OF 48 HOURS PRIOR ._.. - ._.. �. _.._.__.__ _.__._.._. ___ ___________ _ ____._.._.________.____.__._ POTHOLE FOR EXACT LOCATION. UU W ___. ._ _ _ __ LU __________________________________________________________________________________________________________________________________________________________ _.__._.__._._.._._____.__.________._.__._ff_:-" ----- � SHEET LEGEND --------------- --------- - -- - ----- --- -- --- -------------- - ------------------------------------------------ -------=--- ------- ----------------- a ��-ll ----------------��__ _ _ _ -_-_-_ _._fix ._.__._._.._._______.__._.____._._-_ F _ - -.. ._ __ _ _ ____ VARYING THICKNESS ----- _ ---------- ��---- __ __ _-__ ___ ____ __-___:-__ ____ HMA 2.5"H AOVERL Y _ _ _ ____ ______ AND 2.5"HMA OVERLAY O — ,�—__--�. —�� — —��— _—__—._ ---_ — ----- -_---- - --- -- -- - ---_-_--__- o M f _ � � _= -- __—`--- S___� \ _____ _ __ ______ ____ ____:___ —______ o ® DIGOUT SECTION X �X X X o — ¢ - - MINOR CONCRETE SIDEWALK AND DRIVEWAY U TALMAGE RD-CL' PER CITY STD 101/102 _ - - - - - ' -- - - - - - • °• - a STA:17+12.97,29.92'R U) V x� CONFORM L— 2 "TALMAGE RD-CL' 2 \ CITY OF U K/AH CONFORM +13.08,37.34'R / Title a,o�rt N �� CONFORM � N � DOC 7979-1797 m ) DEMO(E)CURB RAMP ? &SIDEWALK APN 0-5,5 LAYOUT PLAN-STA 13+00 TO STA 18+00 0 10, 20' 40' SCALE:1"=20' 13+00 14+00 15+00 16+00 17+00 18+00 635 635 630 630 Q SHEET KEYNOTES 625 625 1. INSTALL CURB AND GUTTER PER MODIFIED CITY STANDARD 102 620 620 2. INSTALL SIDEWALK PER CITY STANDARD 102 o _ o Ed w — w — 3. INSTALL CURB RAMP PER CITY STANDARD 111 615 — 615 4.INSTALL(N)BRIDGE 610 610 5. INSTALL IN)CULVERT 605 605 600 600 13+00 13+50 14+00 14+50 15+00 15+50 16+00 16+50 17+00 17+50 18+00 w LL w LL w LL w LL w LL Cd LL w LL w LL w LL w LL w LL m $ PROFILE-STA 13+00 TO STA 18+00 ^S SCALE:V=20',VERT 1"=5' 30% SUBMITTAL r 0Ient CITY OF UKIAH Title LAYOUT is one inch on ^ � � LAYOUT PLAN &PROFILE- ' original size sheet 0�1" 0 Project TALMAGE ROAD REHABILITATION TALMAGE ROAD STA. 13+00- wvm.ghd.m. PROJECT STA. 18+00 No. Issue Checked Approved Date Conditions of Use Author D.DE LEON Drafting Check E.FANSELAU Project Manager E.FANSELAU This document and the ieeas and designs incorporated herein,as an instrument of professional service,is the property of Project No. Date Scale GHD.This document may only be used by GHD's client(and any other person who GHD has agreed can use this Designer M.EOFF Design Check M.KENNEDY Project Director M.KENNEDY document)for the Purpose for which it was prepared and must not be used by any other person or for any other purpmee, 12571020 May 6,2022 ASSHOWN C-102 Plot Date:6 May 2022-4:53 PM Plotted By:Mays Eaff Filename:\\ghdnehgh&US\RoselilleNrojeds15611f257102MTech106-Digited Designl4CAD 2020\Sheets112571020-GHD-PAP.dwg / SHEET GENERAL NOTES RD-CL" f1 1 1. CONTRACTOR SHALL PERFORM ALL UNDERGROUND UTILITY —_ "TALMAGE RD-CL" G STA19-69.96,20.91'L WORK,CONCRETE WORK,SURFACE RESTORATION WORK, —� /STA:19+44.72,20.88'L Z 1 CONFORM AND PERFORM ALL DIGOUT AND REPAIR WORK,SUCH AS CONFORM Z "TALMAGE RD-CL' 1 1 PLACING LEVELING COURSE AND SEPARATION FABRIC,PRIOR Z 6TA:19+72.55,21.34'L AL VARADO TO FINAL HOT MIX PAVING. �— TALMAGED-CL"i "TALMAGE RD-CL- G) �c BEG O+ LINNILL _STA:19+23.70j-1-�5.71'L �STA:19+42.10,20.92'L = CONFORM DOC BK 190H PG 197 1 m DOC 2016-104 1, TA V BEG �END APN 003-140-10 1 1 APN 003-150-4b 2 OR CONCRETE OSURFACES AND AT JOINT BETWEEN(E ANDS ——— CURB RAMP "TALMAGE 6 196 (N)IMPROVEMENTS. POTENTIAL TREE REMOVAL. �——————— � � STA:22+52.6fi,19.fi4'L (TREE-2.3'DIAM JBT lNI/ESTMENTS ' / PROVIDE 1'CLEARANCE r )) ENDOi 3. SEE SHEETS G-006 AND G-007 FOR TYPICAL SECTIONS. DOC 2019-5364 1 X 2 TO(N)SIDEWALK CONFORM 2 "TALMAGE RD-CL' 1 I APN 003-140-52 \ 1 STA:21+75.44,7.87'L "TALMAGE RD-CL" '1 \ 4. SEE CURB RAMPS ENLARGED PLANS FOR HORIZONTAL AND \ PR TY 'TALMAGE RD-CL" CONFORM STA:22+52.66,24.64- VERTICAL INFORMATION NOT SHOWN. N \ "TALMAGE RD-CL' l z END o LINE STA:19+89.80,18.49'L POLE IN SIDEWALK 5.1 o \\ STA19+18.70,sfi END \ POLE x BEGO - (� CONFORM / m � U \, O 6/ \ \ _ _ / F LOCATION OF EXISTING UTILITIES AND STRUCTURES ARE FROM F — — — — — — — _n _._-_ — — — — — — — AVAILABLE RECORD MAPS,EXACT LOCATION AND COMPLETENESS W _ _ _ _ _ _l-':::-""""" - - - _ - - - _-_ -_ _ _ - _ _ _ - - -- - - - — - - — — U.1 ARE NOT GUARANTEED.CONTRACTOR SHALL NOTIFY LU _ - - - - ----- -- - _ - --_ -- - °-- - -- _ - - - - - --- - -- -,--- - - ---- - - - - - -- - _ - - — 2 UNDERGROUND SERVICE ALERT(USA)AT(800)227-26000R DIAL -..- - - - _ U _ — - -- TO ANY EXCAVATION AND _._ °� - . _ ------- -------------- -�------ ---- --� - � � U 811 A MINIMUM OF 48 HOURS PRIOR W ________________________ _._.__._._.._._._. ..... ....................................... _ ......_._.._._._ .................... - N .................................................. ......_..__._.__.... _ ._.__._._..._- N W POTHOLE FOR EXACT LOCATION. ..... 49tOR-..,., ZQr06.... _ 23 __. _.._._.-.. _ _ __ __ _ __ _ _ 22+00 _._.. ..... ..... .............................. _.._..........._._.__.__.._...__._._.._._.__._.__�_�=��._._.-_._._......._._.__._._. ._._.._._..__.. .. w TO BE MOVEDIADJUSTED 111 O : . -- . . . -. :__: : ::: -------_ :- :_: . ::::... -- - a J SHEET LEGEND --- --- --- -------------------------------------- -- _ H ::-------------� —_---- _._.___,�. ._. _._. -------- .."" VARYING THICKNESS ------------------ C �.' � - - HMA LEVELING COURSE ................. .............�l�—.-.._._._.._._.._._.__. _._.._._._._._.._._.__._._.._._._................._..._.._.__._._._........._._..__..__......... _ _ _ AND 2.5 HMA OVERLAY .......................... _ _ _.__._._......._._ - - - ................... _ ._._.. .._..__._._.._._.__._�._,,_.�— .-......_..........._.__._._... - - - .. 4. J... .._ _ .. -- N DIGOUT SECTION ............................ ... ........................ .. . .............. - a _ F- MINOR CONCRETE SIDEWALKAND DRIVEWAY e: "TALMAGE RD C!- ,"'., m 2 'TALMAGE RD-CL / PER CITY STD 101/02 RUDDICl4 BTA:19+32 02 31 99'R " -1 'UAGERD-CL" 6TA:22+63.39,29.85'R DOC 2013-12110 of BEG75.03,22.22'R END f APN 0,3. 230-34 CONFORM MENDOCINO COUNT` CONFORM MATCH(E)SI ALK / TALMAGE RD-CL.. \ FARM BUREAU N STA:19+32.0564'R ___ DOC 1976 752-3 "TALMAGE RD-CL' BEG - 1 PN 003-2_TC- 1`' m STA:22+63.38,24.85'R CONFORM I I END C 1 0 MATCH(E)C8G 1 LAYOUT PLAN-STA 18+00 TO STA 23+00 G 10, 20' 40' SCALE:1"=20' 18+00 19+00 20+00 21+00 22+00 23+00 630 630 625 625 Q SHEET KEYNOTES szo 620 1. INSTALL CURB AND GUTTER PER MODIFIED CITY STANDARD 102 615 615 2. INSTALL SIDEWALK PER CITY STANDARD 102 o O a a w w — 3. INSTALL CURB RAMP PER CITY STANDARD 111 Ed 610 610 4.INSTALL(N)BRIDGE 605 605 5. INSTALL(N)CULVERT 600 600 595 595 18+00 18+50 19+00 19+50 20+00 20+50 21+00 21+50 22+00 22+50 23+00 w w LL w LL w LL w LL w LL w LL w LL w LL LL w LL w LL gi PROFILE-STA 18+00 TO STA 23+00 SCALE:1"=20',VERT 1"=5' 30% SUBMITTAL r Client CITY OF UKIAH Title Bar ginalsi Inchon ^ � LAYOUT PLAN &PROFILE- ' original size sheet � 0�1" l Project TALMAGE ROAD REHABILITATION TALMAGE ROAD STA. 18+00- wvm.ghd.com PROJECT STA.23+00 No. Issue Checked Approved Date Conditions of Use Author D.DE LEON Drafting Check E.FANSELAU Project Manager E.FANSELAU This document and the ieeas and designs incorporated herein,as an instrument of professional service,is the property of Project No. Date Scale GHD.This document may only be used by GHD's client(and any other person who GHD has agreed can use this Designer M.EOFF Design Check M.KENNEDY Project Director M.KENNEDY document)forthepurposeforwhichitwaspreparedandmustnotbeusedbyanyotherpersonorforanyotherpuryoee. 12571020 May 6,2022 ASSHOWN C-103 Plot Date:6 May 2022-4:53 PM Plotted By:Mays Eaff Filename:llghdnehghdlUSlRoselilleNrojeds15611f257102MTech106-Digital_Designl4CAD 2020hceIs112571020-GHD-PAP.dwg "TALMAGERD-CL' ( SHEET GENERAL NOTES STA:24-54.46,53.37'L 'TALMAGE RD.CL" r 1 BEG 0 " -CL"TALMAGE RD C CONFORM STA2�06.06,35.36'L ( 1. CONTRACTOR SHALL PERFORM ALL UNDERGROUND UTILITY ALVARADO STA:24+33.62,51.70'L CITY OF UKIAH END z CONFORM WORK,CONCRETE WORK,SURFACE RESTORATION WORK, DOC 2022-07406 = DOC SK 2043 PG 275 MATCH(E)SIDEWALK VOGEL ( AND PERFORM ALL DIGOUT AND REPAIR WORK,SUCH AS 1 "TALMAGE RD-CL" APN 003-150-49 r X 1 APN 003 DOC 2012-107r_-150-40 I PLACING LEVELING COURSE AND SEPARATION FABRIC,PRIOR STA:23+62.95,27.81'L ) z "TALMAGE RD-CL' APN 003-150-3<, TO FINAL HOT MIX PAVING. CONFORM 1 STA:24+65.82,49.69'L ) _ PROPERTYLINE 2. APPLY TACK COAT TO ALL ADJACENT(E)AC IMPROVEMENTS BEG O "TALMAGE RD-CL' VU�c� ADD TRUNCATED DOMES? _ CONFORM PROPERTY LINE STA:25+20.97,31.26'L ( DOC 2013-05080 OR CONCRETE SURFACES AND AT JOINT BETWEEN(E)AND END t APN 003-150-47 (N)IMPROVEMENTS. `-' •, - _ ----- 2 MATCHH((E)C8� _ --"-" --- — \ 3. SEE SHEETS G-006 AND G-007 FOR TYPICAL SECTIONS. ---- -------W=-_ ----_____ 4. SEE CURB RAMPS ENLARGED PLANS FOR HORIZONTAL AND -- m� --- _ VERTICAL INFORMATION NOT SHOWN W________________ _ __ p \ -.-.. ____________________ _-_TALMAG ---_ _.__._... __.STA:24+52.0852.57'L .__ __._._----F___.__.__ _______ _ _._._.._._._.___.__....-_. p -------------------------- ._.._.._.- _.___._---- _._._.-------- _._...------ _.----------------.._..____._---- LOCATION OF EXISTING UTILITIES AND STRUCTURES ARE FROM ____._.___.CONFORM;-_-______________________________________ _- •- _ _ _ ________= U AVAILABLE RECORD MAPS,EXACT LOCATION AND COMPLETENESS W .________._ - ______________________ _____ ____ __ _._._.__._._-_.._.- __r=rt=====_-_ -_- ------ --------------- ARE NOT GUARANTEED.CONTRACTOR SHALL NOTIFY .... ..................................... - _ _._._._._.__.._._..........____.____.__.___ -_._____._.._ 2 ___________________ _______________':.-__._.___._.._._._._._._.__._._._._._.__._._._____..._----......-._-___._. -----_._._____.__._.___ W UNDERGROUND SERVICE ALERT USA AT 800 227-26000R DIAL ................. _._._._._._.___2P. - __.______._.. .._.__.._.__.___ W 811AMINIMUM OF 48 HOURS PRIOR TO ANY EXCAVATION AND UL!W POTHOLE FOR EXACT LOCATION. ________________ _-__-_ U __l_ _may^,._=_y_._._.__._._ _ _ _ _- W UL! ------------- ___Z i !"-'-'-- - -------------_--_- -----------'-'-'-'-_-_-_-_-- _ --------_-_'__-_-�-_-_:__------- - J ________ ___________ l Z _________________-__:: __._.____:.____._.:__ .._:_: ;_:::_-- SHEET LEGEND "---------- -- -------------------------------------------------------- ------------------------------------------------- - -------------------- -y= ¢ _- _ i - ------ HMA LEVELING COURSE VARYING THICKNESS _____________ _._...___._____._.__._._._._._._..___._.._.__.__._._ ._..__._.._.._. .,- =._. AND 2.5"HMA OVERLAY .....__ ___ ______ _____ ___________ _ _ _ ___ _ - _ _ p - DIGOUT SECTION N _ —� --_----___---- ___. N MINOR CONCRETE SIDEWALK AND DRIVEWAY "TALMAGE RD-CL" — ~ PER CITY STD 101/102. STA:23+63.03,31.96'R 2014-05877 o COCONFORM DOC 2014-0 ) APN 780-070-02 TALMME LIMITED ) N NORTHEVELO COUNTI DOC 2003-20217 \I I I DEVELOPMENT CO . / DOC APN APN 180-070-01 780-070-29 LAYOUT PLAN-STA 23+00 TO STA 26+00 0 10, 20' 40' SCALE:1"=20' 23+00 24+00 25+00 26+00 625 fi25 620 620 Q SHEET KEYNOTES 615 615 1. INSTALL CURB AND GUTTER PER MODIFIED CITY STANDARD 102 610 610 2. INSTALL SIDEWALK PER CITY STANDARD 102 o o a —w — _ a— w — 3. INSTALL CURB RAMP PER CITY STANDARD 111 605 605 4.INSTALL(N)BRIDGE 600 600 5. INSTALL(N)CULVERT 595 595 590 590 23+00 23+50 24+00 24+50 25+00 25+50 26+00 w LL w LL w LL w LL w LL w LL w LL PROFILE-STA 23+00 TO STA 26+00 SCALE:1"=20',VERT 1"=5' 30% SUBMITTAL r Client CITY OF UKIAH Title original Bar n inch ^ LAYOUT PLAN &PROFILE- ' al size sheeett � 0 0 Project TALMAGE ROAD REHABILITATION TALMAGE ROAD STA.23+00- wvm.ghd.com PROJECT STA.26+00 No. Issue Checked Approved Date Conditions of Use Author D.DE LEON Drafting Check E.FANSELAU Project Manager E.FANSELAU This document and the ideas and designs incorporated herein,as an instrument of professional service,is the propertyof Project No. Date Scale GHD.This document may only be used by GHD's client(and any other person who GHD has agreed can use this Designer M.EOFF Design Check M.KENNEDY Project Director M.KENNEDY document)forthePurposeforwhichitwaspreparedandmustnotbeusedbyanyotherpersonorforanyotherpuryoee. 12571020 May 6,2022 ASSHOWN C-104 t. Plot Date:6 May 2022-4:53 PM Plotted By:Mays Ear Filename:llghdnehghdlUSlRosevilleNrojeds156111257102MTechI06-Dighal_Designl4CAD 2020heets112571020-GHD-PAP.dwg �\ / -_ SHEET GENERAL NOTES \ / "TALMAGE RD-CL" "TALMAGE RD-CL" \ J / 1. CONTRACTOR SHALL PERFORM ALL UNDERGROUND UTILITY STA:26+29.46,68.98'L STA:26+60.48,57.74'L \ ENDOt CONFORM _ WORK,CONCRETE WORK,SURFACE RESTORATION WORK, MATCH(E)C8G 1 AND PERFORM ALL AND REPAIR WORK,SUCH AS COURSE PLACING LEVELING COURSE AND SEPARATION FABRIC,PRIOR AM�, 1(ZU6 r / / 1 TO FINAL HOT MIX PAVING. Title Report \��pRE 20 3O 51 52/ j— !`f �/ L 2. APPLY TACK COAT TO ALL ADJACENT(E)AC IMPROVEMENTS TALMAGE RD-CL" - APN pp Q\ III OR CONCRETE SURFACES AND AT JOINT BETWEEN(E)AND FR / ) (N)IMPROVEMENTS. STA:26+29.CONFORM \\ y �E_` / X/ II 111 1 i __ M 3. SEE SHEETS G-006 AND G-007 FOR TYPICAL SECTIONS. ROW? PROPERTY LINE _____ -_ /Q \ X/ / rn I V - �\ 4. SEE CURB RAMPS ENLARGED PLANS FOR HORIZONTAL AND "TALMAGE RD-CL' /`_ ./ LU' VERTICAL INFORMATION NOT SHOWN. 2.4 _ STA:26+36.61,51.13'LX/� Richard t0 Confirm - .- _--^� CONFORM 'TALMAGERD-CL" c__\ CATED _.=STA:26+32.38 37.83'L=::=-- N DOMES? LOCATION OF EXISTING UTILITIES AND STRUCTURES ARE FROM _ — COMPLETENESS � � RAMP CL AVAILABLE RECORD MAPS,EXACT LOCATION AND ARE NOT GUARANTEED.CONTRACTOR SHALL NOTIFY -- :"TALMAGE RD-CL" --- _ - - - - _-_ _ - - _ - - \ UNDERGROUND SERVICE ALERT(USA)AT(800)227-2600 OR DIAL 11 A MINIMUM F 4 HOURS PRIOR T ANY EXCAVATIONAND -"-_":STA:26+07.88 36.72'L'...:.. .........c...._.....:..--_ _..._.. ..._-. ._.__.-._..-- ....,..-__ -- __ - - --- __ -__- -- -- __ - - - - 8 U O 8 OU S O O _ _ -- - - - - - - - - - - - - "TALMAGE RD CL"_ _ _- _ _.--_�_______________________________ ____>:-:.;.-.-..--.-..."_-. _.....-...-- __ __ __ _ _ -_ ___ __ __ POTHOLE FOR EXACT LOCATION. BEG 2 __ ___ _ _ _ __ ___ ____ �-�'__.-_.__"-__"-_"_____________________ ________ _ _ _____ _ _ _ _ -_ -_ O _ - -- - - - -- - - _ -- -- - _ _ - _ - __ _ - -_-- - _ _ _ _ _-__ _ STA:28+86.82 34.10'L U _ _ _ _ _ _ _ _ _ _ _-=MATCH ESIDEWALK- - -_-.-_._- _ _ -__- - - - _ CONFORM � F"' --- - -- . -- - - - -_�__-- - - - - - - - _„TALMAGE RD-CL„� _ _ _ U,1 _ _ _ -_- TA.2fi 07.97 29.51'L_________ - -- - - - - - - -_-- -- -- - -- - - --_ - -- ---- - - - - - -- - -- - _-- - - - - - - -- - - -_ - - - -_ - - - - _- _ _ - -- - - - - SHEET LEGEND -.MATCH E C8G ___- -_ _ - _ _ _____ __ _ ___ _ _ _ _ _- _-- --_- _ - _ �y} __ - __= 2 bit=-'::..:.::.:::..:..::::.::...:..."-_"..:-...._...__-. - - ---- - ._':-28�99==-':--=--c _ _ _ _ _ _ _ U _ _ -_--__ _ HMA LEVELING COURSE VARYING THICKNESS W _ - - AND 2.5"HMA OVERLAY ____________ - _ DIGOUT SECTION - _ ._- __-_--_ _ -_ _ _ _-___-_ -_ _ _ _____--_ ____-_-_ __-_- __-_- _-- -_-_-- - - - _---- _ -_---- - "TALMAGE RD-CL' TA:2+7.12 1. 'R - - - - - - - - - - - _ MINOR CONCRETE SIDEWALK AND DRIVEWAY CONFORM_ � PER CITY STD 101/102. 04 i o o — �t BANKI n �I A) tN K J LAYOUT PLAN-STA 26+00 TO STA 29+32 0 10, 20' 40' SCALE:1"=20' 26+00 27+00 28+00 29+00 29+50 625 625 620 620 Q SHEET KEYNOTES 615 615 1. INSTALL CURB AND GUTTER PER MODIFIED CITY STANDARD 102 610 610 2. INSTALL SIDEWALK PER CITY STANDARD 102 0 0 ¢ ¢ 3. INSTALL CURB RAMP PER CITY STANDARD 111 605 4.INSTALL(N)BRIDGE 600 E 600 5. INSTALL(N)CULVERT 595 595 590 590 26+00 26+50 27+00 27+50 28+00 28+50 29+00 29+50 w LL w LL w LL w LL w LL w LL w LL S o S o PROFILE-STA 26+00 TO STA 29+32 SCALE:1"=20',VERT 1"=5' 30% SUBMITTAL r Client CITY OF UKIAH Title Bar is one inch on ^ � � LAYOUT PLAN &PROFILE- ' original size sheet 0�1" 0 Project TALMAGE ROAD REHABILITATION TALMAGE ROAD STA.26+00- wvm.ghd.com PROJECT STA.29+32 No. Issue Checked Approved Date Conditions of Use Author D.DE LEON Drafting Check E.FANSELAU Project Manager E.FANSELAU This document and ins ideas and designs incorporated herein,as an instrument of professional service,is the properly of Project No. Date Scale GHD.This document may only be used by GHD's client(and any other person who GHD has agreed can use this Designer M.EOFF Design Check M.KENNEDY Project Director M.KENNEDY document)forthePurposeforwhichitwaspreparedandmustnotbeusedbyanyotherpersonorforanyotherpuryoee. 12571020 May 6,2022 ASSHOWN C-105 Plot Date:6 May 2022-4:53 PM Plotted By:Mays Ear Fllename:llghdnehghd1U51RoselilleNrojeds156111257102MTech106-DigAal_Designl4CAD2020\Sh.ts112571020-GHD-PAP.dwg