HomeMy WebLinkAboutGHD, Inc. 2021-03-12; Amendment 1CITY OF UKIAH AMENDMENT NO. 1 TO PROFESSIONAL SERVICES AGREEMENT BETWEEN GHD INC and THE CITY OF UKIAH This Amendment No. 1, entered on September 23, 2022, revises the Agreement for Engineering Services dated March 12, 2021 between the City of Ukiah and GHD Inc, for the design of the Downtown Streetscape, Road Diet & Utilities Project, Phase 2. This Amendment No. 2 adds the following: •Adds additional engineering elements related to sanitary sewer design to the Scope of Work, as per Exhibit 1. •Adds an additional $117,499.10 to the contract, for a revised total amount not-to- exceed $534,355.79. This Amendment No. 1 starts contract term length to commence on actual install date of Xerox machine and start of services. Except as expressly amended by this Amendment, all other terms remain unchanged and in full force and effect. IN WITNESS WHEREOF, THE PARTIES HAVE EXECUTED THIS AMENDMENT ON THE EFFECTIVE DATE: GHD INC BY: DATE: PRINT NAME: CITY OF UKIAH BY: DATE: SAGE SANGIACOMO, CITY MANAGER ATTEST BY: DATE: KRISTINE LAWLER, CITY CLERK Matthew G. Kennedy, PE September 23, 2022 COU No. 2021-179-A1 Sep 28, 2022 Kristine Lawler (Sep 28, 2022 16:23 PDT) Kristine Lawler Sep 28, 2022 1 GHD Inc. 2235 Mercury Way Suite 150 Santa Rosa CA 95407 USA T 1 707 523 1010 F 1 707 527 8679 W www.ghd.com August 30, 2022 Ref: 11225278 Tim Eriksen Public Works Director / City Engineer City of Ukiah 300 Seminary Avenue Ukiah, CA 95482 RE: Ukiah Downtown Streetscape, Road Diet and Utilities Project – Phase 2 Dear Mr. Eriksen, GHD is pleased to provide this proposal for professional engineering services for additional design efforts and coordination on the Ukiah Downtown Streetscape, Road Diet and Utilities – Phase 2 Project (project). This proposal is based on direction provided by City staff regarding the additional sanitary sewer replacement on State Street south to Cherry Street, and Scott Street between State Street and School Street. This amendment includes the collection of additional topographic survey and the design of the sanitary sewer in the additional areas, as well as accompanying tasks related to the project extension. During the course of design and coordination with the City and adjacent projects, GHD also agreed to include design of the sewer and water main replacements on Gobbi St from approximately 50 feet west to 150 feet east of the intersection. Scope of Work Where the additional work is consistent with activities defined in the original scope of work, the same task and sub task numbers are used. The additional budget effort will be added to the original amount identified in the fee breakdown presented with the proposal. If the additional work falls outside of activities presented in the original scope new task numbers are identified. If no additional work is proposed for a task it is not listed below. The additional sanitary sewer main and pavement rehab added to the original scope and expansion of the project limits led to the creation of an estimated 25 additional plan sheets and 30 Permits to Enter beyond what was originally identified. Task 1 – Project Management Task 1.1 Project Management and Internal Coordination The additional project scope necessitated coordination with GHD’s subcontractors along with amendments to their agreements, as well as additional project meetings and coordination with the design team of an adjacent project. Task 2 – Surveys, Mapping and Site Data EXHIBIT 1 2 Task 2.2 Surveys and Mapping Additional topographic survey to be completed by Cinquini & Passarino (C&P) to include State Street from Gobbi St to 50 feet south of Cherry St and Scott St, between School St and State St. C&P will prepare the base topographic surveys necessary to facilitate the design of the streetscape, road diet and utilities improvement project. All topographic mapping will be at a drawing scale of 1 inch = 20 feet, unless otherwise requested, with a one-foot contour interval. The topographic survey will include the following: • Topographic survey coverage area will include State Street beginning 200 feet south of Gobbi Street to the previous survey limit at Mill Street and the previous survey limit at Henry Street to 2300 feet north of Norton Street • The width of the survey will be from face of building to face of build ing. If the building face is not located at the back of sidewalk, C&P will map 10 feet beyond the back of sidewalk. • Topographic survey will include all necessary work to produce a topographic map, including features such as, but not limited to; building corners and elevations, curb lines, water meters, sewer cleanouts, valves, manholes (including rim, invert and pipe information), utility markings on the pavement, utility poles, driveway and doorway locations, sidewalks, trees four (4) inches and larger, retaining wall or decorative walls, and any other pertinent information that could apply to the project during design. • Topographic survey will be provided on North American Vertical Datum of 1988. • Topographic map to horizontally relate California Coordinate System of 1983, Zone II. Deliverables • Additional Topographic survey - information shall be complete and comprehensive for design use; shall include all surface features within the proposed project limits and construction zone • Miscellaneous field topography pickups as required for detailed design preparation • Topographic map, at 20 scale Task 6 –ROW Engineering Task 6.1 ROW Consulting The extension of the project limits to include the sanitary sewer main replacement, given the location of the existing main, necessitated the need for additional Permits to Enter and Construct south of Gobbi St to the end of the sewer main replacement. The original project limits contained 31 properties with frontage that would be affected by the project, the additional sewer main construction created 30 more parcels where Permits would be required. Associated Right of Way Services, Inc. (AR/WS) will provide right of way consulting services to GHD for the City’s Downtown Streetscape Project. Services include preparation and solicitation of voluntary permits to enter and construct from up to 30 additional property owners. Section 8.09.10.00 Construction Permits and Permits to Enter and Construct of the Caltrans Right of Way Manual states “When temporary rights are needed to perform work for the grantor’s benefit, a Permit to Enter and Construct (PTE) or Construction Permit may be used.” Based on AR/WS’s understanding of the project, soliciting PTEs from the grantors is an appropriate approach to gain access to private property along S. State Street. All 3 AR/WS services will comply with pertinent sections of the Caltrans Right of Way Manual. Services will include the following: • AR/WS will review the properties that will require PTEs and identify owner contact information. • With input regarding project construction and project needs from GHD, AR/WS will prep are draft PTEs for GHD and City review and approval. • Notify property owners with a letter and PTE Agreement for signature, and follow-up with property owners. • Continuous coordination with property owners to obtain voluntarily signed PTE. Follow up will be primarily by phone calls, email correspondence and personal meetings. Personal meetings are limited to a total of 45 for the entire project. • AR/WS will coordinate on-site meetings with project Team members, property owners and/or tenants, as necessary (included in the 45 personal meetings above). • AR/WS will serve as the point of contact for property owners and tenants and will be available to respond to inquiries. • Develop and utilize a project status report that will keep GHD and City informed of progress and will address critical milestones, status, scheduling, and areas of concern. Task 7 –Design Task 7.3 90% PS&E; and Task 7.4 Final Plans, Specifications, and Estimate (Bid Set) The project limits have been extended in the southern end of the project from the north side of the State St/Gobbi St intersection down to the State St/Cherry St intersection, and in the northern segment, Scott St from State St to School St. The replacement of the sanitary sewer main(s) is the primary reason that these segments have been included in the project. Along with the sewer main replacement, pavement rehabilitation and striping modifications are now also included in the Streetscape Project. The City is also in a separate agreement with a consultant to design the utility replacement project along Gobbi Street, including through the Streetscape Project area. Through coordination with the City and the other project team it was decided that GHD would be responsible for the design and inclusion of the sewer and water main replacements in Gobbi Street from approximately 50 feet west of State Street to approximately150 east of the intersection. Given the age of the dual sewer mains south of Gobbi, additional effort was required to locate sewer laterals and other features not accounted for within the original scope. The nature of the replacement changed (replacing the sewer in the same alignment vs relocating and extending laterals) and will require modified contract language and provisions. These additional improvements create the need for approximately 25 additional plan sheets, including demolition, utility, paving and striping sheets. These sheets, along with any additional items within the specifications or estimate/bid item list will be completed per the provisions listed within the original design scope of work, including constructability and QA/QC reviews. 4 Contingency There is no contingency set aside for this project. Assumptions • The City will pay all permit and application fees and will handle permit reviews. GHD will provide support in the form of plan and specification preparation and addressing comments from permit reviews, if required. • The City will waive any encroachment permit fees required to complete project field investigations. • Meetings other than those indicated in the original scope are not required. Fee Estimate The estimated fee for professional services is $117,449.10. See attachment for breakdown of the estimated fee. Closing It is assumed that upon agreement of the scope of work for the engineering services for the Redwood Road MP 5.76 Storm Damage Repair Project, GHD will prepare a task order consistent with the terms provided in the On-Call Request for Qualifications for this project. The Notice to Proceed will be the date of written authorization by the County to proceed or when GHD receives the fully executed task order for the work. If you have any questions or comments regarding this pro posal, please feel free to call me at 707-540- 9612. Sincerely, GHD Inc. Jeremy Schmal, PE Project Manager (707) 540-9612 Cc: Matt Kennedy, PE, GHD Principal Attachment: Fee Estimate Spreadsheet City of Ukiah Downtown Streetscape, Road Diet and Utilities Project Phase 2 Cost Proposal Sub #1 Sub #2 Sub #3 Pr i n c i p a l i n C h a r g e Pr o j e c t M a n a g e r Se n i o r E n g i n e e r Ci v i l E n g i n e e r Pr o j e c t E n g i n e e r St a f f E n g i n e e r CA D / D r a f t i n g S u p p o r t Ad m i n i s t r a t i o n Labor + Overhead Rate 280.78$ 214.53$ 236.61$ 195.60$ 151.43$ 123.04$ 148.28$ 113.57$ Task 1 Project Management 2 16 0 0 8 0 0 6 32 5,887$ $0 $0 $0 5,887$ 1.1 Project Management and Internal Coordination 2 16 8 6 32 5,887$ 5,887$ Task 2 Surveys, Mapping and Site Data 0 4 0 0 8 8 0 0 20 3,054$ $0 $18,000 $0 21,054$ 2.2 Surveys and Mapping 4 8 8 20 3,054$ $18,000 21,054$ Task 6 ROW Engineering 0 0 0 0 0 0 0 0 0 -$ $0 $0 $30,000 30,000$ 6.1 ROW Consulting 0 -$ $30,000 30,000$ Task 7 Design 8 48 32 48 80 80 48 16 360 60,395$ $0 $0 $0 60,395$ 7.3 & 7.4 90% and Final - Plans, Specifications, and Estimate 8 48 32 48 80 80 48 16 360 60,395$ 60,395$ TOTAL HOURS 10 68 32 48 96 88 48 22 412 $69,336 $0 $18,000 $30,000 $117,336 Miles Rate Mileage Costs 200 0.5650 113.00$ 113.00$ -$ Other 219.78$ TOTAL DIRECT COSTS 113$ -$ -$ -$ 113$ TOTAL 69,449.10$ $0.00 18,000.00$ 30,000.00$ 117,449.10$ DIRECT COSTS Co s t Ho u r s GH D C o s t WR T Ci n q u i n i & P a s s a r i n o AR / W S August 30, 2022