Loading...
HomeMy WebLinkAboutBKF Engineers 2022-02-18; Amendment 1 2022-09-13 COU 2122-190-A1 CITY OF UKIAH AMENDMENT NO. 1 TO PROFESSIONAL SERVICES AGREEMENT BETWEEN BKF ENGINEERS and THE CITY OF UKIAH This Amendment No. 1, entered on September 13, 2022 revises the Agreement for Engineering services dated February 18, 2022 between the City of Ukiah and BKF Engineers, for traffic signal pole relocation on the Perkins Widening project. This Amendment No. 1 adds the following: 1. Adds Traffic Operations Analysis, Signal Design, and Curb Ramp Design to the Scope of Work, as per Exhibit 1. 2. Adds an additional $14,581 to the contract, for revised total amount not-to-exceed of$322,612. Except as expressly amended by this Amendment, all other terms remain unchanged and in full force and effect. IN WITNESS WHEREOF, THE PARTIES HAVE EXECUTED THIS AMENDMENT ON THE EFFECTIVE DATE: CONSULTANT BY: _ _ DATE: 0911912022 PRINT NAME: Jason Kirchmann CITY OF UKIAH BY: S�`S DATE: Sep 22, 2022 SAGE SANGIACOMO, CITY MANAGER ATTEST BY: Kristine Lawler 2022 08:21 PDT) DATE: Sep 22, 2022 KRISTINE LAWLER, CITY CLERK EXHIBIT 1 September 9, 2022 BKF No C20212351-10 Andrew Stricklin, Associate Engineer Dept. of Public Works City of Ukiah 300 Seminary Avenue Ukiah, CA 95482 Transmitted Via Email Subject: Ukiah East Perkins Widening Project Additional Service Request No. 1 Traffic Operations Analysis, Signal Design, and Curb Ramp Design Andrew: BKF is pleased to submit this additional service request for engineering services to prepare traffic operations analysis and curb ramp design as part of our work for the East Perkins Avenue project in the City of Ukiah. Fallowing a collision with the existing signal pole at the northeast corner of the East Perkins Avenue/Orchard Avenue intersection, the City has requested that the design team review the replacement and repositioning of this pole to discourage future vehicle impact at this location. The additional design work illustrated herein will become part of the East Perkins Widening Project design package, including plans, specifications as notes on plans, and estimate. The following scope is presented to address your request for additional services. Scope of Services TASK 9:TRAFFIC OPERATIONS ANALYSIS Traffic Operations analysis will be prepared by W-Trans, BKF's sub consultant.The following tasks will be performed by W-Trans to understand the impacts that the lane reassignment will have on the Level or Services at the intersection and to identify is alternative signal timing may be warranted: • Data Collection—Week day AM and PM peak period turning movement counts will be conducted,including vehicle, pedestrian, and bicyclist movements, initial queues, and right-turn-on-red movements at the signalized intersection • Analyze existing plus Project Condition Level of Service with Synchro software. Development of optimum signal phasing, queue storage lengths, and lane geometry. • Northeast Corner Signal Design Update—The traffic signal modification plans will be updated to include the upgrade of the signal mast arm pole on the northeast corner of the intersection of East Perkins Street/ North Orchard Avenue. TASK 10:SIGNAL DESIGN W-Trans will update the traffic signal modification plan to include the upgrade and relocation of the signal mast arm pole on the northeast corner of the East Perkins Avenue/Orchard Avenue intersection This additional work will be reflected in the 60% PG&E submittal and all following milestones. BKF ENGINEERS 200 4th Street,Suite 300,Santa Rosa,CA 9S401 1707.S83.8500 September 9, 2022 TASK 11:CURB RAMP DESIGN BKF will prepare curb ramp grading details for the northeast ramp at the East Perkins Avenue/Orchard Avenue intersection. BKF will prepare this drawing with a designed scale of 1"=10' for clarity. Drawings will be prepared based on the City of Ukiah standards, details and specifications and will be completed in coordination with the replacement signal pole at this corner. As part of this task we have included time for our efforts associated with coordinating the ramp layout with W-Trans and the City, and addressing City review comments at the design milestones. Scope Qualifications and Assumptions BKF's services are limited to those expressly set forth in the scope. BKF shall have no other obligations or responsibilities for the project, except as provided in this proposal letter,or as agreed to in writing. BKF will provide our services consistent with the professional skill and care ordinarily provided by consultants practicing in the same locality under similar circumstances. Our services shall be limited to those expressly summarized in this proposal and we shall have no other obligations or responsibilities, unless otherwise agreed upon. Schedule BKF is able to commence working on this project immediately upon your authorization to proceed_ Fees for Professional Services BKF proposes to provide the services on a Time& Materials basis as noted in the table below. DESCRIPTIONTASK 9 Traffic Operations Analysis $3,898 10 Signal Design $7,220 11 Curb Ramp Design $3,463 TOTAL This additional service request is an amendment to our Professional Services Agreement between BKF Engineers and the City of Ukiah, dated February 18, 2022. All terms of said agreement will remain the same except for the scope and fee items explicitly stated herein. Should you have any questions,or would like additional clarification on any aspect of the scope of work, please feel free to contact me at 707-583 8536. Respectfully, BKF Engineers ("'2 Becky Dower, PE Project Manager Page 2 of 2 BKF ENGINEERS %-