Loading...
HomeMy WebLinkAboutWest Yost Associates 2022-06-08AGREEMENT FOR PROFESSIONAL CONSULTING SERVICES Design Professional] This Agreement, made and entered into this 8th day of June, 2022 (“Effective Date”), by and between CITY OF UKIAH, CALIFORNIA, hereinafter referred to as "City" and West Yost Associates, Inc., a corporation organized and in good standing under the laws of the state of California, hereinafter referred to as "Consultant". RECITALS This Agreement is predicated on the following facts: a. City requires consulting services related to providing professional engineering services to support the City with the Suspended Air Flotation (SAF) Thickening System Project and Screw Press Dewatering System Project. b. Consultant represents that it has the qualifications, skills, experience and properly licensed to provide these services, and is willing to provide them according to the terms of this Agreement. c. City and Consultant agree upon the Scope-of-Work and Work Schedule attached hereto as Exhibit "1", describing contract provisions for the project and setting forth the completion dates for the various services to be provided pursuant to this Agreement. TERMS OF AGREEMENT 1.0 DESCRIPTION OF PROJECT 1.1 The Project is described in detail in the attached Scope-of-Work (Exhibit "1"). 2.0 SCOPE OF SERVICES 2.1 As set forth in Exhibit "1". 2.2. Additional Services. Additional services, if any, shall only proceed upon written agreement between City and Consultant. The written Agreement shall be in the form of an Amendment to this Agreement. 3.0 CONDUCT OF WORK 3.1 Time of Completion. Consultant shall commence performance of services as required by the Scope-of-Work upon receipt of a Notice to Proceed from City. Consultant shall complete the work to the City's reasonable satisfaction, even if contract disputes arise or Consultant contends it is entitled to further compensation. 4.0 COMPENSATION FOR SERVICES 4.1 Basis for Compensation. For the performance of the professional services of this Agreement, Consultant shall be compensated on a time and expense basis not to exceed a guaranteed maximum dollar amount of $522,087. Labor charges shall be based upon hourly billing rates for the various classifications of personnel employed by Consultant to perform the Scope of Work as set forth in the attached Exhibit 1, which shall include all indirect costs and expenses COU No. 2122-238 West Yost – COU 2122-138 PAGE 2 OF 7 of every kind or nature, except direct expenses. The direct expenses and the fees to be charged for same shall be as set forth in Exhibit 1. Consultant shall complete the Scope of Work for the not-to-exceed guaranteed maximum, even if actual time and expenses exceed that amount. 4.2 Changes. Should changes in compensation be required because of changes to the Scope-of- Work of this Agreement, the parties shall agree in writing to any changes in compensation. Changes to the Scope-of-Work" means different activities than those described in Exhibit 1 and not additional time to complete those activities than the parties anticipated on the date they entered this Agreement. 4.3 Sub-contractor Payment. The use of sub-consultants or other services to perform a portion of the work of this Agreement shall be approved by City prior to commencement of work. The cost of sub-consultants shall be included within guaranteed not-to-exceed amount set forth in Section 4.1. 4.4 Terms of Payment. Payment to Consultant for services rendered in accordance with this contract shall be based upon submission of monthly invoices for the work satisfactorily performed prior to the date of invoice less any amount already paid to Consultant, which amounts shall be due and payable thirty (30) days after receipt by City. The invoices shall provide a description of each item of work performed, the time expended to perform each task, the fees charged for that task, and the direct expenses incurred and billed for. Invoices shall be accompanied by documentation sufficient to enable City to determine progress made and the expenses claimed. 5.0 ASSURANCES OF CONSULTANT 5.1 Independent Contractor. Consultant is an independent contractor and is solely responsible for its acts or omissions. Consultant (including its agents, servants, and employees) is not City's agent, employee, or representative for any purpose. It is the express intention of the parties hereto that Consultant is an independent contractor and not an employee, joint venturer, or partner of City for any purpose whatsoever. City shall have no right to, and shall not control the manner or prescribe the method of accomplishing those services contracted to and performed by Consultant under this Agreement, and the general public and all governmental agencies regulating such activity shall be so informed. Those provisions of this Agreement that reserve ultimate authority in City have been inserted solely to achieve compliance with federal and state laws, rules, regulations, and interpretations thereof. No such provisions and no other provisions of this Agreement shall be interpreted or construed as creating or establishing the relationship of employer and employee between Consultant and City. Consultant shall pay all estimated and actual federal and state income and self-employment taxes that are due the state and federal government and shall furnish and pay worker's compensation insurance, unemployment insurance and any other benefits required by law for himself and his employees, if any. Consultant agrees to indemnify and hold City and its officers, agents and employees harmless from and against any claims or demands by federal, state or local government agencies for any such taxes or benefits due but not paid by Consultant, including the legal costs associated with defending against any audit, claim, demand or law suit. West Yost – COU 2122-138 PAGE 3 OF 7 Consultant warrants and represents that it is a properly licensed professional or professional organization with a substantial investment in its business and that it maintains its own offices and staff which it will use in performing under this Agreement. 5.2 Conflict of Interest. Consultant understands that its professional responsibility is solely to City. Consultant has no interest and will not acquire any direct or indirect interest that would conflict with its performance of the Agreement. Consultant shall not in the performance of this Agreement employ a person having such an interest. If the City Manager determines that the Consultant has a disclosure obligation under the City’s local conflict of interest code, the Consultant shall file the required disclosure form with the City Clerk within 10 days of being notified of the City Manager’s determination. 6.0 INDEMNIFICATION 6.1 Insurance Liability. Without limiting Consultant's obligations arising under Paragraph 6.2 Consultant shall not begin work under this Agreement until it procures and maintains for the full period of time allowed by law, surviving the termination of this Agreement insurance against claims for injuries to persons or damages to property, which may arise from or in connection with its performance under this Agreement. A. Minimum Scope of Insurance Coverage shall be at least as broad as: 1. Insurance Services Office ("ISO) Commercial General Liability Coverage Form No. CG 20 10 10 01 and Commercial General Liability Coverage – Completed Operations Form No. CG 20 37 10 01. 2. ISO Form No. CA 0001 (Ed. 1/87) covering Automobile Liability, Code 1 "any auto" or Code 8, 9 if no owned autos and endorsement CA 0025. 3. Worker's Compensation Insurance as required by the Labor Code of the State of California and Employers Liability Insurance. 4. Errors and Omissions liability insurance appropriate to the consultant’s profession. Architects’ and engineers’ coverage is to be endorsed to include contractual liability. B. Minimum Limits of Insurance Consultant shall maintain limits no less than: 1. General Liability: $1,000,000 combined single limit per occurrence for bodily injury, personal injury and property damage including operations, products and completed operations. If Commercial General Liability Insurance or other form with a general aggregate limit is used, the general aggregate limit shall apply separately to the work performed under this Agreement, or the aggregate limit shall be twice the prescribed per occurrence limit. 2. Automobile Liability: $1,000,000 combined single limit per accident for bodily injury and property damage. West Yost – COU 2122-138 PAGE 4 OF 7 3. Worker's Compensation and Employers Liability: Worker's compensation limits as required by the Labor Code of the State of California and Employers Liability limits of $1,000,000 per accident. 4. Errors and Omissions liability: $1,000,000 per occurrence. C. Deductibles and Self-Insured Retentions Any deductibles or self-insured retentions must be declared to and approved by the City. At the option of the City, either the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects to the City, its officers, officials, employees and volunteers; or the Consultant shall procure a bond guaranteeing payment of losses and related investigations, claim administration and defense expenses. D. Other Insurance Provisions The policies are to contain, or be endorsed to contain, the following provisions: 1. General Liability and Automobile Liability Coverages a. The City, it officers, officials, employees and volunteers are to be covered as additional insureds as respects; liability arising out of activities performed by or on behalf of the Consultant, products and completed operations of the Consultant, premises owned, occupied or used by the Consultant, or automobiles owned, hired or borrowed by the Consultant for the full period of time allowed by law, surviving the termination of this Agreement. The coverage shall contain no special limitations on the scope-of-protection afforded to the City, its officers, officials, employees or volunteers. b. The Consultant's insurance coverage shall be primary insurance as respects to the City, its officers, officials, employees and volunteers. Any insurance or self-insurance maintained by the City, its officers, officials, employees or volunteers shall be in excess of the Consultant's insurance and shall not contribute with it. c. Any failure to comply with reporting provisions of the policies shall not affect coverage provided to the City, its officers, officials, employees or volunteers. d. The Consultant's insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer's liability. 2. Worker's Compensation and Employers Liability Coverage The insurer shall agree to waive all rights of subrogation against the City, its officers, officials, employees and volunteers for losses arising from Consultant's performance of the work, pursuant to this Agreement. West Yost – COU 2122-138 PAGE 5 OF 7 3. Professional Liability Coverage If written on a claims-made basis, the retroactivity date shall be the effective date of this Agreement. The policy period shall extend one year from date of final approved invoice for this project. 4. All Coverages Each Insurance policy required by this clause shall be endorsed to state that coverage shall not be suspended, voided, canceled by either party, reduced in coverage or in limits except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City. E. Acceptability of Insurers Insurance is to be placed with admitted California insurers with an A.M. Best's rating of no less than A- for financial strength, AA for long-term credit rating and AMB-1 for short-term credit rating. F. Verification of Coverage Consultant shall furnish the City with Certificates of Insurance and with original Endorsements effecting coverage required by this Agreement. The Certificates and Endorsements for each insurance policy are to be signed by a person authorized by that insurer to bind coverage on its behalf. The Certificates and Endorsements are to be on forms provided or approved by the City. All Certificates and Endorsements are to be received and approved by the City before Consultant begins the work of this Agreement. The City reserves the right to require complete, certified copies of all required insurance policies, at any time. If Consultant fails to provide the coverages required herein, the City shall have the right, but not the obligation, to purchase any or all of them. In that event, after notice to Consultant that City has paid the premium, the cost of insurance may be deducted from the compensation otherwise due the contractor under the terms of this Contract. G. Subcontractors Consultant shall include all sub-contractors or sub-consultants as insured under its policies or shall furnish separate certificates and endorsements for each sub-contractor or sub-consultant. All coverage for sub-contractors or sub-consultants shall be subject to all insurance requirements set forth in this Paragraph 6.1. 6.2 Indemnification. Notwithstanding the foregoing insurance requirements, and in addition thereto, Consultant agrees, for the full period of time allowed by law, surviving the termination of this Agreement, to indemnify the City for any claim, cost or liability that arises out of, or pertains to, or relates to any negligent act or omission or the willful misconduct of Consultant and its agents in the performance of services under this contract, but this indemnity does not apply to liability for damages for death or bodily injury to persons, injury to property, or other loss, arising from the sole negligence, willful misconduct or defects in design by the City, or arising from the active negligence of the City. Indemnify,” as used herein includes the expenses of defending against a claim and the payment of any settlement or judgment arising out of the claim. Defense costs include all West Yost – COU 2122-138 PAGE 6 OF 7 costs associated with defending the claim, including, but not limited to, the fees of attorneys, investigators, consultants, experts and expert witnesses, and litigation expenses. References in this paragraph to City or Consultant, include their officers, employees, agents, and subcontractors. 7.0 CONTRACT PROVISIONS 7.1 Documents and Ownership of Work. All documents furnished to Consultant by City and all documents or reports and supportive data prepared by Consultant under this Agreement are owned and become the property of the City upon their creation and shall be given to City immediately upon demand and at the completion of Consultant's services at no additional cost to City. Deliverables are identified in the Scope-of-Work, Exhibit 1 All documents produced by Consultant shall be furnished to City in digital format and hardcopy. Consultant shall produce the digital format, using software and media approved by City. 7.2 Governing Law. Consultant shall comply with the laws and regulations of the United States, the State of California, and all local governments having jurisdiction over this Agreement. The interpretation and enforcement of this Agreement shall be governed by California law and any action arising under or in connection with this Agreement must be filed in a Court of competent jurisdiction in Mendocino County. 7.3 Entire Agreement. This Agreement plus its Exhibit(s) and executed Amendments set forth the entire understanding between the parties. 7.4 Severability. If any term of this Agreement is held invalid by a court of competent jurisdiction, the remainder of this Agreement shall remain in effect. 7.5 Modification. No modification of this Agreement is valid unless made with the agreement of both parties in writing. 7.6 Assignment. Consultant's services are considered unique and personal. Consultant shall not assign, transfer, or sub-contract its interest or obligation under all or any portion of this Agreement without City's prior written consent. 7.7 Waiver. No waiver of a breach of any covenant, term, or condition of this Agreement shall be a waiver of any other or subsequent breach of the same or any other covenant, term or condition or a waiver of the covenant, term or condition itself. 7.8 Termination. This Agreement may only be terminated by either party: 1) for breach of the Agreement; 2) because funds are no longer available to pay Consultant for services provided under this Agreement; or 3) City has abandoned and does not wish to complete the project for which Consultant was retained. A party shall notify the other party of any alleged breach of the Agreement and of the action required to cure the breach. If the breaching party fails to cure the breach within the time specified in the notice, the contract shall be terminated as of that time. If terminated for lack of funds or abandonment of the project, the contract shall terminate on the date notice of termination is given to Consultant. City shall pay the Consultant only for services performed and expenses incurred as of the effective termination date. In such event, as a condition to payment, Consultant shall provide to City all finished or unfinished documents, data, studies, surveys, drawings, maps, models, photographs and reports prepared by the Consultant under this Agreement. Consultant shall be entitled to receive just and equitable compensation for any work satisfactorily completed hereunder, West Yost – COU 2122-138 PAGE 7 OF 7 subject to off-set for any direct or consequential damages City may incur as a result of Consultant's breach of contract. 7.9 Execution of Agreement. This Agreement may be executed in duplicate originals, each bearing the original signature of the parties. Alternatively, this Agreement may be executed and delivered by facsimile or other electronic transmission, and in more than one counterpart, each of which shall be deemed an original, and all of which together shall constitute one and the same instrument. When executed using either alternative, the executed agreement shall be deemed an original admissible as evidence in any administrative or judicial proceeding to prove the terms and content of this Agreement. 8.0 NOTICES Any notice given under this Agreement shall be in writing and deemed given when personally delivered or deposited in the mail (certified or registered) addressed to the parties as follows: CITY OF UKIAH WEST YOST ASSOCIATES, INC. DEPT. OF PUBLIC WORKS ATTN: TIMOTHY BANYAI, PE 300 SEMINARY AVENUE 1001 GALAXY WAY, SUITE 310 UKIAH, CALIFORNIA 95482-5400 CONCORD, CA 94520 9.0 SIGNATURES IN WITNESS WHEREOF, the parties have executed this Agreement the Effective Date: CONSULTANT BY: __________________________ ____________________ Date PRINT NAME: _________________ IRS IDN Number CITY OF UKIAH BY: ____________________ SAGE SANGIACOMO Date CITY MANAGER ATTEST KRISTINE LAWLER Date CITY CLERK Jun 20, 2022 Kristine Lawler (Jun 20, 2022 10:17 PDT) Kristine Lawler Jun 20, 2022 1001 Galaxy Way Suite 310 Concord CA 94520 925.949.5800 phone 530.756.5991 fax westyost.com May 9, 2022 SENT VIA: EMAIL Mr. Jason Benson Senior Engineer Public Works 300 Seminary Avenue Ukiah, CA 95482 SUBJECT: Proposal for Solids Improvements – SAF Thickening and Screw Press Installation Dear Mr. Benson: West Yost is pleased to submit this proposal for providing professional engineering services to support the City of Ukiah (City) with their Suspended Air Flotation (SAF) Thickening System Project and Screw Press Dewatering System Project (Project). The City is in the process of purchasing the SAF system from Heron Innovators and purchasing the Screw Press System from FKC. Delivery of those systems is expected by the end of the 2022. This proposal is based on using the shop drawings provided by the equipment manufacturers, our knowledge of the project and the plant, reusing existing drawings where available, and our recent discussions with you to develop Construction Documents for the Project. SCOPE OF SERVICES West Yost proposes to execute the Project under the following tasks: Task 1. Review Existing Background Information and Manufacturer Provided Equipment Submittals Task 2 and 3. Detailed Design (SAF and Dewatering) Task 4 and 5. Bid Period Assistance (SAF and Dewatering) Task 6 and 7. Engineering Service during Construction (SAF and Dewatering) Task 8. Project Management and QA/QC The scope of work included in this proposal assumes there will be two separate bid packages and construction periods. The scope of work can be simplified and the fee reduced if the SAF and Dewatering unit were bid and constructed as one package. Task 1. Review Existing Background Information and Manufacturer Provided Equipment Submittals The purpose of this task is to review existing materials (site and building layouts) related to the solids thickening and dewatering areas and review the manufacturer equipment submittals. EXHIBIT 1 Jason Benson May 8, 2022 Page 2 Task 1 Assumptions Equipment manufacturers will provide shop drawings to be used for design of the SAF solids thickening and the screw press solids dewatering systems. The City will provide hydraulic and solids loading design criteria. West Yost will check the calculations used to develop the design criteria. Task 1 Deliverables No deliverables are associated with this task. Task 2. Detailed Design (SAF) and Task 3. Detailed Design (Dewatering) The detailed design will consist of three submittals: 60 percent design, 90 percent design, and Final Contract Documents for bidding. The documents will be divided into two bid packages. The drawings that will be provided in the two bid packages are indicated in Table 1. A total of 62 drawings will be provided between the two bid packages. Table 1. Drawing List No. Drawing Title Use Existing Drawing 60 Percent 90 Percent Final SAF Package Dewatering Package General and Civil Drawings 1 Title Sheet X X X X 2 Drawing List and Design Criteria X X X X 3 Abbreviations and Symbols X X X X 4 Equipment Naming, Pipe Designation System X X X X 5 Site Plan X X X X X 6 Paving and Grading Plan – DAFT Area X X X X Demolition Drawings 7 Demolition 1 – DAFT Plan X X X X 8 Demolition 2 – DAFT Sections X X X X 9 Demolition 3 – Belt Filter Press Plan X X X X 10 Demolition 4 – Belt Filter Press Sections X X X X Structural Drawings 11 General Notes X X X X 12 General Notes, Legend and Abbreviations X X X X 13 General Notes and Special Inspections X X X X 14 Structural Details – Concrete I X X X 15 Structural Details – Miscellaneous I X X X X 16 Miscellaneous Concrete Slabs for Supports X X X X Jason Benson May 8, 2022 Page 3 Table 1. Drawing List No. Drawing Title Use Existing Drawing 60 Percent 90 Percent Final SAF Package Dewatering Package 17 SAF – Plans and Sections X X X 18 SAF – Section and Details X X 19 Dewatering – Foundation Plan and Sections X X X Mechanical Drawings 20 Mechanical Standard Details 1 X X X X 21 Mechanical Standard Details 2 X X X X 22 SAF Equipment Plan X X X X 23 SAF Equipment Sections X X X 24 SAF Equipment Details 1 X X X 25 Dewatering Temporary Unit Plan X X X 26 Dewatering Plan X X X X 27 Dewatering Sections 1 X X X 28 Dewatering Sections 2 and Details X X Electrical Drawings 29 General Notes, Symbols and Abbreviations X X X X 30 DAFT Demolition Plan X X X X 31 SAF One-line Diagram X X X X 32 SAF Building New Power Plan X X X X 33 Dewatering Building Demolition Plan X X X X 34 Dewatering Building One-line Diagram X X X X 35 Dewatering Power Plan X X X X 36 Control Diagrams 1 X X X X 37 Control Diagrams 2 X X X X P&IDs 38 Process Symbols X X X X 39 Instrumentation Symbols & Naming Systems X X X X 40 SAF Generator System X X X 41 SAF Chemical Systems X X X 42 Dewatering System X X X 43 Dewatering Feed Pump Modifications X 44 Dewatering Pump Modification X In addition to the drawing listed in Table 1, the following will also be prepared under Task 2/3: Jason Benson May 8, 2022 Page 4 Specifications including Division 00 and approximately 40 technical specifications (Division 01 through 17) will be provided. The 60 percent submittal will include a draft of major equipment specifications. The 90 percent and final submittals will include a draft of all specifications. The 90 percent submittal will contain an opinion of probable construction cost (OPCC). The OPCC will be in accordance with the Association for the Advancement of Cost Engineers (AACE International). Each submittal will contain a construction sequencing plan. A review workshop will be held after the 60 percent submittal. West Yost will conduct the presentation and develop summary notes. Task 2 and 3 Assumptions Existing pdf files will be used as background for drawings where possible. No surveying or geotechnical is required. Front-end contract documents will be developed by West Yost using EJCDC specifications, West Yost documents, or the City standard documents. Hazardous materials such as asbestos, lead, PCBs, etc. are not present. Scanned images of existing drawings will be used when available including for demolition and equipment installation A temporary dewatering unit will be provided by the contractor. A performance specification will be written. Existing thickened sludge pumps and dewatering sludge pumps will be reused. New SAF system including coagulation and acid/caustic chemical systems will be located in shipping containers. Electrical power for the SAF system will be from the DAFT Equipment Building and electrical power for the dewatering system will be from the existing Sludge Dewatering Facility Building. The SAF and Dewatering systems will be package systems controlled by a PLC provided by the equipment manufacturer. Signals back to the Plant’s SCADA system will be limited and only include alarms and necessary monitoring information. The Contractor or equipment supplier will hire a SCADA and I&C integrator to complete the programming outside the manufacturer supplied PLC. Pipe supports will be designed by the Contractor. The City will be responsible for administrating and issuing bid documents to prospective bidders. Task 2 and 3 Deliverables Design submittals for City review at the 60 and 90 percent design level. Review workshop agenda, presentation materials, and summary notes Sealed and signed bid documents Jason Benson May 8, 2022 Page 5 Task 4. Bid Period Assistance (SAF) and Task 5. Bid Period Assistance Dewatering) West Yost will provide support to the City during bidding under this task. West Yost will specifically perform the following services: Pre-Bid Meetings: West Yost will conduct a pre-bid meeting for each project. West Yost will prepare the meeting agenda, presentation materials, meeting minutes, and attendee list for each meeting. The meeting summary and attendee list will be included in the first addenda. Respond to Bidder Questions: West Yost will prepare responses to bidder questions during the bid period for each project. Prepare addenda: West Yost will prepare revised drawings, specifications, and issue addenda, as needed, during the bid period. West Yost has assumed that up to two (2) addenda will need to be prepared for this subtask Review Bids and Recommend Award: West Yost will review bids for compliance with specifications, totals of itemized costs, balance of bids, bid exceptions, and proposed alternates. West Yost will also provide a recommendation on award. Task 4 and 5 Assumptions The City will be responsible for maintaining a list of bidders and distributing addenda and information to the list of bidders. Conformed documents are not included. Task 4 and 5 Deliverables Pre-bid meeting agenda, presentation and meeting summary Addenda West Yost will provide email or phone call feedback regarding evaluated bids. Task 6. Engineering Services during Construction (SAF) and Task 7. Engineering Services during Construction (Dewatering) West Yost will provide engineering services during construction under this task. This task assumes that the solids treatment improvements will be constructed as two separate projects with two separate bid documents. This task includes the following services: Submittals West Yost will review Contractor submittals (e.g. shop drawings, product data, samples, operations and maintenance (O&M) manuals, etc.) for conformance with the design concepts and general compliance with the Contract Documents and provide review comments on a West Yost standard submittal review Jason Benson May 8, 2022 Page 6 form. Construction related submittals such as work plans, safety plans, stormwater pollution control plans, etc. will also be reviewed by West Yost. West Yost will also maintain a log listing each submittal and its status. The budget assumes the West Yost team will provide responses to up to 40 submittals and re- submittals. Twenty submittals are assumed for the SAF unit and 20 submittals are assumed for the dewatering unit. The budget assumes approximately five hours per submittal review. The budget also assumes that the submittal review process will be conducted in PDF format. RFIs The West Yost team will review requests for information (RFIs) submitted by the Contractor and will provide responses to each RFI on a West Yost standard response form. If the response appears to have changed the contract scope, quality, or time, a potential change order (PCO) number will be assigned and used to track its resolution to closeout. West Yost will maintain a log listing each RFI and its status. A total of 20 RFIs at approximately three hours per RFI has been budgeted. Ten RFIs are assumed for the SAF unit and ten RFIs are assumed for the Dewatering unit. Meetings West Yost will conduct a pre-construction meeting for the SAF and Dewatering projects. West Yost will prepare an agenda, meeting materials, and meeting summary for each pre-construction meeting. West Yost will prepare agendas and conduct bi-weekly virtually progress meetings with the general contractor, City staff, and other members of the project team to review overall progress, coordination, and communication related to safety, submittals, RFIs, changes, progress payments, coordination with plant operations, progress schedules, and quality. If other special meetings are necessary, West Yost will conduct the meetings and collect summaries of the discussions that occurred at the meetings. Open items will be tracked to completion. A total of 24 bi-weekly meetings at two hours per meeting has been budgeted. Twelve bi-weekly meetings are assumed for the SAF unit and twelve bi-weekly meetings are assumed for the Dewatering unit. Site Visits West Yost will complete six eight-hour site visits. Three site visits are assumed the SAF unit and three are assumed for the dewatering unit. Site visit reports will be developed that include a summary of the weather and conditions of the site, the type and quantity of equipment and manpower on-site, and a general description of the work performed. Photos of the work will be included with the report. Weekly Reporting Review and Final Report Review West Yost will review the weekly and final reports prepared by the general contractor. Comments and/or questions will be addressed to the general contractor. Punch List and Final Inspection West Yost will arrange a final inspection for each project once the general contractor requests Substantial Completion. The inspection will create a final punch list of work items remaining to be completed. The punch list will be transmitted to the general contractor with the decision on the Jason Benson May 8, 2022 Page 7 substantial completion request. The remainder of the contract will be to confirm that the items on the punch list have been addressed and any other remaining deliverables are received. Task 6 and 7 Assumptions The construction schedule is assumed to be 24 weeks for each project. Submittal review comments and RFI responses will be provided on standard West Yost forms Site visits will be 8 hours each and includes travel time. Record drawings are not included. Task 6 and 7 Deliverables West Yost will provide the following: Preconstruction agenda, presentation and summary notes Submittal Log and Formal submittal responses (email) RFI Log and Formal RFI responses (email) Progress meeting and site visit notes (email) Final punch list Task 8. Project Management and QA/QC This task includes overall project management of scope, schedule, and budget; regular communication with City; coordination with subconsultants; quality assurance/quality control (QA/QC); and preparation of monthly progress reports and invoices. Task 8 Deliverables West Yost will prepare monthly invoices and descriptions of services performed in electronic PDF) format. PROJECT BUDGET West Yost’s proposed level of effort and budget for each of the tasks described above is shown in Table 2. West Yost will perform the Scope of Services described above on a time-and-expenses basis, at the billing rates set forth in West Yost’s attached 2021 Billing Rate Schedule, with a not-to-exceed budget of $522,078. Any additional services not included in this Scope of Services will be performed only after receiving written authorization and a corresponding budget augmentation. Efforts are limited to the hours and budget defined in the Project Budget section of this proposal. Hours and budgets may be moved between tasks depending on the progression of work. Jason Benson May 8, 2022 Page 8 Table 2. Estimated Project Hours and Budget Task West Yost Services Subconsultant Services Total Estimated Budget Level of Effort, hours Estimated Budget Task 1. Review Existing Background Information and Manufacturer Provided Equipment Submittals 42 $10,754 $2,200 $12,954 Task 2. Detailed Design (SAF) 564 $119,370 $23,540 $142,910 Task 3. Detailed Design (Dewatering) 634 $135,944 $23,540 $159,484 Task 4. Bid Period Assistance (SAF) 36 $9,932 $1,760 $11,692 Task 5. Bid Period Assistance Dewatering) 36 $9,932 $1,760 $11,692 Task 6. Engineering Services during Construction (SAF) 199 $50,404 $18,150 $68,554 Task 7. Engineering Services during Construction (Dewatering) 199 $50,404 $18,150 $68,554 Task 8. Project Management and QA/QC 150 $46,238 $46,238 Total Project Hours and Budget 1,860 $432,978 $89,100 $522,078 SCHEDULE West Yost estimates the following durations for completing the tasks described in the Scope of Services. The task durations defined below may change depending on City timing and availability and the ability to obtain information. Table 3. Proposed Schedule Task Anticipated Schedule Design 20 weeks Bid Period 8 weeks Construction 24 weeks (each project) Jason Benson May 8, 2022 Page 9 Thank you for providing West Yost the opportunity to be of service to the City of Ukiah. We look forward to working with you on this important project. Please call if you have any questions or require additional information. Sincerely, WEST YOST Timothy R. Banyai, PE Managing Engineer RCE #60715 Attachments: A. West Yost 2022 Billing Rate Schedule B. Fee Worksheet West Yost 2021 Billing Rate Schedule Attachment A Effective January 1, 2022 through December 31, 2022)* POSITIONS ENGINEERING Principal/Vice President $318 Engineer/Scientist/Geologist Manager I / II $301 /$315 Principal Engineer/Scientist/Geologist I / II $272 /$289 Senior Engineer/Scientist/Geologist I / II $244 /$256 Associate Engineer/Scientist/Geologist I / II $209 /$224 Engineer/Scientist/Geologist I / II $168 /$195 Engineering Aide $98 Field Monitoring Services $90 Administrative I / II / III / IV $86 /$109 /$130 /$144 ENGINEERING TECHNOLOGY Engineering Tech Manager I / II $313 /$315 Principal Tech Specialist I / II $287 /$297 Senior Tech Specialist I / II $263 /$275 Senior GIS Analyst $238 GIS Analyst $225 Technical Specialist I / II / III / IV $168 /$191 /$215 /$240 Technical Analyst I / II $120 /$144 Technical Analyst Intern $97 Cross-Connection Control Specialist I / II / III / IV $125 /$136 /$152 /$170 CAD Manager $189 CAD Designer I / II $147 /$166 CONSTRUCTION MANAGEMENT Senior Construction Manager $304 Construction Manager I / II / III / IV $185 /$199 /$211 /$267 Resident Inspector (Prevailing Wage Groups 4 / 3 / 2 / 1)$162 /$180 /$201 /$209 Apprentice Inspector $147 CM Administrative I / II $79 /$106 Field Services $209 2022 Billing Rate Schedule LABOR CHARGES DOLLARS PER HOUR) Hourly rates include Technology and Communication charges such as general and CAD computer, software, telephone, routine in-house copies/prints, postage, miscellaneous supplies, and other incidental project expenses. Outside Services such as vendor reproductions, prints, shipping, and major West Yost reproduction efforts, as well as Engineering Supplies, etc. will be billed at actual cost plus 15%. The Federal Mileage Rate will be used for mileage charges and will be based on the Federal Mileage Rate applicable to when the mileage costs were incurred. Travel other than mileage will be billed at cost. Subconsultants will be billed at actual cost plus 10%. Expert witness, research, technical review, analysis, preparation and meetings billed at 150% of standard hourly rates. Expert witness testimony and depositions billed at 200% of standard hourly rates. A Finance Charge of 1.5% per month (an Annual Rate of 18%) on the unpaid balance will be added to invoice amounts if not paid within 45 days from the date of the invoice. This schedule is updated annually Page 1 of 2 Effective January 1, 2022 through December 31, 2022)* Equipment Charges EQUIPMENT 2" Purge Pump & Control Box $270 /day Aquacalc / Pygmy or AA Flow Meter $28 /day Emergency SCADA System $35 /day Gas Detector $80 /day Generator $39 /day Hydrant Pressure Gauge $10 /day Hydrant Pressure Recorder, Impulse (Transient)$55 /day Hydrant Pressure Recorder, Standard $40 /day Low Flow Pump Controller $75 /day Powers Water Level Meter $32 /day Precision Water Level Meter $19 /day Stainless Steel Wire per foot $0.03 /day Storage Tank $15 /day Sump Pump $24 /day Transducer Components (per installation)$23 /day Trimble GPS – Geo 7x $220 /day Tube Length Counter $22 /day Turbidity Meter $22 /day Vehicle $10 /day Water Flow Probe Meter $20 /day Water Quality Meter $27 /day Water Quality Multimeter $185 /day Well Sounder $30 /day BILLING RATES 2022 Billing Rate Schedule This schedule is updated annually Page 2 of 2 Engineering and CM Fee Worksheet Attachment B Costs West Yost Associates P/VP EM/SM/GM I AE/AS/AG I EM/SM/GM I PE/PS/PG II TS III CAD II ADM III P/VP Hours Fee TJCAA Sub.Other Total 318 $301 $209 $301 $289 $215 $166 $130 $318 w/ markup Direct Costs PROJECT: Solids Treatment Improvements Banyai PE Electrical I&C Elect/I&C CAD Mech CAD WP QC/QA 10% Task 1 Review Background Data 1.01 Review Existing Information 2 6 4 4 4 20 5,076$ 1,000$ 1,100$ 6,176$ 1.02 Review Manufacturer's Shop Drawings 4 6 4 4 4 22 5,678$ 1,000$ 1,100$ 6,778$ Subtotal, Task 1 (hours)0 6 12 8 8 8 0 0 0 42 Subtotal, Task 1 ($) 1,806$ 2,508$ 2,408$ 2,312$ 1,720$ 10,754$ 2,000$ 2,200$ 12,954$ Task 2 Detailed Design (SAF) 2.01 60 Percent Design 8 52 8 4 80 60 20 232 46,600$ 9,000$ 9,900$ 400$ 56,900$ 2.02 60 Percent Design Workshop 8 8 4 4 4 28 6,960$ 150$ 7,110$ 2.03 90 Percent Design 12 36 24 12 100 40 20 244 52,568$ 10,000$ 11,000$ 63,568$ 2.04 Final Design 8 12 4 4 8 16 8 60 12,692$ 2,400$ 2,640$ 15,332$ Subtotal, Task 2 (hours)0 36 108 40 24 188 116 52 0 564 Subtotal, Task 2 ($) 10,836$ 22,572$ 12,040$ 6,936$ 40,420$ 19,256$ 6,760$ 118,820$ 21,400$ 23,540$ 550$ 142,910$ Task 3 Detailed Design (Dewatering) 3.01 60 Percent Design 8 48 12 6 100 60 20 254 51,846$ 9,000$ 9,900$ 400$ 62,146$ 3.02 60 Percent Design Workshop 8 8 4 4 4 28 6,960$ 150$ 7,110$ 3.03 90 Percent Design 12 32 32 16 140 40 20 292 63,896$ 10,000$ 11,000$ 74,896$ 3.04 Final Design 8 12 4 4 8 16 8 60 12,692$ 2,400$ 2,640$ 15,332$ Subtotal, Task 3 (hours)0 36 100 52 30 248 116 52 0 634 Subtotal, Task 3 ($) 10,836$ 20,900$ 15,652$ 8,670$ 53,320$ 19,256$ 6,760$ 135,394$ 21,400$ 23,540$ 550$ 159,484$ Task 4 Bid Period Assistance (SAF) 4.01 Conduct Pre-bid Meeting 6 6 1,806$ 150$ 1,956$ 4.02 Respond to Contractor Questions 2 4 2 2 10 2,618$ 2,618$ 4.03 Develop Addenda 4 4 4 2 2 16 4,154$ 1,600$ 1,760$ 5,914$ 4.04 Review Bids 4 4 1,204$ 1,204$ Subtotal, Task 4 (hours)0 16 8 6 4 0 2 0 0 36 Subtotal, Task 4 ($) 4,816$ 1,672$ 1,806$ 1,156$ 332$ 9,782$ 1,600$ 1,760$ 150$ 11,692$ Task 5 Bid Period Assistance (Dewatering) 5.01 Conduct Pre-bid Meeting 6 6 1,806$ 150$ 1,956$ 5.02 Respond to Contractor Questions 2 4 2 2 10 2,618$ 2,618$ 5.03 Develop Addenda 4 4 4 2 2 16 4,154$ 1,600$ 1,760$ 5,914$ 5.04 Review Bids 4 4 1,204$ 1,204$ Subtotal, Task 5 (hours)0 16 8 6 4 0 2 0 0 36 Subtotal, Task 5 ($) 4,816$ 1,672$ 1,806$ 1,156$ 332$ 9,782$ 1,600$ 1,760$ 150$ 11,692$ Labor Costs West Yost Associates P/VP EM/SM/GM I AE/AS/AG I EM/SM/GM I PE/PS/PG II TS III CAD II ADM III P/VP Hours Fee TJCAA Sub.Other Total 318 $301 $209 $301 $289 $215 $166 $130 $318 w/ markup Direct Costs PROJECT: Solids Treatment Improvements Banyai PE Electrical I&C Elect/I&C CAD Mech CAD WP QC/QA 10% Labor Task 6 Engineering Services during Construction SAF) 6.01 Review Submittals 12 50 8 5 75 17,120$ 9,000$ 9,900$ 27,020$ 6.02 Respond to RFIs 6 20 4 30 7,190$ 4,500$ 4,950$ 12,140$ 6.03 Meetings 32 32 9,632$ 100$ 9,732$ 6.04 Site Visits 8 8 16 4,080$ 3,000$ 3,300$ 300$ 7,680$ 6.05 Review of Weekly Reports 12 12 24 6,120$ 6,120$ 6.06 Final Punch List 8 8 4 2 22 5,862$ 5,862$ Subtotal, Task 6 (hours)0 78 98 16 2 0 0 5 0 199 Subtotal, Task 6 ($) 23,478$ 20,482$ 4,816$ 578$ 650$ 50,004$ 16,500$ 18,150$ 400$ 68,554$ Task 7 Engineering Service during Construction Dewatering) 7.01 Review Submittals 12 50 8 5 75 17,120$ 9,000$ 9,900$ 27,020$ 7.02 Respond to RFIs 6 20 4 30 7,190$ 4,500$ 4,950$ 12,140$ 7.03 Meetings 32 32 9,632$ 100$ 9,732$ 7.04 Site Visits 8 8 16 4,080$ 3,000$ 3,300$ 300$ 7,680$ 7.05 Review Weekly Reports 12 12 24 6,120$ 6,120$ 7.06 Final Punchlist 8 8 4 2 22 5,862$ 5,862$ Subtotal, Task 7 (hours)0 78 98 16 2 0 0 5 0 199 Subtotal, Task 7 ($) 23,478$ 20,482$ 4,816$ 578$ 650$ 50,004$ 16,500$ 18,150$ 400$ 68,554$ Task 8 Project Management 8.01 Project Coordination 16 80 96 29,168$ 29,168$ 8.02 QA/QC 6 48 54 17,070$ 17,070$ Subtotal, Task 8 (hours)16 86 0 0 0 0 0 0 48 150 Subtotal, Task 8 ($)5,088$ 25,886$ 15,264$ 46,238$ 46,238$ TOTAL (hours)16 352 432 144 74 444 236 114 48 1,860 TOTAL ($)5,088$ 105,952$ 90,288$ 43,344$ 21,386$ 95,460$ 39,176$ 14,820$ 15,264$ 430,778$ 81,000$ 89,100$ 2,200$ 522,078$