Loading...
HomeMy WebLinkAboutCoastland Civil Engineering 2020-03-05; Amendment 1 2020-08-19Amendment No. 1 to Agreement for Professional Consulting Services COU NO. 1920-231-A1 CITY OF UKIAH AMENDMENT NO. 1 TO AGREEMENT FOR PROFESSIONAL CONSULTING SERVICES DATED MARCH 5, 2020 TERMS AND CONDITIONS All terms and conditions of the Agreement for Professional Consulting Services dated March 5, 2020 shall remain in force and effect except as modified by this first amendment. AUTHORIZATION Upon execution of this amendment, service provider is authorized to provide the service described under the Scope of Additional Work identified in this Amendment No. 1. SCOPE OF ADDITIONAL WORK Work authorized by this amendment shall include that work described in the letter for Additional Engineering Services dated July 23, 2020. A copy of said letter is included in this first amendment as Attachment A. COMPENSATION Compensation for the performance of the additional work shall be made on a time and expense basis at Consultant’s customary fees. Expenses shall not exceed a maximum total cost of $4,615 for a total contract amount of $29,855. COASTLAND CIVIL ENGINEERING, INC. CITY OF UKIAH BY: BY: _________________ ___ SAGE SANGIACOMO CITY MANAGER PRINT NAME: ________________ DATE: ______________________ DATE: _________________ Heidi E. Utterback 08/06/20 08-19-2020 Santa Rosa Auburn Pleasant Hill Fairfield 1400 Neotomas Avenue 11641 Blocker Drive, Ste. 170 3478 Buskirk Avenue, Ste. 1000 324 Campus Lane, Ste. A Santa Rosa, CA 95405 Auburn, CA 95603 Pleasant Hill, CA 94523 Fairfield, CA 94534 Tel: 707.571.8005 Tel: 530.888.9929 Tel: 925.233.5333 Tel: 707.702.1961 www.coastlandcivil.com July 23, 2020 Mr. Tim Erickson Director of Public Works/City Engineer City of Ukiah 300 Seminary Avenue Ukiah, CA 95482 Subject: Proposal for Professional Engineering Services Relating to the Clara Avenue Phase 2 Improvement Project Amendment No. 1 Proposal – Additional Engineering Services Dear Tim, We are pleased to provide you with this amendment proposal for the additional engineering design services for the Clara Ave Phase 2 Project relating to the water main replacement. Project Background During the design process of this project we brought to the City’s attention that there was a section of 40+ year old 6” ACP water main within the paving reconstruction limits that they should consider replacing with new PVC pipe. This ACP section of water main is approximately 690 feet in length (1978 vintage) that goes from 160’ west of the Sidnie intersection to N. Orchard. All of the other water main within the paving reconstruction limits was replaced with new 6” PVC pipe in 2010 with phase 1 of the Clara Avenue improvements. Due to the age of the existing ACP water main and to prevent the need to do future trenching in the newly placed pavement, the City elected to have this water main replacement added to the project. As these improvements for the water main were not part of the original scope of work, we are asking for an amendment to cover the additional design efforts required to incorporate the water main improvements into the final bid documents. Additional design efforts include plan and profile plans, construction notes, research/coordination with City on the waterline background information and miscellaneous construction details. Other additional efforts include preparation of the water facility specifications and an engineer’s estimate of construction cost. Based on the above understanding of the additional required services, we have prepared the following scope of work and estimated fee for your consideration. For clarity, the tasks below follow the original scope of work. "55"$).&/5" SCOPE OF SERVICES Task 1 – Meetings with City Staff No additional work under this task. Task 2 – Background Information Coastland will assemble all of the available City information pertaining to the existing water main including as-built drawings, GIS files and any additional pertinent information. Task 3 – Topographic Survey No additional work under this task. Task 4 – 100% Submittal Preparation of water main plan and profiles plans, construction notes and miscellaneous details. Preparation of technical specifications for water main and associated appurtenances and an engineer’s estimate of construction cost. Task 5 – Bid Support No additional work under this task. ESTIMATED COSTS Based on our scope of work, we are proposing that the services associated with additional design efforts be completed for a not-to-exceed amount of $4,615. The amount quoted is assuming that all of the work for this project will fall under the scope of work as previously described. If additional work is necessary that falls outside of this scope of work, we can either re-negotiate a new scope of work or provide these services on a time and materials basis per our adopted schedule of hourly rates. Please let me know if you have any questions. Sincerely, COASTLAND Heidi Utterback, PE Principal / Engineering Design Manager Attachment: Work Estimate