AMENDMENT NO. 2
TO AGREEMENT FOR PROFESSIONAL CONSULTING SERVICES
DATED MARCH 21, 2018
TERMS AND CONDITIONS
All terms and conditions of the Agreement for Professional Consulting Services dated
March 21, 2018 shall remain in force and effect except as modified by this first
amendment.
AUTHORIZATION
Upon execution of this amendment, service provider is authorized to provide the service
described under the Scope of Additional Work identified in this Amendment No. 2.
SCOPE OF ADDITIONAL WORK
Work authorized by this amendment shall include that work described in the
October 29, 2020 letter proposal. A copy of said letter is included in this second
amendment as Attachment 1.
COMPENSATION
Compensation for the performance of the additional work shall be made on a time and
expense basis at Consultant's customary fees. Expenses shall not exceed a maximum
total cost of$17,073 for a total contract amount of$36,265.93
RAU AND ASSOCIATES, INC. CITY OF UKIAH
BY: BY:
GEORGE KAU, P.E. SAGE SANGIACOMO
CITY MANAGER
/,�Z - i? — a9 o Jan 6, 2021
DATE DATE
Amendment No.2 to Agreement for
Professional Consulting Services
Attachment 1
AND ASSOCIATES INC.
CIVIL ENGINEERS•LAND SURVEYORS
October 29, 2020
Mr. Tim Eriksen, City Engineer
Mr. Jarod Thiele, Public Works Management Analyst
300 Seminary Avenue
Ukiah, CA 95482
Job Number 20001
RE: PROVIDE MONUMENTS AT CITY BOUNDARY WITH.NORGARD LANE AND ADJOINING
PARCELS; PREPARE AND FILE RECORD OF SURVEY MAP
Gentlemen:
This is a proposal to provide surveying services in connection with land acquired by the City of Ukiah
along the south side of Norgard Lane.
STATEMENT OF PROJECT CONDITIONS AND REQUIREMENTS
In 2018, Rau and Associates, Inc. (RAU) was authorized to provide some professional surveying services
related to the establishment of a property line between the City Water Treatment Plant Facilities at Plant
Road and the property owned by Norgard Properties, Inc. Some properties were to be retained by Norgard
Properties, Inc. from a sale of a major portion of the Norgard Property south of Norgard Lane to the City of
Ukiah. A short summary of the tasks to be performed included research existing deeds along Norgard Lane
to establish property lines of the various owners adjoining property purchased by the City, survey the
location of two parcels to be retained by Norgard Properties as marked in the field, prepare legal
descriptions for two parcels, set monuments at various property corners for two parcels, and prepare a
Record of Survey of two parcels.
As work progressed, it became evident that there are actually three parcels which Norgard Properties
wanted to retain and that part of one of them has an overlapping land owner by occupation/encroachment.
The deeds were vague and in the form of a chain of title beginning back in the 1940's. The plot of APN 184-
080-11, owned by a third party, on the Assessor's Map does not coincide with the lines of occupation on
the ground, which reportedly have existed for approximately 40 years. The difference in location on the
Assessor's Map and the lines of occupation on the ground is approximately 55 to 60 feet. Consequently
there was considerably more work to locate existing property lines and then develop the legal description
of three parcels. Exhibit"B" from Instrument Number 2019-05505 where Norgard Properties, Inc. granted
land to the City of Ukiah is attached for reference. It shows the overlap of the location of APN 184-080-11
as plotted by the Assessor on Parcel 1 vs the land fenced on the ground.
Because of the complexities that were not anticipated in the original agreement, and the time schedule for
close of escrow, the work in 2019 was expedited and legal descriptions were written to exclude the land
(wherever it may be) in APN 184-080-11 from the lands of Norgard and the City. The research of the string
of deeds to establish senior and junior rights was not completed and the parcels were not monumented. A
Record of Survey was not prepared and recorded.
Subsequently, as the purchase progressed, it was determined by Norgard Properties, Inc. that they did not
want to retain the third parcel on the eastern end of Norgard Lane (Parcel 2 on Exhibit"B") and that parcel
was deeded to the City.
100 NORTH PINE STREET • UKIAH,CALIFORNIA 95482 • 707-462-6536 FAX 707-463-2729
www.rauandassoc.com
Mr.Tim Ericksen,Mr.Jarod Thiele, Client Name,October 29,
2020
Page 2
Since the City acquired the property, there has been a fire and some major disturbance to the area adjacent
to Norgard Lane and the properties in question. There were only two remaining monuments found along
Norgard Lane in 2019 which establishes its location. With the added confusion caused by the overlap of
deeds between APN 184-080-11 and adjoining property owned by Norgard Properties, Inc. and by the City
of Ukiah, there remains unanswered questions and ambiguities about the location of various boundaries.
It is prudent on behalf of the City to have the survey completed and the property corners monumented, then
have a Record of Survey filed to perpetuate the evidence found and to document the lines of occupation.
Once this is done, there may be additional work required to clear title to the various parcels involved. This
proposal does not include that type of work, but does have an allowance for allowing the Title Company to
review the draft map and for us to attempt to answer questions which they may have.
This proposal includes tasks to review deeds and other evidence, to re-establish/confirm survey control
points in the area, to confirm fence locations, to set monuments and to prepare and file a Record of Survey.
TASKS INCLUDED IN THIS PROPOSAL
• Research and Documentation for Record of Survey Map $ 3,220.00
• Preliminary Field Surveys $2,660.00
• Office Compilation of Evidence and Mapping Resolution $2,100.00
• Set Property Corner Monuments at 9 locations $ 2,380.00
• Prepare Record of Survey for review by County Surveyor's Office
• Corrections/Additions and Final Map for Filing $ 5,525.00
Total Labor Costs 0
$16,345.345.00
Munselle Civil Engineering (MCE) will be a subconsultant to Rau and Associates, Inc. in completing this
work. MCE will provide the field survey crew and CAD drafting required. The estimated cost of their services
is $8,820.00 and is included in the total labor costs.
George Rau will be the Professional of Record to review all supporting documents and to sign and seal the
Record of Survey Map.
In addition, there will be some reimbursable costs and expenses, estimated as follows:
Property Corner Monuments and steel fence post markers $ 60
Record of Survey Map Check Fee-County Surveyor's Office $584
Recorder's Fee
Total Estimated Reimburseable Costs 84
$728
Total Estimated Cost for this Agreement $17,073
SCHEDULE OF WORK
Research of existing conditions and documentation for Record of Survey will be initiated within 5 working
days of receipt of a Notice to Proceed with the work. Preliminary Field Survey will be done within three
weeks of receipt of a Notice to Proceed. Compilation of records and analysis of the boundaries is
anticipated to take three weeks after preliminary field work is complete. After resolution of the boundaries,
monuments will be set in the field and a Draft Record of Survey will be prepared in approximately 3 weeks.
The map will be submitted to the County Surveyor's Office and to Redwood Empire Title Company for
review and comment. That process is anticipated to take two to three weeks. Corrections and additions
will be made to the draft Record of Survey within two weeks of receiving the comments. The map will be
signed and submitted to the County Surveyor's Office for recording. The whole process is anticipated to
take about 14 weeks, when the map will be submitted to the County Recorder for recording by the County
Surveyor's Office. The County Recorder has two weeks by law to review and record the map.
Mr.Tim Ericksen,Mr.Jarod Thiele,Client Name, October 29,
2020
Page 3
DELIVERABLES
• 9 PROPERTY CORNERS—MONUMENTED WITH INCH IRON PIPES OR NAILS AND BRASS
TAGS IN EXISTING FENCE CORNERS
• RECORD OF SURVEY MAP
Thank you for this opportunity to be of service.
IV
OFESS�Q
GE C
oD (SS �AG<"�` Very truly yours,
C 2 908 rn
EXp,09.30.XZ/
O —
tp clvl\. George C. Rau, P.E.
Registered Civil Engineer 21908
Enclosure: Exhibit B to Instrument No.2019-05505 Expires 9-30-2021