Loading...
HomeMy WebLinkAboutSHN Consulting Engineers & Geologists, Inc. 2021-07-21 NOT FULLY EXECUTEDCOU 1617-133-A3 CITY OF UKIAH AMENDMENT NO. 3 TO PROFESSIONAL CONSULTING SERVICES AGREEMENT BETWEEN SHN CONSULTING ENGINEERS & GEOLOGISTS, INC. and THE CITY OF UKIAH This Amendment No. 3, entered on July 21, 2021 revises the Agreement for Professional services dated October 31, 2016 between the City of Ukiah and SHN Consulting Engineers & Geologists, Inc. for professional consulting services relating to project design and construction management services for the City’s Pressure Zone 2 South Reservoir Rehabilitation/Replacement Project. This Amendment No. 3 adds a total of $49,200, as described in Exhibit A, B, and C. This revises the contract total, not-to-exceed amount to $165,352. Except as expressly amended by this Amendment, all other terms remain unchanged and in full force and effect. IN WITNESS WHEREOF, THE PARTIES HAVE EXECUTED THIS AMENDMENT ON THE EFFECTIVE DATE: CONSULTANT BY: DATE: THOMAS M. HERMAN, PRINCIPAL PRINT NAME: CITY OF UKIAH BY: DATE: SAGE SANGIACOMO, CITY MANAGER ATTEST BY: DATE: KRISTINE LAWLER, CITY CLERK Aug 19, 2021 Kristine Lawler (Aug 19, 2021 13:46 PDT) Kristine Lawler Aug 19, 2021 ProjectTitle:PZ2SWaterTankReplacementClient:SHNJobNumber:ProjectManager:ChangeNo.:CityofUkiah416086JasonIsland4ProjectrequirementsorconditionsencounteredindicatethattheScopeofServicesincludedinthisProjectmustberevised.CLIENTandSHNherebyagreethat theProjectScopeofServices,Schedule,and/orBudgetshallberevisedasdescribedbelow.ScopeofServicesChange:ProvideadditionaltopographicsurveytosupportthereplacementandrealignmentofadditionalwaterlinetothePZ2Swatertank,asagreeduponbytheContractorandCity.ImpactTo:Current Schedule:ScheduleChange:RevisedSchedule:Other:NIANIANIA(Wks)IndividualsEndorsingChange:JasonIslandSHNProject ManagerSamHeathSHNProjectQNQCAuthorizationtoProceedwithChange:SHNconsultingEngineers&Geologists,Inc.(signature)x(signature)xcityofUkiahProjectModificationAgreementInitialBudget:$84,472CurrentBudget:$116,152(ReflectingPriorChanges)Budget Change:$2,000(AdditionorReduction+/-)RevisedBudget:$118,152InitialSchedule:N!A(Wks)(ReflectingPriorChanges)(AdditionorReduction+/-Wks)Date:Date:EXHIBIT A Change No.:5 $84,472 $118,152 (Reflecting Prior Changes) $2,200 $120,352 N/A (Wks) N/A (Reflecting Prior Changes) N/A N/A (Wks) Other: Revised Schedule: (Addition or Reduction +/-)Budget Change: Revised Budget: Current Schedule: Current Budget: Initial Schedule: Revise the project geotechnical report to provide design recommendations for cast-in-drilled-hole (CIDH) piles, as agreed upon by the Contractor and City, and for use by the water tank foundation designer. Initial Budget: Impact To: Schedule Change: Individuals Endorsing Change: X (Addition or Reduction +/- Wks) XJason Island Date: SHN Consulting Engineers & Geologists, Inc.City of Ukiah Date: X Project Manager:Jason Island Scope of Services Change: Project requirements or conditions encountered indicate that the Scope of Services included in this Project must be revised. CLIENT and SHN hereby agree that the Project Scope of Services, Schedule, and/or Budget shall be revised as described below. Project Modification Agreement PZ2S Water Tank Replacement City of Ukiah 416086 Project Title: Client: SHN Job Number: Authorization to Proceed with Change: SHN Project QA/QC (signature) SHN Project Manager (signature) Sam Heath EXHIBIT B Change No.:6 $84,472 $120,352 (Reflecting Prior Changes) $45,000 $165,352 N/A (Wks) N/A (Reflecting Prior Changes) N/A N/A (Wks) Authorization to Proceed with Change: SHN Project QA/QC (signature) SHN Project Manager (signature) Sam Heath Project Modification Agreement PZ2S Water Tank Replacement City of Ukiah 416086 Project Title: Client: SHN Job Number: Project Manager:Jason Island Scope of Services Change: Project requirements or conditions encountered indicate that the Scope of Services included in this Project must be revised. CLIENT and SHN hereby agree that the Project Scope of Services, Schedule, and/or Budget shall be revised as described below. Date: SHN Consulting Engineers & Geologists, Inc.City of Ukiah Date: X XJason Island Schedule Change: Individuals Endorsing Change: X (Addition or Reduction +/- Wks) Provide construction management and materials testing services through project completion for the extended project schedule and increased project scope as described: Project was to be completed within 180 calendar days per agreement between City and Contractor dated July 6, 2020, however Change Order 1 extended the contract by 35 calendar days, Change Order 2 extended the contract by 40 working days, and Change Order 3 extended the contract by 45 working days. Additional services to be provided by SHN as a result of these changes include evaluation of top-fill tank design and related yard piping alterations, review of revised grading plan and storm drain improvements, review of additional 455' water line replacement and hydrant installation, as well as corresponding construction management, construction inspections, and materials testing. Initial Budget: Impact To: Other: Revised Schedule: (Addition or Reduction +/-)Budget Change: Revised Budget: Current Schedule: Current Budget: Initial Schedule: EXHIBIT C Herman, Thomas M - Pressure Zone 2 South 1617-133-A3 Final Audit Report 2021-08-19 Created:2021-08-12 By:Kristine Lawler (klawler@cityofukiah.com) Status:Signed Transaction ID:CBJCHBCAABAAGslRiQ_4dAU11_tiOLhvpV9-pcgRkG9J "Herman, Thomas M - Pressure Zone 2 South 1617-133-A3" His tory Document created by Kristine Lawler (klawler@cityofukiah.com) 2021-08-12 - 8:45:48 PM GMT- IP address: 12.12.163.2 Document emailed to Sage Sangiacomo (ssangiacomo@cityofukiah.com) for signature 2021-08-12 - 8:46:27 PM GMT Email viewed by Sage Sangiacomo (ssangiacomo@cityofukiah.com) 2021-08-12 - 8:47:17 PM GMT- IP address: 67.180.40.102 Document e-signed by Sage Sangiacomo (ssangiacomo@cityofukiah.com) Signature Date: 2021-08-19 - 8:44:46 PM GMT - Time Source: server- IP address: 12.12.163.2 Document emailed to Kristine Lawler (lyricalwhims@gmail.com) for signature 2021-08-19 - 8:44:48 PM GMT Email viewed by Kristine Lawler (lyricalwhims@gmail.com) 2021-08-19 - 8:46:41 PM GMT- IP address: 66.249.84.83 Document e-signed by Kristine Lawler (lyricalwhims@gmail.com) Signature Date: 2021-08-19 - 8:46:52 PM GMT - Time Source: server- IP address: 12.12.163.2 Agreement completed. 2021-08-19 - 8:46:52 PM GMT