HomeMy WebLinkAboutCarollo Engineers 2014-07-04; Amendment 6 2019-05-03 COU NO 1314-231-A6 CITY OF UKIAH AMENDMENT NO.6 TO AGREEMENT FOR PROFESSIONAL CONSULTING SERVICES DATED NOVEMBER 28, 2018 TERMS AND CONDITIONS All terms and conditions of the Agreement for Professional Consulting Services dated July 4, 2014 shall remain in force and bffect except as modified by this third amendment. AtIll"QRIZATTION Upon execution of this amendment,service provider is authorized to provide the service described under the Scope of Additional Work identified In this Amendment No. 6. SCOPE OF ADDITIONAL WORK Work authorized by this amendment shall include that work described In the following Subject Letter dated November 1, 2018: 1) Task 5-f=ield Investigation Services and Hydraulics A copy of said work is included In this Sixth Amendment and referred to as Attachment 1. COMPENSATION Compensation for the performance of the additional work shall be made on a time and expense basis at Consultant's customary fees as listed in Attachment 2. Expenses shall not exceed a maximum total cost of$379,634 for a revised total contract amount of$4,939,338 CAR O ENGINEERS CITY OF UKIAH ` LA , B ( g4rNp- Y:cy PR CIPAL SA-41IESAWGIACOMO CITY MANAGER R h�'1 �� la I RR�NG L at PRINT NAME DATE DATE Agenda Item No.: 12e MEETING DATE/TIME: 11/7/2018 PEAK ITEM NO: COU-513-2017 City of Ukiah AGENDA SUMMARY REPORT SUBJECT:Approval of Contract Amendments for Preliminary Design and Environmental Compliance for Phase 4 of the Recycled Water System and Corresponding Budget Amendment. DEPARTMENT: Water Resources PREPARED BY: Jarod Thiele ATTACHMENTS: Attachment 1- TSO Attachment 2- Phase 4 Scope Doc 2018-11-01 Attachment 3-SMB Environmental Addendum 3- Scope of Work Summary: Council will Consider Approval of Contract Amendments for Preliminary Design and Environmental Compliance for Phase 4 of the Recycled Water System and Corresponding Budget Amendment. Background: Since 2016, the City has been working with Larry Walker and Associates (LWA) for renewal of the NPDES Permit (Operation of the Wastewater Treatment Plant) and Enrollment in the State Water Resources Control Board (Operation of the Recycled Water System). The City has recently completed both of the permitting tasks. Previously, the City's Wastewater Treatment Plant (WWTP) was operating under a Cease and Desist Order (CDO). Under its new NPDES Permit the City is no longer operating under a CDO but instead a Time Schedule Order (TSO). In order to comply with the new permit, the TSO (Attachment 1) establishes a number of milestones for plant operations that must be met by specific dates. RECOMMENDED ACTION: Approval of Contract Amendments for Preliminary Design and Environmental Compliance for Phase 4 of the Recycled Water System and Corresponding Budget Amendment. BUDGET AMENDMENT REQUIRED:Yes CURRENT BUDGET AMOUNT: $0-83027330.80230 PROPOSED BUDGET AMOUNT: $2,642,484.75-83027330.80230 PC 15062 FINANCING SOURCE: Water Fund-82000000.30007 PREVIOUS CONTRACT/PURCHASE ORDER NO.: Carollo- 1314231;SMB- 1718183 COORDINATED WITH: Sean White, Director of Water Resources Approved, 1 S e Sa gi rno, City Manager Discussion:The TSO requires the City to construct and operate a Recycled Water System. The City has already complied with Task A on page 11 of the TSO by constructing Phases one through three. Task C of the TSO is a requirement to obtain funding for Phase Four of the Recycled Water System by March 1, 2021. The State's funding cycle for 2019 has already lapsed, and the funding cycle for 2020 closes December 31, 2018. Staff would like to prepare and submit funding applications by the end of the year. In order to have a complete and competitive application, the submittal will need to include preliminary design and final environmental compliance. Carollo Engineers has prepared a Scope of Work to prepare funding applications, the necessary preliminary design, final plans, specifications and Engineer's Estimate. (Attachment 2). SMB Environmental has prepared a Scope of Work(Attachment 3) to amend the existing environmental documentation to include new infrastructure not anticipated in the original CEQA document such as ponds at the golf course. The majority of these funds will only be spent if the City is awarded funding from the State. 2 Attachment 2 EXHIBIT A CITY OF UKIAH RECYCLED WATER PROJECT—PHASE 4 DESIGN, ESDC, and CM SCOPE OF WORK November 1, 2018 BACKGROUND The City of Ukiah (OWNER) has requested Carollo Engineers (ENGINEER) develop a design, ESDC, and CM scope and budget for Phase 4 of the Recycled Water Pipeline Project(Project) as defined in the Feasibility Study dated December 2012. The project will include approximately 19,000 linear feet of 8 to 16-inch recycled water pipeline (including crossings of US 101, the railroad, Gibson Creek, and Orr Creek), a recycled water storage tank (approximate size of 1 MG), and a recycled water pump station with capacity up to 4 MG/day. The scope will also include all field work, funding, permitting, and right-of-way acquisition work to support the design and construction of the project. In addition to the recycled water distribution facilities, the Project will include improvements at the plant to support operation of the recycled water system. These improvements will include the following: • Refurbish 4 existing package clarifier/filter AWT units: { Replace 4 existing analog pressure sensors used to initiate settled sludge blowdown cycle with 4 digital pressure switches Replace 8 existing analog pressure sensors used to initiate filter backwash cycle with 4 digital differential pressure switches Replace existing PLCs and program to incorporate new digital pressure and digital differential pressure switches • Replace existing chlorine residual analyzer 3 (at the backwash pumping station) and chlorine residual analyzer 4 (at the dechlorination structure)with probe-type analyzers • Replace one primary coagulant (ferric chloride)feed pump with smaller capacity pump to provide sufficient turndown for low-demand periods • Install motor-operated valve and valve vault on existing 24-inch FW/RW diversion line west of the dechlorination structure. • Add digester feed alkalinity storage and feed system to handle increased settled sludge/waste filter backwash ferric hydroxide sludge production Carollo will lead the engineering effort as a continuation of the Phase 1-3 Design and Construction services provided. SMB Environmental will continue to support the project, being contracted directly with the City. NHC will conduct the surge analysis, JDH will provide corrosion design services, and local consultants will provide surveying and geotechnical services totaling approximately 12% of the overall contract amount. Local sub consultants will provide the following services: • Crawford &Associates—Geotechnical Investigation, Corrosion Analysis. • Rau & Associates —Surveying, Existing Utility Investigation, Easement Acquisition Assistance. SCOPE OF WORK TASK 1 -PROJECT MANAGEMENT Task 1.1 - Project Administration Administer the project and subconsultants to maintain project schedule and budget. The project progress and budget status will be included in monthly progress reports that will be attached to billing invokes. Additionally, the monthly progress report will include a list of work completed for the time period and what is expected in the coming period. Task 1.2 - Meetings Coordinate the project tasks between the City, subconsultants, stakeholders (including Ag Bureau, Flood Control District, and the San District), and other agencies as required through project meetings. Prepare an agenda and meeting minutes for each of these meetings. Anticipated project meetings are identified below: • Project Kick-off Meeting (City offices) • Monthly Project Status Meetings (Conference call) (Assume 12 total) • Stakeholder Meeting (City offices) • PDR Review Meeting (City offices) • 90% Review Meeting (City offices) Task 1.3—Quality Control Quality control will be monitored throughout the entirety of the Project. We will review deliverables provided by subconsultants prior to forwarding to the City. Any document developed by Carollo will be peer reviewed internally prior to delivering to the City. Task 1A—Coordination with Golf Course Improvements Coordinate with the designer of the golf course facilities to confirm recycled water delivery needs, elevations, etc that will impact the recycled water system design. Task 1 Deliverables: • Monthly invoices • Monthly status reports • Meeting agendas and minutes TASK 2 -SRF FUNDING DOCUMENTATION ASSISTANCE &APPLICATION 2.1 - SRF Documentation & Support Carollo will support the City with funding applications for the CA SRF grant/loan program and the US Bureau of Reclamation (Reclamation). It is assumed that Carollo will be developing the SRF loan packages for General, Technical, and Financial (mainly City) and be delivering a complete package by December 31, 2018 in order for the City to be on the States fundable list for 2020. The environmental package will be developed by others. This task includes uploading the all four packages and reference documents to the State's electronic FAAST system. The Reclamation grants have an approximately 75 page application limit and are estimated to take approximately 140 hours to complete as they have to be developed from a 'project selling' angle. Task 2 Assumptions: • OWNER will provide required financial statements. • OWNER will provide required resolutions. • Carollo will develop documentation for the following packages: General, Technical, and assist with Financial. Task 2 Deliverables: • Grant Application Documentation (75 page limit). • General, Technical, Environmental, and Financial SRF Application packages. TASK 3-PRELIMINARY DESIGN 3.1 —Confirm Phase 4 System Customers & Demands Review the recommended alternative from the Feasibility Study as well as the demand profile generated during Phase 1-3 design to identify the preferred system configuration for the Phase 4 system while maintaining uninterrupted recycled water delivery to Phase 1-3 customers. Confirm water delivery schedule (summer/winter/day/night)to determine minimum and maximum pump flows. The design hydraulic loading will be included in the updated model as part of tasks 2.3-2.5. 3.2—Evaluate and Optimize Chemical Usage at the AWT. Evaluate current chemical usage and optimize. The goal of the AWT chemical addition evaluation is to minimize the quantity of primary coagulant addition in order to minimize the quantity of chemical sludge production, as the chemical sludge in the clarifier blowdown and waste filter backwash ends up in the anaerobic digester feed where it can affect digester alkalinity and performance. Consultant will review existing chemical feed operations procedures and recommend a routine jar test procedure to determine optimum primary coagulant and polymer addition based on secondary effluent water quality. Consultant will evaluate the clarifier component internals and recommend physical modifications to improve clarifier efficiency and minimize primary coagulant and polymer demand. Results of this task will be used to inform the design of the ferric chloride feed pump replacement and digester feed alkalinity storage. 3.3- Develop Design Criteria Review pipeline design criteria used in Phase 1-3 Design and confirm suitability for Phase 4 delivery to the uphill receivers. Develop design criteria for the system storage, pump station, and electrical equipment based on the results of Task 3.1. Develop criteria to be used in the design of the AWT improvements. 3.4-Storage and Pump Station Siting Analysis Review the area within and around the Water Treatment Plant (WTP)to identify sites with sufficient area for a pump station and 1 MG reservoir (-75 ft diameter). Evaluate the alternatives with respect to environmental_ accessibility (for connection to Phase 3 and Phase 4 pipeline facilities), geotechnical conditions, and property acquisition needs. Based on the analysis and discussions with the City, recommend a preferred site. 3.5- Update Model, Confirm Preliminary Routing &Sizing Using the demand profile confirmed in Task 3.1 and the criteria defined in Task 3.2, confirm the preliminary system configuration, including pipe sizing, pump station configuration and capacity, and storage volume. 3.6- Develop 30% Design Develop 30% plans, a list of technical specifications, and a 30% estimate of probable construction cost. 30 percent plans will include: • Preliminary pipeline plan and profile drawings showing the horizontal and vertical alignments, critical utilities, and easement requirements. • Process flow diagrams, • Preliminary pump station site plan, initial structural and mechanical layout, electrical single lines, communication block diagram, and P&IDs • Preliminary tank site plan, initial structural and mechanical layout, communication block diagram, and P&IDs • Preliminary site plan for AWT improvements, including initial structural, mechanical, and electrical layouts, and P&IDs 3.7--Develop Draft/Final Preliminary Design Report (PDR) Prepare a draft PDR that defines the basis of final design for the project components. A project description will be prepared describing the proposed improvements, reasons for selecting specific improvements, hydraulic basis including system and preliminary pump selection/curves, design concepts, description of alternatives analysis (where appropriate), a summary of the chemical usage analysis, recommended construction methods, a final customer list with demands, required permits, required property acquisition (if any), and design criteria. The cost estimate developed in Task 3.6 will be included. The 30% plans and an outline of technical specification sections will be included as an appendix to the PDR. The Draft PDR will be submitted to the City and City review comments will be discussed during the Draft PDR review meeting. The review comments on the Draft PDR will be incorporated and submitted as the Final PDR. All review comments and response to comments will be documented in a comment log. Task 3 Assumptions: • A maximum of two (2) model runs will be conducted to confirm the final alignments, pipe sizing, and pump sizing/configuration. Task 3 Deliverables: • Draft/Final Preliminary Design Report, including 30% plans, technical specification outline and cost estimate. (2 hard copies, and 1 pdf) • Comment log TASK 4-PERMITTING &EASEMENTS Task 4.1 -Regulatory Agency Coordination This task includes meetings with permit agencies as needed to obtain permits. Coordination is anticipated with the US Army Corps of Engineers, North Coast Regional Water Quality Control Board, California Department of Fish and Wildlife, Mendocino County Air Quality Management District, Caltrans, North Coast Rail Authority (NCRA), and County of Mendocino Department of Transportation (DOT). Task 4.2—Prepare Permit Applications This task includes completing the permit applications and preparing supporting documentation packages as necessary for submission to appropriate ageneses. Caltrans, NCRA, and DOT encroachment permits are covered in Task 5. Anticipated permits include Caltrans, NCRA, County DOT, Section 1600, SWPPP NOI, 401 Certification, Section 404 or Nationwide Permit 412, and MCAQMD Authority to Construct. Task 4.3 — Prepare Easement Documents Prepare and submit legal descriptions and plat maps for permanent and temporary easements from private property owners (if required). Prepare preliminary and final Deed forms conforming to City standards for easements on private property. Task 4.4— Easement Staking Where necessary, coordinate with Private Acquisition Appraiser, obtain permission from landowners to stake the proposed acquisition, stake the centerline of proposed private permanent easement areas to be acquired: and stake the centerline of encroachment permit areas. Task 4 Assumptions: Permit fees will be paid for by the CITY. • 2 creek crossings, which will be constructed using a trenchless method (either below flow line or outside riparian zone). • 1 Caltrans crossing • 1 Railroad crossing • Title reports, if needed, will be provided by the City • A maximum of 5 legal descriptions and plat maps will be needed. • Easement areas will only be staked once. • No eminent domain will be required for easement acquisition. City will lead easement negotiations with property owners. Task 4 Deliverables: • Permit application packages. • Meeting agendas and minutes. • Draft/Final legal descriptions and plat maps. • Staked centerline of private property easements and permits. TASK 5-FIELD INVESTIGATIVE WORK 5.1 -Topographical Survey Establish project survey control. Set approximately 25 control points for project mapping in accordance with City of Ukiah control requirements. The horizontal datum will be based on the North American Datum 83 (NAD 83). The vertical datum will be based on the North American Vertical Datum of 1988 (NAVD 88). Aerial photography will be used to provide a 100 ft strip map along the pipeline routes. Ground surveys will be used to supplement the aerial survey and will included utility location and identification of right-of-way lines. Detailed ground survey will be conducted for the pump station and tank sites and will include the FEMA 100 year flood elevation (if appropriate). Detailed ground survey will also be provided at the Orrs Creek and Gibson Creek crossings. 5.2—Geotechnical & Corrosion Investigation Review existing geologic maps, soils reports, and geologic reports for the project area. Review the project area and mark the boring locations for Underground Service Alert (USA). Perform a total of up to 23 borings ranging from 15 to 50 feet below ground surface. Trenchless borings (--3-4) will be 30-40 feet deep, 2 will be at the pump stationlreservoir site and will be 25 to 50 ft deep for liquefaction analysis. The remainder of the borings are anticipated to be 15-20 ft deep. A laboratory testing program will be conducted to characterize the soil properties. A Geotechnical Report documenting the results of the geotechnical exploration will include soil iogs, results of laboratory analysis, results of the quantitative slope stability analysis, recommendations to support design of cut and fill slopes; trench construction, backfill, and compaction; corrosion protection; trenchless construction; and geotechnical related synthetic liner design considerations. 5.3—Existing Utility Research Contact all agencies having existing utilities within the project area to obtain mapping of their facilities. Where appropriate, contact USA, prior to field survey, so that utility location markings can be surveyed and shown on the plans. Identify all utilities within the project corridor and walk the site to verify preliminary locations and identify potential conflicts. A utility contact fog will be maintained. Based on this task and the topographic survey, develop a potholing plan, as necessary to identify potential conflicts. Coordinate with the City for potholing services. The City will perform potholing with City forces or City specified contractor. 5.4—Conduct Surge Analysis Analyze pressure transients created by the operation of the pump station (e.g. pump power failure, pump startup) and their effect on the system pipeline (Phase 4). Winter, summer, daytime, and nighttime scenarios will be evaluated to identify the worst-case pressure surges in the system. Opening and closing of flow control valves at each customer location can also create adverse pressure surges in the pipelines. An analysis of safe opening and closing times will be developed to help define the system operating parameters and time of use strategy. Task 5 Assumptions: • Property line mapping will be consistent with deeds and maps of record. No Record of Survey Map will be prepared. • Mapping of wetland delineations or other resources is not included. • A maximum of 23 geologic borings will be performed. • An environmental assessment or any exploration for the presence or absence of any hazardous or toxic materials is not included. • Current property owner, or their representative, will be responsible for clearance from private utilities not covered by USA. • Geotechnical investigation does not include a site specific quantitative liquefaction analysis. • The City will secure site access for survey and geotechnical investigation. • The City will provide traffic control and asphalt repair along the trench alignment for potholing and geotechnical borings. Task 5 Deliverables: • Topographic Map. • Utility contact log. • Draft/Final Geotechnical Report . (2 hard copies and 1 pdf) • Surge Analysis Report (2 hard copies and 1 pdf) TASK 6-FINAL DESIGN Assist the City with information required to obtain a new electrical service for the pump station from the City's Electric Utility Division including preparing an application for service, if needed. Task 6.1 — Develop 90% Plans, Specifications, and Cost Estimate Develop plans using Carollo CAD standards. Prepare technical specifications in conjunction with City standard front-end specifications. All specification documents will be prepared using Microsoft Word. Technical specification will be in CSI format. An estimate of probable construction will be prepared to reflect the level of design. An electronic PDF of the cost estimate will be provided. The 90% package will be provided to the City for review and comment. A review meeting (identified in Task 1.2)will be held to discuss the City's comments. All review comments and response to comments will be documented in a comment log. Task 6.2 — Develop Final Plans, Specifications, and Cost Estimate Comments received from the City will be incorporated into the plans and specifications to develop a set of final bid ready documents. The cost estimate will be updated to reflect the final design. Ten (10) hard copies (if requested) and a reproducible set of the final bid ready contract documents will be provided to the City for distribution to interested contractors. Task 6 Assumptions: • Pump station design will be for the Phase 4 Pump Station, to be located adjacent to the proposed Phase 4 recycled water storage tank, near the end of the Phase 1-3 pipeline. The proposed pump station will be the single pump station servicing Phase 4, no additional booster station is included in the scope. • Pump station is assumed to consist of dry mounted horizontal split case pumps, with an inlet manifold connected to the storage tank. • New electrical service will be required for the pump station, unless electrical can be pulled from the water treatment plant. • New electrical equipment will be located in a new electrical room within the pump station building. The pump station is assumed to be CMU construction with an on-grade concrete mat foundation. Rooms within the pump station will be air conditioned as required for protection of the proposed equipment and operator comfort. • Fire suppression systems for the electrical building are not included. • Variable frequency drives will be provided for the pumps. • Provisions for a portable generator will be included, but design of a generator is not included. • Pump station will be controlled by a new PLC located in the electrical room and will be tied into the OWNER's SCADA system. • Building permit reviews are not required. • Landscaping and architectural design are not required, and are not included. • Traffic control plans are not included. • City will provide front-end documents. • The project is assumed to consist of approximately 100 sheets. Task 6 Deliverables: Electrical service application. • 90% Plans, Specifications, and Cost Estimate (2 hard copies, 1 electronic copy). • Final Plans, Specifications, and Cost Estimate (10 hard copies, 1 reproducible electronic copy). TASK 7-BID PHASE SERVICES &SUPPORT Task 7.1 —Attend Pre-Bid Meeting Attend the pre-bid conference. The meeting will be conducted by the City, but we will be available to answer questions or discuss the intent of the plans and specifications as requested by the City. Prepare minutes from the meeting. Meeting minutes will be distributed to attendees by the City. Task 7.2 —Answer Questions/Provide Addenda Provide assistance, as required, to the City during the bidding of the Project. This will include answering contractor questions and preparing up to two addenda during the advertisement period. The Engineer will be the primary contact for technical questions during the bid period. Addenda will be distributed by the City. Task 7.3 -Conformed Documentation At the conclusion of the Bid phase, provide a Conformed set of documents from which the Project shall proceed into construction. Task 7 Assumptions: • The City will sell and distribute contract documents to contractors. • City will distribute addenda and minutes from the pre bid meeting. • A maximum of two addenda will be prepared. Task 7 Deliverables: • Written responses to contractors' questions. • Addenda, as necessary • Meeting minutes. • Conformed Documents TASK 8-ENGINEERING SERVICES DURING CONSTRUCTION Task 8.1 —Pre-Construction Conference Attend the pre-construction conference to answer questions and provide clarification. The meeting will be conducted by the Construction Manager. Meeting agendas and minutes will be prepared by the Construction Manager. Task 8.2—Engineer's Site Observation Assuming a construction contract of 12 months, conduct construction observation site visits at least once per month, with these visit increasing to twice monthly at the initial startup and where specific milestones dictate. Where possible the site visits will be scheduled to coincide with progress meetings. Task 8.3 -Submittal Review Review shop drawings and data submittals as requested by the Construction Manager. It is assumed that the Construction Manager will receive all submittals and re-submittals and will forward those submittals and re-submittals that require design review. Provide written responses within 14 calendar days of receipt of a submittal. Exceptions to this response target may include large submittals (up to 30 calendar days for review) or when the Contractor requests an expedited review. An allowance for 120 submittals and 25 resubmittals has been made in the budget. Task 8.4 -Response to Contractor Requests for Information (RFIs) Provide written responses to RFIs. A total of 40 RFIs are included in this scope. Task 8.5 -Design Clarifications Prepare and/or review proposed changes in the project scope or project time, when requested by the City or Construction Manager. A total of eight DCs are included in this scope. It is assumed that the Construction Manager will prepare and manage Change Order's resulting from the Design Clarifications. Task 8.6 - Record Drawings Review, after substantial completion, the final version of the Contractor's redline drawings that have been accepted by the Construction Manager. Based on this final set of marked up drawings, prepare record drawings in an electronic format (AutoCAD and PDF versions) for delivery to the City. Task 8.7 -Substantial & Final Completion At the request of the City or Construction Manager, assist in determining if the project or portions thereof are substantially complete and in accordance with the Contract Document. Assist in preparing the Certificate of Substantial Completion and a list of deficient items ("punch list"). If requested by the Construction Manager, assist in determining whether punch list items have been successfully completed to the standard of work required of the project documentation. The Construction Manager will be responsible for final determination of substantial completion. Task 8.8 -Training and Commissioning Under the lead of the Construction Manager, assist in the review of the Contractor's training plan and instruction materials for compliance with the Contract Documents. If requested by the City, provide instruction to City personnel on the project objectives, design intent and system operating procedures. Task 8.9 -Operations and Maintenance Manuals Review Operations and Maintenance (O&M) documentation provided by equipment vendors and Contractor to ensure they provide adequate information for ongoing maintenance and eventual replacement of the component. Task 8 Deliverables: • Electronic Responses to all Submittals. (120 submittals and 25 resubmittals budgeted) • Electronic Responses to all RFIs. (40 RFls budgeted) • Formal Design Clarifications (8 DCs budgeted) • Conformed Documents TASK 9-CONSTRUCTION MANAGEMENT Task 9.1 --Preconstruction Services Task 9.1 a - Bid Escrow document review-We will perform an escrow review of bid documents provided by the accepted bidder to determine completeness and conformance of the received bid package. Secure bid package for duration of construction contract to assist in negotiation and resolution of change orders and potential claims Task 9.1 b Construction Contract Compliance -We will review the contractor's contract execution for compliance with contract document requirements, state revolving loan fund requirements, including prevailing wage and apprenticeship program requirements, as well as compliance with all environmental documents. Task 9.1c-Pre-Construction Conference -We will schedule, coordinate, and conduct one preconstruction conference. An agenda will be prepared in advance to notify attendees of key items for discussion. Meeting notes will be prepared and distributed to attendees within 10 days of the conference. Task 9.2—Services During Construction Task 9.2a - Documentation System Set-up -We will use Procore. The construction manager (CM)will pay for and maintain a Procore license for the duration of the project for use by all project personnel. Task 9.2b - Communication and Construction Management Plan -A project specific Construction Management Plan will be created for the project to establish project protocols, communications, and procedures. Task 9.2c - Manage Field Inspection Personnel-We will provide resident inspection and our CM and/or resident engineer will manage the activities of the field inspection personnel, including the materials testing subcontractor. Our inspectors will prepare daily inspection reports, and summary weekly and monthly inspection reports to the City. Task .9.2d -Track Submittals -We will coordinate and manage the shop drawing and submittal review process between the design engineer and the contractor. All submittals will be handled using the Procore documentation system.We will screen all submittals and determine their completeness before reviewing them or forwarding them to the design engineer for review. Task 9.2e - Prepare Field Memos and Clarifications -We will coordinate and manage preparation of field memos and clarifications of drawings and specifications between the design engineer and the contractor. Memos will be handled in Procore to allow easy tracking of their status and outcome. Task 9.2f-Track Requests for Information -We will coordinate and manage the RFI process between the design engineer and the contractor. All RFls will be handled using the Procore documentation system. We will screen all RFIs and determine their validity before responding to them or forwarding them to the design engineer for response. Task 9.2g - Review Monthly Progress Payment Requests -We will evaluate the contractor's monthly progress payment requests from the contractor and recommend payment by the City if requirements are met. We will compare requested quantities to the actual quantities completed and negotiate the appropriate progress payment request with the contractor. Task 9.2h - Review Construction Schedule -We will review and approve the contractor's construction schedule, including updates and revisions, in accordance with the contract documents. Our review will focus on key elements such as logic, duration of activities, duration of startup and testing, and construction sequencing constraints and milestones. Task 9.2i - Review Change Order Requests -We will review change order requests in conjunction with the design engineer to determine changes in scope and conditions. We will prepare independent cost estimates and negotiate with the contractor. We will prepare and process approved change orders and incorporate them into the contract. We will prepare a log for tracking all: potential change orders and agreed upon change orders. Task 9.21 - Resolve Conflicts -We will work with all parties involved to resolve potential conflicts before they become an issue. Task 9.2k - Review Labor Compliance-We will monitor project records and review labor compliance of the contractor. We will work with the contractor to correct any deficiencies found and report status to the City. Task 9.21 - Review installation and maintenance of BMPs and Implementation of the SWPPP. Our staff is educated in California's evolving stormwater policies We will monitor the stormwater protection installed by the contractor and work with him to maintain it and report its effectiveness in accordance with the current state regulations. Task 9.2m - Conduct Final Inspection and Issue Punchlists -We will schedule and conduct a final inspection of the completed facilities and issue punch lists of uncompleted items where necessary.We will also assist the City in negotiation of unsettled changes or disputes associated with these inspections. When the final punch list items have been completed or resolved, we will recommend acceptance by the City. Task 9.2n - Documentation of Existinq Site Conditions -We will prepare video and photographic records of initial site conditions before the contractor begins construction. Video documentation will be accompanied by a verbal description of existing conditions. A copy of the video and photographic documentation will be provided to the City. Task 9.2o - Construction Inspection -We will provide a qualified inspector to monitor the contractor's compliance with the specifications requirements Task UP - Electrical Testing -We will work with the designer, contractor and vendors to determine all the required testing, then witness and document all site acceptance tests on electrical equipment. This includes witnessing all point-to-point checks and run tests for electrical equipment. We will confirm that circuit breaker settings conform to the values shown in the short circuit study and that all harmonic filters are correct and in place. All electrical testing results will be documented and filed in the project records. Task 9.2g - Monitor Contractor's Compliance with Contract Documents -We will review and monitor the contractor's work against the contract documents to ensure compliance. We will report any non-conformances and deficiencies to the City and contractor and will work with the contractor to correct these deficiencies in a timely manner to the satisfaction of the City. Task 9.2r- Review Certified Payroll -We will review the contractor and subcontractor certified payroll for compliance with State and Federal prevailing wage requirements. Any discrepancies will be identified and returned to the contractor for immediate correction. Violations will be addressed in accordance with the State Labor Code and Davis Bacon wage requirements. We will also conduct interviews with select contractor field personnel to confirm payroll conditions. Our certified payroll findings will be included in the monthly project progress report. Task 9.2s- Monitor Contractor's Compliance with CEQA Requirements -We will maintain a copy of the CEQA requirements and monitor the contractor's compliance against these requirements. We will periodically inform the City and contractor of compliance status and recommend a course of action to the City and contractor if these requirements are not being met. Task 9.2t- Monitor and Review Record Drawings -We will monitor and coordinate the contractor's recording and maintenance of field changes to plans and specifications during construction on a monthly basis, or more frequently as required. At the 50-, 75-, and 90-percent project completion levels, we will perform a review of the contractor's working record drawings for general completeness and advise him of status. We will approve progress payments beyond 90- percent completion contingent upon the acceptability of the working record drawings Task 9.3—Material Testing Materials testing will be provided by others to take quality assurance samples during construction and report to Carollo. We will coordinate callouts of the materials testing services firm with the contractor to efficiently use the testing firm. Testing results will be monitored for compliance with the contract documents. Discrepancies will be noted and the contractor will be directed to make necessary corrections. Task 9.4—Startup and Testing Task 9.4a -Oversee Startup and Testing -We will oversee facilities acceptance testing and startup in cooperation with the contractor, design engineer, and City and plant staff. Startup and testing services will include assistance with comprehensive testing of functional equipment, sub- systems, and entire treatment processes. Task 9.4b - Field Testing Reports and O&M Manuals-We will witness all field tests of equipment as described in the specifications and the vendor documentation. We will use test report forms as supplied by the vendors and the designer. Where no report forms are available, we will use our own in-house test forms with input from the designer and vendors. All test reports will be field with the equipment O&M manuals. All vendor O&M manuals will be reviewed for completeness, including all recommended maintenance procedures, calibration requirements, and spare parts lists. EXHIBIT A CITY OF UKIAH RECYCLED WATER PROJECT—PHASE 4 DESIGN, ESDC, and CM SCOPE OF WORK November 1, 2018 BACKGROUND The City of Ukiah (OWNER) has requested Carollo Engineers (ENGINEER) develop a design, ESDC, and CM scope and budget for Phase 4 of the Recycled Water Pipeline Project (Project) as defined in the Feasibility Study dated December 2012. The project will include approximately 19,000 linear feet of 8 to 16-inch recycled water pipeline (including crossings of US 101, the railroad, Gibson Creek, and Orr Creek), a recycled water storage tank (approximate size of 1 MG), and a recycled water pump station with capacity up to 4 MG/day. The scope will also include all field work, funding, permitting, and right-of-way acquisition work to support the design and construction of the project. In addition to the recycled water distribution facilities, the Project will include improvements at the plant to support operation of the recycled water system. These improvements will include the following: • Refurbish 4 existing package clarifier/filter AWT units: Replace 4 existing analog pressure sensors used to initiate settled sludge blowdown cycle with 4 digital pressure switches Replace 8 existing analog pressure sensors used to initiate filter backwash cycle with 4 digital differential pressure switches Replace existing PLCs and program to incorporate new digital pressure and digital differential pressure switches • Replace existing chlorine residual analyzer 3 (at the backwash pumping station) and chlorine residual analyzer 4 (at the dechlorination structure)with probe-type analyzers • Replace one primary coagulant(ferric chloride)feed pump with smaller capacity pump to provide sufficient turndown for low-demand periods • Install motor-operated valve and valve vault on existing 24-inch FW/RW diversion line west of the dechlorination structure. • Add digester feed alkalinity storage and feed system to handle increased settled sludge/waste filter backwash ferric hydroxide sludge production Carollo will lead the engineering effort as a continuation of the Phase 1-3 Design and Construction services provided. SMB Environmental will continue to support the project, being contracted directly with the City. NHC will conduct the surge analysis, JDH will provide corrosion design services, and local consultants will provide surveying and geotechnical services totaling approximately 12% of the overall contract amount. Local sub consultants will provide the following services: • Crawford &Associates— Geotechnical Investigation, Corrosion Analysis. • Rau & Associates —Surveying, Existing Utility Investigation, Easement Acquisition Assistance. SCOPE OF WORK TASK 1 -PROJECT MANAGEMENT Task 1.1 - Project Administration Administer the project and subconsultants to maintain project schedule and budget. The project progress and budget status will be included in monthly progress reports that will be attached to billing invoices. Additionally, the monthly progress report will include a list of work completed for the time period and what is expected in the coming period. Task 1.2 - Meetings Coordinate the project tasks between the City, subconsultants, stakeholders (including Farm Bureau, Flood Control District, Ukiah Unified School District, Ukiah Valley Golf Course, and the Ukiah Valley Sanitation District), and other agencies as required through project meetings. Prepare an agenda and meeting minutes for each of these meetings. Anticipated project meetings are identified below: • Project Kick-off Meeting (City offices) • Monthly Project Status Meetings (Conference call) (Assume 12 total) • Stakeholder Meeting (City offices) • PDR Review Meeting (City offices) • 90% Review Meeting (City offices) Task 1.3—Quality Control Quality control will be monitored throughout the entirety of the Project. We will review deliverables provided by subconsultants prior to forwarding to the City. Any document developed by Carollo will be peer reviewed internally prior to delivering to the City. Task 1.4—Coordination with Golf Course Improvements Coordinate with the designer of the golf course facilities to confirm recycled water delivery needs, elevations, etc that will impact the recycled water system design. Task 9 Deliverables: • Monthly invoices • Monthly status reports • Meeting agendas and minutes TASK 2 -SRF FUNDING APPLICATIONS AND COORDINATION Carollo will support the City with funding applications for the CA SRF grant/loan program and the US Bureau of Reclamation (Reclamation). It is assumed that Carollo will be developing the SRF loan packages for General, Technical, and Financial (mainly City) and be delivering a complete package by December 31, 2018 in order for the City to be on the States fundable list for 2020. The environmental package will be developed by others. This task includes uploading the all four packages and reference documents to the State's electronic FAAST system. The Reclamation grants have an approximately 75 page application limit and are estimated to take approximately 140 hours to complete as they have to be developed from a 'project selling' angle. Task 2 Assumptions: • OWNER will provide required financial statements. • OWNER will provide required resolutions. • Carollo will develop documentation for the following packages: General, Technical, and assist with Financial. Task 2 Deliverables: • Grant Application Documentation (75 page limit). • General, Technical, Environmental, and Financial SRF Application packages. TASK 3-PRELIMINARY DESIGN 3.1 ---Confirm Phase 4 System Customers & Demands Review the recommended alternative from the Feasibility Study as well as the demand profile generated during Phase 1-3 design to identify the preferred system configuration for the Phase 4 system while maintaining uninterrupted recycled water delivery to Phase 1-3 customers. Confirm water delivery schedule (summer/winter/day/night)to determine minimum and maximum pump flows. The design hydraulic loading will be included in the updated model as part of tasks 2.3-2.5. 3.2— Evaluate and Optimize Chemical Usage at the AWT. Evaluate current chemical usage and optimize. The goal of the AWT chemical addition evaluation is to minimize the quantity of primary coagulant addition in order to minimize the quantity of chemical sludge production, as the chemical sludge in the clarifier blowdown and waste filter backwash ends up in the anaerobic digester feed where it can affect digester alkalinity and performance. Consultant will review existing chemical feed operations procedures and recommend a routine jar test procedure to determine optimum primary coagulant and polymer addition based on secondary effluent water quality. Consultant will evaluate the clarifier component internals and recommend physical modifications to improve clarifier efficiency and minimize primary coagulant and polymer demand. Results of this task will be used to inform the design of the ferric chloride feed pump replacement and digester feed alkalinity storage. 3.3— Develop Design Criteria Review pipeline design criteria used in Phase 1-3 Design and confirm suitability for Phase 4 delivery to the uphill receivers. Develop design criteria for the system storage, pump station, and electrical equipment based on the results of Task 3.1. Develop criteria to be used in the design of the AWT improvements. 3.4—Storage and Pump Station Siting Analysis Review the area within and around the Water Treatment Plant (WTP)to identify sites with sufficient area for a pump station and 1 MG reservoir (-75 ft diameter). Evaluate the alternatives with respect to environmental, accessibility (for connection to Phase 3 and Phase 4 pipeline facilities), geotechnical conditions, and property acquisition needs. Based on the analysis and discussions with the City, recommend a preferred site. 3.5- Update Model, Confirm Preliminary Routing & Sizing Using the demand profile confirmed in Task 3.1 and the criteria defined in Task 3.2, confirm the preliminary system configuration, including pipe sizing, pump station configuration and capacity, and storage volume. 3.6—Develop 30% Design Develop 30% plans, a list of technical specifications, and a 30% estimate of probable construction cost. 30 percent plans will include: • Preliminary pipeline plan and profile drawings showing the horizontal and vertical alignments, critical utilities, and easement requirements. • Process flow diagrams, • Preliminary pump station site plan, initial structural and mechanical layout, electrical single lines, communication block diagram, and P&IDs • Preliminary tank site plan, initial structural and mechanical layout, communication block diagram, and P&IDs • Preliminary site plan for AWT improvements, including initial structural, mechanical, and electrical layouts, and P&IDs 3.7—Develop Draft/Final Preliminary Design Report (PDR) Prepare a draft PDR that defines the basis of final design for the project components. A project description will be prepared describing the proposed improvements, reasons for selecting specific improvements, hydraulic basis including system and preliminary pump selection/curves, design concepts, description of alternatives analysis (where appropriate), a summary of the chemical usage analysis, recommended construction methods, a final customer list with demands, required permits, required property acquisition (if any), and design criteria. The cost estimate developed in Task 3.6 will be included. The 30% plans and an outline of technical specification sections will be included as an appendix to the PDR. The Draft PDR will be submitted to the City and City review comments will be discussed during the Draft PDR review meeting. The review comments on the Draft PDR will be incorporated and submitted as the Final PDR. All review comments and response to comments will be documented in a comment log. Task 3_Assumptions: • A maximum of two (2) model runs will be conducted to confirm the final alignments, pipe sizing, and pump sizing/configuration. Task 3 Deliverables: • Draft/Final Preliminary Design Report, including 30% plans, technical specification outline and cost estimate. (2 hard copies, and 1 pdf) • Comment log TASK 4-PERMITTING &EASEMENTS Task 4.1 - Regulatory Agency Coordination This task includes meetings with permit agencies as needed to obtain permits. Coordination is anticipated with the US Army Corps of Engineers, North Coast Regional Water Quality Control Board, California Department of Fish and Wildlife, Mendocino County Air Quality Management District, Caltrans, North Coast Rail Authority (NCRA), and County of Mendocino Department of Transportation (DOT). Task 4.2—Prepare Permit Applications This task includes completing the permit applications and preparing supporting documentation packages as necessary for submission to appropriate agencies. Caltrans, NCRA, and DOT encroachment permits are covered in Task 5. Anticipated permits include Caltrans, NCRA, County DOT, Section 1600, SWPPP NOI, 401 Certification, Section 404 or Nationwide Permit #12, and MCAQMD Authority to Construct. Task 4.3—Prepare Easement Documents Prepare and submit legal descriptions and plat maps for permanent and temporary easements from private property owners (if required). Prepare preliminary and final Deed forms conforming to City standards for easements on private property. Task 4.4—Easement Staking Where necessary, coordinate with Private Acquisition Appraiser, obtain permission from landowners to stake the proposed acquisition, stake the centerline of proposed private permanent easement areas to be acquired, and stake the centerline of encroachment permit areas. Task 4 Assumptions: • Permit fees will be paid for by the CITY. • 2 creek crossings, which will be constructed using a trenchless method (either below flow line or outside riparian zone). • 1 Caltrans crossing • 1 Railroad crossing • Title reports, if needed, will be provided by the City • A maximum of 5 legal descriptions and plat maps will be needed. • Easement areas will only be staked once. • No eminent domain will be required for easement acquisition. • City will lead easement negotiations with property owners. Task 4 Deliverables: • Permit application packages. • Meeting agendas and minutes. • Draft/Final legal descriptions and plat maps. • Staked centerline of private property easements and permits. TASK 5--FIELD INVESTIGATIVE WORK 5.1 -Topographical Survey Establish project survey control. Set approximately 25 control points for project mapping in accordance with City of Ukiah control requirements. The horizontal datum will be based on the North American Datum 83 (NAD 83). The vertical datum will be based on the North American Vertical Datum of 1988 (NAVD 88). Aerial photography will be used to provide a 100 ft strip map along the pipeline routes. Ground surveys will be used to supplement the aerial survey and will included utility location and identification of right-of-way lines. Detailed ground survey will be conducted for the pump station and tank sites and will include the FEMA 100 year flood elevation (if appropriate). Detailed ground survey will also be provided at the Orrs Creek and Gibson Creek crossings. 5.2 —Geotechnical & Corrosion Investigation Review existing geologic maps, soils reports, and geologic reports for the project area. Review the project area and mark the boring locations for Underground Service Alert (USA). Perform a total of up to 23 borings ranging from 15 to 50 feet below ground surface. Trenchless borings (--3-4)will be 30-40 feet deep, 2 will be at the pump station/reservoir site and will be 25 to 50 ft deep for liquefaction analysis. The remainder of the borings are anticipated to be 15-20 ft deep. A laboratory testing program will be conducted to characterize the soil properties. A Geotechnical Report documenting the results of the geotechnical exploration will include soil logs, results of laboratory analysis, results of the quantitative slope stability analysis, recommendations to support design of cut and fill slopes; trench construction, backfill, and compaction; corrosion protection; trenchless construction; and geotechnical related synthetic liner design considerations. 5.3—Existing Utility Research Contact all agencies having existing utilities within the project area to obtain mapping of their facilities. Where appropriate, contact USA, prior to field survey, so that utility location markings can be surveyed and shown on the plans. Identify all utilities within the project corridor and walk the site to verify preliminary locations and identify potential conflicts. A utility contact log will be maintained. Based on this task and the topographic survey, develop a potholing plan, as necessary to identify potential conflicts. Coordinate with the City for potholing services. The City will perform potholing with City forces or City specified contractor. 5.4—Conduct Surge Analysis Analyze pressure transients created by the operation of the pump station (e.g. pump power failure, pump startup) and their effect on the system pipeline (Phase 4). Winter, summer, daytime, and nighttime scenarios will be evaluated to identify the worst-case pressure surges in the system. Opening and closing of flow control valves at each customer location can also create adverse pressure surges in the pipelines. An analysis of safe opening and closing times will be developed to help define the system operating parameters and time of use strategy. Task 5 Assumptions: • Property line mapping will be consistent with deeds and maps of record. No Record of Survey Map will be prepared. • Mapping of wetland delineations or other resources is not included. • A maximum of 23 geologic borings will be performed. • An environmental assessment or any exploration for the presence or absence of any hazardous or toxic materials is not included. • Current property owner, or their representative, will be responsible for clearance from private utilities not covered by USA. • Geotechnical investigation does not include a site specific quantitative liquefaction analysis. • The City will secure site access for survey and geotechnical investigation. • The City will provide traffic control and asphalt repair along the trench alignment for potholing and geotechnical borings. Task 5 Deliverables: • Topographic Map. • Utility contact log. • Draft/Final Geotechnical Report . (2 hard copies and 1 pdf) • Surge Analysis Report (2 hard copies and 1 pdf) TASK 6—FINAL DESIGN Assist the City with information required to obtain a new electrical service for the pump station from the City's Electric Utility Division including preparing an application for service, if needed. Task 6.1 —Develop 90% Plans, Specifications, and Cost Estimate Develop plans using Carollo CAD standards. Prepare technical specifications in conjunction with City standard front-end specifications. All specification documents will be prepared using Microsoft Word. Technical specification will be in CSI format. An estimate of probable construction will be prepared to reflect the level of design. An electronic PDF of the cost estimate will be provided. The 90% package will be provided to the City for review and comment.A review meeting (identified in Task 1.2)will be held to discuss the City's comments. All review comments and response to comments will be documented in a comment log. Task 6.2 —Develop Final Plans, Specifications, and Cost Estimate Comments received from the City will be incorporated into the plans and specifications to develop a set of final bid ready documents. The cost estimate will be updated to reflect the final design. Ten (10) hard copies (if requested) and a reproducible set of the final bid ready contract documents will be provided to the City for distribution to interested contractors. Task 6 Assumptions: • Pump station design will be for the Phase 4 Pump Station, to be located adjacent to the proposed Phase 4 recycled water storage tank, near the end of the Phase 1-3 pipeline. The proposed pump station will be the single pump station servicing Phase 4, no additional booster station is included in the scope. • Pump station is assumed to consist of dry mounted horizontal split case pumps, with an inlet manifold connected to the storage tank. • New electrical service will be required for the pump station, unless electrical can be pulled from the water treatment plant. • New electrical equipment will be located in a new electrical room within the pump station building. The pump station is assumed to be CMU construction with an on-grade concrete mat foundation. Rooms within the pump station will be air conditioned as required for protection of the proposed equipment and operator comfort. • Fire suppression systems for the electrical building are not included. • Variable frequency drives will be provided for the pumps. • Provisions for a portable generator will be included, but design of a generator is not included. • Pump station will be controlled by a new PLC located in the electrical room and will be tied into the OWNER's SCADA system. • Building permit reviews are not required. • Landscaping and architectural design are not required, and are not included. • Traffic control plans are not included. • City will provide front-end documents. • The project is assumed to consist of approximately 100 sheets. Task 6 Deliverables: • Electrical service application. • 90% Pians, Specifications, and Cost Estimate (2 hard copies, 1 electronic copy). • Final Plans, Specifications, and Cost Estimate (10 hard copies, 1 reproducible electronic copy). TASK 7-BID PHASE SERVICES &SUPPORT Task 7.1 --Attend Pre-Bid Meeting Attend the pre-bid conference. The meeting will be conducted by the City, but we will be available to answer questions or discuss the intent of the plans and specifications as requested by the City. Prepare minutes from the meeting. Meeting minutes will be distributed to attendees by the City. Task 7.2—Answer Questions/Provide Addenda Provide assistance, as required, to the City during the bidding of the Project. This will include answering contractor questions and preparing up to two addenda during the advertisement period. The Engineer will be the primary contact for technical questions during the bid period. Addenda will be distributed by the City. Task 7.3 -Conformed Documentation At the conclusion of the Bid phase, provide a Conformed set of documents from which the Project shall proceed into construction. Task 7 Assumptions: • The City will sell and distribute contract documents to contractors. • City will distribute addenda and minutes from the pre bid meeting. • A maximum of two addenda will be prepared. Task 7 Deliverables: • Written responses to contractors' questions. • Addenda, as necessary • Meeting minutes. • Conformed Documents TASK 8-ENGINEERING SERVICES DURING CONSTRUCTION Task 8.1 — Pre-Construction Conference Attend the pre-construction conference to answer questions and provide clarification. The meeting will be conducted by the Construction Manager. Meeting agendas and minutes will be prepared by the Construction Manager. Task 8.2 —Engineer's Site Observation Assuming a construction contract of 12 months, conduct construction observation site visits at least once per month, with these visit increasing to twice monthly at the initial startup and where specific milestones dictate. Where possible the site visits will be scheduled to coincide with progress meetings. Task 8.3 -Submittal Review Review shop drawings and data submittals as requested by the Construction Manager. It is assumed that the Construction Manager will receive all submittals and re-submittals and will forward those submittals and re-submittals that require design review. Provide written responses within 14 calendar days of receipt of a submittal. Exceptions to this response target may include large submittals (up to 30 calendar days for review) or when the Contractor requests an expedited review. An allowance for 120 submittals and 25 resubmittals has been made in the budget. Task 8.4 - Response to Contractor Requests for Information (RFIs) Provide written responses to RFIs. A total of 40 RFIs are included in this scope. Task 8.5 -Design Clarifications Prepare and/or review proposed changes in the project scope or project time, when requested by the City or Construction Manager. A total of eight DCs are included in this scope. It is assumed that the Construction Manager will prepare and manage Change Order's resulting from the Design Clarifications. Task 8.8 - Record Drawings Review, after substantial completion, the final version of the Contractor's redline drawings that have been accepted by the Construction Manager. Based on this final set of marked up drawings, prepare record drawings in an electronic format (AutoCAD and PDF versions) for delivery to the City. Task 8.7 -Substantial & Final Completion At the request of the City or Construction Manager, assist in determining if the project or portions thereof are substantially complete and in accordance with the Contract Document. Assist in preparing the Certificate of Substantial Completion and a list of deficient items ("punch list"). If requested by the Construction Manager, assist in determining whether punch list items have been successfully completed to the standard of work required of the project documentation. The Construction Manager will be responsible for final determination of substantial completion. Task 8.8 -Training and Commissioning Under the lead of the Construction Manager, assist in the review of the Contractor's training plan and instruction materials for compliance with the Contract Documents. If requested by the City, provide instruction to City personnel on the project objectives, design intent and system operating procedures. Task 8.9 -Operations and Maintenance Manuals Review Operations and Maintenance (O&M) documentation provided by equipment vendors and Contractor to ensure they provide adequate information for ongoing maintenance and eventual replacement of the component. Task 8 Deliverables: • Electronic Responses to all Submittals. (120 submittals and 25 resubmittals budgeted) • Electronic Responses to all RFIs. (40 RFIs budgeted) • Formal Design Clarifications (8 DCs budgeted) • Conformed Documents TASK 9—CONSTRUCTION MANAGEMENT Task 9.1 —Preconstruction Services Task 9.1 a - Bid Escrow document review-We will perform an escrow review of bid documents provided by the accepted bidder to determine completeness and conformance of the received bid package. Secure bid package for duration of construction contract to assist in negotiation and resolution of change orders and potential claims Task 9.1b Construction Contract Compliance -We will review the contractor's contract execution for compliance with contract document requirements, state revolving loan fund requirements, including prevailing wage and apprenticeship program requirements, as well as compliance with all environmental documents. Task 9.1 c- Pre-Construction Conference -We will schedule, coordinate, and conduct one preconstruction conference. An agenda will be prepared in advance to notify attendees of key items for discussion. Meeting notes will be prepared and distributed to attendees within 10 days of the conference. Task 9.2--Services During Construction Task 9.2a - Documentation System Set-up -We will use Procore. The construction manager (CM)will pay for and maintain a Procore license for the duration of the project for use by all project personnel. Task 9.2b - Communication and Construction Management Plan -A project specific Construction Management Plan will be created for the project to establish project protocols, communications, and procedures. Task 9.2c- Manage Field Inspection Personnel -We will provide resident inspection and our CM and/or resident engineer will manage the activities of the field inspection personnel, including the materials testing subcontractor. Our inspectors will prepare daily inspection reports, and summary weekly and monthly inspection reports to the City. Task .9.2d -Track Submittals -We will coordinate and manage the shop drawing and submittal review process between the design engineer and the contractor. All submittals will be handled using the Procore documentation system.We will screen all submittals and determine their completeness before reviewing them or forwarding them to the design engineer for review. Task 9.2e - Prepare Field Memos and Clarifications-We will coordinate and manage preparation of field memos and clarifications of drawings and specifications between the design engineer and the contractor. Memos will be handled in Procore to allow easy tracking of their status and outcome. Task 9.2f-Track Requests for Information -We will coordinate and manage the RFI process between the design engineer and the contractor. All RFIs will be handled using the Procore documentation system. We will screen all RFIs and determine their validity before responding to them or forwarding them to the design engineer for response. Task 9.2 - Review Monthly Progress Payment Requests -We will evaluate the contractor's monthly progress payment requests from the contractor and recommend payment by the City if requirements are met. We will compare requested quantities to the actual quantities completed and negotiate the appropriate progress payment request with the contractor. Task 9.2h - Review Construction Schedule -We will review and approve the contractor's construction schedule, including updates and revisions, in accordance with the contract documents. Our review will focus on key elements such as logic, duration of activities, duration of startup and testing, and construction sequencing constraints and milestones. Task 9.2i- Review Change Order Requests -We will review change order requests in conjunction with the design engineer to determine changes in scope and conditions. We will prepare independent cost estimates and negotiate with the contractor. We will prepare and process approved change orders and incorporate them into the contract. We will prepare a log for tracking all potential change orders and agreed upon change orders. Task 9.21 - Resolve Conflicts -We will work with all parties involved to resolve potential conflicts before they become an issue. Task 9.2k - Review Labor Compliance-We will monitor project records and review labor compliance of the contractor. We will work with the contractor to correct any deficiencies found and report status to the City. Task 9.21 - Review installation and maintenance of BMPs and Im lementation of the SWPPP. Our staff is educated in California's evolving stormwater policies We will monitor the stormwater protection installed by the contractor and work with him to maintain it and report its effectiveness in accordance with the current state regulations. Task 9.2m - Conduct Final-Inspection and Issue Punchlists -We will schedule and conduct a final inspection of the completed facilities and issue punch lists of uncompleted items where necessary.We will also assist the City in negotiation of unsettled changes or disputes associated with these inspections. When the final punch list items have been completed or resolved, we will recommend acceptance by the City. Task 9.2n - Documentation of Existinq Site Conditions -We will prepare video and photographic records of initial site conditions before the contractor begins construction. Video documentation will be accompanied by a verbal description of existing conditions. A copy of the video and photographic documentation will be provided to the City. Task 9.2o - Construction Inspection -We will provide a qualified inspector to monitor the contractor's compliance with the specifications requirements Task 9.2 - Electrical Testing -We will work with the designer, contractor and vendors to determine all the required testing, then witness and document all site acceptance tests on electrical equipment. This includes witnessing all point-to-point checks and run tests for electrical equipment. We will confirm that circuit breaker settings conform to the values shown in the short circuit study and that all harmonic filters are correct and in place. All electrical testing results will be documented and filed in the project records. Task 9.2g - Monitor Contractor's Compliance with Contract Documents -We will review and monitor the contractor's work against the contract documents to ensure compliance. We will report any non-conformances and deficiencies to the City and contractor and will work with the contractor to correct these deficiencies in a timely manner to the satisfaction of the City. Task 9.2r- Review Certified Payroll -We will review the contractor and subcontractor certified payroll for compliance with State and Federal prevailing wage requirements. Any discrepancies will be identified and returned to the contractor for immediate correction. Violations will be addressed in accordance with the State Labor Code and Davis Bacon wage requirements.We will also conduct interviews with select contractor field personnel to confirm payroll conditions. Our certified payroll findings will be included in the monthly project progress report. Task 9.2s-Monitor Contractor's Compliance with CEQA Requirements-We will maintain a copy of the CEQA requirements and monitor the contractor's compliance against these requirements. We will periodically inform the City and contractor of compliance status and recommend a course of action to the City and contractor if these requirements are not being met. Task 9.2t- Monitor and Review Record Drawings -We will monitor and coordinate the contractor's recording and maintenance of field changes to plans and specifications during construction on a monthly basis, or more frequently as required. At the 50-, 75-, and 90-percent project completion levels, we will perform a review of the contractor's working record drawings for general completeness and advise him of status. We will approve progress payments beyond 90- percent completion contingent upon the acceptability of the working record drawings Task 9.3—Material Testing Materials testing will be provided by others to take quality assurance samples during construction and report to Carollo. We will coordinate callouts of the materials testing services firm with the contractor to efficiently use the testing firm. Testing results will be monitored for compliance with the contract documents. Discrepancies will be noted and the contractor will be directed to make necessary corrections. Task 9.4—Startup and Testing Task 9.4a -Oversee Startup and Testing -We will oversee facilities acceptance testing and startup in cooperation with the contractor, design engineer, and City and plant staff. Startup and testing services will include assistance with comprehensive testing of functional equipment, sub- systems, and entire treatment processes. Task 9.4b - Field Testing Reports and O&M Manuals -We will witness all field tests of equipment as described in the specifications and the vendor documentation. We will use test report forms as supplied by the vendors and the designer. Where no report forms are available, we will use our own in-house test forms with input from the designer and vendors. All test reports will be field with the equipment O&M manuals. All vendor O&M manuals will be reviewed for completeness, including all recommended maintenance procedures, calibration requirements, and spare parts lists. :2 js-'g1F N i p rN N �j NHNNNNN NNN� N NNNi� ~NN N NnNNNNNNM� N �NNN _ M C Rai a gzRE!ExF� <�2 P N «" d N 0 N P a aR R aaaa alga R.NR aa auassa�N a r Raga r m UO5 v^ � O O ....... o. qp .... H 0000NO 1 0 N M 's i'; Wn E.11 Al N 'R� OM1NWrm�g Sa`S3`a3 0 o � N C J Raga a aasaaas Rae m R _ 21.2 aaaaRaaaas Ryas R G �� N N M M N H N - =a n s � = H M � N M N N N n G C tp Ipp eV ppb Gn op [V Vy(J N tp O �Op �.! Ip w�.sw�n R w:n.q`3 m --a H a »'»» Rr:$N M ww.nin S v xv.N.IAaem w �p�'e it w rfi m ti SSP L7 OtE �N Q 4 vv PM V O � Dia aE C ^ 0 0 0 0 O O O O O O O o 0 0 O o 0 0 0 b O D e d O O o 0 p O O O O O O O P O O O ANO J ¢'GS4pp .m O O O O O P O p o m p P p O O o O o o O O O O 8 O O O O O O O O O O O O O O N$$o ^ N o !!y$ V N p 0 0 0 O O o 0 0 0 0 e e e O O O o 0 0 0 o O O o m P p ap p p p 0 0 0 0 0 0 0 O Q W m o N O 0 b Ram J O N o P O O 0 0 0 0 0 0 o O b b o 0 0 0 0 o m O m 0 0 0 0 0 o m O N m O p p p O o 0 0 0 O D o U N q ag 6� o o a o ry p p ry ry n v o n N 0 m ry N�ry n � T O O N o a o 0 0 o v e e d v P O p o o Irvn uaN �g�g �� PP p rr � roro PPP or7 p4 O O O OOo vONO � o�eN � pd 0 O 4 m p Yj e��tO.lp pO o00 0 Wy q�p'' a �o�NN$N $ �$,'Pq o0m0 `yrv3 oe'� h PmeppOryaPOb 'gl oo0o bP �� Does v a OoprvNPo e e 0 N PPpp D a o 000 0 o0oo0medPP 0000 a wyOOPP a P o PgrvNp�Qm n ooao 0 0000 � I� Dem � o �,.� 0o$m � P4pP o� y' ooao b e -"Crlm 0000 0 OVPP v n orm oom^°Omeeee v gpPP �' 0000 o P o oyaoPry� oo00 o eeee o $ $ oaP v o00mom P 4 0 m V O P O O D T n� ^''0m � N n mNm''��� I?evN h �mvm n n N n mmRH$agmmm � opop oa a '(3 II y II II q 75'a F f p 0 0 0 q c 0 0 - �� gar�it € coo m lu�eOo �I, vu ami EI'uvi�R dwr � $ �arccu7saamr�ir�o n �cn �� fV �'nnwl w�wl w1 0O avNmmm '1' rvn N QHmnmmP m Am ra - ``-�d 'rrl= �ec as yimcmommw mm