Loading...
HomeMy WebLinkAboutCC Reso 2020-05 - Updating Fees for Planning & Building RESOLUTION NO. 2020-05 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF UKIAH ESTABLISHING UPDATED FEES FOR PLANNING AND BUILDING PERMITS AND SERVICES PURSUANT TO CITY ADOPTED ORDINANCE 880 WHEREAS, 1. Community Development Department ("Department") Planning Permit service fees have not been updated since 2017 and Department Building Permit and service fees in the City of Ukiah have not been updated since 2018; and 2. The Department conducted a fee analysis for permits processed from 2017 to 2019 to determine the average amount of processing time per permit, as well as the total costs to process the permit. Planning permit fee modifications are based on this analysis; and 3. The existing fee for 100%cost recovery projects was adopted in 2007.To reduce invoicing and processing time for the Finance Department, as well as the amount of requests made to the applicant for additional deposits, one initial deposit per applicant of$1,000 to$3,000 with monthly invoicing based on a Department-wide hourly rate of $105.00/hour for additional services, with an automatic adjustment to the hourly rate based on the Consumer Price Index (CPI)' annual rate beginning January 2021, and continuing for each of the subsequent four years through the end of 2025, is reasonable and appropriate; and ' 4. Due to the increased costs (salary, benefits, legal ads, postage, etc.), for processing of minor planning permits, it is reasonable and appropriate to increase the fee for minor level 1 planning permits from $200.00 to $500.00 and for level 2 planning permits from $600.00 to $900.00; and 5. Due to changes in the Mendocino County Airport Land Use Commission (ALUC) processing procedures, the City finds it reasonable and appropriate to eliminate the ALUC referral fee of$150.00; and 6. Due to the increased costs(salary, benefits, legal ads, postage,etc.)of processing appeals made by the public, it is reasonable and appropriate to increase the fees for appeals submitted by the public from $150.00 to $500.00; and 7. Due to the increased costs (salary, benefits, legal ads, postage, etc.) for processing determinations of appropriate use by the Community Development Director, it is reasonable and appropriate to increase the fee from $200.00 to $300.00; and given the name change of the Department, it is reasonable and appropriate to update the title of the fee from "Planning Director Review"to"Director Determination"; and 8. Due to the discrepancy in timing between the City's updating of its fee schedule and the updating of the fee set by the California Department of Fish and Wildlife (CDFW)for filing environmental documents, it is reasonable to change the fee to state "CDFW Fees" and refer the applicant to their website for current fee information; and 9. A comprehensive building permit fee study/adjustment has not been completed since ' 2003, and in completing a comprehensive study in 2019, the Department determined fee modifications were needed to bring the cost of services in line with the level of services expected by the community. Based on this information the following modifications are reasonable and appropriate (see Exhibit A for a list of specific fee modifications): ' The CPI annual index utilized for all CPI adjustments described in this resolution will be the"CPI-u, San Francisco, Oakland, Hayward,'for all urban consumers using the October measurement date. a) Fees for Building Permits and Mechanical, Electrical, and Plumbing (MEP) permits have been modified to better align the building services expected by the community with the costs of providing services. The Building Permit and MEP fees will be adjusted annually by the annual rate of inflation for a five-year period, as indicated by , the Consumer Price Index (CPI), over the period from December to December of each year beginning in January 2021 and ending December 2025. b) Creation of a new residential solar permit base fee of$368.50 (capped at$450) to be in compliance with AB 1414. c) Increase of the code compliance ('red tag") violations fee from an amount of one multiplied by the total permit cost to an amount of three multiplied by the total permit cost. d) Increase to the hourly rate for Building Division staff (Building Official) in the performance of other inspections from $85/hour to a Department-wide rate of $105/hour with an automatic adjustment to the hourly rate based on the Consumer Price Index(CPI) annual rate beginning January 2021, and continuing for each of the subsequent four years through the end of 2025, is reasonable and appropriate. 10. The City has determined that fee reductions for projects that promote/provide economic development, energy conservation and public benefits are still reasonable and appropriate. These fees have not been adjusted and include the following: Economic Development Fee Reduction Energy Conservation Public (No change) Benefit Components Project Design: Solar PV, LEED 80% cost recovery rather than 100% o ' certification, public access easement Planning Permits (creeks, streets, pedestrian paths, etc.), substantial over-planting of trees, significant creek restoration and/or public access, and similar desi nelements. Downtown Businesses: Planning 80% cost recovery rather than 100% on Applications made by downtown Planning Permits businesses(DZC area)—new business or expansion of existing business Industrial/Light Manufacturing: Planning 80% cost recovery rather than 100% on Applications for industrial or light Planning Permits manufacturing businesses. Public Art: Locally inspired publicly 80% cost recovery rather than 100% on "accessible" art included as prominent Planning Permits component in project Community gardens, outdoor dining, live No Planning Permit or Fees required — must entertainment, sidewalk cafEs and tasting comply with specific standards rooms. Energy and Water Conservation: 80% cost recovery rather than 100% on Installation of significant energy or water Planning Permits conservation fixtures, appliances or equipment beyond green building code , requirements 11. The City Council conducted duly a noticed public hearing on January 15, 2020 to discuss and receive public comments on the proposed fees. ' NOW, THEREFORE, BE IT RESOLVED that the City Council hereby adopts the updated fee schedule for planning and building permits and services of the Community Development Department, as listed on the attached Exhibit A. PASSED AND ADOPTED this 15m day of January, 2020, by the following roll call vote: AYES: Councilmembers Mulheren, Brown, Orozco, and Mayor Crane NOES: Councilmember Scalmanini ABSTAIN:None `- ABSENT: None Douglas F. Crane, ATtTyITE,�rS�IT::�',"Iz'{�"j�"�� Kristine Lawler, City Clerk 1 EXHIBIT A Planning/Building Permits and Services Fee Resolution Current and New Fees ' Planning Services Fees: The following Table shows the current and recommended fees for Planning and Building Permits and Services. The fee modifications include: adopting an hourly rate for the Community Development Department; changing the process for cost recovery deposits and billing for major planning permits; increasing the flat fees for minor permits; increasing the fee for public appeals; increasing and renaming the fee for Community Development Director review ("Director Determination"); removing the Airport Land Use Commission (ALUC) referral fee; and referring the applicant to the California Department of Fish and Wildlife's (CDFW) website for environmental document filing fees. PERMIT APPLICATION CURRENT FEE NEW FEE OR SERVICE Staff Hourly Rate Varies based on position and $105.00 Department-wide hourly salary rate with an automatic adjustment to the houdy rate based on the Consumer Price Index(CPI)' annual rate beginning January 2021, and continuing for each of the ' subsequent four years through the end of 2025 Site Development Permit $1000.00-$3,000.00 deposit and No change to the deposit amounts Major 100% cost recovery but the deposit will be collected once up front. Permit still subject to cost Affordable Housing Project: recovery but will be billed on a $800.00 and 80% cost recovery monthly basis using the department- wide hourly rate Special Housing Needs Project: $600 and 60%cost recovery Site Development Permit $200.00(level 1) $500.00(level 1) Minor $600.00(level 2) $900.00(level 2) Use Permit $1000.00-$3,000.00 deposit and No change to the deposit amounts Major 100% cost recovery butthe deposit will be collected once up front. Permit still subject to cost Affordable Housing Project: recovery but will be billed on a $800.00 and 80%cost recovery monthly basis using the department- wide houdy rate ' Special Housing Needs Project: $600 and 60% cost recovery 'The CPI annual index utilized will be the'CPI-u,San Francisco,Oakland, Hayward,"for all urban consumers using the October measurement date. PERMIT APPLICATION CURRENT FEE NEW FEE OR SERVICE ' Cannabis Related $1,000.00 deposit and subject to No change to the deposit amounts Business Use Permit 100% cost recovery but the deposit will be collected once Renewal up front. Permit still subject to cost recovery but will be billed on a monthly basis using the department- wide hourly rate Use Permit $200.00 (level 1) $500.00(level 1) Minor $600.00 (level 2) $900.00(level 2) Use Permit $200.00(Minor level 1) $500.00 (level 1) Site Development Permit Amendment $600.00(Minor level 2) $900.00 (level 2) $1,000.00-$3,000.00 deposit No change to the deposit amounts and 100% cost recovery but the deposit will be collected once (Major) up front. Permit still subject to cost recovery but will be billed on a ' monthly basis using the department- wide hourly rate Variance $1000.00-$3,000.00 Deposit and No change to the deposit amounts Major (seeking more than 100%Cost Recovery but the deposit will be collected once 50% relief from the Code) up front. Permit still subject to cost Affordable Housing Project: recovery but will be billed on a $800.00 deposit and 80% cost monthly basis using the department- recovery wide hourly rate Special Housing Needs Project: $600.00 deposit and 60% cost recovery Variance $200.00 (level 1) $500.00 (level 1) Minor (seeking less than 50% relief from the Code) $60.000 (level 2) $900.00 (level 2) Subdivision $1,000.00-$3,000.00 deposit No change to the deposit amounts Major and 1 DO% cost recovery but the deposit will be collected once ' up front. Permit still subject to cost Affordable Housing Project: recovery but will be billed on a $800.00 deposit and 80% cost monthly basis using the department- recovery wide hourly rate Special Housing Needs Project: $600.00 deposit and 60% cost recovery PERMIT APPLICATION CURRENT FEE NEW FEE OR SERVICE Subdivision $900.00 No change ' Minor Affordable Housing Project: $720.00 Special Housing Needs Project: $540.00 Subdivision $500.00 No change Exception (Minor Subdivisions) Affordable Housing Project: $400.00 Special Housing Needs Project: $200.00 Boundary Line Adjustment $350.00 No change Affordable Housing Project: $260.00 ' Special Housing Needs Project: $170.00 Lot Merger $350.00 No change Modification to Recorded $600.00 No change Subdivision Ma Subdivision/Parcel Map $200.00 No change Time Extension Appeal $500.00 Deposit and 100% cost Fee for appeals by the Project recovery(Project Applicant) Applicant not changing $150.00 gat fee(Public) $500.00 Flat Fee(Public) General Plan Amendment $1,000.00-$3,000.00 deposit No change to the deposit amounts and 100%cost recovery but the deposit will be collected once ' up front. Permit still subject to cost recovery but will be billed on a monthly basis using the department- wide hourly rate PERMIT APPLICATION CURRENT FEE NEW FEE OR SERVICE Annexation $1,000.00-$3,000.00 deposit No change to the deposit amounts and 100% cost recovery but the deposit will be collected once up front. Permit still subject to cost recovery but will be billed on a monthly basis using the department- wide hourly rate Pre-zoning $1,000.00-$3,000.00 deposit No change to the deposit amounts and 100%cost recovery but the deposit will be collected once up front. Permit still subject to cost recovery but will be billed on a monthly basis using the department- wide hourly rate Rezoning $1,000.00-$3,000.00 deposit No change to the deposit amounts and 100%cost recovery but the deposit will be collected once up front. Permit still subject to cost recovery but will be billed on a monthly basis using the department- wide hourly rate ' Planned Development $1,000.00-$3,000.00 deposit No change to the deposit amounts and 100% cost recovery but the deposit will be collected once up front. Permit still subject to cost Affordable Housing Project: 80% recovery but will be billed on a cost recovery monthly basis using the department- wide hourly rate Special Housing Needs Project 60% cost recovery County CEOA Document $50.00 No change (fee subject to change Filing Fee based on County requirements) CA Fish and Wildlife CEQA Negative Declaration: $2,210.25 CDFW Filing Fee Fee h8os://www.wildlife.ca.cov/Conserv Environmental Impact Report: ation/CEQA/Fees (fee subject to $3,070.00 increase every January 10 based on state requirement) Pre-Application Level 1: $0.00 (1 hour of staff No change (level 1) ' Review and Zoning time) Research No change to the deposit amount but (Planning Staff) Level 2: $200.00 deposit and the deposit will be collected once up 100%cost recovery(more than 1 front. Permit still subject to cost hour of staff time) recovery but will be billed on a monthly basis using the department- wide hourly rate(level 2) PERMIT APPLICATION CURRENT FEE NEW FEE OR SERVICE , Pre-Development Review $250.00 No change (Project Review Committee) Pre-Application Review $300.00 deposit and 100% cost No change (Planning Commission) recovery Environmental Impact Full consultant cost plus 15% No change Report (EIR), Special administration fee CEOA Document or Complex Initial Environmental Study Archaeological Search — Full Cost— Paid directly to SSU No change for Environmental Northwest Information Center Review Public Hearing $200.00 No Change ' Continuations requested by applicants that require re-noticing PenaltyNiolation Double the cost of the permit No change (proceeding without permit) Spec Plan/Master Plan $2,000-$3,000.00 deposit and No change to the deposit amounts Review 100%cost recovery but the deposit will be collected once up front. Permit still subject to cost Affordable Housing Project: recovery but will be billed on a $800.00 deposit and 80% cost monthly basis using the department- recovery wide hourly rate Special Housing Needs Project: $600.00 deposit and 60% cost recovery Address Change $100.00 No change County Airport Land Use $150.00 $0 (eliminating fee) , Commission Referral Plus any additional fee required for Land Use Plan by and paid directly to Consistency Mendocino County. Determination PERMIT APPLICATION CURRENT FEE NEW FEE OR SERVICE Site Inspection Request by $0.00 No change Property Owner/Applicant Minor: $50.00 (up to 1 hour of No change Sign Permit staff time) Major: $150.00 (more than 1 hour of staff time) Building Permit Planning $50 No change Review Fee General Plan/Advance 15%of the total cost of a Building No change Planning Maintenance Fee Permit (Building Permit, Mechanical Permit, Electrical Permit, Plumbing Permit and Plan Check) ' Document and Map Fees $30.00 No change General Plan $30.00 Zoning Ordinance $30.00 Subdivision Ordinance $30.00 Master Bike/Ped Plan $30.00 Airport Master Plan $15.00 Landscaping Guidelines $15.00 Design Guidelines $15.00 Creek Plans $30.00 General Plan Map $30.00 Zoning Map $5.00-$30.00 Other Plans $5.00-$30.00 Misc Maps, Graphics and Reports Photo Copy $0.10 per page No change First 5 copies per day are free 1 1 Existing and New Fees Building Division Existing BuyiJIMM 1.00-500.00 $ 65.00 501.00-2,000.00 $ 65.00 for the first 500.00 plus $ 3.39 for each additional 100.00 or fraction thereof,to and;nclul 2,000.00 2,001.00-25,000.00 $ 76.87 for the first 2,000.00 plus $ 15.54 for each additional 1,000.00 or fraction thereof,to and including 25,000.00 25,001.00-50,000.00 $ 434.84 for the first 25,000.00 plus $ 11.21 for each additional 1,00000 or fraction thereof,to and including 50,000.00 50,001.00-100,000.00 $ 714.56 for the first 50,000.00 plus $ 7.77 for each additional 1,000.00 or fraction thereof,to and including 100,000.00 100,001.00-500,000.00 $ 1,103.60 for the first 100,000.00 plus $ 6.11 for each additional 1,000.00 or fraction thereof,to and including 500,000.00 5000,1X10.00-1,000,000.00 $ 3,589.46 for the first 500,000.00 plus $ 5.27 for each additional 1,000.00 or fraction thereof,to and including 1,000,000.00 1,000,00000-And Lip $ 6,225.71 for the first 1,000,000.00 plus $ 4.05 for each additional 1,000.00 or fraction thereof Red Tagged work w/o Permit Permit toe plus 1 fines permit fee. Other inspection fees Inspections outside of normal business hours 1 $ 8500 '(mininum charge-Two tours Reinspection fees assessed under provisions of section 305.8 $ 85.00 Inspections for which no fee is specifically indicated $ 85.00 Additional plan review required by changes,additions or revisions to plans $ 85.00 For use of outside consultants or plan checkand inspections,or both. Cost "Actual Cost Or the total hourly cost to the jurisdiction,whichever is the greatest. This cost shall include supervision,overhead equipment, hourly wages and fringe benefits of the employees involved. "Actual costs include administrative and overhead costs. M M M 1.00-50D.00 $ 105.00 501.00-2,000.00 $ 105.00 for the first 500.00 plus $ 4.75 for each additional 100.00 or fraction thereof,to and including 2,000.00 2,001.00-25,000.00 $ 107.62 for the first 2,000.00 plus $ 21.76 for each additional 1,000.00 or fraction thereof,to and including 25,000.00 25,001.00-50,000.00 $ 608.78 for the first 25,000.00 plus $ 15.69 for each additional t,000.00 or fraction thereof,to and including 50,000.01) 50,001.00-100,000.00 It 1,000.38 for the first 50,000.00 plus $ 10.88 for each additional 1.000.00 or fraction thereof,to and including 100,000.00 100,001.00-500,000.00 $ 1,545.04 for the first 100,000.00 plus $ 8.55 for each additional 1,000.00 or fraction thereof,to and including 50D,000.00 5000,000.00-1,000,000.00 $ 5,025.24 for the first 500,000.00 plus $ 7.38 for each additional 1,000.00 or fraction thereof,M and including 1,000,000.00 1,000,000.00-And Up $ 8,715.99 for the first 1,000,000.00 plus $ 5.67 for each additional 1,000.00 or fraction thereof Red Tagged work w/o permit Penn it fee plus 3 times perm W. Other inspection fees Inspections outside of normal business hour $A105.00 ' mininum chit -Two hoursReinspection fees assessed under rovisions of section 305.8 $Inspections for which no fee is specifically indicated $Additional Ian review uired b chan adtlhbns or revisions to Tans $For use of outside consultants for Ian checki and inspections,or both. C ••Actual Cost •Or the total hourly cost to the jurisdiction,whichever is the greatest. This cost shall include supervision,overhead,equipment, hourly wages, and fringe benefits of the employees involved. —Actual Actual cost includes administrative and overread cents. Building permit fees will be adjusted annually by the annual rate of inflation for a five-year period,as indicated by the Consumer Price Index(CPI),over the period from December to December of each year beginning in January 2021 and ending December 2025.The CPI utilized is the"CPI-u,San Francisco,Oakland,Hayward'for all urban consumers using the October measurement dale. MEP Fees 1 'Il Mechanical Permit Fees Naw For the issuance of each mechanical R. 85.00 105.W For issuing each su,,emerital pennit for which the o' inal penrult has not expired,been canceled or fnaled. $ 8.05 $ 12.88 Unit Fee Schedule Furnaces For the installation or relocation of each foronal or gravity type fumace or burner,includir,ducts and vents attached to such al,liliance up to and includim 100 000 BN'h 29.3 KW $ 16.43 $ 26.29 For the installation or relocation of each focedair or furnace or bumer,includinq ducts and vents attached to such lianceover 100000 BRA 29.3 KW $ 20.20 $ 3232 For the installation or relocation d each floor furnace,sncWiW vent. It 16.43 26.29 For the installation or relocation of each suspended!heater recessed wall heater or floor-mounted unit heater. $ 16.43 $ 26.29 Appliance Vents For the installation,relocation or replacement:of each appliance vent inslalletl and not Included in an appliance nerraft. $ 8.05 12.88 Repairs or Additions For thereair of alteration of,or adtlitbns to each heading appliance, 'on unit cooling unit,absorption unit or each thestinn.cooing,absorption or eve ra6ve cooling system including installation of controls regulated by the Mechanical Code. $ 15.21 $ 24.34 Broilers,Compression,and Pbsor ions tete For the installation or relocation of each boiler or compressor to and includi 3 has 10.6kw or each abso tans tem to and including100,00 Bluth 29.3kw $ 16.32 $ 26.11 For the installation or relocation of each boiler or can ssa over 3 horse r 10.6kw,to and ixktdi 15 horse ower 52 7kw or each absorption stem over 100,00 Shut, 29.3kw to and including 500000 BtWh 146.6kw $ 30.14 $ 48.22 For the installation or relocation of each boiler or compressor over 15 horse r 52.7kw to and includi W horse ower 105.5kw or each abso lions tem over 500,000 Btruh 146.fikw to and inchich 1 000,1100 BhAn 293.1 kvv $ 41.35 $ WAS For the installation a relocation of each boder or cam sor over 30 hone r(1 05.51,w),to and including50 horse er 176kw or each abso lions tem over 7 0D0,000 Shan 293,1kw to and inckd 1,750,000 Bloh 512.9kw $ 61.55 $ 98.48 Fath installation a relocation of each boder or corn sor over 50 horse r 17fikw,or each absorptionsystem over 1,75D,000 Win 512.gkw $ 102.61 $ 166.54 Nr th ndlena Foreach air-handl' unit to and including 10,000 cubic feet per minute umn 4719 Us), miuding ducts attached thereto.Note:This fee does cwt a to an air-handli unit which $ 11.82 $ 18.91 is a portion of a factory-assembled!appliance,confinq unit,evaporative cooler or absorption unit for which a perritit is required elsewhere in the hiechanical Code. For each air-handling unl over 10000 cfm 4719 Us $ 20.09 $ 32.14 Evaporative Coolers For each evalormitive cooler other than Watts type, $ 11.82 $ 18.91 Ventilation and Exhaust For each ventilation fan connected to a single duct $ 8.05 It 12.88 For each ventilations stem which is not a portion of any he tfi or an-conditioning system authorized by arm8. $ 11.82 $ 18.91 For Ute installation of each hood which is served by mechanicial exhaust including the ducts for such hoed. $ 11.82 $ 18.91 Inclrherators For the installation m relocation of each damerific-tybe incinerator. $ 20.20 $ 32.32 For the installation or relocation of each commercial or industrial-type incinerate. $ 16.10 $ 25.76 Miscellaneous Mechanical For each appiliance or piece of equipment regulated by the Mechanical Costs but not classed in other appliance,callegones,or forwhich no other fee is listed in this code. $ 11.82 $ 18.91 Other Inspections and Fees Mechanical 'Ins tion outside of normal business hours per hour Mnimum c1harre two hoursIt 85.00 $ 105.110 'Reins coon fees assessed under provisions of section 305 5,nor inspection It 85.00 $ 105.00 'las tion for which no fee is specifically indicated per hourMnimum ot h chs a re hall $ 85.00 $ 105.00 'Additional Ian review required changes,additions or revisions to plans or to plans which an initial review has been can rdmum charge one hat hour It 85.00 $ 105.W 'Or the total hourty cost to the jurisdiction,whichever is greatest This cost shall Include supermsion,overhead,equipment,hourly wages and M e beriefils of the employees involved. Note:all MEP tees will be adjusted annually by the annual rate of inflation for a five-year period,as indicated by the Consumer Price Index(CPI),over the pend from December to December of each year beginning in January 2021 and ending December 2025.The CPI utilized is the"CPI-u,San Francisco,Oakland,Hayward'for all urban consumers using the October measurement data Electrical Perm-Fees Existi Now Far theissuarme ofeach electrical omit $ 65.00 $ 101.00 For the isauaace ofeach su edal pennit for witch the original cemit has nate ired,been cancelled,or finaled. $ 8.05 $ 12.88 SyslemFee Schedule(note ft fdlowirg do not include permit lsswn fee) New Residential Suildin The followuni fees shall include all wiring and electrical equipment in or on each building,or other ekcbical equiMent on the same premiseer constructed at the same time. Mu-Ifamil -For new multifamily builei s(apartments and condominiums hannng three or more dwelling units constructed at the same time,not induing area of es,ca rte, and accessory buildinus,Mr square- 0.09.2 $ O.60 $ 0.96 Single and two hmi -For new Single and two family residertal buildings constructed at the same None,not including area of gamiges,catpwis,antl accessory buildings, rsquare fl 009m2 $ 0.60 $ 0.96 For other tyines of residential occupancies and for alteration adtltons,antl modifications to existing residedial Wiklin s use the unit fee schedule, Private SWnssim Pools For new pmaue in round swimming pools for sin le-farn ity antl mulfifamily occu ncies,including a cora to system of necessan,branch circuit wiring.I,onding,nrouncift,under- water liMin ,water purn ping and other similar electncal equipment directty relaletl to ffhe oi,eration of a swimmino local,each pod. $ 54.95 $ 87.92 Carnivals and Circuses Camrvals circuses or other toorefirs shows or exhibitions Wilizing trans rtabk- rides booths dis la and attractions. For electric g.rtors and electrically driven rides,each $ 26.09 $ 41.74 For mechmically driven rides and walk-thou h attractions or disploys hamnq electric lihtr each. $ 8.05 $ 12.88 For a s tem of area antl booth figWiM,each 8.05 $ 1288 For pennanerely installed rides,booths,displays and anoadions use the Unit Fee Schedule. For a temprary service er pole or estal-mounted receptacle stets and appurterances,each $ 26.09 $ 41.74 For a temporary d istnt Bion system and ternponan, i Mi and receptacle outlets for construction sites,decoratixe li Ms,Chnstmas tree sales bis,fireworks stands etc.each $ 13.65 $ 21.84 UNIT FEE SCHEDULE Note:The following does not include emit-issuingfee. Receptacle,Sw-oh and Liahting Outlets For receptacle, switch I' M or other outlets at which cunend is usetl or controlled except services feeders and meters:First 20 each $ 1,22 $ 195 Addtonal fodures,each $ 0.81 $ 1.30 Note:For multi-outlet assemblies each 5feet 1524 mm or fraction thereof may bo considered as one outlet. Lighting Fistums For lighting fixtures sackeh or other lamp-holding devices: First 20 fixtures,each $ 1,22 $ 195 Additional todures each $ 0.81 $ 1.30 For pole or la-orm-mounted lighfiM fixtures,each $ 1.22 $ 1.95 For theatrical-type Miningfudures or assemblies each $ 122 $ 1.95 Residential Appliances For fixed residential appliances or receptacle outlets far same,including wall-mounted ekcbic ovens'courusr-mounted coot to 'electric ranges,se-contained room,console or throh-wall air conditioners;sloace healem food waste Antlers;dishwashers;wesleng machines;water heaters;clothes d err;or other motor-operated appliances not exceeding one hore r HP 746 W in mtiW,each $ 5.27 5.43 Note:For other types of air conditioners and other motordniven appliances havinli laMer electrical reti a see Power Apparatus. Nonresidential Appliances For nonresidential appliances and self-contained facto wired,nonresidenfial appliances not exceecuill 1 hone er(HP),tlowalt kW or ldlovo8-am re(WA),in rating,including medical and dental devices food,beverage and ice cream cabinets'illuminated show cases drinlaN fountains vending machines laurcury macNnes or similar types of e,uipmerd, each.Note:For other tres of air condtoners and mdordriven appliances hama larger electrical rabolls,see Power Appaomus. $ 5.27 $ 8.43 PowerApparatus Formot.., eneratom,tmmformers rectifiers a chronous corwe-err capacitors,industrial heating,air conditioners end heat purnp,coold or balung Nuimem antl otinerapparetus,as follows: Rabno in horse ower HP tlowatts Nlovotr-am res(WA),or tlmft-am res-reactive kVPR Up to and inducing 1,each $ 5.27 $ 8.43 Over 1 and not over 10 each $ 13.65 $ 21. Over 10 and not over 50 each $ 27.31 $ 43.]070 Over 50 and not over 100 each 8 82 95 8 87.92 Over 100 each $ 82]0 $ 132.32 Note:For equipment or appliances hevi more than one motor,trorrsformer,heater,etc.,the sum of the cembinetl rahms may he used. Note:These fees include all switches cicuit breakers contractorsthermostats relays and other directhf related codrd ecuipment. S" Portroll and -inbus each 100 feet 30480 mm afmclion Mereo/ E 8.05 E 12.88 Note:M additional fee will be uiretl Par I olio Ltlures,motors and other a liances Mal are connected to bd and I i b"wa .Fee not required for portalaie tools. Si m,OUNim Ligghting and Ma uses For id ns outline li hfi s te-S or norquem supplied from om branch circuit each 21.31 $ 43.70 For adtlidonal branch circuits whin the same s n,outlim lighting i tem or ma um,each $ 527 $ 8.43 Servkes For services of 600 wilts or less aM not ower 200 am in mfing,each $ 33.86 $ 54.18 For services of 600 vdls or less and!over 200 am to l,"am es in utting,each $ 68.98 110.38 For services over 600 raft or aver 1,000 amperes in rating,each $ 137.97 $ 220.75 Mbcellaneous rat",ConduBs,and Conductors For electrical a drat",conduits,antl conductors for which a it is tided bud for which no fee is herein set form $ 20.20 $ 32.32 Note:This lee is notapplicable when a fee is pid for one or more services,outlets fixtures,applfiances,power a anus bui a' m or other Nuipment OTHER INSPECTIONS M D FEES(Electrical) 'Ms outside of normal busimss hours hour(Minimum cha two hours $ 05.00 $ E05.00'Reins ction tees assessed under rovisions of section 305.8 rim coon. E 85.00 E .00'Ins tion for which no fee is s ci6call indicated r hour Mnimum cha a om hag hour E 85.00 E .00'Additional Ian rrwow r uiretl chars ,additoom a revisions to lam or to lans which an initial review has toren cone leted, Mnimum cha one hag hour E 85.00 S .00 'Or the total houdy cost to the jurisdiction,whichewfr is gnodest.This cmt shall include su envision,overheatl ui mend ho and Midge bemfds of Me ernplotmoi imohetl. Pl.r Fees Ex" Now Fwthe l,s.m death Pl..biN Mmk, $ 6500 $ 100.00 FamsuiM each supoemental Mmd for whirls Me origfed R has r bcen camelkxl or finafed. $ 8.05 $ 12.88 Unit Fee Schedule FbWu and veils.Fm each p4umbiM fixture or tap set of WMrres m are" . h Wwq wafer,drai and bacMMwi wec8on 0~ $ 1088 $ 17.11 Fn it w aft r W drainage or vent ppm each Wil m $ 527 $ 8.43 SS"m.D' l SySWM and InWrmptora For each buiWing sewer and each tmiWr pnk sewer, $ 27.36 $ 43.78 For each cess ml. $ 41.35 $ 66.16 For each pmate seas edis orals stem. 82.70 $ 132.32 For each inrlustnal waste pmtreWment inWre tar Includin its tmp end veil(exception Mchon-tym gmase ids tars(u.tioniM as future tre $ 22.09 $ 35.34 Rainwaters stems wrdrain Onsift build 10.88 $ 17.41 Web,Pipl.9 and Wafer Heaters For installation a intim,or re it of wafer pipiN or water tmU ui mens w both each. $ 5.27 $ 8A3 For each water heater inclWiN sent For wrs mly see Table 3-C), 13.65 $ 21.84 DU Piping S tans Fm each gas piping s tem of one to fire outlets. $ 6.83 $ 10.93 Fw each W Wnal outlet over five.each. S 1.22 $ 1.95 Lawn Spnnklem,Vacuum Breakers and Bxkfbw Protection DevWaa Fm each lawns rimers tem on any ore meter,imlWi ,bacMow wotecOon devicm Dwred. $ 16A3 $ 26.29 Fw abnos lent- vacuum Ixeakers w bxMow protection devices ml nckrded in Ilam 1:1 to 5 devices. $ 13.65 $ 21.81 Fm oxer 5&wms,each $ 2.50 $ 1.00 Fm each bacMow txtim device~than abnas hent- vecmm breaker:2 inches 50.Bmm aW smaew. $ 13.65 $ 21.84 Over 2 inches 50.8mm 27.36 43.78 Smno Pool,Fw Each Swimmi Pool Or$ . Public Pool $ 10129 $ 162.08 Public Spa $ 67,43 $ 107.89 Pnvate Wl $ 8]43 $ 107.89 PnvateS 33.58 $ 53.73 Mismllaneous Plumbl For each a liana¢w pnm of ui mem ulated by the plumbim code bd not classed in other a liame c or for wNch no other tee is Isled in Ml,code. $ 10.88 $ 17.41 ON rlmpeOons and Feer, Plumbl 'hs tim odsMe of mrmal W,.mss hours,w hour(W,mum char a Iwo hours $ 85.00 $ 105.00 'Reins coon Ices assessed udw pmvtsms of sedan 305.5,Wr ins ction. $ 85.00 $ 105.00 'Ins tim for which m fee ms al ktliwWd,w how mmum chs eone.8 hour $ 85.00 $ 105.00 'Pddibanal plan review r uiretl by chs ,aWftiom w rex5siws to plans w to plans which an initial review has bcen mrrl un clsW we NI hotio $ 85.110 $ 105.00 'Or the total hmrty cost W Se- .diction,whichever is gmatest Thm cast shall indWe su ion owx .NuiWeffl,hourty and M berOK of Me em klvahed. CiLy Of Ukiah Fees MandMm T.inim aW Cerllficakm surc. e. based on a%of buildi Rs Ian review,and utHity Mnft fees 4% 1 TechnNogy and rxods mane emml surcharge based m a%of buiMi ib,plan review,and utility rmft fees 3% 3 General plan update fund. based m a%of build mit plan review aW ulil' it fees 15% 15% Tem ra cenificate docw nc . Based m Me pmiect sae aW timebame. 60 Da s$100 000.00 $ 500.00 $ 500.00 100000.00 $ 1000.00 $ 1,000.00 R usstfor altemde mffienals and methods review. 100%rmsl recove fully burdened rale W hmr $ 170.00 $ 230.00 Ap�l to buidiM MLAations spKal boad. Two Hmr of BLoldft Oficial time minimum Cost Cost Pmt a-3d partV plan check. IW%cwt rmow; Red Ta wank wBhaR nnft wiolgon The Pe hfee pka vdl,Wn fee) 1Tmes 3Tkros Naw tlecddxki s win fml $ 28.00 $ 37.80 Re+mfi shi fes on r s uare fml $ 2.00 $ 2.70 Re+od sfeathi s mre foot $ 2.00 $ 2.70 Tem seucWre Max W $ 225.00 $ 225.00 Residential Solar and Wx pemft Fee 150.00 W came k W tom with PS 1414 Value $ 368.50