HomeMy WebLinkAboutCC Reso 2019-52 - Approving Gobbi Commons Subdivision Map1
1
RESOLUTION NO. 2019-52
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF UKIAH APPROVING THE GOBBI
COMMONS TENTATIVE SUBDIVISION MAP (FILE# 19-4625)
WHEREAS, the Planning Commission on October 22, 2019 considered and recommended
approval of the Gobbi Commons Tentative Major Subdivision Map; and
WHEREAS, the City Council approved the Rezone to Planned Development, with Specific
Development Plan, and the Major Site Development Permit for the Gobbi Commons Planned
Development, subject to conditions; and
WHEREAS, the Director of Public Works/City Engineer reports that the City of Ukiah has sufficient
wastewater capacity to handle waste waters for this project without violation of Water Quality
Control Board Standards; and
WHEREAS, the Gobbi Commons Planned Development Project is is categorically exempt from
the provisions of CEQA pursuant to CEQA Guidelines Article 19 §15332, Class 32, In -Fill
Development Projects and §15304, Minor Alterations to Land for the following reasons:
The Project is consistent with the applicable general plan designation and all applicable
general plan policies as well as with applicable zoning designations and regulations.
The proposal is consistent with the Medium Density Residential General Plan designation
and applicable General Plan policies. The project proposes single family dwellings which
are permitted within the R2zoning district. In addition, the project proposes a Precise Plan
of Development, Site Development Permit and Subdivision in compliance with all
applicable zoning codes.
The proposed development occurs within city limits on a project site of no more than five
acres substantially surrounded by urban uses.
The proposal is within the Ukiah City limits on a property that is less than one acre in size.
The site is surrounded on all sides by existing urban uses, both commercial and residential
in nature.
3. The project site has no value as habitat for endangered, rare or threated species.
The site is currently vacant, generally flat, and covered by invasive weeds and grasses
which are routinely mowed. Existing vegetation includes grasses, shrubs, one fruit tree,
and established oak trees. Minimal grading is proposed which will not substantially alter
the natural grade. The project has been designed with consideration of existing trees and
driplines. The Oak trees will remain to the extent feasible, with the exception of one that
is recommended for removal by the City's Electric Utility Department.
4. Approval of the project would not result in any significant effects relating to traffic, noise,
air quality, or water quality.
The proposed eight single family residences would be similar to the existing land uses in
the immediate area. The project would not generate a significant amount of traffic or noise.
The site is in a walkable area of town, on-site parking is provided and the site is located
along Mendocino Transit Authority Route 7. There are no wetlands or creeks on-site. The
general drainage pattern for the site is in a north-western and southeastern direction. A
Preliminary Standard Urban Storm Water Mitigation Plan was prepared for the project with
Low Impact Development features incorporated into the design to reduce impacts from
storm water run-off and water quality. Lastly, the project has been reviewed and
conditioned by several departments and agencies to reduce potential impacts from traffic,
noise, air quality and water quality.
5. The site can be adequately served by all required utilities and public services.
The project site is within the City limits and is already served by City utilities and public
safety agencies.
6. In addition, CEQA §15183 states, "CEQA mandates that projects which are consistent
with the development density established by existing zoning, community plan, or general
plan policies for which an EIR was certified shall not require additional environmental
review, except as might be necessary to examine whether there are project -specific
significant effects which are peculiar to the project or its site. This streamlines the review
of such projects and reduces the need to prepare repetitive environmental studies."
NOW, THEREFORE, IT IS HEREBY RESOLVED that the Gobbi Commons Tentative Major
Subdivision Map, attached hereto as Exhibit A, is approved, conditioned upon compliance with all
applicable State Statutes, local ordinances, conditions of approval for the Major Site Development
Permit, and the following specific conditions:
1. A Major Subdivision and Tentative Subdivision Map shall be approved by the City Council.
A copy of the final subdivision map shall be provided to the City Engineer, nor later than
eighteen (18) months from the date of approval. Submitted final map shall conform to all
particulars of the "Map Act" and Division 9, Chapter 1 of the Ukiah Municipal Code.
2. Prior to issuance of building permits, Developer shall submit a copy of the recorded Final
Subdivision Map to the Community Development Department.
3. Maintenance and inspection of all post -construction best management practices (BMPs)
are the responsibility of the property owner. In accordance with the LID Manual, a legally
binding, signed maintenance agreement approved by the City of Ukiah is required for the
proposed storm water treatment planters and all post -construction BMPs, and shall be
recorded prior to final approval of the building permit. •
4. Street trees shall be spaced approximately every 30 ft. along Gobbi Street within a
landscape strip or within 5 ft. of the back of sidewalk. Street trees shall be installed in
accordance with City Standard Drawing No 601. Tree types shall be approved by the City
Engineer. Street trees may be placed on the property instead of within the public right of
way if the location is approved by the City Engineer, based upon safety and maintenance
factors.
5. All work within the public right-of-way shall be performed by a licensed and properly
insured contractor. The contractor shall obtain an encroachment permit for work within
this area or otherwise affecting this area. Encroachment permit fee shall be $45 plus 3%
of estimated construction costs.
6. All driveway and parking areas shall be paved with asphaltic concrete, concrete, or other
alternative surfacing, subject to approval by the City Engineer.
7 Driveway approach into the project shall be an ADA standard residential driveway with no
curb returns.
1
1
1
1
1
1
8. All parcels of the proposed subdivision are subject to the payment of park fees pursuant
to City Code Section 8400, et seq.
9. A Road Maintenance Agreement, and Covenants, Conditions and Restrictions (CC&R)
will be required for this project.
10. An Agreement for Subdivision Improvements may be required depending on the timing of
construction and timing of map recordation. Please contact the Public Works Department,
at 707.463.6282, for more information.
11. A 10 -ft. utility easement for any underground distribution extended into the parcel beyond
the existing PUE shall be required. Prior to recordation of the final map, easements must
be surveyed and deeded or defined on the map. Alterations to the 10 -ft. utility easement
shall be submitted to the City of Ukiah Electric Utility Department for approval prior to
recordation of the final map.
12. One fire hydrant will need to be installed per the California Fire Code (locations to be
determined on building plans).
PASSED AND ADOPTED this 6th day of November, 2019 by the following roll call vote:
AYES: Councilmembers Orozco, Brown, Scalmanini, Crane, and Mayor Mulheren
NOES: None
ABSTAIN: None
ABSENT: None
ATTEST:
� ),,11`11,L
istine Lawler, City Clerk
rafulheren, Mayor