HomeMy WebLinkAboutSMB Environmental, Inc. 2018-04-11; Amendment 1 2019-01-16COU NO 1718-183-A1
CITY OF UKIAH
AMENDMENT NO.
TO AGREEMENT FOR PROFESSIONAL CONSULTING SERVICES
DATED NOVEMBER 28, 2018
TERMS AND CONDITIONS
All terms and conditions of the Agreement for Professional Consulting Services dated
April 11, 2018 shall remain in force and effect except as modified by this first amendment.
AUTHORIZATION
Upon execution of this amendment, service provider is authorized to provide the service described
under the Scope of Work, Budget, and Schedule identified in this Amendment No. 1.
SCOPE OF ADDITIONAL WORK
Work authorized by this amendment shall include that work described in the
following Subject Letter:
1) City of Ukiah Recycled Water Pipeline Project, Phase 4 Refinements
A copy of said work is included in this First Amendment and referred to as Attachment 1.
COMPENSATION
Compensation for the performance of the additional work shall be made on a Fixed Fee Price as
listed in Attachment 1. Expenses shall not exceed a maximum total cost of $15,000 for a revised
total contract amount of $70,000.
SMB ENVIRONMENTAL
BY:
CITY OF UKIAH
BY:
PRINCIPAL SAG SA A 1
CIT MANAGE
Steve Brown
PRINT NAME DATE
November 30, 2018
DATE
Attachment 1
City of Ukiah
City of Ukiah Recycled Water Pipeline Project
Phase 4 Refinements
Addendum 3 — Scope of Work, Budget, and Schedule
SMB environmental, Inc. (SMB) is pleased to provide this scope of work, budget, and schedule to complete
the necessary environment documentation pursuant to the California Environmental Quality Act (CEQA)
for the Phase 4 Refinements to the City of Ukiah's (City) Recycled Water Pipeline Project (Proposed
Project). What follows is our understanding of the effort required to meet CEQA compliance and our scope,
budget, and schedule for completion.
PROJECT BACKGROUND AND UNDERSTANDING
In May 2013, the City prepared an Initial Study/Mitigated Negative Declaration (IS/MND) on the City's
Recycled Water Pipeline Project and on June 5, 2013 adopted the IS/MND and approved the Project (SCH
#2013032072), which was based on the City's 2012 Recycled Water Feasibility Study. Subsequently in
May 2015 and July 2017, the City prepared and approved two Addendums on minor project changes to the
original Proposed Project description and further evaluated the potential effects of reducing flows to the
Russian River. These documents are included by reference.
Phases 1-3 of the City of Ukiah's Recycled Water Pipeline Project are under construction currently and
expect to be completed by spring/summer 2019. The City would like to implement the complete project as
originally planned in the 2012 Recycled Water Feasibility Study, which includes one remaining phase (i.e.
Phase 4) of pipeline and customers. Phase 4 includes 21 parcels and 190 acres, all urban landscape irrigation
sites. The Phase 4 customer sites include one (1) City owned golf course at the end of the line, a cemetery,
some City parks and several City public schools. The City has already acquired signed recycled water use
agreements from the planned Phase 4 customers.
Due to the fact that many details were not known at the time, the 2012 Recycled Water Feasibility Study
and the subsequent 2013 IS/MND and 2015 and 2017 addendums could not clearly outline or define the
Phase 4 storage requirements. Now the requirements for Phase 4 are better known and defined and include:
• Miscellaneous upgrade improvements at the existing tertiary filtration/disinfection system at the
WWTP, mainly electrical, Instrumentation & controls, monitoring and testing equipment, etc.
• RW storage tank, up to 1 MG, and booster pump station at the City of Ukiah Sports Complex,
located at the end of the Phase 3 RW Pipeline Project.
• Approximately 5,000 LF of 12" diameter pipeline, including a bore and Jack under Highway 101.
• Approximately 14,000 LF of 8" diameter pipeline ending at Lake A on the City owned golf course.
• Four (4) lined lakes, and irrigation pump station, at the golf course to provide operational storage
for the RW system, as defined herein:
Lakes Elev Ac
A 650' 1.4 AC
B1 648' 0.7 AC
B2 646' 0.4 AC
C 641' 1.6 AC (including irrigation PS)
Ukiah Recycled Water Project - Phase 4 Refinements
- Page 1
October 2018
The four lined lakes on the golf course are needed to provide end -of -the -line system storage. The lakes are
designed to be intertied and gravity flow from Lake A to B1 to B2 to C. The irrigation pump station, located
at Lake C, will provide irrigation of the City owned golf course, as well as system reliability. The operation
of the lakes is planned to be such that the RW system will only use the top approximately two feet of the
lake for irrigation, and would therefore be maintained as lakes. The only time the lined lakes would be
emptied is if they need maintenance or cleaning.
Due to the fact that the City is applying for grant money through the State Water Resources Control Board
(State Board) through the State Revolving Fund (SRF) Loan Program and that the deadline for submitting
complete packages, including complete CEQA coverage, is due by December 31, 2018 to be eligible for
2019 funding, - the City must complete CEQA on these Phase 4 Refinements on/or before that December
31, 2018.
SCOPE OF WORK
SMB will prepare an Addendum pursuant to CEQA for the Phase 4 Refinements to the City's Recycled
Water Pipeline Project. It is recognized that some of these refinements may push the envelope of what is
intended for an Addendum to a previously prepared IS/MND. However, given that it is likely that these
refinements will not create any new significant environmental impacts that were not anticipated in the
original IS/MND and/or require any new mitigation, then an Addendum may be appropriately prepared. If
the City, State Board, or any other responsible agency requires that a supplemental IS/MND is required
instead, then additional scope, budget, and schedule will be required and it would then be impossible to
make the December 31, 2018 deadline for submittal for 2019 SRF funding consideration.
BUDGET
SMB proposes to prepare the Addendum as described above for a Fixed Fee price of $15,000.
SCHEDULE
SMB proposes to complete the Addendum as described above for the City to consider for approval at it's
December 5, 2018 City Council Meeting. This will require a complete and Final Project Description of the
Phase 4 refinements from Carollo Engineers and City approval to this Proposal by October 31, 2018. This
Addendum will require a 15 day- public review, which will need to be completed by November 21, 2018.
Ukiah Recycled Water Project - Phase 4 Refinements
Page 2
October 2018