HomeMy WebLinkAbout77-67RESOLUTION NO. 77-67
RESOLUTION GRANTING VARIANCE TO
MERLE P. ORCHARD
The City Council of the City of Ukiah does hereby
RESOLVE:
An application for variance having been duly presented and filed~ the Planning
Commission of the City of Ukiah having duly held a public hearing, taken evidence,
and made and filed its recommendations, and the City Council of the City of Ukiah,
having duly considered the recommendations of the Planning Commission;
The City Council hereby finds that the proposed variance is in harmony with the
general purpose of the Zoning Ordinance of the City of Ukiah and meets the conditions
thereof; and
Does hereby grant Variance No. 77-19 to:
Merle P. Orchard
to permit: _ professional office use on lot in R-3 zone which is 1000
square feet below minimum lot size (415 West perkins Street)
all subject to the following conditions:
1. Standard conditions 1 thru 9 where applicable.
·
·
.Existing structure will not be altered on the exterior so as '
to change the basic architecture or residential nature of the
building without Planning Commission approval, nor the basic
site utilized for a greater intensity use.
Variance shall.be null and void if use as professional office
ceases.
If any condition set forth-above is violated, or if any required approval is not
obtained, then this variance shall be null and void, otherwise to continue in full
force and effect indefinitely and to run with the land. This variance is granted only
for the specific purposes set forth above, and shall not be construed as eliminating
or modifying any building, use or zone requirements except as to such specific purposes.
Dated this _15th day of February , 19
ATTEST ~
City Clerk
ACCEPTANCE
I, the undersigned applicant, do hereby certify that I have read the foregoing
'-contained therein.
and that I accept such variance subject to all ter~..~ and conditi~,.n~
Applicant
STANDARD CONDffTI~OHS.
I~ere the action of the Ce~sslon so ~ndlcates, any or all of the fol-
lowing Standard Conditions may be incorporated by reference into the Cem~ssion's
determination on any matter before it:
1. Ali use, construction or occupancy shall confom to the appilcatl®n
anal to any SUplearting documents submitted therewith.
20 Any construct~en~ and the location thereof~ shall conform to any
maps, sketches or p~ot plans accompanying the application er sub~itteel ~y appli-
cant in support thereof.
3o An), construction shall co~ply wi th the "Standard Speclf~catiens~,
for such type of construction new existing er which may hereafter be promulgateel
by the Engineering Department of the City ef Uk~ah; except where higher stan-
dards are i~posed by law, rule or regulation or l~y action of the Planning Cee-
miss§on such standards shall be met.
L~. fin addition to any particular condition which misht be lmposed~
any construction sha]~ comply with all bulJ)ding, fire, electric~ plu~b~ng~
occuirancy and structural law~, rules, regulations and ordinances.
5o Applicant sh~l be required to obtain any approval wh§ch ~ re-
quireal by law~ re§u~t~on ar ordinance.
6. Any variance or use Perai t shall be put Into effect by completion
of construc:lan0 ~f any, w~thin one (1) year from the date of final approval
of such variance ar use permit.
7. ~f any use permitted shall cease for s~x (6) cens®cut~ve months
then the right te ~ny variance or use permit permitting such use shall term-
Inate and such variance or use permit shall be revocable by the granting body.
~o ~f a~y condition, speclal er standard, is vlola~eal, er if any
required approval ~s not obtained, then the variance er use permit granted
she~l be nu~ and void; otherwise te continue In full force and effect indefin-
Itely unt~ otherwise terminated and shall rue with the land.
~). Except as otherwise Sl~eciflcally noted, :any variance or use permit
shall be granted only for the.'speclf:ic purposes stated In the action approving,
and shall nat be construed as elimlnatln~j or meellfylng any buiiding, use or
zone requirements except as te such spec~flc purposes.
P.C. Rules 0765