Loading...
HomeMy WebLinkAbout76-25RESOLUTION NO. ~ RESOLUTION GRANTING VARIANCE TO KARL GALL The City Council of the City of Ukiah does hereby RESOLVE: An application for variance having been duly presented and filed, the Planning Commission of the City of Ukiah having duly held a public hearing, taken evidence, and made and filed its recommendations, and the City Council of the City of Ukiah, having duly considered the recommendations of the Planning Commission; The City Council hereby finds that the proposed variance is in harmony with the general purpose of the Zoning Ordinance of the City of Ukiah and meets the conditions thereof; and Does hereby grant Variance No. 76-14 to: Karl Gall to permit: The construction of a carport thereby reducinE a portion of the required 5' sideyard to 0' all subject to the following conditions: 1. Standard Conditions 1 through 9 2. Carport is to be unenclosed and of the metal roofed type, If any condition set forth above is violated, or if any required approval is not obtained, then this variance shall be null and void, otherwise to continue in full force and effect indefinitely and to run with the land. This variance is granted only for the specific purposes set forth above, and shall not be construed as eliminating or modifying any building, use or zone requirements except as to such specific purposes. Dated this 5th day of November ATTES.~: City Clerk ACCEPTANCE I, the undersigned applicant, do hereby certify that I have read the foregoing and that I accept such variance subject to all terms and conditions contained therein. App 1 i cant S'rAN BARD CONBffT~ONS o Ii, ere the action of the Ceumisslo~ so t~ndlcates, any or all of the fei- lowing Standard Conditions may be Incorporated by reference into the Ceemm~ssl®n"s detemination on any ~tter before 1o Ali use, constructi®n or occupancy shall conform to the application and te any supparting docue~nts submitted therewith. 20 A~y constructl®n~ and the location thereof~ shall conform te any maps, sketches or plot plans accompanying the appllcatien er subBitted by appli- cant in support thereof, 3. Any construction shall comply with the ~tStandard Specif~catiens' for such type of construction new existlng or which may hereafter be pr~ulgated by the Engi~ring I)epartment of the City ef Uk~ah; except ~ere hi~her d~rds are im~sed by law~ rule or regulation or by action of the Plinn~n~ Cee- m~ss~ such standards sha1~ be /~o ~n addition to any partlcular condition which might be impesed~ any construction shal~ comply with a11 building, fire, electric, plumbing~ occupancy and structural law~, rules, regulations and ordinances° 50 Applicant sha~l be required to obtain any appraval which Is re- red by law~ regulation er ordinance. 6o Any variance or use permit shall be put into effect by ceBpletlen of censtruc:lan0 if any, within eno (1) year from the date of final appraval ef such variance er use permit. 7o ~f any use permitted shall cease for six (&) cansecutive emnths then the r~ght te any variance er use permit permitting such use shall term- ~nate and such variance or use permit shall be revacable by the granting body. Io Of any condition, speclal or standard, is vlalated, ar If any r~lu~red approval is not obtained, then the variance er use permit granted shall be nu~ and veld; otherwise te continue in full force and effect indefin- itely unt~ otherwise terminated and shall run with the land. 9. Except as otherwise Sl~ecifically noted, any variance or use permit shal~ be granted only for the,'speClt:lc purposes stated in the action approving, and shall net be construed as eliminating or medlfylng any building, use or zone requirements except as to such specific purposes. PoCo Rules 0765