HomeMy WebLinkAbout76-24RESOLUTION NO. 76-24
RESOLUTION GRANTING VARIANCE TO
PAUL J. PASQUINI
The City Council of the City of Ukiah does hereby
RE SOLVE:
An application for variance having been duly presented and filed, the Planning
Commission of the City of Ukiah having duly held a public hearing, taken evidence,
and made and filed its recommendations, and the City Council of the City of Ukiah,
having duly considered the recommendations of the Planning Commission;
The City Council hereby finds that the proposed variance is in harmony with the
general purpose of the Zoning Ordinance of the City of Ukiah and meets the conditions
thereof; and
Does hereby grant Variance No.
Paul J. Pasquini
to permit:
76-12 to:
Reduction of 15 f-or required rear yard to a rear yard of
6 feet to permit addition of small bathroom.
all subject to the following conditions:
Standard conditions 1 through 9.
If any condition set forth above is violated, or if any required approval is not
obtained, then this variance shall be null and void, otherwise to continue in full
force and effect indefinitely'and to run with the land. This variance is granted only
for the specific purposes set forth above, and shall not be construed as eliminating
or modifying any building, use or zone requirements except as to such specific purposes.
Dated this 5th day of November
City Clerk
ACCEPTANCE
I, the undersigned applicant, do hereby certify that I have read the foregoing
and that I accept such variance subject to all terms and conditions contained therein.
STANBAKD CONDiTiONS o
t~here the action of the Ce~issio~ so ~ndicates, any or all of the f.l-
lowing Standard Conditions may be ~ncorperated by reference into the Cem§ssien~s
determination on any e~tter before it:
I. All use~ construction er occupancy shall conform to the application
and te any supporting documents submitted therewith.
20 Amy censt~uctiIen~ and the location thereof~ shall conform te any
m~ps, sketches or plot plans accompanying the application er sube|tted by appli-
cant in support thereof.
3. Any construction shall comply with the ""Standard Specif§catiens
far such type of construction new exlstleg er which may hereafter be promulgated
by the Engineerins I)epartment of the City of Llktah; except where higher stan-
dards are imposed by law~ rule or regulation or by action of the Planning
elss§en such standards sha~ be met.
/~. 9n add?tlon to any particular ceedltion which eight be ff~sedo
any censtructt~n shall comply with ali building, fire, electric, plumblnffe
occupancy amd structural laws, rules, regulations and ordinances.
5o Applicant sha~l be required to obtain any approval which Is re-
quired by ~w, re§u~atton or ordinance.
E;. Any variance or use permit shall be put Into effect by ceeplet~en
of censtruct~an~ ~: any, w~thln eno (1} year free the date ef final approval
et: such variance er use permit°
7. Of any use permitted shall cease for six (&) consecutive months
them the r~ght te any variance er use permit permitting such use she1! tone-
§nato and such variance or use permit shall be revocable by the granting body.
lo gf a~y condition, speclal er standard, is violated, er if e~y
reelected approval is net obtained, then the variance er use permi't granted
sha~1 be nu~ and veld; otherwise te continue in full force and effect indefin-
Itely untl~ otherwise terminated and shall rum with the land.
9o Except as otherwise smecifically noted, any variance er use permit
shal~ be granted envy for the'speclfic purposes stated in the action approving,
and shall net be construed as eliminatlng or medify§ng any building, use or
zeno requirements except as te such specific purposes°
P°C. Rules 0765