Loading...
HomeMy WebLinkAbout73-17 - revised schedule of water service and sewer construction charges 1 3 4 8 10 17 18 ~0 ~8 RESOLUTION NO. 73-17 OFIiG P A'L RESOLUTION OF THE CITY COUNCIL OF THE CITY OF UKIAH ADOPTING REVISED SCHEDULE OF WATER SERVICE CHARGES AND SEWER CON- STRUCTION CHARGES; EFFECTIVE DATE; REPEALS OF PRIOR SCHEDULES The City Council of the City of Ukiah does hereby RESOLVE: That the schedule of Water Service Charges and Sewer Construction Charges attached hereto and entitled "~ity of Ukiah Department of Public Works Water Service Charges and Sewer Construction Charges," be and the same is hereby adopted as the applicable schedule of water service charges and sewer construction charges for the City of Ukiah. Said schedule shall become effective at 12:00 o'clock a.m. on the 1st day of October, 1972, and shall continue until modified, amended, or repealed. All prior rate schedules in conflict herewith are repealed upon the effective date of the new schedule. PASSED AND ADOPTED this 20th day of September, 1972, by the following vote: AYES: Councilmen Weinkauf, Norgard, Simpson, Pearson, and Mayor Norgard. NOES: None ABSENT: None ATTEST: City Clerk Mayor CITY OF UKIAH DEPARTMENT OF PUBLIC WORKS WATER SERVICE CHARGE AND SEWER CONSTRUCTION CHARGE SCHEDULE (Effective October 1, 1972) 1. The following service charges for water service shall be paid in advance. A. Restoration of service after discontinuance for non-compliance with water service rules ........................ $7.50 B. Commencing new service where the meter is already installed ....................................... $7.50 C. Installation of a 3/4 inch service, including the meter, for new service ................................. $250.00 (1) The charge in item "C" includes a $5.00 service connection charge. D. Installation of a 1 inch or larger service, including the meter, for a new service ........................ $250.00 or cost (1) Should the cost under "D" above exceed $250.00, the service charge should be the cost. The estimated amount shall be deposited in advance. E. In new subdivisions where the subdivider has constructed the water service from the water main to the property line, including the meter box, the following charges shall apply. (1) The subdivider shall, at the time of payment for other city services, pay for the meter to be installed by the city .................................... $45.00 (a) In cases where a subdivision was approved and accepted prior to the adoption of the policy, the $45.00 charge shall be paid by the customer. (2) The customer shall, at the time of requesting service connection for new service, pay ............ $10.00 F. Installation of fire service, wet or dry standpipe, to non-municipal customers ......................... Cost (1) Cost shall include the meter and the estimated cost shall be deposited in advance. (2) A monthly stand-by fee, in addition to consumption at current rates, shall be as follows: 4 inch service $4.00 6 inch service $6.00 8 inch service $8.00 2. Estimates of costs shall be prepared by the Department of Public Works of the City of Ukiah and shall be based on total construc- tion cost from the water main to be tapped to the location selected by the City for the meter box. -1- Be , The following construction charges shall be paid in advance of connection to sewer service: a. For construction of 4 inch house connection sewer lateral ................................... $250.00 b. For inspection of same .......................... $10.00 c. For connection to trunk line .................... $10.00 This schedule shall be effective 12:00 A.M. on October 1, 1972. may be modified, amended or repealed at any time. It -2-