HomeMy WebLinkAbout73-17 - revised schedule of water service and sewer construction charges 1
3
4
8
10
17
18
~0
~8
RESOLUTION NO. 73-17
OFIiG P A'L
RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF UKIAH ADOPTING REVISED SCHEDULE
OF WATER SERVICE CHARGES AND SEWER CON-
STRUCTION CHARGES; EFFECTIVE DATE;
REPEALS OF PRIOR SCHEDULES
The City Council of the City of Ukiah does hereby RESOLVE:
That the schedule of Water Service Charges and Sewer Construction
Charges attached hereto and entitled "~ity of Ukiah Department of Public
Works Water Service Charges and Sewer Construction Charges," be and the same
is hereby adopted as the applicable schedule of water service charges and
sewer construction charges for the City of Ukiah.
Said schedule shall become effective at 12:00 o'clock a.m. on the
1st day of October, 1972, and shall continue until modified, amended, or
repealed. All prior rate schedules in conflict herewith are repealed upon
the effective date of the new schedule.
PASSED AND ADOPTED this 20th day of September, 1972, by the following
vote:
AYES: Councilmen Weinkauf, Norgard, Simpson, Pearson, and Mayor Norgard.
NOES: None
ABSENT: None
ATTEST:
City Clerk
Mayor
CITY OF UKIAH DEPARTMENT OF PUBLIC
WORKS WATER SERVICE CHARGE AND SEWER
CONSTRUCTION CHARGE SCHEDULE
(Effective October 1, 1972)
1. The following service charges for water service shall be paid in
advance.
A. Restoration of service after discontinuance for non-compliance
with water service rules ........................ $7.50
B. Commencing new service where the meter is already
installed ....................................... $7.50
C. Installation of a 3/4 inch service, including the meter,
for new service ................................. $250.00
(1) The charge in item "C" includes a $5.00 service
connection charge.
D. Installation of a 1 inch or larger service, including the
meter, for a new service ........................ $250.00 or cost
(1) Should the cost under "D" above exceed $250.00, the
service charge should be the cost. The estimated amount
shall be deposited in advance.
E. In new subdivisions where the subdivider has constructed
the water service from the water main to the property line,
including the meter box, the following charges shall apply.
(1) The subdivider shall, at the time of payment for other
city services, pay for the meter to be installed by
the city .................................... $45.00
(a) In cases where a subdivision was approved and
accepted prior to the adoption of the policy,
the $45.00 charge shall be paid by the customer.
(2) The customer shall, at the time of requesting service
connection for new service, pay ............ $10.00
F. Installation of fire service, wet or dry standpipe, to
non-municipal customers ......................... Cost
(1) Cost shall include the meter and the estimated cost
shall be deposited in advance.
(2) A monthly stand-by fee, in addition to consumption
at current rates, shall be as follows:
4 inch service $4.00
6 inch service $6.00
8 inch service $8.00
2. Estimates of costs shall be prepared by the Department of Public
Works of the City of Ukiah and shall be based on total construc-
tion cost from the water main to be tapped to the location
selected by the City for the meter box.
-1-
Be
,
The following construction charges shall be paid in advance
of connection to sewer service:
a. For construction of 4 inch house connection
sewer lateral ................................... $250.00
b. For inspection of same .......................... $10.00
c. For connection to trunk line .................... $10.00
This schedule shall be effective 12:00 A.M. on October 1, 1972.
may be modified, amended or repealed at any time.
It
-2-