Loading...
HomeMy WebLinkAbout52-02R E,$ OLU T I O N The City Council of the CiTV OF Ui'IAH do hereby resolve as fo!l,w~$: l~imc the following ~pecificstions be and the same are hereby adopted as the standard for all improvements inco,.nection with subdivisions within the City of Ukia~:: . 26 27 28 29 SO STA?DARD SPECiFICATiONS F(R S ?BL'iV ES ION !}~PR OVE?,fE}FfS CITY OF UK~H, CALIFORNIA S2 WAYNE P. BURKE City Afforney Ukioh, CaHf, r~:'m:eOie¢., or removed and replaced by the subdivider. Any work lO ii These soecifications are to be used as a standard for all ll I improvements in new subdivisions within 'the City of Ukiah, 12 ii California. 1S ,i 7.! S'i~ND~RDS AND A PE'~OVAL 14 i{ (a) The City ~ngineer o~ his suthorizeda ssistants sb~!l 15 ~ administer or perform the inspections of specified improvement 16 ~ ~ work to determine, confor~ance with these standards and specifics- ~ tions 18 ~ (b) Plans end profiles of proposed improvements s~ll be~ 19 submitted to the City Engineer and his approva~obtained prior to 20 the commencement of any such improvement. 21 (c) Plans and profiles shall be submitted on 18" x 26" 22 l~ subdivision sheet and/or Standard Plan_~rofile Plate A (single 23 ~ or double) not more than ~6 inches in length. 24 (d) ~lans and prcfilos ~y be submitted on tracing paper 25 or .cin? clot and to s scale adequate to portray the data for ~ tra ~  which approval is requested. ~ (e) The subdivid, er shall request inspections twenty-four hours in advance of the time the inspection is required ss here- ~i inafter set forth for eac type of improvement inspected. (f) Ail work rejected, by the City ~ngineer abm!! be 4 lO ll 12 15 14 15 16 17 18 19 20 1 21 22 24 25 26 27 28 29 3O 31 32 WAYNE P. BURKE City Attorney Ukieh, Celif. done beyond the lines and grades shown on the plans approved by the City Engineer raay be ordered removed at the subdivider,s expense. (g) The City ~ngineer, or his author zed represe~-~tative,! shall at all times have ~ ccess to the work durin~jl c~nstruction, and s~ll be furnished with every reasonable facility for ascertainin~2 thst the ~tsrials used and employed, and the work- ~anship, are ina ccc?dance with the requirements and intentions of these specifications. ~ork done and materials furnished s~ll be subject to his inspection and ap reval. ~aterials found un- suitable ~my be rejected an6 must be rsmoved from the project· (h) All underground utilities shall be shown on a ~lan- profile sh~ showing location, size, grade, and/or depth below finished surface. ~ (i) Water ~ins, g~s mains ~nd sanita~ sewers shall be -j located in public rights of way; w~ter mains and gsa mains s~l be insts~led in separste ditches, placed five feet or more off rights of way center line. Sewers st~ll be constructed along th~ Center lines of ri~hts of v~sy. Any variation in this arrangemen$ must be r~co~Lmended by the Planning Co~ission and s?~roved by the City Engineer. (a) All streets and highways shall be graded and paved t~ the cross sections and grades ap?rove~ by the City Engineer. '~'he subdivider shall improve the extension of all subdivision streets,hi. ~-~ g~'ays, or public ways to the intarcepting paving lithe of any ~ity Street, County Road, or S4ste Highway. ~' (b) Street ~ades shall be establi~hed so tt~t storm water can be celia cted st int.~rsections. The minimum grande of all streets s~ll be 0.90%. (c) The subdivi,~.er shall prepare the subgrade of strea~t~, · highways and service roads in acco',~dance with the Prov~sions of Section 14, Chapter III, Method No 2, of" · Standard ~pecification~ State of California, Department of Public ~orks, January 1949". The prepared sub~rade shall receive s .?enetratio~reatment of SC-2 road oil, ~t the rate of approximately 0.25 gallons ocr - square yard. (d) Paving shall be n:t less titan three (3) inches thick after compact::.on and the materials, mixing, olacin~ and co~pscting th.::reof shs!! conform to the desc~iption and require- merits of "Standard Specifica-L'~ons, State of California, Depart- lO ll ii merit of Public ~orks, January, 1949" exceptions noted hereinbelow. 15 , with the provisions and 1. i~o saa]. coat sb~ll ~e required. 2. Subgrade shall be prepared as hereinabove described. 3. Grading of aggregates shall be as specified for 3/4 inch maximum in said Section 28 (b). 4. The type, grade and quantity of bituminous binder to be used in road-mix and plant-mix shall be as directed by the Oity Engineer. 5. Finished surface shall be tc the lips of the ~tters and to the grades and cross-sections shown cn the approved pla ns. (e) Traffic shall be denied access to finishe~ surfaces i for forty-eight ~ours aCter the completion of said surfacing. the City ~'ngineer for each of the followin~.i steps of street (f) Subdividers shall request and obtain insoections by 28 i construction: ~9 i! $1 32 C. ify Afforney Uki~h, C~lif. 1. Preparation of subgrade. 2. Penetration treatment. 3. Surfacing materials before deliver7 toproject. 4. Preparation and laying of st~rface. 5. Finished surface. 3. (g) Any varietion from types of subgrade preparation and/ or roadway surfacing as specified herein shall be for types not less than equal to tL.ose specified; shall be requested by the sub~ divider in writing and no variation permitted with.~ut the written ap?reval of the City ~ngmneer. (h) All struct~.res or conduits to b~ constructed within the subdivision shall be shown on th~ ~i~lans and be approved by the City ~ngineer. (i) Subdividers shall be hel0. responsible for obtaining i~spection and approval by the City ~ngineer for all structures or conduits constructed within the limits of the subd~_vision public rights of way. (j) All curbs and gutters sh~ll be constructed of Class "A" Z~ortland ~ement concrete (6 sacks of cement per cubic yard), in accordance with the Sections ~ an~ ~0 of "Standard Opecificstions, ~tate of California, Department of Public ~orks, January, 1~49." (1) ~!1 curbs and gutters to be constructed in areas subdivided, before the adoption of these specifications shall conform '[:o the requirements herein. 21 (m) SubdiviOers shall request and obtmin inspections by the City ~ngineer for each of the following steps of curb gutter construction: 1. Forms, before pouring of concrete. 24 25 26 27 28 During ~ouring of concrete. $1 WAYNE P. BURKE City Attorney Ukiah, Calif. $. Completed curb and gutter after removal of forms, (n) Sidewalks shall be constructed in ~ccordance with the Standard1 Details, therefor, contained in these specifications. (o) Sidewalks sb. all be constructed of Class "A" Portland Cement concrete, (6 sacks of cement per cubic yard), and in accordance with Section ~ of "Standard E~ecificstions, State of January 1949" Ca lifornia De!artment of Public Yforks, · 4. l0 ll 12 15 14 15 (p) Subdividers shall request and obtain inspections by the City Engineer for each of the follovJin~i~ steps of sidewalk construction: 1. Forms, before pouring concrete 2. During pouring of concrete 5. Co~r~pleted sidewalk after removal of forms. (q) Expansion joints in curb and gutter or sidewalk, of a type approved by the City ~ngineer, shall be located at inter- vals of not ma~e than fifty feet, at the beginnings and ends of all curb~ transitions and at all drive~aI~s or walks abutting on the sidewalk. (r) Service connoctions for all underground utilities shall be cona~.ruCted to propertz~ lines or curb lines so that no excavation of completed paved surfaces will be necessary. V .3 ~numents. (a) I~,~onu~lents, required by the City of Ukiah °ubdivision J 18 !~ Ordinance are to be set at specified points on subdivision bound- l~ i! aries and in streets and alleys, ~nd shall t~ prescribed by 20 ~i the City Engineer. 21 24 25 26 27 (b) Monuments required to be set at all lot corners shall consist of galvanized iron pipe not less than 1/~ inch in inside dia~eter or 1/2 inch diameter metal rod not less than thirty-six inches long, set wit[~ the to~ thez, eof ~ne foot belov~ finished grande and with ~ the center of the top at the e~act point monumente~[ ~ (c) A bench mark shall consist of a brass pin not less 28 Ii! than one-quarter inch in ~:~iameter set in the concrete curb with 29 50 $1 ~2 WAYNE P. BURKI~ C;jty Attorney Ukieh, C;elif. the top of the pin flush with the t~,p of the curb, or lead plug set into the curb in a s~nilar manner, after theconstr-~:.~ction of the curb. 5. (d) After compietio.~ of improvements and prior to final inspection and approval of improvements, the Subdivider shall furnish complete plans of im'orovements "as built" ~ , showing all cha~nges and variations from approved plans, including the locations of monuments and the locations and elevations to 0kiah City Datum of all bench marks. Said plans shall be on linen tracing cloth. 8 7.4 STO~%M DRA ZNS . (a) The subdivider shall instatlcurb inlets conforming l0 to City of Ukiah s ta~dards at all lowpoints in gutters or else- 11 where, as needed to collect s~0rm waters and provide street 12 drainage. 13 (b) ~;~.,here 0ity storm sewers are available such inlets lA 15 16 l? 18 19 2O 21 shall be connected thereto with drains of sizes approved b?:~ the City Engineer, ~here nc storm sewer is available, the subdivider shall provide a temporar~f sump or "French Drain" of s design and capacity to be app~,oved by the City En~ineer. Ds t.ed: July 16 1952 24 25 26 ATTEST: C ~ z.< CLERK 28 29 3O 31 WAYNE P. BURKE City Attorney Ukiah, Calif. ·