HomeMy WebLinkAboutRau & Associates, Inc. 2010-08-03; Amendment 4 2019-01-17cou'1Z13-Iso "A'{ CITY OF UKIAH AMENDMENT NO. 4 TO AGREEMENT FOR PROFESSIONAL CONSULTING SERVICES DATED AUGUST 3, 2010 TERMS AND CONDITIONS All terms and conditions of the Agreement for Professional Consulting Services dated August 3, 2010; the First Amendment dated January 6, 2016; the Second Amendment dated June 30, 2016; and the Third Amendment dated January 6, 2017 shall remain in force and effect except as modified by this fourth amendment. AUTHORIZATION Upon execution of this amendment, service provider is authorized to provide the service described under the Scope of Additional Work identified in this Amendment No. 4. SCOPE OF ADDITIONAL WORK Work authorized by this amendment shall include that work described in the letter proposal received from Rau and Associates, Inc. on October 30, 2018. A copy of said letter is included in this fourth amendment. COMPENSATION Compensation for the performance of the additional work shall be made on a time and expense basis at Consultant's customary fees. Expenses shall not exceed a maximum total cost of $5,300. RAU AND ASSOCIATES, INC BY: GEORGE'C. RAU /- / 7— ./7 DATE Amendment No. 4 to Agreement for Professional Consulting Services BY: CITY OF UKIAH Z DATE AND ASSOCIATES INC. CIVIL ENGINEERS • LAND SURVEYORS City of Ukiah, Public Works Department Attn: Tim Eriksen, Director of Public Works Rick Seanor, Deputy Director of Public Works 300 Seminary Ave Ukiah, CA, 95482 November 4, 2016 Jab Number R10064.1 RECEIVED OCT 3 0 2018 CITY OF UKIAH DEPT_ OF PUBLIC WOWS RE: CHANGE TO SCOPE OF WORK: ADDITIONAL CONSTRUCTION REVIEW AND TESTING; CONSTRUCTION STAKING FOR RECONSTRUCTION OF SMITH STREET IN UKIAH TO INCLUDE ENTIRE WIDTH OF SMITH STREET BETWEEN BOX CULVERT AND MASON STREET, TOGETHER WITH SIDEWALK, CURB AND GUTTER ON SOUTH SIDE PLUS TWO ACCESSIBLE RAMPS AT MASON AND SMITH STREET, FOR A LENGTH OF APPROXIMATELY 100 LINEAR FEET. Gentlemen: This letter is to request an amendment to our Agreement for Professional Consulting Services, dated August 10, 2010. During the bid period, it was decided to add approximately 100 linear feet of reconstruction of Smith Street between the box culvert conveying Gibson Creek and the intersection with Mason Street. At Mason Street, two accessible ramps were added for compliance with accessible standards. City Staff designed the accessible ramps and curb and gutter replacement on the south side of Smith Street. Rau and Associates, Inc. was already authorized to provide the construction staking and construction review for the original length of Smith Street which was to be reconstructed. It is a logical extension of their work to provide the same services for the extension east to Mason Street. This request for an amendment identifies two tasks which must be increased in order to have construction review of the project and have it staked for construction. Amendment 4 - Task 1 — Construction Review and Testing During construction it is anticipated that there will be areas of the subgrade exposed which will require special treatment. These areas will be reviewed by a geotechnical engineer from our firm. It is anticipated that a geogrid such as TX -5 by Tensar will be recommended to be installed to assist in bridging over the areas without significant sub -excavation and re -compaction. The structural section recommended is 1.0 foot of aggregate base to support 0.4 feet of hot mix asphalt applied in two layers. This structural section overlaid on a geogrid should be able to bridge over the expected soft spots. We would observe and approve the condition of the subgrade soils prior to the installation of the geogrid, but no compaction testing of the subgrade will be performed. Compaction testing will be done on the surface of the aggregate base before the street is paved to assure that the base has been adequately compacted. One maximum dry density test will be performed on the aggregate base material to provide a proctor test for the compaction of the aggregate base. A proof -roll test will also be conducted to assure a firm and stable surface has been established for the pavement layers to be applied. A brief letter report of conditions encountered and the results of the compaction testing will complete the construction phase work. 100 NORTH PINE STREET • UKIAH, CALIFORNIA 95482 • 707-462-6536 • FAX 707-463-2729 www.rauandassoc.com RECEIVED City of Ukiah, Public Works Department October 29, 2018 OCT 3 0 2018 CITY Of UKIAtf Amendment 4 - Task 2 -- Construction Staking DEPT. OF PUBLIC WOQKS The estimated cost of this task is $2,400. Construction staking is anticipated to be done in two steps. The first step will be to stake the curb, gutter and sidewalk to conform to accessible standards. It is assumed that the contractor will cut the street two or three feet from the current lip on gutter on the south side, then construct the curb and gutter, then construct the accessible sidewalk. Initial stakes will include an offset from the face of curb. The two accessible ramps will be staked for construction in conformance with the plans prepared by the City staff. The second phase is anticipated to be after the sidewalk curb and gutter is completed. Then the contractor will remove the street pavement section and reconstruct it. There are several locations along the street centerline to stake for proper grading. The estimated cost of this task is $2,900. Our current "Schedule of Fees — Table 33" is attached to Amendment #2 which has already been approved. The cost of this additional work is estimated to be a maximum of $5,300 at our current hourly fee schedule. Very truly yours, Ae-0(-26 /de& George C. Rau, P.E. President Attachment: Task -Hour Breakdown 2 L Budget Worksheet Continued Job No. R10064 Job Name: Smith Street Rehab PHASES Rate/Cost Registered Civil Engineer Principal 175 Associate Civil Engineer 140 Survey Manager 135 Chief of Party (PW) 135 GPS Specialist 135 Construction Inspector (PW) 128 Instrument Operator (PW) 118 Materials Tester (PW) (w/o Nuclear Gauge Charge) 116 Sr. Staff Engineer 115 Rodman (PW) 115 QSO/QSP Specialist (non PW) 110 Technician II 72 Project Coordinator 70 Administrative 60 Technician I 38 Vehicle Use (miles) 0.575 RTS 200 Lab Unit Prices 0 Computer Hours 10 Permit Fees 0 Backhoe and Operator 100 Outside Service cost + 15% Reimbursables cost BUDGET FOR PHASE T-4 1 Const Stakin hrsl cost total 2 $ 350 6 $ 840 6 $ 810 $ $ $ $ - $ - 4 $ 460 $ - $ $ - $ $ - $ $ 2 $ 400 $ 8 $ 80 $ $ - $ $ - 28 $ 2,940.00 Fee Schedule 33 T-4.2 Const Review hrs/ cost total 3 $ 525 1 $ 140 2 $ 270 $ $ $ $ - $ - $ $ $ $ - $ - $ $ - $ $ - $ $ $ 5 $ $ 6 $ 935.00 RECEIVED OCT 302018 GwY OF MAR DER_ OF PUBLIC WORKS Worksheet Page 2 T4 3 Com action Testin hrs/ cost total 700 $ $ 4 $ 464 2 $ 230 $ $ $ $ 10 $ 1,394.00 Date: 10-29-2018 hrs/ cost total 0 $ $ $ $ $ $ hrsl cost total $ - $ - $ $ $ $ $ $ $ $ - $ $ - 5 $ $ $ - $ - $ - $ - $ $ - $ 0 $ Total This Sheet $ 5.269.00