Loading...
HomeMy WebLinkAboutGreen Valley Consulting Engineers 2015-07-14; Amendment 2 2018-02-05(mak,. IJo. M to oD1 CITY OF UKIAH AMENDMENT NO. 2 TO AGREEMENT FOR PROFESSIONAL CONSULTING SERVICES DATED JULY 14, 2015 TERMS AND CONDITIONS All terms and conditions of the Agreement for Professional Consulting Services dated July 14, 2015 and the First Amendment dated April 21, 2017 shall remain in force and effect except as modified by this Second Amendment. AUTHORIZATION Upon execution of this amendment, service provider is authorized to provide the service described under the Scope of Additional Work identified in this Amendment No. 2. SCOPE OF ADDITIONAL WORK Work authorized by this amendment shall include that work described in the letter proposal dated September 11, 2017. A copy of said letter is included in this second Amendment as "Exhibit A" COMPENSATION Compensation for the performance of the additional work shall be made on a time and expense basis at Consultant's customary fees. Expenses shall not exceed a maximum total cost of $6,460. The original contract price plus Amendment No.1 and this Amendment No. 2 will bring the total contract amount to $141,085. GREEN VALLEY CONSULTING ENGINEERS t -r- DATE Amendment No. 2 to Agreement for Professional Consulting Services CITY OF UKIAH i BY: SAQE SANG COMO CITY MANAGER s- m DATE 20 G.een CY"5 September 11, 2017 Jarod Thiele, Project Analyst City of Ukiah, Department of Public Works 300 Seminary Avenue Ukiah, CA 95482-5400 municipal engineprInr; civil engineering construction management land surveying Re: Amendment #2 for the "2016 Sewer and Water Main Replacement Project" — Originally "Summer 2015 Street Reconstruction Project" Dear Jarod: Attached please find our requested fee for amendment 42 for the 2016 Sewer and Water Main Replacement Project (Project), currently under construction. Per your request from last week, we will survey and prepare mapping suitable for the design of two curb return bulb -outs to be located at the midblock unsignalized crosswalk intersection of Luce Avenue and State Street. Once the mapping is prepared, we will then design the bulb outs so that they are suitable to be issued as a change order to the Contractor for construction. We will address the grades and necessary drainage, as well as any pavement conforms. A quantity estimate will be prepared suitable for Argonaut to use to submit costs. The scope of work is briefly summarized below: - Topographic survey of Luce Avenue and State Street to allow for the design of 2 bulb - outs - Design two curb return bulb -outs at the SE and SW corner of Luce Ave. and State Street - Modify quantities and specifications as needed for the addition of bulb -outs We are requesting $6,460 forAmendment #2. This includes Original Contract $119,750 Amendment #1 $14,875 Amendment #2 $6,460 Total $141,085 If you require anything further, please let me know, and again, thank you for the work. Should you have any questions regarding our amendment, please contact me directly at 707.579.0388 or on my cell phone at 707.326.5620. Sincerely, Liz Ellis, P.E. Principal 335 Tesconi Circle, Santa Rosa, California 95401 • web www.gvalley.com • tel 7117.579.038$ a fax 707.579.3877