HomeMy WebLinkAbout82-11 - approving amendment 2 to Kennedy-Jenks AgreementRESOLUTION NO. 82-11
RESOLUTION APPROVING AMENDMENT #2
ENGINEERING SERVICES AGREEMENT
KENNEDY/JENKS ENGINEERS
3 ~
WHEREAS City and Kennedy/Jenks Engineers, Inc. entered into agreement
dated 18 July 1979 and subsequent first amendment dated ll September 1980 for
Step II Engineering Design services for Wastewater Treatment Plant Improve-
7 ments, and
WHEREAS City has now awarded a construction contract for treatment
plant improvements in accordance with the designs and specifications prepared
~0 by Kennedy/Jenks, and
11
WHEREAS the City desires Kennedy/Jenks to perform Step 3 Engineering
12
13
14
Services during construction of said Wastewater Treatment Plant Improvements.
NOW, THEREFORE, BE IT RESOLVED that the City Council does approve the
continued engagement of Kennedy/Jenks Engineers for Step 3 Engineering
15
16
Services and authorizes its Mayor and Clerk to execute Amendment #2 upon
the receipt of concurrence and approval from the California Water Resources
17 Agency. Upon approval, said Amendment #2 shall become part of and be
supplemental to said agreement as previously amended.
19
PASSED AND ADOPTED this 2nd day of September , 1981 by the following
20 roll call vote.
21 AYES: Councilmembers Hickey, Snyder, ~yers
22 NOES: Councilmembers Feibusch, Riley
23 ABSENT: None
24
26 ~ ATTEST:
"CITY CLERK
MAyoR
SECOND AMENDMENT TO AGREEblENT
This amendment made and entered into this ,~~ day of ~~.
1981, by and between the CITY OF UKIAH, MENDOCINO COUNTY, California,
hereinafter referred to as the "CITY" and KENNEDY/JENKS ENGINEERS, INC.,
formerly KENNEDY ENGINEERS, INC., a California Corporation, hereinafter
referred to as "ENGINEER."
WITNESSETH
WHEREAS, CITY and ENGINEER entered into an Agreement dated 18 July
1979, and First Amendment dated 11 September 1980, for Step 2 engineering
design services for wastewater treatment improvements fOr the City of Ukiah;
WHEREAS, the City of Ukiah desires KENNEDY/JENKS ENGINEERS to perform
Step 3 engineering services during the construction of said Wastewater
Treatment Improvements for the CITY OF UKIAH;
THEREFORE, in order for the ENGINEER to perform said Step 3 services,
said scope of work and budget is modified as set forth hereinafter:
ARTICLE V
At the end of Article V, add the following:
"ENGINEER will perform Step 3 services during construction
of the CITY OF UKIAH Wastewater Treatment Improvement Project
C-06-1284, including the following:
1. Provide full-time inspection of construction, including.
site inspection ~nd inspection of offsite materials and
equipment as required by the plans and specifications.
2. Be responsible for continuous review of the project
status.
-1-
3. Coordinate administration of the contract; assist the
CITY in the preparation of documents for submission to
grant and review agencies as requested by the Director
of Public Works.
4. Review the Contractor's construction progress.
5. Certify monthly pay estimates.
6. Prepare progress pay estimates.
7. Prepare record drawings to show new work installed.
8. Review shop drawings and submittals.
9. Arrange for laboratory testing of construction pro-
cedures and materials incorporated in the facilities,
including on-site soils testing and concrete testing.
10. Prepare Change Orders for changes in work approved by
CITY.
11. Issue deficiency list(s) if required.
12. Provide appropriate acceptance testing of installed
equipment.
13. Complete the Operations Manual incorporating data on
the facilities as constructed.
14. Recommend final acceptance of construction as appropriate.
15. Aid in training CITY personnel assigned to operation of
facilities.
16. Provide start-up assistance to CITY's operating staff.
ENGINEER shall provide a full-time Resident Engineer, who shall be
a registered professional engineer with the State of California, and
such supporting staff as required.
-2-
ENGINEER will furnish a Resident Engineer for approximately 14 months,
an Assistant Engineer for approximately 6 months and combined use of office
personnel for approximately 10 months, as well as a qualified soils
laboratory and concrete testing laboratory." The work effort, the classifi-
cation of personnel to be used in the work, and the subcontract assignments
have been estimated for budget purposes as shown on the attached
EPA Form 5700-41 dated 2 March 1981.
ARTICLE VI - PAYMENT
At the end of Article VI, add the fOllowing:
"(7) For Step 3 Services, the above paragraphs (1)
through (6) shall apply, except that:
(a) The 1981 provisional overhead rate for Step 3
services is 1.477.
(b) The fixed dollar incremental fee for Step 3
services is $55,631.
(c) The budget, including the above fixed fee for
Step 3 services, is $427,036, which covers the allocation
of designated personnel for periods of work effort set
forth hereinbefore in Article V. Kennedy/Jenks agrees to see the project
through to completion; not to exceed $427,036.
(d) Direct expenses for Step 3 services shall
include but not be limited to:
(1) Rental of equipment needed for inspection
services.
'--3--
(2) Travel by owned automobiles will be reim-
bursed at 25 cents per mile, for office staff when
traveling on project work. Leased automobile use
will be at $400 per month per car, including
operating expenses. Leased automobiles will be used
by Resident Engineer and his part-time assistant.
(3) Same as (d) (e) (f) and (g) in paragraph
(4) in Article VI Payment.
(e) The parties recognize that the labor costs and
expenses used in the budget have been escalated to reflect
the approximate 15 month time frame for completing the
work. '
(f) Payment for the amount due under the fixed fee
for Step 3 services shall be in 15 equal monthly installments
beginning the first month after authorization to proceed with
the work."
-
ARTICLE VII - SCHEDULE
At the end of Article VII, add the following:
"D. The period~of construction of this project is estimated
to take 15 months. Thus, the Resident Engineer and other personnel
required by this contract will be on the job site for as long as
the work to be performed hereunder requires - estimated to be
approximately 14 of the 15 months allowed for construction. The
Final Operation Manual will be prepared during the construction
period. Start-up and operator training assistance will be provided
upon completion of construction of the facility."
--4--
ARTICLE VIII - ASSIGNbIENT OF CONTRACT
At the end of Article VIII, add the following:
"(2) The ENGINEER proposes the following subcontractors
for Step 3 services:
Soils Testing - Harding-Lawson Associates
Concrete Testing - Testing Engineers, Incorporated
The CITY hereby approves the use of the above named subcontractors."
The parties hereto affix their signatures to this Agreement as of
the date and year first written above.
CITY OF UKIAH
By '~' '~'
Mayor, .City of Ukiah
ATTEST:
City Clerk, City of Ukiah
KENNEDY/JENKS ENGINEERS, INC.
By
David D. Kennedy
-5-
COST OR PRICE SUMU, AR ORMAT FOR SUBAGREEMENTS UNDE J.S. EPA GRANTS
(S('e ,'~ccu:r.p,'~ny;,n~ in.~Iruc~ic, n.~ bt'fore cnr:'pletin~ th/s form)
Form A t,prm.c.d
OMB A'o. 15,.?- R('144
PART I-GENERAL
I. GRANTEE
CITY OF UKIAH :. GRANT HUMBER
C-06-1284
3. NAME OF CONTRACTOR OR SUBCONTRACTOR
4. DATE OF PROPOSAL
KENNEDY/JENKS ENGINEERS, INC. 2 ~[ARCH 1981
$. ADDRESS OF' CONTRACTOR OR SUBCONTRACTOR (Inch]de ZiP code) 6. TYPE OF .~ERVICE T O BE FURNISHED
657 Howard Street
San Francisco CA 94105
Step 3 Services
Construction of Wastewater
Treatment Plant Improvements
7. DIRECT LABOR (Specify labor categories)
See Attach~n__ent "A"
General - Step 3 Service
S t a r t-up_S e r v i_.~c_e_s_
O&M Manual Update
DIRECT LABOR TOTAL:
INDIRECT COSTS (Specify indirect cost poole)
INDIRECT COST5 TOTAL:
OTHER DIRECT COSTS
PART II-COST SUMMARY
ESTI-
MATED
HOURS
RATE
HOURLY
RATE
ESTIMATED
COST
125,613
x BASE :
8,101
2,303
ESTIMATED
COST
_ $ 200_~_897
s._l_ 3_6._&_17
a. TRAVEL
(])TRANSPORTATION
) See Attachment "A" - Step 3 Startup
)
TRAVEL SUBTOTAL: J: ' 1
ESTIMATED
COST
b. EQUIPMENT, MATERIALS, SUPPL lES (Specify cnt~£ories)
Equipment Rental, Mailing Costs
Printing
.ng
EQUIPMENT SUBTOTAL:
C. SUBCONTRACTS
· .
S o i 1 s E-Jg'i'n-~-r'--H-A rd i n ~cL~Q-~-6 h-- 7~S-S-~.
Santa Rosa
Concrete Testing - Testing Engineers, Inc.-Geysers
SUBCONTRACTS SUBTOTAL: J q
d. OTHER (Specify cateBories)
OTHER SUBTOTAL:
e. OTHER DIRECT COSTS TOTAL:
10. TOTAL ESTIMATED COST
1 !. PROFIT
22,550
55O
23,100
ESTIMATED
COST
4,250~
ESTIMATED
COST
s
'----2 ,-q.~ z -
5,000 --
S 7,141
ESTIMATED
COST
$
12. TOTAL PRICE
E PA Fo,m .5700-41 (2-76)
TOTALS
· ,
·
. ..
.
s__136, O17
s 200,~397
o,
S ..... 34,491
s 55.631
427,036
PAGE I OF' !
PART III -PRICE SUMMARY
13.
COMPETITOP'S CATALOG LISTINGS. IN-HOUSE ESTIMATES, PRIOR QUOTES
(Indicate bast~ lot price
MARKET
PRICEIS)
PART IV-CERTIFICATIONS
14. CONTRACTOR
r'~OPOSE D
PRICE
14a. HAS A FEDERAL AGENCY OR A FEDERALLY CERTIFIED STATE OR LOCAL AGENCY PERFORMED ANY REVIEW Or: YOUR
ACCOUNTS OR RECORDS IN CONNECTION WITH ANY OTHER FEDERAL GRANT OR CONTRACT WITHIN THE PAST TWF'LVE MONTH{`
{~ YES E~ NO (It "]'es" ~ive n~me address and telephone rtum[)er o[ revie~v/n~ olfice)
Office of Audit, Western Audit Division
Environmental Protection Agency
215 Fremont Street
San Francisco, CA 94105 415-556-1954
14b ,THIS SUMMARY CONFORMS WITH THE FOLLOWING COST PRINCIPLES
41 CFR 1-15.2 and 1-15.4
14C.
(3)
This proposal is subm;.tted for u.~e in connection with and in response to (1) IP..~,Db~r~T' ~z::vt2_
IO,g-o/Pt::r--¢/xa-L- This is to certify to the best of my knowledge
and belief that the cost and pricing data summarized hereir~ are complete, current, and accurate as of
(2). and that a financial managemt, nt capability exisls to fully and accu-
rately account forthe financial transactions under this project. I further certify that I understand that the
subagreement price may be subject to downward renegotiation and/or recoupment where lhe above cost and
pricing data have been determined, as a result of audit, not to have been complete, current and accurate as
of the date above.
DATE OF EXECUTION SIGNATURE OF PROPOSER
TITLE OF PROPOSER
15. GRANTEE REVIEWER
I certify that I have reviewed the cost/price summary set forth...2u::r~ein and the proposed costs/p'~'ice appear
~/~ ~; 'q'~'~7'~acceptable for s,,bngreement//~/~'~/~award' ~ ~~.~/~~~ ~~ ~) / '
' ~ TiLer REVIEWER
16. EPA REVIEWER (II applicable)
DATE OF EXECUIlON
SIGNATURE OF REVIEWER
31TLE OF Rr~VILW[R
EPA Form 5700-41 (2-76)
PAGE 2. C