HomeMy WebLinkAboutGHD, Inc. 2010-03-09; Amendment 11 2017-06-27cry tzi3- 142 -All CITY OF UKIAH AMENDMENT NO. 11 TO AGREEMENT FOR PROFESSIONAL CONSULTING SERVICES DATED MARCH 9, 2010 TERMS AND CONDITIONS All terms and conditions of the Agreement for Professional Consulting Services dated March 9, 2010; the first amendment dated April 8, 2010; the second amendment dated August 5, 2010; the third amendment dated March 23, 2011; the fourth amendment dated November 30, 2011; the fifth amendment dated August 20, 2012; the sixth amendment dated November 16, 2012; the seventh amendment dated December 13, 2013; the eighth amendment dated June 17, 2015; the ninth amendment dated January 6, 2017; and the tenth amendment dated May 19, 2017 shall remain in force and effect except as modified by this eleventh amendment. AUTHORIZATION Upon execution of this amendment, service provider is authorized to provide the service described under the Scope of Additional Work identified in this Amendment No. 11. SCOPE OF ADDITIONAL WORK Work authorized by this amendment shall include that work described in the May 26, 2017 letter proposal from GHD, Inc. A copy of said letter is included in this eleventh amendment. COMPENSATION Compensation for the performance of the additional work shall be made on a time and expense basis at Consultant's customary fees. Expenses shall not exceed a maximum total cost of $36,319. GHD, INC. ALEX CULI'CK PRINCIPAL 2L1 DAT Amendment No. 11 to Agreement for Professional Consulting Services GHD CITY OF UKIAH T BY: S SA GI COMO CITY MANAG R DATE APPROVED AS TO FORM: DAMD J. RAPPORT CITY ATTORNEY 6/,2,// DATE May 26, 2017 Tim Eriksen Public Works Director / City Engineer City of Ukiah 300 Seminary Avenue Ukiah, CA 95482 Reference No. 0250210001/8410035 Re: Proposal for Professional Engineering Services: Supplemental Design Services for the Redwood Business Park Transportation Improvements and Talmage Road Interchange Projects, Ukiah, CA Dear Mr. Eriksen: GHD is pleased to provide this proposal for professional engineering services for additional design efforts and coordination on the Redwood Business Park Transportation Improvements and Talmage Road Interchange Projects (Agreement dated March 9, 2010). This proposal is based on direction provided by City staff and our recent discussions regarding the addition overlay design to southern Airport Park Boulevard (APB), the addition of full -depth reconstruction of Talmage Road from APB east to within 10 feet of the Caltrans right-of-way, changing the vehicle detection system at the intersection of APB / Talmage Road from detector loops to video detection, revising the bidding schedules for these projects from unit pricing to lump sum per California I -Bank funding requirements, and coordinating the design revisions between the Redwood Business Park Transportation Improvements and Talmage Road Interchange design plans. Background The previous Amendment 9 scope of services approved by the City Council and signed by the City Manager on January 6, 2017 addressed previously out -of -scope items the City wanted to include in the project. These items included: • Design revisions and coordination with other consultants on the Hastings Avenue widening and the intersection of Washington Avenue / Hastings Avenue / South State Street; • Revisions to the City's front-end contract requirements; • Changing the vehicle detection system at APB / Commerce Boulevard from detector loops to video detection; • Adding approximately 2,440 linear feet of full -depth pavement reconstruction on APB including signing and striping; • Adding Low Impact Development (LID) storm water quality improvements to the APB reconstruction area; • Additional right-of-way coordination with Caltrans on the Talmage Road Interchange improvements; and • The addition bid phase services for the Redwood Business Park Transportation Improvements project. The previous Amendment 10 scope of services approved by the City Council and signed by the City Manager on May 19, 2017 addressed previously out -of -scope Right -of -Way items the City needed to include in the project. The scope includes: GHD 2235 Mercury Way Suite 150 Santa Rosa California 95407 USA 1609061- T7075231010 .S09001T7075231010 F 707 527 8679 W www.ghd.com 1 ;" . " ' 0 • Right-of-way and property research to document property information, easements, utilities and other items which may pertain to the area the City is planning to relinquish to the State. • Preparation of a records report to document chain of title history for the area to be relinquished. • Preparation of a legal description, plat map and utility exhibit map for the area to be relinquished. • Field stake the Right -of -Way relinquishment area. • Prepare a Record of Survey of the relinquishment area and file with the County Surveyor's office. In working to complete the above items, we have incorporated a subgrade enhancement geotextile that significantly reduces the structural section of the pavement, as well as incorporated fiber reinforcement into the hot mix asphalt specifications to improve the strength and longevity of the new pavement. The above additions and revisions to the project design have resulted in an approximately 20 additional sheets to the set of plans (originally 27 sheets), as well as extensive revisions to the technical special provisions and the project quantity estimate. Additional Project Scope While design efforts to complete the Amendment 9 scope of services summarized above were underway, the City directed GHD to proceed with the design of approximately 1,760 linear feet of pavement overlay for southern APB, changing the previously designed vehicle loop detection system at APB / Talmage Road to video detection, and reconstructing Talmage Road from APB east to within approximately 10 feet of the Caltrans right-of-way including the requisite LID improvements. The reconstruction of Talmage Road was requested due to a fairly recently pavement failure that is occurring on the westbound Talmage Road approach to APB. The City desires to reconstruct the entire width of Talmage Road. A Traffic Index of 11.5 is proposed for the new pavement structural section. The key goal of this scope of services remains to finalize the design of the Redwood Business Park Transportation Improvements project and deliver construction documents for bidding by mid-April 2017. Task 1. APB Overlay Design This task is for the design of approximately 1,760 linear feet of a 2.5" thick fiber -reinforced hot mix asphalt overlay with conform details, cross sections and typical cross sections. A leveling course of 0" to 3" is also included to improve the pavement cross slope for drainage. Conforms at the existing gutter will be achieved with an edge grind, and conforms at existing median curbs will be to the existing face of the curb. Also included in this task is quantity estimates for the pavement, striping and related items of work. Task 2. APB / Talmage Road Vehicle Detection Revision This task changes the design of the vehicle detection loop system at the intersection of APB / Talmage Road to use a video detection system manufactured by GRIDSMART Technologies, Inc. The development of the technical specifications for the video detection system has already been completed. This task is for the revision of the traffic signal plan and schedule only, as well as revisions to the cost estimate. Task 3: Talmage Road Reconstruction & LID This task includes additional design and coordination efforts to revise the plans and typical cross sections, and prepare design cross sections for the reconstruction of Talmage Road from APB east to within 2017-05-26 GHD Amendment Proposal.docx 2 bow approximately 10 feet of the Caltrans right-of-way including the requisite LID improvements. Also included are revisions to the SUSMP document for the LID requirements, project quantities and cost estimate. Task 4: Revise Special Provisions The City is funding the construction of the Redwood Business Park Transportation Improvements project and Talmage Road Interchange project with funding from the California Infrastructure Bank (I -Bank). During the funding approval process the City discovered that the I -Bank requires projects it funds to bid as a lump sum (fixed price). The items of work, payment and bidding schedules within the special provisions for each of these projects are currently written for unit price bidding, which is typical for transportation and utility improvement projects. In this task, GHD will revise the special provisions and bidding schedules for the Redwood Business Park Transportation Improvements project and Talmage Road Interchange project to accommodate a fixed price bid with provisions for a specific schedule of values from the construction contractor from which construction progress payments can be qualitatively assessed. Task 5: Talmage Road Interchange Design Coordination Tasks 2 and 3 require design revisions to and coordination with the plans, special provisions and quantity estimates prepared for the Talmage Road Interchange project in order to coordinate both projects where the project limits overlap. Key coordination items include the Talmage Road pavement reconstruction, the removal of conduits and conductors for vehicle detector loops, striping and related items. Proposed Fee GHD proposes to complete this scope of services (Tasks 1 — 4) for a time -and -materials fee not to exceed $36,319 without written authorization from the City per the attached fee estimate (Attachment 1). Services not included in this proposal can be provided on a time -and -materials basis per the attached GHD Standard Fee Schedule (Attachment 2) or by a negotiated fee. Budgets will be separated between the Redwood Business Park Transportation Improvements project and Talmage Road Interchange project for invoicing purposes. We are available to begin immediately upon written acceptance of this proposal or receipt of an executed contract amendment. We propose to work efficiently to meet the City's and other stakeholder's expectations and goals for this project. Summary GHD is committed to continuing to provide the City with the high-quality service and flexibility you have come to expect. We understand that these projects have been ongoing for some time, and that there have been numerous changes in direction and approach throughout the course of the projects to address options the City wanted to explore and new issues as they arise. We are excited at the prospect of completing the design by mid-April 2017 so the City can advertise them for bidding and begin construction this summer. 2017-05-26 GHD Amendment Proposal.docx 3 We welcome the opportunity to continue to work with the City of Ukiah and the project stakeholders on these important projects, and look forward to contributing to their success. Should you have any questions, please do not hesitate to contact me. Sincerely, GHD Inc. Matt Kennedy, PE, TE Project Manager Attachments: 1. GHD Fee Estimate 2. Standard Fee Schedule Cc: Bill Silva, PE Project Principal 2017-05-26 GHD Amendment Proposal.docx PMNq Attachment 1 "qr GHD - PROJECT FEE ESTIMATING SHEET Project Name: Redwood Business Park / Talmage Interchange Prepared by: Matt Kennedy Job Number: 0250210001/8410035 Client: City of Ukiah Date: May 26, 2017 `OTHER DIRECT COSTS include telephone, mileage, printing, photocopies and other miscellaneous direct expenses. 5/26/2017 Page 1 LABOR COSTS FEE COMPUTATION Task / Item LABOR CATEGORY > RATE > PD $225 /Hr JobCivil Mgr. $195 /Hr Eng. $160 I /Hr Sr. Traff Eng. $195 /Hr Traff Eng. $165 /Hr Sr Proj. Scientist $140 /Hr CAD Designer $125 /Hr WP $100 /Hr JPA $100 /Hr TOTAL HOURS *OTHER DIRECT COSTS Sub- con - sultant(s) TOTAL FEE TASK -1.0 APB Overlay Design 1.1 Overlay Design 1 81 241 1 1 1 401 11 73 $4381 $10,938 1.2 Quantities / Estimate I I I I I I I 1 0 $0 $0 SUBTOTAL TASK 1.01 01 81 241 01 01 01 401 01 11 73 $438 $0 $10,938 TASK- 2.0 APB / Talmage Vehicle Detection 2.1 Video Detection 1 41 61 1 61 1 11 17 $1021 $2,722 SUBTOTAL TASK 2.01 01 01 01 41 61 01 61 01 11 17 $102 $0 $2,722 TASK- 3.0 Talmage Road Reconstruction & LID 3.1 Talmage Road Reconstruction 6 16 24 1 47 $282 $7,112 3.2 Talmage Road LID 3 16 4 23 $138 $3,783 SUBTOTAL TASK 3.0 0 9 32 0 0 0 28 0 1 70 $420 $0 $10,895 TASK- 4.0 Revise Special Provisions 4.1 Redwood Business Park Special Provisions 2 8 4 1 15 $90 $2,840 4.2 Talmage Road Special Provisions 2 8 8 1 19 $114 $3,504 SUBTOTAL TASK 4.01 41 161 121 01 01 01 01 0 21 34 $2041 $0 $6,344 TASK- 5.0 Talmage Road Interchange Coordination 5.1 Talmage Road Revisions / Coordination 4 8 2 4 16 1 35 $210 $5,420 SUBTOTAL TASK 5.0 0 41 8 21 4 01 16 01 35 $210 $0 $5,420 PROJECT TOTALS 4 37 76 6 10 0 90 0 6 229 $1,374 $0 $36,319 `OTHER DIRECT COSTS include telephone, mileage, printing, photocopies and other miscellaneous direct expenses. 5/26/2017 Page 1 0 Attachment 2 Fee Schedule 2016 USA West Fee Schedule Principals: Environmental Scientists: Level E $185-205 Level A $95-105 Level F $220-250 Level B $110-120 Level C $125 —130 Associates: Level D $130 —145 Level D $160-170 Level E $160 —175 Level E $180 —195 Level F $195 —205 Levell' $215-240 Industrial Hygienists / Specialist: Safety Professionals: Level B $170 Level A $105 Level C $180 Level B $115 —120 Level D $190 Level C $125 —135 Level E $210-230 Level D $145-160 Level F $250 Level E $170 —180 Engineers: Technicians/Technologists: Level A $110 —115 Level A $80 Level B $115— 125 Level B $95 Level C $135— 145 Level C $110-115 Level D $150— 165 Level D $120 —135 Level E $175— 195 Level E $140 —155 Level F $210— 235 Level F $170-190 Geologists/Hydrogeologists: Draft/CADD: Level A $110 Level A $75 Level B $120 Level B $85 —90 Level C $130-150 Level C $95 Level D $155 —180 Level D $110 —120 Level E $185 —200 Level E $125 —155 Level F $210 Level F $165 Environmental Planners: Technical Apprentices: $80-90 Level A $115 Level B $125 Intern: $73.00 Level C $130 Level D $135— 150 Administrative Support: $62.00 Level E $160 —190 Level F $205 —210 Environmental Chemists: Level A $115 Level B $125 Level C $130 Level D $135 —150 Level E $160 —190 0 I Fee Schedule 2016 USA West Fee Schedule Employee time will be billed in accordance with the fees listed above. These rates are subject to change on a semi-annual basis. For other than professional employees, time spent over 8 hours per day, time spent on swing shifts, and time spent on Saturdays will be charged at 1.5 times the hourly billing rate. Work on Sundays will be charged at 2.0 times the hourly billing rate and holiday work will be charged at 2.5 times the hourly billing rate. All field personnel charges are portal to portal. Professional employees will not be charged out at premium charge rates for overtime work. Expenses and other similar project related costs are billed out at cost plus 15%. The cost of using equipment and specialized supplies is billed on the basis of employee hours dedicated to projects. Our rates are: A. Office consumables: $6.00/hr B. Environmental Dept/Construction Inspector consumables: $11.00/hr C. Survey Field consumables: $15.00/hr D. Various Environmental, Construction and Land Surveying equipment: At market B. C. D. Payment for work and expenses is due and payable upon receipt of our invoice. Amounts unpaid thirty (30) days after the issue date of our invoice shall be assessed a service charge of one and one half (1.5) percent per month. (') These rates do not apply to forensic -related services, or to work for which Prevailing Wage obligations exist. It is the responsibility of the client to notify GHD Inc in writing if Prevailing Wage obligations are applicable, in which case the fees will be adjusted proportionate to the increase in labor cost.