HomeMy WebLinkAboutRau & Associates, Inc. 2017-01-06COU No. 1213180-A3
CITY OF UKIAH
AMENDMENT NO. 3
TO AGREEMENT FOR PROFESSIONAL CONSULTING SERVICES
DATED AUGUST 3, 2010
TERMS AND CONDITIONS
All terms and conditions of the Agreement for Professional Consulting Services dated
August 3, 2010; the First Amendment dated January 6, 2016; and the Second Amendment
dated June 30, 2016 shall remain in force and effect except as modified by this third
amendment.
AUTHORIZATION
Upon execution of this amendment, service provider is authorized to provide the service
described under the Scope of Additional Work identified in this Amendment No. 3.
SCOPE OF ADDITIONAL WORK
Work authorized by this amendment shall include that work described in the
November 4, 2016 letter proposal from Rau and Associates, Inc. A copy of said letter is
included in this third amendment.
COMPENSATION
Compensation for the performance of the additional work shall be made on a time and
expense basis at Consultant's customary fees. Expenses shall not exceed a maximum
total cost of $9,930
RAU AND ASSOCIATES, INC
CITY OF UKIAH
BY: �� C' i� BY:
GEORGE C. RAU SA S I OMO
CIT MANA ER
PRINT NAME
/r' 29 , 2®/�g
DATE
Amendment No. 3 to Agreement for
Professional Consulting SenAces
_6 47
DATE
AND ASSOCIATES INC.
CIVIL ENGINEERS - LAND SURVEYORS
City of Ukiah, Public Works Department
Attn: Tim Eriksen, Director of Public Works
Rick Seanor, Deputy Director of Public Works
300 Seminary Ave
Ukiah, CA, 95482
November 4, 2016
Job Number R10064.1
RE: CHANGE TO SCOPE OF WORK: PREPARE CONTRACT SPECIFICATION PACKAGE FOR
RECONSTRUCTION OF SMITH STREET IN UKIAH TO INCLUDE ENTIRE WIDTH OF SMITH
STREET, TOGETHER WITH SIDEWALK, CURB AND GUTTER ON NORTH SIDE, FOR A
LENGTH OF APPROXIMATELY 300 LINEAR FEET; CONSTRUCTION STAKING.
Gentlemen
This letter is to request an amendment to our Agreement for Professional Consulting Services, dated
August 10, 2010. The plans were updated in September, 2016, to expand the project to cover the entire
asphalt paved area of the street as well as to replace the distressed sidewalk and store entrances to bring
them into compliance with the latest Disability Standards. Upon completion of the construction drawings,
an opinion of probable construction costs was developed by your office and it was found to exceed the
amount which could be contracted under an informal contract. Now formal contract specifications and
documents must be prepared to put the project out to bid. You requested that we provide a cost to
prepare the construction specifications to put the project out to formal bid.
In addition, since the project has some complexity in grading the sidewalks and conforming to the curb
and gutter and street surface, you requested that we provide you a cost to do the construction staking..
This request for an amendment identifies three additional tasks which must be completed in order to put
the project out to bid and have it staked for construction.
Amendment 3 - Task 1 — Preparation of Contract Documents
This task includes using the standard construction contract form provided by the City Public Works
Department, and modifying it to conform to the requirements of the Smith Street Rehabilitation Project.
The technical specification section will be modified/developed to address the specific construction project
on Smith Street. We have requested Diana Steele PE, Consulting, to assist us in developing these
contract documents. Diana has had recent experience with the City of Ukiah Contract Form on another
project and served as the Public Works Director/City Engineer for the City of Ukiah in the past.
The deliverable for this task will be one hard copy and a CD with the electronic version to enable the City
to print the contract documents and distribute them for bidding purposes.
The cost of this task is estimated to be $3,300
Amendment 3 - Task 2 — Bid Assistance
RAU will assist the City as needed and requested to answer questions from prospective bidders during
the bid period. An allowance of six hours for Diana Steele and two hours for George Rau has been
included in this task.
100 NORTH PINE STREET - UKIAH, CALIFORNIA 95482 - 707-462-6536 - FAX 707-463.2729
www.rauandassoc.com
City of Ukiah, Public Works Department November 4, 2016
The cost of this task is estimated to be $1,130.
Amendment 3 - Task 3 — Construction Staking
Construction staking is anticipated to be done in two steps. The first step will be to stake the curb, gutter
and sidewalk to conform to accessible standards. It is assumed that the contractor will cut the street two
or three feet from the current lip on gutter on the north side, then construct the curb and gutter, then
construct the accessible sidewalk. Initial stakes will include an offset from the face of curb and a line
stake to a corner of each doorway. At each doorway, finish grade will be marked with paint or a small nail
to establish the finish grade elevation at each side of each entry. There are seven entries and a long
driveway to be demolished and staked. This requires 17 or 18 lines of stakes or other markings initially.
The second phase is anticipated to be after the sidewalk curb and gutter is completed. Then the
contractor will remove the street pavement section and reconstruct it. There are 8 locations along the
street centerline to stake for proper grading.
The estimated cost of this task is $5,500.
Our "Schedule of Fees" for the original work was dated January 1, 2008. We have updated our Schedule
of Fees since then. "Schedule of Fees — Table 33" is attached to Amendment #2 which has already been
approved.
The cost of this additional work is estimated to be a maximum of $9,930 at our current hourly fee
schedule, including $3,380 for Diana Steele PE Consulting, with no markup.
Very truly yours,
George C. Rau, P.E.
President
Attachment: Task -Hour Breakdown
2
AND ASSOCIATES INC.
CrvIL ENGINEERS• LAND SURVEYORS Fee Schedule 33
Job No. RI 0064.1 -Amendment 3 Job Name: Smith Street Rehab Date: 11-4-16
PHASES Amend #3 T-1 Amend #3 T-2 Amend #3 T-3
Contract Docs Bid Assistance r—t -f — ce�i,;n
Registered Civil Engineer Principal
175
Associate Civil Engineer
140
Diana Steele PE
130
Chief of Party (PW)
135
GPS Specialist
135
Construction Inspector (PW)
128
instrument Operator (PW)
118
Materials Tester (PW)
(w/o
Nuclear Gauge Charge)
116
Sr. Staff Engineer
115
Rodman (PW)
115
QSD/QSP Specialist (non PW)
110
Technician II
72
Project Coordinator
70
Administrative
60
Technician 1
38
Vehicle Use (miles)
0.575
Robotic Total Station, per Day
200
Lab Unit Prices
0
Computer Hours
10
-
Permit Fees
0
Backhoe and Operator
100
Outside Service
cost + 15%
Reimbursables
cost
BUDGET FOR PHASE
PW = Prevailing Wages
_ S S
-
_ S $
_ S 5
-
_-
24 $ 3,300.00 F 8 S 1.130.
(1) Title Report=
(2) Map Checking Fees=
(3) Recording Fees=
(4) Monuments=
Subtotal 0
Worksheet Page 1
S -
S
20 $ 11.50
2 $ 400.00
8 S 80.00
S -
39 S 5,500.50
Total Sheet 1
Total Sheet 2
Total Sheet 3
Total Sheet 4
Reimbursables
hrs/
cost total
S -
S -
S -
s -
S -
S -
S -
0 $
S 9,930.50
S -
S
S -
GRAND TOTAL= S 9.930.50
hrs/
hrs/
cost total
cost total
4 S 700.00
2 S 350.00
$
S -
20 5 2,600.00
6 S 780.00
-
S -
$ -
S
S
$
S
S
S
-
S
S
S
S
-
S
S
$
$
S
_ S S
-
_ S $
_ S 5
-
_-
24 $ 3,300.00 F 8 S 1.130.
(1) Title Report=
(2) Map Checking Fees=
(3) Recording Fees=
(4) Monuments=
Subtotal 0
Worksheet Page 1
S -
S
20 $ 11.50
2 $ 400.00
8 S 80.00
S -
39 S 5,500.50
Total Sheet 1
Total Sheet 2
Total Sheet 3
Total Sheet 4
Reimbursables
hrs/
cost total
S -
S -
S -
s -
S -
S -
S -
0 $
S 9,930.50
S -
S
S -
GRAND TOTAL= S 9.930.50