Loading...
HomeMy WebLinkAboutGHD, Inc. 2010-03-09; Amendment 09 2017-01-06CITY OF UKIAH AMENDMENT NO. 9 TO AGREEMENT FOR PROFESSIONAL CONSULTING SERVICES DATED MARCH 9, 2010 TERMS AND CONDITIONS All terms and conditions of the Agreement for Professional Consulting Services dated March 9, 2010; the first amendment dated April 8, 2010; the second amendment dated August 5, 2010; the third amendment dated March 23, 2011; the fourth amendment dated November 30, 2011; the fifth amendment dated August 20, 2012; the sixth amendment dated November 16, 2012; the seventh amendment dated December 13, 2013; and the eighth amendment dated June 17, 2015 shall remain in force and effect except as modified by this ninth amendment. AUTHORIZATION Upon execution of this amendment, service provider is authorized to provide the service described under the Scope of Additional Work identified in this Amendment No. 9. SCOPE OF ADDITIONAL WORK Work authorized by this amendment shall include that work described in the November 4, 2016 letter proposal from GHD, Inc. A copy of said letter is included in this ninth amendment. COMPENSATION Compensation for the performance of the additional work shall be made on a time and expense basis at Consultant's customary fees. Expenses shall not exceed a maximum total cost of $°130,746. GHD, INC / CITY OF UKIAH BY: BY: -, AL CU ICK SA E SANCOMO Principal City Manag /(Z�A6 LII 1-7 DAE DATE Amendment No. 9 to Agreement for Professional Consulting Services GHO November 4, 2016 Tim Eriksen Public Works Director / City Engineer City of Ukiah 300 Seminary Avenue Ukiah, CA 95482 Reference No. 8490078/8410035 Re: Proposal for Professional Engineering Services: Supplemental Design Services for the Redwood Business Park Transportation Improvements and Talmage Road Interchange Projects, Ukiah, CA Dear Mr. Eriksen: GHD is pleased to provide this proposal for professional engineering services for additional design efforts and coordination on the Redwood Business Park Transportation Improvements and Talmage Road Interchange Projects (Agreement dated March 9, 2010). This proposal is based on our recent discussions regarding design revisions, additional project elements to be included, assisting with and coordinating right-of-way needs, and coordination with other consultants. Also as requested is the inclusion of bid period services for the Redwood Business Park Transportation Improvements. Background These projects began preliminary design in March 2010, and have since undergone a number of alterations and alternatives investigating various elements of the Redwood Business Park area, including bicycle connectivity, use of roundabouts, pavement reconstruction options, and signal improvements. Additional project coordination was also needed for the Costco project and Caltrans. The designs for a new sewer main, road widening, Talmage Road interchange options and other items were included but later removed. The environmental review process for both the Costco project and Talmage Road Interchange project also contributed to the overall schedule. The Final plans, technical specifications and opinion of probable cost for the Redwood Business Park Transportation Improvements project are complete and the final deliverable is ready to be provided to the City to advertise for bids. These bid documents were prepared in close coordination with the City, and include all of the confirmed project elements. The 95% design submittal for the Talmage Road Interchange project is currently being reviewed by Caltrans and the City. This proposed Scope of Services includes additional design services and coordination requested by the City for the Redwood Business Park Transportation Improvements and Talmage Road Interchange Projects. These services include previous authorized out -of -scope design revisions, ongoing coordination, inclusion of pavement reconstruction design for Airport Park Boulevard, inclusion of Low Impact Development (LID) design for Airport Park Boulevard, and bid phase services for the Redwood Business Park Transportation Improvements project. A key goal of this scope of services is to finalize the design of the Redwood Business Park Transportation Improvements project and deliver construction documents for bidding. GHD ,.��......,.. ISO 9001 2235 Mercury Way Suite 150 Santa Rosa California 95407 USA .+.nn.ne oe zs. T 707 523 1010 F 707 527 8679 W www.ghd.com Redwood Business Park (RBP) Transportation Improvements Project Task 1. Coordination and Final Design Revisions This task includes additional design and coordination efforts GHD has performed and is in the process of completing for the Redwood Business Park Transportation Improvements Project, as well as previous and on-going project coordination: The City retained a consultant to design improvements on Washington Avenue at South State Street. These improvements include new ADA ramps, pedestrian pushbuttons, and new paving. The improvements overlap with the Redwood Business Park Transportation Improvements. At the request of the City, GHD contacted the consultant to coordinate the designs, exchange CAD design files, and update the Redwood Business Park plans to remove new push buttons from the project, show and label new ADA ramps by others, new striping, and other improvements. GHD also reviewed the design prepared by the consultant and provided suggestions on revising the placement of new pedestrian pushbutton posts to meet ADA requirements. GHD has coordinated with the City on finalizing the bid documents (plans and technical specifications), including revising the City Specification number for the project, updating to the City's current specification template, notice to bidders and other areas of the front-end and back- end contract, revising requirements for construction survey to include it as a separate bid item, revising requirement for construction material testing to make it the responsibility of the City rather than the contractor, confirming contract language to be included regarding the City's funding/financing source for the project, updating contractor requirements for traffic control and traffic signal shut -down, and addressing any final City comments prior to production of bid documents. • The City requested GHD to revise the design of the modified traffic signal at the Washington Avenue / Hastings Avenue / South State Street intersection to eliminate the existing and modified vehicle detector loop system and replace it with a new video detection system manufactured by GRIDSMART Technologies, Inc. • The City requested GHD to revise the design of the video detection system at the new signalized intersection at Commerce Drive / Airport Park Boulevard to specify a video detection system manufactured by GRIDSMART Technologies, Inc. The previously specified system was VersiCam manufactured by Iteris, Inc. The City requested GHD include the design of an asphalt sidewalk connecting the new ADA ramp at the northeast corner of Hastings Avenue / South State Street to the driveway of 1195 South State Street. The nearest connecting sidewalk on the east side of South State Street is about 200 feet north of this driveway. This design was completed as requested within our previously authorized budget. Following a QC review of the design it was determined that including this segment of sidewalk presented a liability because it would encourage pedestrians to proceed down a walkway that lacks contiguous sidewalks. This issue was discussed with the City, the City agreed, and the design was removed. Task 2. Airport Park Boulevard (APB) Pavement Reconstruction GHD will complete the final design of the pavement reconstruction for Airport Park Boulevard. This design was prepared to an approximate 95% design level in the May 2011 design submittal, and was subsequently removed from the project and the remaining task budget was repurposed for other and 2016-11-04 GHD Amendment Proposal.docx changing project elements at the City's direction. The May 2011 design consisted of 6.5" of hot mix asphalt over 24" of aggregate base (equivalent Traffic Index of 10.5), significantly deeper than the existing failing pavement section, which consists of 4" - 5" of pavement over 8" - 12" of aggregate base (equivalent Traffic Index of 6.0). The existing shallow pavement section will require additional subgrade excavation to provide the depth needed to achieve the required Traffic Index of 10.5 and still conform to existing edge constraints (i.e., curb and gutter). Utility potholing information obtained during previous project tasks will be used in the design and incorporated into the plans, and we will coordinate with the City on any additional utility potholing which may be needed. The length of roadway requiring reconstruction was previously confirmed to extend from Talmage Road in the north to the vicinity of the Tractor Supply Company in the south, approximately 2,100 linear feet. As part of the design, GHD will evaluate possible options to a traditional pavement structural section to reduce the section thickness and associated cost. These options could include lime treatment of subgrade, subgrade enhancement geotextiles, fiber -reinforced hot mix asphalt, deep lift of asphalt, or a combination of options. We will meet with the City to review and discuss the options and confirm the approach to be implemented in the final design. Options will include sections that maintain a minimum of 1 foot from subgrade to existing utilities (2 feet for PG&E). Other design elements of the pavement reconstruction include construction of deeper median curbs or other subsurface barrier to minimize root and water intrusion into the pavement section and subgrade, removal and possible replacement of existing subdrains along the medians to remove seasonal shallow groundwater, and utilization of deep asphalt pavement sections over existing shallow storm drain crossings. Additional drawings will include demolition and improvement plans, typical sections, cross-sections every 50 -ft, striping and signing plans, and related details. We will prepare a pre -final design consisting of plans, special provisions and opinion of probable construction cost for City review. We will meet with the City to review comments and complete a page -turn review of the plans before requesting authorization for final design. Task 3. APB Low Impact Development (LID) A new storm water requirement since the original contract that affects road reconstruction projects like this one is the implementation of LID stormwater quality improvements. The City has adopted the City of Santa Rosa and County of Sonoma Stormwater Low Impact Development Technical Design Manual (Manual) to meet State requirements. For a Phase 1 city, the manual requires implementation of LID for "Street, road, highway, or freeway construction or reconstruction, creating or replacing 10,000 square feet or more of impervious surface," with "reconstruction" being defined as work that replaces road surface down to subgrade, as this project must accomplish. GHD will develop an LID strategy and prepare concept typical details that repurpose existing turf and landscaped areas adjacent to Airport Park Boulevard into new LID features to achieve the LID Goal established in the Manual. Median areas will also be used where possible and as width and pavement slopes allow. Inlets in the existing curbs must be provided to convey stormwater into LID areas. A key goal will be to minimize the amount of demolition needed to implement required LID areas while taking advantage of existing landscaped areas. We will meet with the City to review and discuss the LID strategy and confirm the approach and methods to be implemented in the final design. LID details, sections and plan view layouts will be developed and incorporated into the project Drawings. A Preliminary SUSMP design technical memorandum will be prepared in accordance with the LID manual requirements and submitted with the pre -final design. The technical memorandum will summarize the 2016-11-04 GHD Amendment Proposal.docx methodology, approach, calculations and sizing of the LID features using the Manual LID calculators. A Final SUSMP addressing City comments will be submitted with the final design submittal. Deliverables: Pre -Final Submittal: o Plans (3 hard copies on bond, 22"x34", electronic PDF). o Special Provisions (3 hard copies, electronic PDF). o Opinion of Probable Construction Cost (3 hard copies, electronic pdf) o Preliminary SUSMP documentation (3 hard copies, electronic pdf) Final Submittal: o Mylar Plans (Per Contract) o Special Provisions (Per Contract) o Opinion of Probable Construction Cost (Per Contract) o Final SUSMP documentation (3 hard copies, electronic pdf) Task 4. RBP Transportation Improvements Project Bid Period Support As directed by the City, GHD will respond to technical inquiries during bidding via written addenda. This scope is based upon the preparation of up to two (2) written addenda related to technical changes to or interpretations of the Bid Documents. GHD's Project Manager will attend a pre-bid meeting as the City's technical representative for the project to assist in describing the project scope to prospective bidders and answering technical questions. GHD will review the bids received for completeness and provide a letter of recommendation for award to the City. Task 5. Talmage Road Interchange Services The Talmage Road Interchange project design (revised 95% Plans, Specifications and Estimate) is currently undergoing review by the City and Caltrans District 1. Over the course of the last year GHD has coordinated closely with Caltrans District 1 Design, Traffic Operations and Traffic Safety divisions to complete revisions to the design requested by Caltrans, including widening of travel lanes to accommodate a STAA semi -truck (design vehicle), performing vehicle simulations, removing additional trees, and modifying the design of the existing off -ramp gore split area. The design requires the City to relinquish or otherwise provide City right-of-way to the State to accommodate the widening of the southbound off -ramp to westbound Talmage Road. The right-of-way efforts included in our approved scope of services were to prepare linework of the proposed right-of-way area, providing the proposed right-of-way linework to the Caltrans District 1 Right -of -Way division for review. GHD's additional efforts have included coordinating with Caltrans and the City on the method to legally transfer the City's right-of-way to the State, and assisting the City with the right-of-way documentation and transfer process. To facilitate and expedite this process, we propose additional budget be allocated for this ongoing effort. The previous project amendment included the preparation of a Storm Water Pollution Prevention Plan (SWPPP) because the project area of disturbance is greater than 1 acre. This requirement remains, but GHD recommends that the SWPPP document be prepared by a third party hired by the construction contractor, as is customary with Caltrans construction projects. While some SWPPP effort is still needed 2016-11-04 GHD Amendment Proposal.docx to outline the requirements of the SWPPP, the remaining budget ($2,600) will be applied to other tasks proposed herein. GHD proposes to provide the following additional professional services for the Talmage Road Interchange project: Task 5.1 Right -of -Way Services GHD will provide right-of-way coordination and support services including preparing right-of-way plans and linework in Microstation format, providing right-of-way information to the Caltrans District 1 right-of- way division, coordinating with Caltrans and the City on the method to legally transfer the City's right-of- way to the State, assisting the City with title report procurement, and assisting the City with the right-of- way transfer process. Included in this task is additional subconsultant survey efforts (Rau and Associates). Task 5.2 Storm Water Pollution Prevention Plan (SWPPP) GHD will apply $2,600 of the original $4,694 budget to prepare a SWPPP document toward the Right -of - Way Services task. Proposed Fee GHD proposes to complete this scope of services (Tasks 1 — 5)for a time -and -materials fee not to exceed $130,746 without written authorization from the City per the attached fee estimate (Attachment 1). Services not included in this proposal can be provided on a time -and -materials basis per the attached GHD Standard Fee Schedule (Attachment 2) or by a negotiated fee. We are available to begin immediately upon acceptance of this proposal receipt of an executed contract amendment. We propose to work efficiently to meet the City's and other stakeholder's expectations and goals for this project. Summary GHD is committed to continuing to provide the City with the high-quality service and flexibility you have come to expect. We understand that these projects have been ongoing for some time, and that there have been numerous changes in direction and approach throughout the course of the projects to address options the City wanted to explore and new issues as they arise. We are excited at the prospect of completing the designs so the City can advertise them for bidding and begin construction. Before beginning we will work with you to develop a schedule that aligns with the City's project funding requirements with a general goal to complete the final deliverable for the Redwood Business Park Transportation Improvements project this winter so the project can be advertised for bids during late winter / early spring 2017 with construction anticipated to start in late spring / early summer. 2016-11-04 GHD Amendment Proposal.docx We welcome the opportunity to continue to work with the City of Ukiah and the project stakeholders on this important project, and look forward to contributing to its success. Should you have any questions, please do not hesitate to contact me. Sincerely, GHD Inc. , Matt Kennedy, PE, TE Project Manager Attachments: 1. GHD Fee Estimate 2. Standard Fee Schedule Cc: Bill Silva, PE Project Principal 2016-11-04 GHD Amendment Proposal.docx Attachment 1 GHD - PROJECT FEE ESTIMATING SHEET Project Name: Redwood Business Park / Talmage Interchange Prepared by: Matt Kennedy Job Number: 849007818410035 Client: City of Ukiah Date: November 4, 2016 `OTHER DIRECT COSTS include telephone, mileage, printing, photocopies and other miscellaneous direct expenses. 11/4/2016 Page 1 LABOR COSTS FEE COMPUTATION Task / Item LABOR CATEGORY > RATE > PD $225 /Hr Job Mgr. $195 /Hr Civil Eng. $160 /Hr Sr. Traff Eng. $195 /Hr Traff Eng. $165 /Hr Sr Proj. Scientist $140 /Hr CAD Designer $125 /Hr WP $100 /Hr PA $100 /Hr TOTAL HOURS *OTHER DIRECT COSTS Sub- con - sultant(s) TOTAL FEE TASK -1.0 RBP Coordination & Final Design Revisions 1.1 Consultant and City Coordination 1 81 81 1 1 1 1 1 18 $1081 1 $3,273 1.2 Final Design Revisions 1 8 8 1 16 34 $204 $5,464 SUBTOTAL TASK 1.0 2 16 16 1 0 0 16 0 1 52 $312 $0 $8,737 TASK- 2.0 APB Pavement Reconstruction 2.1 Pavement Reconstruction Strategy 1 16 24 8 49 $294 $8,479 2.2 Pre -Final Design 2 64 80 80 226 $1,356 $37,086 2.3 Final Design 2 40 64 64 170 $1,020 $27,510 SUBTOTAL TASK 2.0 5 120 168 0 0 0 152 0 0 445 $2,670 $0 $73,075 TASK- 3.0 APB Low Impact Development 3.1 LID Concept & Strategy 1 24 32 12 69 $414 $11,939 3.2 Pre -Final Design 1 32 40 40 113 $678 $18,543 3.3 Final Design 1 24 32 32 89 $534 $14,559 SUBTOTAL TASK 3.0 3 80 104 0 0 0 84 0 0 271 $1,626 $0 $45,041 TASK- 4.0 RBP Bid Period Support 4.1 Bid Period Services 1 6 81 8 1 1 25 $1501 $4,025 SUBTOTAL TASK 4.0 11 61 81 0 0 01 8 1 1 25 $150 $0 $4,025 TASK- 5.0 Talmage Road Interchange 5.1 R/W Services 4 4 8 $104 $1,000 $2,524 5.2 SWPPP -16 -16 -$96 -$2,656 SUBTOTAL TASK 5.0 0 4 -12 0 0 0 0 0 0 -8 $8 $1,000 -$132 PROJECT TOTALS 11 226 284 1 0 0 260 1 2 785 $4,766 $1,000 $130,746 `OTHER DIRECT COSTS include telephone, mileage, printing, photocopies and other miscellaneous direct expenses. 11/4/2016 Page 1 Attachment 2 Fee Schedule 2016 USA West Fee Schedule Principals: Environmental Scientists: Level E $185-205 Level A $95-105 Level F $220-250 Level B $110-120 Level C $125 —130 Associates: Level D $130 —145 Level D $160-170 Level E $160 —175 Level E $180— 195 Level F $195 —205 Level F $215-240 Industrial Hygienists / Specialist: Safety Professionals: Level B $170 Level A $105 Level C $180 Level B $115 —120 Level D $190 Level C $125 —135 Level E $210-230 Level D $145-160 LevelF $250 Level E $170 —180 Engineers: Tech nicians/Technologists: Level A $110-115 Level A $80 Level B $115— 125 Level B $95 Level C $135 —145 Level C $110-115 Level D $150 —165 Level D $120 —135 Level E $175— 195 Level E $140 —155 Level F $210 —235 Level F $170-190 Geologists/Hydrogeologists: Draft/CADD: Level A $110 Level A $75 Level B $120 Level B $85 —90 Level C $130-150 Level C $95 Level D $155 —180 Level D $110 —120 Level E $185 —200 Level E $125 —155 LevelF $210 Level F $165 Environmental Planners: Technical Apprentices: $80-90 Level A $115 Level B $125 Intern: $73.00 Level C $130 Level D $135— 150 Administrative Support: $62.00 Level E $160— 190 Level F $205 —210 Environmental Chemists: Level A $115 Level B $125 Level C $130 Level D $135 —150 Level E $160 —190 1 Fee Schedule 2016 USA West Fee Schedule Employee time will be billed in accordance with the fees listed above. These rates are subject to change on a semi-annual basis. For other than professional employees, time spent over 8 hours per day, time spent on swing shifts, and time spent on Saturdays will be charged at 1.5 times the hourly billing rate. Work on Sundays will be charged at 2.0 times the hourly billing rate and holiday work will be charged at 2.5 times the hourly billing rate. All field personnel charges are portal to portal. Professional employees will not be charged out at premium charge rates for overtime work. Expenses and other similar project related costs are billed out at cost plus 15%. The cost of using equipment and specialized supplies is billed on the basis of employee hours dedicated to projects. Our rates are: A. Office consumables: $6.00/hr B. Environmental Dept/Construction Inspector consumables: $11.00/hr C. Survey Field consumables: $15.00/hr D. Various Environmental, Construction and Land Surveying equipment: At market B. C. D. Payment for work and expenses is due and payable upon receipt of our invoice. Amounts unpaid thirty (30) days after the issue date of our invoice shall be assessed a service charge of one and one half (1.5) percent per month. (*)These rates do not apply to forensic -related services, or to work for which Prevailing Wage obligations exist. It is the responsibility of the client to notify GHD Inc in writing if Prevailing Wage obligations are applicable, in which case the fees will be adjusted proportionate to the increase in labor cost.