RESOLUTION NO. 85-4
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
UKIAH APPROVING USE PERMIT NO. 84-71, UKIAH GREEN
WHEREAS, the 2.8 acres encompassed by Ukiah Green/South is zoned PD,
Planned Development, and
WHEREAS, the PD, Planned Development zone requires a use permit to be
reviewed and approved by the Planning Commission and the City Council prior to
development taking place within that zone, and
WHEREAS, on June 27, 1984 the Planning Commission approved Use Permit No.
84-71 with 20 conditions, and
WHEREAS, a Negative Declaration for the project was approved by the
Planning Commission on June 27, 1984, and by the City Council on July 18,
1984.
NOW THEREFORE BE IT RESOLVED that Use Permit No. 84-71 is approved
subject to the following conditions:
1. Water and sewer improvement plan to be approved by the City Engineer and
include mains in the new street section through the project.
2. Five foot public utility easement in back of sidewalk be continued on
Mulberry Street.
3. On-site fire hydrant Rich #76 or equal to be provided.
4. Sound attenuation measures be taken to insure noise levels do not exceed
the maximum allowable levels to the approval of the Building Inspector.
5. Dedication of a 50 ft. public right-of-way to provide access and
utilities to the southern property line. Said right-of-way be
constructed by developer to City standards for a 50' street including
curb, gutter, sidewalk, paving, street lights and drainage.
--1--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
6. Process parcel map to eliminate property line through development.
7. Existing sewer laterals that are not used should be abandoned by the City
at the developer's expense.
A drainage easement be dedicated to the City for the area outside the
development. Drainage shall be taken through storm drains or in pipes
under sidewalk to face of curb. It will be necessary to convey drainage
from property to the west through the development and into the drain
system on Mulberry.
9. On-site paving to be a minimum 2" of asphaltic concrete of a 6" aggregate
base.
10. Undergrounding of utilities required at developer's expense, including
necessary street lights along street frontages.
11. Capital Improvement fees as set forth by the Director of PUblic Works be
paid by the Applicant.
12. Trash collection facilities be aesthetically screened from view.
13. Any roof mounted air conditioning apparatus be aesthetically screened
from view.
14. Ail landscaping be irrigated by an automated irrigation system and
maintained in a neat, weed-free manner. A landscaping plan be approved
by the Director of Planning prior to placement.
15. Standard Conditions 1-9.
16. Improvement plans shall be prepared by a Civil Engineer at the
developer's expense and approved by the Director of Public Works.
17. Directional address sign be located at the Mulberry St. access.
18. Ail setbacks shall be as depicted on the approved site plan.
19. Ail improvements and conditions of approval be completed prior to use and
occupancy.
--2--
8,
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
20. The Director of Planning is requested to work with the developer
regarding the feasibility of fencing in the lot in conjunction with an
opinion from the City Attorney in that it will be to the discretion of
the Planning Director to have that as a condition if it is found to be
necessary and feasible.
PASSED AND ADOPTED this 18th day of July, 1984 by the following roll
call vote:
AYES: Councilmembers Henderson, Kier, Hickey, Kelley and Mayor Myers
NOES: None
ABSENT: None
ATTEST: