Loading...
HomeMy WebLinkAboutRau & Associates, Inc. 2010-08-03; Amendment 2 2016-06-30CITY OF UKIAH / Pfau/urn- AMENDMENT NO. 1 --� TO AGREEMENT FOR PROFESSIONAL CONS DATED AUGUST 10, 2010 ��� Ptvit 31 alb TERMS AND CONDITIONS All terms and conditions of the Agreement for Professional Consulting Services dated August 10, 2010 shall remain in force and effect except as modified by this first amendment. AUTHORIZATION Upon execution of this amendment, service provider is authorized to provide the service described under the Scope of Additional Work identified in this Amendment No. 1. SCOPE OF ADDITIONAL WORK Work authorized by this amendment shall include that work described in the Change to Scope of Work dated June 10, 2010 also referred to as Attachment 1. A copy of said work is included in this first amendment. COMPENSATION Compensation for the performance of the additional work shall be made on a time and expense basis at Consultant's customary fees. Expenses shall not exceed a maxim total cost of $9,896 RAU AND ASSOCIATES, INC BY: C` BY: CITY EOR GE C. RAU TIM E. ERIKSEN, P.E. l oe64 c, r4. PRINT NAME DATE Amendment No 1 to Agreement for Professional Consulting Services DIRECTOR OBLIC WORKS 6/7o/� DATE CLEM COPY AND ASSOCIATES INC. CIVIL ENGINEERS-LAND SURVEYORS June 10, 2016 RECEIVED JUN 10 2016 City of Ukiah, Public Works Department CITY OF UKIAH Attn: Tim Eriksen, Director of Public Works DEPT.OF PUBLIC WORKS Rick Seanor, Deputy Director of Public Works 300 Seminary Ave Ukiah, CA, 95482 Job Number R10064.1 RE: CHANGE TO SCOPE OF WORK: UPDATE PLANS FOR RECONSTRUCTION OF SIDE WALK ON NORTH SIDE OF SMITH STREET IN UKIAH TO INCLUDE ENTIRE WIDTH OF SMITH STREET FOR A LENGTH OF APPROXIMATELY 300 LINEAR FEET. Gentlemen: This letter is to request an amendment to our Agreement for Professional Consulting Services, dated August 10, 2010. The plans were updated in February, 2016, to bring the sidewalk and store entrances into compliance with the latest Disability Standards. Then a walk-through was conducted with you to field review the constraints and difficulties remaining after the sidewalk issues were resolved. As a result of a constructability review of the sidewalk alone on May 4, 2016, it was clear that the street surface was so irregular that it will not match the required grades of the new curb and gutter, which must conform to the sidewalk. In addition, the existing pavement surface of one driveway on the north side will not conform to the grades of the planned back of sidewalk and there is no way to modify the planned sidewalk grades in a manner that they meet existing pavement grade and still conform to Accessibility Standards. Therefore, it was the consensus that the entire street should be reconstructed, except for the curb gutter and sidewalk on the south side which was done to current standards a few years ago and is not deteriorating. As part of that reconstruction, a right of entry will be required to modify the way the pavement on private property conforms to the new back of sidewalk. A concrete walkway to an entrance to a building on private property must be raised to conform to the new planned grades for a distance of approximately 5 feet in length. This request for an amendment identifies four tasks which must be completed in order to put the project out to bid. Task 1 —Project Manaaement and Coordination This task includes developing a scope of work to conform to the needs of the conditions on Smith Street, review of work in progress with the City Public Works Department, and coordinating the work product for delivery to the City Public Works Department. The cost of this task is estimated to be$875. Task 2—Plan Modifications The plans must be modified to add the entire paved section of the street. Work will include developing a centerline profile which will match the lip of gutter grades planned for the new sidewalk, curb and gutter. Construction notes will be added to describe how the street work must be done. 100 NORTH PINE STREET - UKIAH,CALIFORNIA 95482 • 707-462-6536 - FAX 707-463-2729 www.rauandassoc.com City of Ukiah,Public Works Department June 10,2016 In addition, the westerly driveway on the north side of Smith Street must have a short transition designed on private property to allow the paved area on the private property to conform properly with the new back of sidewalk on Smith Street. It is anticipated that the street improvement project can be done as an informal contract and formal contract documents, including technical specifications, will not be necessary. The cost of this task is estimated to be$4,400. Task 3—Right of Entry A construction right of entry must be obtained from the landowner to allow the City to have a contractor work on private property to construct transitions which conform to Accessibility Standards at 7 doorways. Also pavement on a private driveway must be constructed to conform to the new back of sidewalk over a short transition area. These activities on private property must have a construction right of entry developed with an exhibit showing the areas of entry. The estimated cost of this task is$1,160. Task 4—Construction Review and Testinq During construction it is anticipated that there will be areas of the subgrade exposed which will require special treatment. These areas will be reviewed by a geotechnical engineer from our firm. It is anticipated that a geogrid such as TX-5 by Tensar will be recommended to be installed to assist in bridging over the areas without significant sub-excavation and re-compaction. The structural section recommended is 1.0 foot of aggregate base to support 0.4 feet of hot mix asphalt applied in two layers. This structural section overlaid on a geogrid should be able to bridge over the expected soft spots. We would observe and approve the condition of the subgrade soils prior to the installation of the geogrid, but no compaction testing of the subgrade will be performed. Compaction testing will be done on the surface of the aggregate base before the street is paved to assure that the base has been adequately compacted. One maximum dry density test will be performed on the aggregate base material to provide a proctor test for the compaction of the aggregate base. A proof-roll test will also be conducted to assure a firm and stable surface has been established for the pavement layers to be applied. A brief letter report of conditions encountered and the results of the compaction testing will complete the construction phase work. The estimated cost of this task is$3,460. Tasks Not Included, But Which Could be Added by Amendment Formal construction documents are not anticipated to be required. Construction staking is not included. Aggregate testing of aggregate base and hot mix asphalt is not included. Compaction testing of hot mix asphalt is not included. Our"Schedule of Fees"for the original work was dated January 1, 2008. We have updated our Schedule of Fees since then. "Schedule of Fees—Table 33" is attached with our current rates. 2 City of Ukiah,Public Works Department June 10,2016 The cost of this additional work is estimated to be a maximum of$9,900 at our current hourly fee schedule. Very truly yours, George C. Rau, P.E. President Attachment: Task-Hour Breakdown Schedule of Fees-Table 33 3 C fO0 N 000 N r T f1j CO H (A fo fo (A to fo fo f9 w w fo w fo fo fo fo fo 69 fo 69 fo w fo 69 M fo fo H m C O � m r o v co II � J O y N O O O O � N C7 a m Q o 0c � LO m m m m m 0 43) C04fo v o'i CO to cn r) D m �a m m E p y a fo w 69 t9 f9 fo f9 u9 fo V9 W. f9 fo f9 fo fo f9 fo to fo fo to f9 Fc- Ic- 10- H U' co~ 2 CN f0 er N 0 G i- N y ,C � a 'C N 1 L p O O O In a co r Mw r 0 C O EA 69 fo fo 49 64 !A fA 49 H fo fo 69 69 w fo f9 49 fo f9 W fo fo gym, � � y O L � N O M M o0 0 O 0 y0 i O i i i o _ 93 ° 0 v G1 Y !E N N .G y Y9 fo 49 to fo W fo H Go 69 fo f9 fin, f9 to 69 fo W fo fA H 9) fo O IT f Oa d N N O N V C1 a 9 °� v U- u y �, m 0 O O C C lLL IN L6 LC) CL N C m o O a0 co Q' L) U m a 8 c yv i= M0: m 69 v96% EA f9 w to f9 t9 f960.41 69 fA w 69 f9 &W f9 f9 to to u9 s9 m .. CLLJ uo � o t v M t M E y u� o u� m m W8 m m u� uo o n n foo Cl) n o 0 0 0 00 3E w Ec u� m � r- � c� m o + z oNp O fl O 3 yV r7 01 sy a o ¢ y w d a. O d m n c La y c ami zc o a �Sa` .mc. y `-'L y � y m y La �U m m m E- E g o W a H c m E cai' m c LU Z w mea � 0 UJ (L °o % fmn � d _ � g � SILL w m 7.- cm c3U y � ' a "? � � LLj g Z N H ami ° y 2 m =° E d a II o = m ca = r a o w m tUi) ai ° v m m FY m o a€i m 12 d � IL marnUc9U �ZcnWC71- aQF- > � JUam0 � m a SCHEDULE OF FEES - Table 33 Effective September 1,2015 Administration $60.00/hr. Associate Civil Engineer $140.00/hr. Chief of Party (PW) $135.00/hr. Construction Inspector/QSP Specialist(PW) $128.00/hr. Expert Witness/Testimony at Trial, Deposition, Arbitration $250.00/hr. (4 hour minimum) GPS Operator $135.00/hr. Instrument Operator(PW) $118.00/hr. Materials Tester including PW(nuclear gauge charge may apply) $116.00/hr. Outside Services Cost+ 15% Project Coordinator $70.00/hr. Registered Civil Engineer Principal $175.00/hr. Rodman (PW) $115.00/hr. Sr. Staff Engineer/Surveyor/QSP Specialist $115.00/hr. Survey Manager $135.00/hr. Technician I $38.00/hr. Technician II $72.00/hr. Vehicle Use (subject to change due to Internal Revenue Standards) $0.54/mile Laboratory Tests: Texture Analysis (Mendocino County Health Dept.) $45.00/ea. Unit Dry Weight-Moisture Content(Tube Sample or Ped) $35.00/ea. Sand Equivalent(CTM 217) $110.00/ea. Sieve Analysis-Coarse Aggregates (CTM 202) $50.00/ea. Sieve Analysis- Fine Aggregate (CTM 202) $90.00/ea. Maximum Dry Density (ASTM D1557) 4" Mold $205.00/ea. 6" Mold $235.00/ea. Maximum Dry Density (ASTM D698) $190.00/ea. Maximum Wet Density (CTM 216) $235.00/ea. Unit Weight of Aggregate (CTM 212) Method A or B $55.00/ea. Method C $39.00/ea. Crushed Particle Analysis (CTM 205) $67.00/ea. Cleanness Value (CTM 227) $67.00/ea. Durability Index-Coarse (CTM 229) $140.00/ea. Durability Index- Fine (CTM 229) $220.00/ea, Specific Gravity &Absorption (CTM 206) $90.00/ea. Plasticity Index(ASTM 4318) $162.00/ea. Expansion Index(UBC Standard 18-2) $190.00/ea. Unit Weight of Fresh Concrete (CTM 518) Technician Hourly Rate Ball Penetration (CTM 533) Technician Hourly Rate Air Content of Fresh Concrete (CTM 504) Technician Hourly Rate Sample Preparation Times Technician Hourly Rate Special Equipment Rates: Supplemental Billings: All Terrain Vehicle $45.00/per day* Engineering Copies 24 X 36 $3.00/sheet Computer Aided Design Software $10.00/hr. Engineering Copies 18 X 26 $2.00/sheet GPS Equipment $600/per day* Engineering Copies 11 X 17 $1.00/sheet Nuclear Gauge $100/per day* Steel Fence Posts $8.00/each Robotic Total Station $200/per day* Survey Monuments $3.00/each "One Day Minimum Charge Invoices will be rendered monthly, as a final or progress billing, whichever applies, and are payable upon receipt, unless a mutually acceptable payment schedule has been established. Late Fees at a rate of 1 %% per month, computed and charged monthly on the entire unpaid balances, shall be payable on accounts not paid within 30 days from invoice date.