CITY OF UKIAH
AMENDMENT NO. 1
TO AGREEMENT FOR PROFESSIONAL CONSULTING SERVICES
DATED MAY 9, 2016
TERMS AND CONDITIONS
All terms and conditions of the Agreement for Professional Consulting Services dated
May 9, 2016 shall remain in force and effect except as modified by this first amendment.
AUTHORIZATION
Upon execution of this amendment, service provider is authorized to provide the service
described under the Scope of Additional Work identified in this Amendment No. 1.
SCOPE OF ADDITIONAL WORK
Work authorized by this amendment shall include that work described in the
July 19, 2016 letter proposal from SHN Consulting Engineers & Geologists, Inc. A copy of
said letter is included in this first amendment.
COMPENSATION
Compensation for the performance of the additional work shall be made on a time and
expense basis at Consultant's customary fees. Expenses shall not exceed a maximum
total cost of $32,380.
SHN CONSULTING ENGINEERS
AND GEOLOGISTS, INC.
BY:
THOMAS M. HERMAN
PRINCIPAL
9/, ill �,-
DATE
Amendment No. 1 to Agreement for
Professional Consulting Services
CITY OF UKIAH
SA4G,OMO
CI' MAN ER
DATE
CONSULTING ENGINEERS & GEOLOGISTS, INC.
335 S. Main St.- Willits, CA 95490-3977. 707/459-4518 • FAX: 707/459-1884 • willitsinfo@shn-engr.com
Reference: 415080.200
July 19, 2016
Richard Seanor Via email: rseanor@cityofukiah.com
Deputy Public Works Director
City of Ukiah
300 Seminary Avenue
Ukiah, CA 95482
Subject: Engineering Services Contract Amendment - North State Street
Intersection and Storm Drainage Improvements -Low Gap Road/Brush
Street
Dear Mr. Seanor :
Under your direction, we submitted an engineering services proposal on April 27, 2016 for the
preparation of plans for new curb returns on the northwest and northeast corners of North State
Street and Low Gap Road/ Brush Street together for the repair of the collapsed storm drain at the
northwest corner of North State Street and Low Gap Road. When SHN Consulting Engineers &
Geologists, Inc. (SHN) started the original discussions regarding this work, the City of Ukiah was
only considering the improvements to the northwest corner curb return and repair of the collapse
sidewalk to be constructed as a Contractor Change Order for extra work. We were directed by Tim
Eriksen during a meeting to put the project on hold temporarily because of complications with the
Contractor working on the Sewer Main Improvements project. We were later directed by yourself
to move forward with preparing an estimate for engineering services and to include both the
northeast and northwest corner curb returns and repair the of the collapsed storm drain at the
northwest corner. It was the hope that this work could be added to the North State Sewer Project
Improvements by Contractor Change Order. We provided a proposed cost of $9,780 for the
preparation of engineering plans for this work with a budget to facilitate a quick, internal approval
so the engineering work could be started in an effort to provide plans to the Contractor for a
Change Order budget prior to the finishing of the existing project. We endeavored to perform these
services as quickly as possible. We understood this effort would include the relocation of two
traffic signal poles and the associated pull boxes and electrical conduits in the sidewalk.
Subsequent to the authorization of the original work order, the following elements were added to
the Scope of Work at different times, and were thus included on the plans per the direction of
various City of Ukiah personnel:
While SHN was in the process of preparing plans, it was discovered the existing
storm drain in North State Street was in grade conflict with the new sewer main and
had to be compromised to construct the new sewer main. It was also noted that the
existing CMP storm drain was rusted along the spring line and was in need of
replacement. It was then confirmed that the storm drain across North State Street
needed to be replaced. We thus included the new storm drain improvement to our
plans.
\ \Willits\ projects\2015\415080-CoUNStateSew•\200-LowGapRdlntx\ PUBS\agr\20160719-ContractamendRevl.doc
Richard Seanor
Contract Amendment - Low Gap Road & North State Street Drainage and Curb Return
Improvements
July 19, 2016
Page 2
• After I requested the right of way documents that were prepared in 1995, we
discussed the realignment of the sidewalk and driveway on Quest Mart property on
Brush Street.
• In the process of realigning the sidewalk, it was determined that the Quest Mart sign
pole would have to be moved thus a footing design was calculated.
• While SHN was preparing the new curb alignment, we were directed by yourself to
replace the existing traffic light pole on the northeast corner with one large enough
to provide a left turn arrow module on the mast arm over North State Street. Also,
left turn arrow signal modules were to be added on all of the appropriate signal
poles together with a Gridsmart camera traffic signal control system.
• We later had discussions about including the rehabilitation of Brush Street where we
recommended providing a new structural section as opposed to an overlay. Thus, a
new structural section and limits of the rehabilitation work were prepared.
• During a Sewer Project walk with Tim Eriksen and Jarod Thiele, we were directed to
add pavement rehabilitation for North State Street and Low Gap Road to the project
plans.
• Relative to reconstructing the structural section on Brush Street, we suggested that
the remaining section of CMP storm drain on Brush Street to the corner of Mazzoni
Street should be replaced as well so future digging in Brush Street to repair a rust
out storm drain would not necessary.
• Upon completing a 95% complete set of plans, we then prepared a Bid Schedule with
construction items and quantities for the preparation of a Bid by TGI. We have
since provided pdf plans to TGI and City of Ukiah for Bid Estimate and final review.
At this juncture, SHN would like to respectfully submit a request to the City of Ukiah for additional
compensation for the extra work that was performed relative to the above described elements that
were added to the completed plans. To date, our additional engineering services fees for the
preparation of the North State Street Intersection and Storm Drainage Improvement Plans are
$23,840.
On July 18, 2016, the City of Ukiah requested a fee for preparing Contract Documents and Technical
Specifications for the bidding of the North State Street Intersection and Storm Drain Improvements
at Low Gap/ Brush Street. SHN will prepare the Contract Documents and Technical Specifications
using base digital documents provided by the City of Ukiah for a fee of $8,540. We will provide the
City of Ukiah a digital copy of the Contract Documents together with digital copies of the project
plans for submittal to Builders Exchange Plan rooms. We will also provide three (3) hard copies of
the Contract Documents and full size Project Plans signed by a California Registered Civil Engineer.
The proposed amendment to the Engineering Services Contract is $23,840 for design services
completed, plus an additional fee of $8,540 for the finalization of the project plans and the
preparation of Contract Documents and Technical Specifications, for a total contract increase of
$32,380.
\ \Willits\ projects\ 2015\415080-CoUNStateSew\200-LowGapRdIntx\PUBS\a0gr\20160719-ContractamendRevl.doc
Richard Seanor
Contract Amendment - Low Gap Road & North State Street Drainage and Curb Return
Improvements
July 19, 2016
Page 3
Please review this request and call or email us at your earliest convenience to discuss the future
direction for finalizing this work and the adjustment to our engineering services contract fees. We
appreciate the opportunity to work with the City of Ukiah on this project and we are looking
forward to providing our services on future projects.
Sincerely,
SHN Consulting Engineers & Geologists, Inc.
Thomas A. Hunt, PE
Senior Civil Engineer
Project Manager